2019 Federal Transportation Improvement Program San Bernardino County
Local Highway
Including Amendments 1-11 and 13-19_21 (In $000`s)
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 1/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$560
LeadAgency ADELANTO Modeling NO
County SanBernadino Primary Program Code NCR91 - UPGRADED FACILITI (NO LN
ADD) Air Basin RTP ID 200201
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM ELMIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $70 - - - - - - - $70
Total Preliminary Engineering $70 - - - - - - - $70ROW SBD CO MEASURE I - $50 - - - - - - $50
Total Right of Way - $50 - - - - - - $50CON CITY FUNDS - $440 - - - - - - $440
Total Construction - $440 - - - - - - $440Total Programmed $70 $490 - - - - - - $560
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 2/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD55011 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02
ConformCategory
NON-EXEMPT
TotalProject Cost$5,500
LeadAgency
APPLEVALLEY Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55011
System Local HwyProjectLimits From APPLE VALLEY RD to Rincon Road, Begin: 0 End:
DescriptionYUCCA LOMA RD.: FROM APPLE VALLEY RD. TO RINCON RD. (westerly segment) - WIDEN EXISTING 2 LANE RD. TO 4LANE RD. (2 LANES IN EACH DIRECTION) (1 MILE)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $500 - - - - - - - $500
Total Preliminary Engineering $500 - - - - - - - $500CON SBD CO MEASURE I - - - $5,000 - - - - $5,000
Total Construction - - - $5,000 - - - - $5,000Total Programmed $500 - - $5,000 - - - - $5,500
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 3/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200202 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$584
LeadAgency CHINO Modeling YES
County SanBernadino Primary Program Code CAR63 - HWY/RD IMP-LANE ADD w/ NO
HOV LANE(S):NRS Air Basin SCAB RTP ID 200202
System LocalHwy
ProjectLimits From SIXTH STREET to MONTE VISTA, Begin: 0 End:
DescriptionIN CHINO - ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES ANDINSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $88 - - - - - $88
Total Preliminary Engineering - - $88 - - - - - $88CON DEVELOPER FEES - - - $496 - - - - $496
Total Construction - - - $496 - - - - $496Total Programmed - - $88 $496 - - - - $584
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 4/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200207 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03
ConformCategory
NON-EXEMPT
TotalProject Cost$24,940
LeadAgency CHINO Modeling YES
County SanBernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSS
TRAFFIC IMP: RS Air Basin SCAB RTP ID 200207
System LocalHwy
ProjectLimits From El PRADO to EUCLID, Begin: 0 End:
DescriptionPine Ave extension (0-4 lanes) from Route 71 to Euclid Avenue in the City of Chino, CA
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $306 - - - - - - $306PE DEMO-SAFETEA-LU $2,560 $1,226 - - - - - - $3,786PE DEVELOPER FEES $1,440 - - - - - - - $1,440
Total Preliminary Engineering $4,000 $1,532 - - - - - - $5,532CON DEMO-SAFETEA-LU - - - $3,014 - - - - $3,014CON DEVELOPER FEES - - - $16,394 - - - - $16,394
Total Construction - - - $19,408 - - - - $19,408Total Programmed $4,000 $1,532 - $19,408 - - - - $24,940
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 5/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031118 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,000
LeadAgency CHINO Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031118
System Local HwyProjectLimits From RAMONA AVENUE to CENTRAL AVENUE, Begin: 0 End:
DescriptionEDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $200 - - - - - $200
Total Preliminary Engineering - - $200 - - - - - $200CON DEVELOPER FEES - - - $1,800 - - - - $1,800
Total Construction - - - $1,800 - - - - $1,800Total Programmed - - $200 $1,800 - - - - $2,000
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 6/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031152 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$20,000
LeadAgency CHINO Modeling YES
County SanBernadino Primary Program Code CAX60 - BRIDGE RESTORATION &
REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID SBD031152
System Local HwyProjectLimits From AT SAN ANTONIO FLOOD CONTROL to AT SAN ANTOINIO FLOOD CONTROL, Begin: 0 End:
DescriptionRIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES (PA&EDOnly)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $100 $2,000 - - - - - - $2,100
Total Preliminary Engineering $100 $2,000 - - - - - - $2,100Total Programmed $100 $2,000 - - - - - - $2,100
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 7/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200401 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory TCM Total
Project Cost$4,530
LeadAgency
CHINOHILLS Modeling YES
County SanBernadino Primary Program Code CAXT5 - NEW CONNECTNS/CROSS TRAFFIC
IMP w/TCM: RS Air Basin SCAB RTP ID 200401
System Local HwyProjectLimits From ABOUT 0.40 MILES SOUTH OF STANFIELD CT (CURRENT NORTHERN ROAD CLOSURE) to PINE AVE, Begin: 0 End:
DescriptionFAIRFIELD RANCH RD: CONSTRUCT BOX CULVERT (approx. 0.40 miles south of Stanfield Ct.) TO RE-OPEN 0.76 MILES OFFAIRFIELD RANCH RD AT CURRENT CLOSURE SOUTH TO PINE AVE. CONSTRUCT RD IMPROVEMENTS AND ADDMARKED BIKE LANES IN BOTH DIRECTIONS.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $387 - - - - - - - $387PE SBD CO MEASURE I $430 - - - - - - - $430
PE TRANS AND COMM AND SYS PRESRV PILOTPROG $175 - - - - - - - $175
Total Preliminary Engineering $992 - - - - - - - $992ROW CITY FUNDS - - - - - $70 - - $70ROW SBD CO MEASURE I - - - - - $430 - - $430
Total Right of Way - - - - - $500 - - $500CON CITY FUNDS - - - - - - $426 - $426CON SBD CO MEASURE I - - - - - - $2,612 - $2,612
Total Construction - - - - - - $3,038 - $3,038Total Programmed $992 - - - - $500 $3,038 - $4,530
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 8/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200856 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-15
ConformCategory
NON-EXEMPT
TotalProject Cost$16,279
LeadAgency COLTON Modeling YES
County SanBernadino Primary Program Code CAY60 - BRIDGE RESTORATION &
REPLACEMENT- LN ADDITIONS: GM Air Basin SCAB RTP ID 200856
System LocalHwy
ProjectLimits From M ST. to I-10 ON RAMP, Begin: 0 End:
DescriptionMT. VERNON BRIDGE OVER UPRR(54C0101) -ON MT. VERNON AVE. FROM "M" ST. TO I-10 ON RAMP. WIDENINGBRIDGE FROM 2-4 LANES (CA338)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $1,151 - - - - - - - $1,151PE CITY FUNDS $149 - - - - - - - $149
Total Preliminary Engineering $1,300 - - - - - - - $1,300ROW BRIDGE - LOCAL - $133 $291 - - - - - $424ROW CITY FUNDS - $17 $38 - - - - - $55
Total Right of Way - $150 $329 - - - - - $479CON BRIDGE - LOCAL - - - - - - - $12,837 $12,837CON CITY FUNDS - - - $1,663 - - - $-19 $1,644CON LOCAL - ADVANCED CONSTRUCTION - - - $12,837 - - - $-12,837 -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - - - $19 $19
Total Construction - - - $14,500 - - - - $14,500Total Programmed $1,300 $150 $329 $14,500 - - - - $16,279
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTAL… 9/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201158 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$6,652
LeadAgency COLTON Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07226
System LocalHwy
ProjectLimits From RIALTO CHANNEL to RANCHO AVE., Begin: 0 End:
DescriptionAGUA MANSA FROM RIALTO CHANNEL TO RANCHO AVE. 2-4 LANE WIDENING
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $350 - - - - - - - $350
Total Preliminary Engineering $350 - - - - - - - $350ROW CITY FUNDS - $150 - - - - - - $150
Total Right of Way - $150 - - - - - - $150CON CITY FUNDS - - - $6,152 - - - - $6,152
Total Construction - - - $6,152 - - - - $6,152Total Programmed $350 $150 - $6,152 - - - - $6,652
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 10/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20170201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$27,535
LeadAgency COLTON Modeling NO
County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &
REPLC (NO LN ADD) Air Basin SCAB RTP ID 4A01069
System LocalHwy
ProjectLimits From to , Begin: 0 End:
DescriptionIn Colton: La Cadena Drive over Santa Ana River, 1.5 MI south of I-10; Replace existing 4 lane bridge with 4 lane bridge (54C0077)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $2,457 - - - - - - - $2,457PE CITY FUNDS $318 - - - - - - - $318
Total Preliminary Engineering $2,775 - - - - - - - $2,775ROW BRIDGE - LOCAL - $753 $273 - - - - - $1,026ROW CITY FUNDS - $97 $36 - - - - - $133
Total Right of Way - $850 $309 - - - - - $1,159CON BRIDGE - LOCAL - - - - - - - $20,894 $20,894CON CITY FUNDS - - - $2,573 - - - - $2,573CON LOCAL - ADVANCED CONSTRUCTION - - - $20,894 - - - $-20,894 -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - $134 - - - - $134
Total Construction - - - $23,601 - - - - $23,601Total Programmed $2,775 $850 $309 $23,601 - - - - $27,535
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 11/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20170805 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
NON-EXEMPT
TotalProject Cost$450
LeadAgency COLTON Modeling NO
County SanBernadino Primary Program Code CAY66 - NEW CONNECTNS/CROSS
TRAFFIC IMP: GM Air Basin SCAB RTP ID 4120116
System LocalHwy
ProjectLimits From Existing Intersection at Washington St. to Four way intersection along Washington St. at Hunts Ln., Begin: 0 End:
DescriptionREALIGN RECHE CANYON ROAD TO HUNTS LANE/WASHINGTON STREET. CONSTRUCT NEW FOUR (4) LANE ROADWITH TOTAL LENGTH OF 0.30 MILE. Toll credits to match EARREPU. (PA&ED ONLY)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $360 - - - - - - $360PE CITY FUNDS - $90 - - - - - - $90
Total Preliminary Engineering - $450 - - - - - - $450Total Programmed - $450 - - - - - - $450
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 12/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201107 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$3,375
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04087
