ALJABER ENGINEERING | CORPORATE PROFILE 1
02
03
04
05
09
17
28
29
54
62
66
68
71
74
82
CHAIRMAN’S MESSAGE
VISION & MISSION
CEO’S MESSAGE
COMPANY PROFILE
CAPABILITIES
PROJECTS PORTFOLIO
SELECTED PROJECTS
HIGHWAYS, ROADS AND INFRASTRUCTURE
OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS
PIPELINE CONSTRUCTION
POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS
SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS
LANDMARK BUILDINGS
RESOURCES
AFFILIATES
CONTENTS
JEC_PRO_VER3_6_NOV_2015
In parallel with the vision and extraordinary growth of Qatar, AlJaber Engineering (JEC) continues to be at the forefront of the construction industry and a major player in the ongoing development of the nation.
JEC has fully diversified contracting capabilities through which we have successfully delivered numerous prestigious projects for local clients and we continue to participate in large scale projects either independently or in a joint venture with some of the largest multi-national companies in the world.
JEC’s future challenge in this dynamic market is to maximize its competitive edge and take full advantage of the strong pipeline of opportunities, which continue to emerge in Qatar. We are all working together to support JEC’s Mission to deliver projects for the benefit of our clients and partners.
I take this opportunity to offer my appreciation and gratitude to JEC’s partners and clients without which our continued success would not be possible. I look forward to a long and sustained partnerships with you all.
Mohamed Sultan Al JaberChairman
CHAIRMAN’S MESSAGE
ALJABER ENGINEERING | CORPORATE PROFILE 3
OUR VISION
JEC’s vision is to be Qatar’s premier general contractor always striving to deliver construction works to complex projects with excellence. Our track record has proven that regardless of all challenges, we deliver the work to the highest standards on time and on budget.
OUR MISSION
AlJaber Engineering endeavors to be the market leader and preferred general contractor, widely recognized for superior construction expertise. We achieve consistency in the delivery of high quality services and add value for clients through proactivity, transparency in communication, timely completion of projects, and high quality performance. We practice sustainability to safeguard our environment, and maintain the highest levels of professionalism, honesty, and trust in our relationships with clients, employees, and affiliates.
For over 15 years AlJaber Engineering (JEC) has been a cornerstone of development and infrastructure projects in the State of Qatar. As one of the largest general contractors in Qatar, we have been a consistent player in the nation’s extraordinary growth.
Qatar, under the wise leadership of His Highness The Emir, Sheikh Hamad Bin Khalifa Al Thani, is becoming increasingly international as an emerging diplomatic and travel hub. This is being delivered on the back of Qatar National Vision 2030, which supports strong public policy towards diversifying the national economy away from a dependence on oil and gas exports. This policy has already succeeded in dramatic fashion with Qatar’s successful bid for the FIFA World Cup 2022, supporting the nation’s upward trajectory.
AlJaber Engineering has been taking a leading role in providing general contracting services with uncompromised commitment to Quality, Health, Safety and Environment. We do this through the combination of an open relationship with our employees based on mutual trust, transparency, accountability and discipline.
To that end, we continue to invest in the most qualified, best-in-class talent to manage operations and project delivery. Our management team is backed by an international workforce of over 8,000, each trained to industry’s best practice and operating to fully accredited management systems, health, safety and environmental sustainability standards. This amounts to our ultimate goal of ensuring continued precision in everything we do. We use state-of-the-art equipment to help in participating in upcoming challenging large-scale projects.
We are proud of our achievements to date and we are committed to continually enhancing our capabilities to ensure we remain at the forefront of our industry both in terms of client and project needs.
Osama HadidChief Executive Officer
WELCOME MESSAGE
ALJABER ENGINEERING | CORPORATE PROFILE 5
AlJaber Engineering (JEC) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies- JEC has successfully completed numerous large-scale turnkey projects for many prestigious clients in different sectors including:
• Highways, Roads and Infrastructure
• Engineering, Procurement, Installation & Commissioning (EPIC)
• Oil, Gas, Petrochemical and Industrial
• Pipeline Construction
• Power Generation, Substations & Desalination Plants
• Sewage Treatment Plants and Pumping Stations
• Maintenance of Oil & Gas and Petrochemical Installations
• Landmark Buildings
Our commitment to execute projects with the highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JEC to be recognized as an icon in the construction community in Qatar. We have recently established an office in Iraq to undertake projects in contribution to the large ongoing developments.
In line with the growing demands to build Qatar’s infrastructure and new developments, JEC has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects.
COMPANY PROFILE
LEGAL & FINANCIAL STATEMENT
Certificate Document No. Expiry Date
Trade License 25964 03-06-2016
Commercial Registration 21753 10-08-2017
Contractor’s Classification Certificate 1602 14-12-2016
KAHRAMAA Grade “A” Contractors Certificate 1028 30-03-2017
Fire Alarm Certificate 1381 16-08-2017
Fire Protection (Defence) Certificate 1381 16-08-2017
ALJABER ENGINEERING | CORPORATE PROFILE 7
Key Personnel
SL. Name Position
01 Osama Hadid Chief Executive Officer
02 Hisham Hadid Executive Director
03 Amr Nadim Executive Manager - Engineering
04 Andrew Mulcuck Executive Manager - Commercial
05 Alex Calfat Executive Manager - Operations Civil
06 Baris Nazlim Executive Manager - Operations Civil
07 Nabil Nakhle Executive Manager - Operations Civil
08 Khaled Jarrar Executive Manager - Finance
09 Husam Orabi Corporate Business Development Manager
10 Thomas Anderson Corporate QHSE Manager
11 Sohile Ismail Operations Manager - M & E
12 Hisham Obeidat Corporate Assets Manager
13 Firas Abu Zaki Projects Controls Manager
14 Qais Al Dabbas Cost Control Manager
15 Matthew Wood Commercial Manager
16 Carlos Haddad Estimation Manager
17 Mohamed Al Smadi Engineering Manager
18 Ayman Amer Procurement Manager
19 Ahmed Effat Houda Planning Manager
20 Ahmed Hadid Corporate Finance Manager-Affiliates
21 Thaer Abu Shaikha Accounts Manager
22 Anas Al Ereksousi HR Operations Manager
23 Muttiya Khayyat IT Manager
AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:
Oil & Gas, Petrochemical & Industrial
CLIENTS
Large International EPC Contractors
Large Developers
Government Clients
ALJABER ENGINEERING | CORPORATE PROFILE 11
HIGHWAYS, ROADS AND INFRASTRUCTUREAlJaber Engineering is a leading general contractor executing Highways, Roads, Infrastructure and mega earth moving projects.
JEC FOCUS AREAS ARE:• Highways and roads.• Underpasses, bridges and interchanges.• Major earth and reclamation works.• Turnkey Infrastructure Projects.• Site development works for industrial and petrochemical plants.• Pipeline construction (water, sewage and drainage).• Treated sewage effluent system (TSE).• Drainage and sewage systems.• Electrical and telecommunication networks.• Street lighting.• Signalization and traffic light systems.• Tunneling including related electrical and mechanical works.
JEC STRENGTH INCLUDES;• JEC owns the largest fleet of construction and earthmoving equipment in the state of Qatar.
• Concrete supply through JEC affiliated company Al Wataniya, Total production capacity 100,000m3/ month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan).
• Asphalt works through JEC Affiliated company Al Jaber Makhlouf with own fleet of equipment for production and delivery of Asphalt, total capacity of 10,000 tons/day.
• JEC owns onsite crushing and screening plants utilized for production of fill, structural fill, sub base and other crushed products.
PETROCHEMICAL, INDUSTRIALAND OIL AND GAS
AlJaber Engineering has been a key contractor involved in design, procurement and construction of turnkey projects related to the following:
• EPIC projects • Waste management facilities
• Oil & Gas facilities • Water treatment plants
• Power and desalination plants • Water transmission systems
• Petrochemical plants • Tanks and reservoirs
• Industrial plants• Maintenance of petrochemical and industrial installations
• Sewage treatment plants • HV substations
JEC STRENGTH INCLUDES:
EngineeringJEC has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP.
ProcurementOur Procurement team has extensive experience in managing and performing procurement activities for large EPIC contracts.
ConstructionJEC construction team has worked on complex projects, with technical experience to meet international contracting standards and capable to perform high-profile projects.
ALJABER ENGINEERING | CORPORATE PROFILE 13
CIVIL WORKS• Underground and elevated concrete structures• Silos• Cooling towers• Precast concrete pipe racks• Culverts• Structural steel works• Industrial buildings• Underground utility networks• Road works• Fencing
MECHANICAL WORKS• Supply, fabrication and erection of major process static equipment• Process piping and Pipelines• Fire fighting systems• Pipe gantry’s and support systems• Cranes• Supply and erection of rotary equipment• HVAC systems• Insulation, Painting and scaffolding works
ELECTRICAL & INSTRUMENTS• Supply and erection of major electrical equipment.• Power distribution systems• Lighting and power• Fire detection and alarm systems• Programmable logic control systems (PLC)• Scada systems• Structural cabling• Security systems• Instrumentation and control works• Telecommunication systems
ALJABER ENGINEERING | CORPORATE PROFILE 15
LANDMARK BUILDINGSWe have successfully executed various industrial buildings on design and build basis. In addition, JEC currently executing construction of landmark buildings as part of a Joint Venture with international companies.
JEC is a Kirby Certified builder to supply and erect Kirby Buildings in Qatar.
