3CC 11774 AAAA TQ BJA Ed. 01
2/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Status Released
Change Note
Short Title A9900. Terminal Station – release 2.1
All rights reserved. Passing on and copying of thisdocument, use and communication of its contentsnot permitted without written authorization from Alcatel.
3/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Table of contents
1 – Foreword 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1 – Structure of the manual 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2 – Using the manual 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 – Safety instructions 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3.1 – General rules 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3.2 – Symbols on products 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3.3 – Symbols used in the document 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3.4 – Declarations of conformity with European policies relating to EMC and LVD 10. . . .
2 – Equipment overview 13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 – Overview of the A9900 system 13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2 – Composition of the A9900 system 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3 – A9900 system specifications 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 – Frequency bands used 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 – Radio transmission specifications (typical values) 15. . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 – Capacity 16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.4 – Description of the Terminal Station (9900TS) 18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5 – Examples of configuration of the Terminal Station (9900TS) 18. . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 – Mono “NT” without repeater 18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.2 – Mono “NT” with repeater 18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 – Multi “NT” with passive splitters and repeaters 19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.6 – Technical specifications of the Terminal Station (9900TS) 20. . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.1 – RT specifications 20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.2 – NT specifications 20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.7 – Equipment power consumption 20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 – Installation of the 9900TS Terminal Station 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1 – Equipment delivery 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1.1 – Unpacking 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1.2 – Checking the configuration 22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2 – Labels on the equipment 23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.3 – Installing the equipment 24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.3.1 – Information required for installation 24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.3.2 – Precautions concerning electromagnetic compatibility 24. . . . . . . . . . . . . . . . . . . . . . . 3.3.3 – Tools required 24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4 – Installation of the Terminal Station RT unit 25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.4.1 – Definition of assemblies with respect to chosen polarization 25. . . . . . . . . . . . . . . . . . 3.4.2 – Installation of the 9900RT on a wall or flat vertical surface 27. . . . . . . . . . . . . . . . . . . 3.4.3 – Installation of the RT unit on a tube 29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.4.4 – Grounding the RT unit 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.5 – Installation of the RT/NT link 36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.6 – Installation of the Terminal Station 9900NT (Indoor Unit) 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.1 – Installation of the 9900NT unit on a desktop 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.2 – Installation of the NT unit on a vertical wall support 39. . . . . . . . . . . . . . . . . . . . . . . . .
4/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.6.3 – Installation of the NT unit on a 19” rack 40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.4 – Earthing the NT units 40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.7 – Installation of one or more repeater modules 41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.8 – Installation of one or several repeaters with splitter(s) 43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.8.1 – Instructions with passive splitter(s) 43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.8.2 – Installation directions for an assembly with active splitter 45. . . . . . . . . . . . . . . . . . . .
4 – Commissioning the 9900TS Terminal Station 47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1 – Purpose 47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2 – Commissioning the RT unit 47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.2.1 – Equipment required 47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.2.2 – RIT Tool 48. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.2.3 – NIT Tool 49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.2.4 – Site configuration and adjustment procedures 49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3 – Commissioning the NT 61. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4 – Client terminal connections 63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.4.1 – Ethernet connector 63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.4.2 – G703 connector (75 ohm E1 and 100 ohm T1 standards) 63. . . . . . . . . . . . . . . . . . . . 4.4.3 – X21 connector 63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5 – Initiating services 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.6 – Filling in the installation sheet 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.6.1 – 9900 RT installation sheet 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.6.2 – NT installation sheet 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.6.3 – RT/NT wiring sheet 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 – Operation and maintenance 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1 – 9900 system supervision 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2 – Preventive maintenance 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.3 – Corrective maintenance 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4 – Changing a faulty NT unit 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5 – Changing a faulty RT unit 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.6 – Replacing an NIT fuse 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 – Changes of configuration 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1 – Declaration, deletion, reset of an NT 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.2 – Implementation of client services 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.3 – Changing an RT 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.4 – Adding an NT to a cluster 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4.1 – Case of a pre–wired installation 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4.2 – Case of a non–pre–wired installation 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.5 – Affectation of an NT to another BS 69. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix 1 – 9900 TS INSTALLATION SHEET 71. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.1.1 – 9900 RT INSTALLATION SHEET 71. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.1.2 – 9900 NT INSTALLATION SHEET 73. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
A.1.3 – 9900 RT / NT CABLING SHEET 74. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.1.4 – List of checkpoints for TS commissioning 75. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix 2 – Using the DALLET[ system by SOFRER] for 1 m & 1.5 m high mast on rooftop 77
Appendix 3 – Mounting coaxial connectors 79. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix 4 – Climatic areas world map 83. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix 5 – Correspondence between commercial codes and industrial codes relating to the TS85
Appendix 6 – List of abbreviations/Liste des abréviations 87. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
7/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
1 – Foreword
1.1 – Structure of the manual
This manual is for users with a sound knowledge of how to operate and install point–multipoint microwavesystems and how to use a PC-based craft terminal running the Windows operating system. With it, youshould quickly be able to operate the equipment. It is not intended to replace the training services that we canprovide for your particular needs.
The manual is divided into six sections followed by appendixes:
– Foreword
– Equipment overview
– Installation of the 9900TS Terminal Station
– Commissioning the 9900TS Terminal Station
– Operation and maintenance
– Changes of configuration
– Appendixes
1.2 – Using the manual
With this manual, you should be able to commission and operate the described equipment to a basic level.
You should always read this manual in conjunction with the attached “Update” document (if provided) so thatyou are aware of the latest equipment upgrades.
Manual updates
This edition of the manual describes hardware and software releases of the following revision indexes andabove:
Hardware revision: 01
In cases where an equipment upgrade affects the content of the manual, the relevant modification should beinserted in the “Update” document, with the same reference number, but with code type VE (instead of TQ).
When the number or extent of the changes justifies it, they should be incorporated in the body of the manualand the manual’s revision index should be incremented. Revision bars will show the differences from theprevious version.
Note: MS-DOS, MICROSOFT and WINDOWS are registered trademarks of Microsoft Corporation.
8/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
1.3 – Safety instructions
1.3.1 – General rules
The following general safety precautions must be observed by the installer and the operator. ALCATELassumes no liability for the customer’s failure to comply with these requirements.
Ground the equipment: for Safety Class 1 equipment, always connect the earth conductor of the powercable to an appropriate earthing device.
DO NOT operate the product in an explosive atmosphere or in presence of flammable gases orfumes.
For protection against fire: replace the line fuse(s) only with fuse(s) of the same voltage and current ratingand type.
Dangerous voltages: users must not remove equipment covers or shields. The installation andmaintenance procedures described in this manual are for use by service–trained personnel only.
Protection against short circuits: the mains equipment should ensure protection against short circuitsaccording to the current domestic standards (residual current differential protection recommended).
Observe the standards in force for all activities carried out on the roofs.
For any on–site intervention, observe the precautions against lightning.
DO NOT operate equipment which may be damaged: its protection level could be affected.
Whenever it is possible that the safety protection features built into this equipment have been impaired,ISOLATE FROM THE POWER SUPPLY and do not use the equipment until safe operation can be verifiedby service–trained personnel. If necessary, return the equipment to Alcatel After Sales for service andrepair.
DO NOT OPEN THE EQUIPMENT.
Return the product to Alcatel Customer Service for servicing and repair.
Recommendation to installers and maintenance operators: before carrying out any operations, checkthe equipotential bonding of the earthing devices to which our measurement equipment and instrumentsare connected. If necessary, during installation, ensure the equipotential bonding by electrical connectionof these devices.
1.3.2 – Symbols on products
1.3.2.1 – Danger symbols
When subsystems and modules have warning labels, it is extremely important to follow their instructions.
These labels are designed to indicate dangerous situations; they may contain any standard symbol or any textconsidered necessary to protect users and employees.
The most frequent danger situations and symbols are:
Danger or general warning
Prompts the user to refer to the manual.
9/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Dangerous electrical voltages
Close to dangerous voltages (>42.4 V AC peak, 60 V DC; power level >240 VA) you will findthis warning label. The maintenance personnel is exposed to dangerous electrical voltageswhen removing the covers.
1.3.2.2 – Earth symbols
Terminal for connecting the protective earth conductor in power supply wiring
Other earth terminal
1.3.2.3 – Other symbols
Indicate compliance with essential requirements of the applicable European directives.
1.3.3 – Symbols used in the document
These symbols alert the reader the possible risks. They indicate:
– the cause and type of danger,
– the possible consequences,
– the preventive action.
1.3.3.1 – Warning
– protection of personnel,
– warning of a possible dangerous situation,
– danger of fatal or serious injury.
1.3.3.2 – Precautions
– protection of equipment,
– warning of a procedure, practice or condition that could be dangerous toequipment or its environment,
– danger of damage to the equipment or its environment; permanent loss of datapossible.
– This symbol, introducing the description of a procedure, indicates that it willcause the link to be temporarily disconnected.
10/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
1.3.4 – Declarations of conformity with European policies relating to EMC and LVD
11/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
12/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
13/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
2 – Equipment overview
2.1 – Overview of the A9900 system
The Alcatel 9900 is a multi–service broadband wireless local loop system designed to provide telecomservices to small and medium–sized enterprises.
Broad band WLL (Wireless Local Loop) system, Alcatel 9900 allows operators to offer rapid provision – to alarge number of client sites – of a comprehensive range of telephone and data transmission services.
For cellular phone network operators, Alcatel 9900 offers the possibility of linking base stations to basestation controllers. This makes Alcatel 9900 an economical transmission solution, for the implementation orextension of high traffic density areas coverage.
For mixed network operators (fixed and mobile), Alcatel 9900 enables to connect, with the same system, fixedprofessional end user as well as base stations of cellular telephony.
Figure 1 – A9900 System – Local point–multipoint service distribution –
SME
Company D
Company C
Company A
Company BIndependant profession
Independant profession
14/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
2.2 – Composition of the A9900 system
An A9900 network cell consists of the following:
a common base station designated 9900BS;
and several terminal stations distributed across the user sites, and designated 9900TS.
Figure 2 – Base Station and Terminal Stations
“Digital Base Station”DBS
“Terminal Stations”
“Radio Base Station”RBS
9900BS
nx9900TS
15/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
2.3 – A9900 system specifications
2.3.1 – Frequency bands used
25 GHz frequency band:– CEPT T/R 13–02E European recommendation 24.5 – 26.5 GHz
26 GHz frequency band:– MPT (Japan) 25.25 – 27 GHz
– Korea 24.25 – 24.59 ; 25.73 – 26.07 GHz
28 GHz frequency band:– 27 GHz (LMCS – Canada) 27.35 – 28.35
– 28 GHz (CEPT) 28.0 – 28.5, 29.0 – 29.5
– 29 GHz (LMDS – USA) 27.5 – 28.35, 29.10 – 29.25
2.3.2 – Radio transmission specifications (typical values)
The following table gives the main characteristics of the A9900 wireless system.
A downstream (BS to TS) carrier is combined with up to four upstream (TS to BS) carriers.