System Local HwyProjectLimits From SOUTH HIGHLAND to I-15, Begin: 0 End:
DescriptionCHERRY AVENUE FROM SOUTH HIGHLAND TO I-15 WIDEN (2-6 LANES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $255 - - - - - $255PE SBD CO MEASURE I - - $545 - - - - - $545
Total Preliminary Engineering - - $800 - - - - - $800ROW CITY FUNDS - - - $32 - - - - $32ROW SBD CO MEASURE I - - - $68 - - - - $68
Total Right of Way - - - $100 - - - - $100CON CITY FUNDS - - - - $790 - - - $790CON SBD CO MEASURE I - - - - $1,685 - - - $1,685
Total Construction - - - - $2,475 - - - $2,475Total Programmed - - $800 $100 $2,475 - - - $3,375
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 13/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201139 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$11,464
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV
LANE): RS Air Basin SCAB RTP ID 4A04084
System Local HwyProjectLimits From LYTLE CREEK ROAD to MANGO AVENUE, Begin: 0 End:
DescriptionCASA GRANDE AVENUE FROM LYTLE CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $244 - - - - - - - $244PE SBD CO MEASURE I $516 - - - - - - - $516
Total Preliminary Engineering $760 - - - - - - - $760ROW CITY FUNDS - $1,570 - - - - - - $1,570ROW SBD CO MEASURE I - $3,335 - - - - - - $3,335
Total Right of Way - $4,905 - - - - - - $4,905CON CITY FUNDS - - $1,855 - - - - - $1,855CON SBD CO MEASURE I - - $3,944 - - - - - $3,944
Total Construction - - $5,799 - - - - - $5,799Total Programmed $760 $4,905 $5,799 - - - - - $11,464
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 14/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201140 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,866
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01093
System Local HwyProjectLimits From SUMMIT AVENUE to I-15, Begin: 0 End:
DescriptionCITRUS AVENUE FROM SUMMIT AVENUE TO I-15 WIDEN FROM 2 TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $132 - - - - - $132PE SBD CO MEASURE I - - $281 - - - - - $281
Total Preliminary Engineering - - $413 - - - - - $413ROW CITY FUNDS - - $35 - - - - - $35ROW SBD CO MEASURE I - - $74 - - - - - $74
Total Right of Way - - $109 - - - - - $109CON CITY FUNDS - - - $750 - - - - $750CON SBD CO MEASURE I - - - $1,594 - - - - $1,594
Total Construction - - - $2,344 - - - - $2,344Total Programmed - - $522 $2,344 - - - - $2,866
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 15/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201141 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,727
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID REG0701
System Local HwyProjectLimits From SLOVER AVENUE to JURUPA AVENUE, Begin: 0 End:
DescriptionCYPRESS AVENUE FROM SLOVER TO JURUPA AVENUE WIDEN FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $71 - - - - - $71PE SBD CO MEASURE I - - $148 - - - - - $148
Total Preliminary Engineering - - $219 - - - - - $219ROW CITY FUNDS - - - $175 - - - - $175ROW SBD CO MEASURE I - - - $371 - - - - $371
Total Right of Way - - - $546 - - - - $546CON CITY FUNDS - - - - - $627 - - $627CON SBD CO MEASURE I - - - - - $1,335 - - $1,335
Total Construction - - - - - $1,962 - - $1,962Total Programmed - - $219 $546 - $1,962 - - $2,727
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 16/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201142 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$3,200
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV
LANE): RS Air Basin SCAB RTP ID 4A1005
System Local HwyProjectLimits From DUNCAN CANYON to FRONTAGE ROAD (I-15), Begin: 0 End:
DescriptionCYPRESS AVENUE FROM DUNCAN CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $128 - - - - - $128PE SBD CO MEASURE I - - $272 - - - - - $272
Total Preliminary Engineering - - $400 - - - - - $400ROW CITY FUNDS - - - $160 - - - - $160ROW SBD CO MEASURE I - - - $340 - - - - $340
Total Right of Way - - - $500 - - - - $500CON CITY FUNDS - - - $736 - - - - $736CON SBD CO MEASURE I - - - $1,564 - - - - $1,564
Total Construction - - - $2,300 - - - - $2,300Total Programmed - - $400 $2,800 - - - - $3,200
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 17/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201143 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,251
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV
LANE): RS Air Basin SCAB RTP ID 4A01099
System Local HwyProjectLimits From CITRUS AVE to SIERRA AVE., Begin: 0 End:
DescriptionDUNCAN CANYON ROAD FROM CITRUS AVENUE TO SIERRA AVENUE CONSTRUCT 4 LANES.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $138 - - - - - - $138PE SBD CO MEASURE I - $292 - - - - - - $292
Total Preliminary Engineering - $430 - - - - - - $430ROW CITY FUNDS - $96 - - - - - - $96ROW SBD CO MEASURE I - $204 - - - - - - $204
Total Right of Way - $300 - - - - - - $300CON CITY FUNDS - - $1,447 - - - - - $1,447CON SBD CO MEASURE I - - $3,074 - - - - - $3,074
Total Construction - - $4,521 - - - - - $4,521Total Programmed - $730 $4,521 - - - - - $5,251
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 18/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201144 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$958
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04108
System Local HwyProjectLimits From TAMARIND AVENUE to ALDER AVENUE, Begin: 0 End:
DescriptionJURUPA AVENUE FROM TAMARIND AVENUE TO ALDER AVENUE WIDEN FROM 2 TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $64 - - - - - - $64PE SBD CO MEASURE I - $136 - - - - - - $136
Total Preliminary Engineering - $200 - - - - - - $200ROW CITY FUNDS - $80 - - - - - - $80ROW SBD CO MEASURE I - $170 - - - - - - $170
Total Right of Way - $250 - - - - - - $250CON CITY FUNDS - - $172 - - - - - $172CON SBD CO MEASURE I - - $336 - - - - - $336
Total Construction - - $508 - - - - - $508Total Programmed - $450 $508 - - - - - $958
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 19/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201146 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$4,290
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A04127
System Local HwyProjectLimits From BEECH AVENUE to CITRUS AVENUE, Begin: 0 End:
DescriptionSIERRA LAKES PARKWAY FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $128 - - - - - - $128PE SBD CO MEASURE I - $272 - - - - - - $272
Total Preliminary Engineering - $400 - - - - - - $400ROW CITY FUNDS - - $320 - - - - - $320ROW SBD CO MEASURE I - - $680 - - - - - $680
Total Right of Way - - $1,000 - - - - - $1,000CON CITY FUNDS - - - $925 - - - - $925CON SBD CO MEASURE I - - - $1,965 - - - - $1,965
Total Construction - - - $2,890 - - - - $2,890Total Programmed - $400 $1,000 $2,890 - - - - $4,290
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 20/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201147 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$6,551
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01132
System Local HwyProjectLimits From ETIWANDA AVENUE to 800 FT. EAST OF ETIWANDA AVENUE, Begin: 0 End:
DescriptionSLOVER AVENUE FROM ETIWANDA AVENUE TO 800 FEET EAST OF ETIWANDA AVENUE WIDEN FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $100 - - - - - - - $100PE SBD CO MEASURE I $213 - - - - - - - $213
Total Preliminary Engineering $313 - - - - - - - $313ROW CITY FUNDS $101 - - - - - - - $101ROW SBD CO MEASURE I $213 - - - - - - - $213
Total Right of Way $314 - - - - - - - $314CON CITY FUNDS - $1,897 - - - - - - $1,897CON SBD CO MEASURE I - $4,027 - - - - - - $4,027
Total Construction - $5,924 - - - - - - $5,924Total Programmed $627 $5,924 - - - - - - $6,551
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 21/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201148 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,250
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07056
System Local HwyProjectLimits From CHERRY AVENUE to CITRUS AVENUE, Begin: 0 End:
DescriptionSOUTH HIGHLAND AVENUE FROM CHERRY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $179 - - - - - - $179PE SBD CO MEASURE I - $381 - - - - - - $381
Total Preliminary Engineering - $560 - - - - - - $560ROW CITY FUNDS - - $160 - - - - - $160ROW SBD CO MEASURE I - - $340 - - - - - $340
Total Right of Way - - $500 - - - - - $500CON CITY FUNDS - - $1,341 - - - - - $1,341CON SBD CO MEASURE I - - $2,849 - - - - - $2,849
Total Construction - - $4,190 - - - - - $4,190Total Programmed - $560 $4,690 - - - - - $5,250
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 22/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201149 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,418
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07273
System Local HwyProjectLimits From CHERRY AVENUE to BEECH AVENUE, Begin: 0 End:
DescriptionVALLEY BOULEVARD FROM CHERRY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $117 - - - - - - $117PE SBD CO MEASURE I - $246 - - - - - - $246
Total Preliminary Engineering - $363 - - - - - - $363ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $247 - - - - - $247
Total Right of Way - - $363 - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151
Total Construction - - - $1,692 - - - - $1,692Total Programmed - $363 $363 $1,692 - - - - $2,418
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 23/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201162 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,418
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07274
System Local HwyProjectLimits From BEECH AVENUE to CITRUS AVENUE, Begin: 0 End:
DescriptionVALLEY BOULEVARD FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 4-6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $39 $78 - - - - - - $117PE SBD CO MEASURE I $82 $164 - - - - - - $246
Total Preliminary Engineering $121 $242 - - - - - - $363ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $247 - - - - - $247
Total Right of Way - - $363 - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151
Total Construction - - - $1,692 - - - - $1,692Total Programmed $121 $242 $363 $1,692 - - - - $2,418
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 24/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201163 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,418
