Download pdf - A1 A4 H4 - RBKC

Transcript

01

25/0

5/1

2

01

25/0

5/1

2

P

L

252

1:2

5@

A1

5

PL

AN

NIN

G S

UB

MIS

SIO

N

6

6

FA

CA

DE S

EC

TIO

N 5 & 6

5Sports Hall North West Facade

1:25 6Sports Hall/Dance Studio South East Facade

1:25

DW

G.

NO.

RE

VISIO

N

SC

ALE

DA

TE

DR

AWIN

G

PR

OJE

CT

CH

EC

KE

D

FO

R I

NF

OR

MA

TIO

N

NO

TE

1.

2.

3.

4.

Fax. 020 7

381 4

995

Tel. 0

20 7

385 7

126

London,

W6 9

HN.

Palace W

harf, Rainville R

oad,

Key

1265

LLP

ESTU

DIO

LA

TT

ER T

AK

E P

RE

FE

RE

NC

E.

DE

TAIL D

RA

WIN

GS, T

HE

AS

SE

MB

LY D

RA

WIN

GS &

BE

TW

EE

N R

EF

ER

EN

CE O

RW

HE

RE DIS

CR

EP

AN

CIE

S E

XIS

T

RE

SO

LU

TIO

N.

AR

CHIT

EC

TS F

OR

AT

TE

NTIO

N O

F T

HE

BE B

RO

UG

HT T

O T

HE

DIM

EN

SIO

NS T

HE

SE M

US

TA

RE F

OU

ND B

ET

WE

EN

WH

ER

E A

NY DIS

CR

EP

AN

CIE

S

DIM

EN

SIO

N S

TRIN

GS.

