ADOT Rest Areas
Open Rest Areas • Nine (9) Locations in both
Directions
Open Rest Areas • Nine (9) Locations in both
Directions • Four (4) Locations in one
Direction
Open Rest Areas • Nine (9) Locations in both
Directions • Four (4) Locations in one
Direction Closed Rest Areas • Two (2) Locations closed for
construction both directions
Open Rest Areas • Nine (9) Locations in both
Directions • Four (4) Locations in one
Direction Closed Rest Areas • Two (2) Locations closed for
construction both directions • Two(2) locations temporarily
closed
Open Rest Areas • Nine (9) Locations in both
Directions • Four (4) Locations in one
Direction Closed Rest Areas • Two (2) Locations closed for
construction both directions • Two(2) locations temporarily
closed • Two (2) locations
permanently
X X
Rest Areas Program
Rest Areas Program
Mohawk Rest Area (FY 2016) ($4.8)
•Replace Water/Booster Pumps, Replace Septic Tanks, Replace Water Pipeline, Rehab Water Pump Building, Replace Water Storage Reservoir, ADA Compliance, Site Paving, Water System
Rest Areas Program
Sacaton & Canoa Ranch Rest Area (FY 2017) ($5.9)
•Sacaton: Replace Water Pipeline, Replace Septic Tanks and Leach Fields, Abandon old Well; Structural, Mechanical, and Electrical Rehab • Canoa Ranch: Drill New Well, Replace Water Pumps, Replace Septic Tanks and leach Fields, Replace water Pipeline, Paint Water Storage Reservoir, Water System Communications; Structural, Mechanical and Electrical Rehab
Rest Areas Program
Haviland Rest Area (FY 2018) ($3.4)
•Replace Water/Booster Pumps, Paint Water Storage Reservoir, Replace Septic Tanks, ADA Compliance, Site Paving, Structural, Mechanical, and Electrical Rehab.
Rest Areas Program
Painted Cliffs & Meteor Crater Rest Areas (FY 2018) ($5.4)
•Painted Cliffs: Replace Water Pumps, Septic Tanks and Leach Fields, Water System Communications; Site Work, Structural, Mechanical and Electrical Rehab. •Meteor Crater: Replace Water Pumps, Evaporation Pond Liners, Paint Water Storage Reservoir, Water System Communications; Site Work, Structural, Mechanical, and Electrical Rehab
Rest Areas Program
Mazatzal Rest Area (FY 2020)(4.15)
•Replace Evaporation Ponds, Replace Water/Booster Pumps and related work, Replace Septic Tanks, Paint Water Storage Reservoir, ADA Compliance, Site Paving, Structural, Mechanical, and Electrical Rehab
Rest Areas Program