SACYR GROUP – KEY DATES
2009
Creation of Sacyr
Awards: Hacemos lo
Imposible
Panama Canal
expansion contract
2007
Acquisition of 20% of
Repsol YPF and 91.21%
of Europistas
2003
Creation of Sacyr
Vallehermoso Group by
fusion of Sacyr with
Vallehermoso
Integration of Somague
(100%)
1996
Beginning of
international activity
1921
Foundation of Vallehermoso
1986
Foundation of Sacyr
2002
Acquisition of Real
Estate Business
(Vallehermoso and
Testa)
2004
Purchase of the biggest
independent
environmental company
– Sufi, currently called
Valoriza Servicios
Medioambientales
2008
Conclusion of the
merger between Itínere
and Europistas
Sale of Itínere
2010
A share capital increase
of 401 million euros
1900 2000 …
SACYR GROUP – KEY DATES
2013
Change of company
name to Sacyr
Subscribed an increase
in share capital
Placement of a
convertible bond issue
for 200 million euros
Manuel Manrique
appointed as Chairman
2012
Creates 3rd edition of
the Sacyr Awards: Sacyr
Innovation
2014
Exit from housing
business
Reinforce capital
structure
Sacyr awarded its 3rd
road concession in
Colombia
Acquisition of 50% of
the Spanish subsidiary
of the company Fluor,
for the energy market –
Joint Venture Sacyr
Fluor
Panama Canal
expansion inauguration
… 2000
2011
Second share capital
increase of 96 million
euros
Subscribed an increase
in share capital of 96.10
million euros at 6 euros
2015
Sale of Testa — asset
operations
Refinance of Repsol
stakes
2016
Sacyr Concesiones sells
98% of its company HC -
Hospitais Concesionados
to Aberdeen
Infrastructure Fund
ACTIVITY AREAS OF SACYR GROUP
Focused on construction
activities including:
Civil works
Buildings
Hydro projects
Turnkey/EPC
Top technological
capacity
International activity
reaching 84% of the
total
Diversified infrastructure
portfolio:
Different industries
Diverse geographic
markets
Combination of mature
assets and concessions
with upside potential
35 assets
26 years average
remaining life
High growth potential and
increasing value
Focused on public services concessions: Water,
environmental and multiservices
Stable and cash generator activity for the long run
Solid portfolio of contracts
Track record
Improving earnings and margins
Focused on EPC
projects related to
energy, waste
treatment and water:
Core-business with
potential upside
JV with Fluor
Highest technological
capabilities
+250 power plants
+100 water plants
S A C Y R
I N D U S T R I A L V A L O R I Z A
S E R V I C E S I N D U S T R I A L C O N C E S S I O N S C O N S T R U C T I O N
S A C Y R
C O N S T R U C C I Ó N /
S O M A G U E
S A C Y R
C O N C E S I O N E S
8.2% interest in Repsol
Large potential of
upside & synergies
R E P S O L
I N V E S T M E N T
E B I T D A M I L L I O N E U R O S
+ 1 3 %
2 0 1 6
3 6 0
2 0 1 5
3 1 8
E B I T D A M A R G I N %
+ 1 . 8 %
2 0 1 6
1 2 . 6
2 0 1 5
1 0 . 8
O R I G I N
O F R E V E N U E S I N T E R N A C I O N A L
2008 27%
2016 52%
KEY FIGURES
SOMAGUE – KEY DATES
2003
Integration in the Sacyr
Vallehermoso Group
1998
Somague Engenharia is
the company that is
formed from the merger
of Soconstroi and
Somague Construções
1947
Creation of Somague
1997
Acquisition of
Soconstroi
2002
Acquisition of Neopul
2007
Certification of the
Integrated Environment,
Quality and Safety
Management System
(SIGAQS) and Innovation
1900 2000 …
SOMAGUE – KEY DATES
2010
Contract for the design,
construction and
financing of the new
Vila Franca de Xira
Hospital
2008
Creation of Somague
Concessões
2009
Sale of Somague Itínere
2011
Ceremony of Laying the
First Stone of the Foz
Tua Dam Project
Inauguration of Braga
Hospital
… 2000
Inauguration of Santo
Espírito da Ilha Terceira
Hospital – Azores
Inauguration of Sines
LNG Terminal Expansion
- Sines
2012
Inauguration of
Bemposta Dam power
capacity increase
SOMAGUE – KEY DATES
2014
Inauguration of the Port
of Praia
2013
Opening of the
Barcelona-Figueras
high-speed (TGV) rail
link (132 km)
Inauguration of Data
Center PT - Covilhã
Inauguration of Alegro
de Setúbal shopping
centre, in Portugal
Inauguration of the 1st
phase of Instituto Médio
de Artes (IMA) - Angola
Extension of QSA
certification to
international activities
Inauguration of the Cruise Ship Pier
of the Port of Funchal – Madeira
2016
José Maria Orihuela
Uzal appointed as
Chairman of Somague
Engenharia
Inauguration of the
Pestana CR7 Hotel,
Funchal - Madeira
… 2000
2015
Inauguration of the CEART - Arts
School Complex – 2nd phase (IMA) -
Angola
Inauguration of Assicom Retirement
Home - Madeira
Contract to build the second phase
of the new campus of the University
of Ulster in Belfast, United Kingdom
2017
Inauguration of San
Francisco River
Diversion Project –
Eastern Stretch, in
Brazil
BUSINESS AREAS
• Dams / Power capacity increases
• Fluvial hydraulics
• Railway works • Track infra &
superstructure
• Overhead electrification
• Infrastructure
maintenance
• Transportation infrastructures • Roads • Bridges and viaducts • Airports
• Industrial construction works • Energy
• Environment
• Water, sanitation and gas
infrastructures
• Building construction works • Housing • Offices • Leisure, sports, health
and environmental infrastructures
• Airports terminals • Monuments and buildings
renovation and rehabilitation
Mission:
► The undertaking of complex infrastructure and services projects that:
Contribute to improving the quality of life of the general public;
Offer opportunities of personal and professional development to our employees;
Generate value for our clients, partners and shareholders.