Downstream
Channel bandwidth 14 MHz 28 MHz
Occupied bandwidth 13.63 MHz 27.25 MHz
Roll–off factor 35% 35%
Modulation QPSK QPSK
Gross bit rate 20.19 Mbit/s 40.37 Mbit/s
Inner Code Convol. 7/8 (k=7) Convol. 7/8 (k=7)
Interleaving depth 12 depth 12
Outer Code Reed–Solomon(204,188,8)
Reed–Solomon(204,188,8)
Bit rate before coding 16.19 Mbit/s 32.38 Mbit/s
Radio 25 GHz 28 GHz 25 GHz 28 GHz
RBS output power (antenna port) 17 dBm 17 dBm 17 dBm 17 dBm
Transmit antenna gain 15 dB 15 dB 15 dB 15 dB
Receive antenna gain (with radome) 35 dB 34.5 dB 35 dB 34.5 dB
16/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Upstream
Channel bandwidth 3.5 MHz 7 MHz
Occupied bandwidth 3.36 MHz 6.72 MHz
Roll–off factor 25% 25%
Modulation D–QPSK D–QPSK
Gross bit rate 5.38 Mbit/s 10.75 Mbit/s
Outer Code Reed–Solomon(63,53,5)
Reed–Solomon(63,53,5)
Bit rate before coding 4.19 Mbit/s 8.38 Mbit/s
Radio 25 GHz 28 GHz 25 GHz 28 GHz
TS output power (antenna port) 14 dBm 14 dBm 14 dBm 14 dBm
Transmit antenna gain 35 dB 34.5 dB 35 dB 34.5 dB
Receive antenna gain (with radome) 15 dB 15 dB 15 dB 15 dB
2.3.3 – Capacity
The system capacity depends on the traffic mix betwen data services (transported on ATM cells) and leasedlines or telephony services (transported on TDM circuits)
It also depends on the channeling and the number of upstream channels.
Figures are given in the following tables for three mix examples : minimum, medium and maximum circuitcapacity but any intermediate mix is possible.
28 / 7 MHz channeling:
Downlink: 28 MHz Trafic MIX: circuit capacity
Uplink: 1 x 7 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 60 120
ATM uplink capacity (cells/s) 18,823 9,412 0
ATM downlink capacity (cells/s) 75,512 66,530 57,399
Downlink : 28 MHz Trafic MIX: circuit capacity
Uplink : 2 x 7 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 120 240
ATM uplink capacity (cells/s) 37,647 18,823 0
ATM downlink capacity (cells/s) 75,512 57,548 39,286
Downlink : 28 MHz Trafic MIX: circuit capacity
Uplink : 3 x 7 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 180 360
ATM uplink capacity (cells/s) 56,471 28,235 0
ATM downlink capacity (cells/s) 75,512 48,566 21,173
17/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Downlink : 28 MHz Trafic MIX: circuit capacity
Uplink : 4 x 7 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 240 480
ATM uplink capacity (cells/s) 75,294 37,647 0
ATM downlink capacity (cells/s) 75,512 39,585 3,084
14/3.5 MHz channeling:
Downlink: 14 MHz Trafic MIX: circuit capacity
Uplink: 1 x 3.5 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 30 60
ATM uplink capacity (cells/s) 9,412 4,706 0
ATM downlink capacity (cells/s) 38,047 33,519 28,990
Downlink : 14 MHz Trafic MIX: circuit capacity
Uplink : 2 x 3.5 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 60 120
ATM uplink capacity (cells/s) 18,824 9,412 0
ATM downlink capacity (cells/s) 38,047 28,990 19,934
Downlink : 14 MHz Trafic MIX: circuit capacity
Uplink : 3 x 3.5 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 90 180
ATM uplink capacity (cells/s) 28,235 14,118 0
ATM downlink capacity (cells/s) 38,047 24,462 10,877
Downlink : 14 MHz Trafic MIX: circuit capacity
Uplink : 4 x 3.5 MHz Minimum Medium Maximum
Nb of circuits: 64 kbit/s 0 120 240
ATM uplink capacity (cells/s) 37,647 18,824 0
ATM downlink capacity (cells/s) 38,047 19,934 1,821
18/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
2.4 – Description of the Terminal Station (9900TS)
The A9900 system Terminal Station (9900TS) consists of the following main elements:
an external transceiver constituting the radio antenna part and designated “RT” (RadioTermination);
a user connection unit constituting the “indoor” part and designated NT (Network Termination);
a cable linking the RT and NT (NT/RT link);
depending on the configurations (see sections 2.5, 3.7, 3.8), one (or more) repeater module(s),or (and) one (or more) splitter module(s).
2.5 – Examples of configuration of the Terminal Station (9900TS)
2.5.1 – Mono “NT” without repeater
0 to 70 mRT NT
2.5.2 – Mono “NT” with repeater
repeater repeater
0 to 70 mRT
NT
Fixed lenght:70 m
Fixed lenght:70 m
A repeater compensates 70 meters of cable.
The system can support maximum three 70 m cable sections and two repeaters.
19/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
2.5.3 – Multi “NT” with passive splitters and repeaters
Figure 3 – Exemple of assembly with passive splitters and repeaters.
RT0 to 70 meters
NT1 NT2 NT3 NT4
50 m
eter
s
50 m
eter
s
50 m
eter
s
repeater repeater
splitter splitter
splitter
repeater
The system can support 2 repeaters and 2 passive splitters per route. Route means the path between a NTunit and the RT unit.
The fixed distance between two repeaters or between a repeater and a NT unit is 50 meters if a passive splitteris used.
The fixed distance between two repeaters or between a repeater and a NT unit is 30 meters if two passivesplitters are used.
20/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
2.6 – Technical specifications of the Terminal Station (9900TS)
2.6.1 – RT specifications
RT NT
Designation Description Observations Description Observations
DimensionsHxLxP
200(mm)x200(mm)x50(mm)
antennadiameter: 26 cmcf. diagram in §
3 Installation1Ux19”x240(mm)
cf. diagramin § 3 Installation
Weight 2 kg –– 3 kg ––
Operatingtemperature –33°C to + 55°C –– –5°C to + 55°C ––
2.6.2 – NT specifications
There are six types of NT unit:
NT units
9900 NCA 001 9900 NCA 002 9900 NCD 001 9900 NGA 001 9900 NGA 002 9900 NCE 001
Telephony,leased lines
2 x E1(G703+G703)
2x E1(G703 + X21) –– 2 x E1
(G703+G703)2x E1
(G703 + X21)2 x T1
(G703+G703)
Data 2 x Eth 10bT 2 x Eth 10bT 2 x Eth 10bT 2 x Eth 10bT 2 x Eth 10bT 2 x Eth 10bT
Supply secteur 220V~ secteur 220V~ secteur 220V~ 48 V 48 V secteur 220V~
2.7 – Equipment power consumption
The typical power consumption of the RT is 13 W.
The maximal power consumption of an NT is 71 VA.
21/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3 – Installation of the 9900TS Terminal Station
3.1 – Equipment deliveryWhen you receive the equipment in its packaging:
– Check the condition of the packaging.
– If damaged, make your reservations known to the carrier without delay.
3.1.1 – Unpacking
Considerations
You are recommended to:
– unpack the equipment according to the instructions on the packaging, and to the instructions givenbelow.
– take an inventory and identify any missing items. If the delivery does not match the delivery advice note,notify ALCATEL within 48 hours of receipt of the equipment.
Stages
1. Open the cover flap of the package lid (Figure 4).
2. Remove the cardboard packing wedge protecting the box’s contents.
3. Remove the RT unit, taking care not to damage the antenna.
4. Remove the slotted casing from the box.
5. Remove the packaged items fixed in the slots of the casing.
6. Detach the drilling template if wall–mounting is to take place.
mounting kit
Figure 4 – Unpacking the RT unit
radio unitand antenna
wall mount
bearing mount
polarization kit
“N” connector and
attachment hardware
22/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Figure 5 – Unpacking the NT unit
The NT unit equipment is protected by safety cover. Do not unpack the equipment in advance if it is not to beinstalled immediately.
3.1.2 – Checking the configuration
The Terminal Station components delivered are:
– the RT unit (also called RT or RT radio) and its installation accessories are in one box
– the NT unit (also called NT) and its installation accessories are in another box
Depending on the site configurations, the delivery will include individual boxes containing:
– one or more splitter modules
– one or more repeater modules
3.1.2.1 – Content of boxes
EQUIPMENT CONTENTS
1 RT with antenna mounted assembly
1 wall mount
1 bearing mount
RT UNIT 1 horizontal polarisation kit with screw accessories
2 U bolts
1 bag containing 1 type “N” 75 ohm connector, four M6x50 screws with washers andplugs; four M8 nuts with washers, 2 terminal lugs and one M6x20 screw with washers
EQUIPMENT CONTENTS
1 Indoor UnitNT UNIT 1 installation kit containing feet, bracket mouting, handles, attachment accessories and
1 “F” connector
23/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
EQUIPMENT CONTENTS
1 splitter module
Splitter kit 1 bag containing screw accessories
3 connectors F and one 75 load
EQUIPEMENT CONTENTS
1 repeater module
Repeater kit 1 bag containing screw accessories
2 connectors “F”
3.1.2.2 – Specific case of RT units delevered without integrated antenna
IMPORTANT NOTE: NEVER REMOVE THE ROUND YELLOW PADS, VISIBLE AT THEANTENNA ACCESS, USED TO SEAL THE OUTDOOR SYSTEM.
3.1.2.3 – Storage
If installation is to be deferred, the type of packaging defines the equipment storage conditions:– cardboard boxes should be warehoused indoors, in a well–ventilated and dry room ,
– wooden or polywood boxes may be stored outdoors, provided that they are protected from rain anddirect sunlight.
3.2 – Labels on the equipment
The labels below are affixed to the equipment and their cardboard boxes to indicate the contents.
Figures given on the examples below are not contractual.
Figure 6 – Packaging of the RT unit Figure 7 – Packagings of the NT unit
Issue date
Serial numberCommercial reference
RT unit modelbar code and plain text
Serial numberbar code and plain text
RT unit model / status index
3CC 09778 AAAA 03
CU002103050
Model / ICS
serial n.Mnemonic
3CC10329AAA01CU001205759900NCA001
ALCATEL 9900NT85 – 264 VAC0.05 A
Serial number of the mother board :this one must be input in the 9900LTsoftware
24/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.3 – Installing the equipment
It is recommended that all peripheral equipment (e.g., repeaters, splitters) as well as the engineeringaccessories should be installed before installation of the Terminal Station.
3.3.1 – Information required for installationAppendix A.1 contains a sheet for you to complete and collect all the general information needed for theinstallation procedure.
3.3.2 – Precautions concerning electromagnetic compatibilityInstallation is designed to meet all new requirements concerning electromagnetic compatibility and safety
The performance of the equipment depends on installation practices (cable installation, ground connections,etc.) which should be based on best trade practices and which may be degraded if these pratices are notrespected.
3.3.3 – Tools requiredThe installation staff must possess a standard installation toolkit (containing, in particular: drill, drill bits,soldering iron, cable tie pliers, terminal pliers). A heating pack is also required for heat–shrinking operations.
The list of tools required for the mechanical installation of the Terminal Station is given below:
Tool Use
5 mm Allen key (for M6 screw) For securing the pole mounting and wall mounting
13 wrench For tightening the U bolts on the 40 to 50 mm tube
Level gauge or inclinometer For verticaly of the bearing axis
Figure 7 – Inclinometer
Depending on the installations, additional equipment, provided by Alcatel as optional, may prove useful:
Tool Use Industrial Code
RIT and NIT installation tool kitcables and software RIT and NIT installation 9900YTA001
To get the commercial codes of these items, please consult Appendix A.5 which gives the connection betweenindustrial and commercial codes.
