April 2019 Monthly Report
Administrative Oversight Committee Citizens Oversight Advisory Committee Richard J. Llewellyn Jr., CAO Chair Adi Liberman, Chair Cecilia Cabello, Board of Public Works Francine Diamond Sharon Tso, Chief Legislative Analyst Mark Gold David Wright, Department of Water & Power Alina Bokde Elizabeth Crosson, Office of the Mayor Miguel Luna
Cynthia McClain-Hill Craig A. Perkins
M. Teresa Villegas
(Vermont Stormwater Capture & Green Street Phase I)
Proposition O – Clean Water Bond Program
PREPARED BY BUREAU OF ENGINEERING
PROP O CLEAN WATER BOND DIVISION
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 2
Distribution List Richard J. Llewellyn Jr., CAO Office of the City Administrative Officer (CAO) Kevin James, President Board of Public Works Sharon Tso, Chief Legislative Analyst Office of the Chief Legislative Analyst (CLA) David Wright, General Manager Department of Water and Power (DWP) Barbara Romero, Deputy Mayor Mayor’s Office Elizabeth Crosson Mayor’s Office Adi Liberman, Chair Citizens Oversight Advisory Committee Francine Diamond Citizens Oversight Advisory Committee Mark Gold Citizens Oversight Advisory Committee Alina Bokde Citizens Oversight Advisory Committee Miguel Luna Citizens Oversight Advisory Committee Cynthia McClain-Hill Citizens Oversight Advisory Committee Craig A. Perkins Citizens Oversight Advisory Committee M. Teresa Villegas Citizens Oversight Advisory Committee Cecilia Cabello, Vice-President Board of Public Works Michael R. Davis, President Pro-Tempore Board of Public Works Aura Garcia, Commissioner Board of Public Works Jessica M. Caloza, Commissioner Board of Public Works Gary Lee Moore, City Engineer Bureau of Engineering (BOE) John L. Reamer, Jr., Director Bureau of Contract Administration (BCA) Enrique C. Zaldivar, Director Bureau of Sanitation (BOS) Victoria Santiago, Director Board of Public Works, Office of Accounting Michael A. Shull, General Manager Department of Recreation & Parks (RAP) Kenneth R. Redd, Deputy City Engineer BOE Brian McCormick, Manager III BOS Edward Jordan, Assistant City Attorney City Attorney’s Office Laurie Rittenberg City Attorney’s Office David H. Hirano CAO Roy Cervantes CAO Salyna Cun CAO Rafael E. Prieto CLA David Pettijohn DWP Shahram Kharaghani BOS Christopher F. Johnson BOE Comments or suggestions regarding the Proposition O Monthly Report may be directed to Christopher F. Johnson, BOE Proposition O Implementation Program Manager, at 213-485-1165 or email at [email protected] This report is available for viewing online at: http://www.lacitypropo.org/
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 3
Section Page 1.0 Executive Summary 1.1 Program Summary 4 1.1.1 COAC, AOC, and Other
4
1.1.2 Key Issues 5 1.1.3 Proposition O Awards 5 1.1.4 Project Community Meetings Schedule 7 1.2 Bond Sales 8 1.3 Project Status Summary 9 1.3.1 Projects in Planning 9 1.3.2 COAC & AOC Project Funding Recommendations 10 1.3.2.1 COAC & AOC Project Recommendations 10 1.3.3 Total Project Budget Summary 11 1.3.4 Program Budget Summary 12 1.3.5 Projects in Implementation Funding Detail 13 2.0 Schedule 2.1 Project Schedules 15 2.2 Program Master Schedule 17 3.0 Budget 3.1 Budget vs. Actual Expenditure 18 4.0 Project Status 4.1 Project Status Reports 23 5.0 Appendix 5.1 Table of Catch Basin Retrofits Screen Covers and Inserts by Council Districts 37 5.2 Council District Map 38 5.3 Map of Proposition O Projects Approved for Implementation 39
TABLE OF CONTENTS
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 4
1.1 Program Summary
In November 2004, voters of the City of Los Angeles passed the Proposition O – Clean Water Bond, authorizing $500 million of general obligation bonds for projects to protect public health by cleaning up pollution in the City’s rivers, lakes, and beaches. The projects are intended to assist the City of Los Angeles in meeting Federal Clean Water Act requirements. Proposition O – Clean Water Bond will also fund improvements to protect water quality, provide flood protection, increase water conservation, provide habitat protection, and create open space.
This monthly progress report summarizes the status of activities and progress of the Proposition O – Clean Water Bond program for December 2018, which also includes the January 2019 AOC meeting.
1.1.1 Citizens Oversight Advisory Committee (COAC), Administrative Oversight Committee (AOC), and Other highlights
• City of Los Angeles Administrative Oversight Committee (AOC) approved the
following on January 31, 2019: Recommendations for AOC action, SUBJECT TO THE APPROVAL OF THE CITY COUNCIL:
Aliso Creek Limekiln Creek Restoration Project Budget Increase
1. Authorize an increase in the Aliso Creek Limekiln Creek Restoration Project (Project) total project budget by $5,200,000 from $10,940,089 to $16,140,089.
2. Authorize the transfer of $5,200,000 from the existing Program Budget Contingency to the Project Account.
3. Authorize the City Administrative Officer, in coordination with the Bureau of Engineering, to make technical corrections, as needed, to the recommendations in this correspondence.
Proposition O Master Schedule Update For 2018 1. Approve 10 modified project schedules, as shown in the Proposition O Master Schedule dated
June 2018.
2. Approve 3 added project schedules as shown in the Proposition O Master Schedule dated June 2018.
1.0 EXECUTIVE SUMMARY
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 5
1.1.2 Key Issues
• Los Angeles County Health Department Permit Compliance 1.1.3 Prop O Awards
• Elmer Avenue Green Street Project National Association of Clean Water Agencies 2011 Operations and Environmental Performance Award Institute for Sustainable Infrastructure Envision Platinum Award
• South Los Angeles Wetlands Park
Construction Management Association of America – Southern California Chapter 2013 Project Achievement Award – Parks less than $10M Institute for Sustainable Infrastructure Envision Platinum Award American Council of Engineering Companies 2014 Engineering Excellence Awards Competition National Recognition Award
American Academy of Environmental Engineers and Scientists (AAEES) 2014 Superior Achievement Award
• Echo Park Lake Rehabilitation Project
Engineering News Record - California 2013 California Best Projects (Southern California) – Water/Environment American Public Works Association – Southern California Chapter 2013 BEST Project Award - Drainage, Water and Wastewater American Society of Civil Engineers – Metro Los Angeles Branch 2013 Outstanding Public Civil Engineering Project – (Water) over $10M American Society of Civil Engineers – Los Angeles Section 2013 Outstanding Government Civil Engineering Project
California Water Environment Association - Los Angeles Basin Section 2013 Engineering Achievement Award
Southern California Development Forum 2013 Urban Design and Planning Award
National Association of Clean Water Agencies 2014 Operations and Environmental Performance Award
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 6
Prop O Awards cont’d
American Society of Civil Engineers - Region 9 2013 Outstanding Parks & Recreation Project American Academy of Environmental Engineers and Scientists 2014 Grand Prize for Environmental Sustainability Construction Management Association of America – Southern California Chapter 2014 Project Achievement Award – Public Works Project California Preservation Foundation 2014 California Preservation Design Award - Rehabilitation Category American Society of Civil Engineers - National 2015 Outstanding Civil Engineering Achievement Award Finalist California Stormwater Quality Association (CASQA) 2014 Outstanding Sustainable Stormwater BMP Project American Society of Landscape Architects - Southern California Chapter 2014 Quality of Life Design Award - Honor Award, Recreation and Parks
American Society of Landscape Architects - Southern California Chapter 2014 Quality of Life Design Award - Award of Excellence
• Harbor City Greenway/Machado Lake Phase 1 American Society of Civil Engineers – Metropolitan Los Angeles Branch 2015 Outstanding Environmental Engineering Project American Public Works Association - Southern California Chapter 2015 APWA BEST Project Award - Storm Water Quality
• Rory M. Shaw Wetlands Park
Institute for Sustainable Infrastructure Envision Platinum Award
• Santa Monica Bay Low Flow Diversion Upgrades American Public Works Association – Southern California Chapter 2013 BEST Project Award – Storm Water Quality
• Temescal Canyon Stormwater BMP Phase 1 American Society of Civil Engineers – Metropolitan Los Angeles Branch 2015 Outstanding Small Project
• Broadway Neighborhood Stormwater Greenway Project American Public Works Association – Southern California Chapter 2016 BEST Project Award - Storm Water Quality
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 7
Prop O Awards cont’d
• Machado Lake Ecosystem Rehabilitation Project American Public Works Association – Southern California Chapter 2018 BEST Project Award – Storm Water Quality Engineering News Record (ENR) California Region 2018 Best Projects Award (Southern California) - Water/Environment
Construction Management Association of America – Southern California Chapter 2018 Project Achievement Award – Public Works American Society of Civil Engineers – Metropolitan Los Angeles Branch 2017 Outstanding Environmental Engineering Project
1.1.4 Project Community Meetings Schedule
The following is a list of Proposition O project meetings with the public that occurred in April 2019 and are planned through the month of May 2019.
• Machado Lake Pipeline Eastern Reach: Wilmington Neighborhood Council Community Meeting,
Wednesday May 22, 2019, 6:30 pm at Banning High School, 1527 Lakme Avenue, Wilmington CA. 90744.
• Vermont Stormwater Capture & Green Street: South East Neighborhood Neighborhood Council Meeting, Tuesday May 28, 2019, 6:00 pm at New Prospect Baptist Church, 10910 South Broadway, Los Angeles, CA 90061.
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 8
1.2 Bond Sales The following table is a summary of the bond sales that fund Proposition O.
PROPOSITION O BOND SALE SUMMARY
General Obligation Bonds Approved by Voters $500,000,000
$439,500,000 Fund 16F July 13, 2005
City Council Approved Bond Sale $37,000,000 (Ord. 176839 CF 05-1408) Bond Interest Earnings (As of December 31, 2018) $3,092,272.43 Fund 16M July 21, 2006 $8,000,000
City Council Approved Bond Sale (Ord. 177733 CF 06-0600-S37) Bond Interest Earnings (As of December 31, 2018) $907,305.51 Fund 16Q July 22, 2008 $101,000,000
City Council Approved Bond Sale (Ord. 180090 CF 08-1706) Bond Interest Earnings (As of December 31, 2018) $6,542,850.04 Fund 16T July 21, 2009 $176,500,000 City Council Approved Bond Sale (Ord. 180808 CF 09-1674) Bond Interest Earnings (As of December 31, 2018) $12,576,078.65 Fund 16V July 28, 2011 $117,000,000
City Council Approved Bond Sale (Ord. 181755 CF 11-0841) Bond Interest Earnings (As of December 31, 2018) $8,080,889.15
Bond Interest Earnings (As of December 31, 2018)
$30,863,072.65
General Obligation Bonds Remaining to be Sold $60,500,000
1.3.1 Projects in Planning
* except as noted pending further scope & concept development
COAC AOC
Taylor Yard G2 BOS TBD $12,400,000 TBD TBD TBD *
Hollenbeck Lake BOS $5,000,000 $0 $23,000,000 11/20/2017 1/25/2018
Fernangeles Park BOS $2,235,000 $0 $15,000,000 11/20/2017 1/25/2018
Big Tujunga Canyon Via
Verde-RevisedBOS TBD $0 $0 11/20/2017 TBD *
Public Right-of-Way Low Impact
Development
BOS $1,108,750 $0 $399,300 11/20/2017 1/25/2018
Rosa Parks Learning Center
Stormwater Capture
BOS TBD $0 TBD 11/20/2017 1/25/2018
Sepulveda Median Island BOS TBD $0 TBD TBD TBD
$8,343,750 $12,400,000 $38,399,300
$0
TBD
Funds From Other
Sources (if applicable)
$49,246,225
$28,000,000
$17,235,000
$397,000
Proposition O - Clean Water Bond Monthly Progress Report - April 2019
The following table summarizes the projects that are approved in concept. The projects were presented and approved by the COAC and the AOC on 1/25/2018 and the City Council on 04/10/2018 (CF 13-1526) .
1.3 Project Status Summary
TOTALS
$1,508,050
PROJECTS
Project Title
$2,503,175
ApplicantProp O Funding
Request
Date presented to the COAC & AOC
Total Project Funding Needed
Prop O Pending Future
Allocation
Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 9
Vermont Avenue Storm Water Capt and Green Street
BOS $1,950,100 $0 $0 $1,749,900 $3,700,000 $3,700,000 9/18/2017 9/28/2017
Westwood Neighborhood
GreenwayProp O $3,260,000 $0 $0 $2,200,000 $5,460,000 $5,460,000 9/18/2017 9/28/2017
1.3.2.1 COAC & AOC Project Recommendations (Pending Funding Approval)
Boyle Heights Joint Use Community Center
City of LA, Council District 14 $2,291,000 $0 $528,000 $2,819,000
$2,291,000 $0 $528,000 $2,819,000
TOTALS
AOC
Prop O Set Aside Funds
Funds From Other Sources
Total Project Funding
Month/Year Recommended by COAC & AOC
TOTALS
July 2007
PROJECTS RECOMMENDED BY COAC AND AOC
Project Title Applicant
Prop O Funding
The following table summarizes the projects approved by COAC and AOC, without funding authority.
Proposition O - Clean Water Bond Monthly Progress Report - April 2019
The following table summarizes the projects approved and recommended by COAC and AOC for funding. The projects were approved by the City Council (10/31/2017) and Mayor (CF 13-1526).
Total Project Funding Needed
1.3.2 COAC & AOC Funding Recommendations (Council & Mayor approved)
Prop O Funding Recommendations
Project Title COAC AOC COAC
Date Recommended by COAC & AOC
PROJECTS RECOMMENDED FOR FUNDING BY COAC AND AOC
Prop O Set Aside Funds
RequestApplicant
Funds From Other Sources (if applicable)
Prop O Funding Request
Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 10
Description Prop O Funding
Pending Future Funding
Allocation
Potential Funds From Other
Sources*Total Project
Budget
Proposition O - Clean Water Bond Monthly Progress Report - April 2019
1.3.3 Project Budget Summary
The following table is a summary of the Proposition O project funding.