Vision:
► To be a leading group with an international vocation that serves as a touchstone for others by:
Undertaking innovative, high value projects;
Growing in a profitable and sustainable manner;
Offering quality professional opportunities for our employees;
Respecting the environment.
Values:
► Team spirit: Confidence, Collaboration, Loyalty;
► Excellence: Rigor, Talent, Passion;
► Innovation: Imagination, Creativity, Courage;
► Flexibility: Resilience, Pragmatism, Austerity;
► Integrity: Honesty, Transparency.
MISSION, VISION AND VALUES
QSA CERTIFICATION
The Integrated Environment, Quality and Safety Management
System (SIGAQS) is now certified in its three dimensions.
The scope of its implementation covers the entirety of the
Companies' activities.
SIGAQS
INNOVATION MANAGEMENT
► Somague has an RDI Management System certified by APCER in line
with the Portuguese Standard NP4457;
► This includes the pilot group of companies certified in 2007;
► Various RDI projects have been developed, and have been
recognized by the Innovation Agency;
► Part of the Strategic Council and Executive Commission of the
Portuguese Construction Technology Platform (PTPC).
Characteristics:
Port of Funchal expansion (1,014 m) of mooring quay in reinforced concrete caissons. Sea wall extension: (length – 182 m, width – 17 to 35 m).
Main quantities:
Rock fill: 1,400,000 m³ ▌Concrete: 60,000 m³
Location: Portugal - Madeira
Start / completion date: 1956 / 1962
Value: 160.000.000 PTE
Current equivalent value: € 58.099.979
Port of Funchal
Characteristics:
Port of Beira expansion. Construction of two new mooring
quays (-10.00 m), 21 caissons of reinforced concrete 13,6 x
13,6 m, “havage” embedded.
Main quantities:
Dredging: 270,000 m³ ▌Concrete: 65,000 m³ ▌Iron sheeting
piles: 1,000 ton
Port of Beira
Location: Mozambique
Start / completion date: 1960 / 1963
Value: 114.210.265 PTE
Current equivalent value: € 41.472.587
Characteristics:
Port of Ponta Delgada expansion for the loading and unloading of fuels.
Main quantities:
Rock fills: 450,000 m³ ▌Concrete: 70,000 m³ ▌Mooring quay in concrete caissons (-10,00 m): 200 m ▌Breakwater: 150 m
Location: Portugal - Azores, S. Miguel
Start / completion date: 1963 / 1966
Value: 80.000.000 PTE
Current equivalent value: € 25.554.413
Port of Ponta Delgada
Characteristics:
Expansion. Outer breakwater of classified rock fill harbour with concrete superstructure; widening of the existing breakwater and expansion of the
northern breakwater to 350 m.
Main quantities:
Rock fill: 300,000 m³ ▌“In situ” concrete: 15,000 m³ ▌Concrete blocks: 11,000 m³
Location: Portugal - Póvoa de Varzim
Start / completion date: 1963 / 1968
Value: 37.736.272 PTE
Current equivalent value: € 11.272.958
Port of Póvoa do Varzim
Characteristics:
Expansion. Mooring quay (-6,00 m) for fishing boats. Quay-wall in precast concrete blocks.
Location: Portugal - Lisbon, Tejo River
Start / completion date: 1965 / 1967
Value: 53.000.000 PTE
Current equivalent value: € 15.832.693
Pedrouços Dock in Port of Lisbon
Characteristics:
Port of Luanda expansion. 410 m of new quay (-10,00 m). Reinforced concrete caissons of 15,00 x 8,30 x 14,00 m (49 caissons).
Main quantities:
Dredging concrete: 60,000 m³ ▌Concrete: 30,000 m³
Location: Angola - Luanda
Start / completion date: 1965 / 1968
Value: 51.757.892 PTE
Current equivalent value: € 15.461.638
Port of Luanda
Characteristics:
Expansion of outer northern breakwater to 750 m. 3 mooring harbours for tankers of 5,000, 27,000 and 100,000 ton, installation of fuel piping and
transportation equipment and 3 column piers, with length of the 1,000 m, to unload sardines.
Main quantities:
Rock excavation: 30,000 m³ ▌Rock fill: 523,300 m³ ▌Concrete in tetrapod's: 40,000 m³ ▌Concrete: 62,400 m³ ▌Reinforced concrete: 30,000 m³
▌Dredging: 610,000 m³
Location: Portugal - Porto
Start / completion date: 1964 / 1968
Value: 368.000.000 PTE
Current equivalent value: € 109.932.662 (in consortium)
Port of Leixões
Characteristics:
Dry dock for repair of tankers up to one million ton, with length
the 520 m at level -9,00 and 97 m width.
Main quantities:
Excavation: 1,000,000 m³ ▌Concrete piles: 20,000 m³ ▌Concrete:
120,000 m³ ▌Steel: 8,000 ton
Location: Portugal - Almada, Margueira
Start / completion date: 1969 / 1972
Value: 325.000.000 PTE
Current equivalent value: € 80.000.947
Dry Dock n.º 13 at the Lisnave Shipyard
Characteristics:
Construction platform with 420 x 75 m; dock no. 21 with 450 x 75 m; dock no. 22 with 350 x 55 m.
Main quantities:
Excavation: 250,000 m³ ▌Landfill: 320,000 m³ ▌Concrete: 150,000 m³ ▌Reinforced steel: 12,000 ton ▌Concrete pipes: 72,000 m³ ▌Steel piles: 310
ton
Location: Portugal - Setúbal
Start / completion date: 1973 / 1975
Value: 500.000.000 PTE
Current equivalent value: € 73.298.350
Setenave Shipyard in Setúbal
Characteristics:
Port of Portimão expansion. Construction of 550 m of quay for fishing boats at level -6.00 m and 400 m of quay for commercial vessels at level -
10.00 m.
Main quantities:
Dredging: 1,750,000 m³ ▌Landfill: 900,000 m³ ▌Rock fill: 300,000 m³ ▌Concrete: 75,000 m³ ▌Steel rods: 520 ton
Location: Portugal - Algarve, Portimão
Start / completion date: 1976 / 1983
Value: 2.300.000.000 PTE
Current equivalent value: € 65.507.127
Port of Portimão
Characteristics:
1,2 km breakwater extension and construction of 7 new docking quays.