A compass and a pair of binoculars (not supplied) are useful for rough prepointing of the antenna.
The use of a torque wrench is recommended.
25/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4 – Installation of the Terminal Station RT unit
IMPORTANT NOTE: NEVER HANDLE THE RT UNIT BY ITS ANTENNA BUT BY THEBODY OF THE RADIO OR THE SUPPORT ARM.
Considerations:
The installation of the RT unit should satisfy the following criteria:
– unimpeded direct line of sight between RT unit and RBS (Base Station),
– perfect mechanical rigidity,
– enabling precise antenna alignment.
The 9900RT is designed for outdoor installation without any particular protection. However, the followingrecommendations must be respected:
– do not install equipment below bird nesting areas,
– do not attach equipment to a surface prone to vibrations (machinery, lift housing, air conditioning, etc.),
– do not attach equipment to chimneys which give off fat deposits, dust and other aerosols which are liableto come to rest on the equipment,
– do not install equipment in proximity of sources of heat,
– do not place the equipment in proximity to corrosive gas outputs,
– do not place the equipment below roof run–offs not equipped with guttering (high risk of microwaveshort–circuit),
– do not install at man–height to prevent human collisions against the antenna. This could cut the radiolink with the central station.
Two types of assembly are possible:
– on a flat, vertical surface (e.g., a wall),
– on a pole/tube (existing or to be installed), using threaded U–bolts and nuts (M8).
Note : The pole/tube selected should be sufficiently rigid to prevent antenna misalignment and resistvibrations.Use tube supports that comply with our recommendations. Support references are mentionned in thenext chapters.
3.4.1 – Definition of assemblies with respect to chosen polarization
The Terminal Station RT unit can be mounted with horizontal (H) or vertical (V) polarization.
USE THE SAME POLARIZATION ON TERMINAL STATION AND BASE STATION.
To mount the radio/antenna assembly on the support arm, in the event of horizontal polarization, thehorizontal polarization kit must be used. This consists of an additional joint to compensate for the mechanicalrotation of the system.
26/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
The pole–mounting mechanical assembly consists of (Figure 8):– two components in the case of vertical polarization (V): wall mounting (ref.1) and bearing mounting
(ref.2);
– three components in the case of horizontal polarization (H): wall mounting (ref.1) , bearing mounting(ref.2) and polarisation mounting (ref.3).
Figure 8 – Support arm components
12
3
wall mount
bearing mount
horizontal polarization mount
A polarization slot indicator at the rear of the RT unit can be checked to confirm that the assembly is correctwith respect to the chosen polarization:
– if the letter “H” can be read naturally, polarization is horizontal,
– if the letter “V” can be read naturally, polarization is vertical,
Figure 9 – Vertical Polarization
Vertical axis
Figure 10 – Horizontal polarization
Vertical axis
27/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4.2 – Installation of the 9900RT on a wall or flat vertical surface
Considerations:
– If attaching the RT unit using bolts and plugs, select the attachment components to suit the compositionof the attachment surface.
– The surface chosen should not be prone to vibrations (e.g., avoid machine housings).
– To mark the drill holes, use the drilling template printed on the inside panel of the RT unit packagingbox.
Figure 11 – Installation of the RT unit on a wall
Stages
1. Select the installation location and determine the polarization of the RT unit.
2. Place the drilling template against the wall (or surface) to be pierced.
Note : The vertical axis of the wall mounting assembly must be respected (see figure 12).Used a bubble level or inclinometer.
3. Drill the 4 holes.
4. Insert the 4 plugs.
5. Install and secure the wall mounting (V et H polarization) using four M6x50 screws with washers.
Note : screw torque = 4,3 to 4,9m.N.
IMPORTANT : VERTICALITY OF +/– 1° REQUIRED FOR POLARIZATION
28/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Figure 12 –Wall mounting
The vertical axis of the wall mounting assemblymust be respected.
2
2
1
1
2
2
1
169 mm
56 mm
56 m
m
71.5
mm
1
2
Use elongated holes dia. 6.5 mm for wall mounting
(plugs and M6 screws with washers).
Use holes dia. 10 mm for 50 mm tube mounting (U–bolts and
M8 nuts)
6. Install and secure the bearing mounting on the wall mounting (V and H polarization).
Figure 13 – Screws mounting
this screw is installed on site
this screw is installed on site
To continue the hardware installation, go to step 7 in the case of horizonal polarization or go directlyto step 8 for vertical polarization.
7. Install and secure the polarization mounting (H polarization only).
8. Install and secure the RT unit on the support arm. Check on polarization indicator that the polarizationassembly is correct (cf. figures 9 and 10).
9. Release the RT assembly locking screw and carry out antenna prepointing visually and/or using a compassand a map. To do this, orientate the assembly so that the antenna is pointed towards the Base Stationantenna.
10. Remove the radio module from its axis for configuration (see Chapter 4).
29/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4.3 – Installation of the RT unit on a tube
Considerations– Install on tube using two U–bolts.
– Installation may be carried out on a newly installed or existing tube.
– The external diameter of the tube is 50 mm in standard configuration.
– The support tube, along with the U–bolts, must be clean and (apart from threads) grease–free.
– If specific site features make perfect alignment impossible (line of sight parallel to the wall, for example).you are recommended to use a support that complies with our specifications (see references in theparagraphs which follow).
IMPORTANT : VERTICALITY OF +/– 1° REQUIRED FOR POLARIZATION
IMPORTANT NOTE: THE USE OF SUPPORTS WITH A SLENDERNESS RATIOGREATER THAN OUR MODELS SHOULD BE EXCLUDED (TOO FLEXIBLE)
Note : the use of supports with slenderness ratios inferior to our own is authorized (more rigid).
Note : slenderness ratio = length / cross–section of sections used.
Steps
1. Select the installation location and determine the polarization of the RT.
2. Install and secure the wall mounting (V et H polarization) using the two U–bolts (and nuts with washers)provided for this purpose, or the attachment hardware delivered with the specific wall mount.
Note : screw torque = 10.5 to 12 m.N.
Note : The vertical axis of the wall mounting assembly must be respected.
3. Install and secure the bearing mounting on the wall mounting (V and H polarization), see figure 8.
To continue the hardware installation, go to step 4 in the case of horizontal polarization or go directly to step5 for vertical polarization.
4. Install and secure the polarization mounting (H polarization only).
5. Install and secure the RT radio unit with its antenna on the support arm. Check the polarization indicatorto check correct polarization (cf. figures 9 and 10).
6. Release the RT assembly locking screw and carry out antenna prepointing visually and/or using a compassand a map. To do this, orientate the assembly so that the antenna is pointed towards the Base Stationantenna.
7. Remove the radio module from its axis for configuration (See Chapter 4).
30/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.4.3.1 – Installing the RT unit on an existing tube, 40 or 50 mm in diameter
Figure 14 – Installing the RT unit on an existing tube, 40 or 50 mm in diameter
3.4.3.2 – Installing the RT unit on an existing tube, 50 to 115 mm in diameter
Use the 3CC10802 AAAA kit.
Figure 15 – Installing the RT on a tube, 50 to 115 mm in diameter
Kit 3CC10802AAAA
31/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4.3.3 – Front installation of the RT unit
Use a support in accordance with our 3CC11132AAAA model.
Figure 16 –Topview of RT front installation
Figure 17 – Quotation of the RT in frontage
150
11020
150
110
20
1245 x 10
250
250
SPIT M8
32/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.4.3.4 – Rooftop mounting of the RT unit (raised), 1 meter mast
Use a support in accordance with our 3CC11133AAAA model.
Figure 18 – Rooftop mounting of the RT unit (raised), 1 meter mast
fixation detail
Figure 19 – Quotation of the rooftop mounting of the RT unit, 1 meter mast
1000
SPIT M12
250300
25
250
25
300
16
33/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4.3.5 – Rooftop mounting of the RT unit (raised), 1,5 meter mast
Use a support in accordance with our 3CC11134AAAA model.
Figure 20 – Rooftop mounting of the RT unit (raised), 1.5 meter mast
34/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Figure 21 – Quotation of the rooftop mounting of the RT unit, 1.5 meter mast
1500
SPIT M1
250300
250
300
16
260
450
35/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.4.4 – Grounding the RT unit
Considerations
– It is not necessary to establish special grounding connection for the RT casing. However the RT unitcan be grounded.
– On the RT unit, the ground terminal is in the form of a tapped hole (see figure 22) on the attachmentaxis of the pole mounting.
– The RT unit can be grounded using the grounding lug and screw hardware supplied with the equipment.
Steps
1. Crimp a lug (ref.: 16–6 CT) on to the grounding cable (16 mm2 minimum cross–section).
2. Screw the cable lug into the tapped hole. Use an M6 screw and onduflex washers.
Figure 22 – Grounding the RT unit
grounding screw
36/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.5 – Installation of the RT/NT link
Considerations– The electrical connection between the RT unit and the NT unit of the Terminal Station is made using
a type ET 2PA 981 75 ohm coaxial cable equipped with “F” connectors (at the NT side end) and “N”connectors (at the RT side end).
– If a single cable (70 meters without connectors) does not cover the distance between the RT unit andthe NT unit, two or more repeaters must be used. For the possible configurations and installation ofa repeater, see paragraph 3.7.
– If the RT unit is connected to several NTs of the Terminal Station, use several splitters. For the possibleconfigurations, and installation of a splitter, see paragraph 3.8.
– The length of the cable used must be noted. In order to facilitate this measurement, refer to the markingsprinted every meter, on the outer sheath of the cables. To know the length of cable installed, subtractthe number at one end from the number at the other end of the cable used. Note the result at the NTside end.
– You are recommended to secure the coaxial cable every meter with a cable tie. Use collars fitted to thesupport used for the path.
Figure 23 – Coaxial cable
“F” connector
To NT unit
75 “ N” connector
To RT unit
– Physical cable characteristics are :
diameter = 7.5 mm,
maximum installed cable length = 200 meters,
minimal bend radius = 40 mm.
minimal bend radius = 100 mm for a “drip of water”
Steps
1. Carry out the 75 ohm connector between the RT unit and the NT unit.
Note : In the event of the use of repeaters and/or splitters, use the number of cables required by theconfiguration. Refer to paragraphs 3.7 and 3.8.
Note : Make a drip groove where the cable enters the building, respection the cable’s bending radius (100 mmminimum), in order to prevent water infiltration.
AVOID A TOO LONG PARALLEL WALK BETWEEN THE RT/NT COAXIAL LINK AND ELEC-TRICAL CABLES, OR GSM/DCS BASE STATION CABLES.
2. Note the length of the cable installed in the 9900 RT/NT cabling sheet (Appendix A.1). This information willbe entered into the database when the equipment is commissioned using the configuration software.
Note : The accuracy required by the configuration software is + 1.5 m.
3. At the RT unit side end, equip the cable with a type “N” 75 ohm coaxial connector, supplied with theequipment. For attaching the coaxial terminals, refer to the manufacturer’s Assembly manual and use thespecific tools as recommended. One of the main causes of installation problems is the faulty mounting ofconnectors.
37/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
NEVER USE 50 OHM CONNECTORS, AT THE RISK OF DESTROYING THE RADIO UNIT,USE ONLY THE N 75 Ω CONNECTOR SUPPLIED IN THE RT BOX.
IMPORTANT NOTE: NEVER HANDLE THE RT UNIT BY ITS ANTENNA BUT BY THE BODYOF THE RADIO OR THE SUPPORT ARM.