$124,847,201
Projects Recommended by AOC
$567,243,794
PROJECT BUDGET SUMMARY
$8,343,750 $12,400,000 $40,902,475 $61,646,225 Projects In Planning– Prop O Funding Request
$0 $0 $0
Projects In Implementation $450,370,752 $0
$0
*Estimated direct funding and potential reimbursements
$12,400,000 $165,749,676
$471,114,502
$628,890,019
TOTALS
Prop O Total Project Obligation
$458,714,502
Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 11
1.3.4 Prop O - Program Budget Summary April 2019 Monthly Report
Original BudgetApproved Planned Future Allocation
Albion Dairy Park - Demolition & Remediation - COMPLETED 3,956,400$ 3,000,000$ 6,956,400$ Albion Dairy Park - Land Acquisition - COMPLETED 17,560,000$ (3,000,000)$ 14,560,000$ Albion Riverside Park 11,455,000$ 6,900,000$ 18,355,000$ Argo Drain Sub-basin Facility 30,122,000$ 7,965,269$ 38,087,269$ Avalon Green Alley South - COMPLETED 1,602,642$ (108,418)$ 1,494,224$ Aliso Wash - Limekiln Creek Confluence Restoration 1,595,089$ 9,345,000$ 10,940,089$ Boyle Heights Joint Use Community Center Improvements -$ -$ Broadway Neighborhood Stormwater Greenway - COMPLETED 4,626,502$ 4,626,502$ Catch Basin Inserts and Coverings Phase I - COMPLETED 17,000,000$ (2,297,114)$ 14,702,886$ Catch Basin Opening Screen Covers Phase II - COMPLETED 10,000,000$ (369,212)$ 9,630,788$ Catch Basin Opening Screen Covers Phase III - COMPLETED 44,500,000$ 44,500,000$ Catch Basin Inserts & Opening Screen Covers Phase IV 6,160,000$ 6,160,000$ Cesar Chavez Ground Water Improvement - COMPLETED 3,040,000$ (512,127)$ 2,527,873$ Echo Park Lake Rehabilitation - COMPLETED 84,263,313$ (47,637,298)$ 36,626,015$ Elmer Avenue Phase II: Elmer Paseo - COMPLETED $ 829,000 (76,240)$ 752,760$ Glenoaks/Sunland Stormwater Capture - COMPLETED $ 508,696 508,696$ Grand Blvd. Tree Wells - COMPLETED 1,075,927$ (362,888)$ 713,039$ Hansen Dam Wetlands Restoration - COMPLETED 2,220,702$ 2,220,702$ Imperial Highway Sunken Median Stormwater BMP - COMPLETED 2,723,403$ (1,421,679)$ 1,301,724$ Inner Cabrillo Beach Bacterial Water Quality Improvement - COMPLETED 8,000,000$ (1,078,994)$ 6,921,006$ La Cienega/Fairfax Stormwater BMP - CANCELED 7,667,888$ (6,999,728)$ 668,160$ Los Angeles Zoo Parking Lot - COMPLETED 13,904,243$ (7,663,788)$ 6,240,455$ Machado Lake-Phase I (Wilmington Drain) - COMPLETED 21,049,911$ 4,043,800$ 25,093,711$ Machado Lake Ecosystem Rehabilitation 110,457,563$ (11,000,000)$ 99,457,563$ Mar Vista Recreation Center Stormwater BMP - COMPLETED 4,556,186$ 4,556,186$ Oros Green Street - COMPLETED 386,000$ (187,076)$ 198,924$ Peck Park Canyon Enhancement - COMPLETED 6,190,000$ (718,322)$ 5,471,678$ Penmar Water Quality Improvement Phase I - COMPLETED 17,754,800$ 17,754,800$ Penmar Water Quality Improvement Phase II 5,830,200$ 5,830,200$ Rory M. Shaw Wetlands Park 7,800,000$ 7,800,000$ Rosecrans Recreation Center Stormwater Enhancements - COMPLETED 4,829,119$ (1,850,884)$ 2,978,235$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 1 - COMPLETED 6,814,377$ (2,201,290)$ 4,613,087$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 2 - COMPLETED 3,380,111$ (1,347,770)$ 2,032,341$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 3 - COMPLETED 20,634,036$ (6,554,928)$ 14,079,108$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 3 Ph II - COMPLETED 14,194,469$ (654,063)$ 13,540,406$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 4 - COMPLETED 6,290,504$ (2,399,442)$ 3,891,062$ South Los Angeles Wetlands Park (includes Site Readiness) - COMPLETED 16,678,202$ (6,848,828)$ 9,829,374$ Strathern Pit Multiuse - Land Acquisition - COMPLETED 10,000,000$ 10,000,000$ Taylor Yard River Park - Parcel G2 Land Acquisition - COMPLETED (Non-Prop O) -$ Taylor Yard River Park - Parcel G2 Pending Planned for Future Fund Allocation 12,400,000$ 12,400,000$ Temescal Canyon Park Stormwater Phase I - COMPLETED 14,247,435$ 14,247,435$ Temescal Canyon Park Stormwater Phase II 4,398,565$ 658,000$ 5,056,565$ Vermont Ave Sormwater Capture & Green St. 3,700,000$ 3,700,000$ Westchester Stormwater BMP - RENAMED "ARGO" 32,722,000$ (30,147,213)$ 2,574,787$ Westminster Dog Park Stormwater BMP - COMPLETED 1,438,755$ (750,867)$ 687,888$ Westside Park Rainwater Irrigation - COMPLETED 6,904,589$ (2,348,085)$ 4,556,504$ Westwood Neighborhood Greenway 5,460,000$ 5,460,000$
Total - Project Budget 598,527,627$ 12,400,000$ -$ (106,624,185)$ 504,303,442$
Office of Accounting 1,906,709$ 1,906,709$ Bureau of Contract Administration -$ -$ Bureau of Engineering 7,490,358$ 7,490,358$ Bureau of Sanitation 16,087,893$ 16,087,893$ Related Costs 8,077,839$ 8,077,839$
Subtotal 33,562,799$ -$ -$ -$ 33,562,799$
Program Development/Implementation 600,000$ (136)$ 599,864$ Full Proposal Development 360,000$ 360,000$
Subtotal 960,000$ -$ -$ (136)$ 959,864$
Optimization 1,616,524$ 5,382,000$ 6,998,524$ Arbitrage 2,000,000$ Controller-ITA 2,700$ 2,700$
Subtotal 1,619,224$ 2,000,000$ -$ 5,382,000$ 7,001,224$ Total - Prop O Budget 634,669,650$ 14,400,000$ -$ (101,242,321)$ 545,827,329$
Bond Proceeds - First Sale 37,000,000$ 37,000,000$ Bond Proceeds - First Sale Interest 3,089,894$ 2,029$ 3,091,923$ Bond Proceeds - Second Sale 8,000,000$ 8,000,000$ Bond Proceeds - Second Sale Interest 902,800$ 4,146$ 906,946$ Bond Proceeds - Third Sale 101,000,000$ 101,000,000$ Bond Proceeds - Third Sale Interest 6,386,168$ 137,156$ 6,523,324$ Bond Proceeds - Fourth Sale 176,500,000$ 176,500,000$ Bond Proceeds - Fourth Sale Interest 11,606,622$ 858,455$ 12,465,077$ Bond Proceeds - Fifth Sale 117,000,000$ 117,000,000$ Bond Proceeds - Fifth Sale Interest 6,094,654$ 1,781,148$ 7,875,802$ Bond Proceeds - Future Sales 60,500,000$ 60,500,000$ Secured Grants Received 18,270,046$ 18,270,046$ Sewer Construction and Maintenance (SCM) 6,826,018$ 20,952$ 6,846,970$
Total - Funding Sources $ 492,676,202 $ - $ 60,500,000 $ 2,803,886 $ 555,980,088 (545,827,329)$
10,152,758$ Bond Proceeds - Secured Grants Anticipated 36,437,505$ 36,437,505$
PROP O PROGRAM BUDGET CONTINGENCY*
City Staff - Program Related Budget (as of Fiscal Year 16)
Consultants - Program Related Budget (as of October 2015)
General Costs (as of October 2015)
POTENTIAL FUNDING SOURCESFunding Sources (as of October 2015)
Total - Prop O Budget
Project Title
Council / Mayor Approved
Future NeedsBudget
Adjustments
Current Council/Mayor
Approved Budget
12
Proj
ect T
itle
Bud
get
Orig
inal
Pro
p O
Fun
ding
(w
ith s
et a
side
s) O
ther
Dire
ct
Fund
ing
Pot
entia
l R
eim
burs
emen
ts
Sou
rce
Sta
tus
Mac
hado
Lak
e Ph
ase
I (W
ilmin
gton
Dra
in) H
RM
MP
-$
$
- -
$
-$
Proj
ect
Mac
hado
Lak
e Ec
osys
tem
Reh
abili
tatio
n (H
RM
MP)
$
-
$
- -
$
-$
Ec
osys
tem
Pro
ject
Alis
o C
reek
-Lim
ekiln
Cre
ek R
esto
ratio
n10
,940
,089
$
$
1
0,94
0,08
9 -
$
-$
N/A
Ror
y M
. Sha
w W
etla
nds
Park
$
22,0
00,0
00
$
7,8
00,0
00
14,2
00,0
00$
-
$
LA
Cnt
y Fl
ood
Con
trol D
istri
ctSe
cure
d Ve
rmon
t Ave
. Sto
rmw
ater
Cap
ture
& G
reen
St.
Ph II
$
2,7
49,4
78
$
3,7
00,0
00
1,14
5,40
0$
-$
MTA
Gra
nt
Pend
ing
Wes
twoo
d N
eigh
borh
ood
Gre
enw
ay $
5
,460
,000
$
3
,260
,000
2,
200,
000
$
-
$
C
F-13
-152
6 1
0/31
/201
7 / P
rop
84
5,00
0,00
0$
-$
Prop
84
Fund
ing
Con
firm
ed1,
644,
500
$
-
$
R
AP F
undi
ngFu
ndin
g C
onfir
med
684,
355
$
-$
Prop
ositi
on K
Fund
ing
Con
firm
ed-
$
-$
750,
000
$
-$
CD
BGFu
ndin
g C
onfir
med
-$
-
$
10
0,00
0$
-
$
M
ayor
's B
udge
tFu
ndin
g C
onfir
med
-$
-
$
20
7,87
5$
-
$
Si
te &
Fac
ility
Fund
ing
Con
firm
edAr
go D
rain
Sub
-bas
in F
acili
ty
$
52,8
65,1
31
$
3
8,08
7,26
9 14
,777
,862
$
$
- L
AWA
Fund
ing
Con
firm
edC
atch
Bas
in In
serts
& O
peni
ng S
cree
n C
over
s Ph
ase
IV $
6
,160
,000
$
6
,160
,000
-
$
-$
N/A
N/A
Verm
ont A
ve. S
torm
wat
er C
aptu
re &
Gre
en S
t. Ph
I $
950
,522
$
- 60
4,50
0$
-
$
IR
WM
P
780,
000
$
-$
Prop
KFu
ndin
g of
$78
0,00
0 pa
id a
nd c
ompl
eted
296,
997
$
-$
Coa
stal
Con
serv
ancy
$296
,997
rece
ived
352,
000
$
-$
Qui
mby
Secu
red
-$
-
$
75
0,00
0$
-
$
-
$
-$
100,
000
$
-$
-$
-
$
20
7,87
5$
-
$
Pe
nmar
Wat
er Q
ualit
y Im
prov
emen
t (P
hase
II)
$
5,8
30,2
00
$
5,8
30,2
00
-$
2,
112,
985
$
Prop
84
$1,9
57,1
52 re
ceiv
ed, 1
0% re
tent
ion
with
held
Tem
esca
l Can
yon
Park
Sto
rmw
ater
BM
P (P
hase
II)
$
5,0
56,5
65
$
4,3
98,5
65
-$
-
$
N
/AN
/A
$
-
$
5
00,0
00
Brow
nsfie
ld$5
00,0
00 re
imbu
rsed
-$
3,
000,
000
$
Dem
oliti
on e
scro
w a
ccou
nt$3
,000
,000
rece
ived
642,
761
$
-$
Sprin
t/Sw
iss
II le
ase
paym
ents
Leas
e pa
ymen
t of $
642,
761
rece
ived
-$
37
,569
$
C
ity C
lerk
Leas
e pa
ymen
t of $
37,5
69 re
ceiv
edAv
alon
Gre
en A
lley
Sout
h $
1
,602
,642
$
1
,494
,224
-
$
891,
344
$
Pr
op 8
4$8
02,2
09 re
ceiv
edAl
bion
Dai
ry P
ark
- Lan
d Ac
quis
ition
$
14,5
60,0
00
$
1
4,56
0,00
0 -
$
-$
N/A
N/A
Broa
dway
Nei
ghbo
rhoo
d St
orm
wat
er G
reen
way
$
4,6
26,5
02
$
4,6
26,5
02
-$
2,
939,
361
$
Prop
84
$2,6
45,4
24.9
0 re
imbu
rsed
Cat
ch B
asin
Inse
rts a
nd C
over
ings
Pha
se I
$
14,7
02,8
86
$
1
4,70
2,88
6 -
$
600,
000
$
Pr
op 4
0G
rant
com
plet
edC
atch
Bas
in O
peni
ng S
cree
n C
over
s Ph
ase
II $
9
,630
,788
$
9
,630
,788
-
$
-$
N/A
N/A
Cat
ch B
asin
Ope
ning
Scr
een
Cov
ers
Phas
e III
$
44
,500
,000
$
44,
500,
000
-$
-
$
N
/AN
/A5,
250,
000
$
-
$
D
WP
Secu
red
750,
000
$
-$
CIW
MB
Secu
red
387,
230
$
-$
UD
AG
Secu
red
414,
000
$
-$
CIE
P Se
cure
d
13
Proj
ects
in P
ost-C
onst
ruct
ion
Prop
ositi
on O
– C
lean
Wat
er B
ond
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
1.3.
5
Proj
ects
in Im
plem
enta
tion
(App
rove
d by
City
Cou
ncil
& M
ayor
)PR
OJE
CT
FUN
DIN
G D
ETAI
L
Proj
ects
in P
re-D
esig
nLa
nd A
cqui
sitio
n / R
ight
of W
ay/A
ppro
vals
Proj
ects
in D
esig
n
Proj
ects
in B
id &
Aw
ard
Proj
ects
in C
onst
ruct
ion
$
26,7
41,7
30
$
1
8,35
5,00
0
Albi
on R
iver
side
Par
k
$
1
00,8
86,5
60
$
9
9,45
7,56
3
Proj
ects
Com
plet
ed
Albi
on D
airy
Par
k - D
emol
ition
& R
emed
iatio
n $
6
,956
,400
6,
956,
400
$
Mac
hado
Lak
e Ec
osys
tem
Reh
abili
tatio
n
Ces
ar C
have
z G
roun
d W
ater
Impr
ovem
ent
$
9,8
41,2
30
$
2,5
27,8
73
Proj
ect T
itle
Bud
get
Orig
inal
Pro
p O
Fun
ding
(w
ith s
et a
side
s) O
ther
Dire
ct
Fund
ing
Pot
entia
l R
eim
burs
emen
ts
Sou
rce
Sta
tus
Prop
ositi
on O
– C
lean
Wat
er B
ond
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
1.3.
5
Proj
ects
in Im
plem
enta
tion
(App
rove
d by
City
Cou
ncil
& M
ayor
)PR
OJE
CT
FUN
DIN
G D
ETAI
L
Echo
Par
k La
ke R
ehab
ilita
tion
$
37,2
25,8
90
$
3
6,62
6,01
5 59
9,87
5$
-
$
Pr
op K
Dire
ct fu
ndin
g of
$59
9,87
5 pa
id a
nd c
ompl
eted
Elm
er A
venu
e Ph
ase
II: E
lmer
Pas
eo
$
1,2
75,0
00
$
75
2,76
0 44
6,00
0$
-
$
C
ounc
il fo
r Wat
ersh
ed H
ealth
Secu
red
Gle
noak
s/Su
nlan
d St
orm
wat
er C
aptu
re
$
5
08,6
96
$
50
8,69
6 -
$
-$
N/A
N/A
Gra
nd B
lvd.
Tre
e W
ells
$
713
,039
$
713
,039
-
$
350,
000
$
Pr
op 5
0-SM
BRP
Gra
nt re
imbu
rsem
ent o
f $35
0,00
0 re
ceiv
edH
anse
n D
am W
etla
nds
Res
tora
tion
$
2,5
17,7
02
$
2,2
20,7
02
297,
000
$
-$
Cal
trans
- FT
IPSe
cure
d by
MR
CA
for D
esig
nIm
peria
l Hig
hway
Sun
ken
Med
ian
Stor
mw
ater
BM
P $
1
,301
,724
$
1
,301
,724
-
$
-$
N/A
N/A
Inne
r Cab
rillo
Bea
ch B
acte
rial W
ater
Qua
lity
Impr
ovem
ent
$
16,0
00,0
00
$
6,9
21,0
06
$
8,0
00,0
00
-$
Port
of L
os A
ngel
esSe
cure
dLo
s An
gele
s Zo
o Pa
rkin
g Lo
t $
6
,240
,455
$
6
,240
,455
-
$
-$
N/A
N/A
-$
4,
942,
134
$
Prop
50-
IRW
MP
4,94
2,13
4.46
rece
ived
and
gra
nt c
ompl
eted
-$
8,
166,
474
$
LA C
nty
Floo
d C
ontro
l Dis
trict
Fina
l Agr
eem
ent P
endi
ng10
,000
$
-
$
La
wsu
it Se
ttlem
ent
Dire
ct fu
ndin
g of
$10
,000
pai
d an
d co
mpl
eted
-$
1,
777,
838
$
Amer
Rec
ov&R
einv
est A
ct (A
RR
A)$1
,777
,838
rece
ived
and
gra
nt c
ompl
eted
-$
30
0,00
0$
Prop
50-
SMBR
P$3
00,0
00 re
ceiv
ed a
nd g
rant
com
plet
edM
ar V
ista
Rec
reat
ion
Cen
ter S
torm
wat
er B
MP
(Pha
se II
) $
460
,025
$
460
,025
-
$
-$
N/A
N/A
Oro
s G
reen
Stre
et
$
7
84,2
51
$
1
98,9
24
586,
651
$
-$
Prop
13
& C
WA
319t
hSe
cure
d1,
586,
193
$
-
$
Pr
op 5
0
$1,5
86,1
93 p
aid
120,
000
$
-$
Rec
& T
rails
Gra
nt
com
plet
ed14
,925
$
LA
CD
PW
co
mpl
eted
1,95
7,15
2$
D
ept.
of W
ater
Res
ourc
esA
rete
ntio
n of
$10
5,64
9.25
is b
eing
hel
d56
8,69
0$
-
$
Pr
op K
Fund
ing
secu
red
1,35
6,22
4$
-$
TBD
Prop
O/K
to fi
nd fu
ndin
g or
dow
n sc
ope
proj
-$
4,
361,
106
$
(AR
RA)
Pkg
2 AR
RA
fund
ing
is b
undl
ed w
ith P
kg 1
-$
76
7,07
7$
Prop
50-
CBI
$767
,077
rece
ived
and
gra
nt c
ompl
eted
Sant
a M
onic
a Ba
y Lo
w F
low
Div
ersi
on U
pgra
des,
Pkg
. 22,
032,
341
$
2,
032,
341
$
-
$
-$
(AR
RA)
Pkg
2 AR
RA
fund
ing
is b
undl
ed w
ith P
kg 1
Sant
a M
onic
a Ba
y Lo
w F
low
Div
ersi
on U
pgra
des,
Pkg
. 3
14,0
79,1
08$
14
,079
,108
$
-$
-
$
N
/AN
/ASa
nta
Mon
ica
Bay
Low
Flo
w D
iver
sion
Upg
rade
s, P
kg. 3
Ph
214
,194
,469
$
-$
173,
981
$
6,82
6,01
8$
SC
M F
und
$173
,981
pai
d &
$6,8
26,0
18 re
imbu
rsed
Sant
a M
onic
a Ba
y Lo
w F
low
Div
ersi
on U
pgra
des,
Pkg
. 43,
891,
062
$
3,
891,
062
$
-
$
-$
Prop
50-
CBI
Pkg.