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A1007
System Local HwyProjectLimits From CITRUS AVENUE to SIERRA AVENUE, Begin: 0 End:
DescriptionVALLEY BOULEVARD FROM CITRUS AVENUE TO SIERRA AVENUE WIDEN FROM 4-6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $117 - - - - - - - $117PE SBD CO MEASURE I $246 - - - - - - - $246
Total Preliminary Engineering $363 - - - - - - - $363ROW CITY FUNDS - $116 - - - - - - $116ROW SBD CO MEASURE I - $247 - - - - - - $247
Total Right of Way - $363 - - - - - - $363CON CITY FUNDS - - - $541 - - - - $541CON SBD CO MEASURE I - - - $1,151 - - - - $1,151
Total Construction - - - $1,692 - - - - $1,692Total Programmed $363 $363 - $1,692 - - - - $2,418
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 25/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201164 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,416
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07140
System Local HwyProjectLimits From SIERRA AVENUE to ALDER AVENUE, Begin: 0 End:
DescriptionVALLEY BOULEVARD FROM SIERRA AVENUE TO ALDER AVENUE WIDEN FROM 4-6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $116 - - - - - - $116PE SBD CO MEASURE I - $246 - - - - - - $246
Total Preliminary Engineering - $362 - - - - - - $362ROW CITY FUNDS - - $116 - - - - - $116ROW SBD CO MEASURE I - - $246 - - - - - $246
Total Right of Way - - $362 - - - - - $362CON CITY FUNDS - - $541 - - - - - $541CON SBD CO MEASURE I - - $1,151 - - - - - $1,151
Total Construction - - $1,692 - - - - - $1,692Total Programmed - $362 $2,054 - - - - - $2,416
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 26/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201166 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,312
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A1006
System Local HwyProjectLimits From I-15 to CITRUS AVENUE, Begin: 0 End:
DescriptionDUNCAN CANYON ROAD FROM I-15 TO CITRUS AVENUE-WIDEN FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $394 - - - - - - - $394
Total Preliminary Engineering $394 - - - - - - - $394CON CITY FUNDS - $294 - - - - - - $294CON SBD CO MEASURE I - $624 - - - - - - $624
Total Construction - $918 - - - - - - $918Total Programmed $394 $918 - - - - - - $1,312
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 27/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20131506 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
TCMCommitted
TotalProject Cost$3,966
LeadAgency FONTANA Modeling NO
County SanBernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAIN
FACILITIES-NEW Air Basin SCAB RTP ID 0A6410
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN FONTANA: SAN SEVAINE TRAIL (PHASE 1, SEG 2) North/South 1.25 mile long, 12 ft wide paved multi-use trail from BanyanSt. to the Pacific Electric Trail in Fontana
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $20 - - - - - - - $20PE PARTNERSHIP PLANNING GRANT $150 - - - - - - - $150PE RECREATIONAL TRAILS $567 - - - - - - - $567
Total Preliminary Engineering $737 - - - - - - - $737CON AGENCY - $500 - - - - - - $500CON CITY FUNDS - $828 - - - - - - $828CON RECREATIONAL TRAILS - $1,901 - - - - - - $1,901
Total Construction - $3,229 - - - - - - $3,229Total Programmed $737 $3,229 - - - - - - $3,966
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 28/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20170804 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-08
ConformCategory
EXEMPT -93.126
TotalProject Cost$1,198
LeadAgency FONTANA Modeling NO
County SanBernadino Primary Program Code ITS08 - FIBER OPTIC
COMMUNICATIONS Air Basin SCAB RTP ID 4120193
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionCITY OF FONTANA TO INSTALL FIBER OPTIC CABLE TO BRING BACK VIDEO AND COMMUNICATIONS TO THETRANSPORTATION MANAGEMENT CENTER. TOLL CREDIT TO MATCH EARREPU.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $120 - - - - - - - $120
Total Preliminary Engineering $120 - - - - - - - $120CON 2016 EARMARK REPURPOSING - $1,078 - - - - - - $1,078
Total Construction - $1,078 - - - - - - $1,078Total Programmed $120 $1,078 - - - - - - $1,198
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 29/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190006 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,858
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319
System Local HwyProjectLimits From Oleander Ave to Cypress Ave, Begin: 0 End:
DescriptionFoothill Boulevard: Oleander Ave to Cypress Ave; Widen 4-6 lanes
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $150 - - - - - - - $150
Total Preliminary Engineering $150 - - - - - - - $150ROW CITY FUNDS $655 - - - - - - - $655
Total Right of Way $655 - - - - - - - $655CON CITY FUNDS - $2,053 - - - - - - $2,053
Total Construction - $2,053 - - - - - - $2,053Total Programmed $805 $2,053 - - - - - - $2,858
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 30/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190007 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,620
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319
System Local HwyProjectLimits From Sierra Ave to Mango Ave, Begin: 0 End:
DescriptionFoothill Boulevard: Sierra Ave to Mango Ave; Widen 4-6 lanes
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $120 - - - - - - - $120
Total Preliminary Engineering $120 - - - - - - - $120CON CITY FUNDS - $1,500 - - - - - - $1,500
Total Construction - $1,500 - - - - - - $1,500Total Programmed $120 $1,500 - - - - - - $1,620
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 31/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
NON-EXEMPT
TotalProject Cost$1,501
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAN76 - ADDING A LANE THROUGH A
BOTTLENECK: NRS Air Basin SCAB RTP ID 4A04102
System Local HwyProjectLimits From Hemlock Ave to Almeria Ave, Begin: 0 End:
DescriptionIn Fontana: Widen Foothill Blvd (4-6 lanes) from Hemlock Ave to Almeria Ave; includes class II bike lanes, raised median, andreplacement of historic Malaga Bridge to accommodate street widening. Existing Malaga bridge to be relocated. (PA&ED Only)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE LOCAL TRANS FUNDS - $1,500 - - - - - - $1,500PE STP LOCAL - $1 - - - - - - $1
Total Preliminary Engineering - $1,501 - - - - - - $1,501Total Programmed - $1,501 - - - - - - $1,501
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 32/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031217 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,055
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031217
System Local HwyProjectLimits From FOOTHILL to MILLER, Begin: 0 End:
DescriptionBEECH AVENUE FOOTHILL TO MILLER AVE WIDEN FROM 2 LANES TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $150 - - - - - - - $150PE SBD CO MEASURE I $317 - - - - - - - $317
Total Preliminary Engineering $467 - - - - - - - $467ROW CITY FUNDS $349 - - - - - - - $349ROW SBD CO MEASURE I $741 - - - - - - - $741
Total Right of Way $1,090 - - - - - - - $1,090CON CITY FUNDS - $1,120 - - - - - - $1,120CON SBD CO MEASURE I - $2,378 - - - - - - $2,378
Total Construction - $3,498 - - - - - - $3,498Total Programmed $1,557 $3,498 - - - - - - $5,055
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 33/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031218 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,624
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031218
System Local HwyProjectLimits From BASELINE to FOOTHILL, Begin: 0 End:
DescriptionALDER AVENUE BASELINE TO FOOTHILL BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE - $210 - - - - - - $210PE SBD CO MEASURE I - $446 - - - - - - $446
Total Preliminary Engineering - $656 - - - - - - $656ROW FEE - $210 - - - - - - $210ROW SBD CO MEASURE I - $446 - - - - - - $446
Total Right of Way - $656 - - - - - - $656CON FEE - $420 - - - - - - $420CON SBD CO MEASURE I - $892 - - - - - - $892
Total Construction - $1,312 - - - - - - $1,312Total Programmed - $2,624 - - - - - - $2,624
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 34/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031228 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,635
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031228
System Local HwyProjectLimits From RIVERSIDE COUNTY LINE to I-10, Begin: 0 End:
DescriptionETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $58 - - - - - - $58PE SBD CO MEASURE I - $122 - - - - - - $122
Total Preliminary Engineering - $180 - - - - - - $180ROW CITY FUNDS - $160 - - - - - - $160ROW SBD CO MEASURE I - $340 - - - - - - $340
Total Right of Way - $500 - - - - - - $500CON CITY FUNDS - - $626 - - - - - $626CON SBD CO MEASURE I - - $1,329 - - - - - $1,329
Total Construction - - $1,955 - - - - - $1,955Total Programmed - $680 $1,955 - - - - - $2,635
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 35/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031233 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,830
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031233
System Local HwyProjectLimits From ALDER AVE to MAPLE AVE, Begin: 0 End:
DescriptionARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $466 - - - - - - - $466PE SBD CO MEASURE I $991 - - - - - - - $991
Total Preliminary Engineering $1,457 - - - - - - - $1,457ROW CITY FUNDS - $467 - - - - - - $467ROW SBD CO MEASURE I - $991 - - - - - - $991
Total Right of Way - $1,458 - - - - - - $1,458CON CITY FUNDS - $933 - - - - - - $933CON SBD CO MEASURE I - $1,982 - - - - - - $1,982
Total Construction - $2,915 - - - - - - $2,915Total Programmed $1,457 $4,373 - - - - - - $5,830
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 36/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031235 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,265
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031235
System Local HwyProjectLimits From ALMERIA to CITRUS AVE, Begin: 0 End:
DescriptionARROW HIGHWAY ALMERIA TO CITRUS AVENUE WIDEN 2 LANES TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE - - - - $101 - - - $101PE SBD CO MEASURE I - - - - $215 - - - $215
Total Preliminary Engineering - - - - $316 - - - $316ROW FEE - - - - $102 - - - $102ROW SBD CO MEASURE I - - - - $215 - - - $215
