MT PIPER ENERGY RECOVERY PROJECT
APPENDIX U PROJECT PLANS
Mt Piper Power Station
!
ERP AshPlacement Facility
!
ERP Plant
WALLERAWANG
BLACKMANSFLAT
PORTLAND
LIDSDALE
BEN BULLENState Forest
BEN BULLENState Forest
SKELLY ROAD
FOREST STREET
MAIN STREETBRAY S
LANE
BOULDERROAD
ALBION ROAD
RANGE ROAD
PIPERS FLAT ROAD
CAST
LERE
AGH
HIGH
WAY
IRON
DALE ROA D
WOL
GAN R
OAD
NOON STREET
VIEW STREET
IAN HOLT DRIVE
04/12/20190436662m_EIS_G001_R10.mxd
A3
This figure may be based on third party data or data which has notbeen verified by ERM and it may not be to scale. Unless expresslyagreed otherwise, this figure is intended as a guide only and ERM doesnot warrant its accuracy.
Client:Drawn By:
Drawing No:Date: Drawing Size:
Reviewed By:
Mt Piper Energy Recovery
EnergyAustralia and Re.GroupGR AACoordinate System: GDA 1994 MGA Zone 56
Regional Locality Plan F1-1
LegendMt Piper Property BoundaryProject SiteLot BoundaryState ForestMajor RoadLocal RoadTrackRail Line
0 0.5 1km [N
Source:Imagery : ESRI World Imagery - 15 Oct 2016GIS Base Data : NSW DFSI DCDB/DTDBLayout: Client Provided 22 Oct 2019Inset : Bing Maps
Site Location
!(
BOULDER ROAD
FRANKFORT ROAD
CASTLEREAGH HIGHWAY
Notes:Elevations for existing infrastructure based onground elevation of 940m AHD derived fromWallerawang 2m DEM (NSW Gov, 2017)Elevations for existing ash repositories derived fromsite survey - (MPA0719.dwg, received August 2019)
05/12/20190436662m_EIS_G031_R02.mxd
A3
This figure may be based on third party data or data which has notbeen verified by ERM and it may not be to scale. Unless expresslyagreed otherwise, this figure is intended as a guide only and ERM doesnot warrant its accuracy.
Client:Drawn By:
Drawing No:Date: Drawing Size:
Reviewed By:
Mt Piper Energy Recovery
EnergyAustralia and Re.GroupGR AACoordinate System: GDA 1994 MGA Zone 56
Energy Recovery Project Layout F3-1
LegendMt Piper Property BoundaryLamberts North Ash Placement AreaMt Piper Extension (MP 09_0119)(approximate boundary, not acted upon)
Proposed LayoutProject SiteProject Ancillary UsesProposed Ash Placement FacilityProposed Stormwater Pond RDF Truck RouteAsh Truck Route
0 100 200 300m [N
Source:Lots : Lithgow DCDB, NSW GovernmentImagery : World View 2 Sept 2018Layout : Client Provided 22 Oct 2019Mt Piper Extension : Derived from Fig 3-1 (SKM, 2019)
ERP AshPlacement Facility
ERP Plant
Laydown Area
ExistingContractorCar Park
Mt PiperPower Station
Mt PiperCoal Stockpile
Mt PiperAsh Repository
!
Turbine Hall (980m AHD)! Coal Bunker (996m AHD)
!
Boilers (1025 m AHD)
!
Existing Stack (1190m AHD)!
971 AHD
!
944 AHD
Drawing Not to Scale
0436662m_EIS_C005_RA3.cdr
This figure may be based on third party data or data which has not been verified by ERM and it may not be to scale. Unless expressly agreed otherwise, this figure is intended as a guide only and ERM does not warrant its accuracy.
F3-2
EnergyAustralia and Re.GroupClient:
Drawing No:
Date: 04/12/2019
GR AAReviewed by:Drawn by:
Drawing size: A3
ERP Plant Site PlanMt Piper Energy Recovery
Notes: Text here
10 20m0
Drawing Not to Scale
Type text here
Type text here
Type text here
Type text here
Legend
N
Source: AU6054-GN-GHD-SKT-0002.dwg
Drawing Not to Scale
Notes:
EL : Elevation above ground (mm)
m AHD : based on ground elevation of 940m AHD
Derived from Wallerawang 2m DEM (NSW Gov, 2017)
FUEL STORAGEBUNKER
BOILER
FABRIC FILTER
STACK
FURNACE \GRATE
TRUCKUNLOADING
BOILER LHS ELEVATION
DRY
REACTOR
(~940.2 m AHD)
(~1010.2 m AHD)
(~992.425 m AHD)
(~980.202 m AHD)
(~970.175 m AHD)
(~962.2 m AHD)
(~974.474 m AHD)
(~962.175 m AHD)mm mm
mm
mm
mm
mm
mm
mm
0436662m_EIS_C002_RA3.cdr
This figure may be based on third party data or data which has not been verified by ERM and it may not be to scale. Unless expressly agreed otherwise, this figure is intended as a guide only and ERM does not warrant its accuracy.