4 is
bun
dled
with
Pkg
. 1-
$
3,71
3,36
8$
Pr
op 5
0-IR
WM
P$3
,713
,368
.43
rece
ived
and
gra
nt c
ompl
eted
2,01
1,93
7$
-$
Prop
12
(RZH
) - fo
r Lan
dD
irect
fund
ing
of $
2,01
1,93
7 pa
id a
nd c
ompl
1,28
2,72
1$
-$
Prop
40
(RZH
)D
irect
fund
ing
of $
1,28
2,72
1 pa
id a
nd c
ompl
3,27
7,19
3$
-$
Supp
lem
enta
l Env
. Pro
ject
Fund
ing
of $
3,27
7,19
3 pa
id1,
000,
000
$
-
$
Pr
op K
- fo
r Lan
d Ac
quis
ition
Dire
ct fu
ndin
g of
$1,
000,
000
paid
and
com
pl50
0,00
0$
-
$
Pr
op K
Dire
ct fu
ndin
g of
$50
0,00
0 pa
id a
nd c
ompl
-$
85
8,52
5$
MTA
for r
emed
iatio
n$8
58,5
25 re
ceiv
ed
-$
67
,501
$
M
TA -
leas
e pa
ymen
tLe
ase
paym
ent o
f $67
,501
rece
ived
-
$
199,
977
$
EP
A - B
row
nfie
lds
gran
t$1
99,9
77 re
ceiv
ed a
nd g
rant
com
plet
edSt
rath
ern
Pit M
ultiu
se -
Land
Acq
uisi
tion
$
28,0
00,0
00
$
1
0,00
0,00
0 18
,000
,000
$
-$
LA C
nty
Floo
d C
ontro
l Dis
trict
Secu
red
Tayl
or Y
ard
Riv
er P
ark
- Pa
rcel
G2
(Pen
ding
Fut
ure
Allo
catio
n) $
12
,400
,000
$
- $
-
$
- N
/A
Land
Acq
uisi
tion
non-
Prop
O is
com
plet
e. P
rop
O s
cope
for p
oten
tial p
lann
ed p
roje
ct is
pe
ndin
g fu
ture
fund
ing
allo
catio
nTe
mes
cal C
anyo
n Pa
rk S
torm
wat
er B
MP
(Pha
se I)
$
14,2
47,4
35
$
1
4,24
7,43
5 $
-
$
- N
/AN
/AW
estm
inst
er D
og P
ark
Stor
mw
ater
BM
P $
687
,888
$
687
,888
-
$
-$
N/A
N/A
-$
2,
000,
000
$
Prop
50-
SMBR
PG
rant
com
plet
ed90
0,00
0$
-
$
Q
uim
bySe
cure
d29
0,03
8$
-
$
Pr
op K
Secu
red
La C
iene
ga F
airfa
x St
orm
wat
er B
MP
- CAN
CEL
ED $
668
,159
$
668
,159
-
$
-$
N/A
Proj
ect c
ance
led
Wes
tche
ster
Sto
rmw
ater
BM
P - R
ENAM
ED "
ARG
O"
$
2,5
74,7
87
$
2,5
74,7
87
-$
-
$
N
/AN
/A
$
5
93,1
49,3
00
$
47
5,50
5,03
5 92
,251
,858
$
46,3
83,3
55$
138,
635,
214
$
14
Proj
ects
Com
plet
ed
Mac
hado
Lak
e-Ph
ase
I (W
ilmin
gton
Dra
in)
$
25,0
93,7
11
$
2
5,09
3,71
1
Mar
Vis
ta R
ecre
atio
n C
ente
r Sto
rmw
ater
BM
P $
4
,096
,161
$
4
,096
,161
Peck
Par
k C
anyo
n En
hanc
emen
t $
7
,177
,871
$
5
,471
,678
Penm
ar W
ater
Qua
lity
Impr
ovem
ent
(Pha
se I)
$
17,7
54,8
00
$
1
7,75
4,80
0 -
$
Ros
ecra
ns R
ecre
atio
n C
ente
r Sto
rmw
ater
Enh
ance
men
ts $
4
,903
,149
$
2
,978
,235
Sant
a M
onic
a Ba
y Lo
w F
low
Div
ersi
on U
pgra
des,
Pkg
. 14,
613,
087
$
4,
613,
087
$
Sout
h Lo
s An
gele
s W
etla
nds
Park
(inc
lude
s Si
te R
eadi
ness
) $
17
,901
,225
$
9
,829
,374
Wes
tsid
e Pa
rk R
ainw
ater
Irrig
atio
n5,
746,
542
$
4,
556,
504
$
Proj
ects
Can
cele
d/R
enam
ed
TOTA
LS
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 15
2.1 Project Schedules The following table summarizes the schedule status for projects based on the new master schedule update effective July 2, 2018.
Description Ahead On Behind Projects in Pre-Design Land Acquisition / Right of Way Projects Machado Lake Ecosystem Rehabilitation HRMMP
Machado Lake Phase I (Wilmington Drain) HRMMP Projects in Design Aliso Creek-Limekiln Creek Restoration Rory M. Shaw Wetlands Park* Vermont Ave. Stormwater Capture & Green St. Ph II Projects in Bid & Award Westwood Neighborhood Greenway Projects in Construction Albion Riverside Park Argo Drain Sub-basin Facility Catch Basin Inserts & Opening Screen Covers Phase IV* Machado Lake Pipeline – Eastern Reach** Vermont Ave. Stormwater Capture & Green St. Phase 1 Projects in Post Construction Machado Lake Ecosystem Rehabilitation Machado Lake Pipeline** Mar Vista Recreation Center Stormwater BMP Phase II Penmar Water Quality Improvement Phase II Temescal Canyon Park Stormwater BMP Phase II Projects Completed Albion Dairy Park – Demolition & Remediation Albion Dairy Park – Land Acquisition* Avalon Green Alley South Broadway Neighborhood Stormwater Greenway Catch Basin Inserts and Coverings Phase I Catch Basin Opening Screen Covers Phase II Catch Basin Inserts & Opening Screen Covers Phase III* Cesar Chavez Ground Water Improvement* (a.k.a. Sheldon Arleta) Echo Park Lake Rehabilitation Elmer Avenue Phase II: Elmer Paseo Glenoaks/Sunland Stormwater Capture Grand Blvd. Tree Wells Hansen Dam Wetlands Restoration Imperial Highway Sunken Median Stormwater BMP Inner Cabrillo Beach Bacterial Water Quality Improvement* Los Angeles Zoo Parking Lot Machado Lake Phase I (Wilmington Drain) Mar Vista Recreation Center Stormwater BMP Oros Green Street Peck Park Canyon Enhancement Penmar Water Quality Improvement Phase I Rosecrans Recreation Center Stormwater Enhancements* Santa Monica Bay Low Flow Diversion Upgrades Pkg. 1 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 2 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3 Phase II Santa Monica Bay Low Flow Diversion Upgrades Pkg. 4 Prop O Schedule Cont’d
2.0 SCHEDULE
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 16
Projects Completed South Los Angeles Wetlands Park Strathern Pit Multiuse – Land Acquisition* Taylor Yard River Park-Parcel G2 Land Acquisition* Temescal Canyon Park Stormwater BMP Phase I Westminster Dog Park Stormwater BMP Westside Park Rainwater Irrigation Projects Canceled Cabrito Paseo Walkway/Bike Path (CANCELED) La Cienega/Fairfax Stormwater BMP (CANCELED) Westchester Stormwater BMP (RENAMED ARGO) *Schedule not controlled by Prop O **Non Prop O Funded
2.2
Prog
ram
Mas
ter S
ched
ule
17
Project Original Prop O Budget
Current Prop O Budget
March Expenditures
Prop O Expenditures as of
March 28, 2018Albion Dairy Park Demolition & Remediation
Funding Category 3Pre-Design/Design/ Construction Mgmt/Inspection
$816,400 $816,400 $0 $2,258,768
Construction Cost $3,140,000 $6,140,000 $0 $4,093,136$3,956,400 $6,956,400 $0 $6,351,904
Albion Dairy Park Land Acquisition Land Acquisition $17,560,000 $14,560,000 $0 $14,471,528Funding Category 2
*$3 million in escrow reimbursement provided to Albion Dairy Park Demolition & Remediation
Pre-Design/Design/ Construction Mgmt/Inspection
$0 $0 $0 $63,412
Construction Cost $0 $0 $0 $0 Sub-total $17,560,000 $14,560,000 $0 $14,534,940
Land Acquisition
Funding Category 2
Pre-Design/Design/ Construction Mgmt/Inspection
$2,907,000 $2,907,000 $19,116 $2,509,426
Construction Cost $8,548,000 $15,448,000 $313,219 $14,652,259Sub-total $11,455,000 $18,355,000 $332,334 $17,161,684
Land Acquisition
Funding Category 2
Pre-Design/Design/ Construction Mgmt/Inspection
$1,595,089 $1,595,089 $2,288 $1,069,653
Construction Cost $0 $9,345,000 $0 $0Sub-total $1,595,089 $10,940,089 $2,288 $1,069,653
Land Acquisition
Funding Category 1, 2, & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$3,622,200 $3,622,000 $88,712 $1,248,416
Construction Cost $26,500,000 $34,465,269 $580,935 $2,228,575Sub-total $30,122,200 $38,087,269 $669,647 $3,476,991
Land Acquisition
Funding Category 2 and 4
Pre-Design/Design/ Construction Mgmt/Inspection
$481,913 $481,913 $0 $45,455
Construction Cost $1,120,729 $1,120,729 $0 $1,424,130 Sub-total $1,602,642 $1,602,642 $0 $1,469,585
Land Acquisition
Funding Category 2 and 4
Pre-Design/Design/ Construction Mgmt/Inspection
$1,331,046 $1,331,046 $0 1,684,108
Construction Cost $3,095,456 $3,095,456 $0 2,367,481 Sub-total $4,626,502 $4,626,502 $0 $4,525,819
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$2,100,000 $560,017 $0 $560,017
Construction Cost $14,900,000 $14,142,869 $0 $14,142,869 Sub-total $17,000,000 $14,702,886 $0 $14,702,886
Aliso Creek-Limekiln Creek Restoration$0 $0
Proposition O - Clean Water Bond
3.1 Budget vs. Actual Expenditure
$0 $0 $0
$0Albion Riverside Park Improvements
CLOSEOUT NEED COUNCIL/MAYOR APPROVAL
$0$0
$0
$0
$0
COUNCIL/MAYOR APPROVED CLOSE-OUT
$0
Argo Drain Sub-basin Facility
Avalon Green Alley South$0 $0 $0
Catch Basin Inserts and Coverings Ph I $0 $0
Broadway Neighborhood Stormwater Greenway $200,000 $200,000 $0
$0 $0
$0
$0
$0
$474,230
$0
3.0 PROP O PROGRAM BUDGET
18
Proposition O - Clean Water Bond
Project Original Prop O Budget
Current Prop O Budget
March Expenditures
Prop O Expenditures as of
March 28, 2018
Land Acquisition
Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection
$0 $383,822 $0 $383,822
Construction Cost $10,000,000 $9,246,965 $0 $9,246,965 Sub-total $10,000,000 $9,630,787 $0 $9,630,787
Land Acquisition
Funding Category 1 & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$2,475,000 $2,475,000 $0 $7,028,411
Construction Cost $42,025,000 $42,025,000 $0 $36,449,516 Sub-total $44,500,000 $44,500,000 $0 $43,477,927
Land Acquisition
Funding Category 1 & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$0 $3,400,000 $39,946 $3,596,149
Construction Cost $0 $2,760,000 $67,804 $779,751Sub-total $0 $6,160,000 $107,750 $4,375,900
Land Acquisition
Funding Category 2Pre-Design/Design/ Construction Mgmt/Inspection
$1,234,950 $712,248 $0 $712,248
Construction Cost $1,805,050 $1,815,625 $0 $1,815,625Sub-total $3,040,000 $2,527,873 $0 $2,527,873
Echo Park Lake Rehabilitation Land Acquisition $0 $0 $0 $0
Funding Category 1, 2, 3, & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$19,569,791 $10,653,574 $0 $10,653,574
Construction Cost $64,693,522 $25,972,441 $0 $25,972,441 Sub-total $84,263,313 $36,626,015 $0 $36,626,015
Land Acquisition
Funding Category 3
Pre-Design/Design/ Construction Mgmt/Inspection
$318,900 $318,900 $0 $283,699
Construction Cost $510,100 $510,100 $0 $469,042 Sub-total $829,000 $829,000 $0 $752,741
Land Acquisition
Funding Category 3
Pre-Design/Design/ Construction Mgmt/Inspection
$168,696 $168,696 $0 $35,757
Construction Cost $340,000 $340,000 $0 $340,748 Sub-total $508,696 $508,696 $0 $376,505
Grand Blvd. Tree Wells Land Acquisition $0 $0 $0 $0
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$248,927 $330,595 $0 $330,595
Construction Cost $827,000 $382,444 $0 $382,444COUNCIL/MAYOR APPROVED CLOSE-OUT Sub-total $1,075,927 $713,039 $0 $713,039Hansen Dam Wetland Restoration Land Acquisition $0 $0 $0 $0
Funding Category 3
Pre-Design/Design/ Construction Mgmt/Inspection
$637,302 $637,302 $0 $467,303
Construction Cost $1,583,400 $1,583,400 $0 $1,345,488 Sub-total $2,220,702 $2,220,702 $0 $1,812,791
COUNCIL/MAYOR APPROVED CLOSE-OUT
Catch Basin Opening Screen Covers Ph II $0 $0 $0
Catch Basin Opening Screen Covers Ph III $0 $0 $0
Cesar Chavez Ground Water Improvement $0 $0 $0
COUNCIL/MAYOR APPROVED CLOSE-OUT
Catch Basin Opening Screen Covers Ph IV $0 $0 $0
PRE-CLOSE-OUT
Elmer Avenue Phase II: Elmer Paseo$0 $0 $0
Glenoak/Sunland Stormwater Capture
PRE-CLOSE-OUT
COUNCIL/MAYOR APPROVED CLOSE-OUT
PRE-CLOSE-OUT
$0 $0
$0
$0
$0 $0
$0
$0
$0
19
Proposition O - Clean Water Bond
Project Original Prop O Budget
Current Prop O Budget
March Expenditures
Prop O Expenditures as of
March 28, 2018
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$505,700 $537,188 $0 $537,188
Construction Cost $2,217,703 $764,536 $0 $764,536 Sub-total $2,723,403 $1,301,724 $0 $1,301,724
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$1,043,478 $1,043,478 $0 $14,455
Construction Cost $6,956,522 $6,956,522 $0 $6,906,550 Sub-total $8,000,000 $8,000,000 $0 $6,921,005
Land Acquisition
Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection
$2,050,388 $668,159 $0 $0
Construction Cost $5,617,500 $0 $0 $0 Sub-total $7,667,888 $668,159 $0 $0
LA Zoo Parking Lot Land Acquisition $0 $0 $0 $0
Funding Category 1 & 3Pre-Design/Design/ Construction Mgmt/Inspection
$2,774,743 $1,726,283 $0 $1,726,283
Construction Cost $11,129,500 $4,514,172 $0 $4,514,172 Sub-total $13,904,243 $6,240,455 $0 $6,240,455
Land Acquisition(Includes Habitat Restoration Mitigation & Monitoring Plan)
Pre-Design/Design/ Construction Mgmt/Inspection
$5,298,626 $5,298,626 $1,680 $8,306,405
Construction Cost $15,751,285 $19,795,085 $0 $16,117,358 Sub-total $21,049,911 $25,093,711 $1,680 $24,423,763
Land Acquisition(Includes Habitat Restoration Mitigation & Monitoring Plan)
Pre-Design/Design/ Construction Mgmt/Inspection
$23,113,996 $20,369,499 $33,652 $17,440,631
Construction Cost $65,409,901 $79,088,064 $0 $73,169,622 Sub-total $88,523,897 $99,457,563 $33,652 $90,610,253
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$1,130,482 $1,130,482 $0 $1,660,090
Construction Cost $3,425,704 $3,425,704 $0 $2,690,299 Sub-total $4,556,186 $4,556,186 $0 $4,350,389
Oros Green Street Land Acquisition $0 $0 $0 $0
Funding Category 4Pre-Design/Design/ Construction Mgmt/Inspection
$300,000 $1,325 $0 $1,325
Construction Cost $86,000 $197,600 $0 $197,600 Sub-total $386,000 $198,925 $0 $198,925
Land Acquisition
Funding Category 3
Pre-Design/Design/ Construction Mgmt/Inspection
$714,662 $2,978,961 $0 $2,978,961
Construction Cost $5,475,338 $2,578,129 $0 $2,578,129 Sub-total $6,190,000 $5,557,090 $0 $5,557,090
Inner Cabrillo Beach Bacterial Water Quality Improvement N/A N/A N/A
COUNCIL/MAYOR APPROVED CLOSE-OUT
Imperial Hwy Sunken Median Stormwater BMP $0 $0 $0
Funding Category 1 & 3
Machado Lake - Phase I (Wilmington Drain) $0 $0 $0
La Cienega/Fairfax Stormwater BMP (Canceled) $0 $0 $0
COUNCIL/MAYOR APPROVED CLOSE-OUT
CANCELED
Mar Vista Recreation Center Stormwater BMP (Phases I & II) $0 $0 $0
Funding Category 1 & 3
Machado Lake Ecosystem Rehabilitation $0 $0 $0
COUNCIL/MAYOR APPROVED CLOSE-OUT
Peck Park Canyon Enhancement$0 $0 $0
N/A
$0
$0
$0
$0
$0
$0
20
Proposition O - Clean Water Bond
Project Original Prop O Budget
Current Prop O Budget
March Expenditures
Prop O Expenditures as of
March 28, 2018
Land Acquisition
Funding Category 2 & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$3,946,800 $4,600,000 $0 $5,039,805
Construction Cost $16,808,000 $13,154,800 $0 $12,363,592 Sub-total $20,754,800 $17,754,800 $0 $17,403,397
Land Acquisition
Funding Category 4
Pre-Design/Design/ Construction Mgmt/Inspection
$538,200 $1,582,000 $635 $1,530,694
Construction Cost $2,292,000 $4,248,200 $73,180 $3,222,457 Sub-total $2,830,200 $5,830,200 $73,815 $4,753,151
Rory M. Shaw Wetlands ParkLand Acquisition $0 $0 $0 $0
Funding Category 2
Pre-Design/Design/ Construction Mgmt/Inspection
$0 $0 $0 $9,064
Construction Cost $7,800,000 $7,800,000 $0 $0 Sub-total $7,800,000 $7,800,000 $0 $9,064
$0Land Acquisition
Funding Category 3 & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$1,106,427 $144,737 $0 $144,737
Construction Cost $3,722,692 $2,833,498 $0 $2,833,498 Sub-total $4,829,119 $2,978,235 $0 $2,978,235
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$1,864,976 $1,413,342 $0 $1,409,649
Construction Cost $4,949,401 $3,199,746 $0 $3,143,463 Sub-total $6,814,377 $4,613,088 $0 $4,553,112
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$925,077 $858,394 $0 $852,465