Main quantities:
Rock fill: 6,000,000 m³ ▌Concrete: 720,000 m³ ▌Steel sheet piles: 8,000 ton ▌Reinforced concrete: 30,000 m³ ▌Landfill: 2,000,000 m³
Location: Venezuela – La Guaira
Start / completion date: 1977 / 1980
Value: 4.500.000.000 PTE
Current equivalent value: € 235.906.465
Port of La Guaira
Characteristics:
1,000 m of mooring quay on reinforced concrete caissons with base depth of -13.00 m, -12.00 m and -11.00 m and 8 ha of earthworks.
Location: Portugal - Lisbon
Start / completion date: 1978 / 1980
Value: 1.162.392.334 PTE
Current equivalent value: € 60.936.859
Alcântara Quay – Port of Lisbon
Characteristics:
Construction and protection of the Port of Leixões oil terminal breakwater, including the manufacture and placement of 45 t artificial blocks on
the inside of the north breakwater.
Location: Portugal - Leixões
Start / completion date: 1966 / 1969
Value: 368.000.000 PTE
Current equivalent value: € 109.932.662
Oil Terminal in Port of Leixões
Characteristics:
Extension of the North breakwater to 520 m; construction of 500 m of quay at -12 m, 20 ha of earthworks, 5 km of hydraulic correction and
marginal retention damming.
Main quantities:
Reinforced concrete piles Ø 1,00 m: 8,400 m ▌Reinforced concrete in structures: 20,000 m³ ▌Concrete in blocks and tetrapod's: 70,000 m³
▌Rock fill: 1,300,000 m³
Location: Portugal - Aveiro
Start / completion date: 1983 / 1986
Value: 10.936.524.189 PTE
Current equivalent value: € 182.746.361
Port of Aveiro Development Plan
Characteristics:
Construction of 3 block quays in a length of 602 m, at bottoms (-9 m), (-7,50 m) and (-4,50 m), protection and expansion of the existing
breakwater and construction of the land installations.
Location: Cape Verde – Praia Island
Start / completion date: 1984 / 1986
Value: 11.847.557 USD
Reconstruction and development of the Port of Praia
Characteristics:
800 m of access wharf to a 1,100 m long breakwater parallel to the shore with base depth of -25,00 m, creating shelter to 350 m from the quay in
reinforced concrete caissons with base depth of -18,00 m for the unloading of coal.
Main quantities:
Reinforced concrete: 800,000 m³ ▌Earthworks landfill: 3,500,000 m³ ▌Rock fill: 6,000,000 m³
Location: Portugal - Sines
Start / completion date: 1984 / 1987
Value: 10.426.000.000 PTE
Current equivalent value: € 159.654.333 (in consortium)
Sines Coal Terminal
Characteristics:
1,280 m long breakwater, consisting of rock fill prisms with base depth of -20,00 m, sheltered with mantle of 30 ton tetrapod's.
Location: Portugal - Azores - Terceira, Praia da Vitória
Start / completion date: 1984 / 1987
Value: 3.060.000.000 PTE
Current equivalent value: € 46.858.072
Praia da Vitória Bay south breakwater
Characteristics:
Construction of the Caniçal shipyard and fishing harbour; design and construction of the outer wharf of the Caniçal marine terminal (1st stage) and
construction of the outer wharf of the Caniçal marine terminal (2nd stage). Western expansion of the Caniçal commercial harbour; eastern
expansion of the Caniçal commercial harbour and outer wharf (3rd stage).
Location: Portugal - Madeira, Caniçal
Start / completion date: 1990 / 1992
Value: € 51.763.477
Current equivalent value: € 93.691.893
Marine terminal of the Caniçal Industrial free trade zone
Characteristics:
Dredging of the sand and excavation of the rocky bases to the west of the Bugio breakwater and construction of a new mooring quay 300 m long
with base depth of -6,50 m. Construction of six prefabricated modules for installation of the new shipyard facilities with a covered area of 3,600
m2.
Location: Portugal - Viana do Castelo
Start / completion date: 1991 / 1993
Value: 1.170.220.000 PTE
Current equivalent value: € 9.806.215
Port of Viana do Castelo – Mooring quay and docks support facilities
Characteristics:
420 m long mooring quay-wall with base depth of -12,00 m CD; construction of 4 pile moorings; construction of the marginal retainers of the level
ground, dredging of an estimated volume of 2 million m3, construction of level ground of approximately 15 ha, including paving and rainwater
drainage system, construction of water supply, sewage, electricity and telephone networks; construction of access roads.
Location: Portugal – Porto de Setúbal
Start / completion date: 1992 / 1995
Value: 4.659.455.685 PTE
Current equivalent value: € 35.791.551
Roll-on/Roll-off Terminal – Ford / VW VX62
Characteristics:
Hydraulic repulsion landfill with an area of about 4,5 ha. The existing commercial quay (Quay nos. 3 and 4) was also expanded in order to allow
the operation of container ships approximately 200 m in length and requiring depths of -12,00 m. Quay no. 4 is now 215 m long and made up of
columns of 6 superimposed blocks, 2 m wide, weighing between 30,000 kg and 41,000 kg. The quay base level is -12,00 CD. The superstructure has
a height of 2,75 m. The adjacent level ground has an area of 10,750 m2 at level +3,00. Construction of a passenger and ferry terminal. The quay is
now composed of columns of 3 blocks 2 m wide weighing between 12,000 and 38,000 kg. The quay has a length of 261 m. The foundations level is -
4,00 CD. The superstructure is 2,00 m in height. The surrounding level ground has an area of 7,035 m2 at level -3,00 CD. Retainers in selected rock
fills to protect the landfill. Demolition of 180 m of existing protection wall to allow access to the area recovered by the North landfill. 10 m wide
access to the North landfill. Paving of areas adjacent to the commercial quay, the ferry and passenger terminal and the North landfill. Surface
infrastructure comprising the installation of electrical, lighting, earthling, fuel and water networks.