F3-3
EnergyAustralia and Re.GroupClient:
Drawing No:
Date: 02/12/2019
GR AAReviewed by:Drawn by:
Drawing size: A3
ERP Plant ElevationMt Piper Energy Recovery
Notes: Text here
10 20m0
Drawing Not to Scale
Type text here
Type text here
Type text here
Type text here
Legend
N
Source: Concept Design - Surface water management plan(GHD Drawing No 12510536-C007 Rev A)
Top
X
\\ghdnet\ghd\AU\Brisbane\Projects\41\32777\Tech\Deliverables\Specific EIS Inputs
N 20100.000
N 20000.000
E 1
9700
.001
E 1
9500
.000
E 1
9600
.000E
195
00.0
00
1740
00 A
PP
RO
X. B
OIL
ER
ISLA
ND
PR
ELI
MIN
AR
Y
95613 APPROX. BOILER ISLAND
PRELIMINARY
SITE REFERENCEDATUM POINT
X = 0.000Y = 0.000
153345 (TBC)
ACCESSROADS
TNPN
20°
N 19930.000
EXISTINGFENCE
30000
TBC
TURNING PATHFOR TYPICAL
TRUCK
ADDITIONAL AREA OF ROADREQUIRED FOR B-DOUBLE
ROAD PROFILE SHOWNACCOMMODATES 'B-DOUBLE'
TURNING REQUIREMENTS
3100
0
37809
1600
0
18
17
16
19
22
13
1221
7
10
6
8
9
5
4
1
2
3
15
14
11
20
23
24
10m RADIUS FROMSTACK CENTRE LINE
STACK CENTRE LINESITE GRID (m) GRID COORDINATE MGA94 ZONE56E 109.791 E 19609.791 E 223476.24N 151.497 N 20081.497 N 6305024.77RL 180.3 RL 940.365 RL 940.10
25
LEGEND - DRAINAGE
SYMBOL DESCRIPTION
CONCRETE HEADWALLWITH SCOUR PROTECTION
900x900x900 PIT WITHGRATE (GRADE D)
CONCRETE KERB& GUTTER
CONCRETE EDGE STRIP
CONTAMINATED WATERAREASLEGEND
ITEM DESCRIPTION
1 BALE OPENER
2 TRUCK UNLOADING
3 REUSE WATER RESERVOIR
4 MECHANICAL STOREROOM
5 ELECTRICAL STOREROOM
6 FUEL STORAGE BUNKER
7 COARSE ASH REMOVAL
8 FUEL HOPPER
9 BOILER
10 ASH DRAINAGE RESERVOIR
11 ACTIVATED CARBON HANDLING
12 OILY WATER SEPARATOR
13 FUEL STORAGE TANK
14 RESIDUE \/ FLY-ASH SIL
15 LIME SILO
16 STACK
17 ID FAN
18 FABRIC FILTER
19 SPRAY COOLER AND REACTOR
20 ECONOMISER
21 PIPE RACK
22 ACTIVATED CARBON STORAGE & SHELTER
23 ELEVATED WATER TANK
24 ASH TREATMENT FACILITY
25 COMPRESSED AIR PLANT
Mt Piper Energy Recovery
Base Drawing : AU6054-GN-000-SKT-0001 RevA 30/09/2019Client Provided Update 04/11/2019
This figure may be based on third party data or data which has not been verified by ERM and it may not be to scale. Unless expressly agreed otherwise, this figure is intended as a guide only and ERM does not warrant its accuracy.