Construction Cost $2,455,034 $1,173,948 $0 $1,173,948 Sub-total $3,380,111 $2,032,342 $0 $2,026,413
Right of Way
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$5,378,778 $3,627,036 $0 $3,640,026
Construction Cost $13,255,258 $8,452,072 $0 $8,446,053 Sub-total $20,634,036 $14,079,108 $0 $12,604,684
Right of Way
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$0 $1,790,120 $0 $2,154,199
Construction Cost $0 $12,153,554 $0 $11,245,535 Sub-total $0 $14,194,469 $0 $13,399,734
Land Acquisition
Funding Category 1
Pre-Design/Design/ Construction Mgmt/Inspection
$1,721,601 $1,434,020 $0 $1,391,303
Construction Cost $4,568,903 $2,457,042 $0 $2,457,042 Sub-total $6,290,504 $3,891,062 $0 $3,848,345
Penmar Water Quality Improvement Phase I $0 $0
Penmar Water Quality Improvement Phase II $0 $0 $0
PRE-CLOSE-OUT
Santa Monica Bay Low Flow Diversion Upgrades P 2 $0 $0 $0
PRE-CLOSE-OUT
Santa Monica Bay Low Flow Diversion Upgrades P 1 $0 $0 $0
Rosecrans Recreation Center Stormwater Enhancements $0 $0
PRE-CLOSEOUT
Santa Monica Bay Low Flow Diversion Upgrades P 3 Phase 2 $0 $250,795 $0
PRE-CLOSE-OUT
PRE-CLOSE-OUTSanta Monica Bay Low Flow Diversion Upgrades P 3 $2,000,000 $2,000,000 $0
Santa Monica Bay Low Flow Diversion Upgrades P 4 $0 $0 $0
PRE-CLOSEOUT
$0
$0
$0
$518,605
$0
$0
$0
$0
$0
21
Proposition O - Clean Water Bond
Project Original Prop O Budget
Current Prop O Budget
March Expenditures
Prop O Expenditures as of
March 28, 2018
Funding Category 3Pre-Design/Design/ Construction Mgmt/Inspection
$4,466,265 $5,973,306 $0 $5,973,306
Construction Cost $10,200,000 $3,856,068 $0 $3,856,068 Sub-total $16,678,202 $9,829,374 $0 $9,829,374
Funding Category 2
Pre-Design/Design/ Construction Mgmt/Inspection
$0 $0 $0 $2,729
Construction Cost $0 $0 $0 $0 Sub-total $10,000,000 $10,000,000 $0 $2,729
Land Acquisition $12,440,000 $12,400,000 $0 $0Pre-Design/Design/ Construction Mgmt/Inspection
$0 $0 $0 $0
Construction Cost $0 $0 $0 $0 Sub-total $12,440,000 $12,400,000 $0 $0
Land Acquisition $0 $0 $0 $0Pre-Design/Design/ Construction Mgmt/Inspection
$2,842,626 $5,122,699 $0 $5,043,983
Funding Category 3 & 4 Construction Cost $12,104,809 $9,124,736 $0 $9,111,923
PRE-CLOSE-OUT Sub-total $14,947,435 $14,247,435 $0 $14,155,906Temescal Canyon Park Stormwater BMP Phase II
Land Acquisition$0 $0 $0 $0
Funding Category 3 & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$1,361,374 $1,461,374 $280 $1,410,394
Construction Cost $2,995,191 $3,595,191 $67,886 $2,681,829 Sub-total $4,356,565 $5,056,565 $68,166 $4,092,223
Vermont Avenue Stormwater Capture & Green Street Land Acquisition
$0 $0 $0 $0
Funding Category 3 & 4
Pre-Design/Design/ Construction Mgmt/Inspection $1,014,820 $1,014,820 $11,386 $359,340Construction Cost $2,685,180 $2,685,180 $0 $33,186 Sub-total $3,700,000 $3,700,000 $11,386 $392,526
Westchester Stormwater BMP (Renamed Argo) Land Acquisition
$0 $0 $0 $0
Funding Category 1, 2, & 4
Pre-Design/Design/ Construction Mgmt/Inspection
$2,574,787 $2,574,787 $0$2,657,762
Construction Cost $0 $0 $0 $0 Sub-total $2,574,787 $2,574,787 $0 $2,657,762
Land Acquisition
Funding Category 4
Pre-Design/Design/ Construction Mgmt/Inspection
$279,755 $432,928 $0 $432,928
Construction Cost $1,159,000 $254,960 $0 $254,960 Sub-total $1,438,755 $687,888 $0 $687,888
Westside Park Rainwater Irrigation Land Acquisition $0 $0 $0 $0
Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection
$1,147,945 $1,572,362 $0 $1,569,812
Construction Cost $5,756,644 $2,984,142 $0 $2,986,141 Sub-total $6,904,589 $4,556,504 $0 $4,555,953
Westwood Neighborhood Greenway Land Acquisition $0 $0 $0 $0
Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection
$1,413,000 $1,413,000 $2,039 $224,397
Construction Cost $4,047,000 $4,047,000 $0 $0
Sub-total $5,460,000 $5,460,000 $2,039 $224,397
COUNCIL/MAYOR APPROVED CLOSE-OUT
South Los Angeles Wetlands Park (includes Site Readiness)
$2,011,937 $0 $0Land Acquisition
Funding Category 3 & 4
Temescal Canyon Park Stormwater BMP Phase I
Taylor Yard River Park Pending Planned for Future Funding Allocation
Strathern Pit Multiuse -Land Acquisition
Land Acquisition$10,000,000 $10,000,000
PRE-CLOSEOUTWestminster Dog Park Stormwater BMP
$0 $0 $0
COUNCIL/MAYOR APPROVED CLOSE-OUT
PRE-CLOSEOUT
$0
$0
$0
$0
22
Proposition O - Clean Water Bond
PROJECTS SUBTOTAL 539,190,479$ $506,306,570 $1,302,758 $401,365,538
Project Optimization $6,198,524 $0 $2,207,106 Program Development $599,864 $0 $599,684 Full Proposal Development $360,000 $0 $360,000
Office of Accounting $1,906,709 $0 $1,611,318 Bureau of Engineering $7,490,358 $50,210 $5,678,763 Bureau of Sanitation $16,087,893 $62,871 $15,486,058 Related Costs $8,077,839 ** Arbitrage $2,000,000 $0 $7,340 Controller $2,700 $0 $2,700PROGRAM TOTAL $549,030,457 $1,415,839 $427,318,507*Expenditures are estimates, and will be adjusted to conform with approved modified indirect labor rated. Estimated expenditures are shown to assist in monitoring of expenses, and are not intended to be financial statements. **Included in Bureau staff costs
Consultant Cost – Program Related Budget
City Staff - Program Related Budget
23
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 24
4.1 Project Status Report
A brief status report for each project is provided on the following pages. The report identifies key project information, the planned scope of work, progress date, updated construction costs and percentage complete for all Proposition O projects. The Percentage Complete at the far right hand column of the diagram uses a color-coding system to designate the current phase of each project.
Turquoise Pre-Design Yellow Right of Way Acquisition/ Land Acquisition Red Design Violet Bid and Award Green Construction Blue Post Construction
Progress for each project is tracked by a color-coded pie chart. The color-coding system shows work completed in the darker shade of each color and the lighter shade denotes work to be completed. For example, if a project is in design the pie chart begins as light red. As progress is made, a darker red will indicate the approximate percentage of design work completed to date.
4.0 PROJECT STATUS REPORT
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STN
otic
e to
Pro
ceed
:07
/11/
11
CD
1 -
Gilb
erto
Ced
illoC
ontra
ct D
urat
ion:
661
days
1739
N. A
lbio
n St
reet
Des
igne
r:M
alco
lm P
irnie
City
Eng
inee
r's E
st.
(Cla
ss A
):2,
468,
100
$
C
ontra
ctor
:N
atio
nal D
emol
ition
Con
tract
Aw
ard
Amou
nt:
1,26
9,55
5$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:4,
469,
555
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e
(2
3, 2
23%
):2,
827,
281
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
4,09
6,83
6$
100%
Fund
ing:
Pro
p O
& B
row
nsfie
ld
14-A
ug-1
7St
atem
ent o
f C
ompl
etio
nO
CT
2013
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Prop
O A
cqui
sitio
n C
ost:
CD
1 -
Gilb
erto
Ced
illo17
,474
,154
1739
N. A
lbio
n St
reet
Des
igne
r:N
/A
Con
tract
or:
N/A
Proj
. Mgr
.:C
hris
toph
er F
. Joh
nson
Con
tact
#:
213-
485-
1165
Boa
rd A
ccep
tanc
e R
epor
t D
ate
100%
Fund
ing:
Pro
p O
N/A
Acqu
isiti
on D
ate:
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
03/2
9/20
17
CD
1 -
Gilb
erto
Ced
illoC
ontra
ct D
urat
ion:
608
days
1739
Alb
ion
Stre
etD
esig
ner:
Tetra
Tec
hC
ity E
ngin
eer's
Est
. (C
lass
A):
12,5
00,0
00$
C
ontra
ctor
:Su
lly-M
iller
Con
tract
Aw
ard
Amou
nt:
16,6
25,0
00$
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
war
d +
Con
tinge
ncy:
21,6
60,5
00$
Con
tact
#:
213-
485-
1411
CO
's to
dat
e
(2
7%):
4,56
3,87
8$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
21,1
88,8
78$
96
%
Fund
ing:
Pro
p O
, Pro
p. 8
4, &
Pr
op. K
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:M
AR 2
019
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Post
Con
st
Not
ice
to P
roce
ed:
TBD
CD
- 12
Mitc
hell
Engl
ande
rC
ontra
ct D
urat
ion:
TBD
Des
igne
r:Te
tra T
ech,
Inc.
City
Eng
inee
r's E
st.
(Cla
ss A
):-
$
Con
tract
or:
N/A
Con
tract
Aw
ard
Amou
nt:
-$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
war
d +
Con
tinge
ncy:
-$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
98
%98
%
Fund
ing:
Pro
p O
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:JU
L 20
21
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
This
pro
ject
is c
ompl
ete
The
Purc
hase
and
Sal
e Ag
reem
ent w
as e
xecu
ted
on
10/2
/09.
Esc
row
clo
sed
on
10/2
3/09
. Par
k la
nd a
cqui
sitio
n is
co
mpl
ete.
Rib
bon
cutti
ng c
erem
ony
was
hel
d on
Mar
ch 3
0, 2
019.
The
proj
ect i
s in
the
desi
gn
appr
oval
s ph
ase.
Albi
on D
airy
Par
k - D
emo
& R
emed
iatio
nD
emol
ition
of t
he b
uild
ings
and
im
prov
emen
ts o
f an
indu
stria
l fa
cilit
y, re
med
iatio
n an
d ab
atem
ent
of a
ll ha
zard
ous
mat
eria
ls a
nd s
oils
on
site
, and
the
impo
rtatio
n of
cle
an
soil
to le
ave
the
prop
erty
in a
leve
l, gr
aded
con
ditio
n.
Con
stru
ctio
n of
BM
P’s
to re
duce
co
ntam
inan
ts to
Alis
o/ L
imek
iln
Cre
eks,
and
the
Los
Ange
les
Riv
er
to a
ssis
t the
City
in m
eetin
g TM
DL
requ
irem
ents
. BM
Ps in
clud
e bi
osw
ales
, veg
etat
ed b
asin
, ope
n an
d sp
ace
rest
orat
ion.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
09
Albi
on D
airy
Par
k - L
and
Acqu
isiti
on
Phot
o of
pro
ject
site
Albi
on R
iver
side
Par
k
Ren
derin
g of
pro
ject
site
PER
CEN
T C
OM
PLET
E
Acqu
ire a
par
cel o
f lan
d ad
jace
nt
to th
e LA
Riv
er a
s pa
rt of
LA
Riv
er
Rev
italiz
atio
n M
aste
r Pla
n.
Alis
o C
reek
-Lim
ekiln
Cre
ek
Res
tora
tion
No
Con
cept
Rep
ort p
repa
red
This
pro
ject
will
inst
all a
ser
ies
of
stor
m w
ater
bes
t man
agem
ent
prac
tices
. Sto
rm w
ater
will
be
dive
rted
from
nea
rby
stor
m d
rain
s an
d ut
ilized
/trea
ted
with
bio
swal
es,
bior
eten
tion
basi
ns, a
n in
filtra
tion
tank
, and
a s
tora
ge ta
nk.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
N
ov 2
013
Phot
o of
pro
ject
site
afte
r re
med
iatio
n
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
O
ct 2
012
Phot
o of
pro
ject
site
100
25
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
09/1
0/18
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:75
8 da
ys
Los
Ange
les
Wor
ld A
irpor
tD
esig
ner:
AEC
OM
City
Eng
inee
r's E
st.
(Cla
ss A
):23
,435
,933
$
Con
tract
or:
OH
L U
SAC
ontra
ct A
war
d Am
ount
:35
,810
,500
$
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
war
d +
Con
tinge
ncy:
39,3
91,5
50$
Con
tact
#:
213-
485-
1411
CO
's to
dat
e
(0
%):
1,31
1$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
35,8
11,8
11$
33
%
Fund
ing:
Pro
p O
& L
AWA
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:N
OV
2020
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
04/2
0/15
CD
9 -
Cur
ren
Pric
e, J
r.C
ontra
ct D
urat
ion:
112
days
Alle
y nw
of 5
4th
and
San
Pedr
o.D
esig
ner:
The
Trus
t for
Pub
lic L
and
City
Eng
inee
r's E
st.
(Cla
ss A
):-
$
Con
tract
or:
Los
Ange
les
Engi
neer
ing
Con
tract
Aw
ard
Amou
nt:
959,
001
$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:-
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
10
0%
Fund
ing:
Pro
p O
& P
rop
84
TBD
Stat
emen
t of
Com
plet
ion
Dat
eFE
B 20
16
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/1
9/15
CD
9 -
Cur
ren
Pric
e, J
r.C
ontra
ct D
urat
ion:
240
days
Vici
nity
of 4
8th
St &
Bro
adw
ayD
esig
ner:
Car
ollo
City
Eng
inee
r's E
st.
(Cla
ss A
):2,
302,
300
$
C
ontra
ctor
:M
ike
Prlic
h &
Sons
, Inc
.C
ontra
ct A
war
d Am
ount
:2,
339,
600
$
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
war
d +
Con
tinge
ncy:
2,43
9,60
0$
Con
tact
#:
213-
485-
1411
CO
's to
dat
e(15
, 2.
76%
):64
,544
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
2,40
4,14
4$
100%
Fund
ing:
Pro
p O
& P
rop
84
TBD
Stat
emen
t of
Com
plet
ion
Dat
eJU
L 20
16
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
CD
6 -
Nur
y M
artin
ezC
ontra
ct D
urat
ion:
btw
n M
arso
n St
. and
Ray
mer
St.
Des
igne
r:TB
DC
ity E
ngin
eer's
Est
. (C
lass
A):
3,09
5,45
6$
Con
tract
or:
TBD
Con
tract
Aw
ard
Amou
nt:
-$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:-
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
Fund
ing:
N/A
Stat
emen
t of
Com
plet
ion
Dat
eD
EC 2
014
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Proj
ect i
s on
hol
d du
e to
fund
ing
issu
es.
The
Los
Ange
les
Nei
ghbo
rhoo
d La
nd T
rust
(LAN
LT)
is u
nabl
e to
sec
ure
addi
tiona
l $3
milli
on in
fund
s ne
eded
to
com
plet
e th
e pr
ojec
t. LA
NLT
re
ques
ted
to w
ithdr
aw th
eir
Prop
osed
pro
ject
site
pla
n
Shor
ing
inst
alla
tion
cont
inue
s at
th
e pu
mp
stat
ion
site
and
at t
he
Cou
nty
rein
forc
ed c
oncr
ete
box
culv
ert s
ite. T
he c
ontra
ctor
co
ntin
ues
to h
aul e
xces
s ex
cava
ted
dirt.
This
pro
ject
is c
ompl
ete
Proj
ect i
s in
the
post
con
stru
ctio
n ph
ase.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ay 2
013
Con
stru
ctio
n of
sto
rmw
ater
BM
Ps
in a
n al
ley
loca
ted
in th
e So
uth
Los
Ange
les
area
to c
aptu
re, i
nfilt
rate
, an
d re
tain
sto
rmw
ater
runo
ff fro
m
the
tribu
tary
are
a: p
erm
eabl
e pa
vers
, dry
wel
ls, a
nd ra
inw
ater
ha
rves
ting
for p
lant
irrig
atio
n.
Cab
rito
Pase
o W
alkw
ay/B
ike
Path
Aval
on G
reen
Alle
y So
uth
Argo
Dra
in S
ub-b
asin
Fa
cilit
y D
iver
ts &
cap
ture
s S
torm
wat
er
flow
s fro
m 2
exi
stin
g st
orm
drai
ns.
Div
erte
d flo
ws
will
be tr
eate
d th
roug
h th
e im
plem
enta
tion
of
stor
mw
ater
BM
P el
emen
ts,
incl
udin
g cl
arifi
er fo
r ini
tial
treat
men
t & U
nder
grou
nd
Infil
tratio
n G
alle
ry. T
he tr
eate
d st
orm
wat
er w
ill ev
entu
ally
infil
trate
in
to th
e gr
ound
.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ay 2
013
Con
stru
ctio
n of
sto
rmw
ater
BM
Ps
of re
side
ntia
l BM
Ps: d
ry w
ells
, rai
n ga
rden
s, &
infil
tratio
n tre
nche
s;
neig
hbor
hood
BM
Ps: s
ub-s
urfa
ce
infil
tratio
n ba
sins
& d
ry w
ells
; & a
su
b-re
gion
al fa
cilit
y co
nsis
ting
of a
in
filtra
tion
galle
ry.
Estim
ated
co
nstru
ctio
n co
st is
$2.
6 m
il.
Prop
osed
pro
ject
layo
ut
Broa
dway
Nei
ghbo
rhoo
d St
orm
wat
er G
reen
way
Phot
o of
pro
pose
d ra
in g
arde
n
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
11
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Impl
emen
t sto
rmw
ater
bes
t m
anag
emen
t pra
ctic
es in
clud
ing:
in
stal
latio
n of
bio
swal
es, t
rash
ca
ptur
e de
vice
s, tr
ee w
ells
to a
id
in fi
ltrat
ion,
and
a "S
MAR
T"
irrig
atio
n sy
stem
.