JEC FOCUS AREAS ARE• Landmark buildings• Structural steel buildings• Control rooms• Blast proof buildings• Temporary facilities
JEC STRENGTH INCLUDESCIVIL WORKS:• Enabling works• Concrete works• Curtain wall systems• Stone cladding• Steel structure• Architectural finishes
MEP WORKS:• Drainage• Plumbing• HVAC systems• Chilled water systems• Waste water treatment systems• Electrical (MV/HV/ELV networks)• Instrumentation• Telecommunication• Lifts• Fire fighting and fire alarm systems• Building Management System (BMS)
Project Client Value (USD) Status of Completion
CP12-E Additional Dredging of Southern Marina ChannelLusail Real Estate Development Company W.L.L
25,656,219 Ongoing
Roads & Infrastructure in Wadi Aba Seleel – Package 1A, Advanced Grading & Temporary Roads (QS004-P01A)
Public Works Authority 43,830,488 Ongoing
Camp at Abu Nakhlah Aljaber Engineering LLC 35,616,438 Ongoing
Construction of CP08-A3: Enabling Works - Qetaifan Islands Lusail Real Estate Development Co. W.L.L. 50,645,068 Ongoing
Design & Build of Plants (STP, SWRO, TSE Polishing, RO) & Supply and Installation of Utility HUB and Pumping Stations-MEP Works including Process
Al-Ali Engineering Cont. Trading WLL 20,273,973 Ongoing
Doha Metro project - Gold Line (A Joint Venture with Aktor, Yapi Merkezi, STFA and Larsen & Toubro)
Qatar Rail 3,357,810,000 Ongoing
Design and Construct New Orbital Highway and Truck Route Mesaieed to Salwa Road (A Joint Venture with Leighton Contracting Qatar)
Public Works Authority 1,687,232,160 Ongoing
Site Preparation Works for GASAL Project GASAL Q.S.C 7,683,540 August, 2014
Construction of CP7A-1B waterfront wommercial / Seef Lusail Infrastructure works Lusail Real Estate Development Co. W.L.L. 38,540,200 Ongoing
Rasgas flow assurance project - Site preparation works RasGas Company Ltd. 1,800,350 May, 2014
Construction of CP7C-1C, enabling works for Commercial Boulevard Lusail Real Estate Development Co. W.L.L. 42,593,000 August, 2015
Upgrading of Mesaieed Town RPSQatar Electricity & Water Corporation-KAHRAMAA
27,900,000 Ongoing
Development of new camp for Internal Security Forces (ISF) at Al Duhail (A Joint venture with AKTOR).
Internal Security Force (ISF) 662,506,000 Ongoing
Coast Guard Base - Expansion of the main navigational channel & turning basin Urbacon General Contracting 10,405,500 May, 2014
The Base Project in North Lusail - The Island Bridge Works UrbaCon General Contracting 7,946,000 May, 2014
EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at West End extension, Ras Laffan Industrial City
Qatar Petroleum 147,370,000 May, 2014
HIGHWAYS, ROADS AND INFRASTRUCTURE
ALJABER ENGINEERING | CORPORATE PROFILE 19
Project Client Value (USD) Status of Completion
EPIC for southern perimeter industrial fence, security patrol access and other roads in Ras Laffan City
Qatar Petroleum 23,985,000 December, 2013
Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary irrigation, portable water networks and street lighting
Jawhara Greens Company SPC
20,274,000 November, 2013
The Base Secondary Chanel Excavation and Disposal Works in Semisima. UrbaCon General Contracting 7,209,600 April, 2013
Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area
Qatar Petroleum 190,000,000 February, 2012
Early site earth works for Barzan onshore project at Ras LaffanRasGas- Main Contractor: CCC /Teyseer JV
36,000,000 July, 2011
Construction of road paving at Pearl GTL plant area Strabag Qatar W.L.L. 1,272,000 January, 2011
West Bay project. Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area
Public Works Authority (ASHGHAL)
55,000,000 December, 2010
EPIC for new support services and site development of 3,000,000 m2 land at Ras Laffan Industrial City
Qatar Petroleum 82,000,000 November, 2010
Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed
SNC-Lavalin 96,000,000 August, 2010
Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed
Qatar Aluminium Co. (Qatalum)
18,071,000 October, 2009
Site preparation and earth works for Elsewedy Cables factory at Mesaieed. Elsewedy Cables 3,500,000 February, 2009
Salwa International Highway interchanges and installation of water pipelines and street lighting
Public Works Authority (ASHGHAL)
86,304,000 January, 2009
Site preparation and road works for QAFCO 5 project in MesaieedHyundai Engineering & Construction Co
8,410,000 December, 2008
Site preparation, ground improvement by dynamic compaction and installation of 8000 Im new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed
Qatar Aluminium Co. (Qatalum)
34,446,000 December, 2008
Project Client Value (USD) Status of Completion
Gas pipeline crossings for service area and potroom building at Qatar Aluminium Smelter in Mesaieed
SNC-Lavalin 1,730,000 April, 2008
Construction of land water drain outfall at Ras Laffan Port Jan De Nul / Boskalis JV 625,000 February, 2008
Soil Improvement for Boiler and Demin units in Qatar Vinyl Company Qatar Vinyl Company 500,000 May, 2007
Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water treatment area
Chiyoda /Technip JV 2,530,000 March, 2007
Ras Laffan port expansion project: Excavation and site preparation to construct a lake within Ras Laffan port expansion and construction of access road and street lighting
Jan De Nul / Boskalis JV 6,600,000 February, 2007
QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT) areas at Ras Laffan, in connection with Qatar Gas 3 project
Chiyoda / Technip JV 30,400,000 February, 2007
Hamad Medical City surface and ground water scheme: Construction of surface and groundwater pipelines by microtunneling and construction of reinforced concrete outfall structure
Public Works Authority (ASHGHAL)
12,500,000 September, 2006
Design and construction of central sewage collection system and construction of precast concrete boundary wall
Boom Construction Co. 4,000,000 October, 2006
Excavation and stockpiling of hard material at Ras Laffan Cracker II project site Qatar Petroleum 10,000,000 May, 2006
Ras Laffan Olefin project: Site preparation and installation offence Technip 8,000,000 April, 2006
Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site in Mesaieed
New Doha International Airport (NDIA)
38,050,000 October, 2005
Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City
Public Works Authority (ASHGHAL)
18,600,000 October, 2005
Construction of paved walk ways, unpaved track road, landscaping and new boundary wall at Dukhan Township
Qatar Petroleum 3,300,000 March, 2004
ALJABER ENGINEERING | CORPORATE PROFILE 21
Project Client Value (USD) Status of Completion
Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed
SNC-Lavalin 20,420,000 September, 2010
Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City Doha Cables 2,986,000 June, 2010
Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed
Qatar Aluminium Co. (Qatalum)
24,240,000 February, 2010
EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical andelectrical works at Mesaieed Port
Qatar Petroleum 31,336,000 March, 2009
Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed
SNC-Lavalin 7,850,000 January, 2009
Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units
Chiyoda/Technip JV 33,455,000 November, 2007
OIL & GAS, PETROCHEMICAL ANDINDUSTRIAL PROJECTS
Project Client Value (USD) Status of Completion
Engineering, procurement, fabrication and installation of dust collection towers and sunshades
General Electric (GE) 1,600,000 August, 2007
EPIC of desalinated water network including installation, testing and commissioning of 14 km GRP pipelines at Ras Laffan
Qatar Petroleum 9,985,634 July, 2006
EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan
Qatar Petroleum 13,600,000 October 2005
Construction of new access platforms and walkways in Dukhan oil fields Qatar Petroleum 580,000 June, 2004
Construction of dry storage sunshades at Camp As Sayliyah US Army 800,000 January, 2004
EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RUC)
RasGas 4,600,000 December,2002
Extension of central control room building at QAFCO. Qatar FertilizerCo. (QAFCO) 1,800,000 March, 2002
ALJABER ENGINEERING | CORPORATE PROFILE 23
Project Client Value (USD) Status of Completion
GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A
Qatar Electricity & Water Co. (KAHRAMAA)
436,649,087 Ongoing
Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm
Public Works Authority (ASHGHAL)
44,370,000 December 2011
Upgrading of New and Old Salwa distillate and rising mains (22km of pipes)Qatar Electricity & Water Co. (KAHRAMAA)
32,000,000 September, 2007
EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with RasGas expansion project
CHIYODA - TECHNIP JV 21,200,000 February, 2007
Supply and lay the extension of water distribution mains (58 km) in north Duhail Phase C & D
Qatar Electricity & Water Co. (KAHRAMAA)
4,905,000 January, 2006
Supply and lay the extension of water distribution mains (57 km) in north Duhail Phase A & B.
