AGGREGATE PLANNING
AND SCHEDULING
8/4/2019 Aggregate Planning and Scheduling
2/19
4/22/12
Aggregate planning involves planning the best quality toproduce in the intermediate-range horizon (3 months to oneyear)
Objectives of Aggregate Planning
i. The overall objective is to balance conflictingobjectives involving customer service, work forcestability, cost and profit.
ii. To establish company-wide strategic plan for allocatingresources.
iii. To develop an economic strategy to meet customer
demand.
8/4/2019 Aggregate Planning and Scheduling
3/19
4/22/12
Inputs to and Outputs from AggregateProduction Planning
8/4/2019 Aggregate Planning and Scheduling
4/19
4/22/12
Importance of Aggregate
Plans The various inputs to aggregate plans that affect the
performance of production and operations managersare:i. Engineeringii. Materialsiii. Operationsiv. Marketing and distributionv. Accounting and financevi. Human resources
8/4/2019 Aggregate Planning and Scheduling
5/19
4/22/12
Aggregate Planning or
Aggregate CapacityPlanning
Need for Aggregate Capacity Planning
1. It facilitates fully loaded facilities and minimizesoverloading and underloading and keeps productioncosts low.
2. Adequate production capacity is provided to meetexpected aggregate demand.
3. Orderly and systematic transition of productioncapacity to meet the peaks and valleys of expectedcustomer demand is facilitated.
8/4/2019 Aggregate Planning and Scheduling
6/19
4/22/12
Steps in Aggregate Capacity Planning
i. Determine the demand (i.e., sales forecast) for eachproduct for each time period (i.e., weeks or months orquarters) over the planning horizon (6 to 12 months).
ii. Determine the aggregate demand by summing up thedemand for individual products.
iii. Transform the aggregate demand for each time periodinto workers, materials, machines required to satisfyaggregate demand.
iv. Identify company policies that are pertinent (e.g., policyregarding safety stock maintenance, maintaining stableworkforce etc.).
8/4/2019 Aggregate Planning and Scheduling
7/19
4/22/12
i. Determine unit costs for regular time, overtime,
subcontracting, holding inventories, back orders, layoffs etc.ii. Develop alternative resource plans for providing necessary
production capacity to support the cumulative aggregatedemand and compute the cost of each alternative plan.
iii. Select the resource plan from among the alternativesconsidered that satisfies aggregate demand and best meetsthe objectives of the firm.
8/4/2019 Aggregate Planning and Scheduling
8/19
4/22/12
Approaches to Aggregate Planning
1. Top down approach2. A bottom-up approach or subplan consolidation
approach. Rough-cut Capacity Planning
This is done in conjunction with the tentativemaster production schedule to test its feasibility
in terms of capacity before the master productionschedule (MPS) is finalised.
8/4/2019 Aggregate Planning and Scheduling
9/19
4/22/12
Flow Chart for Rough-cut Capacity Planning
8/4/2019 Aggregate Planning and Scheduling
10/19
4/22/12
Capacity Planning andCapacity Requirement Planning (CRP)
Production capacity is defined as the maximum production rateof a facility or a plant.Types of Capacity
1. Fixed capacity2. Adjustable capacity3. Design capacity4. System capacity5. Potential capacity
6. Immediate capacity7. Effective capacity8. Normal capacity or rated capacity9. Actual or utilised capacity
8/4/2019 Aggregate Planning and Scheduling
11/19
4/22/12
Actual Output
System efficiency is the ratio of the actual measuredoutput of goods/services to the system capacity
System efficiency =
System capacity
8/4/2019 Aggregate Planning and Scheduling
12/19
4/22/12
Capacity DecisionsMajor considerations in capacity decisions are
a. What size of plant? How much capacity to install?b. When capacity is needed? When to phase-in capacity or
phase-out capacity?c. At what cost? How to budget for the cost?
Factors Affecting Determination of Plant Capacity1. Market demand for a product/service.2. The amount of capital that can be invested.3. Degree of automation desired.4. Level of integration (i.e., vertical integration).
5. Type of technology selected.6. Flexibility for capacity additions.
8/4/2019 Aggregate Planning and Scheduling
13/19
4/22/12
Capacity Planning
Capacity planning involves activities such as:a. Assessing existing capacityb. Forecasting future capacity needsc. Identifying alternative ways to modify capacityd. Evaluating financial, economical and technological
capacity alternativese. Selecting a capacity alternative most suited to achieve
the strategic mission of the firm. Capacity planninginvolves capacity decisions that must merge consumer
demands with human, material and financial resourcesof the organization.
8/4/2019 Aggregate Planning and Scheduling
14/19
4/22/12
4 Types of Capacity Planning are: Long term Capacity Planning Short-term Capacity Planing Finite Capacity Planning Infinite Capacity Planning.
Two catagories of factors affecting capacity planning are: Controllable Factors Less Controllable Factors.
Capacity Requirement Planning (CRP): A technique todetermine the labour and equipment capacities needed to
meet the objectives.
8/4/2019 Aggregate Planning and Scheduling
15/19
4/22/12
Capacity Requirement Planning (CRP) ProcessCapacity Requirement Planning Process (Flow Chart)
8/4/2019 Aggregate Planning and Scheduling
16/19
4/22/12
Master Production Scheduling
Objectives of Master Production Scheduling1. To schedule end items to be completed promptly and
when promised to customers.2. To avoid overloading or underloading the production
facility so that production capacity is efficiently
utilized and low production costs result.Functions of MPS:
. Translating aggregate plans. Evaluating alternative master schedules. Generating material and capacity requirements
. Facilitating information processing. Maintaining priorities. Utilizing the capacity effectively.
8/4/2019 Aggregate Planning and Scheduling
17/19
4/22/12
Master Production Schedule - Flow Chart
8/4/2019 Aggregate Planning and Scheduling
18/19
4/22/12
Guidelines for Master Scheduling
1. Work from an aggregate production plan2. Schedule common modules when possible
3. Load facilities realistically4. Release orders on a timely basis5. Monitor inventory levels closely6. Reschedule as required
8/4/2019 Aggregate Planning and Scheduling
19/19
4/22/12
MPS in Produce-to-stock andProduce-to-order Firms
The elements of the MPS that are affected by the
type of production system are:a. Demand management
b. Lot-sizing
c. Number of products to be scheduled (product-mix).