Ren
derin
g of
alle
y im
prov
emen
ts
26
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
CD
: All
Con
tract
Dur
atio
n:
City
wid
eD
esig
ner:
Bure
au o
f San
itatio
nC
ity E
ngin
eer's
Est
. (C
lass
A):
14,9
00,0
00$
C
ontra
ctor
:Va
rious
Con
tract
Aw
ard
Amou
nt:
-$
Proj
. Mgr
.:Al
fredo
Mag
alla
nes
Con
tract
Aw
ard
+ C
ontin
genc
y:-
$
Con
tact
#:
213-
485-
3958
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
10
0%
Fund
ing:
Pro
p O
& P
rop
40
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:SE
P 20
07
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
CD
: All
Con
tract
Dur
atio
n:
City
wid
eD
esig
ner:
Bure
au o
f San
itatio
nC
ity E
ngin
eer's
Est
. (C
lass
A):
9,40
0,00
0$
Con
tract
or:
Vario
usC
ontra
ct A
war
d Am
ount
:-
$
Proj
. Mgr
.:Al
fredo
Mag
alla
nes
Con
tract
Aw
ard
+ C
ontin
genc
y (%
)-
$
Con
tact
#:
213-
485-
3958
CO
's to
dat
e(#
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
10
0%
Fund
ing:
Pro
p O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:O
CT
2007
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
06/0
1/08
CD
: All
Con
tract
Dur
atio
n:73
0
City
wid
eD
esig
ner:
Bure
au o
f San
itatio
nC
ity E
ngin
eer's
Est
. (C
lass
A):
42,0
25,0
00$
C
ontra
ctor
:TB
DC
ontra
ct A
war
d Am
ount
:-
$
Proj
. Mgr
.:Al
fredo
Mag
alla
nes
Con
tract
Aw
ard
+ C
ontin
genc
y:-
$
Con
tact
#:
213-
485-
3958
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
10
0%
Fund
ing:
Pro
p O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:D
EC 2
016
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
03/2
9/16
CD
: All
Con
tract
Dur
atio
n:21
12 d
ays
City
wid
eD
esig
ner:
Bure
au o
f San
itatio
nC
ity E
ngin
eer's
Est
. (C
lass
A):
2,76
0,00
0$
Con
tract
or:
Ecol
ogy
Con
trol I
ndus
tries
Con
tract
Aw
ard
Amou
nt:
2,30
0,00
0$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:2,
530,
000
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e(#,
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
76
%
Fund
ing:
Pro
p O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:O
CT
2020
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Phot
o of
cat
ch b
asin
inse
rt
The
proj
ect i
s in
the
post
-co
nstru
ctio
n ph
ase.
The
Cat
ch B
asin
Ope
ning
Scr
een
Cov
ers
Phas
e IV
is in
con
stru
ctio
n
Cat
ch B
asin
Ope
ning
Sc
reen
Cov
ers
Phas
e IV
Ret
rofit
of c
atch
bas
ins
with
op
enin
g sc
reen
cov
ers
and
inse
rts.
Incl
udes
City
-ow
ned
catc
h ba
sins
no
t cov
ered
in P
hase
s I,
II, &
III a
s w
ell a
s al
l Sta
te a
nd C
ount
y ca
tch
basi
ns w
ithin
the
City
.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
N
ov 2
013
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
07
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ju
n 20
05
This
pro
ject
is c
ompl
ete.
This
pro
ject
is c
ompl
ete.
Cat
ch B
asin
Inse
rts a
nd
Cov
ers
Phas
e I
Ret
rofit
of a
ppro
xim
atel
y 24
,219
ca
tch
basi
ns w
ith o
peni
ng s
cree
n co
vers
and
2,6
00 in
serts
. In
clud
es
City
-ow
ned
catc
h ba
sins
not
co
vere
d in
Pha
ses
I & II
, as
wel
l as
all
Stat
e an
d C
ount
y ca
tch
basi
ns w
ithin
the
City
.
Inst
all a
ppro
xim
atel
y 6,
400
scre
ens
in m
ediu
m tr
ash
gene
ratio
n ar
eas,
in th
e C
ity, t
o in
crea
se tr
ash
redu
ctio
n fro
m 2
0%
(acc
ompl
ishe
d in
Pha
se 1
) to
30%
tra
sh re
duct
ion
in B
allo
na C
reek
an
d LA
Riv
er W
ater
shed
s.
Cat
ch B
asin
Ope
ning
Sc
reen
Cov
ers
Phas
e III
Cat
ch B
asin
Ope
ning
Sc
reen
Cov
ers
Phas
e II
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Phot
o of
cat
ch b
asin
scr
een
cove
r
Phot
o of
cat
ch b
asin
scr
een
cove
r
Phot
o of
cat
ch b
asin
scr
een
cove
r
Inst
all 8
,000
inse
rts a
nd 6
,000
sc
reen
s in
the
high
tras
h ge
nera
tion
area
s, in
the
City
, to
achi
eve
20%
tras
h re
duct
ion
in th
e Ba
llona
Cre
ek a
nd L
os A
ngel
es
Riv
er W
ater
shed
s.
27
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
CD
6 -
Nur
y M
artin
ezC
ontra
ct D
urat
ion:
1245
5 W
icks
Stre
etD
esig
ner:
Klei
nfel
der/G
eosy
ntec
City
Eng
inee
r's E
st.
(Cla
ss A
):C
ontra
ctor
:En
viro
nmen
tal C
onst
ruct
ion
Con
tract
Aw
ard
Amou
nt:
Proj
. Mgr
.:Fa
ng C
hang
Con
tract
Aw
ard
+ C
ontin
genc
y:
Con
tact
#:
213-
978-
1896
CO
's to
dat
e(#,
%):
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
100%
12-D
ec-1
1M
aste
r Sch
. C
ompl
etio
n D
ate:
OC
T 20
09
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
07/1
1/11
CD
13
- Mitc
h O
'Far
rell
Con
tract
Dur
atio
n:60
0 D
ays
751
Echo
Par
k Av
enue
Des
igne
r:Bl
ack
& Ve
atch
City
Eng
inee
r's E
st.
(Cla
ss A
):49
,580
,000
$
Con
tract
or:
Ford
E.C
.C
ontra
ct A
war
d Am
ount
:24
,485
,000
$
Proj
. Mgr
.:Ju
lie A
llen
Con
tract
Aw
ard
+ C
ontin
genc
y:26
,933
,500
$
Con
tact
#:
213-
485-
1454
CO
's to
dat
e
(9
3, 8
%):
1,88
2,09
3$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
26,3
67,0
93$
10
0%
Fund
ing:
Pro
p O
& P
rop
K
4-Ju
n-14
Stat
emen
t of
Com
plet
ion
Dat
eN
OV
2013
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
12/1
0/12
CD
6 -
Nur
y M
artin
ezC
ontra
ct D
urat
ion:
180
days
7702
Nor
th E
lmer
Ave
nue
Des
igne
r:Te
tra T
ech
City
Eng
inee
r's E
st.
(Cla
ss A
)30
6,37
5$
C
ontra
ctor
:Ad
jul C
orpo
ratio
nC
ontra
ct A
war
d Am
ount
358,
256
$
Proj
. Mgr
.:Ift
ekha
r Ahm
ed/
N
aush
in K
Con
tract
Aw
ard
+ C
ontin
genc
y:42
9,90
6$
Con
tact
#:
213-
485-
5875
CO
's to
dat
e (7
,-4.
2%):
(15,
131)
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
343,
125
$
100%
Fund
ing:
Pro
p O
& C
ounc
il fo
r W
ater
shed
Hea
lth
19-O
ct-1
5St
atem
ent o
f C
ompl
etio
n D
ate
OC
T 20
13
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
12/0
9/11
CD
6 -
Nur
y M
artin
ezC
ontra
ct D
urat
ion:
197
days
Inte
rsec
tion
of S
unla
nd &
Gle
noak
sD
esig
ner:
Bure
au o
f San
itatio
nC
ity E
ngin
eer's
Est
. (C
lass
A)
508,
696
$
Con
tract
or:
Hol
lyw
ood
Beau
tific
atio
n Te
amC
ontra
ct A
war
d Am
ount
508,
696
$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:50
8,69
6$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e (#
,%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
10
0%
Fund
ing:
Pro
p O
N/A
Stat
emen
t of
Com
plet
ion
Dat
eFE
B 20
14
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Ret
rofit
exi
stin
g ga
s co
llect
ion
syst
em, i
nsta
ll ne
w fl
are
& re
stor
e ca
paci
ty in
adj
acen
t Tuj
unga
Sp
read
ing
Gro
unds
thro
ugh
reno
vatio
n of
clo
sed
colle
ctio
n sy
stem
.
Phot
o of
pro
ject
site
Phot
o of
exi
stin
g la
ke
This
pro
ject
is c
ompl
ete.
Gra
nd O
peni
ng e
vent
occ
urre
d on
Ju
ne 1
5, 2
013.
The
par
k is
ope
n to
th
e pu
blic
.
Proj
ect i
s co
mpl
eted
.
Wor
k or
der c
lose
-out
in p
rogr
ess.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
07
Phot
o of
bio
swal
e co
nstru
ctio
n
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
11
Con
vert
a pa
ved
20' x
270
' alle
y in
to a
poc
ket p
ark
with
wat
er
qual
ity im
prov
emen
ts, i
nclu
ding
a
perv
ious
ped
estri
an p
athw
ay a
nd a
ve
geta
ted
swal
e. S
edim
enta
tion
rem
oval
dev
ices
will
also
be
inst
alle
d.
Echo
Par
k La
ke
Reh
abilit
atio
n
Phot
o of
con
stru
cted
pas
eo w
ith
impr
ovem
ents
Gle
noak
s-Su
nlan
d St
orm
wat
er C
aptu
reTh
is p
roje
ct w
ill in
stal
l inf
iltra
tion
wel
ls a
nd o
ther
sto
rm w
ater
Bes
t M
anag
emen
t Pra
ctic
es (B
MPs
) to
help
alle
viat
e flo
odin
g at
the
subj
ect i
nter
sect
ion
durin
g st
orm
ev
ents
.
In-la
ke im
prov
emen
ts, i
n-la
ke
vege
tatio
n (w
etla
nds)
and
hab
itat
impr
ovem
ents
, and
par
klan
d st
ruct
ural
bes
t man
agem
ent
prac
tices
(sw
ales
), la
ke re
-ci
rcul
atio
n sy
stem
, lak
e ae
ratio
n sy
stem
, rel
ocat
e fo
unta
in p
ump
hous
e.
Elm
er A
venu
e Ph
ase
II:
Elm
er P
aseo
Ces
ar C
have
z G
roun
d W
ater
Impr
ovem
ent
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
11
28
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
07/0
7/08
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:10
0 da
ys
Inte
rsec
tion
Gra
nd &
Riv
iera
Des
igne
r:PS
OM
ASC
ity E
ngin
eer's
Est
. (C
lass
A):
428,
900
$
Con
tract
or:
Andr
ew P
apac
& S
ons
Con
tract
Aw
ard
Amou
nt:
401,
797
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
war
d +
Con
tinge
ncy:
501,
797
$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(5
, -15
%):
(19,
353)
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
382,
444
$
100%
Fund
ing:
Pro
p O
& P
rop
50
7-D
ec-0
9St
atem
ent o
f C
ompl
etio
n D
ate
JUL
2009
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
02/0
3/11
CD
7 -
Vaca
ntC
ontra
ct D
urat
ion:
240
days
Osb
orne
Stre
et @
Foo
thill
Blvd
.D
esig
ner:
MR
CA
City
Eng
inee
r's E
st.
(Cla
ss A
):1,
159,
000
$
C
ontra
ctor
:Le
e C
onst
ruct
ion
Con
tract
Aw
ard
Amou
nt:
955,
257
$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:1,
050,
257
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e
(3
2, 4
1%):
394,
150
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
1,33
4,49
6$
100%
Fund
ing:
Pro
p O
& C
altra
ns-F
TIP
24-F
eb-1
4St
atem
ent o
f C
ompl
etio
n D
ate
JUN
201
2
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/0
4/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:27
0 da
ys
Pers
hing
Driv
e to
Cal
iforn
ia S
treet
Des
igne
r:PS
OM
ASC
ity E
ngin
eer's
Est
. (C
lass
A):
512,
864
$
Con
tract
or:
Park
Wes
t Lan
dsca
pe In
c.C
ontra
ct A
war
d Am
ount
:51
2,86
4$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Aw
ard
+ C
ontin
genc
y:-
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e
(3
, 2%
):72
8,76
5$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
626,
781
$
100%
Fund
ing:
Pro
p O
17-A
ug-1
1St
atem
ent o
f C
ompl
etio
n D
ate
MAR
201
1
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
CD
15
- Joe
Bus
cain
oC
ontra
ct D
urat
ion:
San
Pedr
o Sh
ore/
W. H
arbo
rD
esig
ner:
DM
JM (P
ort o
f Los
Ang
eles
)C
ity E
ngin
eer's
Est
. (C
lass
A):
Con
tract
or:
L.A.
Dee
peni
ng C
onst
ruct
ors
Con
tract
Aw
ard
Amou
nt:
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
war
d +
Con
tinge
ncy:
Con
tact
#:
213-
485-
1411
CO
's to
dat
e
(#
,%):
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
100%
Fund
ing:
Pro
p O
& P
ort o
f LA
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:JU
N 2
009
Pre
Des
ign
Land
Acc
. / R
ight
of
Way
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Con
cept
ual d
raw
ing
of tr
ee w
ell
Phot
o of
com
plet
ed p
roje
ct
Phot
o of
exi
stin
g m
edia
n
Phot
o of
new
san
d pl
acem
ent
Proj
ect i
s co
mpl
eted
.
Proj
ect c
ompl
eted
. Site
is n
ow
open
for p
ublic
use
.
Proj
ect i
s co
mpl
eted
.
The
sand
-repl
acem
ent p
roje
ct is
co
mpl
ete.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Rec
onto
ur re
crea
tiona
l bea
ch a
nd
repl
ace
beac
h sa
nd to
pre
vent
flo
odin
g, p
rom
ote
drai
nage
and
sa
nd fl
ushi
ng to
impr
ove
wat
er
qual
ity. P
roje
ct is
bei
ng
cons
truct
ed b
y th
e H
arbo
r Dep
t. Pr
op O
is fu
ndin
g up
to $
8.0
M.
Stor
mw
ater
runo
ff fro
m th
ree
exis
ting
park
ing
lots
will
be s
ent
thro
ugh
new
ly co
nstru
cted
se
dim
ent f
oreb
ays
for r
emov
al o
f tra
sh &
sed
imen
ts p
rior t
o w
etla
nds
disc
harg
e.
Inst
all s
even
sto
rmw
ater
bi
oret
entio
n fil
ters
in a
hig
h-de
nsity
re
side
ntia
l and
com
mer
cial
cor
ridor
in
the
Veni
ce a
rea
to tr
eat r
unof
f fro
m 6
.8 a
cres
.
Inne
r Cab
rillo
Bea
ch
Bact
eria
l WQ
I
Gra
nd B
lvd.
Tre
e W
ells
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Se
p 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
07
Incl
udes
one
200
-feet
long
gra
ss
swal
e, o
ne 2
50-fe
et lo
ng in
filtra
tion
trenc
h (7
‘D x
10’
W) w
ith n
ativ
e ve
geta
tion
alon
g th
e fu
ll le
ngth
of
the
med
ian,
& lo
cal r
egra
ding
to
redu
ce p
ondi
ng in
the
med
ian
at
Mai
n St
.
Impe
rial H
wy
Sunk
en
Med
ian
Stor
mw
ater
BM
P
Han
sen
Dam
Wet
land
s R
esto
ratio
n
29
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STN
otic
e to
Pro
ceed
:N
/A
CD
10
- Her
b J.
Wes
son,
Jr.
Con
tract
Dur
atio
n:N
/A
2800
S. F
airfa
x Av
enue
Des
igne
r:PS
OM
ASC
ity E
ngin
eer's
Est
. (C
lass
A):
5,61
7,50
0$
Con
tract
or:
TBD
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:Ift
ekha
r Ahm
ed/
Nau
shin
Kam
alC
ontra
ct A
ward
+
Con
tinge
ncy:
-$
Con
tact
#:
213-
485-
5875
CO
's to
dat
e
(#,%
):-
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
ON
/AM
aste
r Sch
. C
ompl
etio
n D
ate:
N/A
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
02/1
0/10
CD
4 -
Tom
LaB
onge
Con
tract
Dur
atio
n:30
7 da
ys
5333
Zoo
Driv
eD
esig
ner:
Tetra
Tec
hC
ity E
ngin
eer's
Est
. (C
lass
A):
7,97
9,50
0$
Con
tract
or:
Pim
a C
o.C
ontra
ct A
ward
Am
ount
:4,
227,
360
$
Proj
. Mgr
.:Ift
ekha
r Ahm
ed/
Nau
shin
Kam
alC
ontra
ct A
ward
+
Con
tinge
ncy:
4,65
0,09
6$
Con
tact
#:
213-
485-
5875
CO
's to
dat
e
(4
0, 6
%):
251,
853
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
4,47
9,21
3$
100%
Phot
o of
com
plet
ed p
roje
ctFu
ndin
g: P
rop
O
2-Ju
l-12
Stat
emen
t of
Com
plet
ion
Dat
eJU
L 20
11
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/1
3/13
CD
15
- Joe
Bus
cain
oC
ontra
ct D
urat
ion:
830
days
PCH
& V
erm
ont A
venu
eD
esig
ner:
CD
M S
mith
/Par
sons
City
Eng
inee
r's E
st.
(Cla
ss A
)15
,910
,250
$
Con
tract
or:
Ford
E.C
.C
ontra
ct A
ward
Am
ount
:14
,940
,264
$
Proj
. Mgr
.:Al
len
Wan
gC
ontra
ct A
ward
+
Con
tinge
ncy:
16,4
34,2
90$
Con
tact
#:
(213
) 485
-141
1C
O's
to d
ate
(84,
8%
)1,
153,
527
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
16,0
93,7
91$
10
0%
Phot
o of
pro
ject
site
afte
r rem
oval
of i
nv
Fund
ing:
Pro
p O
, LA
Cou
nty,
&
Prop
50
17-A
pr-1
7St
atem
ent o
f C
ompl
etio
n D
ate
AUG
201
5
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
10/1
6/15
CD
15
- Joe
Bus
cain
oC
ontra
ct D
urat
ion:
N/A
PCH
& V
erm
ont A
venu
eD
esig
ner:
N/A
City
Eng
inee
r's E
st.
(Cla
ss A
)-
$
Con
tract
or:
Arca
dis
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:Al
len
Wan
gC
ontra
ct A
ward
+
Con
tinge
ncy:
-$
Con
tact
#:
(213
) 485
-141
1C
O's
to d
ate
(0, 0
%)
-$
Boa
rd A
ccep
tanc
e R
epor
t Dat
eAw
ard
Amou
nt +
C
O's
Issu
ed-
$
71%
Fund
ing:
Pro
p O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:JA
N 2
020
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
07
Post
con
stru
ctio
n 5-
year
hab
itat
miti
gatio
n an
d m
onito
ring
perio
d fo
r the
Mac
hado
Lak
e-Ph
ase
I (W
ilmin
gton
Dra
in)
Proj
ect,
requ
ired
by th
e C
alifo
rnia
D
epar
tmen
t of F
ish
and
Wild
life
Perm
it an
d H
abita
t Res
tora
tion
Miti
gatio
n an
d M
onito
ring
Plan
(H
RM
MP)
.