Qatar Electricity & Water Co. (KAHRAMAA)
4,050,000 November,2005
Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor cycle race track
Qatar Electricity & Water Co. (KAHRAMAA)
13,100,000 July, 2004
PIPELINE CONSTRUCTION
Project Client Value (USD) Status of Completion
Umm Al Houl Power Project - Package A (Civil & Building Works) & Package B (HVAC Works)
Hitachi Zosen Corporation 95,800,000 Ongoing
Ras Abu Fontas A1 new water plant- Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 MIGD water desalination plant at Ras Abu Fontas
Fisia Italimpianti 75,500,000 March, 2010
RAFB2-site-0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and large bore pipes (CS & SS)
General Electric (GE) 4,350,000 December, 2006
Qatar transmission system - Phase VI, Substations: Civil works associated with various substations
VATECH 4,900,000 March, 2006
Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Laffan
Fisia Italimpianti / Enel Power 20,437,000 May, 2003
POWER GENERATION, SUBSTATIONSAND DESALINATION PLANTS
ALJABER ENGINEERING | CORPORATE PROFILE 25
Project Client Value (USD) Status of Completion
Engineering, Procurement, Construction, Testing & Commissioning of the District Cooling Plant-3 in West Bay
Qatar District Cooling (Q.C.S.C) 60,994,300 Ongoing
Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works
Public Works Authority (Ashghal)
53,295,000 Ongoing
Construction of treated sewage effluent permanent disposal system including 21 km of HDPE pipeline at Ras Laffan
Chiyoda Technip JV -QGE (CTJV)
10,800,000 February, 2009
Civil works and upgrading of pumping stations Torishima Pump Mfg. Co. Ltd. 2,045,000 May, 2008
Design and construction of sewage treatment plant and labour compound infrastructure including boundary wall, roadworks and chainlink fence
New Doha International Airport (NDIA)
13,000,000 February, 2006
Upgrade of sewage network and refurbishment of pumping stations and relocation of TSE distribution mains
Qatar Petroleum 5,120,000 June, 2005
Construction of treated sewage effluent network (TSE) T5 to T7 including 14 km of TSE mains
Ministry of Municipal Affairs Agriculture (MMAA)
4,000,000 November, 2004
Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains
Ministry of Municipal Affairs Agriculture (MMAA)
13,000,000 April, 2004
Construction of additional sludge drying beds and other labour accomodation facilities including one storey building
Ministry of Municipal Affairs Agriculture (MMAA)
1,251,000 February, 2002
SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS
Project Client Status of Completion
Shutdown associated works for Qatar Aluminium Smelter in Mesaieed SNC - Lavalin Completed
Long term fabrication and maintenance support on call off basis Qatar Vinyl Company (QVC) Completed
Civil work for rolling mill major repair Qatar Steel Company (QASCO) Completed
Refurbishment of administration building ground floor corridor flooring tiles Qatar Fertilizer Co. (QAFCO) Completed
Revamp of closed cooling water cycle and civil works Qatar Fertilizer Co. (QAFCO) Completed
Surface protection of buried sealine O.S.B.L. at Ras Laffan QatarGas Completed
Repair of transformer DHTS 90000/140 ANSALDO Industrial Completed
MAINTENANCE OF OIL & GAS, PETROCHEMICALAND INDUSTRIAL INSTALLATIONS
ALJABER ENGINEERING | CORPORATE PROFILE 27
Project Client Value (USD) Status of Completion
Central warehouse at Mesaieed Qatar Steel Co. 2,500,000 July, 2005
EPIC of 2600 m² pre-engineered steel structure store building with all associated electrical and mechanical works at QAFCO 4 expansion project in Mesaieed
Qatar Fertilizer Co. (QAFCO) 1,615,000 November, 2003
EPIC of 3240m² new office building with all associated roads and external works including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan
RasGas 2,500,000 October, 2003
EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil and electro-mechanical works at Mesaieed
KBR / Technip 5,420,000 January, 2002
Design, supply, installation and commissioning of Q-Chem prefab temporary training facility, with all associated civil and MEP works
Q-CHEM 713,000 July,2001
EPIC of temporary facilities consist of prefabricated office with all associated power supply,mechanical and electrical works for Q-Chem project at Mesaieed
KBR / Technip 1,600,000 April, 2000
Project Client Value (USD) Status of Completion
Barwa Financial District. (A Joint venture with Bouygues and Midmac Contracting) Barwa Real Estate Company 1,301,370,000 Ongoing
Dubai Towers (A Joint venture with Al Habtoor) Sama Dubai 400,000,000 Ongoing
Alwaha Club RasGas 7,400,000 March, 2002
LANDMARK BUILDINGS
OTHER BUILDINGS
Lusail Real Estate Development Company W.L.L
25,656,219
The Scope of Works consists of deepening the Southern Marina (By Dredging) from -3.00 ONHD to -4.50 QNHD as well as dredging additional isolated areas, including deepening of the Central Lagoon entrance.
The major work elements are:Dredging operation – average Dredging productivity 60,000 m3/Day. Transportation of dredged material to a multi-cell Spoil Pit. Pumping of sea water from the Spoil Pit to the existing sedimentation ponds 1 & 2 Removal of the wet silty material from the spoil pit to the “Drying multi-cell pit” for Drying process Finally, transportation of the dried material off site to approved municipality disposal site.
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
CP12-E ADDITIONAL DREDGING OF SOUTHERN MARINA CHANNEL
ALJABER ENGINEERING | CORPORATE PROFILE 31
Public Works Authority
43,830,488
The purpose of this project is to provide both single lane and dual two lane temporary roads in Wadi Aba Seleel within the project limits. This includes advance grading and levelling of specific sections of the roadways within the main project boundary, including the construction of temporary roads, over an area of aproximately 19.7km as follows;
Dual carriageway - 9.00km (approx.) Single Carriageway - 11.00km (approx.)
The Major quantities are: • Site Clearance - 147 Ha • Excavation - 533,200 m3 • Filling - 786,300 m3 • Roadworks (Sub-Base, Base Course & Wearing Course) - 323,500 m2 • 14m Street light Columns - 1,262 Nos. • Swales for Surface Water Drainage - 39,365 m • Gulleys & Soakaways • Road Marking & Road Signs • Kerb Stone & Precast Concrete Barricades
Ongoing
Client
Value (USD$)
Project Scope
The major scope of works
Completion Date
ROADS & INFRASTRUCTURE IN WADI ABA SELEEL – PACKAGE 1A, ADVANCED GRADING & TEMPORARY ROADS (QS004-P01A)
Aljaber Engineering LLC
35,616,438
Construction of new Worker’s Accommodation Facility as per the latest welfare standards. The facility estimated for a capacity of 4,500 workers with all the welfare & recreation facilities. The major elements consists of:
Labor Accommodation, Mess Hall & Kitchen, Camp Office & Training Room, Grocery & Retail Barber Shop, Clinic, Mosque, Guard Room, Delivery Area & Parking Money Exchange, Delivery Area & Parking, Car & Bus parking Lots, Garbage Collection Sewerage Treatment Plant, Generator Farm & Diesel Farm, Cricket Ground, Basket Ball Ground, Foot Ball GroundExternal Works & Utilities:• Road Works, Road Marking & Sign Boards • Hard Scaping works • Hoarding / Fencing, Gates & Barriers • Street Lighting • Drainage Network • Water Network • Fire Fighting Network • Electrical Works
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
CAMP AT ABU NAKHLAH
ALJABER ENGINEERING | CORPORATE PROFILE 33
Lusail Real Estate Development Company W.L.L
50,645,068
The Major Scope of the Project consists of:
• Design & Construction of the civil works and associated MEP works for two large diameter utility tunnels for the Bridge 9 and Bridge 8 • Construction of the Marafeq-designed 7 Nos. gasline crossings. • Removal of a section of the existing sea wall (198m) and construction of new realigned sea walls (152m).• Widening of the five (5) existing temporary earth bunds with pipe culverts • Raising the finished level of the existing sea wall on Qetaifan Islands from 2.0m to 2.5m QNHD by the installation of precast reinforced concrete capping blocks.• Construct concrete block staircases adjacent to the sea wall at five (5) locations providing restricted access from the promenade to the tidal lagoon basin.
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
CONSTRUCTION OF CP08-A3: ENABLING WORKS - QETAIFAN ISLANDS
Al-Ali Engineering Cont. Trading WLL
20,273,973
The Major Scope of the Project consists of: • Potable water pumping station TSE Pump Station• Fire Water Pumping Station Storm water Pump Stations - 3 Nos• Marine Restaurant Pump Station Sewag Pumping Stations - 6 Nos.• Design and build a sewage treatment facility with a design capacity of 2,600 cubic meter per day.• Design and build a seawater desalination facility with a design capacity of 4,500 cubic meter per day average daily demand• Design and build a treated sewage effluent polishing facility with a design capacity of 1,800 cubic meter per dayServices for Various Utility Buildings: • Storm Water and Waste water drainage system• Soil, waste and vent system• Supply and install sanitary fittings and fixtures.• Water supply works• Air conditioning and ventilation works• Fire Fighting works• Electrical works• Testing and commissioning Ongoing
Client
Value (USD$)
Project Scope
Completion Date
DESIGN & BUILD OF PLANTS (STP, SWRO, TSE POLISHING, RO) & SUPPLY AND INSTALLATION OF UTILITY HUB AND PUMPING STATIONS-MEP WORKS INCLUDING PROCESS
ALJABER ENGINEERING | CORPORATE PROFILE 35
Qatar Rail
3,357,810,000
The Doha Metro is part of the Qatar Integrated Railways Program (QIRP). The Gold Line Underground section of the network runs East/West through the heart of Doha City, starting to the East at Airport City and continuing through Al Sharq, Doha Souq, Msheireb and Al Adhawaa, before following both Al Sadd Street and Al Waab Street to the West of Doha and terminating at Sports City in the Aspire Zone.