TO B

E T

AK

EN F

RO

MD

RA

WIN

G A

LL DIM

EN

SIO

NS

NO

T S

CA

LE F

RO

M T

HE

TH

E C

ON

TR

AC

TO

R M

US

T S

TU

DIO E L

LP

THIS D

RA

WIN

G IS C

OP

YRIG

HT

AC

AD

EM

Y

KE

NSIN

GT

ON A

ND A

LD

RID

GE

PILES TO SE DETAILRC CAPPING BEAM ON TOP OF

DRAIN CAVITY 100mm

BLOCK WALL 140mm

DPC TO TOP OF BLOCK

RC SLAB TO SE DETAIL

CONCRETE BLINDING TO SE DETAIL

DPM

PROTECTION TO SE DETAILCELLCORE FOR GROUND MOVEMENT

DRAINAGE COURSE

= +5.000SSL - 3.400

= +5.200FFL - 3.200

GROUND BEAM TO SE DETAIL

GROUND BEAM & PILE BEYOND TO SE DETAIL

PLASTER 13mm PAINTED

TAKEN DOWN TOP OF PILES APPROX. 1mDPM TO FACE & TOP OF CAPPING BEAM

BRIDGINGCAPPING BEAM TO PREVENT COLD EPS INSULATION TO FACE & TOP OF

LANDSCAPE ARCHITECT’S DETAILSURFACE FINISH AND BUILD-UP TO

BLOCK WORK BELOW GROUND

LEAN MIX CONC FILL

TO PREVENT COLD BRIDGINGEPS INSULATION TO FACE OF RC SLAB

WHEEPHOLE

BRICKWORK

ACHIEVE REQUIRED U-VALUERIGID PHENOLIC INSULATION TO

CAVITY CLOSERPROPRIETARY INSULATED

DPM

RC WALL TO SE DETAIL

PILE TO SE DETAIL

TO SE DETAILPILES UNDER COLUMN BEYOND RC CAPPING BEAM ON TOP OF

REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE

SPRUNG FLOOR WITH WOOD FINISH

LAPPING DRAINAGE COURSE & DPCDPM TO FACE OF BLOCK WORK OVER-

WATERPROOFING TO CAPPING BEAMVERTICAL DPM TANKING OVERLAPPING

WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH

DPM TANKINGDPC (CAVITY TRAY) OVERLAPPING

= +7.700GL - 0.700

ENGINEER’S DETAILSUBSTRATE BUILD UP TO CIVIL

PREFORMED CAVITY TRAY WITH STOP ENDS

PROPRIETARY BRICK SUPPORT TO SE DETAIL

PROPRIETARY CAVITY CLOSER

WHEEPHOLE

REQUIRED VENTIALTION RATELOUVRE WITH ACTUATED DAMPER TO ACHIEVE PROPRIETARY PPC ALUMINIUM ACOUSTIC

WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH

PLASTER BOARD LINING

REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE

CEMENT PARTICLE BOARD 12mm

150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM

BRICKWORK

RC COLUMN BEYOND TO SE DETAIL

OPENING LINED WITH MINERAL WOOLGALVANIZED SHEET METAL SHROUD TO

SCREW FIXED TO SHROUDPERFORATED PPC ALUMINIUM COVER PANEL

OF BRICKWORKPPC ALUMINIUM PRESSING TO TOP

BREATHER MEMEBRANE

PPC ALUMINIUM RAINSCREEN PANEL

U-VALUEPIR INSULATION TO ACHIEVE REQUIRED

RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

REQUIRED VENTIALTION RATELOUVRE WITH ACTUATED DAMPER TO ACHIEVE PROPRIETARY PPC ALUMINIUM ACOUSTIC

OF LOUVREPPC ALUMINIUM PRESSING TO TOP

BREATHER MEMEBRANE

PPC ALUMINIUM RAINSCREEN PANEL

U-VALUEPIR INSULATION TO ACHIEVE REQUIRED

RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

CEMENT PARTICLE BOARD 12mm

TIMBER SPACER

FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING

TO PREVENT COLD BRIDGINGTIMBER BOARD TO TOP OF RC UPSTAND

OPENING LINED WITH MINERAL WOOLGALVANIZED SHEET METAL SHROUD TO

SCREW FIXED TO SHROUDPERFORATED PPC ALUMINIUM COVER PANEL

COFFERED RC SLAB TO SE DETAIL

BALASTAND WASHED ROUND SHINGLE AS TO ACHIEVE REQUIRED U-VALUE POLYSTYRENE INSULATION ON TOP COATING WITH EXTRUDED HOT APPLIED INVERTED ROOF

