WKMC Architects, Inc. www.WKMCarchitects.com
Aransas County ISD October 26, 2018
PROJECT MANUAL
WHITE GYMNASIUM REBUILD 18022
Volume 1 of 2
Set No.
in association with Ferrell/Brown & Associates, Inc.
10/26/2018
10/26/2018
10/26/2018
10/26/2018
10/26/2018
ARANSAS COUNTY INDEPENDENT
SCHOOL DISTRICT
White Gymnasium Rebuild
Rockport, Texas
October 26, 2018
PROJECT ARCHITECT PLANNING/PROGRAMMING
WKMC Architects, Inc. Ferrell/Brown & Associates, Inc.
P. O. Box 2941 700 Everhart Road, #C11
Corpus Christi, Texas 78403 Corpus Christi, Texas 78411
(361) 887-6696 (361) 854-1967
CIVIL ENGINEERING/SURVEYING LANDSCAPE ARCHITECT
J. Schwarz & Associates, Inc. Gignac Landscape Architecture
P. O. Box 60733 3833 S. Staples Street, Suite N-119
Corpus Christi, Texas 78466 Corpus Christi, Texas 78411
(361) 906-2430 (361) 853-0795
STRUCTURAL ENGINEERING CONSTRUCTION MANAGER-
Wilkerson & Sanders, Inc. AT-RISK
314 Paloma Street Teal Construction Company
Corpus Christi, Texas 78412 5110 Interstate Highway 37
(361) 853-2071 Corpus Christi, Texas 78407
(361) 882-4825
MEP ENGINEERING CONSULTANT
DBR Engineering Consultants
921 N. Chaparral Street, Suite 211
Corpus Christi, Texas 78401
(361) 888-5797
WKMC Project No. 18022
VOLUME 1 OF 2
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 1 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
Aransas County ISD White Gymnasium Rebuild
Project Manual Table of Contents – Volume 1 of 2
DOCUMENT
ID NO. DOCUMENT TITLE
NO. OF
PAGES
Project Title / Architect Seal Page 1
Project Manual Table of Contents 7
INTRODUCTORY INFORMATION
NB Notice to Bidders 2
IB Instructions to Bidders 3
GC General Conditions for Construction 56
List of Drawings 3
Code Analysis – 2012 International Building Code 17
Geotechnical Report 26
COMcheck – Envelope Compliance 3
COMcheck – Mechanical Compliance 3
COMcheck – Interior Lighting Compliance 8
CONTRACTING REQUIREMENTS
Payment Bond 2
Performance Bond 2
Tax Information 1
Prevailing Wage Rates 7
Contractor’s Release and Waiver of Lien 1
Contractor’s Lead-Free Affidavit 1
Contractor’s Asbestos-Free Affidavit 1
Contactor’s Non-Use of Urea-Formaldehyde Affidavit 1
Subcontractor’s/Material Supplier’s Affidavit 1
Contractor’s Affidavit for Final Completion 1
DIVISION 01 – GENERAL REQUIREMENTS
01010 Summary of Work 1
01015 Construction Phasing and Sequencing 2
01017 Permitting 1
City of Rockport Permitting Forms 13
01020 Allowances 3
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 2 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 01 – GENERAL REQUIREMENTS
01027 Application for Payment 4
01030 Alternates 2
01035 Modification Procedures 3
01040 Coordination 4
01045 Cutting and Patching 3
01200 Project Meetings 4
01300 Submittals 6
01400 Quality Control 3
01410 Testing Laboratory Services 17
01450 Windstorm Construction Requirements 2
Windstorm Application Help Form 8
WPI-1: Application for Windstorm Building Inspection 3
WPI-2: Building Inspection 2
WPI-2: Building Construction Compliance 2
WPI-2A: Building Construction Compliance 2
WPI-2D: Building Design 2
WPI-2D: Building Design Compliance 2
01500 Construction Facilities and Temporary Controls 7
01520 Campus Security Measures 2
01525 Security Background Check 2
01600 Materials and Equipment 3
01631 Substitutions 3
01700 Contract Closeout 5
01710 Clean Up 1
01740 Warranties 3
01781 Project Record Documents 3
01782 Operation and Maintenance Data 6
01785 Applicator Warranty 3
DIVISION 02 – EXISTING CONDITIONS
02 41 13.13 Removing Existing Pavement and Structures 2
DIVISION 03 – CONCRETE
03 10 00 Concrete Forming and Accessories (Structural) 5