Main quantities:
Landfill: 370,000 m3 ▌TOT rock fills: 52,750 m3 ▌of 100/300 kg: 14,200 m3 ▌of 1 to 3 ton: 4,000 m3 ▌Concrete: 20,000 m3 ▌Paving: 40,000 m3
Location: Cape Verde – Mindelo
Start / completion date: 1994 / 1997
Value: 1.381.225.742 CVE
Large Porto of Mindelo
Characteristics:
Boa Vista: Breakwater 230 m long; docking quay (in blocks) 80 m long and with base at level -5,00 DC; “roll-on/roll-off” (Ro-Ro) ramp 15 m wide;
flat behind dock land with area of 5,600 m², at level +3,00 DC; quay accessories – protective barriers and mooring heads; illumination for Harbor
and dock land; 500 m long access road to Harbour from the town of Sal-Rei.
Maio: Quay of reinforced concrete on cylindrical reinforced concrete on cylindrical reinforced concrete piles with metal sleeves, 112 m long and
14,5 m wide, access to quay in reinforced concrete on piles, 110,5 m long and 8,2 m wide; behind dock land with area of 7,000 m², at level of
+3,20 DC; quay accessories – mooring heads, protective barriers; 800 m long access road to Harbour from Vila do Maio, with 2 lanes each 3 m wide.
Location: Cape Verde – Boa Vista (Baía de Sal-Rei)/Maio (Vila do Maio)
Start / completion date: 1995 / 1997
Value: 2.252.631.014 CVE
Cape Verde Port Project – Ports of Boa Vista and Maio
Characteristics:
Breakwater (floating) and creation of a water mirror to be used as a marina in the basin between the river bank and the floating breakwaters;
assembly of all breakwater networks and accesses. Repair and rehabilitation of the Cabo Ruivo Column Pier, via cleaning of the entire structure
with sand jets and repair with projected concrete, micro-concrete and non-retractable mortars. Painting of the structure with cement based
paint.
Main quantities:
Sinking of pipes with molding pipe: 591 m ▌Reinforcement A400 NR: 212 ton ▌Concrete B25 BD 2.1: 1,048 m³ ▌Concrete B30 BD 2.1: 330 m³
▌Reinforced concrete caissons size 7,15 x 5,0 x 3,15: 730 m ▌Sinking of piles with Fe 370 molding pipe, e= 10 mm, Ø 813 mm: 288 m ▌Pontoons 6
m wide: 254 m
Location: Portugal - Lisbon, Cabo Ruivo
Start / completion date: 1996 / 1997
Value: 1.087.167.000 PTE
Current equivalent value: € 8.025.693
Floating Pontoon Breakwaters for Cabo Ruivo Column Pier
Characteristics:
Terminal expansion. Quay with reinforced concrete caissons with 305 m of mooring, with service base depth of -18,00 CD and crest level +7,00 CD.
To the rear of this quay, a parallel quay was constructed with base depth at -15,00 CD and crest also at level +7,00 CD. The level ground created
between the 2 new quays is 76,20 m wide, closed at one end by a vertical quay with base depth of -15,00 CD. A side unloading station for Ro-Ro
ships was also built, comprising a fixed ramp supported on the land side at level +7,00 CD and on the sea side at level +4,50 CD, and a
hydraulically raised ramp. To facilitate loading and unloading, a 3 ha park was built, with fencing and its own power and lighting supply.
Main quantities:
Removal of rocks/dredging: 43,000 m³ ▌Rock fill caissons foundations: 27,000 m³ ▌Rock fill: 520,000 m³ ▌On site concrete: 78,700 m³ ▌A400 NR
steel reinforcements: 54,700 km ▌Breaking of submerged rocks: 3,400 m³ ▌Paving with tarmac surfacing: 18,000 m³ ▌Concrete block paving:
37,770 m³ ▌Electric cables: 9,000 m ▌Water piping: 2,500 m
Location: Portugal - Sines
Start / completion date: 1996 / 1999
Value: 3.689.290.000 PTE
Current equivalent value: € 25.946.942 (in consortium)
Port of Sines Multipurpose Terminal
Characteristics:
Expansion of the area of the level ground of the Xabregas quay by extending the quay towards the river by approximately 100 m; dredging to
enable the implantation of the TOT prism for the foundations of the new quay; pre-fabrication of caissons for the new quay wall; execution of
final superstructure; general landfill of area gained from the river; installation of gantry crane movement track beams; concrete paving; drainage
network, electrical, water and telephone networks.
Main quantities:
Dredging: 1,722,261 m³ ▌TOT rock fill: 410,030 m³ ▌Rock fill: 26,326 m³ ▌Landfill with sand: 1,675,953 m³ ▌Concrete: 43,712 m³ ▌Compacting:
62,950 m² ▌Reinforcement: 41,759 kN ▌Concrete slab paving: 138,108 m²
Location: Portugal - Lisbon
Start / completion date: 1998 / 2000
Value: € 26.161.950
Current equivalent value: € 36.103.491
Xabregas container terminal
Characteristics:
Hydrolift in the Mitrena Shipyard comprising: a central flood gate 300 m long and 40 m wide; 3 docking platforms for PANAMAX type ships 280 m
long and 39 m wide; 2 pumping stations; metal gates for the floodgate and the 3 platforms, respective telephone networks, technical networks
(fluids, electricity, data) and paving.
Main quantities:
Dredging: 100,000 m³ ▌Landfills: 120,000 m³ ▌Rock fill and protections: 15,000 m³ ▌Dynamic compaction: 65,000 m³ ▌Reinforced concrete
caissons: 110,000 m³ ▌Paving: 50,000 m²
Location: Portugal - Setúbal
Start / completion date: 1998 / 2000
Value: 7.971.802.000 PTE
Current equivalent value: € 54.873.189 (in consortium)
Hydrolift in Mitrena Shipyard
Characteristics:
Container terminal, with mooring zone in caissons (33 units), expansion of eastern zone with piling work (76 units) and paving of all the adjoining
quay area of over 120,000 m².