DRAINAGE LAYER

BOUND RUBBER CRUMB SURFACE

TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND

UP-STAND 10mmCEMENT PARTICLE BOARD TO

RC UPSTAND TO SE DETAIL

PPC RHS PROFILE AS FENCING POST

PPC WELD MESH MUGA FENCING

STEEL MESH PANEL

MESH PANELS HORIZONTAL PPC STEEL BARS TO FIX

RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

PPC ALUMINIUM RAINSCREEN PANEL

TO STEEL FRAME GALVANIZED RHS PROFILE AS TOP RAIL

TO SUPPORT MUGA FENCING AND CLADDINGGALVANIZED RHS PROFILE AS FRAME POST

RAINSCREEN FIXING BRACKETSGALVANIZED SHS PROFILE TO SUPPORT

TO SUPPORT SHSCONTINUOUS GLAVANIZED STEEL BRACKET

FENCING POST FIXED TO FRAME POSTGALVANIZED STEEL BRACKET TO SUPPORT

FROM FENCING POSTMESH COVER TO MUGA SUSPENDED

OF BLOCK WALLTO FACADE FRAMING SYSTEM TO TOP ON TIMBER SUBSTRUCTURE TIED BACK PAINTED MDF BOARD AND FACE PLATE

CEMENT PARTICLE BOARD 12mm

= +15.600FFL +7.200

= +15.310SSL + 6.910

= +15.750+7.350 UPSTANDTOP OF

= +19.825+11.425FENCETOP OF

9110

850

2690

835

30

1060

15

75

1755

30

790

1125

2870

A1

320

820

3770

850

625

2725

SPORTS HALL

MUGA

FORM INNER SKIN OF EXTERNAL WALLCOLD ROLLED STEEL FRAMING TO

4150

75

4225

FRAMING SYSTEMSDEFLECTION HEAD TO TOP OF STEEL

= +15.750+7.350 UPSTANDTOP OF

= +15.600FFL +7.200

= +15.310SSL + 6.910

= +8.200SSL - 0.200

= +8.400FFL +/- 0.000

= +5.000SSL - 3.400

= +5.200FFL - 3.200

= +8.400FFL +/- 0.000

= +12.050FFL +3.650

= +11.800SSL +3.400

9110

= +19.825+11.425FENCETOP OF

4225

3705

75

1125

2870

= +13.110+4.710BALUSTRADETOP OF

= +12.505+4.105UPSTANDTOP OF

= +9.510+1.110BALUSTRADETOP OF

= +8.925+0.525UPSTANDTOP OF

= +8.325SSL - 0.075

2725

625

100

2250

150

3125

2500 2340

1110

2260

390

SPORTS HALL

STORESPORTS

LOBBYSPORTS

STUDIODANCE

6325

TERRACE

MUGA

FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING

TO PREVENT COLD BRIDGINGTIMBER BOARD TO TOP OF RC UPSTAND

STEEL MESH PANEL

MESH PANELS HORIZONTAL PPC STEEL BARS TO FIX

RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

PPC ALUMINIUM RAINSCREEN PANEL

TO STEEL FRAME GALVANIZED RHS PROFILE AS TOP RAIL

TO SUPPORT MUGA FENCING AND CLADDINGGALVANIZED RHS PROFILE AS FRAME POST

RAINSCREEN FIXING BRACKETSGALVANIZED SHS PROFILE TO SUPPORT

TO SUPPORT SHSCONTINUOUS GLAVANIZED STEEL BRACKET

FROM FENCING POSTMESH COVER TO MUGA SUSPENDED

FENCING POST FIXED TO FRAME POSTGALVANIZED STEEL BRACKET TO SUPPORT

PPC WELD MESH MUGA FENCING

PPC RHS PROFILE AS FENCING POST

TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND

UP-STAND 10mmCEMENT PARTICLE BOARD TO

BOUND RUBBER CRUMB SURFACE

DRAINAGE LAYER

BALASTAND WASHED ROUND SHINGLE AS TO ACHIEVE REQUIRED U-VALUE POLYSTYRENE INSULATION ON TOP COATING WITH EXTRUDED HOT APPLIED INVERTED ROOF