Total Right of Way - - - - $317 - - - $317CON FEE - - - - $202 - - - $202CON SBD CO MEASURE I - - - - $430 - - - $430
Total Construction - - - - $632 - - - $632Total Programmed - - - - $1,265 - - - $1,265
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 37/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031254 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,065
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031254
System Local HwyProjectLimits From ALDER AVENUE to MAPLE AVENUE, Begin: 0 End:
DescriptionMERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $38 - - - - - - - $38PE SBD CO MEASURE I $82 - - - - - - - $82
Total Preliminary Engineering $120 - - - - - - - $120ROW CITY FUNDS - - - $96 - - - - $96ROW SBD CO MEASURE I - - - $204 - - - - $204
Total Right of Way - - - $300 - - - - $300CON CITY FUNDS - - - - $526 - - - $526CON SBD CO MEASURE I - - - - $1,119 - - - $1,119
Total Construction - - - - $1,645 - - - $1,645Total Programmed $120 - - $300 $1,645 - - - $2,065
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 38/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD031266 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$8,129
LeadAgency FONTANA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD031266
System Local HwyProjectLimits From FOOTHILL BOULEVARD to BASELINE AVENUE, Begin: 0 End:
DescriptionSIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $10 $48 - - - - - - $58PE SBD CO MEASURE I $20 $102 - - - - - - $122
Total Preliminary Engineering $30 $150 - - - - - - $180ROW CITY FUNDS - $1,760 - - - - - - $1,760ROW SBD CO MEASURE I - $3,740 - - - - - - $3,740
Total Right of Way - $5,500 - - - - - - $5,500CON CITY FUNDS - - $784 - - - - - $784CON SBD CO MEASURE I - - $1,665 - - - - - $1,665
Total Construction - - $2,449 - - - - - $2,449Total Programmed $30 $5,650 $2,449 - - - - - $8,129
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 39/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201105 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,800
LeadAgency
GRANDTERRACE Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07268
System Local HwyProjectLimits From COMMERCE WAY to MAIN ST., Begin: 0 End:
DescriptionMICHIGAN AVENUE WIDENING (2-4 LANES) FROM COMMERCE WAY TO MAIN STREET
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $300 - - - - - $300
Total Preliminary Engineering - - $300 - - - - - $300CON CITY FUNDS - - - $1,500 - - - - $1,500
Total Construction - - - $1,500 - - - - $1,500Total Programmed - - $300 $1,500 - - - - $1,800
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 40/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201106 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$3,500
LeadAgency
GRANDTERRACE Modeling YES
County SanBernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOV
LANE): RS Air Basin SCAB RTP ID 4A01008
System Local HwyProjectLimits From MICHIGAN AVENUE to BARTON ROADVIVIENDA, Begin: 0 End:
DescriptionCOMMERCE WAY FROM MICHIGAN AVENUE TO BARTON ROAD AT VIVIENDA AVENUE. NEW ROAD - 4 LANE ROADEXTENSION
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - $1,400 - - - - - - $1,400CON SBD CO MEASURE I - $2,100 - - - - - - $2,100
Total Construction - $3,500 - - - - - - $3,500Total Programmed - $3,500 - - - - - - $3,500
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 41/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20084104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$743
LeadAgency HESPERIA Modeling YES
County SanBernadino Primary Program Code TDR64 - PARK & RIDE LOT
MODIFICATIONS/UPGRADE Air Basin RTP ID 20084104
System Local HwyProjectLimits From W OF US 395 to I-15, Begin: 0 End:
DescriptionJOSHUA STREET PARK & RIDE EXPANSION - ON JOSHUA STREET WEST OF US 395,C ITY OF HESPERIA, EXISTING PNRHAS 188 SPACES AND NEEDS TO ADD 200 SPACES, TO INCLUDE LANDSCAPING, LIGHTING AND VARIOUS NON-CAPACITY STREET IMPROVEMENTS TO FACILITATE ADDITIONAL SPACES (M003). Toll credits to match CMAQ.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $25 - - - - - - - $25
Total Preliminary Engineering $25 - - - - - - - $25CON CITY FUNDS - $26 - - - - - - $26CON CMAQ - $508 - - - - - - $508CON STATE AB2766 - $184 - - - - - - $184
Total Construction - $718 - - - - - - $718Total Programmed $25 $718 - - - - - - $743
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 42/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150008 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02
ConformCategory
NON-EXEMPT
TotalProject Cost$30,136
LeadAgency HESPERIA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55025
System Local HwyProjectLimits From I-15 to MAPLE, Begin: 0 End:
DescriptionIN HESPERIA: MAIN ST FROM I-15 TO MAPLE (PHASE 1) / MAPLE TO 11TH (PHASE 2) / I-15 TO SR 395 (PHASE 3); WIDENAND RECONSTRUCT FROM 4-6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $72 - - - - - - - $72PE DEVELOPER FEES $7 - - - - - - - $7PE LOCAL TRANS FUNDS $456 $270 - - - - - - $726PE SBD CO MEASURE I - $1,200 - - - - - - $1,200
Total Preliminary Engineering $535 $1,470 - - - - - - $2,005ROW DEVELOPER FEES - - - - $2,647 - - - $2,647ROW SBD CO MEASURE I - - - - $1,846 - - - $1,846
Total Right of Way - - - - $4,493 - - - $4,493CON DEVELOPER FEES - - - - - $13,923 - - $13,923CON SBD CO MEASURE I - - - - - $9,715 - - $9,715
Total Construction - - - - - $23,638 - - $23,638Total Programmed $535 $1,470 - - $4,493 $23,638 - - $30,136
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 43/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD55030 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
NON-EXEMPT
TotalProject Cost$27,622
LeadAgency HESPERIA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin RTP ID SBD55030
System Local HwyProjectLimits From TOPAZ AVE to 7TH STREET, Begin: 0 End:
DescriptionRANCHERO RD. FROM TOPAZ AVE TO 7TH ST. - WIDEN FROM 2 TO 5 LANES (6 MILES)(includes bridge over CaliforniaAqueduct)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $2,064 - - - - - - - $2,064
Total Preliminary Engineering $2,064 - - - - - - - $2,064ROW DEVELOPER FEES $1,606 - - - - - - - $1,606ROW SBD CO MEASURE I $1,120 - - - - - - - $1,120
Total Right of Way $2,726 - - - - - - - $2,726CON AGENCY - - $6,339 - - - - - $6,339CON DEVELOPER FEES - - $9,548 - - - - - $9,548CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - $3,900 - - - - - - $3,900CON SBD CO MEASURE I - - $3,045 - - - - - $3,045
Total Construction - $3,900 $18,932 - - - - - $22,832Total Programmed $4,790 $3,900 $18,932 - - - - - $27,622
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 44/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200019 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$38,776
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &
REPLC (NO LN ADD) Air Basin SCAB RTP ID 200019
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionBRIDGE NO. 54C0035 (previously shown as 00L0028), BASE LINE, OVER CITY CREEK. REPLACE 4 LANE BRIDGE WITH 4LANE BRIDGE.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $531 $2,517 - - - - - - $3,048PE DEVELOPER FEES $69 $326 - - - - - - $395
Total Preliminary Engineering $600 $2,843 - - - - - - $3,443ROW BRIDGE - LOCAL - - $536 - - $3,098 - - $3,634ROW DEVELOPER FEES - - $471 - - - - - $471ROW LOCAL - ADVANCED CONSTRUCTION - - $3,098 - - $-3,098 - - -
Total Right of Way - - $4,105 - - - - - $4,105CON BRIDGE - LOCAL - - - - - - - $55,292 $55,292CON DEVELOPER FEES - - - $3,582 - - - - $3,582CON LOCAL - ADVANCED CONSTRUCTION - - - $27,646 - - - $-55,292 $-27,646
Total Construction - - - $31,228 - - - - $31,228Total Programmed $600 $2,843 $4,105 $31,228 - - - - $38,776
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 45/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20082402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$20,958
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAY76 - ADDING A LANE THROUGH A
BOTTLENECK: GM Air Basin SCAB RTP ID 4A07308
System Local HwyProjectLimits From CHURCH to BUCKEYE ST., Begin: 0 End:
DescriptionWIDEN BASE LINE BETWEEN CHURCH AVE AND BUCKEYE ST FROM 4-6 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $438 $632 - - - - - $1,070PE SBD CO MEASURE I - $728 $876 - - - - - $1,604
Total Preliminary Engineering - $1,166 $1,508 - - - - - $2,674ROW CITY FUNDS - - - $1,257 - - - - $1,257ROW SBD CO MEASURE I - - - $1,743 - - - - $1,743
Total Right of Way - - - $3,000 - - - - $3,000CON CITY FUNDS - - - - $525 - - - $525CON SBD CO MEASURE I - - - - $14,759 - - - $14,759
Total Construction - - - - $15,284 - - - $15,284Total Programmed - $1,166 $1,508 $3,000 $15,284 - - - $20,958
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 46/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 2011104 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$8,325
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR31 - ROAD REPLC & REHAB (NO
LN ADD) Air Basin SCAB RTP ID 4OM0701
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIn Highland: Victoria Ave from 3rd St to 6th St including reconstruction of the 5th St/Victoria ave intersection, additional turn lanes,shoulder improvements, traffic signal mod, no add'l thru lanes; Storm drain improvements from 3rd St to 9th St w/connection to theexisting drainage channel on the south side of 3rd St.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $775 - - - - - - - $775
Total Preliminary Engineering $775 - - - - - - - $775CON CITY FUNDS - - $7,550 - - - - - $7,550
Total Construction - - $7,550 - - - - - $7,550Total Programmed $775 - $7,550 - - - - - $8,325
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 47/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201153 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,070
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4120141
System Local HwyProjectLimits
From ABOUT 0.36 MILES SOUTH OF 5TH STREET ALONG SR 210 to ABOUT 0.38 MILES SOUTH OF 5TH STREET ALONGSR 210, Begin: 0 End:
DescriptionWIDEN 5TH ST FROM CITY CRK TO SR210; RESTRIPE 5TH ST FROM 4-6LNS BTW CHURCH AVE & SR210; WIDEN ANDRESTRIPE 210 UNDERCROSSING 4-5LNS BTW RAMPS AND ADDITIONAL TURN LN.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE PRIVATE FUNDS $507 - - - - - - - $507