The major elements consist of:
• 10 Nos. stations.• 11.7km of twin bored tunnels
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
DOHA METRO PROJECT - GOLD LINE(A JOINT VENTURE WITH AKTOR, YAPI MERKEZI, STFA AND LARSEN & TOUBRO)
Public Works Authority
1,687,232,160
The Project is located west and south of the Doha city and providing the New Orbital Highway connecting Mesaieed to Salwa Road.The major elements are:• 57 Km of road works with 5 Main Interchanges - 30 km of 14 lanes Orbital Highway - 27 km of 8-16 lane side roads• 4 no. grade separated clover leaf type Interchange and 1 no. grade separated Junction comprising 24 no. bridge structures• 18 no’s Braiding and Emergency exists• Pedestrian & Bicycle paths with appropriate underpass structures• New Utilities such as Surface Drainage Works, TSE Line, Electrical Works, Street lighting works, Q-Tel, QAF, ITS Ducts• Diversion and Protection of Existing Utilities (including QP gas pipelines)• Crossing Points of EHV Pylons• Landscaping (Within Interchange)
May 2017 (Ongoing)
Client
Value (USD$)
Project Scope
Completion Date
DESIGN AND CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE - MESAIEED TO SALWA ROAD - MRPSC/014/2012 2013/L (A JOINT VENTURE WITH LEIGHTON CONTRACTING QATAR).
ALJABER ENGINEERING | CORPORATE PROFILE 37
Lusail Real Estate Development Company W.L.L.
42,593,000
The scope includes early enabling works project consisting of dewatering works, bulk excavation and temporary support of excavation systems etc.
• Worksite Clearance• Temporary Fencing• Temporary Access Roads• Design, installation, operation and maintenance of temporary dewatering systems and handed over to the permanent works contractor• Excavation in the dry with mechanical means and the transport of excavated materials to an authorized off-site landfillThe Excavation consists of: - Car Park 2 141,587 m3 - Car Park 3 124,613 m3 - Car Park 4 105,576 m3 - Car Park 5 15,1622 m3 - Underpass Tunnel 996,973 m3• Monitoring ground movements around and within the excavations• Provision for the disposal of 3,000,000 m3 of excavated material from the stockpile generated by LREDC • Lowering of Western Marina 386,000 m3• Widening of Earth Bridge 2A 30,000 m3 (Filling with selected excavated material)
August,2015
Client
Value (USD$)
Project Scope
The major scope of works
Completion Date
CONSTRUCTION OF CP7C-1C, ENABLING WORKS FOR COMMERCIAL BOULEVARD
RasGas Company Ltd.
1,800,350
The project scope consists of site preparation and fencing works. The worksite consists of two (2) parts OSPL area and the Temporary Site Facilities (TSF) Area. The major works consists of:
For OSPL AreaSoil Cutting for Soil improvement 13,867 m3Excavation inside pile area 1,027m3Soil Fill (Type A material) 39,179 m3
For TSF AreaSoil Fill (Type B material) 9,387 m3Temporary Perimeter Fence 1,040 lmGates 4 setsTemporary pipe culverts 57 lmConcrete Pavement 670 m2
May, 2014
Client
Value (USD$)
Project Scope
Completion Date
RASGAS FLOW ASSURANCE PROJECT - SITE PREPARATION WORKS
ALJABER ENGINEERING | CORPORATE PROFILE 39
GASAL Q.S.C
7,683,540
The project site is located within Lot W8 of Ras Laffan Industrial City and the scope consists of earthworks encompassing excavation, dumping of unwanted soil to designated location within RLIC, backfill, grading, levelling, compaction to arrive at the finished ground level as per project requirements as set out in Specifications for Site Preparation Works, Concrete Works and Road Works.
The major quantities are:• Soil Grubbing and Scrubbing 75,000 m2• General Excavation 95,775 m3• Surface Levelling 75,000 m2• General fill and embankment (0 50mm) 189,420 m3• Surface Compaction 75,000 m2• Galvanized Fence 1,100 m• Vehicle Gates 2 Nos.• Protection of Existing Pipe 50 m
August,2014
Client
Value (USD$)
Project Scope
Completion Date
SITE PREPARATION WORKS FOR GASAL PROJECT
UrbaCon General Contracting
10,405,500
The scope of subcontract works shall be the excavation, bunds creation, bunds removal and disposal of all excavated materials:
• Complete excavation of estimated quantity 1,055,000 m3
• Creation and complete removal of the bounds to seabed level or original grade level• Supply, install and operate complete dewatering system ensuring working in dry ambient surface conditions• Pre and post survey works• Removal of excavated material from the excavated areas for drying purposes• Dispose all excavated materials off site to an approved local authorities disposal location
May, 2014
Client
Value (USD$)
Project Scope
The major scope of works
Completion Date
COAST GUARD BASE - EXPANSION OF THE MAIN NAVIGATIONAL CHANNEL & TURNING BASIN
ALJABER ENGINEERING | CORPORATE PROFILE 41
UrbaCon General Contracting
7,946,000
The project involves the construction of a bridge to provide access to the private island(Private residence palace) from mainland with an approximate length of 442 m with 20m span between two piers.
• Bridge construction including foundations, piers, superstructure, arch towers, lighting podiums and decorations.• Road pavement as well as all related drainage works for the road, sidewalks and utilities trenches.• Bridge lighting and decorative lighting.
May, 2014
Client
Value (USD$)
Project Scope
The major scope of works
Completion Date
THE BASE PROJECT IN NORTH LUSAIL - THE ISLAND BRIDGE WORKS
UrbaCon General Contracting
7,209,600
• Pre & Post excavation bathymetric surveys• Island channel excavation 537,000 m3
• Diposal of excavated material on land off-site 537,000 m3
April, 2013
Client
Value (USD$)
Project Scope
Completion Date
THE BASE SECONDARY CHANNEL EXCAVATION AND DISPOSAL WORKS.
ALJABER ENGINEERING | CORPORATE PROFILE 43
Qatar Petroleum
147,370,000
Engineering, procurement and construction of major Civil, Mechanical, Electrical, Instrumentation and SCADA control works detailed as follows:Various utility pipeline Networks 230 KmSewage pumping stations 29 Nos.Civil Works:• Excavation 873,300 m3
• Imported fill material 111,000 Ton• Precast concrete paving 28,000 m2
• Major RCC/Steel structure works & Road crossing(Microtunneling)Major Machanical Works: • Potable water/fire water pumping station• Potable water and fire water tanks 9 Tanks• Overhead cranes and manual hoist cranes 31 CranesMajor Electrical Installations:• Power network(Transformers with panels, ups, etc) 30 KmControl System and Instrumentation:• Telecommunication and SCADA control system• Fire alarm system/Fiber optic network (25 km)
February, 2013
Client
Value (USD$)
Project Scope
Completion Date
EPIC FOR WET UTILITIES DISTRIBUTION NETWORK (POTABLE WATER SUPPLY, FIRE WATER AND SEWRAGE) FOR SUPPORT SERVICES FOR AN AREA OF APPROXIMATELY 3000 HECTARES COMPLETE WITH AUXILIARY FACILITIES, SUB-SYSTEMS AND MAINS NETWORK AT RAS LAFFAN INDUSTRIAL CITY.
Qatar Petroleum
190,000,000
The project scope includes all associated Civil, Mechanical, Electrical, Instrumentation and telecommunication works.
Design Works:- Coordination of existing and future utility services- Traffic management strategy and traffic phasing- Reinforced concrete protection slab and culverts• Road Works and street lighting: 39 Km• Conversion of existing Mesaieed main and Police roundabout to traffic signal junction• Electricity and Power Network(LV/MV/HV/EHV) 187 Km• Potable Water Network 9 Km• Telecommunication Network 34 Km• Utility Duct Network 29 Km• Treated Sewer Effluent Network(TSE) 18 Km• Surface Water Drainage Network 70 Km• Foul Sewer Network 5 Km• Landscaping Network & Irrigation Network 250 Km
February, 2012
Client
Value (USD$)
Project Scope
Completion Date
RECONSTRUCTION OF EXISTING ROADS AND CONSTRUCTION OF NEW ROADS WITH ALL ASSOCIATED SERVICES AND INFRASTRUCTURE INCLUDING UPGRADE OF EXISTING UTILITIES AND INSTALLATION OF NEW UTILITIES AT MESAIEED COMMUNITY AREA.
ALJABER ENGINEERING | CORPORATE PROFILE 45
RasGas
CCC / Teyseer JV
36,000,000
Earth works for Barzan onshore early site project total area of 1,560,000 m2 detailed as follows:
• Grubbing, removal and transport vegetation 1,560,000 m2
• Remove, transport and depose marine deposit 1,512,000 m3
• Remove, transport and stockpile dune sand 400,000 m3
• Excavation (suitable soil, soft rock and hard rock) 940,000 m3
• Fill material 698,600 m3
• Imported fill 1,521,000 m3
July, 2011
Client
Main Contractor
Value (USD$)
Project Scope
Completion Date
EARLY SITE EARTH WORKS FOR BARZAN ONSHORE PROJECT AT RAS LAFFAN.
Public Works Authority (ASHGHAL)
55,000,000
• Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works• Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items.• Hard and soft landscaping and irrigation system.• Construction of roads (12.1 km)
December, 2010
Client
Value (USD$)
Project Scope
Completion Date
CONSTRUCTION OF ROADS AND INFRASTRUCTURE SERVICES SUCH AS FOUL SEWAGE, SURFACE WATER, POTABLE WATER, TSE LINES, PUMP STATIONS AND STORM WATER SYSTEM IN NEW DIPLOMATIC AREA.
ALJABER ENGINEERING | CORPORATE PROFILE 47
Qatar Petroleum
82,000,000
Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows:
• Excavation 435,000 m3
• Imported fill 2,060,000 m3
• Concrete 42,000 m3
• Concrete culverts (600 & 1000mm diameter) 13 Km• Construction of roads 145,000 m2
November, 2010
Client
Value (USD$)
Project Scope
Completion Date
EPIC FOR NEW SUPPORT SERVICES AND SITE DEVELOPMENT OF 3,000,000 M2 LAND AT RAS LAFFAN INDUSTRIAL CITY.