Mac
hado
Lak
e-Ph
ase
l (W
ilmin
gton
Dra
in) H
RM
MP
Phot
o of
pro
ject
site
afte
r rem
oval
of
inva
sive
pla
nts
Proj
ect c
ompl
eted
. Site
is n
ow
open
for p
ublic
use
.
This
pro
ject
is c
ompl
ete
Miti
gatio
n cr
edit
purc
hase
was
co
mpl
eted
in A
pril
2019
. BO
E an
d Ar
cadi
s st
aff c
ondu
cted
pre
-in
spec
tion
wal
k an
d de
term
ined
it if
re
ady
for C
DFW
fiel
d in
spec
tion.
PER
CEN
T C
OM
PLET
E
Con
stru
ct fl
ow d
iver
sion
, lift
-st
atio
n, h
ydro
dyna
mic
sep
arat
or,
unde
rgro
und
tank
, bio
-rete
ntio
n ar
ea, s
tora
ge ta
nk, e
fflue
nt p
ump
stat
ion,
reci
rcul
atio
n pu
mp
syst
em
and
an o
verfl
ow s
yste
m.
Inst
all t
rash
net
ting
syst
ems,
in
stal
l sm
art i
rriga
tion
in
land
scap
ed a
reas
, use
bio
filte
rs
or s
imila
r veg
etat
ed B
MPs
, and
re
cont
our a
nd a
lign
the
chan
nel.
Con
stru
ct s
torm
wat
er b
est
man
agem
ent p
ract
ices
incl
udin
g tra
sh c
aptu
re d
evic
es, p
orou
s pa
vem
ent a
nd b
iosw
ales
at t
he
Zoo
Park
ing
Lot.
On
4/1/
09, C
ity C
ounc
il ca
ncel
ed
this
pro
ject
. The
Wes
tsid
e Pa
rk
Rai
nwat
er Ir
rigat
ion
proj
ect w
as
appr
oved
to re
plac
e it.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Fe
b 20
07
Mac
hado
Lak
e-Ph
ase
l (W
ilmin
gton
Dra
in)
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
07
La C
iene
ga/F
airfa
x St
orm
wat
er B
MP
LA Z
oo P
arki
ng L
ot
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
100
0
30
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
03/0
3/14
CD
15
- Joe
Bus
cain
o
Con
tract
Dur
atio
n:10
40 d
ays
PCH
& V
erm
ont A
venu
eD
esig
ner:
CD
M S
mith
City
Eng
inee
r's E
st.
(Cla
ss A
)79
,000
,000
$
Con
tract
or:
OH
L U
SAC
ontra
ct A
ward
Am
ount
:74
,841
,795
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
:82
,341
,795
$
Con
tact
#:
(213
) 485
-449
6C
O's
to d
ate
(5
5%)
(551
,348
)$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
:74
,290
,447
$
84
%
Phot
o of
exi
stin
g la
keFu
ndin
g: P
rop
O, C
oast
al
Con
serv
ancy
, Qui
mby
& P
rop
K
TBD
Stat
emen
t of
Com
plet
ion
Dat
e:FE
B 20
18
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/0
3/17
CD
15
- Joe
Bus
cain
o
Con
tract
Dur
atio
n:N
/A
PCH
& V
erm
ont A
venu
eD
esig
ner:
N/A
City
Eng
inee
r's E
st.
(Cla
ss A
)-
$
Con
tract
or:
Arca
dis
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:Ka
tie D
oher
tyC
ontra
ct A
ward
+
Con
tinge
ncy
:-
$
Con
tact
#:
(213
) 847
-039
5C
O's
to d
ate
(0
, 0%
)-
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
:-
$
37%
Phot
o of
hab
itat
Fund
ing:
Pro
p O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:JU
N 2
022
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/0
4/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:36
5 da
ys
1143
0 W
. Woo
dbin
eD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):2,
979,
900
$
Con
tract
or:
LA E
ngin
eerin
g In
c.C
ontra
ct A
ward
Am
ount
:2,
340,
120
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
2,
790,
120
$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(1
8, 3
%):
65,7
02$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
2,40
5,82
2$
100%
Phot
o of
con
stru
ctio
n si
teFu
ndin
g: P
rop
O, P
rop
50 &
AR
RA
12-D
ec-1
1St
atem
ent o
f C
ompl
etio
n D
ate
JAN
201
1
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
02/2
8/18
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:33
2 da
ys
1143
0 W
. Woo
dbin
eD
esig
ner:
Lee
& R
o, In
c.C
ity E
ngin
eer's
Est
. (C
lass
A):
Con
tract
or:
Mur
ray
Con
tract
Awa
rd
Amou
nt:
369,
613
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
40
7,00
0$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(0
, 0%
):
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
369,
613
$
85%
Phot
o of
con
stru
ctio
n si
teFu
ndin
g: P
rop
O
TBD
Stat
emen
t of
Com
plet
ion
Dat
e:JU
N 2
018
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Phas
e II
will
inst
all a
n irr
igat
ion
syst
em w
hich
will
use
sto
rmw
ater
w
ater
from
the
an e
xist
ing
260,
000
gallo
n un
derg
roun
d ci
ster
n, to
irrig
ate
turf
on th
e no
rther
ly s
ide
of th
e pa
rk n
ear
Saw
telle
Bou
leva
rd a
nd th
e ex
istin
g pl
ante
r box
es a
long
the
perim
eter
of t
he te
nnis
cou
rts. T
he
scop
e w
ill a
lso
incl
ude
the
inst
alla
tion
of a
des
ert g
arde
n.
Mac
hado
Lak
e Ec
osys
tem
R
ehab
ilitat
ion
HR
MM
PPo
st c
onst
ruct
ion
5-ye
ar h
abita
t m
itiga
tion
and
mon
itorin
g pe
riod
for t
he M
acha
do L
ake
Ecos
yste
m
Reh
abili
tatio
n Pr
ojec
t, re
quire
d by
th
e C
alifo
rnia
Dep
artm
ent o
f Fis
h an
d W
ildlif
e Pe
rmit
and
Hab
itat
Res
tora
tion
Miti
gatio
n an
d M
onito
ring
Plan
(HR
MM
P).
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
07
Mac
hado
Lak
e Ec
osys
tem
R
ehab
ilitat
ion
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Ja
n 20
07
In-la
ke re
habi
litat
ion
tech
niqu
es,
ripar
ian
syst
em e
nhan
cem
ents
, an
d tre
atm
ent b
est m
anag
emen
t pr
actic
es.
Mar
Vis
ta R
ecre
atio
n C
ente
r St
orm
wat
er B
MP
Ph II
This
pro
ject
is c
ompl
ete.
The
proj
ect i
s in
the
post
-co
nstru
ctio
n ph
ase.
The
proj
ect i
s in
pos
t-con
stru
ctio
n
The
post
-cos
ntru
ctio
n ha
bita
t re
stor
atio
n m
itiga
tion
and
mon
itorin
g is
ong
oing
.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
stru
ctio
n of
a s
torm
wat
er li
ft st
atio
n, h
ydro
dyna
mic
sep
arat
or,
unde
rgro
und
dete
ntio
n ta
nk,
chlo
rinat
ion
faci
lity,
fina
l effl
uent
pu
mp
stat
ion,
reci
rcul
atio
n pu
mp,
an
d ov
erflo
w p
ipin
g at
Mar
Vis
ta
Park
.
Mar
Vis
ta R
ecre
atio
n C
ente
r St
orm
wat
er B
MP
31
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
CD
13
- Mitc
h O
'Far
rell
Con
tract
Dur
atio
n:
betw
een
Blak
e Av
enue
& L
A R
iver
Des
igne
r:N
orth
Eas
t Tre
es (N
ET)
City
Eng
inee
r's E
st.
(Cla
ss A
):-
$
Con
tract
or:
Stre
et S
ervi
ces
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:D
ean
Har
ding
Con
tract
Awa
rd +
C
ontin
genc
y (#
,%)
-$
Con
tact
#:
213-
473-
4242
CO
's to
dat
e
(#
, %):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
100%
Phot
o of
new
sid
ewal
k an
d st
orm
wat
er F
undi
ng: P
rop
O, P
rop
13 &
CW
A
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:JU
L 20
07
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
02/2
2/10
CD
15
- Joe
Bus
cain
oC
ontra
ct D
urat
ion:
593
days
560
N. W
este
rn A
venu
eD
esig
ner:
Tetra
Tec
hC
ity E
ngin
eer's
Est
. (C
lass
A):
4,00
0,64
1$
Con
tract
or:
C.S
. Leg
acy
Con
stru
ctio
n, In
cC
ontra
ct A
ward
Am
ount
:3,
636,
946
$
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
ward
+
Con
tinge
ncy
(10%
)4,
000,
640
$
Con
tact
#:
213-
485-
1411
CO
's to
dat
e
(3
0, 8
%):
301,
760
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
3,93
8,70
6$
100%
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
O, P
rop
50 &
Rec
an
d Tr
ails
Gra
nt
23-J
ul-1
2St
atem
ent o
f C
ompl
etio
n D
ate
OC
T 20
11
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
12/1
2/10
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:60
0 da
ys
1216
E. R
ose
Ave
Des
igne
r:Br
own
& C
aldw
ell
City
Eng
inee
r's E
st.
(Cla
ss A
):13
,878
,500
$
Con
tract
or:
Paci
fic H
ydro
tech
Con
tract
Awa
rd
Amou
nt:
11,3
60,7
00$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
(10%
)12
,500
,700
$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(6
9, 8
%):
881,
734
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
12,2
42,4
34$
10
0%
Phot
o of
con
stru
ctio
n si
teFu
ndin
g: P
rop
O, D
ept.
Wat
er
Res
ourc
es &
LAC
DPW
17-O
ct-1
4St
atem
ent o
f C
ompl
etio
n D
ate
FEB
2014
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/1
6/16
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:46
0 da
ys
1216
E. R
ose
Ave
Des
igne
r:C
arol
lo E
ngin
eers
City
Eng
inee
r's E
st.
(Cla
ss A
):2,
275,
000
$
Con
tract
or:
Gre
en B
uild
ing
Cor
p.C
ontra
ct A
ward
Am
ount
:3,
037,
000
$
Proj
. Mgr
.:Ka
tie D
oher
tyC
ontra
ct A
ward
+
Con
tinge
ncy
(10%
)3,
341,
000
$
Con
tact
#:
213-
847-
0395
CO
's to
dat
e
(4
.18%
):12
6,88
4$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
3,16
3,88
4$
52%
Prop
osed
pro
ject
layo
ut.
Fund
ing:
Pro
p O
& P
rop
84
TBD
Stat
emen
t of
Com
plet
ion
Dat
e:AU
G 2
018
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
The
proj
ect i
s in
pos
t-con
stru
ctio
n.
This
pro
ject
is c
ompl
ete.
Inst
all v
eget
ated
bio
-sw
ales
, in
filtra
tion
strip
s, s
torm
wat
er c
atch
ba
sins
, arm
orin
g an
d re
-ve
geta
tion
for b
ank
stab
iliza
tion,
an
d a
step
poo
l cha
nnel
in P
eck
Park
.
Cap
ture
& tr
eat d
ry/w
et w
eath
er
runo
ff. D
ry w
eath
er ru
noff
to b
e di
verte
d to
san
itary
sew
er fo
r tre
atm
ent.
Wet
wea
ther
runo
ff to
be
div
erte
d to
the
unde
rgro
und
stor
age
tank
for d
isch
arge
to
sani
tary
sew
er.
This
pro
ject
is c
ompl
eted
.
Phas
e II
of th
e Pe
nmar
Wat
er
Qua
lity
Impr
ovem
ent P
roje
ct
prop
oses
the
cons
truct
ion
of a
n on
site
sto
rmw
ater
trea
tmen
t /
disi
nfec
tion
syst
em. T
he tr
eate
d st
orm
wat
er is
to b
e us
ed fo
r la
ndsc
ape
irrig
atio
n.
Penm
ar W
ater
Qua
lity
Impr
ovem
ent P
hase
II
Con
duct
ing
Miti
gatio
n M
easu
res
esta
blis
hmen
t and
Bes
t M
anag
emen
t Pra
ctic
es (B
MP)
op
timiz
atio
n.
Con
stru
ct fi
ve c
urb
side
"s
torm
wat
er g
arde
ns" i
n st
reet
pa
rkw
ay a
nd a
larg
e in
filtra
tion
galle
ry b
enea
th S
teel
head
Par
k.
Peck
Par
k C
anyo
n En
hanc
emen
t
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
N
ov 2
006
Penm
ar W
ater
Qua
lity
Impr
ovem
ent P
hase
I
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Oro
s G
reen
Stre
et
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
100
0
32
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
TBD
CD
6 -
Nur
y M
artin
ezC
ontra
ct D
urat
ion:
TBD
8175
& 8
216
Fair
Aven
ueD
esig
ner:
LA C
ount
yC
ity E
ngin
eer's
Est
. (C
lass
A):
-$
Con
tract
or:
N/A
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
-$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(#
,%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
97
%
Prop
osed
pro
ject
site
pla
nFu
ndin
g: P
rop
O &
L.A
. Cou
nty
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:AP
R 2
022
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
01/1
7/11
CD
15
- Joe
Bus
cain
oC
ontra
ct D
urat
ion:
640
days
1500
0 S.
Ver
mon
t Ave
nue
Des
igne
r:W
ither
s &
Sand
gren
City
Eng
inee
r's E
st.
(Cla
ss A
):3,
500,
000
$
Con
tract
or:
Hor
izon
Con
stru
ctio
n In
tl.C
ontra
ct A
ward
Am
ount
:3,
195,
540
$
Proj
. Mgr
.:R
ay A
rauj
oC
ontra
ct A
ward
+
Con
tinge
ncy:
3,51
5,09
4$
Con
tact
#:
213-
473-
9717
CO
's to
dat
e
(4
, 2%
):32
,151
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
3,23
7,94
0$
100%
Phot
o of
com
plet
ed c
onst
ruct
ion
site
Fund
ing:
Pro
p O
& P
rop
K
TBD
Stat
emen
t of
Com
plet
ion
Dat
eFE
B 20
14
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
07/0
6/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:36
6 da
ys
PCH
Sev
eral
Loc
atio
nsD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):3,
714,
300
$
Con
tract
or:
LA E
ngin
eerin
g, In
c.C
ontra
ct A
ward
Am
ount
:3,
024,
545
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
3,32
7,00
0$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(2
6, 6
%):
121,
970
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
3,14
6,51
5$
100%
Phot
o of
Mar
quez
Ave
. LFD
Fund
ing:
Pro
p O
, Pro
p 50
&
ARR
A
30-A
pr-1
2St
atem
ent o
f C
ompl
etio
n D
ate
JAN
201
1
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
07/2
7/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:TB
D
At T
emes
cal C
anyo
n Pa
rkD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):1,
807,
900
$
Con
tract
or:
LA E
ngin
eerin
g, In
c.C
ontra
ct A
ward
Am
ount
:1,
207,
440
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
(9.9
%)
1,32
7,44
0$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(1
1, 3
%):
42,0
74$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
1,24
9,51
4$
100%
Phot
o of
Tem
esca
l Cyn
LFD
Fund
ing:
Pro
p O
& A
RR
A
19-D
ec-1
1St
atem
ent o
f C
ompl
etio
n D
ate
JAN
201
1
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
The
proj
ect w
ill c
onve
rt a
30-a
cre
land
fill t
o a
wet
land
s pa
rk fa
cilit
y
to p
rovi
de e
nhan
ced
wat
er q
ualit
y,
flood
pro
tect
ion,
hab
itat c
reat
ion,
gr
ound
wat
er re
char
ge,
recr
eatio
nal a
nd w
ater
reus
e. (
fo
rmer
ly th
e St
rath
ern
Pit M
ultiu
se
Proj
ect )
Ros
ecra
ns R
ec. C
ente
r St
orm
wat
er E
nhan
cem
ents
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
N
ov 2
006
SMBL
FD U
pgra
des
Pkg
1Pr
ojec
t is
com
plet
e.
Proj
ect i
s co
mpl
ete.
Proj
ect c
ontin
ues
in th
e po
st
cons
truct
ion
phas
e. B
urea
u of
Sa
nita
tion
and
the
Bure
au o
f En
gine
erin
g co
ntin
ue im
plem
ent
optim
izat
ion
of th
e sy
stem
.
Inst
all "
SMAR
T" ir
rigat
ion
syst
em,
bios
wal
es, v
eget
ated
rete
ntio
n ba
sins
, inf
iltra
tion
basi
ns,
synt
hetic
soc
cer f
ield
, de
com
pose
d gr
anite
pat
hway
, and
la
ndsc
apin
g.
Upg
rade
Mar
quez
, Bay
Clu
b,
Thor
nton
, Ven
ice
Pavi
lion,
and
Im
peria
l Low
Flo
w D
iver
sion
sy
stem
s to
div
ert b
oth
sum
mer
an
d w
inte
r dry
-wea
ther
flow
s, in
or
der t
o co
mpl
y w
ith th
e ba
cter
ia
TMD
L w
inte
r dry
-wea
ther
re
gula
tions
.
Ror
y M
. Sha
w W
etla
nds
Park
SMBL
FD U
pgra
des
Pkg
2
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
O
ct 2
006
Upg
rade
the
exis
ting
Tem
esca
l C
anyo
n Lo
w F
low
Div
ersi
on
Syst
em to
com
ply
with
the
bact
eria
TM
DL
win
ter d
ry w
eath
er
regu
latio
ns.
Los
Ange
les
Cou
nty
cont
inue
s in
th
e de
sign
pha
se.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
33
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
10/2
0/10
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:66
0 da
ys
Alon
g PC
HD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):8,
684,
000
$
Con
tract
or:
Bloi
s C
onst
ruct
ion
Con
tract
Awa
rd
Amou
nt:
8,46
8,45
1$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
9,31
5,45
1$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(4
5, -.