Main quantities:
Other concrete elements: 3,800 m³ ▌Paving: 250,000 m²
Location: Portugal – Port of Setúbal
Start / completion date: 1999 / 2001
Value: 4.611.555.000 PTE
Current equivalent value: € 29.673.017 (in consortium)
Container Terminal/Multimodal Platform
Characteristics:
Cutting and removal of 2 metal pile moorings, localized dredging around the pile moorings, placing and TOT setting, pre-fabrication of 2 BA boxes
(size 15 x 15 x 23 m), placing of boxes in respective setting sites, filling of interior with concrete, on site concreting of top of each pile mooring,
fitting of quay accessories.
Main quantities:
Dredging: 15,600 m³ ▌Volume of concrete: 13,035 m³ ▌Iron: 410,454 kg
Location: Morocco - Mohammedia
Start / completion date: 2000
Value: € 4.251.519
Current equivalent value: € 5.867.096
Mohammedia Harbour Oil Terminal
Characteristics:
Wharf strengthening. Reprofiling of the most damaged sections of the wharf’s outer slope, across an extent of around 920 m, with 48.4 ton
tetrapods, including removal of tetrapods from the existing shell, dredging of the existing layers followed by reprofiling with rockfill produced at a
quarry, and with restored/fabricated tetrapods. Reprofiling of the most damaged sections of the wharf’s inner slope, with Antifer cubes of 6.7
ton. Demolition and reconstruction of 70 m of ridge wall with non-reinforced concrete. Prospecting for cavities / hollows under the ridge wall and
respective filling with rock materials.
Main quantities:
Pre-fabrication and placement of Antifer cubes in the profiling of the inner slope: 200 of 6,7 ton ▌Pre-fabrication and placement of tetrapod's in
the profiling of the outer slope: 1,400 of 48,4 ton ▌Lifting, storage and replacement of tetrapod's (outer slope): 2,400 of 48,4 ton ▌Dredging of
rock fill of up to 3 t: 35,000 m3 ▌Supply and placement of rock fill of up to 5 t: 65,000 m3
Location: Morocco – Jorf Lasfar
Start / completion date: 2000 / 2002
Value: 101.222.330 DHS
Current equivalent value: € 11.675.840
Reinforcement of the Port of Josf-Lasfar Breakwater
Characteristics:
Extension of the current east wharf southwards to a length of 1,100 m, including dredging with rock removal, rock fill, blocks of 600 and 710 kN in
the protection layers and concrete in the superstructure.
Main quantities:
Dredging: 41,000 m³ ▌Rock Removal: 36,000 m³ ▌Placing of rock fill: 3,000,000 m³ ▌Pre-fabrication and placement of Antifer cubes of 600 kN:
17,900 unit ▌Pre-fabrication and placement of Antifer 710 kN cubes: 2,100 unit ▌Surface concreting: 37,000 m³
Location: Portugal - Sines
Start / completion date: 2000 / 2002
Value: € 47.395.340
Current equivalent value: € 58.770.222
East breakwater of Port of Sines
Characteristics:
Project, supply, construction and commissioning of an LPG terminal at Sines, including a marine terminal with capacity to receive LNG tankers
between 25,000 and 165,000 m³ in size, storage capacity for 240,000 m³ of gas at cryogenic temperatures in 2 tanks and dispatch to national gas
pipeline, operating support and administrative buildings, seawater re-gassing system.
Main quantities:
Concrete: 80,800 m³ ▌Steel: 9,600 ton ▌Shuttering: 204,500 m2 ▌Pre-stressed steel: 1,240 ton
Location: Portugal - Sines
Start / completion date: 2000 / 2003
Value: € 190.324.889 (in consortium)
Current equivalent value: € 228.389.866
Liquefied Natural Gas Terminal
Characteristics:
Land infrastructures at the wharf, including ice factory building and fish market. Net floor area of 2,000 m2.
Location: Cape Verde - Mindelo
Start / completion date: 2000
Mindelo Fisherman’s Wharf
Characteristics:
Building of land infrastructure facilities for fishing port, specifically: sewage, water supply and electricity networks and external concrete paving.
Construction of metal frame and galvanised sheeting buildings for: freezing, handling and conservation of fish, including the assembly of all
cooling and ice production machinery. Building of water storage tank, office building and sanitary facilities for port staff.
Main quantities:
Gross construction area: 925 m2 ▌Excavation: 570 m3 ▌Iron: 106 ton ▌Concrete: 1,150 m3 ▌Shuttering: 2,610 m2 ▌Metal structure: 159 ton
▌Galvanized sheeting: 1,630 m2
Location: Cape Verde – Mindelo, Cova da Inglesa/São Vicente
Start / completion date: 2000
Port of Mindelo Fishing – 2nd Phase
Characteristics:
Quay wall with a mooring front of 325 m (foundation level at – 16,5 ZH deep) in caissons of 31,30 x 16 x 20,50 m (15 unit). Back filling of 1,400,000
m3 at level (+5.0 ZH). Marginal back filling protection in a length of 380 m. Paving of an area of approx. 110,000 m2. Rails for the quay portal-
cranes. Rainwater drainage system. Water and sewage system of the main substation and quay office. Electric system of the terminal, including
related civil works.
Main quantities:
Alluvial and rock fill: 1,370,511 m3 ▌Reinforced concrete: 33,421 m3 ▌Reinforced concrete paving up to a thickness of 0,40 m: 106,593 m2 ▌Rails
for portal-cranes: 638 m ▌Drilling, blasting and removal of underwater rock: 5,765 m3 ▌Dredging of alluvial material: 27,524 m3 ▌Sand fill with
crushed stone columns: 5,877 m2 ▌Reinforced concrete piles with a diameter of 1,10 m: 839 m3
Location: Portugal - Sines
Start / completion date: 2001 / 2003
Value: € 22.644.892
Current equivalent value: € 27.173.870
PSA Container Terminal in Port of Sines
Characteristics:
260,000 m² solid bulk terminal, consisting of 2 quays with 750 m in total and a water depth of -12 m CD. Construction specification included all
energy, water, security and communications infrastructures, the railway line and two support buildings.