Qatar Aluminium Company (Qatalum)
SNC - Lavalin
96,000,000
This project includes underground piping works and major Civil works for Qatar Aluminium plant detailed as follows:
• Total excavation 325,000 m3
• Dewatering 74,000 m3
• Sheet piling 38,500 m2
• Concrete works 15,500 m3
• Piping works 73 Km• Ducting works 58 Km
August, 2010
Client
EPC Contractor
Value (USD$)
Project Scope
Completion Date
CONSTRUCTION OF UNDERGROUND PIPING SYSTEMS CONSIST OF INSTALLATION OF GRP SEA WATER PIPELINES, FIREWATER, PROCESS, POTABLE WATER LINES AND MAJOR INFRASTRUCTURE CIVIL WORKS AT ALUMINIUM SMELTER IN MESAIEED.
ALJABER ENGINEERING | CORPORATE PROFILE 49
Qatar Aluminium Company (Qatalum)
SNC - Lavalin
18,071,000Engineering and Technical Services:• Engineering and details design• Compaction test of the existing sub grade and newly constructed roads• Survey of existing utility servicesEarth Works:• Grading and leveling 3,000 m3
• Sub grade of road system and the drainage ditches 25,000 m3
• Site filling of utility corridor and underground pipelines 10,000 m3
Construction of Road System and Surface Drainage• Road base with well graded crushed stone (0-25mm)• Lining of the open ditches with well graded crushed stone 52,000 m3
• Surfacing of the road base with a layer of 70mm of compacted asphalt for roads 9,000 m3
• Curbstone, temporary road signs chain-link fence 87,000 m3
Supply & Installation of Potable Water Line• Permanent pipeline 300 Lm• Temporary pipeline including fire hydrants 4,000 Lm• Concrete works 1,100 m3
October, 2009
Client
EPC Contractor
Value (USD$)Project Scope
Completion Date
SITE DEVELOPMENT OF SERVICE AREAS AND POTROOM BUILDING AREA INCLUDING EARTH WORKS, CONSTRUCTION OF ROADS, SURFACE DRAINAGES SUPPLY AND INSTALLATION OF POTABLE WATER LINES FOR QATAR ALUMINIUM SMELTER IN MESAIEED.
Public Works Authority (ASHGHAL)
86,304,000
Water Pipes:
• Laying of D.I Pipes from 200mm to 400mm diameter 2300 LM• Removal of existing water D.I pipes 400mm & 500mm diameter 15,000 LM
Street lighting columns foundation: 1200 sets• Cable trenches 34,000 LM
Construction works for ten(10) interchanges:• Site clearance, demolition and earthworks• Sub-base and road base• Flexible surfacing• Road marking• Bridge structure works
January, 2009
Client
Value (USD$)
Project Scope
Completion Date
SALWA INTERNATIONAL HIGHWAY INTERCHANGES AND INSTALLATION OF WATER PIPELINES AND STREET LIGHTING.
ALJABER ENGINEERING | CORPORATE PROFILE 51
Qatar Aluminium Company (Qatalum)
34,446,000
• Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares).• Placing and compaction of fill materials for the platform construction of the aluminium and power plant
(4,540,000 m3).• Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing
and relocating to power plant area) of (750,000 m3).• Ground improvement for the carbon plant (12 Hectares), using dynamic compaction.• Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the
perimeter of the aluminium and power plant.
December, 2008
Client
Value (USD$)
Project Scope
Completion Date
SITE PREPARATION, GROUND IMPROVEMENT BY DYNAMIC COMPACTION AND INSTALLATION OF 8000 LM NEW SECURITY PALISIDE FENCE FOR QATAR ALUMINIUM SMELTER AND POWER PLANT IN MESAIEED.
Public Works Authority (ASHGHAL)
18,600,000
• Transformation of the existing Al Razi roundabout into a large elliptical roundabout with two underpasses including all associated road works, concrete works and diversion/replacement of existing underground utilities.
• upgrade of Ahamed Bin Ali Street (C Ring Road) between the existing Bin Omran roundabout and Rayyan street including all associated diversions and replacement of existing underground utilities.
• Excavation works for the overall car park, situated within the boundaries of the large elliptical roundabout.
October, 2005
Client
Value (USD$)
Project Scope
Completion Date
UNDERPASS AND ACCESS ROADS FOR DOHA 2006 ASIAN GAMES VILLAGE AND HAMAD MEDICAL CITY.
ALJABER ENGINEERING | CORPORATE PROFILE 53
ENVIRONMENTAL CLEAN-UP FOR NEW DOHA INTERNATIONAL AIRPORT PROJECT SITE INCLUDING EXCAVATION AND REMOVAL OF WASTE, TRANSPORTATION FROM NDIA SITE AND PLACEMENT AT ENGINEERED LANDFILL SITE AT MESAIEED.
New Doha International Airport (NDIA)
38,050,000
• Excavation and removal of 8,000,000 m3 waste from the NDIA site and placement at engineered landfill site at Mesaieed.• Demolition and removal of all direct structures.• Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects.• Stock piling of the waste removed to the new landfill site until the landfill is ready to receive waste materials.• Fencing for stock piling areas and wheel washing systems for transporting trucks.
October, 2005
Client
Value (USD$)
Project Scope
Completion Date
ALJABER ENGINEERING | CORPORATE PROFILE 55
FABRICATION AND INSTALLATION OF ABOVE GROUND METAL PIPING, INSTALLATION OF WATER SUPPLY PUMPS, EMERGENCY COOLING TOWERS, COMPRESSED AIR PIPING SYSTEM AND CLOSED COOLING MEDIUM SYSTEM AT QATAR ALUMINIUM SMELTER IN MESAIEED.
Qatar Aluminium Company (Qatalum)
SNC - Lavalin
20,420,000
• Fabrication and erection of pipes and connection to potable, process and fire water tanks.• In water supply area.• Installation of water supply pumps.• Installation of emergency cooling tower.• Fabrication and erection of compressed air piping system.• Fabrication and erection of closed cooling medium system.
September, 2010
Client
EPC Contractor
Value (USD$)
Project Scope
Completion Date
Qatar Aluminium Company (Qatalum)
24,240,000
• Excavation for foundations• Filling to structures and embankment• Fire rated concrete works and surface painting• Water proofing, and fencing works• miscellaneous metal works
March, 2010
Client
Value (USD$)
Project Scope
Completion Date
MAJOR GROUND AND CIVIL WORKS FOR RECTIFIER STATIONS AT QATAR ALUMINIUM SMELTER IN MESAIEED.
ALJABER ENGINEERING | CORPORATE PROFILE 57
EPIC FOR TWO NEW KANGAROO CRANES AND UPGRADING OF EXISTING GABBRO BERTHS CRANE FACILITIES INCLUDING ALL MECHANICAL AND ELECTRICAL WORKS AT MESAIEED PORT.
Qatar Petroleum
31,336,000
The Scope includes engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:
• Two kangaroo crane with a rated capacity of 1,100 ton/hour• HV electrical power supply for the new kangaroo cranes• Four new grabs and ropes for the two existing kangaroo cranes• Fresh-water based dust suppression systems for the two existing kangaroo cranes• Video camera system
The scope also includes all related mechanical and electrical works to upgrade the following:
• A mobile harbour crane• A hopper• LV electrical power supply and sockets for mobile hopper
March, 2009
Client
Value (USD$)
Project Scope
Completion Date
Qatar Aluminium Company (Qatalum)
SNC - Lavalin
7,850,000
All associated mechanical, piping, electrical and instrumentation works to install the following:
• Cathode roding equipment• Induction furnace• Overhead cranes• Emergency water pumps
January, 2009
Client
EPC Contractor
Value (USD$)
Project Scope
Completion Date
INSTALLATION OF CATHODE ROADING EQUIPMENT AND INDUCTION FURNACE INCLUDING SUPPLY AND ERECTION OF ALL MECHANICAL, PIPING, ELECTRICAL AND INSTRUMENTATION WORKS AT QATAR ALUMINIUM SMELTER IN MESAIEED.
ALJABER ENGINEERING | CORPORATE PROFILE 59
CIVIL, INFRASTRUCTURE AND ELECTROMECHANICAL WORKS FOR CAMPS AND OTHER FACILITIES INCLUDING UNDERGROUND PIPING NETWORKS, ROAD WORKS, INSTALLATION OF TREATED EFFLUENT TANKS, WASTE WATER TREATMENT UNITS AND SLUDGE TREATMENT UNITS.
Chiyoda - Technip J.V.
33,455,000
This project consists of the following:
Civil and Infrastructure works:
• Underground networks(HDPE 40 to 410 mm)• GRP pipeline 10” diameter• Foundations for the waste water treatment, potable water/ firewater and power generation units• Road works and street lighting• Sludge building• Galvanized fence• Construction of secondary substations and diesel generators buildings
Mechanical, Electrical and Instrumentation works:
• Installation of secondary package substations• Cable laying• Instrumentation works• Diesel storage tanks• Structural steel works• Above ground galvanized steel piping• Supply and installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) each, with aluminium dome cover• Supply and Installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) each, with aluminium dome cover• Installation of the waste water treatment units• Installation of sludge treatment unit
November, 2007
Client
Value (USD$)
Project Scope
Completion Date
General Electric (GE)
1,600,000
• Fabrication and erection of structural steel• “Dust Collection Towers” 201 Ton• Checkered plates 18 Ton• Gratings 190 m2
• Supply and installation of H2 sunshade 28 Ton• Aluminium sheeting 430 m2
August, 2007
Client
Value (USD$)
Project Scope
Completion Date
ENGINEERING, PROCUREMENT, FABRICATION AND INSTALLATION OF DUST COLLECTION TOWERS AND SUNSHADES.