03 20 00 Concrete Reinforcement (Structural) 4
03 12 16 Epoxy Related Work 6
03 30 00 Cast-In-Place Concrete 10
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 3 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 03 – CONCRETE
03 35 00 Concrete Floor Finishing 3
DIVISION 04 – MASONRY
04 29 00 Reinforced Concrete Masonry Units 6
04 81 00 Unit Masonry Assemblies 22
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 4
05 21 00 Steel Joist Framing 4
05 31 00 Steel Decking 3
05 44 00 Cold-Formed Metal Framing 9
05 50 00 Metal Fabrications 8
05 52 10 Pipe and Tube Railings 9
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 8
06 20 00 Finish Carpentry 5
06 40 23 Interior Architectural Woodwork 9
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 19 00 Water Repellants 4
07 21 00 Building (Thermanl) Insulation 5
07 22 00 Tapered Roof Insulation System 5
07 26 13 Vapor Barrier 4
07 27 26 Fluid-Applied Weather Barrier 8
07 54 00 Thermoplastic Membrane Roofing (PVC) 16
07 62 00 Sheet Metal Flashing and Trim 7
07 72 00 Roof Accessories 6
07 92 00 Joint Sealants 4
DIVISION 08 – OPENINGS
08 11 00 Steel Doors and Frames Volume 2
08 14 16 Flush Wood Doors Volume 2
08 33 23 Overhead Coiling Counter Doors Volume 2
08 33 44a Overhead Rolling Service Fire Doors Volume 2
08 43 13a Aluminum Entrances and Storefronts (Exterior Systems) Volume 2
08 43 13b Aluminum Storefronts (Interior Systems) Volume 2
08 51 13 Aluminum Windows Volume 2
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 4 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 08 – OPENINGS
08 71 00 Door Hardware [by Addendum] Volume 2
08 71 13 Automatic Door Operators Volume 2
08 80 00 Glazing Volume 2
08 90 00 Louvers and Vents Volume 2
DIVISION 09 – FINISHES
09 21 13 Portland Cement Plaster Volume 2
09 21 16 Gypsum Board Assemblies Volume 2
09 30 13 Porcelain Ceramic tile Volume 2
09 51 10 Lapendary Panels Volume 2
09 51 13 Acoustical Panel Ceilings and Clouds Volume 2
09 64 55 Resilient Wood Flooring Systems Volume 2
09 65 15 Resilient Tile Flooring Volume 2
09 84 14 Acoustical Wall Panels Volume 2
09 90 00 Painting Volume 2
09 97 00 Special Coatings Volume 2
DIVISION 10 – SPECIALTIES
10 21 13 Toilet Compartments Volume 2
10 28 00 Toilet and Bath Accessories Volume 2
10 28 26.01 Electric Hand Dryers Volume 2
10 40 13 Signs Volume 2
10 44 43 Fire Extinguishers, Cabinets and Accessories Volume 2
10 73 10 Protective Covers Volume 2
DIVISION 11 – EQUIPMENT
11 40 00 Food Service Equipment Volume 2
11 52 16 Projection Screens Volume 2
11 52 23 Retractable Projector Mounts Volume 2
11 66 00 Athletic Equipment Volume 2
DIVISION 12 – FURNISHINGS
12 36 00 Agglomerate Stone Countertops Volume 2
12 66 13 Telescoping Gymnasium Seating Volume 2
DIVISION 13 – SPECIAL CONSTRUCTION
Not Used
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 5 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 14 – CONVEYING EQUIPMENT
Not Used
DIVISION 21 – FIRE SUPPRESSION
Not Used
DIVISION 22 – PLUMBING
22 02 00 Basic Materials and Methods Volume 2
22 05 16 Expansion Fittings and Loops for Plumbing Piping Volume 2
22 05 29 Hangers and Supports for Plumbing Piping and Equipment Volume 2
22 05 48 Vibration and Seismic Controls for Plumbing Piping Volume 2
22 05 53 Identification for Plumbing Piping and Equipment Volume 2
22 07 19 Plumbing Piping Insulation Volume 2
22 10 00 Plumbing Piping Volume 2
22 11 19 Plumbing Specialties Volume 2
22 11 21 Natural Gas Piping Systems Volume 2
22 30 00 Plumbing Equipment Volume 2
22 40 00 Plumbing Fixtures Volume 2
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