Main quantities:
Concrete: 17,000 m³ ▌Rock fill: 310,000 m³ ▌Sheet piles: 4,500 ton ▌Pavement in cobblestone: 200,000 m² ▌Rail track: 1,457 ton ▌Concrete
reinforcement steel: 1,048 ton
Location: Portugal - Aveiro
Start / completion date: 2002 / 2004
Value: € 21.026.024 (in consortium)
Current equivalent value: € 24.810.708
Solid bulk terminal of the Port of Aveiro
Characteristics:
Manufacture of concrete blocks for port expansion, land
infrastructures, including ice factory building and fish market.
Main quantities:
Concrete: 5,200 m³
Location: Cape Verde – Praia
Start / completion date: 2003 / 2004
Value: 425.000.000 CVE
Current equivalent value: € 4.548.133
Praia Fishing Wharf (1st and 2nd phase)
Characteristics:
Construction works and erection of the metal structures necessary
for building the Road Bridge made of Concrete and Structural
Steel for Berth 301.
Operational bridge with a total length of 147 m, divided into
three equal spans: two spans are 10 m wide (with two 3,5 m
traffic lanes, one 2,2 m lane for pedestrians and 0,40 m for the
base of the guard rails on both sides) and the central span is 13 m
wide. Two access bridges, one at each end, with a total length of
42,10 m and a width of 10 m. Two triangular platforms with 10 x
10 m sides at the junction between the access bridges and the
operational bridge. Two metal-structure overhead walkways
linking the operational bridge to the mooring dolphins. Four
bollards on the dolphins with a capacity of 750 kN. Two access
ramps 54 m long and 10 m wide, with 2 traffic lanes 3,5 m wide
and a 2,20 m pedestrian lane. Lighting system for the operational
bridge and for the access ramps. Fire-fighting system.
Location: Brazil – Rio de Janeiro, Sepetiba
Start / completion date: 2003 / 2004
Value: 5.900.000 R$
Port of Sepetiba – Berth 301
Characteristics:
Reprofiling of the wharf´s damaged external layer (~300 m), reloading of the breakwater head with 40 ton tetrapod's and construction of a 95 m
docking quay.
Main quantities:
Pre-fabrication and placement of 40 ton tetrapod's: 700 ▌Pre-fabrication and application of 40 ton Antifer cubes: 106 ▌Pre-fabrication and
application of 30 ton quay blocks: 120 ▌Supply and placement of rock fill of up to 5 ton: 15,000 m³ ▌Removal and reapplication of tetrapod's of
the existing shell (40 ton): 730 ▌Removal and re-application at the foot of the exterior embankment (reinforcement) of broken tetrapod's: 525
▌Dredging of rock fill: 5,500 m³
Location: Portugal - Azores – Lajes, Flores Island
Start / completion date: 2003 / 2006
Value: € 9.043.678
Current equivalent value: € 10.128.920
Port of Lajes Breakwater
Characteristics:
Refurbishment of two quays. Platform expansion to support the new urban plan for docking areas, refurbishment of the marina docking including
construction of new walkways docking areas.
Location: Spain – Maiorca, Soller
Start / completion date: 2004 / 2005
Value: € 4.600.000
Current equivalent value: € 5.336.000
Port of Puerto de Soller
Characteristics:
Rehabilitation of 1,000 m of the wharf and construction of a new 230 m passenger quay and respective terminal.
Main quantities:
Dredging/wharf excavation: 48,800 m³ ▌Placing of rock fill: 83,800 m³ ▌Pre-fabrication and placement of 300 kN tetrapod's: 4,200 unit ▌Pre-
fabrication and placement of 250 kN Antifer cubes: 1,300 unit ▌Concrete in wharf superstructure: 37,000 m³ ▌Ridge wall concrete: 5,000 m²
▌Dredging of the passenger quay zone: 27,000 m³ ▌Concrete for quay: 15,400 m³ ▌Slab concrete: 3,200 m³
Location: Portugal - Azores, Terceira
Start / completion date: 2004 / 2007
Value: € 31.679.092 (in consortium)
Port of Praia da Vitória
Characteristics:
Two wharfs at Barra do Douro to improve navigation conditions. Consisting of two 450 m breakwaters, one to the south made of rock fill and
Antifer blocks of high-density concrete, and the other, to the north, made of vertical concrete walls, consisting of caissons and arches topped by a
superstructure. Environmental follow-up and monitoring.
Main quantities:
Concrete: 60,000 m3 ▌High-density concrete: 30,000 m3 ▌Concrete reinforcement steel: 17,100 kN ▌Rock fill: 285,000 m3 ▌Dredging: 210,000 m3
Location: Portugal - Porto
Start / completion date: 2004 / 2008
Value: € 21.193.897 (in consortium)
Barra do Douro breakwaters
Characteristics:
Construction of a wharf with two strips: one strip 1,000 m long, running parallel to the wharf and about 220 m from its superstructure, and
another strip 300 m long and perpendicular to the latter and connected to the current Xitá quay. 330,000 square m platforms will be created
between the two breakwater strips. The work performed on the existing basin between the east wharf and the Xitá quay includes the following
work: capping crest, quay, link to the Xitá quay, dredging and landfill.
Main quantities:
Trench dredging: 907,000 m³ ▌Maneuver basin dredging: 1,186,000 m³ ▌Dredging in Sagunto Harbour and transport to Valencia Harbour:
1,307,000 m³ ▌Foundation berm rock fill: 486,000 ton ▌Stone fill in the caisson backs: 443,000 m³ ▌Filling of caissons cells: 268,000 m³ ▌Caisson
concrete: 85,500 m³ ▌Caisson steel: 4,224 ton ▌Caissons: 31 units ▌Superstructure concrete: 34,000 m³ ▌Superstructure steel: 2,089 ton
▌Underwater concrete: 6,200 m³ ▌Crest rock fill: 490,000 ton
Location: Spain - Valencia
Start / completion date: 2005 / 2007
Value: € 127.718.809 (in consortium)
East wharf platform and mooring quay of Valencia Harbour
Characteristics:
Execution of reinforced concrete caissons for a breakwaters expansion.