ALJABER ENGINEERING | CORPORATE PROFILE 61
EPIC OF POTABLE WATER TRANSMISSION SYSTEM AND LANDSCAPING MAINS TO DISTRIBUTE WATER PRODUCED BY RLPC TO VARIOUS FACILITIES WITHIN RAS LAFFAN.
Qatar Petroleum
13,600,000
Detailed engineering, procurement, construction, installation, testing and commissioning of:
• Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan power company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.
• Water landscaping (WL) transmission system (FRP, uPVC & CS) to distribute water from Ras Laffan power company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.
October, 2005
Client
Value (USD$)
Project Scope
Completion Date
Qatar General Electricity & Water Co. (KAHRAMAA)
436,650,000
The scope of this Contract is to provide and complete the corridor pipelines (Corridor Mains) and fibre optic cable ducts within the southern length of the Qatar Utility Corridor (QUC) between PRPS 3 (Rawdat Rashed) and PRPS 4 (Abu Nakhla), transmission mains and corridor main pipework and connections at both PRPS 3 and 4 for Package A and northern length of the Qatar Utility Corridor (QUC) between the Dukhan Road and PRPS 3 (Rawdat Rashed) for Package BThe Major Quantities:Main Utility Corridor from Rawdat Rashed ( PRPS3) to Abu Nakhla ( PRPS4):23.95km of twin 1600mm diameter water corridor main | 10.40km of single 1200mm diameter transmission main0.35km of twin 1600mm diameter branches water corridor mainNorthern length between the Dukhan Road and PRPS 3 (Rawdat Rashed):1600 mm dia.: 22.9 km of twin pipeline from the Dukhan Road to PRPS 3.1200 mm dia.: 10.7 km of pipeline from the Dukhan Road to PRPS 3900 mm dia.: 1.5 km of pipeline from the QUC water corridor to the west edge of the QUCConstruction of all washout, air valve and other chambersDesign and construction of Trenchless road and utility crossingsSupply, installation & testing of the ducts in parallel with the pipelines for FOC.The pipeline (DI) quantities are: 1600mm dia Pipes - 94,292m 1400mm dia Pipes - 32,866m 1200mm dia Pipes - 33,970m 900mm dia Pipes - 1,5361m
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
(0.3) PIPELINE CONSTRUCTIONGTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C >C/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A
ALJABER ENGINEERING | CORPORATE PROFILE 63
DESIGN AND CONSTRUCTION OF 1200 MM OF 30 KM TRANSMISSION MAIN FROM DOHA WEST STW TO AL RAKHIYA FARM.
Public Works Authority (Ashghal)
44,370,000
The project consists of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:
• 1200 mm diameter GRP main 30 Km• 500 mm diameter GRP main 720 M• Air valves, washout and connection chambers• Flow control valves and flow meters.
December, 2011
Client
Value (USD$)
Project Scope
Completion Date
Qatar Electricity & Water Co. (KAHRAMAA)
32,000,000
Replacement of 1200 mm, 900 mm rising mains and associated pipe works from Old Salwa reservoir station and New Salwa reservoir station.
Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to immigration interchange.
Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.
September, 2007
Client
Value (USD$)
Project Scope
Completion Date
UPGRADING OF NEW AND OLD SALWA DISTILLATE AND RISING MAINS (22 KM OF PIPES)
ALJABER ENGINEERING | CORPORATE PROFILE 65
Hitachi Zosen Corporation
95,800,000
The Major Scope of the Project consists of:For Package A (Civil & Building Works)MSF Plant Area• MSF Switchgear Building – 3,540 m2• Demister Acid Cleaning Unit• MSF Unit – 1 Nos.• Roads & PavingPWT (Remine) Plant Area• Remine Switchgear Building - 1,747 m2 Cable Trenches Equipment Foundations• Generator System Building - 168 m2 Underground PipelinesRO Plant AreaCivil WorksDAF - 7,648 m2 DAF Sunshades HVAC Works Cable Trenches Underground Piping Roads & PavingBuilding WorksUF Building – I & II - 3,837 m2 each RO Building - 9,264 m2 RO Electrical Building - 4,737 m2Control Building - 305 m2 Chemical Building - 1,075 m2Waste Water Treatment Building - 450 m2 Ongoing
Client
Value (USD$)
Project Scope
Completion Date
(0.4) POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTSUMM AL HOUL POWER PROJECT - PACKAGE A (CIVIL & BUILDING WORKS) & PACKAGE B (HVAC WORKS)
MAJOR CIVIL WORKS RELATED TO THE CONSTRUCTION OF DISTILLERS AND BOILERS AREAS, INTAKE STRUCTURE AND POTABLE WATER RESERVOIRS FOR 45 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS ABU FONTAS.
Fisia Italimpianti
75,500,000
Distillers area and intake structure• Intake and outfall structures & Equipment and pipe rack foundations• Road works / Pipe trenches• Local control room, Chlorination building and C02 production building• Water basins and pumps well• Seawater screening and pumping stationBoilers area• Storage tanks• Local control rooms, switchgear and control room buildings• Pipe rack and equipment foundations, boilers and stack foundationsPotable water reservoirs• Potable water reservoirs 102,000 m2 (2 Nos.)• Potable water pumping station• Equipment foundations & Flow meters and valve pits
March, 2010
Client
Value (USD$)
Project Scope
Completion Date
ALJABER ENGINEERING | CORPORATE PROFILE 67
Fisia Italimpianti and Enel Power
20,437,000
All associated civil works to build 40 million gallons per day desalination, blending and demineralization plants.
• Installation of temporary facilities and lay down area for this project and future expansion• Bulk earth works• Concrete foundations for 4 main desalination units• Supply and discharge stations including U.G. GRP pipe works• Onsite GRP pipelines of various diameters• Main pumps structure and chemical dosing units• Re-mineralization structure including water tight structure• Main switchgear and control buildings (3 Nos.)• Electro-chlorination building (1 No.)• New roads and walkways with all associated civil works• Construction of cooling tower• Construction of 220 KVA cable corridor involves 80,000 m3 of excavation
May, 2003
Client
Value (USD$)
Project Scope
Completion Date
CIVIL WORKS RELATED TO THE CONSTRUCTION OF 40 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS LAFFAN.
Qatar District Cooling Q.C.S.
60,994, 300
The Works include the design, supply, delivery, erection and installation on site of a district cooling plant with a guaranteed capacity of 35,000tons of mechanical refrigeration plus 5,000 tons thermal energy storage tank (TES) capacity, serving the West Bay area including architectural and civil works and all necessary mechanical, electrical, plumbing and fire (“MEPF”) equipment and installations, associated structures, and the civil works of Kahramaa substation.The major elements are: • Construction of plant building including all civil and architectural works• MEP services complying with the final plant capacity• District Cooling Process work serving 35,000 RT plus 5,000 RT TES tank• Construction of Primary Substation
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
(0.5) SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONSENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF THE DISTRICT COOLING PLANT-3 IN WEST BAY
ALJABER ENGINEERING | CORPORATE PROFILE 69
REFURBISHMENT AND UPGRADING WORKS FOR VARIOUS FOUL AND STORMWATER PUMPING STATIONS INCLUDING CIVIL, MECHANICAL ELECTRICAL AND HVAC WORKS.
Public Works Authority (Ashghal)
53,295,000
The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:
• Civil works• Temporary bypass works, wet and dry well works• Rising main works and mechanical works
February, 2016 (Ongoing)
Client
Value (USD$)
Project Scope
Completion Date
Ministry of Municipal Affairs and Agriculture (MMAA)
13,000,000
Construction of 48 Km of treated sewage effluent network to service the north of Doha area including:
• Various TSE mains HDPE pipes 300 - 600 (mm)• D.I. pipes laid over the channel hung on the parapet of the bridge• Air valves circular type• Gate valves circular type• Washouts circular type• Distribution chambers rectangular type• TSE pipes installed by non-disruptive method• Partial TSE mains HDPE ducts installed by NDM• Remote control irrigation systems for primary and secondary roads
April, 2004
Client
Value (USD$)
Project Scope
Completion Date
CONSTRUCTION OF TREATED SEWAGE EFFLUENT NETWORK (TSE) T6 TO T7 INCLUDING 48 KM OF TSE MAINS
ALJABER ENGINEERING | CORPORATE PROFILE 71
(0.6) LANDMARK BUILDINGSBARWA FINANCIAL DISTRICT (A JOINT VENTURE WITH BOUYGUES AND MIDMAC CONTRACTING).
Barwa Real Estate Company
1,301,370,000
The Barwa Financial District (BFD) is situated in Doha’s new business district in West Bay with approximately built-up area of 700,000 m2 as detailed below:
• Elevated car parking• 15 Podiums: Retail + Technical• 9 Towers: Offices - Shell & Core• Hotel & Convention Center• Primary substation• Energy Center
May, 2016 (Ongoing)
Client
Value (USD$)
Project Scope
Completion Date
Sama Dubai
400,000,000
Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments.
The scope consists an 84-storey tower with total built-up area of 295,000 m2 detailed as below:
• Residential space 31 floors• Office space 29 floors• Five-star boutique hotel 13 floors• Retail space 2 floors• Ballroom• Meeting facilities• Business center• Swimming pool and Spa• Associated facilities
Ongoing
Client
Value (USD$)
Project Scope
Completion Date
DUBAI TOWERS (A JOINT VENTURE WITH AL HABTOOR).