IMPERATIVE : PROTECT THE “N” CONNECTOR CONNECTION WITH A PRE–PASTEDTHERMOSHRINKABLE SLEEVE.
Figure 24 – Connecting the “N” connector with the thermoshrinkable sleeve
70
Thermoshrink a pre–pasted sleeve on theconnector/terminal/cable assembly 70 mmalong. (80 mm minimum long before ther-moshrink)The sleeve end should stop at the termi-nal base.
4. Attach the cable to the RT unit using a cable tie.
THE COAXIAL CABLE SHOULD NEVER BE TOO TIGHT BETWEEN THE RT AND ITSMOUNTING.ADJUST THE POSITION OF THE MOUNTING AND THE LENGHT OF THE CABLE TO SUIT,OTHERWISE THERE IS A MAJOR RISK OF ANTENNA MISALIGMENT OR CABLEDAMAGE AT THE CONNECTOR. ON THE OTHER HAND, TOO SLACK A CONNECTIONCAN HAVE THE SAME CONSEQUENCES UNDER THE EFFECT TO THE WIND.
Note : No overtighten the cable tie on the cable; this could cause deformation of the dielectric and subsequentloss of performance.
5. Run the cable to the NT unit and equip it with a type “F” 75 ohm coaxial connector, supplied with theequipment.
38/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.6 – Installation of the Terminal Station 9900NT (Indoor Unit)
A SPACE OF 1U (in the event of rack mounting) OR APPROXIMATELY 50 mm MUSTBE LEFT FREE ABOVE THE TERMINAL STATION IDU.
NEVER STORE DOCUMENTATION OR ANY OTHER OBJECTS ABOVE THE NT UNITON THE VENTILATION HOLES. THIS MAY CAUSE IT TO BE DAMAGED.
Considerations
– The NT units are intended for indoor installation only.
– The NT should be positioned in accordance with the needs of the user and the technical constraints(e.g., minimum distances to be respected, topology of the connections, accessibility of the RT/NT link,power supply).
– Always place the NT nit in a dry, dust–free environment, away from any major source of heat(–5 °C < T< + 55°C).
– Always place the NCAxxx NT unit near a rated power source: 85–264VAC , 47–63Hz with groundconnection.
Note : Use grounded power connections only. Avoid the use of extension cables.
– The NT to sector connection must be done last, during commissioning (see § 4), TS installation,included all other connections, being completed.
– Do not install the NT too close to the ground (keep at a distance from dust and floor cleaning products).
– do not install on premises containing corrosive materials.
3.6.1 – Installation of the 9900NT unit on a desktop
Steps
1. After unpacking the unit, fit it with its four feet, clipping them on to the bottom of the unit.
2. Connect the NT unit to the Terminal Station RT (”F” connector).
Figure 25 – Mounting the feet
39/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.6.2 – Installation of the NT unit on a vertical wall support
Figure 26 –Installation of the NT on a vertical wall support
484
203
Steps
1. Select a flat, vertical wall surface for installing the NT unit, at a height of over 1 meter from the ground.
2. Mount the four brackets on the unit.
3. Mark the position of the holes on the support with a sharp implement or marker.
4. Drill the holes and insert the plugs.
5. Mount and secure the screw fittings, starting from the top.
THE MAIN CONNECTOR MUST ALWAYS BE AT THE TOP OF THE UNIT
DO NOT STRAIN OR TWIST THE UNIT
6. Connect the NT to the RT (“F” connector).
40/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
3.6.3 – Installation of the NT unit on a 19” rack
Steps
1. Fit the handles on the NT unit (see figure 27).
2. Install the unit in the 19” (or other type) rack (screw fittings not included, depending on the manufacturer).
3. Connect the NT to the RT (”F” connector).
Figure 27 – Fitting the NT unit handles
M3x6 countersunk fixing screws Handle
A SPACE OF AT LEAST 1U MUST BE LEFT FREE ABOVE THE ASSEMBLY.
3.6.4 – Earthing the NT units
Considerations– NT casing must imperatively be connected to the main earth with a cable 16 mm2 minimal cross–section
whose length must not exceed 2.40 m. The grounding terminal is on the right of the NT unit (connectionsside) and is in the form of a tapped hole (see Figure 28).
– The earth connection should be made as directly as possible between the unit and the general earthingsystem of the side (bar, rod, plate, etc.).
– The grounding of the NCAxxx NT units is through the 220V main connector; for the NGAxxx units, onlyone earthing point is necessary, after the earthing of all the NT units.
Steps
1. Crimp a lug (ref.: 16–6 CT) on to the earthing cable (16 mm2 cross–section).
2. Screw the cable lug into the terminal designed for this purpose. Use an M6 screw.
Figure 28 – Earthing the (NCAxxx) NT unit
General earthing lug
41/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.7 – Installation of one or more repeater modules
Considerations
– In the case of a coaxial cable to cover a distance greater than 70 meters between the 9900RT and the9900NT, a repeater module is required to compensate losses.
– Repeaters are installed indoors only, sheltered from dust and heat.
– The repeater must be installed in series on the RT/NT connection (coaxial cable).
– Respect the installation orientation of the repeaters, paying attention to the reference marks on thecasing.
– The repeater needs no setting. It has no individual power supply: the repeater automatically takes itspower from the supply passing through the RT/NT connection.
– The repeater is a fixed gain bi–directional amplifier. This means that the installation instructions andmethodology described below MUST be respected.
Repeater installation instructions– Between repeater and RT unit, the length of the connection (coaxial cable) is variable: from 0 to 70
meters.
– Between repeater and NT unit, the length of the connection (coaxial cable) is always fixed: 70 meters.
– Between two repeaters, the length of the connection (coaxial cable) is always fixed: 70 meters.
– The system supports a maximum of 2 repeaters per route. Route means the path between an NTunit and the RT unit.
First example: length of coaxial cable less than 140 m (here, 110 m).
A single repeater is used.
Figure 29 –Installation with one repeater
RT
NTExample: 40 meters Fixed: 70 meters
Repeater
The variable length (< 70 m), is always situated between repeater and RT unit.
The fixed length, 70 m, is always situated between repeater and NT unit.
42/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Second example: length of coaxial cable less than 210 m but greater than 140 m (here, 200 m).
Two repeaters are used.
Figure 30 –Installation with two repeaters
RT
NTExample:
60 meters
Fixed:
70 meters
repeater
Fixed:
70 meters
repeater
Methodology
1. Select the installation location with respect to the location of the NT unit.
2. Install and secure the repeater.
3. Wire the repeater to the NT unit and to the RT unit, respecting the instructions contained in the installationprinciples above.
4. Note the real length of the cables installed. The length of each should be < 70 m. This information will beentered in the database when the equipment is commissioned, using the configuration software.
Note : The accuracy required by the configuration software is + 1.5 m.
5. If the last 70 meter section must be coiled, respect a minimum bending radius of 200 mm.
IN ALL CASES, CUMULATED CABLE LENGTH MUST NOT EXCEED 210 METERS.
Remind : TWO REPEATERS MAXIMUM PER ROUTE CAN BE SUPPORTED.
43/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.8 – Installation of one or several repeaters with splitter(s)
Considerations– Where there are several NT units for a single RT unit, one or several splitter(s) need(s) to be used.
– For a single RT unit it is possible to mount up to four NT units with passive splitter(s) and 8 NTunits.with active splitter.
– The splitter is installed in series on the RT/NT connection (coaxial cable).
– The splitter has no individual power supply: it feeds the power through from the NT to the RT.
– Respect the installation orientation of the repeaters and splitters, paying attention to the referencemarks on the casing.
– The length of the cable used must be noted. In order to facilitate this measurement, refer to the markingsprinted every meter, on the outer sheath of the cables. To know the length of cable installed, subtractthe number at one end from the number at the other end of the cable used.
3.8.1 – Instructions with passive splitter(s)– The system supports a maximum of 2 repeaters and 2 passive splitters per route. Route means
the path between an NT unit and the RT unit.
– The variable distance between an RT and a repeater is from 0 to 70 meters.
– The fixed distance between two repeaters is 70 meters.
– The fixed distance between a repeater and an NT is 70 meters.
– The fixed distance between two repeaters encompassing a passive splitter is 50 meters.
– The fixed distance between a repeater and an NT, and encompassing a splitter, is 50 meters.
– The fixed distance between two repeaters encompassing two passive splitters is 30 meters.
– The fixed distance between a repeater and an NT, encompassing two splitters, is 30 meters.
– If a fixed lenght section must be coiled, respect a minimum bending radius of 200 mm.
Figure 31 – Passive splitter
15
454,5
4
35,5 8
44/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Figure 32 – Repeater
169
124
Example of “star” assembly
This example is well suited to the distribution of NTs on the same floor of a building.
Figure 33 – Preferred “star” assembly
RT0 to 70 meters
NT1 NT2 NT3 NT4
50 m
eter
s
50 m
eter
s
50 m
eter
s
repeater repeater
splitter splitter
splitter
repeater
45/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
3.8.2 – Installation directions for an assembly with active splitter
– The active splitter comprises 2 repeaters and 7 passive splitters, see figure 34.
– This set of components is located in a casing (if necessary, the active splitter may be assembled on–sitevia field cabling by the installer).
– The cables between the passive splitter and the other components must then be less than 30 cm long.
– The variable distance between a RT and an active splitter is from 20 to 50 m for a standard cable orfrom 70 to 140 m for a low–loss cable.
– The fixed distance between an active splitter and an NT is 24 m for a standard cable.
– The fixed distance around a repeater from an active splitter to an NT is 94 m for a standard cable.
– For each access not used by an NT, add a 75 Ohm load.
Example of assembly with active splitter:
Figure 34 – “Star” assembly with active splitter
20 to 50 meters of standard cables or 70 to 140 meters of low–loss cables
NT1 NT2 NT3
NT4
repeater
splitter
splitter
NT5 NT6 NT7
NT8
cables < 30 cm
RT
ACTIVE SPLITTER
splitter splitter splitter
splittersplitter
repeater
repeater repeater
46/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
47/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
4 – Commissioning the 9900TS Terminal Station
4.1 – PurposeThe purpose of this task is to carry out:
– site adjustment of the RT unit (also called RT or RT radio),
– initialization and configuration of the RT unit and NT unit parameters,
– checking and validation of the installed parameters before rendering the equipment operational.
4.2 – Commissioning the RT unit
4.2.1 – Equipment required
To configure the parameters and carry out site adjustment of the RT unit, the following equipment is required:– the RT unit,
– the RIT tool (Radio Installation Tool) cf § 4.2.2,
– NIT tool (Network Installation Tool) cf § 4.2.3,
– one tool cable set (see figures 37 and 38),
– one audio–head set (see figure 38),
– one No.5 Allen key,
– the RT installation and programming software pre–installed on a portable PC,
– a diskette (or CD–ROM) containing the data pre–recorded by the network operator,
– a PC fitted with the RT unit initialization and programming software; the PC should have the followingminimum characteristics:
Microprocessor: 300 MHz Pentium II,
RAM: 64 MB,
Hard disk: 2 GB,
Graphics board: 2 MB,
3”1/2 disk drive (internal or external),
12x CD drive (internal or external),
Ports: 1 available serial port (DB9) and 1 available parallel port (centronics),
2–button mouse (PS2 series) or a pointing device,
Network board: 10/100BT Ethernet (RJ45), 10B2 (BNC),
12” screen (1024x768).