24%
):(1
9,92
9)$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
8,44
8,52
2$
100%
Phot
o of
relie
f sew
er lo
catio
nFu
ndin
g: P
rop
O
2-Ju
n-14
Stat
emen
t of
Com
plet
ion
Dat
eAP
R 2
013
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
02/0
5/14
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:36
0 da
ys
Alon
g PC
HD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):8,
261,
000
$
Con
tract
or:
Ford
E.C
.C
ontra
ct A
ward
Am
ount
:8,
784,
278
$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
10,7
74,2
93$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(7
5, 2
8%):
2,46
1,25
7$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
11,2
45,5
35$
10
0%
Phot
o of
pro
ject
loca
tion
Fund
ing:
Pro
p O
& S
CM
12-F
eb-1
8St
atem
ent o
f C
ompl
etio
n D
ate
OC
T 20
15
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
09/2
3/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:36
5 D
AYS
Will
Rog
ers
Beac
h Pa
rkin
g Lo
tD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):3,
798,
800
$
Con
tract
or:
Grif
fith
Com
pany
Con
tract
Awa
rd
Amou
nt:
2,27
9,00
0$
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy:
2,50
7,00
0$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(1
0, 8
%):
178,
640
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
2,45
7,64
0$
100%
Phot
o of
cha
nnel
at d
iver
sion
site
Fund
ing:
Pro
p O
& P
rop
50
24-O
ct-1
1St
atem
ent o
f C
ompl
etio
n D
ate
JUL
2011
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
04/0
9/10
CD
9 -
Cur
ren
D. P
rice,
Jr.
Con
tract
Dur
atio
n:68
3 da
ys
54th
St &
Ava
lon
Boul
evar
dD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):10
,354
,300
$
Con
tract
or:
Ford
E.C
.C
ontra
ct A
ward
Am
ount
:6,
370,
000
$
Proj
. Mgr
.:Jo
hn S
aldi
nC
ontra
ct A
ward
+
Con
tinge
ncy:
7,29
7,00
0$
Con
tact
#:
213-
485-
1411
CO
's to
dat
e
(6
7, 1
1%):
713,
375
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
7,02
9,37
9$
100%
Ren
derin
g of
pro
pose
d pr
ojec
t
24-M
ay-1
3St
atem
ent o
f C
ompl
etio
n D
ate
JUL
2012
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Con
stru
ct a
wet
land
s pa
rk a
t 54t
h St
. and
Ava
lon
Blvd
to im
prov
e ar
ea s
torm
wat
er q
ualit
y, a
nd
prov
ide
recr
eatio
nal s
pace
for t
he
surro
undi
ng c
omm
unity
.
Proj
ect i
s co
mpl
ete.
Proj
ect i
s co
mpl
ete.
The
wet
land
s ce
lls a
re in
the
optim
izat
ion
phas
e.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
stru
ct a
relie
f sew
er (C
IRS)
to
the
Coa
stal
Inte
rcep
tor S
ewer
in
orde
r to
com
ply
with
the
bact
eria
TM
DL
win
ter d
ry-w
eath
er
regu
latio
ns.
SMBL
FD U
pgra
des
Pkg
4Th
is p
roje
ct w
ill u
pgra
de th
e ex
istin
g Lo
w F
low
Div
ersi
on
Syst
em a
t San
ta M
onic
a C
anyo
n an
d Pa
lisad
es P
ark
Low
Flo
w
Div
ersi
on S
yste
m. U
pgra
des
incl
ude
pum
p an
d el
ectri
cal
upgr
ades
and
aut
omat
ic c
ontro
l fro
m V
enic
e Pu
mp
Plan
t.
SMBL
FD U
pgra
des
Pkg
3
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
Sout
h Lo
s An
gele
s W
etla
nds
Park
Con
stru
ctio
n w
ork
has
been
co
mpl
eted
.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Au
g 20
06
SMBL
FD U
pgra
des
Pkg
3 Ph
ase
2
Con
stru
ct a
relie
f sew
er (C
IRS)
to
the
Coa
stal
Inte
rcep
tor S
ewer
in
orde
r to
com
ply
with
the
bact
eria
TM
DL
win
ter d
ry-w
eath
er
regu
latio
ns.
34
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
CD
6 -
Nur
y M
artin
ez
p
Acqu
isiti
on C
ost:
$10,
000,
000
8175
& 8
216
Fair
Aven
ueD
esig
ner:
LA C
ount
y
Con
tract
or:
N/A
Proj
. Mgr
.:An
dy F
lore
s
Con
tact
#:
213-
485-
4496
Boa
rd A
ccep
tanc
e R
epor
t D
ate
100%
Prop
osed
pro
ject
site
pla
nFu
ndin
g: P
rop
O &
LA
Cou
nty
N/A
Expe
cted
Acq
uisi
tion
Dat
e:TB
D
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
08/1
7/11
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:61
6 da
ys
200
N. T
emes
cal C
anyo
n R
d.
Des
igne
r:AE
CO
MC
ity E
ngin
eer's
Est
. (C
lass
A):
8,00
8,80
0$
Con
tract
or:
LA E
ngin
eerin
g, In
c.C
ontra
ct A
ward
Am
ount
:7,
019,
800
$
Proj
. Mgr
.:N
aush
in K
amal
Con
tract
Awa
rd +
C
ontin
genc
y:8,
701,
780
$
Con
tact
#:
213-
847-
0342
CO
's to
dat
e
(6
2, 2
7%):
1,90
0,09
5$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
8,91
9,89
5$
100%
Phot
o of
pla
ygro
und
and
new
rest
room
sFun
ding
: Pro
p O
30-J
an-1
7St
atem
ent o
f C
ompl
etio
n D
ate
APR
201
5
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
05/1
6/16
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:42
0 da
ys
362
N. T
emes
cal C
anyo
n R
d.D
esig
ner:
Car
ollo
Eng
inee
rsC
ity E
ngin
eer's
Est
. (C
lass
A):
2,46
7,00
0$
Con
tract
or:
Gre
en B
uild
ing
Cor
p.C
ontra
ct A
ward
Am
ount
:2,
817,
500
$
Proj
. Mgr
.:Ka
tie D
oher
tyC
ontra
ct A
ward
+
Con
tinge
ncy
(%)
3,09
9,25
0$
Con
tact
#:
213-
847-
0395
CO
's to
dat
e
(6
.77%
):19
0,82
9$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
52
%
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
O
TBD
Stat
emen
t of
Com
plet
ion
Dat
e:AU
G 2
018
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
CD
8 -
Mar
quee
ce H
arris
-Daw
son
Con
tract
Dur
atio
n:10
4 da
ys
Verm
ont A
ve.
Des
igne
r:Ar
cadi
s/Te
tra T
ech
City
Eng
inee
r's E
st.
(Cla
ss A
):66
5,50
0$
Con
tract
or:
Cla
rke
Con
tract
ing
Cor
p.
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
(%)
686,
400
$
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(0
%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
624,
000
$
79%
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
O &
IRW
MP
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:JU
N, 2
019
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Phas
e I i
nclu
des
inst
alla
tion
of
BMPs
in th
e pu
blic
righ
t-of-w
ay in
or
aro
und
an e
xist
ing
med
ian
to
colle
ct a
nd tr
eat t
he 8
5th
perc
entil
e st
orm
wat
er ru
noff
from
a
4.7
acre
are
a th
at d
rain
s w
est
tow
ard
the
sout
heas
t cor
ner o
f G
age
Aven
ue a
nd V
erm
ont
Aven
ue.
The
proj
ect i
s in
the
cons
truct
ion
phas
e.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
&
AOC
Sep
t 201
7
Proj
ect i
s co
mpl
ete.
Proj
ect i
s co
mpl
ete.
The
proj
ect i
s in
pos
t-con
stru
ctio
n.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
O
ct 2
006
Acqu
ire th
e la
nd n
eces
sary
to
conv
ert a
30-
acre
gra
vel p
it si
te
into
a m
ultip
urpo
se fa
cilit
y de
dica
ted
to s
torm
wat
er re
tent
ion
and
reus
e.
Tem
esca
l Can
yon
Park
St
orm
wat
er B
MP
Ph II
Phas
e II
of th
e Te
mes
cal C
anyo
n Pa
rk S
torm
wat
er B
MP
Proj
ect
prop
oses
the
cons
truct
ion
of a
n on
site
sto
rmw
ater
trea
tmen
t /
disi
nfec
tion
syst
em. T
he tr
eate
d st
orm
wat
er is
to b
e us
ed fo
r la
ndsc
ape
irrig
atio
n.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Div
ert s
torm
wat
er fr
om a
n ex
istin
g st
orm
dra
in to
Tem
esca
l Can
yon
Park
for t
reat
men
t by
a hy
drod
ynam
ic s
epar
ator
, un
derg
roun
d de
tent
ion
tank
and
di
vers
ion
to a
san
itary
sew
er fo
r tre
atm
ent a
t tre
atm
ent p
lant
.
Stra
ther
n Pi
t Mul
tiuse
- La
nd
Acqu
isiti
on
Tem
esca
l Can
yon
Park
St
orm
wat
er B
MP
Ph I
Verm
ont A
ve. S
torm
wat
er
Cap
ture
- Ph
ase
1
35
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
CD
8 -
Mar
quee
ce H
arris
-Daw
son
Con
tract
Dur
atio
n:
Verm
ont A
ve.
Des
igne
r:Ar
cadi
s/Te
tra T
ech
City
Eng
inee
r's E
st.
(Cla
ss A
):
Con
tract
or:
Con
tract
Awa
rd
Amou
nt:
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
(%)
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(1
, 0.0
6%):
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
98
%
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
O &
MTA
Gra
nt
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:FE
B 20
21
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:
Los
Ange
les
Wor
ld A
irpor
tD
esig
ner:
AEC
OM
City
Eng
inee
r's E
st.
(Cla
ss A
):26
,500
,000
$
Con
tract
or:
TBD
Con
tract
Awa
rd
Amou
nt:
-$
Proj
. Mgr
.:Sa
lem
Gar
awi
Con
tract
Awa
rd +
C
ontin
genc
y:-
$
Con
tact
#:
213-
847-
0345
CO
's to
dat
e
(#
,%):
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
Prop
osed
pro
ject
layo
utFu
ndin
g: P
rop
O
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:TB
D
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
03/0
4/09
CD
11
- Mik
e Bo
nin
Con
tract
Dur
atio
n:16
0 da
ys
1203
Sou
th M
ain
Stre
etD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):37
3,00
0$
Con
tract
or:
Flem
ing
Envi
ronm
enta
l, In
c.C
ontra
ct A
ward
Am
ount
:28
5,33
0$
Proj
. Mgr
.:Sa
lem
Gar
awi
Con
tract
Awa
rd +
C
ontin
genc
y:38
5,33
0$
Con
tact
#:
213-
847-
0345
CO
's to
dat
e
(3
, -11
%):
(30,
370)
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
254,
585
$
100%
Phot
o of
exi
stin
g do
g pa
rkFu
ndin
g: P
rop
O
7-Se
p-11
Stat
emen
t of
Com
plet
ion
Dat
eM
AR 2
010
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
06/0
3/10
CD
10
- Her
b J.
Wes
son,
Jr.
Con
tract
Dur
atio
n:27
0 da
ys
2785
Cly
de A
venu
eD
esig
ner:
PSO
MAS
City
Eng
inee
r's E
st.
(Cla
ss A
):2,
766,
900
$
Con
tract
or:
PPC
Con
stru
ctio
n, In
c.C
ontra
ct A
ward
Am
ount
:2,
675,
963
$
Proj
. Mgr
.:Ift
ekha
r Ahm
ed/
Nau
shin
Kam
alC
ontra
ct A
ward
+
Con
tinge
ncy:
2,94
3,55
9$
Con
tact
#:
213-
485-
5875
CO
's to
dat
e
(3
7, 2
2%):
600,
216
$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
3,27
6,17
9$
100%
Phot
o of
com
plet
ed p
ark
Fund
ing:
Pro
p O
, Pro
p 50
, Pro
p K,
Q
uim
by
6-Au
g-12
Stat
emen
t of
Com
plet
ion
Dat
eO
CT
2011
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
009
Phas
e II
will
prov
ide
stor
mw
ater
and
ur
ban
runo
ff tre
atm
ent,
infil
tratio
n an
d ca
ptur
e an
d us
e fo
r ev
apot
rans
pira
tion
by v
eget
atio
n in
st
orm
wat
er B
MPs
; gre
en s
pace
on
side
wal
ks a
nd m
edia
ns; a
nd a
re
duct
ion
of lo
cal f
lood
ing
durin
g st
orm
eve
nts.
Thi
s pr
ojec
t is
loca
ted
alon
g Ve
rmon
t Ave
nue,
bet
wee
n G
age
Aven
ue a
nd F
lore
nce
Aven
ue,
wes
t of H
oove
r Stre
et.
Incl
udes
inst
alla
tion
of a
mod
ular
co
nstru
cted
wet
land
(b
iore
med
iatio
n fil
ter),
so
that
on-
site
runo
ff w
ill b
e ca
ptur
ed a
nd
treat
ed p
rior t
o di
scha
rgin
g in
to
the
stor
m d
rain
sys
tem
.
Wes
tche
ster
Sto
rmw
ater
BM
PPr
ojec
t is
in b
id &
aw
ard
Proj
ect i
s co
mpl
ete.
Proj
ect c
ompl
eted
. Sev
ente
en
(17)
sol
ar li
ghts
inst
alle
d by
R
ecre
atio
n &
Park
s.
The
Proj
ect i
s cu
rrent
ly in
the
desi
gn p
hase
.
Wes
tsid
e Pa
rk R
ainw
ater
Irr
igat
ion
Trea
t pol
luta
nts
from
on-
site
and
of
f-site
sto
rmw
ater
by
inst
allin
g a
stor
mw
ater
lift
stat
ion,
a
subs
urfa
ce ir
rigat
ion
syst
em, a
nd
a dr
y cr
eek
with
a p
erfo
rate
d pi
pe
for c
olle
ctin
g an
d re
turn
ing
exce
ss
irrig
atio
n w
ater
to th
e ex
istin
g st
orm
dra
in.
Cap
ture
and
trea
t sto
rmw
ater
ru
noff
from
thre
e ex
istin
g st
orm
dr
ains
thro
ugh
the
proj
ect B
MP
elem
ents
, inc
ludi
ng T
rash
Net
Sy
stem
, Und
ergr
ound
Det
entio
n Ta
nk a
nd U
nder
grou
nd In
filtra
tion
Faci
lity.
Wes
tmin
ster
Dog
Par
k St
orm
wat
er B
MP
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
Se
p 20
06
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Verm
ont A
venu
e St
orm
wat
er
Cap
ture
Ph
II
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
&
AOC
Sep
t 201
7
36
Pro
posi
tion
O -
Cle
an W
ater
Bon
d Pr
ogra
mPR
OJE
CT
STAT
US
REP
OR
T
M
onth
ly P
rogr
ess
Rep
ort -
Apr
il 20
19
PRO
JEC
TC
ON
TAC
TSPL
ANN
ED S
CO
PEM
ON
THLY
UPD
ATE
CO
NST
RU
CTI
ON
CO
STPE
RC
ENT
CO
MPL
ETE
Not
ice
to P
roce
ed:
CD
5 -
Paul
Kor
etz
Con
tract
Dur
atio
n:
Des
igne
r:Ar
cadi
s/At
kins
City
Eng
inee
r's E
st.
(Cla
ss A
):
Con
tract
or:
Con
tract
Awa
rd
Amou
nt:
Proj
. Mgr
.:An
dy F
lore
sC
ontra
ct A
ward
+
Con
tinge
ncy
(%)
Con
tact
#:
213-
485-
4496
CO
's to
dat
e
(1
, 0.0
6%):
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
-$
47
%
Fund
ing:
Pro
p O
& P
rop
84
TBD
Mas
ter S
ch.
Com
plet
ion
Dat
e:AU
G 2
020
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
01/0
9/17
CD
15
- Joe
Bus
cain
o
Con
tract
Dur
atio
n:45
0 da
ys
Des
igne
r:LA
DW
PC
ity E
ngin
eer's
Est
. (C
lass
A)
3,69
0,00
0$
Con
tract
or:
Mik
e Bu
balo
Con
stru
ctio
nC
ontra
ct A
ward
Am
ount
:4,
255,
100
$
Proj
. Mgr
.:Ka
tie D
oher
tyC
ontra
ct A
ward
+
Con
tinge
ncy:
5,10
6,12
0$
Con
tact
#:
213-
847-
0395
CO
's to
dat
e
(200
,410
)$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
4,05
4,69
0$
35%
Prop
osed
Alig
nmen
t Fu
ndin
g: L
A D
WP
N/A
Mas
ter S
ch
Com
plet
ion
Dat
e:AP
R 2
019
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
Not
ice
to P
roce
ed:
07/0
9/18
CD
15
- Joe
Bus
cain
o
Con
tract
Dur
atio
n:95
4 da
ys
Des
igne
r:LA
DW
PC
ity E
ngin
eer's
Est
. (C
lass
A)
15,5
00,0
00$
Con
tract
or:
Gro
up O
HL
USA
C
ontra
ct A
ward
Am
ount
:15
,921
,294
$
Proj
. Mgr
.:M
oham
mad
Al-J
amal
Con
tract
Awa
rd +
C
ontin
genc
y:19
,105
,553
$
Con
tact
#:
213-
847-
0322
CO
's to
dat
e
-$
Boa
rd A
ccep
tanc
e R
epor
t D
ate
Awar
d Am
ount
+
CO
's Is
sued
15,9
21,2
94$
20
%
Prop
osed
Alig
nmen
t Fu
ndin
g: L
A D
WP
N/A
Mas
ter S
ch.
Com
plet
ion
Dat
e:N
OV
2021
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
CD
1 -
Gilb
ert C
edillo
Prop
O A
cqui
sitio
n C
ost:
$0
2850
Ker
r Stre
etD
esig
ner:
N/A
Con
tract
or:
N/A
Proj
. Mgr
.:C
hris
toph
er F
. Joh
nson
Con
tact
#:
213-
485-
1165
Boa
rd A
ccep
tanc
e R
epor
t D
ate
100%
Phot
o of
G2
parc
el &
LA
Riv
erFu
ndin
g: M
ICLA
N/A
Expe
cted
Acq
uisi
tion
Dat
e:TB
D
Pre
Des
ign
Land
Acc
. /
Rig
ht o
f W
ay
Des
ign
Bid
& Aw
ard
Con
stPo
st C
onst
The
proj
ect i
s in
the
Bid
& Aw
ard
phas
e.
Wes
twoo
d N
eigh
borh
ood
Gre
enw
ay -
Prop
OTh
is p
roje
ct w
ill p
rovi
de u
rban
ru
noff
treat
men
t, gr
een
spac
e,
acce
ss to
pub
lic tr
ansi
t, a
nd
educ
atio
nal &
recr
eatio
nal
oppo
rtuni
ties.