23 02 00 Basic Materials and Methods Volume 2
23 05 29 Hangers and Supports for Piping and Equipment HVAC Volume 2
23 05 93 Testing, Adjusting and Balancing Volume 2
23 07 13 Duct Insulation Volume 2
23 07 19 HVAC Piping Insulation Volume 2
23 09 63 Energy Managements and Control System Volume 2
23 23 00 Refrigerant Piping Volume 2
23 31 13 Metal Ductwork Volume 2
23 31 14 Fabric Air Dispersion System Volume 2
23 33 00 Ductwork Accessories Volume 2
23 34 00 HVAC Fans Volume 2
23 37 13 Air Distribution Devices Volume 2
23 63 13 Air Cooled Condensing Units Volume 2
23 81 33 Rooftop Heating and Cooling Units: Electric Cooling – Gas Heat Volume 2
23 82 19 Fan Coil Units Volume 2
DIVISION 26 – ELECTRICAL
26 02 00 Basic Materials and Methods Volume 2
26 05 19 Wire, Cable, and Related Materials Volume 2
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 6 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 26 – ELECTRICAL
26 05 26 Grounding Volume 2
26 05 33 Raceways Volume 2
26 05 73 Short-Circuit, Coordination Study, Arc Flash Hazard Analysis Volume 2
26 06 34 Low-Voltage Raceway System Volume 2
26 08 00 Commissioning of Electrical Systems Volume 2
26 21 13 Low-Voltage Underground Electrical Power Systems Volume 2
26 22 22 Low-Voltage Harmonic Distribution Transformers Volume 2
26 24 16 Panelboards Volume 2
26 27 26 Wiring Devices Volume 2
26 28 10 Class J Fuses Volume 2
26 28 16 Safety and Disconnect Switches Volume 2
26 29 26 Miscellaneous Electrical Controls and Wiring Volume 2
26 43 13.13 Surge Protection Devices (SPD) – Standard Interrupting Volume 2
26 51 00.13 Lighting Fixtures – Light Emitting Diode (LED) Volume 2
DIVISION 27 – COMMUNICATIONS
Not Used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 01 Fire Alarm and Smoke Detection System with Voice Evacuation Volume 2
DIVISION 31 – EARTHWORK
31 00 00 Earthwork Volume 2
31 11 00 Clearing and Grubbing Volume 2
31 22 00 Site Grading Volume 2
31 23 16 Roadway Excavation Volume 2
31 23 16.10 Trench Safety Volume 2
31 23 16.13 Excavation and Backfill for Utilities Volume 2
31 23 16.16 Structural Excavation and Backfill Volume 2
31 23 23.15 Backfill Sand Volume 2
31 31 16 Termite Control Volume 2
31 41 33 Excavation Safety Volume 2
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 17 Pavement Repair Volume 2
32 12 13.19 Prime Coat Volume 2
32 12 16.16 Asphaltic Concrete Pavement Volume 2
32 16 13.13 Concrete Curbs and Gutters and Headers Volume 2
PROJECT MANUAL TABLE OF CONTENTS VOLUME 1: Page 7 of 7
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 16 23 Concrete Sidewalks Volume 2
32 84 23 Underground Sprinklers Volume 2
32 90 01 Common Planting Volume 2
32 91 13 Soil Preparation Volume 2
32 92 23 Sodding Volume 2
32 93 00 Plants Volume 2
DIVISION 33 – UTILITIES
33 05 18 Pressure Pipe Installation Volume 2
33 05 19 Pipe Restraint System Volume 2
33 08 10.10 Hydrotesting Volume 2
33 11 13.10 PVC Pipe Volume 2
33 11 13.20 Ductile Iron Pipe and Fittings Volume 2
33 12 50 Polyethylene Pipe Wrap Volume 2
33 13 00 Disinfection of Waterlines Volume 2
END OF TABLE OF CONTENTS
NOTICE TO BIDDERS Page 1 of 2
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
NOTICE TO BIDDERS
TO: Subcontractors, Suppliers and Materialmen
FROM: Aransas County Independent School District
619 North Live Oak Street
Rockport, Texas 78382
DATE: October 1, 2018
The Aransas County Independent School District, (hereafter sometimes called the “District” or the “Owner”)
is soliciting Subcontractor Proposals for the “White Gymnasium Rebuild” Project located in Rockport, Texas.