Main quantities:
Docking: 231 m ▌Expansion of service area: 25,200 m²
Location: Spain – Marín
Start / completion date: 2006 / 2008
Value: € 8.364.798
Port of Marín – 2nd phase
Characteristics:
480 berth recreational marina, an inter-island ferry docking quay, a docking quay for large cruise liners built parallel to the current commercial
quay, and support buildings.
Main quantities:
Dredging: 92,000 m³ ▌Rock extraction: 55,000 m³ ▌Steel A500: 11,000 ton ▌Concrete: 150,000 m³ ▌Various rock fill: 270,000 m³ ▌Caissons: 29
unit ▌Arches: 313 unit ▌Various pre-fabricated parts: 533 unit
Location: Portugal - Azores, Ponta Delgada
Start / completion date: 2006 / 2008
Value: € 56.162.137 (in consortium)
Ponta Delgada cruise line terminal
Characteristics:
Access platform with 500 m2 in stone paving and 350 m2 in wood,
supported by concrete and steel pillars.
Location: Cape Verde - Santa Maria, Sal Island
Start / completion date: 2006
Regeneration of the bridge at Santa Maria quay
Characteristics:
Sea work with concrete spans, transition parts (one caisson in catchment one in reinforced concrete and another in catchment two in fiberglass),
spans in HDPE (two placed by sinking in each of the two catchment outfalls) and sunken and linked catchment raisers. 4 access shafts in molded
walls were also made, two for collection and two for discharge; 1,248 fattening tanks in reinforced concrete, covered with a metallic structure
and canvas; 480 pre-fattening tanks, covered with a polyester coated metallic structure coated, and 21 buildings in metallic structure.
Main quantities:
Piping Ø 32 to Ø 3,000: 125,232 m ▌Concrete: 116,000 m3 ▌Steel: 6,198,373 kg ▌Shuttering: 171,519 m2 ▌Metallic structure: 1,977,302 kg
▌Concrete paving: 265,741 m2
Location: Portugal - Aveiro, Praia da Mira
Start / completion date: 2007 / 2009
Value: € 103.434.577 (in consortium)
Acuinova
Characteristics:
Rehabilitation of the existing quay and construction of the new quay having a reinforced concrete pile structure (length of 200 m and a variable
width of 33 to 46 m). Improvement of the geotechnical characteristics of soils at the front of the existing quay by executing crushed stone
columns to ensure the whole structure stability; execution of a rock filling prism on the outside of the existing quay to improve its whole stability;
reconstruction of the rock filling prism and filter on the back of the quay to avoid layers from fine filling material; strengthening of the
superstructure block with bolting.
Main quantities:
Construction dredging: 73,000 m3 ▌General dredging: 57,000 m3 ▌Supply and placing of rock fill: 60,000 m3 ▌Execution of crushed stone columns:
13,900 m ▌Reinforced concrete piles: 6,800 ml ▌Reinforced concrete (quay structure): 5,200 m3
Location: Portugal - Lisbon
Start / completion date: 2007 / 2009
Value: € 15.903.875 (in consortium)
Jardim do Tabaco Quay – 1st phase
Characteristics:
New Basin for nautical services in Valencia Harbour.
Main quantities:
Execution of reinforced concrete caissons: 200 m ▌Breakwater: 250 m ▌Expansion of service area: 25,000 m²
Location: Spain - Valencia
Start / completion date: 2008 / 2009
Value: € 18.485.944
New Basin in Valencia Harbour
Characteristics:
Rehabilitation of the existing quay 2: execution of a breakwater with quarry stone prism; Filling of the hollows under the quay blocks; Treatment and demolition works on the existing top girder; Removal of the existing quay equipment; Concreting of the reinforced concrete elements; Execution of the technical gutter and installation of the quay equipment. Construction of the “Cargo Village” (site for container/cargo storage and administrative buildings).
Construction of access road (linking the port, Cargo Village, and Praia ring road).
Location: Cape Verde – Santiago Island
Start / completion date: 2008 / 2010
Value: 68.058.322 CVE (in consortium)
Expansion and Modernization of Port of Praia – 1st phase
Characteristics:
Rehabilitation of the structure of the present quays, along a front of 450 m, closing and fill works of the Terreiro do Trigo Dock, construction of
the new quay having a reinforced concrete pile structure with higher bottoms for cruise liners.
Main quantities:
Dredging works: 42,000 m3 ▌Supply and placing of quarry stone, rock filling and crushed stone: 80,500 m3 ▌Execution of crushed stone columns
with a Ø 0,95 m: 85,500 m ▌Reinforced concrete piles with a Ø 1,0 m (drilling): 14,800 m ▌Pile steel casing with a Ø 1,0 m: 18,600 m ▌Reinforced
concrete: 37,000 m3 ▌Steel reinforcements A500: 3,782,000 Kg
Location: Portugal - Lisbon
Start / completion date: 2008 / 2011
Value: € 38.285.532 (in consortium)
Jardim do Tabaco Quay – 2nd phase
Characteristics:
Main breakwater with three forms of construction – rubble mound (1,150 m), vertical (2,000 m) and mixed (400 m) -, in addition to a rubble mound
secondary breakwater (1,100 m). The construction of the rubble mound breakwater is divided into two stages: creation of two rubble mounds with
base depth of -5 Z.H and filling of the core by direct truck offloading, using a high capacity crane to complete the planned section. Execution of
52 reinforced concrete caissons, reinforced concrete for curtain walls and superstructure, hydraulic fill for installation surface; sub base, bases
and access road paving.
Main quantities:
Breakwater: 3,385 m ▌Secondary breakwater: 1,100 m ▌Rock fill and quarry stone: 8,300,000 ton ▌Concrete for caissons, blocks and
superstructure: 885,000 m3 ▌Dredging of foundation trench: 750,000 m3 ▌Dredging for hydraulic fill and caissons: 2,850,000 m3 ▌Embankment:
2,100,000 m3 ▌Agglomerate paving: 180,000 m2
Location: Spain - Valencia
Start / completion date: 2008 / 2011
Value: € 224.317.948
Expansion of Port of Valencia
Characteristics:
Regeneration and extension of Quay 1 by 233 m, frontline container park in sea embankment, construction of protective breakwater, dredging to
fix seabed at depth of -12 to allow for berthing of vessels, container park complex, including access road, infrastructures and control building.