The
sys
tem
will
ca
ptur
e ur
ban
runo
ff fro
m
Ove
rland
dra
in a
nd W
estw
ood
Blvd
and
div
ert i
t to
a co
nstru
cted
bi
o-sw
ale
stre
am o
n th
e no
rth s
ide
of th
e M
TA s
tatio
n.C
once
pt R
epor
t app
rove
d by
the
CO
AC
& AO
C S
ept 2
017
The
stat
emen
t of c
ompl
etio
n w
as
obta
ined
on
April
11,
201
9. T
he
proj
ect i
s in
pos
t-con
stru
ctio
n.
Inst
alla
tion
of 3
,300
line
ar fe
et o
f re
clai
med
wat
er p
ipel
ine
in th
e H
arbo
r are
a to
pro
vide
a la
ke
mak
e-up
wat
er s
uppl
y to
Mac
hado
La
ke fr
om th
e Te
rmin
al Is
land
W
ater
Rec
lam
atio
n Pl
ant.
Tayl
or Y
ard
Riv
er P
ark
- Pa
rcel
G2
Land
Acq
uisi
tion
(Non
-Pro
p O
Fun
ded)
Mac
hado
Lak
e Pi
pelin
e
(Non
-Pro
p O
Fun
ded
Proj
ect)
Acqu
ire a
par
cel o
f lan
d ad
jace
nt
to th
e LA
Riv
er a
s pa
rt of
R
evita
lizat
ion
Mas
ter P
lan.
Escr
ow c
lose
d on
3/1
/17.
Con
cept
Rep
ort a
ppro
ved
by th
e C
OAC
M
ar 2
007
Mac
hado
Lak
e Pi
pelin
e -
East
ern
Rea
ch(N
on-P
rop
O
Fund
ed P
roje
ct)
Inst
alla
tion
of 6
,500
line
ar fe
et o
f re
clai
med
wat
er p
ipel
ine
in th
e H
arbo
r are
a to
pro
vide
a b
ack-
up
to th
e La
ke m
ake-
up w
ater
sup
ply
to M
acha
do L
ake
from
the
Term
inal
Isla
nd W
ater
R
ecla
mat
ion
Plan
t.
The
proj
ect i
s in
the
cons
truct
ion
phas
e.
37
Proposition O – Clean Water Bond Monthly Progress Report – April 2019
- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 38
5.2 Council District Map
See attached 5.3 Map of Proposition O Projects Approved for Implementation See attached
PROJECT PHASE STATUS
Phase I Complete
7,620 catch basin inserts 7,900 catch basin curb opening screens covers • Installations coverage addressed the City’s high trash generation areas.
Phase II
Complete 6,400 catch basin curb opening screen covers
• Installation coverage addressed only a portion of the City’s medium trash generation area.
Phase III
Complete 24,187 catch basin curb opening screen covers
• Installation coverage addressed the low and medium trash generation areas in the Los Angeles and Ballona Creek watersheds.
• Completed a special study, The Quantification of the City of LA’s Institutional Measures for Trash TMDL Compliance. The study resulted in demonstrating the City’s institutional measures having a 13.5% effectiveness in the prevention of trash discharges into the storm drain system.
Phase IV
In Progress
1,600 catch basin inserts (PLANNED) 1,000 catch basin curb opening screen covers (PLANNED)
• Ecology Control Industries selected as contractor and negotiations have begun.
• Completed the field evaluation of 250 catch basins in the Machado Lake watershed for feasibility of curb opening screen covers or insert installation.
• Completed the field evaluation of 1,150 catch basins in the Dominguez Channel watershed for feasibility of curb opening screen covers or insert installation.
• Completed the field evaluation of 1,200 catch basins in the Santa Monica Bay watershed for feasibility of curb opening screen covers or insert installation.
• Completed 68 inserts in the Civic Center high trash area.
• Catch basin retrofits in the Machado Lake watershed and Trash TMDL Receiving Water Monitoring Protocol: Notice to Proceed was given on March 29, 2016 to TRC Solutions and G2. Construction for the amount of $300,000. Catch Basin retrofits to commence on May 2, 2016.
• A Request for Proposals to establish a contract for the fabrication and installation of curb opening screen covers was advertise on December 2015, 2 proposals were received January 2016, and currently being reviewed by the Bureau of Contract Administration for BIP adherence. Anticipate contract start date late Summer or early Fall 2016.
5.0 APPENDIX
4
4
5
11
14
VENT
URA
COUN
TY5
10
P A C I F I C O C E A N
712
6
3 2
5
4
13111
10
98
15
101
101
5
210
605
5
10
105
710
110
405
14
90
22
1
47
103
91
170
110
60
2
134
118
ARTESIA BLVD
HU NTINGTON DRN
SLACIEN EGABL VD
E SEPULVEDA BLVD
SVE
RMON
TAV
W JEFFERSON BLVD
S MAI
N ST
SANVICENTE BLVD
HUNTINGTON DR
N BROADWAY
S GRAN
D AV
SAT
LANT
ICBL
VDE ALONDRA BLVD
LANKERSHIM BLVD
ALONDRA BLVD
E SLAUSON AV
NBEVERLY
GLENBLVD
VAN
NUYS
BLVD
GARF
IELD
AV
W WILLOW ST
M O NTEREY RD
FLETCHER DR
SING
LEW
OODA
V
PASS
ONS BL
VD
FOOTHILL BLVD
INGL
EWOO
D AV
W IMPERIAL HWY
W VERNON AV
W PICO BLVD
SCE
NTRA
LAV
E 223RD ST
E W ASHINGTON BLVD
W ALAMEDA AV
W ARTESIA BLVD
NLO
SRO
BLES
AV
IMPERIAL HWY
WILSHIRE BLVD
N FRONTST
WOLIV
E AV
S HAW
THOR
NE BL
VD
HERMOSAAV
SFIG
UERO
AST
M ELR OSE AV
W DEL AMO BLVD
PARA
MOUNT B
LVD
VISDEL MAR
E 4TH ST
CREN
SHAW
BLV
D
CARSON ST
SW
ESTE
RNAV
MUL HOL LANDD R
NHO
LLYW
OOD
WY
W CENTURY BLVD
W SLAUSON AV
ANZAAV
RINALDI ST
NBUENA
VISTA ST
E VICTORIA ST
E 6TH ST
BEVERLY BLVD
BANDINI BLVD
E FIRESTONE BLVD
FALL
BROO
K AV
VALLE
YCIR
CLE
BLVD
SANT
A FE A
V
MARENGO ST
NGAFFEY
ST
VICTORY BLVD
SOUTH ST
ROSECRANS AV
SEA
STE R
N AV
SHELDON ST
190TH ST
CANO
GA AV
SFREMONT
AV
CENTINELA AV
LONGBEACH
BLVD
LAKE
WOOD BL
VD
BALB
OA B
LVD
N AL TAD ENADR
E ARTESIA BLVD
SLA
BRE A
AV
FIRESTONE BLVD
SSAN
PEDROST
NMA IN ST
E MANCHESTER AV
SIERRA
HW
Y
W 223RD ST
SALAM ED A
ST
VANOWEN ST
LAUR
EL C
ANYO
N BL
VD
E OLYMPIC BLVDS B
ROAD
WAY
E OLIVE AV
AVAL
ON BL
VD
DESO
TOAV
STUD
EBAK
ERR D
N F IGUERO
AST
E SPRING ST
E GAGE AV
MOORPARK ST
SUNL
ANDBLVD
PRAI
RIE A
V
GAGE AV
VINEL
AND
AV
CAHUENGA BLVDW
CULVER BLV
D
W SEPULVEDA B LVD
SFA
IRFA X
AV
NAL
LEN
AV
WHI
TEOA
KAV
SAN FERNANDO MISSION BLVD
WINN
ETKA
AV
SW
ILM IN G TO NAV
FLORENCE AV
S SEPULVEDA BLVD W WASHINGTON BLVD
DEVONSHIRE ST
E BROADWAY
W 3RD ST
NWILMINGTON AV
N BE
LLFL
OWER
BLV
D
W 1ST ST
E DEL AMO BLVD
SSA
NTA
FEAV
ABBOTT RD
DEL AMO BLVD
W ROSECRANS AV
TAMPA
AV
W 25TH ST
NL A
K EA V
PARTHENIA STRE
SEDA
BLVD
TELEGRAPH RD
N MALIBU
CANY
ONRD
VENTURA BLVD
S ALVA
RADO
ST
W FLORENCE AV
S GL E
NDAL
EAV E CALIFORNIA BLVD
SNO
R MAN
DIEAV
NA L
A ME D
AST
MAGNOLIA BLVD CANA
DABL
VD
NORDHOFF ST
JEFF
ERSO
NBLV
D
W
S UN
SE TB L VD
PLUMMER ST
GARVEY AV
W MAR TIN LUTHER KING JR BLVD
S BUNDY DR
HAW
THORNE BLV D
ROSCOE BLVD
E ALAMEDA AV
SBRA ND BLVD
W MAGNOLIA BLVD
WOOD
MAN
AV
NR E
DOND
OAV
7TH ST
E ATH ERTON ST
BURBANK BLVD
FOX ST
NSE
PULV
EDA
BLVD
WHITTIER BLVD
WENTWORTH ST
BIG TUJUN GA CANY ON RD
OSBORNE ST GLENOAKS BLVD
LA TIJERA BLVD
E OCEAN BLVD
NPR
AIRIE
AV
W LOMITA BLVD
SUNSET DR
COMP
TON A
V
PALO
SVE
RDES
DRW
HAY VE NHURSTAV
N AV IA
TIONB
LVD
ATLA
NTIC
AV
BELL
FLOW
ER BL
VD
E 1ST ST
LOS FELIZ B LVD
E 7TH ST
MANHATTAN BEACH BLVD
TUXFORD ST
E MAIN ST
FRANKLIN AV
E ORANGE GROVE BLVD
S UNSETBLVD
HOLLYWOOD BLVDS
ROB E
RTSO
NBL
VD
PACIFIC AV
E CESAR E CHAVEZ AV
VERDUGO BLVD
ST OCK
ER S T
LASV
I RGE
NES
RD
E COLORADO BLVD
E 3RD ST
E ANAHEIM ST
LITTLE TU J UN
GARD
S SAN
GAB
RIEL
BLV
D
SFAI
ROAK
SAV
PLAT
T AV
N HIGHLAND AV
E WILLOW ST
E CARSON ST
OLYMPIC BLVD
SATICOY ST
MISSIONRD
EAGLE ROC K BL
VD
E FLORENCE AV
E ROSECRANS AV
VALLEY B LVD
EXPOSITION BLVD
ZELZ
AH AV
PALOS VERDES DRN
BURTON WY
COLD
WAT ER
CANY
O NDR
SGA
RFIEL
DA V
E 103RD ST
EAST
ERN
A V
PICO BLVD
NEASTERNAV
NW
ESTE
RNAV
W RIGGIN ST
E COMPTON BLVD
W ANAHEIM ST
W M AIN ST
SPA
CIFIC
AV
S CENTINELA AV
CHER
RY AV
SOTO
ST
NST
UDEB
AKER
RD
AVIAT
ION B
LVD
LA TUNACAN Y ON RD
SAN FERNANDO RD
SMITH RD
W GLENOA K S BLVD
NCENTRAL AV
VENICE BLVD
RODEO RD
W BROADWAY
CHEVY CHASEDR
W 7TH ST
MTGL
EASO
NAV
MISSION ST
SHEPARD ST
WEST
ERN
AV
NPAC
IFIC
AV
PACI
FIC BL
VD
OCEAN AV
MULH
OLLAND HWY
LOMITA BLVD
VESP
ER AV
*****
WESTWOOD BLVD POTRERO G RAND
EDRNEILSON WY
WILMING
TON
AV
W MANCHESTER AV
AIRPO
RT B
LVD
E COLORADO ST
W LAS TUNAS DR
ANG EL ES
FOREST
HW Y
ANITA ST
SLAK
EAV
OCEAN PARK BLVD
CALIF
ORNI
A AV
W ALTADENA DR
LALOM A R D
WOOD
LEY A
V
SHERMAN WY
CHATSWORTH STLA
CRE SCE NTA AV
SANTAS USAN A PASS RD
E 9TH ST
W WHITTIER BLVD
N MACLAY AV
VINE S
T
W MANCHESTER BLVD
MACLAY ST
W BEVERLY BLVDS G
AFFE
Y ST
ALAMED
AST
W AVE 26
SMALIBUCANYONRD
POLK ST
SLAUSON AV
NLOR
ENA ST
WEBB AV
E ALTADENA DR
E VALLEY BLVD
W OCEAN BLVD
C REST RD
TRUMAN ST
LINCOLNAV
PALOS VERDES DR S
W VICTORIA ST
HONOLULU AV
NAVA LO N B LV D
NAVE
54
E CHEVY CH
AS
E DR
NLAB
REAA
V
E 2ND ST
SAV
IATIO
NBLV
DARLETA AV
OCEAN BLVD
MARILLA ST
S PAS DL MAR
E 7TH ST
SSEP
ULVE
DABL
VD
N LAK
EWOO
DBL
VD
LINCOLN BLVD
TOPA
NGAC
ANYO
NBL
VD
SANTA MONICA BLVD
H AWTHORNEBLVD
VENICE BLVD
SAR
ROYO
PKW
Y
WEST
ERN A
V
MARINA EXWY
NALVA
RADO
ST
NSE
PULV
EDAB
LVD
E PACIFIC COAST HWY
LAKE
WOO
D BL
VD
NTOP
AN GACA
NYONBLV
D
ROSE
MEAD
BLVD
S GAF
FEY S
T
SWE
STER
NAV
S TOPANG ACANYONBLVD
W PACIFIC COAST HWY
PACIF IC COAST HWY
SPACIF ICCOAS
T HWY
A N GELES CRE ST HWY
0 51 2 3 4
Miles
Copyright © 2019 City of Los AngelesPrepared by BOE\GIS\Mapping Division: 1/2019
This map shall not be copied or reproduced, all or anypart thereof, whether for distribution or resale, withoutthe prior written permission of the CITY ENGINEER.
L E G E N D
City of Los Angeles Council Districts
Street Data Copyright © 2014 Rand McNally and Company
Council District
GARY LEE MOORE, P.E.CITY ENGINEER
ERIC GARCETTIMAYOR
1. Gilbert Cedillo (15.8 Sq Mi)
2. Paul Krekorian (25.0 Sq Mi)
3. Bob Blumenfield (36.6 Sq Mi)
4. David Ryu (41.0 Sq Mi)
5. Paul Koretz (37.5 Sq Mi)
6. Nury Martinez (27.2 Sq Mi)
7. Monica Rodriguez (54.1 Sq Mi)
8. Marqueece Harris-Dawson (16.0 Sq Mi)
9. Curren D. Price, Jr. (13.0 Sq Mi)
10. Herb J. Wesson, Jr. (14.5 sq Mi)
11. Mike Bonin (63.8 Sq Mi)
12. Greig Smith (58.7 Sq Mi)
13. Mitch O'Farrell (13.6 Sq Mi)
14. Jose Huizar (24.2 Sq Mi)
15. Joe Buscaino (32.1 Sq Mi)
45
5
11
14
14
15
4
7
11
3
12
6
2
15
8
1
14
9
10
13
Rory M. Shaw Wetlands Park (CD 6)
Cesar Chavez GroundWater Quality Improvement
(CD 6)
Mar Vista RecreationCenter Stormwater BMP
(CD 11)
Westside Park RainwaterIrrigation Project
(CD 10)
Echo Park LakeRehabilitation
(CD 13)
Oros Green Street(CD 13)
Rosecrans Rec. CenterStormwater Enhancements
(CD 15)
South Los AngelesWetlands Park
(CD 9)
Machado Lake EcosystemRehabilitation
(CD 15)
Peck Park CanyonEnhancement
(CD 15)
Westminster Dog ParkStormwater BMP
(CD 11)
Grand Blvd.Tree Wells
(CD 11)
Imperial Highway SunkenMedian Stormwater BMP
(CD 11)
Inner Cabrillo Beach BacterialWater Quality Improvement
(CD 15)
Machado LakePhase I(CD 15)
NOT TO SCALE
Proposition O Projects Approved for Implementation
Taylor Yard RiverPark (G2 Parcel)
(CD 1)
LA Zoo Parking Lot(CD 4)
Hansen DamWetlands Restoration
(CD 7)
Temescal Canyon ParkStormwater BMP
(CD 11)
Argo Drain(CD 11)
Penmar Water QualityImprovement
(CD 11)
Albion Riverside Park (CD 1)
Catch Basin Inserts andCovers Ph I
Catch Basin OpeningScreen Covers Ph II
Projects Not Shown:
Catch Basin Opening ScreenCovers and Inserts Ph III
Project SitesSanta Monica Bay Low Flow Diversion Upgrades Pkg. 1-4Council District
Santa Monica LFDUpgrades Pkg. 1
(CD 11)
Santa Monica LFDUpgrades Pkg. 3 & 4
(CD 11)Santa Monica LFDUpgrades Pkg. 2
(CD 11)
Santa Monica LFDUpgrades Pkg. 1
(CD 11)
Santa Monica LFDUpgrades Pkg. 1
(CD 11)
Copyright ©2018 City of Los AngelesPrepared by :\BOE\GIS MAPPING DIVISION : 06/2018
This shall not be copied or reproduced, all or anypart thereof, whether for distribution or resale, withoutthe prior written permission of the CITY ENGINEER.
Elmer Avenue Phase II:Elmer Paseo
(CD 6)
Glenoaks-Sunland Stormwater Capture(CD 2 & CD 6)
WatershedSanta Monica BayDominguez ChannelLos Angeles River Malibu Creek San Gabriel RiverSanta Clara River Marina Del ReyBallona Creek
Avalon GreenAlley South
(CD 9)
Broadway NeighborhoodStormwater Greenway
(CD 9)
Streets Copyright © 2010 Rand McNally & Co.
Gary Lee Moore P.E.City Engineer
Eric GarcettiMayor
Aliso-Limekiln CreekRestoration
(CD 12)
Vermont AveStormwater Capture
Phase I(CD 8)
Vermont AveStormwater Capture
Phase II(CD 8)
Prop O - Westwood Neighborhood Greenway
(CD 5)