The general construction, mechanical, electrical work and alternates shall be performed in strict conformity with
the Contract Documents, including the Drawings and Specifications.
NOTICE TO BIDDERS: A PRE-PROPOSAL Conference will be held at the ACISD Administration
Building, 619 N. Live Oak Street; Rockport, Texas 78382 on Wednesday, November 7, 2018 at 11:00 am,
local time. The site will be available for review and tour immediately following the pre-bid conference. All
Sub-Contractors, Suppliers and Materialmen are invited to attend and ask questions about the Proposal and the
Project. Attendance is not mandatory.
One (1) copy of the Cost Proposal will be accepted by the Construction Manager-at-Risk, Teal Construction –
Attention Michael Miller: 5110 IH 37; Corpus Christi, Texas 78407; no later than 2:00 pm, local time on
Thursday, November 15, 2018. All Proposals shall be submitted in a sealed envelope and clearly marked:
Aransas County ISD
WHITE GYMNASIUM REBUILD
The Sealed Cost Proposals for Sub-Contractors will be received by the Construction-at-Risk Manager
(Teal) until 2:00 pm, local time, on Thursday, November 15, 2018.
OBTAINING DOCUMENTS:
Electronic (PDF) copies of the Contract Documents may be obtained from the Construction Manager-at-Risk:
Teal Construction Company in accordance with the Instructions to Bidders.
Drawings and Specifications may be purchased through ARC or printed by Bidders from the electronic PDF files.
Digital (PDF) copies of Drawings and Specifications will forwarded to and may be examined through the
following planrooms:
Associated General Contractors Associated General Contractors
518 S. Enterprize Parkway 10806 Gulfdale
Corpus Christi, Texas 78405 San Antonio, Texas 78216
Associated Builders & Contractors Associated Builders & Contractors
7433 Leopard Street 116 Jason Plaza
Corpus Christi, Texas 78409 Victoria, Texas 77901
NOTICE TO BIDDERS Page 2 of 2
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
Builder’s Exchange
4047 Naco Perrin
San Antonio, Texas
INTERPRETATION OF BIDS:
In the event of a difference in written words and figures in the Bid, the amount in written words shall govern.
The Owner reserves the right to reject any and all Proposals and to waive any formality in bidding.
Throughout the entire course of the Work, the Contractor will maintain a qualified Superintendent or foreman at
the project site at least 40 hours per week, every day, Monday through Friday, who will have full authority to
act for the company represented. His responsibilities will include keeping up to date as-built drawings,
notifying the Architect of any on-site problems or conflicts, receiving and unloading any material deliveries at
the site. A single individual will maintain these duties throughout the course of the work, unless the Architect
and Owner are previously notified.
METHOD OF AWARD:
The Owner reserves the right to reject any and all bids, to waive any and/or informalities and to disregard all
nonconforming, non-responsive or conditional bids.
The Owner intends to execute a contract on a "Best Value Basis", based upon the Owner's available budget for
this project. All of the bids will be evaluated for each individual combination of base bid items plus additive
alternate items to determine the "Best Value" bidder, considering the available budget. If the lowest
combination base bid only exceeds the available budget, the Owner may reject any and/or all bids.
Bidders are advised that Aransas County Independent School District reserves the right to add additional
minor repair, remediation and remodeling projects to the scope of work during the course of the building
program. Such work may or may not affect the specific work identified in the plans and specifications available
at the time of bid submission. Any additional work will be added by Change Order mutually acceptable to the
District and the Contractor.
END OF SECTION
INSTRUCTIONS TO BIDDERS Page 1 of 3
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
INSTRUCTIONS TO BIDDERS
1.1 OWNER
Whenever the term “Owner” or the “District” is used in the Contract Documents, it shall refer to the
Aransas County Independent School District; 619 N. Live Oak Street, Rockport, Texas 78393.
1.2 PROJECT ARCHITECT
Whenever the term “Architect/Engineer” or “Project Architect” is used in the Contract Documents, it
shall refer to WKMC Architects, Inc. 909 S. Tancahua St., Corpus Christi, Texas 78403. Telephone
number (361) 887-6696, Fax number (361) 886-6697.
1.3 CONSTRUCTION MANAGER-AT-RISK
Whenever the term “Construction Manager-at-Risk” is used in the Contract Documents, it shall refer to
Teal Construction Company, 5110 IH 37, Corpus Christi, Texas 78407. Telephone no. (361) 882-4825.