48/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
4.2.2 – RIT Tool
The RIT is used:– as an interface between the PC and the RT unit: it receives the information necessary to the
initialization and programming of the RT from the PC and transmits it to the RT unit;
– to implement optimal alignment of the antenna facing the Base Station. This function is provided bythe Received Signal Level control system (visual and/or audible) of the RIT.
The RIT tool is equipped with a sheath to protect it from impacts and allowing the operator hands–free operation.
Figure 35 – RIT tool
Rear view of RIT
Front view of RIT
Sensitivitypotentiometer
Field Gauge forreceived level
Alarm indicator On/Off switch
On line indicator
PC and headsetcable connector
N connector toNIT tool
BNO connectorto RT unit
N connector toRT unit
Receiving indicatoris off in case fieldis exceeded: level
> –10dbm
49/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
4.2.3 – NIT Tool
The NIT is used as a power source for the RT unit and the RIT tool during the RT adjustment and configurationprocedures.
This power source function may, if necessary (in the absence of the NIT), be provided by the NT.
On/Off switch
Connector for mains cable
Connector for RIT/NIT cable
T1L 220V Fuse
Figure 36 – NIT tool
4.2.4 – Site configuration and adjustment procedures
FOR THE ASSEMBLIES DESCRIBED IN THE FOLLOWING PARAGRAPHS, CONNECTTHE NIT TO THE MAINS SUPPLY LAST OF ALL, ONCE ALL THE OTHER CONNECTIONSHAVE BEEN MADE BEFORE.
4.2.4.1 – Configuration setting of the 9900RT parameters
To carry out RT radio programming, implement FIRST the assembly shown in Figure 37.
Note : The radio configuration requires the information featuring in the installation instructions (see AppendixA.1), duly completed in advance. This will be used to define the parameters required by the configurationapplication.
Note : It is recommended that this task be carried out indoors. The use of the portable PC in inclement weatherconditions (rain, snow, etc.) is not advisable.
Note : Safety recommendations listed in section 1.3 being followed, it is not necessary to establish specialgrounding connection for the NIT casing. Therefore, it is performed via the 3–wire mains cord.
50/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Figure 37 – RT configuration setup diagram
RT/RIT link (tool cable)
I2C bus (tool cable)Coaxial cable (tool cable)
or “site” cable
mains 85 – 264 VAC
47 – 63 HZ
NIT tool RIT tool RT
Portable computer
RIT/PC link (tool cable)
Stages
1. Connect the cables of the configuration tools (cables and tools delivered with the equipment):
– between the RT unit and the RIT tool: the RT/RIT link coaxial cable (“N” type connectors at both ends(75 Ω)),
– between the RT unit and the RIT tool: the data transfer bus (“BNO” type connectors at both ends),
– between the portable PC and the RIT tool,
– between the RIT tool and the NIT tool: coaxial cable (“N” type connector at the RIT (75 Ω) and “F” typeconnector at the NIT),
– between the NIT tool and the mains power supply: mains connection cable (to connect last).
2. Power–up the assembly:
– power–up the NIT tool,
– power–up the PC,
– power–up the RIT tool.
3. Run the radio configuration application by clicking on its “kit–install.exe” icon on the PC Windows desktop.
To run the kit_install.exe application from the Windows desktop, double–click on theicon shown opposite. The first configuration screen then appears (see § 4.2.4.2).
Note : The user of the installation software must be familiar with the operation of software in the Windows95, 98 or NT environments.
51/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
4.2.4.2 – Application of the RT radio Kit_install configuration
Once the configuration application has been run, the radio parameters must be supplied.
The radio configuration parameters can be supplied to the software in two different ways: in the form of a configuration file stored on an IT medium (floppy disk, CD–ROM or other); the
parameters so obtained may, if necessary, be subsequently modified,
by direct input of parameters via configuration screens.
1. In the case of data saved in a file, insert the IT medium in the PC and transfer the contents of the file tothe installation software.
Click here to go to the next screen
Select language and display the software version
Click here to define theconfiguration file path
Save
2. In the case of the parameters being directly entered, follow the RT radio programming stages describedbelow:
Calculate the maximum RT–RBS distance (cf.A),
Calculate the gain corrections (cf. B),
Define the installation topology (topology screen) in the event of multi–NT configuration (cf. C),
Once the parameters have been entered, the configuration must be sent to the RT radio unit.
Note : To ensure optimum radio link quality, define with care the parameter values in compliance with the realenvironmental characteristics.
52/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
A. Calculating the maximum RT–RBS distance
To define the value of the parameters to be entered in the “Maximum length RT–RBS Calculation” screen, usethe installation sheet (see Appendix A.1), complemented by the Radio Planning.To define the climate zone, consult the world map of climate zones in Appendix A.4, if it does not appear inthe installation sheet. Using the entered values, the software calculates the maximal distance betweenRT–RBS.
Select the region Select the climate zone (see Appendix A4)
Select the countryClick here to select the RT
polarization
Select the availability
Select the type of RBS antennaSelect the RBS transmit power
Select the RTtransmit power
Select the type of RT antenna
Select the downlink frequency(transmission)
Select the bandwidth used(14 or 28 MHz)
Select the uplink frequency(reception)
Uplink bandwidth calculatedautomatically by the software
Maximum distance calculatedautomatically by the software
53/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Once the maximum distance calculation has been made, click on the arrow to go to the next screen :
Click here to go backto the previous screen
Click here for the RT to take account ofthe parameter settings
The range of possible valuesis defined with respect to thecalculation made in theprevious screen
Total cable length = part tobe defined + part imposedby the topology
Click here to select eitherMono NT or Multi NTmode
B. Gain corrections calculation
RF gain correction
To define the value of the parameters to be entered in the “Gain corrections calculation” screen, use theinstallation sheet (see Appendix A.1), complemented by the Radio Planning. The RT–RBS distance must becompatible with the value defined in the previous screen.
As the software parameters are entered, the software carries out the gain correction calculations.If the parameters cannot be accepted, the background colors of the Rx and Tx gain connection windows changeto red. If the values are beyond the system capabilities, all the windows are emptied of their contents and aregrayed–out; it is then necessary to recommence the input starting with the first RT–RBS distance parameter.
For the RT–RBS distance, it must be to within the following margins: 100 m < D < 200 m 20 m max. error
200 m < D < 400 m 40 m max. error
400 m < D < 800 m 80 m max. error
D > 800 m 100 m max. error
54/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Enter the differential height (to within 10 %)
Enter the RT–RBS distance Enter the estimated max.differential height
Enter the antenna tiltEnter the nature ofany obstacles
Automatic gain correctioncalculation
Cable gain correction calculation
For the cable gain correction calculation, there are two possible scenarios depending on the installationtopology: Mono NT or Multi NT.
1. Cable gain correction in the case of Mono NT, the screen appears as follows, once Mono NT has beenselected:
Click here to define thenumber of repeaters
Total cable length field
Gain correction calculated automatically by the software
The cable length indicated is the total length including the free part and the part imposed by the topology.
The field in brackets on the screen is defined as follows:
minimum value = 1 + length imposed by the topology,
maximum value = length of first segment + length imposed by the topology,
The length adjustment is between 1 m and the maximum length of the first segment with respect to the cableselected (70 or 210 m).
The software will calculate automatically with respect to the entire set of parameters the corrections to be made.
55/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
C. Definition of the installation topology
In the case of Multi–NT configuration, the following screen appears, once Multi–NT has been selected:
Maximum total length
Click here to validateonce the topology hasbeen defined
This screen is used to define the installation topology. Depending on the topology, the total maximum length(incorporating the imposed part and the free part) is displayed.
2. Cable gain correction in the case of Multi NT: once the data presented in the “Star” screen is validated,the following screen appears:
Select the cable type
Automatic calculation of the cable gaincorrection
Enter the cable length to within 1.5 mper segment, 5 m for the total length
Sending the configuration to the RT radio unit
Once the calculations have been made, click on the icon “data send” shown here ,that is at the top of the “Gain corrections calculation” screen, for the values to beacknowledged by the RT.
56/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
4.2.4.3 – Aligning the RT unit antenna
1. Preparation
IMPORTANT NOTE: NEVER HANDLE THE RT UNIT BY ITS ANTENNA BUT BY THEBODY OF THE RT RADIO OR THE SUPPORT ARM.
Note : To carry out the following phases of the Terminal Station commissioning, the link Base Station must beoperational and its antenna correctly oriented.
Montage
The following equipment is required for carrying out RT antenna alignment:
– the RT unit,
– the RIT (Radio Installation Tool),
– the NIT (Network Installation Tool) or the NT modem,
– an audio headset,
– a No. 5 Allen key.
– the service cable kit.
WARNING: DO NOT PERFORM SUCH ASSEMBLY IN STORMY CONDITIONS; THE EQUIP-MENT METAL STRUCTURES MAY BE A TARGET FOR LIGHTNING.
To carry out RT unit antenna alignment, implement the assembly shown in figure 38.
Figure 38 – RT antenna fine alignment assembly diagram
RT/RIT link cable (tool cable)
“Site” caxial cable (link RT/NT)
mains 85 – 264 VAC
47 – 63 HZ
NIT tool or NT modem
RIT tool
RT
Headset
RIT/ Headset tool cable
57/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Help for using the RIT
– RIT tool received field indicator (represented in figure 39): to the maximum received fieldcorresponds a maximum vumeter pointer deviation; as soon as the pointer reaches its maximum stop,adjust the potentiometer to set the pointer back to its center position (these adjustments may berenewed).
Figure 39 – Adjustment procedure using the RIT tool potentiometer
PotentiometerPotentiometerVumeter Vumeter
– audio headset connected to the “service kit” cable: to the minimum received field corresponds a lowfrequency audio signal (headset’s LF tone); to the maximum received field corresponds a highfrequency audio signal.
The received signal follows the curve below which comprises several maximum points called “lobes”:
Figure 40 – Main lobe and side lobes of the received signal
15 dB
side lobes
main lobe
Vertical plane
Lobe cross–section
Horizontalplane
~ 1.5 for every3 dB leveldeviation
~ 6 to ~– 15 dBfrom the main lobe
Note : As the side lobes are rather close (4 to 5) from the main lobe at a rather high level (–15 dB), searchingthe maximum received signal must be carried out carefully to make sure that pointing is effectivelycarried out considering the main lobe (see § Horizontal and vertical pointings).
58/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
2. Pointing
Figure 41 – “azimuth” and “elevation” adjustment screw
1
2
Presets
– Using the Allen key, slightly untighten the “azimuth” and “elevation” screws so that the RT can moveeasily (marks 1 and 2, figure 41).
– Horizontally direct the RT to the Base Station using a compass if necessary.
Horizontal and vertical pointings
Using the RIT tool and/or the audio headset (see section Help for using the RIT § 4.2.4.3) , perform the followingadjustments:
– Move the RT radio by performing horizontal scanning, until you find a maximum reception level.
Note : If no level is detected, check with the compass that the RT correctly points to the base station. In caseof failure check the installation (polarization, connections).
– Carry out alignment with respect to the strongest signal. To do this, either:
observe the maximum field level on the RIT tool indicator shown in figure 39,
or, evaluate the maximum field level using the audio headset connected to the service kit cable,
– Using the Allen key, slightly tighten the “azimuth” screws (mark 1, figure 41) before performing thevertical pointing, in order to maintain a maximum azimuth reception and make the two adjustmentsindependent (H and V).
