Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20081
SLAC National Accelerator Laboratory
Undulator Controls Module StatusFAC – November 2008
SchedulesSchedules
Scope of Undulator Controls ModuleScope of Undulator Controls Module
Installation StatusInstallation StatusMechanical interfaceMechanical interface
Controls hardwareControls hardware
Software infrastructureSoftware infrastructure
UtilitiesUtilities
UCM EPICS ModuleUCM EPICS Module
Checkout StatusCheckout Status
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20082
SLAC National Accelerator Laboratory
Re-establishRe-establishee to SL2 to SL2
LTU/LTU/UndUnd
Comm. Comm.
Firs
t Li
ght
in
Firs
t Li
ght
in
FEE
FEE
Firs
t Li
ght
in F
EH
Firs
t Li
ght
in F
EH
NEH Ops & NEH Ops & CommissioningCommissioning
JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ AAAA SSSS DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJ AAAA SSSS OOOO NNNN DDDD JJJJ FFFF MMMM AAAA MMMM JJJJ JJJJOONNAA
2008 2009 20102008 2009 2010 2008 2009 20102008 2009 2010DownDownPPS
PPS
Linac/BC2 Linac/BC2 CommissioninCommissionin
g g FEL/FEEFEL/FEECommissioniCommissioni
ng ng Nov. 3, 2008Nov. 3, 2008
Inst
all
Inst
all U
ndula
tors
Undula
tors
MMDD
LCLSLCLS Installation and Commissioning Time-Line Installation and Commissioning Time-Line
LTU
/Und
In
stall
LTU
/Und
In
stall
PEP-I
I ru
n
PEP-I
I ru
n
ends
ends
FEE/N
EH
In
stall
FEE/N
EH
In
stall
PPS C
ert
. LT
U/D
um
pPPS C
ert
. LT
U/D
um
p
CD-4
CD-4
(7
/31
/201
0)
(7/3
1/2
01
0)
X-R
ays
in N
EH
X-R
ays
in N
EH
no
wn
ow
DDDown?Down?
FEH
Hutc
h B
OFE
H H
utc
h B
O
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20083
SLAC National Accelerator Laboratory
Schedule
Stuart Metcalfe’s ScheduleStuart Metcalfe’s Schedule
Undulator Controls module must be ready for the commissioning of the Undulator Controls module must be ready for the commissioning of the LTU-UND complex, ~December 15, 2008LTU-UND complex, ~December 15, 2008
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20084
SLAC National Accelerator Laboratory
Undulator Controls Module Scope
Beam Finder Wire actuationBeam Finder Wire actuation
Girder motion, five camsGirder motion, five cams
Undulator motion, two translation stagesUndulator motion, two translation stages
Temperature monitoring, twelve RTDs.Temperature monitoring, twelve RTDs.
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20085
SLAC National Accelerator Laboratory
Mechanical StatusAll 33 girders in placeAll 33 girders in place
Translation stages fiducialized at CMM labTranslation stages fiducialized at CMM lab
Translation stages tested for proper motionTranslation stages tested for proper motion
Undulator roll-in test performed at CMM labUndulator roll-in test performed at CMM lab
Girder linear pots installation almost completeGirder linear pots installation almost completeLinear pot brackets, modification, installationLinear pot brackets, modification, installation
Linear pot girder interface plates, fabrication, installationLinear pot girder interface plates, fabrication, installation
Linear pot range adjustmentsLinear pot range adjustments
Linear pot cap installationLinear pot cap installation
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20086
SLAC National Accelerator Laboratory
Controls Hardware Status
All controls hardware has been delivered by All controls hardware has been delivered by Argonne, and has been installed at SLACArgonne, and has been installed at SLAC
Mini rackMini rackVME crate and modulesVME crate and modules
Undulator Controls Module InterfaceUndulator Controls Module Interface
Undulator Module Power and InterlockUndulator Module Power and Interlock
Interconnect cablesInterconnect cables
Electronics Interface AssemblyElectronics Interface Assembly
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20087
SLAC National Accelerator Laboratory
Software Infrastructure Status
RTEMSRTEMSRTEMS 4.9 running on the MVME3100 for the RTEMS 4.9 running on the MVME3100 for the last couple of monthslast couple of monthsRTEMS 4.9 running on productionRTEMS 4.9 running on production
EPICSEPICS3.14.10 built again RTEMS 4.9, and running in 3.14.10 built again RTEMS 4.9, and running in productionproductionAll necessary EPICS modules built and running All necessary EPICS modules built and running in productionin production
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20088
SLAC National Accelerator Laboratory
Utilities Status
PowerPower120V AC online120V AC online
NetworkNetworkAll IOC’s onlineAll IOC’s online
Compressed airCompressed airInstallation in progressInstallation in progress
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/20089
SLAC National Accelerator Laboratory
UCM App Status
Version 1.0 delivered by Argonne in JulyVersion 1.0 delivered by Argonne in JulyRunning in productionRunning in production
Displays integrated into lclshomeDisplays integrated into lclshome
Argonne currently working on some Argonne currently working on some upgradesupgrades
Arturo AlarconArturo Alarcon
Undulator Controls Module StatusUndulator Controls Module Status [email protected]@slac.stanford.edu
11/12/200811/12/200810
SLAC National Accelerator Laboratory
Checkout Status
Preliminary checkout completePreliminary checkout completePurpose is to discover basic problems quicklyPurpose is to discover basic problems quickly
Detailed checkout in progressDetailed checkout in progressProcedureProcedure
Calibration in progressCalibration in progressProcedureProcedure
Physicists checkout planPhysicists checkout plan