COFFERED RC SLAB TO SE DETAIL

BREATHER MEMEBRANE

PPC ALUMINIUM RAINSCREEN PANEL

U-VALUEPIR INSULATION TO ACHIEVE REQUIRED

RAINSCREEN PANELSVERTICAL ALUMINIUM RAILS TO SUPPORT PRORIETARY FIXING BRACKETS AND

CEMENT PARTICLE BOARD 12mm

TIMBER SPACER

RC COLUMN BEYOND TO SE DETAIL

UP-STAND 10mmCEMENT PARTICLE BOARD TO

150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM

FORM INNER SKIN OF EXTERNAL WALLCOLD ROLLED STEEL FRAMING TO

PLASTER BOARD LINING

FRAMING SYSTEMSDEFLECTION HEAD TO TOP OF STEEL

TO PREVENT COLD BRIDGINGEPS INSULATION TO UPSTAND

TOP RAIL AND GLASS INFILL PANELSBRACKETS AND POSTS, NYLON POWDER COATED BALUSTRADE COMPRISING PPC STEEL FIXING

SLABS ON PEDESTALS AS BALASTAND PAVEMENT TO ACHIEVE REQUIRED U-VALUE

EXTRUDED POLYSTYRENE INSULATION ON TOP HOT APPLIED INVERTED ROOF COATING WITH

TO PREVENT COLD BRIDGINGTIMBER BATTEN TO TOP OF RC UPSTAND

CEMENT PARTICLE BOARD TO UP-STAND 10mm

BRICKWORK

WALL TIESSURFACE FIXED CHANNEL SYSTEM WITH

REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE

PREFORMED CAVITY TRAY WITH STOP ENDS

PROPRIETARY BRICK SUPPORT TO SE DETAIL

PROPRIETARY CAVITY CLOSER

WHEEPHOLE

FIXED TO TOP OF RC UPSTAND PPC ALUMINIUM PRESSING TO FORM COPING

REQUIRED U-VALUESYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING

TO ACHIEVE REQUIRED U-VALUEEPS INSULATION TO UPSTAND

DEFLECTION HEAD TO FACADE FRAMING SYSTEMRC SLAB TO SE DETAIL

SUSPENDED PLASTER BOARD CEILING

TO ACOUSTIC ENG. DETAILACOUSTIC PERFORMACE REQUIREMENTS METAL STUD PARTITION TO COMPLY WITH

ACOUSTIC, FIRE AND H&S REQUIREMENTS GLAZED SCREEN TO COMPLY WITH

TO ACOUSTIC ENG. DETAILACOUSTIC PERFORMACE REQUIREMENTS METAL STUD PARTITION TO COMPLY WITH

CONCRETE BLINDING TO SE DETAIL

PROTECTION TO SE DETAILCELLCORE FOR GROUND MOVEMENT

DPM

RC SLAB TO SE DETAIL

DRAINAGE COURSE

REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE

SPRUNG FLOOR WITH WOOD FINISH

BLOCK COURSE AT BOTTOM OF STUD PARTITION

RC SLAB TO SE DETAIL

REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE

ALLOW FOR SCREED MOVEMENTSTRIP OF FOAM INSULATION TO

COVED VINYL UPSTAND

WITH VINYL SHEET AS FLOOR FINISHREINFORCED SCREED ON SEPARATING LAYER

RC COLUMN BEYOND TO SE DETAIL

RC COLUMN BEYOND TO SE DETAIL

ALLOW FOR SCREED MOVEMENTSTRIP OF FOAM INSULATION TO

FINISHLAYER WITH LINOLEUM SHEET AS FLOOR REINFORCED SCREED ON SEPARATING

REQUIRED U-VALUERIGID URETHANE INSULATION TO ACHIEVE

PAINTED MDF AS SKIRTING

RC SLAB & UPSTAND TO SE DETAIL

150mm TO FORM OUTER FACADECOLD ROLLED FACADE FRAMING SYSTEM

BLIND FIXED TO DOWNSTAND

PAINTED MDF AS SILL BOARD

PLASTER BOARD LINING

RC RING BEAM TO SE DETAIL

DETAIL CURTAIN WALLING AT BOTTOM TO SE SECONDARY STEELWORK TO SUPPORT

OVERLAPPING TERRACE WATER PROOFINGEPDM TO BOTTOM OF CURTAIN WALLING

PPC ALUMINIUM FLASHING

STRUCTURAL THERMAL BREAK TO SE DETAIL

INFILL PANELSCOATED TOP RAIL AND GLASS AND POSTS, NYLON POWDER PPC STEEL FIXING BRACKETS BALUSTRADE COMPRISING

TO SE DETAILRC CONCRETE SLAB AND UPSTAND

ON TOPPAVEMENT SLABS ON PEDESTALS HOT APPLIED ROOF COATING WITH

PROTECT ROOF COATING UPSTANDPPC ALUMINIUM FLASHING TO

BRICKWORK

RECONSTITUTED STONE COPING

CAVITY TIE

STOP ENDSPREFORMED CAVITY TRAY WITH

SE DETAILPROPRIETARY BRICK SUPPORT TO

WHEEPHOLE

RAILING SYSTEM MINERAL FIBER SOFFIT CLADDING ON

REQUIRED U-VALUERIGID PHENOLIC INSULATION TO ACHIEVE

PREFORMED CAVITY TRAY WITH STOP ENDS

PROPRIETARY BRICK SUPPORT TO SE DETAIL

WHEEPHOLE

PROPRIETARY CAVITY CLOSER

BLIND FIXED TO BULKHEAD

SEALING TAPE

CAVITY TIE

HEAD RESTRAINTBULKHEAD TO COVER CURTAIN WALL

REQUIRED U-VALUESYSTEM, DOUBLE GLAZED, TO ACHIEVE PPC ALUMINIUM CURTAIN WALLING

RC COLUMN BEYOND TO SE DETAIL

RC COLUMN BEYOND TO SE DETAIL

TO PREVENT COLD BRIDGINGEPS INSULATION TO FACE OF RC SLAB

GLAZED INTO CW BOTTOM TRANSOMPPC INSULATED ALUMINIUM PANEL

INTO CW BOTTOM TRANSOM EPDM BONDED TO DPM AND GLAZED

UPSTANDCONTINUOUS STEEL ANGLE TO FORM

LAPPING DRAINAGE COURSE DPM OVER

LANDSCAPE ARCHITECT’S DETAILSURFACE FINISH AND BUILD-UP TO

ENGINEER’S DETAILSUBSTRATE BUILD UP TO CIVIL

DPM TANKINGENGINEER’S SPECOVERLAPPING IMPERMEABLE GEOTEXTILE TO CIVIL

RC SLAB TO SE DETAIL

PROTECTION CELLCORE FOR GROUND MOVEMENT

DPM

DPM TANKING TO FACE OF SLAB

CONCRETE BLINDING TO SE DETAIL

TO SE DETAILCONCRETE PILE CAP & PILE BEYOND

450

2335

75

2785

WAYWALK-

1490

2585

50

A4 H4