Total Preliminary Engineering $507 - - - - - - - $507CON PRIVATE FUNDS - $4,563 - - - - - - $4,563
Total Construction - $4,563 - - - - - - $4,563Total Programmed $507 $4,563 - - - - - - $5,070
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 48/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201156 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$22,530
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 20061014
System Local HwyProjectLimits From SANTA PAULA to 2,600' S/O SANTA ANA RIVER, Begin: 0 End:
DescriptionGREENSPOT RD. FROM SANTA PAULA ST. TO SOUTH CITY LIMIT - WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $787 - - - - - - $787PE SBD CO MEASURE I - $925 - - - - - - $925
Total Preliminary Engineering - $1,712 - - - - - - $1,712ROW DEVELOPER FEES - $520 - - - - - - $520ROW SBD CO MEASURE I - $600 - - - - - - $600
Total Right of Way - $1,120 - - - - - - $1,120CON DEVELOPER FEES - - - - $9,056 - - - $9,056CON SBD CO MEASURE I - - - - $10,642 - - - $10,642
Total Construction - - - - $19,698 - - - $19,698Total Programmed - $2,832 - - $19,698 - - - $22,530
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 49/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201180 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$673
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200852
System Local HwyProjectLimits From 5TH STREET to 6TH STREET, Begin: 0 End:
DescriptionDEL ROSA DRIVE FROM 5TH STREET TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.2 MILES)FORMERLY PART OFPROJECT ID 200852
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $63 - - - - - - $63
Total Preliminary Engineering - $63 - - - - - - $63ROW CITY FUNDS - - $42 - - - - - $42
Total Right of Way - - $42 - - - - - $42CON CITY FUNDS - - - $568 - - - - $568
Total Construction - - - $568 - - - - $568Total Programmed - $63 $42 $568 - - - - $673
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 50/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201182 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$798
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07142
System Local HwyProjectLimits From 3RD STREET to 5TH STREET, Begin: 0 End:
DescriptionTIPPECANOE AVENUE FROM 3RD STREET TO 5TH STREET - WIDEN FROM 2-4 LANES (0.3 MILES)FORMERLY PART OFPROJECT ID 200852
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $61 - - - - - - $61
Total Preliminary Engineering - $61 - - - - - - $61ROW CITY FUNDS - - $30 - - - - - $30
Total Right of Way - - $30 - - - - - $30CON CITY FUNDS - - - $707 - - - - $707
Total Construction - - - $707 - - - - $707Total Programmed - $61 $30 $707 - - - - $798
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 51/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201183 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,255
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A01368
System Local HwyProjectLimits From TIPPECANOE AVENUE to VICTORIA AVENUE, Begin: 0 End:
Description5TH ST FROM TIPPECANOE AVENUE TO DEL ROSA DR.-WIDEN FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $441 - - - - - - $441
Total Preliminary Engineering - $441 - - - - - - $441ROW CITY FUNDS - - $732 - - - - - $732
Total Right of Way - - $732 - - - - - $732CON CITY FUNDS - - - $4,082 - - - - $4,082
Total Construction - - - $4,082 - - - - $4,082Total Programmed - $441 $732 $4,082 - - - - $5,255
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 52/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201191 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$683
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4OM0701
System Local HwyProjectLimits From SEINE AVENUE to STONEY CREEK DRIVE, Begin: 0 End:
DescriptionBASE LINE FROM SEINE AVENUE TO STONEY CREEK DRIVE - WIDEN FROM 4-6 LANES (0.2 MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $143 - - - - - - $143
Total Preliminary Engineering - $143 - - - - - - $143ROW CITY FUNDS - - - $47 - - - - $47
Total Right of Way - - - $47 - - - - $47CON CITY FUNDS - - - - $493 - - - $493
Total Construction - - - - $493 - - - $493Total Programmed - $143 - $47 $493 - - - $683
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 53/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20130306 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
EXEMPT -93.126
TotalProject Cost$42
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code RECREATION TRAIL PROJECTS Air Basin SCAB RTP ID REG0704
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionCITY CREEK LEVEE TRAILS - CONSTRUCT NON-MOTORIZED TRAILS ALONG THE EASTERLY AND WESTERLY CITYCREEK FLOOD CONTROL LEVEES BETWEEN HIGHLAND AVE AND BASE LINE
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE RECREATIONAL TRAILS $11 - - - - - - - $11
Total Preliminary Engineering $11 - - - - - - - $11CON CITY FUNDS - $5 - - - - - - $5CON RECREATIONAL TRAILS - $26 - - - - - - $26
Total Construction - $31 - - - - - - $31Total Programmed $11 $31 - - - - - - $42
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 54/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20130401 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-16
ConformCategory
EXEMPT -93.126
TotalProject Cost$10,530
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &
REPLC (NO LN ADD) Air Basin SCAB RTP ID 20130401
System Local HwyProjectLimits From N/O Pioneer Ave-Bridge to N/O Pioneer Ave-Bridge, Begin: 0 End:
DescriptionBRIDGE NO. 54C0592, ORANGE ST OVER PLUNGE CREEK OVERFLOW, 1.5 MI N OF PIONEER AVE. Replace existing twolane bridge structure with four lane bridge structure. (Non-Capacity: bridge will remain striped for two lanes)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $469 - - - $655 - - - $1,124PE DEVELOPER FEES $61 - - - $85 - - - $146
Total Preliminary Engineering $530 - - - $740 - - - $1,270ROW BRIDGE - LOCAL - - - - - $1,006 - - $1,006ROW DEVELOPER FEES - - - - - $130 - - $130
Total Right of Way - - - - - $1,136 - - $1,136CON BRIDGE - LOCAL - - - - - - - $14,384 $14,384CON DEVELOPER FEES - - - - - - - $1,864 $1,864
Total Construction - - - - - - - $16,248 $16,248Total Programmed $530 - - - $740 $1,136 - $16,248 $18,654
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 55/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20131501 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-19
ConformCategory
EXEMPT -93.126
TotalProject Cost$4,064
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCN46 - PLANTING/LANDSCAPING Air Basin SCAB RTP ID 200018
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN HIGHLAND: ON BOULDER AVE FROM SAN MANUEL VILLAGE ENTRANCE TO GREENSPOT ROAD; STREET ANDLANDSCAPING IMPROVEMENTS (non-capacity enhancements)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $41 - - - - - - - $41PE CITY FUNDS $200 - - - - - - - $200
PE PROJECTS OF NATIONAL AND REGIONALSIGNIFICANCE $164 - - - - - - - $164
Total Preliminary Engineering $405 - - - - - - - $405CON AGENCY - - $223 - - - - - $223CON CITY FUNDS - - $1,600 - - - - - $1,600
CON PROJECTS OF NATIONAL AND REGIONALSIGNIFICANCE - - $1,045 - - - - - $1,045
CON STP LOCAL - - $791 - - - - - $791Total Construction - - $3,659 - - - - - $3,659Total Programmed $405 - $3,659 - - - - - $4,064
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 56/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20131502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$2,000
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 4A01387
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN HIGHLAND: ALONG NORTH SIDE OF 5TH STREET FROM VICTORIA AVE TO PALM AVE; SHOULDERIMPROVEMENTS (no additional lanes)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $250 - - - - - - - $250
Total Preliminary Engineering $250 - - - - - - - $250ROW CITY FUNDS - $500 - - - - - - $500
Total Right of Way - $500 - - - - - - $500CON CITY FUNDS - - $1,250 - - - - - $1,250
Total Construction - - $1,250 - - - - - $1,250Total Programmed $250 $500 $1,250 - - - - - $2,000
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 57/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20131503 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$2,733
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 0A6410
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN HIGHLAND: PALM AVE HISTORIC DISTRICT IMPROVEMENTS; PALM AVE (BASE LINE TO HIGHLAND AVE) &PACIFIC ST (CHURCH AVE TO 350FT WEST OF PALM) SHOULDER IMPROVEMENTS (curb, gutter and sidewalkimprovements), NEW ROUNDABOUT AT PALM/PACIFIC INT., BIKE LANES (Intersection improvements - no new lanes)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $600 - - - - - - $600
Total Preliminary Engineering - $600 - - - - - - $600ROW CITY FUNDS - - - $100 - - - - $100
Total Right of Way - - - $100 - - - - $100CON CITY FUNDS - - - - - $2,033 - - $2,033
Total Construction - - - - - $2,033 - - $2,033Total Programmed - $600 - $100 - $2,033 - - $2,733
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 58/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150401 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$680
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID REG0703
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionHIGHLAND: DEL ROSA DR SHOULDER IMPROVEMENTS; FROM 3RD ST TO 5TH ST (curb, gutter & sidewalk improvements)(non-capacity)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - - - $680 - - - - $680
Total Construction - - - $680 - - - - $680Total Programmed - - - $680 - - - - $680
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 59/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20171101 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$1,316
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCN26 - BICYCLE FACILITY-NEW Air Basin SCAB RTP ID 4A07275
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionPACIFIC ST. RECONFIGURATION FROM 2 LANES TO 2 LANES WITH CONTINUOUS CENTER 2-WAY LEFT-TURN LANEAND BIKE LANES (VICTORIA AVE TO APPROXIMATELY 350' WEST OF PALM AVENUE). 1 CENTERLINE MILE OF BIKELANE.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $130 - - - - - - - $130
Total Preliminary Engineering $130 - - - - - - - $130CON CITY FUNDS - - - - $1,186 - - - $1,186
Total Construction - - - - $1,186 - - - $1,186Total Programmed $130 - - - $1,186 - - - $1,316