– Move the Radio by performing vertical scanning, until you find a maximum reception level.Provided that a maximum has effectively been detected during the previous pointing, several cases arepossible depending on the maximum position in the reception curve (see figure 40):
59/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Note : The following cases are treated for the vertical scanning (site), they are also valid for the horizontalscanning (azimuth).
Case 1 (figure 42): only one wide maximum is found throughout the vertical scanning. Thus the RT is alignedwith respect to the 6 deviation limit allowed.Then slightly move the RT horizontally (by less than 6) to the BS.Perform again vertical scanning.
Figure 42 – Vertical scanning: case 1
Only one maximum is found:the received signal curve follows one of
the side lobes
––> pointing to be continuedThe double arrow symbolizes
the vertical scanning
Case 2 (figure 43): only two remote maxima have been found throughout vertical scanning.Then adjust the vertical position so that the reception level is at the minimum between both maxima.Horizontally move the RT until the main lobe is found, as shown in figure 43.
Figure 43 – Vertical scanning: case 2
Two maxima are detected:the received signal curve follows both
side lobes
––> pointing to be continued
Schematization of the pointing to beperformed
Case 3 (figure 44): three maxima have been found throughout vertical scanning, including one maximum ofhigher level (main lobe).Then move the RT so that it matches the central maximum.Use the potentiometer to distinguish both maximum types by varying the received signal sensitivity and thusconfirm that the pointing effectively corresponds to the main lobe (maximum of higher level).Slightly adjust the vertical and horizontal positions until the maximum main lobe level is reached.
RT alignment with the base station is then correct.
Figure 44 – Vertical scanning: case 3
Three maxima are detected:the received signal curve follows both side-
lobes and the main lobe
––> pointing to be adjusted to the maxi-mum of the main lobe (point M)
M
60/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Note : If no maximum is detected throughout vertical scanning, it means that the horizontal receptionmaximum is lost, the horizontal position is not located within the 6 deviation range.Then horizontally move the RT to the BS so that a maximum is found and vertically scan again tofind one of the 3 previously described cases.
Make sure you observe the conditions of case 3 before performing the following stepto complete the pointing.
End of pointing
Once alignment is completed:– Tighten the “azimuth” screws using the Allen key, then the “elevation” screws (marks 1 and 2, figure
41).
TORQUE VALUE MUST BE 9 TO 10 m.N. USE A TORQUE WRENCH.
– Make sure the maximum reception signal is always found.
– Completely lock the mechanical assembly preventing the RT radio assembly from misaligning
3. Cabling according to standards– Remove the tools and cables used for the RT commissioning and adjustment.
– On the Radio side, connect the RT/NT connection cable in accordance with the requirements indicatedin paragraph 3.5.
– Screw up the stopper of catch BNO on the radio to allow the sealing of the radio.
IMPORTANT NOTE: IT IT MANDATORY TO OBSERVE THE REQUIREMENTS IN PARA-GRAPH (3.5) ENSURING RT/NT CABLE WATERTIGHTNESS (THERMOSHRINKABLESLEEVE) AND ATTACHMENT (CLIPS).
61/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
4.3 – Commissioning the NTNote : To carry out the following phases of the Terminal Station commissioning, the link Base Station must be
operational and its antenna correctly orientated.Considerations
– Before commissioning the NT unit, complete the RT unit adjustment procedures.
– No adjustment is required for commissioning the NT.
– To check the voltage at the mains connector terminals, use a measuring instrument (voltmeter).
– For the mains connection, use only the connection cable supplied with the equipment.
– Never use an extension cable for connecting the NT unit to the power source.
Stages (Figure 45)
1. Connect the RT/NT connection cable. Use ref. 1 connector.
2. To ground the NT unit in this way, carry out the procedures described in Chapter 3.Use the lug and screw hardware supplied with the equipment, ref. 7.
3. Check that the mains socket to which the NT is to be connected supplies voltage compliant with theequipment characteristics and that it is fitted with an earth.
4. (ref. 5)– For NCAxxx: connect the NT connection cable to the NT connector and then to the mains
– For NGAxxx: connect the 48V cable to the HE15–3 connector, then to the 48V arrival.
5. Power–up the NT unit using the On/Off switch (ref. 6); the green “Power on” LED (ref. 3) lights up.The red “Alarm” LED (ref. 4) lights up (searching for the carrier frequency) then flashes at different ratesaccording to the current phase:– slow flashing: automatic scanning over the frequencies,
– fast flashing: frame recovery (authentication by the serial number) once the frequency is found.
62/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Malfunctions to the installation :
The A9900 is a reliable and easy–to–install system. By following the procedures described in thedocumentation, no problems should occur. However, if these procedures have been poorly applied, here is alist of the possible problems that may arise.
Manifestation of theproblem Possible causes Solution
The red NT LED is flas-hing slowly.
1. Check the NT declaration.
2 Poor connector contact.
3 Cable damaged or severed.
4 Alignment problem.
5 Incorrect RT settings.
6. RT breakdown.
7 NT breakdown.
1 Check connectors. Secure loo-sely cabled connectors.
2 Check installation wiring. Changedamaged cables.
3 and 4 Reconfigure and checkantenna alignnment (cf § 4.2.4).
5 Replace RT.
The red NT LED is flas-hing quickly.
1 Alignment problem.
2 Incorrect NT settings.
1 Delete and recreate the managedNT using the 9900LT.
Check the allocation of the correctNT serial number.
2 and 3 Reconfigure and checkantenna alignnment (cf § 4.2.4).
4 Replace RT.
The red NT LED rest lituninterrupted
1 Check the NT supply voltage
2 NT breakdown.
Replace NT.
6. Wait for this automatical initialization time of the NT. As soon as the red LED (ref. 4) goes out, the systemis operational (calibration of the radio link (output, frequency, time) has been performed).
NEVER DISCONNECT THE NT/RT LINK UNLESS REQUIRED FOR MAINTENANCE ORINSTALLATION PURPOSES. SUCH INTERVENTION MUST BE CARRIED OUT INACCORDANCE WITH THE PROCEDURE INDICATED IN CHAPTER 5.
Note : The maximum initialization time is in the order of 5 minutes (otherwise see § 5.4 ).
Client terminals are connected to the ref. 2 connectors (see § 4.4).
Figure 45 – The NT unit
1 2 5 763 4
63/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
4.4 – Client terminal connections
There are six types of NT units:
9900 NCA 001, 9900 NGA 001 and 9900 NCE 001 9900 NCD 001
2 x Eth 10bT 2 x Eth 10bT2 x Eth 10bT
2x G703:E1 for NCA001 and NCA002T1 for NCE001
G703X21
9900 NCA 002 and 9900 NGA 002
4.4.1 – Ethernet connector
Figure 46 – Affectation of Ethernet access points at NT back
Pin 1: Tx_diff_plusPin 2: Tx_diff_MoinsPin 3: Rx_diff_plusPin 4: Not connected
Pin 5: Not connectedPin 6: Rx_diff_MoinsPin 7: Not connectedPin 8: Not connected
Pair 3 Pair 1 Pair 4Pair 2
SHIELDED CABLES MANDATORY
4.4.2 – G703 connector (75 ohm E1 and 100 ohm T1 standards)
Figure 47 – Affectation of G703 access points at NT back
Pin 1: Rx_RingPin 2: Rx_TipPin 3: Not connected orequipment ground
Pin 5: Tx_Tip
Pin 7: Not connectedPin 8: Not connectedPin 4: Tx_Ring
Pin 6: Not connected orequipment ground
Pair 3 Pair 1 Pair 4Pair 2
SHIELDED CABLES MANDATORY
4.4.3 – X21 connector
If the distance between DCE (NT) and DTE is too long, according to V11 norms, you can exchange pin 4 andpin 11 in order to get a phase inversion.
Note : The description below is for the client cable side connector
Figure 48 – Affectation of X21 connector access points
Pin 1: ScreenPin 2: T_negPin 3: C_neg
Pin 5: I_neg
Pin 7: B_negPin 8: Ground
Pin 4: R_neg
Pin 6: S_neg
Pin 9: T_posPin 10: C_pos
Pin 12: I_pos
Pin 14: B_posPin 15: Not connected
Pin 11: R_pos
Pin 13: S_pos
1
15
8
9
female connector
SHIELDED CABLES MANDATORY
64/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
4.5 – Initiating services
Once RT and NT are installed and in operational status, service initiation requires a further step: the Base Stationoperator must activate the cross–connections (see User Manual 3CC11771 AAAA TQ BJB Base Station §Client Services and § 6.2 of the present document).
4.6 – Filling in the installation sheet
The installation sheet (Appendix A.1) is initially issued by Radio Planning. It contains all the data needed by theinstaller for successful programming of the RT.The installer must complete this sheet by supplying the requested information, in particular the serial numbersof the installed equipment, then submit it to the supervisor. The information in the sheet ensures the traceabilityof the customer installation equipment, to facilitate subsequent interventions.
The sheet should be signed by the client and the installer. It allows with the customer, the effectivecommissionings to be validated.
The sheet consists of three parts:– 9900 RT installation sheet,
– 9900 NT installation sheet
– 9900 RT/NT connections sheet.
4.6.1 – 9900 RT installation sheet
This part contains all the information necessary for the configuration. The installer must have this informationto configure the radio part (see § 4.2.4.1).For each parameter to be entered according to the Radio Planning, the installer must if appropriate indicate thereal input value if this differs from the value on the sheet. He must also provide the following information: siteand operator co–ordinates.
4.6.2 – NT installation sheet
This sheet is to be completed for each NT in the installation, by filling in the requested information.
4.6.3 – RT/NT wiring sheet
The installer must fill in, in this part, all the information relating to the wiring and to the equipment used forcarrying out the assembly.
In addition, a wiring diagram is to be drawn up.
65/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
5 – Operation and maintenance
5.1 – 9900 system supervision
The system operator receives the alarms sent by the network equipment. With the aid of the the 9900LTsoftware applications, the operator can view and analyze the alarms and trigger the appropriate operations (seespecific procedures below).
On detection of a fault, the operator analyzes alarms and starts the suitable maintenance actions.
5.2 – Preventive maintenance
This maintenance is carried out, either during a corrective maintenance inspection, or during a periodicinspection, on all station equipment. It consists in inspecting the units and their interconnections (connectors,cables, sockets, etc.) and ensuring that the environment of the Indoor Units (NTs and RTs) complies withinstallation requirements (see section 3). It is essential to check connectors and splitters state with earthing.In case of doubt, the suspect parts should be checked, taking all precautions to avoid interrupting link datatransmission.
5.3 – Corrective maintenance
DO NOT OPEN THE EQUIPMENT UNDER ANY CIRCUMSTANCE
Corrective maintenance is carried out with the use of the programs of the 9900 LT software
To use the alarms refer to section “Alarms” of the Base Station User Manual, ref.: 3CC11771AAAA TQ BJB.
5.4 – Changing a faulty NT unit
Make sure that the network manager has deleted the NT to be replaced beforehand and declared the new one,using the 9900LT software.
Stages
1. Turn off NT unit power.
2. Disconnect the mains cable connecting the NT unit to the power source.
3. Disconnect all cables connected to the NT unit to be changed.
4. Change NT unit after checking that the characteristics coincide (number of inputs, impedance, etc.).
5. Reconnect NT unit cables.
6. Connect the NT power cable to the mains supply.
7. Power up NT unit.
8. Wait for “Power on” LED to light up.
9. Wait for flashing of “Alarm” LED. The NT unit is in operation once the LED is extinguished.
10. Check the absence of alarms in the 9900LT software application (see section Alarms of the Base StationUser Manual ref.3CC11771AAAA).