Location: Cape Verde – Santiago Island
Start / completion date: 2010 / 2013
Value: € 71.998.178 (in consortium)
Expansion and Modernization of Port of Praia – 2nd phase
Characteristics:
The third set of locks is a new lane of traffic that runs alongside the current locks: they are two enormous and complex works, one in the Atlantic
and the other in the Pacific, each with a length of almost two kilometers. Each new locks complex consist of a set of three chambers or
consecutive levels for vessels to move between sea level and Lake Gatun level.The new lock chambers have 427 metres long, 55 metres wide and
18.3 metres deep and allow the passage of Post-Panamax vessels.
Location: Panama
Start / completion date: 2010 / 2016
Value: 3.221.631.384 USD (Sacyr in consortium)
Panama Canal Expansion
Characteristics:
Breakwater, mooring quays, pavements annexed to the quays, embankments for construction of parks and buildings, infrastructures for supply of
water and power to the quays, fire-fighting systems, interior roads, parking, outer arrangements and buildings (main warehouse, workshops for
maintenance and repair) belonging to the Harbor area, as well as the infrastructures necessary for the said buildings.
Location: Cape Verde – Boa Vista
Start / completion date: 2010 / on going
Value: € 32.840.432 (in consortium)
Port of Sal-Rei
Characteristics:
Port infrastructure required for the operation of a conventional open-pit copper mine and a concentrator to produce copper and molybdenum
concentrates.
Port Berth and Causeway Construction: This port envisages the execution of a module offloading facility (MOF), essential to support the
offloading of equipment and building materials at this initial stage of the project, which does not yet have any access by land.
Module Offloading Facility – MOF: The module offloading facility (MOF) will be built using reinforced concrete caissons, which will be pre-
fabricated in Colón and then transported by sea to their deployment site.
MOF protection breakwater: Provisional protection breakwater to protect the MOF from the effects of waves. Access to the MOF will be by the
protection breakwater and landfill for caissons.
Breakwater: Rock-fill breakwater providing access to the berths, to shelter the berth to be built. The breakwater, which extends as a 330 metre
causeway from the coast, will support the coal and concentrate galleries conveyor and provide an access road for maintenance equipment and
personnel.
Commodity berth: The commodity berth will be in an area protected by the breakwater and will provide mooring and berthing capability for
cargo ships up to 10,000 DWT and for 6,000 DWT fuel barges. The berth to be built will be also with a ramp for roll-on/roll-off operations.
Location: Panama
Start / completion date: 2012 / on going
Value: 45.000.000 USD (in consortium: Somague: (50%) /Sacyr (50%))
Port in Panama
Characteristics:
Creation of two berthing lines of the vertical caisson quay type, 430 m and 440 m long, respectively. The quay depth is 14 m, which means it can
receive and handle the largest cruise ships currently sailing. Two areas of 83,000 m2 and 4,350 m2 were also built for the new terminal building
and other passenger services, as well as infrastructure for transport connections to the city, creating an interface between the Port and the city of
Valencia. 16 caissons measuring 54 m by 12 m by 17 m and 184,754 m3 of dredging.
Main quantities:
Rock fills: 1,100,000 ton ▌Concrete in caissons and superstructures: 52,000 m3 ▌Structural steel: 2,413 ton ▌Nº. of caissons (54mx12mx17m): 16
unit.
Location: Spain – Valencia
Start / completion date: 2012 / 2014
Value: € 22.387.097 (in consortium: Somague: (12%) /Sacyr (38%) /Cyes (50%))
Valencia Container Terminal
Characteristics:
Design, procurement and construction of all works and structures. Construction of an inland basin, 1250 m long by 250 m wide, dredged to -16.60
m ZP, bordered by 1050 m quay structure to the north and a 1270 m embankment to the south. The construction work will include various
interventions, namely on the quay structures, the basin and the terminal itself.
Designed to receive container ships with a capacity 11 300 TEU, length up to 363 m, beam of 45.6 m and draft up to 15 m and with a stock
stacking area prepared to receive up to six levels of full containers, the TLC will be the first and sole modern container transhipment hub in West
and Central Africa.
Main quantities:
Excavation: 1,350,000 m3 ▌Dredging: 2,005,000 m3 ▌Landfill: 3,355,000 m3 ▌Soil Improvement using vibro-compaction: 530,000 m3 ▌20 cm soil-
cement base course: 525,000 m2 ▌Concrete surfacing for container park and circulation routes, thicknesses varying from 26 to 38 cm: 525,000 m2
▌C28/35 concrete for surfacing: 165,000 m3
Location: Togo - Lomé
Start / completion date: 2012 / 2014
Value: € 107.900.000 (Somague: (50%) /Cyes (50%))
Lomé Container Terminal (TCL)
Characteristics:
Docking pier around 322.35 m long, with an operating depth of -8.00 m (chart datum), being a continuous pier of around 271.15 m by 26.6 m wide,
complemented by two separated breasting and mooring dolphins (13.80 m and 12.60 m).
The pier will be equipped with 17 quay fenders with an absorption capacity of 850 kNm, equipped with front panels clad with low-attrition
material, with 10 1000 kN mooring bollards, 9 emergency ladders and 7 metal rings distributed along the pier front. It will also be equipped with
water supply systems for ships, a fire fighting system, an electricity distribution system and lighting, as well as infrastructure for the future
installation of fuel supply systems. The structure will comprise a set of 17 reinforced concrete caissons, of four different types.
Main quantities:
Pre-cast caissons: 17 units ▌Concrete: 14,902.52 m3 ▌Reinforcements: 1,881.9 ton ▌Dredging: 130,000 m3 ▌Rock fill: 66,171 m3 ▌In situ concrete:
50,784 m3 ▌Concrete for superstructure: 15,284.68 m3
Location: Portugal - Madeira, Funchal
Start / completion date: 2013 / 2015
Value: € 17.880.000 (in consortium)
Cruise Ship Pier of the Port of Funchal