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 60/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190001 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02
ConformCategory
NON-EXEMPT
TotalProject Cost$9,661
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX75 - OVERCROSS OR
UNDERCROSS IMP(LN ADD'S) : RS Air Basin SCAB RTP ID 4M01003
System Local HwyProjectLimits From East edge of City Creek Bridge to EB SR210 ramps, Begin: 0 End:
Description
SR-210/5th St IC Improvements: Widen & restripe 5th St (4-6 lanes) from east edge of City Creek Brdg to the EB SR-210 ramps w/add?lturn pockets plus 2 truck access lanes; Widen & restripe 5th St (6-8 lanes) under SR-210 b/w EB & WB ramps, incl. add?l thru & turnlanes; Widen the EB & WB on-ramps 2-3 lanes, widen the EB & WB off-ramps 1-2 lanes, all ramps remain 1 ln at the mainline.(Combines prior projs 2011153 & 2011154)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $818 - - - - - - $818
Total Preliminary Engineering - $818 - - - - - - $818ROW CITY FUNDS - - - $1,000 - - - - $1,000
Total Right of Way - - - $1,000 - - - - $1,000CON CITY FUNDS - - - - $7,843 - - - $7,843
Total Construction - - - - $7,843 - - - $7,843Total Programmed - $818 - $1,000 $7,843 - - - $9,661
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 61/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190003 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02
ConformCategory
NON-EXEMPT
TotalProject Cost$7,058
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 2016A319
System Local HwyProjectLimits From Palm Ave to 5th Street, Begin: 0 End:
Description
In Highland: 3rd & 5th St Corridor Improvements: Widen 0.4 miles of 3rd St b/w Palm Ave & 5th St 2-4 lns; Extend 3rd St NE toconnect to/at 5th St/Church Ave Intersection; Restripe 0.1 mile of 5th St b/w Church Ave & East edge of City Creek Brdg 4-6 lns;Shoulder improvements along 5th St, Central Ave & Palm Ave; Add?l turn lanes at 3rd/Palm & 5th/Palm Intersections. (Comb 2017FTIP ID 2011105)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $483 - - - - - - $483PE EDA GRANT - $350 - - - - - - $350
Total Preliminary Engineering - $833 - - - - - - $833ROW CITY FUNDS - - $261 - - - - - $261ROW EDA GRANT - - $189 - - - - - $189
Total Right of Way - - $450 - - - - - $450CON CITY FUNDS - - - $1,650 - - - - $1,650CON EDA GRANT - - - $2,425 - - - - $2,425CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - - - $1,700 - - - - $1,700
Total Construction - - - $5,775 - - - - $5,775Total Programmed - $833 $450 $5,775 - - - - $7,058
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 62/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190302 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-13
ConformCategory
EXEMPT -93.126
TotalProject Cost$285
LeadAgency HIGHLAND Modeling NO
County SanBernadino Primary Program Code NCN29 - SIDEWALKS/CURB CUTS-NEW Air Basin SCAB RTP ID 0A6410
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionHighland 2017 Repurposing Funds for SCAG016: This project captures repurposing earmarks for Highland SRTS projects SRTS3-08-008 (McKinley) & SRTS3-08-009 (9th St) not included in FTIP ID SCAG016; Construct sidewalks, curb and gutter, and curb ramps;install in-pavement crosswalk lights and flashing beacons
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW 2017 EARMARK REPURPOSING - - $225 - - - - - $225
Total Right of Way - - $225 - - - - - $225CON 2017 EARMARK REPURPOSING - - - $60 - - - - $60
Total Construction - - - $60 - - - - $60Total Programmed - - $225 $60 - - - - $285
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 63/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD55031 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,078
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD55031
System Local HwyProjectLimits From 3RD STREET to SOUTH CITY LIMITS, Begin: 0 End:
DescriptionALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS - WIDEN FROM 2 TO 3 NB LANES (0.25 MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE PRIVATE FUNDS - $68 - - - - - - $68
Total Preliminary Engineering - $68 - - - - - - $68ROW PRIVATE FUNDS - - $40 - - - - - $40
Total Right of Way - - $40 - - - - - $40CON PRIVATE FUNDS - - - $970 - - - - $970
Total Construction - - - $970 - - - - $970Total Programmed - $68 $40 $970 - - - - $1,078
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 64/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD55033 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,350
LeadAgency HIGHLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD55033
System Local HwyProjectLimits From GREENSPOT ROAD/5TH ST to SOUTH CITY LIMITS, Begin: 0 End:
DescriptionBOULDER AVE. FROM GREENSPOT TO SOUTH CITY LIMITS - WIDEN FROM 2-4 LANES (0.70 MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $235 - - - - - - - $235
Total Preliminary Engineering $235 - - - - - - - $235CON CITY FUNDS - - $2,115 - - - - - $2,115
Total Construction - - $2,115 - - - - - $2,115Total Programmed $235 - $2,115 - - - - - $2,350
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 65/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190301 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03
ConformCategory
EXEMPT -93.126
TotalProject Cost$375
LeadAgency
LOMALINDA Modeling NO
County SanBernadino Primary Program Code NCR91 - UPGRADED FACILITI (NO LN
ADD) Air Basin SCAB RTP ID REG0703
System LocalHwy
ProjectLimits From to , Begin: 0 End:
DescriptionIn Loma Linda: Construct a round-a-bout along Andersen Street at the joint intersection of Mound Street and Hill Drive. (non-capacityincreasing, conversion from typical intersection to round-a-bout)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $50 - - - - - - $50
Total Preliminary Engineering - $50 - - - - - - $50ROW DEVELOPER FEES - $25 - - - - - - $25
Total Right of Way - $25 - - - - - - $25CON SBD CO MEASURE I - - $300 - - - - - $300
Total Construction - - $300 - - - - - $300Total Programmed - $75 $300 - - - - - $375
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 66/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD31876 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,090
LeadAgency
LOMALINDA Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD31876
System Local HwyProjectLimits From REDLANDS BOULEVARD to BARTON ROAD, Begin: 0 End:
DescriptionCALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - $20 - - - - - $20
Total Preliminary Engineering - - $20 - - - - - $20ROW CITY FUNDS - - - $70 - - - - $70
Total Right of Way - - - $70 - - - - $70CON CITY FUNDS - - - - $1,000 - - - $1,000
Total Construction - - - - $1,000 - - - $1,000Total Programmed - - $20 $70 $1,000 - - - $1,090
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 67/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150001 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
NON-EXEMPT
TotalProject Cost$14,585
LeadAgency MONTCLAIR Modeling YES
County San Bernadino Primary Program Code CAX60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID 4G07421
System Local HwyProjectLimits From About 0.25 miles north of Mission Blvd. to About 0.15 miles south of Holt Blvd., Begin: 0 End:
DescriptionBRIDGE NO. 54C0112, CENTRAL AVE OVER UP RR AMTRAK METROLINK, 0.2 MI S HOLT AVENUE. Bridge rehabilitate.Rehabilitate existing four lane bridge with six lane bridge with sidewalks. Toll credits to match EARREPU.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $1,440 - - - - - - $1,440PE BRIDGE - LOCAL $531 - - - $548 - - - $1,079PE CITY FUNDS $69 - - - $71 - - - $140
Total Preliminary Engineering $600 $1,440 - - $619 - - - $2,659ROW BRIDGE - LOCAL - - - - - $483 - - $483ROW CITY FUNDS - - - - - $63 - - $63
Total Right of Way - - - - - $546 - - $546CON BRIDGE - LOCAL - - - - - - - $10,075 $10,075CON CITY FUNDS - - - - $1,305 - - - $1,305CON LOCAL - ADVANCED CONSTRUCTION - - - - $10,075 - - $-10,075 -
Total Construction - - - - $11,380 - - - $11,380Total Programmed $600 $1,440 - - $11,999 $546 - - $14,585
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 68/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150109 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-11
ConformCategory
TCMCommitted
TotalProject Cost$3,500
LeadAgency OMNITRANS Modeling NO
County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
Description
PEDESTRIAN & BICYCLE ACCESS IMPROVEMENTS WITHIN 1/2 MILE OF RAPID TRANSIT STATIONS, INCLUDINGSIDEWALK AND CURB RAMP REPLACEMENT & BIKE PARKING AT STATIONS (Termini at Pomona Downtown MetrolinkStation & Kaiser Medical Center Fontana, following Holt Ave/Blvd, Archibald Ave, Milliken Ave, Foothill Blvd, & Sierra Ave).(TDC:FY18/19, ATP $402)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - $525 - - - - - - $525
Total Preliminary Engineering - $525 - - - - - - $525CON ACTIVE TRANSPORTATION PROGRAM - $2,975 - - - - - - $2,975
Total Construction - $2,975 - - - - - - $2,975Total Programmed - $3,500 - - - - - - $3,500
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 69/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150201 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
NON-EXEMPT
TotalProject Cost$45,028
LeadAgency ONTARIO Modeling YES
County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A
BOTTLENECK: RS Air Basin SCAB RTP ID 2002160
System LocalHwy
ProjectLimits From FOURTH ST to AIRPORT DRIVE, Begin: 0 End:
DescriptionGROVE AVE CORRIDOR: WIDEN GROVE BETWEEN FOURTH ST AND STATE ST / AIRPORT DR (4-6 LNS); ANDIMPROVEMENTS TO GROVE AVE / HOLT BLVD INTERSECTION. Toll Credit to match EARREPU.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE 2016 EARMARK REPURPOSING - $3,335 - - - - - - $3,335PE DEMO-SAFETEA-LU $1,834 - - - - - - - $1,834PE DEVELOPER FEES $204 - - - - - - - $204PE SBD CO MEASURE I $255 - - - - - - - $255
Total Preliminary Engineering $2,293 $3,335 - - - - - - $5,628ROW DEVELOPER FEES $5,916 - - - - - - - $5,916ROW SBD CO MEASURE I $7,409 - - - - - - - $7,409
Total Right of Way $13,325 - - - - - - - $13,325CON DEVELOPER FEES - $11,577 - - - - - - $11,577CON SBD CO MEASURE I - $14,498 - - - - - - $14,498
Total Construction - $26,075 - - - - - - $26,075Total Programmed $15,618 $29,410 - - - - - - $45,028
