153
REJECTAND
REPLACE
ANCHOR TEST TO TEST LOAD
LOCK-OFF AT 50%OF THE
MAXIMUMACCEPTABLETEST LOAD
CREEP CRITERIA
ENHANCEDACCEPTANCE
CRITERIA
LOCK-OFFAT DESIGNLOCK-OFF
LOAD
LOCK-OFFAT DESIGNLOCK-OFF
LOAD
OR
OR
OR
OR
MINIMUM APPARENT FREELENGTH CRITERIA
PASS FAIL
FAILPASS
POSTGROUT NO POSTGROUT
REJECTAND
REPLACE
PASS FAIL
REJECTAND
REPLACE
LOCK-OFF AT 50%OF THE
MAXIMUMACCEPTABLETEST LOAD
Figure 73. Ground anchor acceptance decision tree (after PTI, 1996).