11. Update the station installation sheet (appendix A.1).
66/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
5.5 – Changing a faulty RT unit
Stages
1. Turn off the NT power supply.
2. Disconnect the mains cable connecting the NT unit to the power source.
3. Disconnect the RT/NT connection cable.
4. Change RT after checking on the label that mnemonics are identicals to the previous one.
5. Install again the RT and carry out antenna alignment. For this, refer to sections 3 and 4.
6. Reconnect the RT/NT connection cable.
7. Connect the NT to the mains supply.
8. Power up the NT.
9. Wait between 2 and 5 minutes. Reconfiguration is automatic.
10. Check the absence of alarms in the 9900LT software application (see section “Alarms” of the Base StationUser Manual ref.3CC11771AAAA).
11. Update the station installation sheet (appendix A.1).
5.6 – Replacing an NIT fuse
1. Set the ON/OFF switch of the NIT unit at “OFF”.
2. Disconnect the mains cable.
The 6.3 x 32 cartridge type 1A fuse is accessible by unscrewing the fuse cover. (T 1A L 220V: Feeble currenttime delay fuse, 1 A, Nominal voltage = 220 V)
67/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
6 – Changes of configurationThe changes to the transmission network may require changes to the equipment configurations in order to meetnew requirements. The A9900 equipment is likely to satisfy these changes either by modifying just theequipment software configuration or by physically modifying the equipment and its configuration.
The supervisor must be informed of any configuration changes.
These changes may involve either changes of configuration using the 9900LT software, or changes ofconfiguration with physical intervention on the equipment.
The possible changes using the 9900LT software only are:– declaration/removal/reset of an NT terminal (cf. § 6.1),
– implementation of client services (cf.§ 6.2).
The possible changes with physical intervention are:– addition/removal of an NT unit (cf. § 6.1),
– changing an NT unit (cf. § 5.4),
– changing an RT unit (cf. § 6.3),
– addition of an NT to a cluster (cf. § 6.4),
– affectation of an NT unit to another BS (cf. § 6.5).
6.1 – Declaration, deletion, reset of an NT
To add a new NT :– update the “Installation information” sheet required for station installation (refer to Annex A.1),
– carry out installation (refer to Chapter 3) and commissioning (refer to Chapter 4) of the NT,
– to declare the new NT terminal, execute the commands indicated in section Declaring a new NT ofthe Base Station User Manual (ref. 3CC11771AAAA TQ).
To delete a NT from the network:– update the “Installation information” sheet required for station installation (refer to Annex A.1),
– execute the commands indicated in section NT deletion of the Base Station User Manual (ref.3CC11771AAAA TQ),
– turn off power to unit using ON/OFF switch (reference 6 of figure 45).
To reset a NT :– execute the commands indicated in section NT reset of the Base Station User Manual (ref.
3CC11771AAAA TQ)
– if necessary, update the “Installation information” sheet (refer to Annex A.1).
68/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
6.2 – Implementation of client services
To implement client services :
– execute the commands indicated in section Client services of the Base Station User Manual (ref.3CC11771AAAA TQ),
Note : The system benefits from E1 or IP links. For each case, use the specific procedure.– if necessary, update the “Installation information” sheet (refer to Annex A.1).
6.3 – Changing an RT
When changing the RT, as needs to be done in the event of a change to the frequency band on the BaseStation, it is necessary to carry out antenna alignment (tracking) and reinitialisation of the radio partconfiguration.
To change the RT:
– turn off the mains supply to the NT,
– disconnect the mains cable,
– disconnect the RT/NT link cable,
– carry out installation of the RT unit and tracking of the Terminal Station antenna. For this, refer to Chapter 3.
– restart the Terminal Station. For this, refer to Chapter 4.
– reconfigure the system according to the procedures in Chapter 4.
For system initialisation and retrofit, refer to section NT Supervision of the Base Station User Manual (ref.3CC11771AAAA TQ).
6.4 – Adding an NT to a cluster
6.4.1 – Case of a pre–wired installation
In the case of a pre–wired installation, for which an extension has been envisaged, the cables are already pulled,the distribution frames and repeaters are already in place and there are load modules filling the free NT locations.To add an NT to a cluster:
– remove the load module,
– connect the NT in place of the load module,
– follow the procedure for adding an NT described in § 6.1.
Note : There is no service interruption and, furthermore, it is not necessary to reconfigure the radio parametersof the RT.
6.4.2 – Case of a non–pre–wired installation
Where extension has not been envisaged, the repeaters and distribution frames must be wired, leading to aninterruption of services. Once wiring has been carried out:
– follow the procedure for adding an NT described in § 6.1,
– reconfigure the RT radio parameters as described in §4.2.4.
Note : You are recommended, with a view to possible future Multi–NT use, to wire as for Multi–NT on firstinstallation. This means that it will not be necessary to reset the RT, so avoiding the interruption ofservices.
69/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
6.5 – Affectation of an NT to another BS
To change the Base Station on a Terminal Station:
– delete the NT in the BS with the 9900LT software beforehand (cf. § 6.1),
– declare the NT in the new BS with the 9900LT software,
– turn off the mains supply to the NT unit,
– carry out tracking of the Terminal Station antenna. For this, refer to Chapter 3.
– restart the Terminal Station. For this, refer to Chapter 4.
– reconfigure the system according to the procedures in Chapter 4.
For system initialisation and retrofit, refer to section NT supervision of the Base Station User Manual (ref.3CC11771AAAA TQ).
70/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
71/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 1 – 9900 TS INSTALLATION SHEET
A.1.1 – 9900 RT INSTALLATION SHEET
General information
NameAddress
.................................................................No .....Street..............................................Bld ...... Stair ............. Floor...............Town ...................Country......................
Operator
Radio planning parameters
Installation parametersto be entered (Radio
planining instructions)
Installation parametersentered
(OK or new values)Site identificationName of the correspondingBase StationSector number (1, 2, 3, 4,etc.)Distance between BS and TSAltitude differenceClimatic zone (A,B, etc.)AvailabilityRBS antenna type (dBi)RBS antenna tiltRBS power outRT antenna type (dBi)Polarization (H or V)Frequency band (GHz)
Frequency down linkFrequency up linkBandwidthDuplex deviation (MHz)Sub–band (A,.B, etc.)
72/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
9900 RT INSTALLATION SHEET (continuation)
DesignationVersionReference (3CC...)
ICS (01,02, etc.)
Serial numberReception level (dBm)
Installation type (rooftop, tower, mast)
Mecanical support ReferencesRadio installation height / groundObstacle (type, distance,...)
Date:
Name:
Visa:
Installer: Costumer:
73/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
A.1.2 – 9900 NT INSTALLATION SHEET
NameAddress
.................................................................No ..... Street..............................................Bld ...... Stair ............. Floor...............Town ...................Country......................
Operator
Designation NTTypeReference (3CC...)ICS (01,02,...)Serial numberDownloaded application
VersionPosition, location of theequipmentInstallation type (Rack,wall–mounting,table)
ACCEPTANCE
Green LED lighting: (OK or NO OK)
Date:
Name:
Visa:
Installer: Costumer:
Red LED off: (OK or NO OK)
74/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
A.1.3 – 9900 RT / NT CABLING SHEET
Diagram marks
Type of cableLength between RTand the first elementSplitter referencesSplitter serial num-bersRepeater referencesRepeater ICSRepeater serialnumber75 ohm load referen-ces
Connecting diagram
Date:
Name:
Visa:
Installer: Costumer:
75/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
A.1.4 – List of checkpoints for TS commissioning
CHECK SAFETY RULE:
– Equipment grounding OK NOK
– Differential protection OK NOK
– Fire protection OK NOK
CHECK RT INSTALLATION
– No pollutants or possible flow on the RT OK NOK
– No possible trespassing in the RT antenna field OK NOK
– Direct view between RT antenna and base station antenna OK NOK
– Use of a torque wrench for the RT assembly OK NOK
– Support stiffness and absence of vibrations OK NOK
– Same polarization as for base station antenna OK NOK
CHECK CABLES BETWEEN RT and NT
– N 75Ω connectors RT side OK NOK
– Watertightness by thermoshrinkable pre–pasted sleeve RT side OK NOK
– No cable strain OK NOK
– Observe minimum bend radius OK NOK
CHECK NT INSTALLATION
– Min Max temperature of the premises hosting the NT (–5º to + 55ºC) OK NOK
– Ventilation clearance above the NT OK NOK
– Check the NT grounding OK NOK
– Check that all client access cables are shielded cables OK NOK
– Diagram compliant with multi–NT connection OK NOK
– Repetear(s) installed indoor OK NOK
76/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
77/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 2 – Using the DALLET system bySOFRER for 1 m & 1.5 m high mast on rooftopRecommendations according to Snow and Wind Rules NV 65 are only indications and shouldbe verified according to the sites.
Feet weight : about 50 Kg for each DALLET.
2 DALLET
Zone 1 and Zone 2 Zone 1 and Zone 2
Zone 3 Zone 3
3 DALLET
3 DALLET4 DALLET
Before any use, verify the rules applicable locally and compute according to theregulations.
78/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
79/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 3 – Mounting coaxial connectorsSheet “N” 75Ω.
TECHNICAL SPECIFICATION75 Ohm male N connector for crimping on group 04 cable
DSP–51102–00–B
Page: 1/1
Rédigé par : Approuvé par : Edition du : / /Mise à jour Par Le Objet de la mise à jour
A POTTIER 14–10–98 Issu de la DSP–511P suivant DT 095–98B BLONDEAU 23–02–2000 Modifications suivant DT 016–00
• Siège Social• TEL: (33) 01 34 18 93 93 • FAX: (33) 01 34 18 22 20 • Unité de Production • TEL: (33) 03 86 81 77 88• FAX: (33) 03 86 81 77 22
H:\iso9001\formu\be\fbe05A.dot
1. CODIFICATION. (Codification).Réf. DELTA OHM : 08 250–178
2. CABLIER. (Cable manufacturer).ALCATEL : 6 F (TC) PACOME : M 0326Groupe : G 04
3. DIMENSION. (Dimension).
4. CARACTERISTIQUE ELECTRIQUE. (Electrical characteristic).Impédance (Impedance) : 75 WW .Fréquence d’utilisation ( Frequency range) : DC à 3 GHz.Insertion (Insertion) : ££ 0,05 dB.
5. CARACTERISTIQUE MECANIQUE. (Mechanical characteristic).Corps, écrou, ferrule (Body, nut, ferrule) : Laiton nickelé. (Nickel plated brass)Isolant (Isolator) : PTFE. (PTFE)Contact central (Central contact) : Laiton doré. (Goldenbrass)Tenue en traction (Keeping in traction) : 20 kgs.
6. PREPAR ATION DU CABLE. (Cable preparation).6.1 Dénuder la tresse (7.00mm).
Strip the braid (7.00mm).
Tresse + FeuillardBraid + Foil
6.2 Monter laferrule et rabattre la tresse. (4.00mm).Evaser entre lefeuillard et la tresseInsert the ferrule and flange the braid. Strip the core (4.00mm). Widen betweenthe foil and the braidwith the tool 22–395–036.
FerruleFerrule
EvaseurFlange tool
FeuillardFoil
AmeCore
TresseBraid
7. MONTAGE DU CONNECTEUR.(Mounting of the connector).7.1 Monter le contact central sur l’âme du câble et sertir celui–ci à l’aide de la pince
22–395–208(hexagone 1.73mm).