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 70/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150004 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-05
ConformCategory
EXEMPT -93.126
TotalProject Cost$2,250
LeadAgency
RANCHOCUCAMONGA Modeling NO
County San Bernadino Primary Program Code NCN26 - BICYCLE FACILITY-NEW Air Basin SCAB RTP ID 20010133System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIMPROVE FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN GROVE AVENUE AND SAN BERNARDINO RD:INCLUDES BIKE LANES, SIDEWALKS, STREET LIGHTS, TRAFFIC SIGNAL, PAVEMENT REHABILITATION, ANDSTRIPING.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $50 $250 - - - - - $300
Total Preliminary Engineering - $50 $250 - - - - - $300CON CITY FUNDS - - - $1,950 - - - - $1,950
Total Construction - - - $1,950 - - - - $1,950Total Programmed - $50 $250 $1,950 - - - - $2,250
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 71/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190004 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
EXEMPT- 93.126
TotalProject Cost$60,000
LeadAgency
RANCHOCUCAMONGA Modeling NO
County San Bernadino Primary Program CodeNCN31 - GRADE SEPARATION;RAIL/HWY CROSSING-NONCAPACITY
Air Basin SCAB RTP ID 2016A319
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIn Rancho Cucamonga: Etiwanda Ave & SCRRA Grade Separation; Project replaces an at grade railroad crossing with an overheadroadway at the SCRRA/BNSF railroad corridor.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SB1TRADE CORRIDOR ENHANCEMENT - $2,850 - - - - - - $2,850
Total Preliminary Engineering - $2,850 - - - - - - $2,850ROW SB1TRADE CORRIDOR ENHANCEMENT - $5,000 - - - - - - $5,000
Total Right of Way - $5,000 - - - - - - $5,000CON SB1TRADE CORRIDOR ENHANCEMENT - - $52,150 - - - - - $52,150
Total Construction - - $52,150 - - - - - $52,150Total Programmed - $7,850 $52,150 - - - - - $60,000
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 72/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200035 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$950
LeadAgency REDLANDS Modeling YES
County SanBernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSS
TRAFFIC IMP: RS Air Basin SCAB RTP ID 200035
System Local HwyProjectLimits From 5TH AVE to I-10 FREEWAY, Begin: 0 End:
DescriptionWABASH AV FROM 5TH ST TO I-10 - CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW PRIVATE FUNDS - - $100 - - - - - $100
Total Right of Way - - $100 - - - - - $100CON PRIVATE FUNDS - - - $850 - - - - $850
Total Construction - - - $850 - - - - $850Total Programmed - - $100 $850 - - - - $950
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 73/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200419 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$7,200
LeadAgency REDLANDS Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE
ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200419
System Local HwyProjectLimits From NORTH CITY LIMITS to 3,00' N/O PALMETTO, Begin: 0 End:
DescriptionALABAMA STREET WIDENING - WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $700 - - - - - - $700
Total Preliminary Engineering - $700 - - - - - - $700ROW CITY FUNDS - - $500 - - - - - $500
Total Right of Way - - $500 - - - - - $500CON CITY FUNDS - - - $6,000 - - - - $6,000
Total Construction - - - $6,000 - - - - $6,000Total Programmed - $700 $500 $6,000 - - - - $7,200
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 74/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201113 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$540
LeadAgency REDLANDS Modeling NO
County SanBernadino Primary Program Code NCR81 - CURB AND GUTTER
IMPROVEMENTS Air Basin SCAB RTP ID 4GL04
System Local HwyProjectLimits From LUGONIA to SAN BERNARDINO AVE., Begin: 0 End:
Description
ORANGE STREET FROM LUGONIA TO SAN BERNARDINO AVE. -WIDEN THE EAST SIDE OF THE STREET TO REMOVE ARESTRICTION IN THE ROADWAY TRAVEL AREA. PROJECT INCLUDES ROAD PAVING, CURB AND GUTTER, SIDEWALK,STREET LIGHTING, STRIPING AND MARKING, AND LANDSCAPE IMPROVEMENTS. THE PROJECT WILL IMPROVEPEDESTRIAN AND VEHICULAR SAFE TRAVEL AND CIRCULATION.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $60 - - - - - $60
Total Preliminary Engineering - - $60 - - - - - $60CON DEVELOPER FEES - - - $87 - - - - $87CON SBD CO MEASURE I - - - $393 - - - - $393
Total Construction - - - $480 - - - - $480Total Programmed - - $60 $480 - - - - $540
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 75/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190012 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$13,206
LeadAgency RIALTO Modeling YES
County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A
BOTTLENECK: RS Air Basin SCAB RTP ID 2016A319
System LocalHwy
ProjectLimits From South City Limits (Santa Ana River) to Slover Ave, Begin: 0 End:
DescriptionRialto: Widen Riverside Ave; from South City Limits to Slover Ave 4-6 lanes.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $1,314 - - - - - - $1,314PE DEVELOPER FEES - $900 - - - - - - $900
Total Preliminary Engineering - $2,214 - - - - - - $2,214ROW CITY FUNDS - - $1,200 - - - - - $1,200ROW DEVELOPER FEES - - $800 - - - - - $800
Total Right of Way - - $2,000 - - - - - $2,000CON CITY FUNDS - - - - $5,300 - - - $5,300CON DEVELOPER FEES - - - - $3,692 - - - $3,692
Total Construction - - - - $8,992 - - - $8,992Total Programmed - $2,214 $2,000 - $8,992 - - - $13,206
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 76/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190013 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
EXEMPT -93.126
TotalProject Cost$11,643
LeadAgency RIALTO Modeling NO
County SanBernadino Primary Program Code NCR36 - BRIDGE RESTORATION &
REPLC (NO LN ADD) Air Basin SCAB RTP ID 2016A319
System LocalHwy
ProjectLimits From to , Begin: 0 End:
DescriptionRialto: Reconfigure/widen Alder Ave over SR-210, and widen Locust Ave from Renaissance Pkwy to Casmalia St. Alder Ave bridgewidening will accommodate additional left and right turn lanes for on and off ramps from N&S bound Alder, provide for full standardlanes. Locust Ave widening will accommodate class II bike lanes, and ADA compliant sidewalks. (Non-Capacity)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY - $909 - - - - - - $909PE CITY FUNDS - $250 - - - - - - $250PE DEVELOPER FEES - $511 - - - - - - $511
Total Preliminary Engineering - $1,670 - - - - - - $1,670CON AGENCY - - - $1,135 - - - - $1,135CON CITY FUNDS - - - $8,838 - - - - $8,838
Total Construction - - - $9,973 - - - - $9,973Total Programmed - $1,670 - $9,973 - - - - $11,643
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 77/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190103 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
NON-EXEMPT
TotalProject Cost$4,582
LeadAgency RIALTO Modeling NO
County SanBernadino Primary Program Code CAX76 - ADDING A LANE THROUGH A
BOTTLENECK: RS Air Basin SCAB RTP ID 4120181
System LocalHwy
ProjectLimits From Baseline Road to Renaissance Parkway, Begin: 0 End:
DescriptionIn Rialto: Widen Alder Ave 2-4 lns from Baseline Rd to Renaissance Pkwy; Widen Randall Ave 2-4 lns from Riverside Ave to CactusAve; Project includes various improvements such as, added turn lanes, bike lanes, eliminate bottlenecks, new landscaped medians, andimproved traffic signal operations. (RTP IDs 4120181 & 4120231 respectfully)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON CITY FUNDS - $2,291 - - - - - - $2,291CON SB1 LOCAL PARTNERSHIP COMPETITIVE FUNDS - $2,291 - - - - - - $2,291
Total Construction - $4,582 - - - - - - $4,582Total Programmed - $4,582 - - - - - - $4,582
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 78/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200619 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-03
ConformCategory
NON-EXEMPT
TotalProject Cost$32,669
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200619
System Local HwyProjectLimits From 0.2 MILES EAST OF CAJON CREEK to 0.2 MILES WEST 0F CAJON CREEK, Begin: 0 End:
DescriptionGLEN HELEN PARKWAY - FROM 0.2 MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36FT WIDE 48 FT LONG 2 LN BRIDGE OVER CAJON CREEK W/ 102 FT, 526 FT LONG 4 LN BRIDGE (54C0025)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $2,081 - - - - - - - $2,081PE COUNTY $269 - - - - - - - $269
Total Preliminary Engineering $2,350 - - - - - - - $2,350ROW BRIDGE - LOCAL $1,195 $266 - - - - - - $1,461ROW COUNTY $155 $34 - - - - - - $189
Total Right of Way $1,350 $300 - - - - - - $1,650CON BRIDGE - LOCAL - - - - - $25,381 - - $25,381CON COUNTY - - - $3,288 - - - - $3,288CON LOCAL ADVANCE CONSTRUCTION - - - $25,381 - $-25,381 - - -
Total Construction - - - $28,669 - - - - $28,669Total Programmed $3,700 $300 - $28,669 - - - - $32,669
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 79/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200810 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-14
ConformCategory
NON-EXEMPT
TotalProject Cost$13,300
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAY60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: GM Air Basin MDAB RTP ID 200810
System Local HwyProjectLimits From 150' E/O MOJAVE FLOOD CHANNEL to BRIDGE SPAN, Begin: 0 End:
DescriptionBAKER BLVD. BRIDGE - OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANEBRIDGE (BRIDGE NO 54C0127)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY - - $264 - - - - - $264
Total Preliminary Engineering - - $264 - - - - - $264CON COUNTY - - - - - $1,262 - - $1,262
Total Construction - - - - - $1,262 - - $1,262Total Programmed - - $264 - - $1,262 - - $1,526
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 80/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200816 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09
ConformCategory
EXEMPT -93.126
TotalProject Cost$32,876
LeadAgency
SANBERNARDINOCOUNTY
Modeling NO
County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID 200816
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionROCK SPRINGS RD.: 0.9 Miles east of Arrowhead Lake Rd.; Replace 2 lane bridge with 2 lane bridge.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE AGENCY $540 - - - - - - - $540PE COUNTY $3,103 - - - - - - - $3,103