ALJABER ENGINEERING | CORPORATE PROFILE 73
ALWAHA CLUB
RasGas
7,400,000
Construction of one storey concrete structure building with a total buit up area of 7300 m2 includes a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.
• Restaurant, snack bar and private dining room• Lounge and meeting rooms• Recreational rooms• Multi-purpose hall that functions as a theatre• Gymnasium• Children’s nursery• Administration offices• External swimming pool• Shaded paddling pools• Play areas and mini golf course
March, 2002
Client
Value (USD$)
Project Scope
Completion Date
ALJABER ENGINEERING | CORPORATE PROFILE 75
OFFICESJEC’s head office is located Foxhills, Lusail. Our offices are equipped with latest IT infrastructure to meet the international standards and requirements in order to meet our local and international clients’ expectations.
FABRICATION WORKSHOPJEC’s philosophy is to achieve maximum efficiency of fabrication productivity. JEC has established state of art fabrication workshop facilities equipped with new machines, equipment and tools.
Our fabrication workshop is situated in Al Khor Industrial Area close to the Ras Laffan Industrial City where all the major clients are located.
PMV FACILITIESJEC has invested heavily in purchasing new equipment to be able to execute the upcoming mega projects. In addition, JEC has established two central PMV workshops located in Salwa Industrial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and trained team. JEC has the largest fleet count in the State of Qatar exceeding 1,700 pieces of machinery.
ALJABER ENGINEERING | CORPORATE PROFILE 77
Description No. Description No
Lifting Equipment 73 Others 925
Mobile Crane 27 Generator 205
Tower Crane 3 Tower Lights 342
Man Lift 3 Concrete Mixer 18
Forklift &Tele Handler 19 Power Floats 11
Self-Loader 21 High Water Pressure Pump 20
Earth Works 825 Asphalt Cutters 7
Trencher / Surface Miner 5 Vibrators 58
Bulldozer 30 Hydro Testing Pump 20
Back Hoe (JCB) 31 Air Compressor 17
Excavator 168 Dewatering Pump (6” & 3”) 154
Wheel Loader 60 Welding Machine 39
Uni-Loader 33 Power Screen & Vibratory Screen 13
Water Tank Truck 3 Mobile Jaw Crusher & Impact Crushers 18
Roller 74 Sand Plant 1
Compactor 80 Kerb Casting Machine 1
Grader 28 Interlock Laying Machine 1
Tipper Truck & Trailer 281 Vehicles 514
Articulated Dump Truck 32 Buses 96
Transport Equipment 25 Pickups 264
Trailer with Low Bed & Flat Bed) 22 Cars 154
Recovery Truck & Pickup 3
Grand Total 2362
EQUIPMENT FLEET
ALJABER ENGINEERING | CORPORATE PROFILE 79
Description No
Management Staff 259
Top Management 8
Business Development 2
Estimation Department 43
Procurement Department 39
Commercial and Contract Department 50
Planning & Cost Control Department 29
Technical Department 6
Finance & Accounts Department 32
Information Technology 17
Human Resources Department 33
Projects Staff 9,620
Operation Civil 854
Operation MEP 901
Quality, Health, Safety & Environment 345
Project Technical Staff 50
HR Department Support Staff (Site Admin & Camps) 74
Project Workforce (Skilled & Unskilled Labor) 3,986
Drivers & Operators 2,065
PMV Department 1,172
Crusher Operations 28
Main Store Operations 86
Security Department 59
Grand Total 9,879
STAFF & MANPOWER
SUSTAINABILITY
INTEGRATED MANAGEMENT SYSTEM (IMS)
Quality, Health, Safety and EnvironmentJEC places emphasis on internally improving the physical and social environments in which employees operate in. We
constantly perform risk management techniques to identify the dangers employees can encounter in the workplace.
Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has
led to a higher productivity. Our standards of procedure and policies are implemented to ensure employee safety and
health is an action taken proactively and controlled by the top management.
In QHSE (Quality, Health, Safety and Environment), JEC continues to be one of the leading performers within our
industry sectors.
JEC is striving to continually improve the performance in QHSE management system and continually improving our
Quality, Health, Safety and Environment performance is one of our key strategic objectives. AlJaber Engineering’s
QHSE objectives are given equal value with other business objectives and being monitored by top management.
The quality of everything we make and do brings value to our customers and justifies their decision to do business
with us.
The protection of human health, personal safety and environmental rank at the highest level of importance to JEC.
We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our
stated QHSE business goals and policy.
JEC empowers and supports our associates in their ongoing efforts to prevent accidents of all kinds and to promote a
safe environment where-ever they go. We use comprehensive management systems to demonstrate our commitment
to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing
value to our associates, customers and the community.
Responsibility for Quality, Health, Safety and Environment rests at the top management level of AlJaber Engineering
and is transferred to down the line for implementation. Everyone in our organization is accountable for QHSE
performance in their respective area. JEC embarked upon a number of behavioral safety initiatives to complement
our procedures and to seek to ensure that everyone engages fully in matters.
ALJABER ENGINEERING | CORPORATE PROFILE 81
CERTIFICATIONS• ISO & OHSAS Certifications• Quality & HSE Policies• Safety Certifications & Achievements• 2 Million Man Hours without a lost time incident. Presented By NDIA.• 20,000,000 Man Hours with no lost time incidents. Presented by CTJV.• 1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.• 5,000,000 Man Hours without LTI at Ras Abu Fontas - A1 Project.Presented by Fisia Italimpianti• 1,000,000 Man Hours without LTI & with outstanding Safety Performance. Presented By LUSAIL.• 250,000 Man-hours without LTI under Onshore Flow Assurance Project Contract. Presented by RasGas.• Appreciations
ARABIAN SPECIALIZED MATERIALS
Arabian Specialised Materials Company ASMA is part of the Al Jaber Group and specializes in trading, supply and manufacture of a wide range of quality products and services to a diverse sphere of sectors and industries.
ASMA has the ability to deliver the right product from the right supplier. ASMA achieve this through many partnerships and associations with world-class companies in Europe, America, Canada and India. ASMA has been serving the market for more than sixteen years. ASMA provided construction materials and solutions to numerous clients in several industries including infrastructure, buildings, railway, water, electricity, Oil & Gas, and petrochemicals. ASMA provides a wide range of products such as:Formwork & ScaffoldingGRP & Steel Sectional Water TanksGarbage & Linen Chute SystemGeneral Fabrication WorksHVAC Ducts and accessoriesAluminum access covers Power CablesStreet Lighting Poles, Fixtures, Luminaries street safety furnitureWelded and safety fences Granite curbs and paversGRP, HDPE pipesHDPE LiningPassive Fire Stopping systemIronmongery & High security Locks
Contact Details:P.O. Box: 55289Tel: +974 4421 3636 Fax: +974 4421 3737Email: [email protected] www.asmaqatar.com
AL WATANIYA CONCRETE
Al Wataniya Concrete is the first company in the market to receive certification from the National Ready Mix Concrete Association (NRMCA) and from Qatar General Organization for Standard and Metrology (QGSM).
The Al-Wataniya Concrete corporate strategy is to integrate processes and services to ensure deliver high-quality, customer-centric timely products. Al-Wataniya prides itself for being the first company in the market to acquire NRMCA and QGSM certifications. Al-Wataniya’s commitment to excellence and quality is sustained by the dedication of its team-oriented, highly qualified and experienced team of engineers and professionals who utilize their know-how of the gulf market to deliver concrete efficiently and in a timely manner. To this effect, Al-Wataniya Concrete, established in July 2005, has positioned itself as one of the leading producers and suppliers of ready-mix concrete in Qatar. Al-Wataniya currently operates 9 plants that are spread across the State of Qatar to fulfill the country’s escalating construction and infrastructure needs.
Contact Details:P.O. Box: 24381Tel: +974 4483 8751Fax: +974 4483 2334Email: [email protected]
AFFILIATES
ALJABER ENGINEERING | CORPORATE PROFILE 83
CONFIDENCEEQUIPMENT & TRANSPORTATION CO WLL
Confidence Equipment and Transportation (CET) offers solutions for water tankers, sewage removal, garbage material as well as the transportation of these activities. With more than 170 employees at their disposable, they are one of the market leaders in catering to various sectors and provide assistance for any rental of equipment that aid companies in their operations.
CORE COMPETENCE:Confidence Equipment and Transportation (CET) offers solutions for the supply of sweet water and Treated Water (TSE) tanker rentals, removal of Sewage water, Garbage material, construction wastes, Hazardous & non-hazardous wastes as well as the transportation of these activities since its inception from the year 2002 operating 150 plus vehicles all corners of State of Qatar with more than 320 plus employees at their disposable, we are one of the market leaders in waste management industry & Equipment rental catering to various sectors and provide assistance that aid companies in their operations.