1.4 OBTAINING DOCUMENTS AND ELECTRONIC COPIES OF BID DOCUMENTS
Documents may be reproduced at ARC-Ridgway’s at the expense of the user.
Bidders may receive digital copies of the bid documents directly from the Construction Manager-at-
Risk, Teal Construction Company.
1.5 PLAN ROOMS
The drawings and specifications will be on file and may be examined at the following plan rooms:
Associated General Contractors Associated General Contractors
518 S. Enterprise Pkwy. 10806 Gulfdale
Corpus Christi, Texas 78405 San Antonio, Texas 78216-3607
Associated Builders & Contractors Builder’s Exchange
1408 N. Ben Jordan Street 4047 Naco Perrin
Victoria, Texas 77901 San Antonio, Texas 78217
Associated Builders & Contractors McGraw-Hill Dodge
7433 Leopard 2122 Mannix Dr.
Corpus Christi, Texas 78409 San Antonio, Texas 78217
1.6 BIDDING DOCUMENTS
Bidding documents include the Instructions to Bidders, the Notice to Bidders and proposed Contract
Documents, including any Addenda issued prior to receipt of bids.
INSTRUCTIONS TO BIDDERS Page 2 of 3
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
1.7 VISIT TO SITE
Each bidder by making his bid represents that he has visited the project site prior to submitting his bid
for the Work and has familiarized himself with the existing conditions and requirements under which
the Work is to be performed. Sub-Contractors will not be allowed extra payment for conditions which
can be determined by examining the site. Failure to inspect the site does not relieve him of the
responsibility of knowledge of the nature of the site and conditions which work will be performed.
1.8 CLARIFICATION OF BIDDERS’ QUESTIONS
Bidders must submit questions concerning the Contract Documents to the Project Architect in writing.
Clarification will be made to the inquiring Bidder by Addendum. Questions of bidders may be
discussed by telephone as a convenience to the bidder but are not binding unless confirmed by
Addendum issued by the Project Architect to all Bidders.
1.9 WITHDRAWAL OF BIDS
Proposals may be withdrawn by written or telegraphic request received by the Construction Manager-
at-Risk prior to the time fixed for opening. Two (2) signed copies of any such withdrawal notice
should be forwarded immediately to the Owner and Construction Manager-at-Risk in a sealed opaque
envelope properly marked to identify the contents.
1.10 TERMINATION OF BID
The submission of a bid by a Contractor or Supplier shall constitute an offer by the Contractor or
Supplier to enter into contract with the Owner to provide the work describe herein, such offer being
binding until forty-five (45) days after bid opening.
1.11 BONDS REQURIED
The Construction Manager-at-Risk will provide 100% payment bond and 100% performance bond as
part of base bid pricing for this contract.
1.12 WAGE RATES
All Contractors and Sub-contractors employed upon the work shall be required to conform to the
Labor Law of the State of Texas and the various Acts Amendatory and Supplementary thereto; and all
other laws, ordinances and legal requirements applicable thereto. Not less than the general prevailing
rate per diem wages must be paid to all laborers, workmen, and mechanics directly employed on the
work covered by this contract.
1.13 SALES TAX
The Owner is exempt from payment of the State of Texas sales tax on the purchase of materials which
are incorporated into this project. The Contractor will be required to provide a separated cost
breakdown of all labor and materials to meet any requirements of the State of Texas Comptroller’s
office for classification of this contract as a “separated contract”. The Owner will provide to the
Contractor an exemption certificate for exemption of state and local sales taxes. The Contractor will be
fully responsible for assurance of compliance with state sales tax laws. No additional payment will be
made by the Owner if any Contractor, Supplier or Sub-contractor fails to meet compliance standards.
INSTRUCTIONS TO BIDDERS Page 3 of 3
White Gymnasium Rebuild WKMC Architects, Inc. Project No. 18022
Aransas County Independent School District October 26, 2018
1.14 PRE-PROPOSAL CONFERENCE
See the Notice to Bidders for information on a Pre-Proposal Conference for Sub-contractors, Suppliers
and Materialmen. All Sub-Contractors, Suppliers and Materialmen are invited to attend and ask
questions about the requirements of the Project. Attendance is not mandatory but is highly
recommended.
1.15 VENUE
The venue for filing any liens, litigation or other legal documents for this contract shall be Aransas
County, Texas
END OF SECTION