F3-9
EnergyAustralia and Re.GroupClient:
Drawing No:
Date: 02/12/2019
GR AAReviewed by:Drawn by:
Drawing size: A3
ERP Plant Layout and Stormwater System0436662m_EIS_C001_RA3.cdr Mt Piper Energy Recovery
Notes: Text here
10 20m0
Base Drawing : AU6054-GN-000-SKT-0001 RevA 30/09/2019Client Provided Update 04/11/2019
Type text here
Type text here
Type text heresecond line example
Type text here
Legend
N
Source: Text here
940
940
960
955
950
945935
940
940
940
950
945
955
940
950 950
950
945
FINAL STAGING PLANSCALE 1:1500
SEDIMENT BASIN MAY BEDECOMMISSIONED FOLLOWINGREVEGETATION OF FINALLANDFORM SURFACE
STAGE G1
STAGE R1
935
930
940
935
930
940935
935
930
940
935
940
930
STAGING 1 PLANSCALE 1:1500
SEDIMENTBASIN
SURFACE WATER AT LOW POINT MAY NOTBE ABLE TO BE TRANSFERRED TO SEDIMENTPOND WILL REQUIRED LOCALISED SEDIMENTCONTROL \/ MANAGEMEN
SEDIMENT POND FOR WATERFROM DISTURBED AREAS
935
930
940
935
930
940935
935
930
940
935
940
930
STAGE G2
STAGE R2
945
940
935
930
935
940
945
940
935
940
STAGING 2 PLANSCALE 1:1500
SEDIMENTBASIN
INTERFACE LINING TO BEINSTALLED PRIOR TO PLACEMENTOF GENERAL SOLID WASTE OVERRESTRICTED SOLID WASTE
VEGETATED BUND TO BECONSTRUCTED PRIOR TOWASTE FILLING BEHIND FORAREA BELOW FIRST BENCH
935
930
940
935
930
940935
935
930
940
935
940
930
STAGE R3
STAGE G3
940
945
935
945
940
930
945
950
940
945
935
945
935
940
940
STAGING 3 PLANSCALE 1:1500
SEDIMENTBASIN
RELOCATE SEDIMENT PONDTO ALLOW CONSTRUCTIONOF STAGE G3
INTERFACE LINING TO BEINSTALLED PRIOR TO PLACEMENTOF GENERAL SOLID WASTE OVERRESTRICTED SOLID WASTE
LEGEND
EXISTING SITE CONTOURS (1m INCREMENT)
DESIGN CONTOURS
APPROVED LAMBERTS NORTH COAL ASH PLACEMENT AREA (NOTE 2)
LINED ASH PLACEMENT AREA
VEGETATED BUND \/ FINAL CAP ARE
INTERFACE LINER
GENERAL SOLID WASTE CELL
RESTRICTED SOLID WASTE CELL
NOTES:
1. EXISTING SITE CONTOURS BASED ON CEH SURVEY DATED 19 JULY2019 (DRAWING TITLE: LEND LEASE SERVICES PTY. LTD. - MOUNTPIPER - ASH PLACEMENT SURVEY: 19TH JULY 2019, DRAWING NO.MPA0719 (AS SURVEYED))
2. APPROVED LAMBERTS NORTH COAL ASH PLACEMENT AREA ISEXTRACTED FROM FIGURE 3 (IN PDF FORMAT) OF SKM REPORT (SKM2012, MT PIPER POWER STATION ASH REPLACEMENT PROJECTCONSISTENCY REPORT - PROJECT APPROVAL - DELTA ELECTRICITY)
960
N
Drawing Not to Scale
0436662m_EIS_C002_RA3.cdr
This figure may be based on third party data or data which has not been verified by ERM and it may not be to scale. Unless expressly agreed otherwise, this figure is intended as a guide only and ERM does not warrant its accuracy.
F3-10
EnergyAustralia and Re.GroupClient:
Drawing No:
Date: 02/12/2019
GR AAReviewed by:Drawn by:
Drawing size: A3
Ash Placement Facility Concept Design and Mt Piper Energy Recovery
Notes: Text here
10 20m0
Drawing Not to Scale
Type text here
Type text here
Type text here
Type text here
Legend
N
Source: Concept Design - Surface water management plan(GHD Drawing No 12510536-C007 Rev A)
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
WALLERAWANG
BLACKMANSFLAT
PORTLAND
LIDSDALE
VIEW STREET
FOREST STREETGEO
RGE PARADE
BRAY SLA
NE
MCMAN US ROAD
BOULDERROAD
IAN HOLT DRIVE
A LBI ON R OAD
RANGE ROAD
PIPERS FLAT ROAD
IRONDALE ROAD
CASTLEREAGH HIGHWAY
WOLG
AN R
OAD
LAM B
ERTS
GULL
Y
HUONS CREE
K (GU
LLY)
NEUBECKS CREEK
940
950
950
950
1000
1010
950
970
960920
960
990
970
920940
970
940
960
940
1000 970
980
950
960
980
980
960
950
960
910
1010
930
990
920
1080
980920
950
920
950
900
1050
930
920980940
880
930
950
950
880
1060910
1000
920
930
950
910
960
1030
1070
920
1050
880
980
1040
10101060
1090
1000
1030
1040880
900
1040
960
890
1040
1010