Insert the central contact on the core of the cable andcrimp with thepliers 22–395–208 (hexagon 1.73mm).
Zone de sertissage Hexa. =1.73Area for crimping Hexa. =1.73
Contact centralCentral contact
7.2 Insérer le câble équipé dans le corps. Couper le surplus de tresse au ras ducorps.
Insert the assembly cable in the body. Cut the excess of braidagainst the body.
7.3 Positionner la ferrule et sertir celle–ci à l’aide de la pince 22–395–208 (hexagone8.30mm).
Set up the ferrule and crimpit with pliers 22–395–208 (hexagon 8.30mm).
Zone de sertissage Hexa. =8.3Area forcrimping Hexa. =8.3
Dénuder l’âmeà l’aide de l’outil 22–395–036.
80/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
Fiche “F” 75Ω.
Code
Part number
Evas. / Evid.
Widener / Remover
Pince à sertir
crimping tool
Héxa.
Hexa.
A
08–550–122 22–395–036 22–395–057 ou 208 ÏÏÏ8.3
ASSEMBLY NOTICE75 Ohm male F connector / 75 Ohm male F connector
81/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
PRODUCT REFERENCES
FILOTEX ref. :
Pas
sin
go
no
rco
py
ing
of
the
do
cum
ent,
use
or
com
mu
nic
ate
of
its
con
ten
tis
no
tp
erm
itte
dw
ith
ou
tp
rio
rw
ritt
enau
tho
riza
tio
n.
Filotex
Information subject to change without notice.
Main applications
Electrical values
Physical characteristics
ET 2PA 981
Characteristic impedance : 75 ΩNominal capacitance : 55.5 pF/mRelative velocity of propagation : 82 %Dielectric strength : 1.5 KvJacket strength : 3.0 Kv
Ω /kmAttenuation at 50 MHz : < 4.72 dB/100 m
300 MHz : < 11.10 dB/100 m450 MHz : < 13.70 dB/100 m600 MHz : < 16 dB/100 m860 MHz : < 19.50 dB/100 m1000 MHz : < 21.10 dB/100 m2000 MHz : < 32.40 dB/100 m
Screening attenuation from 100 to 1000 MHz : 85 dB according toIEC1196–1§12–4.Structural return loss : 30 to 450 MHz : > 20 dB
450 to 600 MHz : > 18 dB600 to 1000 MHz : > 15 dB
1000 to 2000 MHz : > 12 dBTolerance : 3 peaks at – 4 dB in each bandwith
CONSTITUTION
1.02 +/– 0.1 mm bare copperinner conductor
Cellular polyolefin insulationØ = 4.60 +/– 0.1 mm
Aluminium/PET/Aluminium tape
Tinned copper braid(filling factor > 60%).
LSZH ivory jacket
Ø = 7.15 + 0.15 mm
Weight : 58 Kg/Km
Drop coaxial cable for indoor/outdoor applications.
Coaxial cable 75Ω
Maximum pulling strength : 34 daNMinimum bending radius for one single bend : 40 mm
for 10 bends : 80 mmWeathering resistance according to NFC 20 540Resistance to propagation according to IEC 332–3 but with a reducedvolume of flamable material (0.5l instead of 1.5l)Smoke emission according to IEC 1034–2Halogen content according to IEC 754–1
1
2345
1
2
3
4
5
>_
DC loop resistance ar 20 degres : 38.5
82/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
83/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 4 – Climatic areas world map
84/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
PAGE INTENTIONALLY LEFT BLANK
85/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 5 – Correspondence between commercialcodes and industrial codes relating to the TS
Installation item Commercial code Industrial code Comments
9900 NC – commercial NT
Packed NT without power cable
NCA 001 (2 Eth, 2G703)
9900NCA001+9900SWA001 3CC 10329 AAAA
NCA 002 (2 Eth, G703,X21)
9900NCA002+9900SWA001 3CC 10329 ABAA
NCD 001 (2 Eth) 9900NCD001+9900SWA001 3CC 10329 ACAA
NCE 001 (2 Eth, 2 T1ANSI)
9900NCE001+9900SWA001 3CC 10329 AEAA
NGA 001 (2 Eth, 2G703, 48V)
9900NGA001+9900SWA001 3CC 10329 ANAA
RT installation items
Indoor–outdoor cabling
coaxial cable 6F(TC)75 Ohm
9900XTA001
70 m
1AC 00273 0003
(per meter)(70 meters)
Crimping tool DeltaOhms 9900YTB001 3CC 11239 AAAA
Repeater (without cable) 9900XTB002 3CC 08473 AAAA
Passive Splitter(without cable) 9900XTC002 3CC11234AAAAA
Bended pipe(48 mm of diameter) 9900XTE001 3CC 11132 AAAA
self–supporting mast
1 meter(48 mm of diameter)
9900XTD002 3CC 11133 AAAA
self–supporting mast1.5 meter
(48 mm of diameter)9900XTD001 3CC 11134 AAAA
74/114mm–pipeadaptation kit 9900XTF001 3CC 10802 AAAA
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10884 AAAA 25 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10884 ABAA 25 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10884 ACAA 25 GHz
86/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
CommentsIndustrial codeCommercial codeInstallation item
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10884 ADAA 25 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10896 AAAA 25 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10896 ABAA 25 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10885 AAAA 26 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10885 ABAA 26 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10885 ACAA 26 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10110 AAAA 28 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10110 ABAA 28 GHz
24–30 GHz–RT with anintegrated antenna of
26 cm9900RTA001 3CC 10883 AAAA 28 GHz
RT installation tools
Installation tools(RIT+NIT+cables +soft) 9900YTA001 3CC10784 AAAA
87/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
Appendix 6 – List of abbreviations/Liste desabréviations
MNEMONIC ENGLISH FRANCAIS
AAL ATM Adaptation Layer Couche adaptation en mode de transfertasynchrone
AIS Alarm Indication Signal (SIA) Signal d’Indication d’Alarme
AL Alarm Alarme
AMD ATM Modulator Demodulator Modulateur démodulateur en mode de trans-fert asynchrone
ANT ATM Network Termination Terminaison de réseau en mode de transfertasynchrone
ASAP Alarm Severity Assignment Profile Profil d’affectation de gravité de l’alarme
ATM Asynchronous Transfer Mode Mode de transfert asynchrone
AT Attend alarm on LT Alarme en attente (sur LT)
AVC Attribute Value Change Changement de valeur de l’attribut
BER Bit Error Rate (TEB) Taux d’Erreur Binaire
BNC Bayonet–locking Connector Connecteur BNC
BS Base Station Station de base
CBR Constant Bite Rate Débit binaire constant
CCIR International radio consultative comitee Comité consultatif international des radio-communications
CEPT Conference of European Post and Tele-communications administrations
Conférence européenne des postes ettélécommunications
CPL Coupler Coupleur
CRC Cyclic Redundancy Check Contrôle de redondance cyclique
DBS Digital Base Station Station de base numérique
EMC ElectroMagnetic Compatibility (CEM) Compatibilité ElectroMagnétique
EPROM Electronically Programmable Read–OnlyMemory
Mémoire fixe programmable de façon électro-nique
ETSI European Telecommunications StandardsInstitute
Institut de standardisation des télécommuni-cations européennes
ETH Ethernet Ethernet
FAS Frame Alignment Signal Signal d’alignement de trame
FEC Forward error correction (CCE) Code Correcteur d’Erreurs
HDB3 High Density Binary 3 code (3rd order) Code haute densité binaire d’ordre 3
IBS Intermediate frequency Base Station Station de base de fréquence intermédiaire
ICS Identifier Change Status Indice d’état
I2C or IIC Inter Integrated Circuit Inter circuits intégrés
ID IDentifier Identificateur
88/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
FRANCAISENGLISHMNEMONIC
IEC International Electrotechnical Commission Commission internationale d’électrotechni-que
IM Information Model Modèle d’information
IP Internet Protocol Protocole internet
ITU International Telecommunication Union Union Internationale des Télécommunica-tions
LAIS Line Alarm Indication Signal Signal témoin d’alarmes de ligne
LAN Local Area Network Réseau local d’entreprise
LED Light Emitting Diode (DEL) Diode ElectroLuminescente
LMDS Local Multipoint Distribution Service Distribution multipoint en mode local
LMFA Loss of MultiFrame Alignment Perte d’alignement multi–trames
LOF Loss Of Frame Perte de trame
LOP Loss Of Pointer Perte du pointeur
LOPC Loss Of Polling Cell Perte de cellule d’interrogation
LORF Loss Of Radio Frame Perte de trame radio
LOS Loss Of Signal Perte du signal
LRDI Line Remote Defect Indicator Indicateur de défaut de ligne distante
LT Local Terminal Terminal local
MAC Medium Access Control Sous couche MAC de l’OSI
Mbps Mega Bit Per Second (Mbit/s) Débit binaire = 1000 000 bits parseconde
MIB Management Information Base Base de données de gestion
MMI Man Machine Interface (IHM) Interface Homme Machine
MSC Message Sequence Chart Tableau de séquence de messages
MUX Multiplexer Multiplexeur
NE Network Element Elément de réseau
NFS Network File System Système de fichiers de réseau
NIT Network Installation Tool NTd’installation
NRZ Non return to zero Non retour à zéro
NT Network Terminal Terminal de réseau
OC Object Creation Création d’objet
OD Object Deletion Destruction d’objet
OOF Out Of Frame Hors trame
OS Operation System Système d’exploitation
PAIS Path Alarm Indication Signal Signal témoin d’alarme d’acheminement
PC Personal Computer Odinateur individuel
89/903CC11774AAAA TQ BJA 01 Issue 01 - August 10, 2000
FRANCAISENGLISHMNEMONIC
PCR Peak Cell Rate Débit max de cellules
PLL Phase Locked Loop Boucle de phase bloquée
PSU Power Supply Unit Alimentation
PVC Permanent Virtual Circuit Circuit Virtuel Permanent
QAM Quadrature amplitude Modulation (MAQ) Modulation d’Amplitude en Quadra-ture
RAI Remote Alarm Indicator Témoin d’alarme distante
RBS Radio of Base Station Radio de la station de base
RDI Remote Defect Indication Indication de défaut distant
REI Remote Error Indication Indication d’erreur distante
RF Radio Frequency (FR) Fréquence Radio
RIT Radio Installation Tool Outil d’installation de la radio
RT Radio Terminal Terminal radio
SC State Change Changement d’état
SDH Synchonous Digital Hierarchy Hiérarchie numérique synchrone
SMD Surface Mounted Device (CMS) Composant Monté en Surface
SNMP Simple Network Management Protocol Protocole de gestion de réseau
STP Shielded Twisted Pair Câble 1 paire torsadée blindé
TAC Technical Assistance Center Centre d’assistance technique
TCP Transmission Control Protocol Protocole de contrôle de transmission
TDM Time Division Multiplex Mutiplexage à répartition dans le temps
TE Transaction End Fin de transaction
TNT TDM Network Termination Interface TDM
TS Terminal Station (ST) Station Terminale
UNI User Network Interface Interface usager–réseau
VPI Virtual Path Identifier Identificateur de conduit virtuel
VCI Virtual Channel Identifier Identificateur de voie virtuelle
WAN Wide Area Network Réseau grande distance
90/90 3CC11774AAAA TQ BJA 01Issue 01 - August 10, 2000
END OF DOCUMENT