NATURE OF SERVICES:• Rental of Treated water tankers (TSE)• Rental of Sweet water tankers• Supply of Sweet water• Removal of Sewage water• Removal of Garbage Material, Construction waste, mixed waste and other wastes.• Supply of 7m3 Skip boxes
Contact Details:P.O.Box 24430, Industrial Area 41, Doha -QatarTel: +974 44690714Fax: +974 44690735Email: [email protected]
ARABIAN SUPPLY CENTER
Established in 2008, Arabian Supply Center (ASC) caters to the Qatari market’s need for quality spare parts, accessories and allied products. Initially providing only its affiliates with a limited range of spare parts for trucks and trailers, it soon expanded as it obtained exclusive distributor rights for world-class brands and equipment.By 2012, within only four years of its founding, ASC became the exclusive dealer for AKSA generators in Qatar, followed by Sandvik rock tools (Rammer and Bretec) in 2013. One year later ASC acquired exclusive dealership for its flagship product: Hitachi construction equipment. This year, ASC’s success story continues with its appointment as the sole distributor of LUK lubricants in Qatar.ASC’s reputation is based on three principles: providing quality products, at the right prices, and following it with excellent customer service. Our team of experts has extensive experience with our products and is fully prepared to meet all customer needs. With continued investment in people, processes and resources, ASC is well positioned to remain one of the leading suppliers of construction, industrial and transport equipment, spare parts and allied products in both the Qatari market and throughout the region.ASC offers following products & services:
Contact Details:P.O. Box: 10882Tel: +974 4458 0623, +974 4458 0635Fax: +974 4458 0562Email: [email protected]
ALJABER & MAKHLOUF
AL JABER & MAKHLOUF W.L.L. is a Grade Contractor for Road Works and Infrastructure in Qatar.
The Company has proven track record of executing large scale, multi-dimensional projects, of expressways, development of urban & rural infrastructure, road maintenance & safety improvements, infrastructure and road works for airports, educational institutions, real estate developments, industrial & petro-chemical plants, sports stadium, commercial and residential communities.
Al Jaber & Makhlouf’s core business activities comprises of earth works, Infrastructure works , road works , road marking works , asphalt texturing and coating works and landscaping works .
The Company owns large fleet of latest equipment and qualified workforce to deliver the works to the highest quality and safety standards.
Al Jaber & Makhlouf motto is satisfaction of its Clients adopting safe working practices and protection of environment.
Contact details :Al Jaber & Makhlouf W.L.L.P.O.Box 22801, Lusail, Doha – Qatar T +974 4040 9600 F +974 4040 9797E-mail:[email protected] / [email protected]
DELMON SCAFFOLDING
Delmon Scaffolding & Formwork has been operating in the Gulf for more than 30 years. It manufactures, supplies and hires various types of scaffolding and formwork systems. Over those years this division has developed a name in the market place for its technical expertise, quality products and ability to deliver. It has branches in the U.A.E, Oman, Qatar, and Saudi Arabia.In addition to D-Lock systems for Scaffolding, Delmon is the exclusive distributor of ULMA products in Qatar which can proved solutions to client achieve their targets in a timely manner and within budget, for almost all types of projects..Delmon’s scaffolding & formwork system are manufactured according to specifications of the International Construction Standards and the Society of Engineers.Delmon has a reputation for providing a reliable and dependable service backed up by its vast products range, its management and sales teams, experienced design engineers, supervisors and inspectors.Please contact us so we can become part of your team.
Contact Details:Qatar Office:P.O.Box: 17096, Doha-QatarC Ring Road, Office 6A, 6th Floor,Al Mana Business TowerTel: +974 4 4353131Fax: +974 4 [email protected]
ARABIAN PROJECTSDEVELOPMENT COMPANY
APDC is involved in Business Development and offers marketing strategies for foreign companies aiming to sell their products and services in the Qatari Market. They have partnered with many international companies in the Qatari market and have a standing reputation that has attracted more companies within the region.
ADPC offers the following services:
• Establishing all ground work needed to facilitate daily operations for a new company• Provides support in understanding legislation and legal systems in Qatar• Offers expertise in analyzing short - term and long - term trends• Assistance in development of planning to foster growth in a dynamic environment
Contact Details:P.O. Box: 55289Tel: +974 4421 3636Fax: +974 4421 3737E-mail: [email protected]
BIMTEC
BIMTEC is a “Vendor free” Client driven firm specialized in Building Information Modelling, Value engineering and Project Management Services.With more than 43 Billion Qatari Riyals using BIMTEC’s BIM through our certified engineers in the MENA region, we have engaged in Railway/Towers/Hotels/Theme park/infrastructure Projects and more. BIMTEC’s services covers:
· Virtual Design Construction· Vertical Planning· Project Management· Health and Safety· Facilities Management Integration· Scan to BIM· Road Scanning and Mapping· Lidar and Marine Scanning· BIM Consultancy and Training
Contact Details:ContractsEmail: [email protected]
Arabian Projects Development Co.
ALJABER ENGINEERING | CORPORATE PROFILE 85
EMCON
Emirates Concrete & Steel Protective Coating Works (EMCON) was established in 1978 and started its Painting and Special Coating Division in 1987. Today EMCON is one of the leaders in Qatar & UAE in the following fields:
• Fireproofing• Protective Coating for Concrete & Steel• Pipe Coating• GRP Lining• Surface Preparation• Epoxy & Traffic Floor Coatings• Special effect paints, Calligraphy and Multicolor paints• Tank Coatings• Concrete Repairs• Crack/Leakage Injections• Structural Strengthening• Guniting/Shotcrete
EMCON has manpower exceeding 300 highly skilled employees and access to additional workforce in Dubai/Doha. EMCON has Airless Spray equipment, Injection Equipment, Floor Grinders, Shot Blasting Machines, Water Jetting equipment, Compressors, Sand Blasting equipment, Guniting and Shotcreting Equipment.
Contact Details:P.O Box: 124288Tel: +971 4347 3400Fax: +971 4347 3402Email: [email protected]
STREAM ACOUSTIC & THERMAL
Stream Acoustic & Thermal (SAT) was established in 2005 as a reliable providers of acoustic and insulation solutions. By applying their vast experience and support of first class manufacturers, SAT became in no time one of the major solution providers in the state of Qatar.
In 2013, SAT became a member of Al Jaber Group of companies, one of the most reputable business groups in Qatar, which shall strengthen our presence in the market.
SAT is a specialized solution provider of sound absorption, sound insulation, and isolation for both vibration and structural born noise. It is also specialized in thermal and water proofing for International Contractors as well as grade A local contractors targeting high end / prestigious projects.
We offer our clients solutions empowered with the latest standards and technologies and in compliance with international standards and building codes.
Our products and solutions cover:
• Sound Absorption• Sound & Impact Insulation• Thermal Insulation• Vibration Isolation• Water Proofing Insulation
Contact Details:P.O. Box: 30486Tel: +974 4413 3735Fax: +974 4413 3799E-mail: [email protected]
HYDROSERV
HYDROSERV is a leading name in dewatering and specialized in ground water treatment, pumping services for fluid handling applications. With vast knowledge and experience of the complex hydrogeological conditions encountered, Hydroserv can engineer a solution to safely manage the risks associated for any dewatering project. Hydroserv offers a complete line ground water treatment, water pumps and related equipment for a range of applications, including diesel, hydraulic and electric powered centrifugals, electric submersibles, light towers and diesel generators.The principle that we can support the growth of industry, infrastructure and community while protecting the integrity of the natural environment is highly important to us. Our approach, our equipment and our services cater to site specific environmental sensitivities.Services:• DEWATERING• OVER PUMPING WORKS• SEWAGE WORKS• EMERGRNCY PUMPING• PIPE LAYING• RENTAL AND SALES• PRESSURE WASHERS & WHEEL WASHERS• GROUND WATER TREATMENT
Contact Details:HYDROSERV HEAD OFFICEP.O. Box 209403SALWA ROAD, DOHA QATARTel No: +974 4421 1325Fax No: +974 4472 7315www.hydroserv.qa
INTERNATIONAL DRILLING GROUP
IDG is a leading specialized contractor serving the Trenchless pipeline industry using the most advanced techniques in Horizontal Directional Drilling, Micro Tunneling and Pipe Bursting.IDG services cover the whole project from Consultation, Planning, Management and Execution based on IDG’s four corner-stone philosophies, Flexibility, Mobility, Reliability and Quality.IDG main activities include:• Horizontal Directional Drilling• Micro Tunneling • Pipe Bursting
Contact Details:PO. Box: 45730Tel : +974 4480 5247Fax:+974 44029 6258Email. [email protected]
VIJAY ARABIA FIRE & SECURITYSYSTEMS WLL
Vijay Arabia Fire & Security Systems WLL (VASS) is one of the fastest growing integrated Fire & Security Specialist Company. Established in Qatar in 2007, VASS specializes in turnkey industrial and commercial projects. From conceptualizing, design, supply, installation, testing, commissioning & maintenance – complete array of solution is offered to the customers through a professional team of more than 200 personnel.
Solution Constellation offered by VASS includes -• Fire Detection System – Addressable, Conventional, Enterprise Solutions• Fire Protection System – Hydrant, Sprinkler, Foam, Gas Suppression (FM200, Novec), Pre-action & Deluge Systems• Passive Fire Protection Contractor & Supplier of Fire Door, Sealant, Cable coating, Mortar. • Security Systems - Access Control, CCTV, Intruder Alarm & AV systems.• Access Control Systems.• Annual Maintenance for Fire Fighting and Fire Alarm Systems.Contact Details:
P.O.Box : 31146, Doha, Qatar.Tel : (+974) 44365529 / 44982275.Fax : (+974) 44364993Mob : (+974) 74438012Email. [email protected] www.vijayarabia.com
URBAN COCEPT W.L.L
Urban Concept W.L.L. is a Design and Contractor of Landscape and Urban Spaces.It has a long history in designing large scale landscape and urban projects, such as New Doha International Airport, Barwa City, Oxyen Park Qatar Foundation, Ras Abou Abboud Interchange.Presently we are building a Horse race track and all facilities around it for the Ministry of Youth and Sports.We have a plant nursery for outdoor plants.Our primary activities are:- Landscape design and construction.- Hardscape design and construction- irrigation Design and construction- Garden lighting design and construction.
Contact Details:PO Box 24363Tel: +974 4414 1198Fax: +974 4414 1124Email: [email protected]