LIBRARY
STUDIO HALL
WORKSPACEWORKSPACE
WORKSPACE
WORKSPACE WORKSPACE
AIRLOCK
MACHINE WORKSHOP
WORKSPACE
AMENITIES
AMENITIES
AMENITIES
AMENITIES
Masson Road
BuildingRedmond Barry
LARGE LECTURE THEATRE LIBRARY
B138B117B202
G29G24 G23
SPACEWORKSHOP BENCH
135
132
124
233
221 219
344
329
WORKSPACE
334
437
423
425WORKSPACE
429
STAIR 3
(EXTERNAL)ENTRY
FOYER
UFAD / MECH. PLENUM
02
4311
218
RL 65.500
500
900
1000
500
500
35°
950
450
133
000CR07
PLANTPLANTPLANTR06R05
500
900
1000
500
500
35°
950
450
A B C D E F G H9000300082507250300090007500
CCC
3502
BBB
3501
AAA
3500
L01 +48.50m
L02 +52.50m
L03 +56.50m
L04 +60.50m
L05 +64.50m
G01 +43.40m
G01 +42.65
G01 +41.30m
B01 +38.50m
B01 +37.20m
B01 +36.00m
B02 +34.68m
B02 - SSL +34.56m
PARAPET +65.50m
FCL +63.40m
1000
1100
2900
1100
2900
FCL +59.40m
1100
2900
FCL +55.40m
1100
2900
FCL +51.40m
B01 +37.50m
B01 +38.00m
980
4450
4000
4000
4000
4000
5100
4900
1300
2520
PARAPET +68.95m
PARAPET +69.93m
2242
Project No.
Drawing No.
FILENAME - $FILE$
Date Drwn Co-Ord Chck
Revision
Title
AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE
DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS
BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS
SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED
ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE
CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES.
Rev Amd DateRevision DescriptionIssue
Scale
THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE
+1 617 442 6232
Facsimile
+1 888 442 1417
Telephone
1920 Washington
Street No.2
Boston
Massachusetts
02118 USA [email protected]
NADAAA
0913
AR
Project
Client
Parkville Campus
University of Melbourne
Building and Planning
Faculty of Architecture
Tel : +61 3 8662 0400 www.johnwardlearchitects.com
ABN 83 006 814 268© 2012 John Wardle Architects
25 Rokeby Street, Collingwood, Victoria 3066 Australia
FOR CONSTRUCTION
General Notes
REFER ARCHITECTURAL DRAWINGS:
AR6550-AR6554SCREEN DETAILS
AR1552-AR1557SCREEN SETOUT
AR1512-AR1517PRECAST SETOUT
AR1502-AR1507FACADE SETOUT
- - -
3505 A
1:100 @ A0
1:200 @ A2
GENERAL ARRANGEMENT
SECTION F
Sept 2011
SG - 07.10.11PRELIMINARY DD01
SG -PRELIMINARY DD02 02.11.11
SG -DESIGN DEVELOPMENT ISSUE 22.12.1103
SG - 20.01.12DD UPDATE04
SG - 24.02.12FINAL DD ISSUE05
06 SG -25% CD ISSUE 20.04.12
06
6102
05
6102
03
6114
01
6204
02
6106
03
6204
02
6114
01
6114
05
6114
04
6114
SG - 01.06.1250% CD ISSUE07
SIM.
SG -08 08.06.1250% CD ISSUE - UPDATE
09 SG -75% CD ISSUE 13.07.12
10 SG 90% CD ISSUE - 10.08.12
09
3554
SG - 07.09.12100% CD - TENDER ISSUE11
02
6204
SIM.
06
6104
05
6104
SG - 21.03.13PRECAST REVIEW12
SG13 VALUE MANAGEMENT ISSUE 28.03.13
SGA ISSUED FOR CONSTRUCTION 10.01.14