970
990
1020
960
930
980
960
9101000
960
1050
10301000
1020
1000
990
1030
930
1040
900
1040
980
1080
930
920
890
1050
920
900
1040
950960
1040
990
920
1020
1000
1010
1020
1020
870
900
970
900
950
1000
1040
1060
960
1020
920
1040
900
1060
960
930
1050
1010
890
970
1010
910
950
1020
1010
980
980
920
900
1000
970
920
910
910
1000
1050
940
960
1070
910
960
920
910
1010
940
950
960
960
1060
950
920
1000
1030
910
930
920
920
890
920
940
980
1030
1020
930
930
930
1000
1030
960
1040
950
950
900
1020
890
950
1040
1040
990
910
970
1060
960
930
940
960
900
1020
920
1060
1010
1000
880
940
1020
1000
930
1070
950
910
1060
1010
890
890
980
890
1050
1000
940900
1050
960
960900
920
890
920
980
960
1040
1020
930
1000
1010
1000880
1040
970
1000
910
940
930
900
970
9201020
960
910
930
980
1000
940
900
930
960
960940
920
910
950
950
900
1060
910
930890
1010
950
920
1020
930
1040 930
1040
880
1040
1030
900
980
890
980
980
1040
970
960
960
950
950
960
1030
940
940
940
930
890
1010
1050
910
870
940
950
990
930
900
910
980
890
960
1030
1000
1040
1020
890
1020
950
1000
980
1010
1020
1050
980
950
900
1020
9301030
920
1000
1020
900
960
900
950
920
900
960
920
960
980
940
940
970
1010
960
1010
950
1030
990
9701000
910
960
930
990
910
1010
930 91
0940
1020
910
930
950
1000
940
920
1020
1040
1000
880
890
940
980
1000
1020
1000
990
970
910
940
970940
960
900
950
940
960
950
930
980
920
980
980
1000
930
990
970
980
960
920
R01
R02
R03
R04
R05
R06
R07
R08
R09
R10
R11
R12
R13
R14
R15
02/12/20190436662m_EIS_G004_R12.mxd
A3
This figure may be based on third party data or data which has notbeen verified by ERM and it may not be to scale. Unless expresslyagreed otherwise, this figure is intended as a guide only and ERM doesnot warrant its accuracy.
Client:Drawn By:
Drawing No:Date: Drawing Size:
Reviewed By:
Mt Piper Energy Recovery
EnergyAustralia and Re.GroupGR AACoordinate System: GDA 1994 MGA Zone 56
Nearby Features and Representative Receptors F6-1
Legend!( Representative Receptors
Residential / RuralResidential AreaWatercourseFormer Surface WaterFeaturesProject SiteProject Ancillary Uses RDF Truck RouteAsh Truck RouteMt Piper Property Boundary
Approximate Pine DaleOperations Boundary(Former)Approximate Western CoalServices OperationBoundaryState ForestMajor RoadLocal RoadTrackRail LineContour (10m AHD)
0 500 1,000m [N
Source:Imagery : ESRI World Imagery - 15 Oct 2016GIS Base Data : NSW DFSI DCDB / DTDB
FRANKFORT ROAD
BOULDER ROAD
CASTLEREAGH HIGHWAY
Lot 1DP702619
Lot 2DP702619
Lot 7DP804929
Lot 191DP629212Lot 101
DP1164619
Lot 102DP1164619
Lot 103DP1164619
Lot 101DP1240974
Lot 9DP804929
Lot 101DP1240974
Lot 8DP804929
Lot 1DP829065
Lot 5DP804929
04/12/20190436662m_EIS_G011_R04.mxd
A3
This figure may be based on third party data or data which has notbeen verified by ERM and it may not be to scale. Unless expresslyagreed otherwise, this figure is intended as a guide only and ERM doesnot warrant its accuracy.
Client:Drawn By:
Drawing No:Date: Drawing Size:
Reviewed By:
Mt Piper Energy Recovery
EnergyAustralia and Re.GroupGR AACoordinate System: GDA 1994 MGA Zone 56
Land Cadastre F6-2
LegendMt Piper Property BoundaryLot Boundary
Proposed LayoutProject SiteProject Ancillary Uses Proposed Ash Placement FacilityProposed Stormwater Pond RDF Truck RouteAsh Truck Route
0 100 200 300m [N
Source:Lots : Lithgow DCDB, NSW GovernmentImagery : World View 2 Sept 2018Layout : Client Provided 22 Oct 2019
ERP AshPlacement Facility
ERP Plant
Laydown Area
ExistingContractorCar Park
Mt PiperPower Station
Mt PiperCoal Stockpile
Mt PiperAsh Repository