Total Preliminary Engineering $3,643 - - - - - - - $3,643ROW CITY FUNDS $230 - - - - - - - $230
Total Right of Way $230 - - - - - - - $230CON AGENCY - $21,328 - - - - - - $21,328CON COUNTY - $7,675 - - - - - - $7,675
Total Construction - $29,003 - - - - - - $29,003Total Programmed $3,873 $29,003 - - - - - - $32,876
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 81/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200835 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$3,866
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200835
System Local HwyProjectLimits From CHERRY AVE. to FONTANA CITY LIMITS (ELM AVE), Begin: 0 End:
DescriptionSAN BERNARDINO AVE. FROM CHERRY AVE. TO FONTANA CITY LIMITS (ELM AVE.) (1.27 MILES)-WIDEN 2-4 LANES(North side only)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY $425 - - - - - - - $425
Total Preliminary Engineering $425 - - - - - - - $425ROW COUNTY $350 - - - - - - - $350
Total Right of Way $350 - - - - - - - $350CON COUNTY - $3,091 - - - - - - $3,091
Total Construction - $3,091 - - - - - - $3,091Total Programmed $775 $3,091 - - - - - - $3,866
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 82/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200843 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,650
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 200843
System Local HwyProjectLimits From 1.20 MILES OF S. BARTON ROAD to 0.42 MILES SOUTH OF BARTON RD, Begin: 0 End:
DescriptionRECHE CANYON RD. FROM 1.20 MILES OF S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (0.78 MILES)-WIDEN FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - - $250 $800 - - - - $1,050
Total Preliminary Engineering - - $250 $800 - - - - $1,050ROW DEVELOPER FEES - - - $1,500 - - - - $1,500
Total Right of Way - - - $1,500 - - - - $1,500CON DEVELOPER FEES - - - - $3,100 - - - $3,100
Total Construction - - - - $3,100 - - - $3,100Total Programmed - - $250 $2,300 $3,100 - - - $5,650
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 83/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20130402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$25
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAX76 - ADDING A LANETHROUGH A BOTTLENECK: RS Air Basin RTP ID 20130402
System Local HwyProjectLimits From West I-15 Ramps to SH 127, Begin: 0 End:
DescriptionRestripe existing structural section of Baker Blvd between I-15 ramps and SH 127 from 2 - 4 lane configuration in conjunction withproject to replace existing 2 lane bridge 54CO127 with 4 lane bridge
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON COUNTY - - - - $25 - - - $25
Total Construction - - - - $25 - - - $25Total Programmed - - - - $25 - - - $25
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 84/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150002 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$6,600
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAY66 - NEW CONNECTNS/CROSSTRAFFIC IMP: GM Air Basin RTP ID 200414
System Local HwyProjectLimits From WILSON RANCH ROAD to BALDY MESA, Begin: 0 End:
DescriptionON DUNCAN ROAD FROM WILSON RANCH ROAD TO BALDY MESA PAVE DIRT ROAD IN 4 ONE MILE SEGMENTS 1LANE IN EACH DIRECTION
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE FEE $600 - - - - - - - $600
Total Preliminary Engineering $600 - - - - - - - $600CON FEE - $6,000 - - - - - - $6,000
Total Construction - $6,000 - - - - - - $6,000Total Programmed $600 $6,000 - - - - - - $6,600
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 85/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20151302 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$39,001
LeadAgency
SANBERNARDINOCOUNTY
Modeling NO
County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID 4AL04
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionREPLACE OR REHABILITATE MULTIPLE BRIDGES ALONG NATIONAL TRAILS HIGHWAY BETWEEN DAGGETT TO THEWEST AND INTERSTATE 40 TO THE EAST.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE COUNTY $7,000 - - - - - - - $7,000PE STP LOCAL $1 - - - - - - - $1
Total Preliminary Engineering $7,001 - - - - - - - $7,001CON AGENCY - - $32,000 - - - - - $32,000
Total Construction - - $32,000 - - - - - $32,000Total Programmed $7,001 - $32,000 - - - - - $39,001
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 86/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20152202 FTIP AmendmentSan Bernardino CountyTransportation Authority (SBCTA)19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$1,782
LeadAgency
SANBERNARDINOCOUNTY
Modeling NO
County San Bernadino Primary Program Code NCR31 - ROAD REPLC & REHAB(NO LN ADD) Air Basin RTP ID SBD031426
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionSegment 1B: Needles Highway from 500 ft south of Park Road north to David Drive; Overlay existing roadway, L-5373' (1.01 MI)(Parent project SBD031426).
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON PUBLIC LAND HWYS - $1,782 - - - - - - $1,782
Total Construction - $1,782 - - - - - - $1,782Total Programmed - $1,782 - - - - - - $1,782
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 87/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190014 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
NON-EXEMPT
TotalProject Cost$15,439
LeadAgency
SANBERNARDINOCOUNTY
Modeling YES
County San Bernadino Primary Program Code CAN76 - ADDING A LANETHROUGH A BOTTLENECK: NRS Air Basin RTP ID 200815
System Local HwyProjectLimits From 0.3 Miles E/O Mariposa to Hesperia CL, Begin: 0 End:
DescriptionSan Bernardino County: Widen Ranchero St. 2-4 lanes - From 0.3 M E/O Mariposa to Hesperia CL (3 miles)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES - $1,625 - - - - - - $1,625
Total Preliminary Engineering - $1,625 - - - - - - $1,625ROW DEVELOPER FEES - $1,033 - - - - - - $1,033ROW SBD CO MEASURE I - $1,457 - - - - - - $1,457
Total Right of Way - $2,490 - - - - - - $2,490CON DEVELOPER FEES - - $4,700 - - - - - $4,700CON SBD CO MEASURE I - - $6,624 - - - - - $6,624
Total Construction - - $11,324 - - - - - $11,324Total Programmed - $4,115 $11,324 - - - - - $15,439
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 88/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 2011150 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-11
ConformCategory
TCMCommitted
TotalProject Cost$13,021
LeadAgency
SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY
ModelingNO
County San Bernadino Primary Program Code TDM20 - RIDESHARING Air Basin SCAB RTP ID 4RL04System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionSOUTH COAST AIR BASIN RIDESHARE PROGRAM (Ongoing)(Toll Credits are being used as match for CMAQ)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CMAQ $4,070 - - - - - - - $4,070PE SBD CO MEASURE I $466 - - - - - - - $466
Total Preliminary Engineering $4,536 - - - - - - - $4,536CON CMAQ $3,985 $1,950 - $1,950 - - - - $7,885CON SBD CO MEASURE I $150 $150 $150 $150 - - - - $600
Total Construction $4,135 $2,100 $150 $2,100 - - - - $8,485Total Programmed $8,671 $2,100 $150 $2,100 - - - - $13,021
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 89/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 2011151 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-15
ConformCategory
EXEMPT- 93.126
TotalProject Cost$5,896
LeadAgency
SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY
ModelingNO
County San Bernadino Primary Program Code TDM20 - RIDESHARING Air Basin MDAB RTP ID 4RL04System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionMOJAVE DESERT AIR BASIN RIDESHARE PROGRAM (Toll Credits to match: CMAQ)(Ongoing)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CMAQ $2,320 - - - - - - - $2,320PE SBD CO MEASURE I $266 - - - - - - - $266
Total Preliminary Engineering $2,586 - - - - - - - $2,586CON CMAQ $1,810 $650 - $650 - - - - $3,110CON SBD CO MEASURE I $50 $50 $50 $50 - - - - $200
Total Construction $1,860 $700 $50 $700 - - - - $3,310Total Programmed $4,446 $700 $50 $700 - - - - $5,896
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 90/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20159907 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-03
ConformCategory
EXEMPT- 93.127
TotalProject Cost$10,968
LeadAgency
SAN BERNARDINOCOUNTYTRANSPORTATIONAUTHORITY
ModelingNO
County San Bernadino Primary Program CodeNCR87 -OVERCROSS/UNDERCROSSIMP (NO LN ADD)
Air Basin SCAB RTP ID 4M01025
System Local HwyProjectLimits From NORTH OF I-10 OVERCROSSING to SOUTH OF I-10 OVERCROSSING, Begin: 0 End:
DescriptionI-10 @ Alabama St IC: Intersection improvements w/ ramp widening (No Capacity Enhancements)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $874 - - - - - - - $874PE SBD CO MEASURE I $857 - - - - - - - $857
Total Preliminary Engineering $1,731 - - - - - - - $1,731ROW DEVELOPER FEES $18 - - - - - - - $18ROW SBD CO MEASURE I $18 - - - - - - - $18
Total Right of Way $36 - - - - - - - $36CON DEVELOPER FEES - - - $4,646 - - - - $4,646CON SBD CO MEASURE I - - - $4,555 - - - - $4,555
Total Construction - - - $9,201 - - - - $9,201Total Programmed $1,767 - - $9,201 - - - - $10,968
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 91/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190702 FTIP AmendmentSan Bernardino CountyTransportation Authority(SBCTA) 19-07
ConformCategory TCM Total
Project Cost$6,983
LeadAgency
SAN BERNARDINO COUNTYTRANSPORTATIONAUTHORITY
Modeling NO
County San Bernadino Primary Program CodeNCN25 - BICYCLE &PEDESTRAIN FACILITIES-NEW
Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionSBCTA Metrolink Station Accessibility Improvement Project - Phase II: Bicycle and pedestrian accessibility improvements near fiveMetrolink transit stations (Montclair, Upland, Rancho Cucamonga, Fontana, and San Bernardino). Toll Credit to match ATP
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE LOCAL TRANS FUNDS - - - $559 - - - - $559
Total Preliminary Engineering - - - $559 - - - - $559CON ACTIVE TRANSPORTATION PROGRAM - - - - $6,132 - - - $6,132CON LOCAL TRANS FUNDS - - - - $292 - - - $292
Total Construction - - - - $6,424 - - - $6,424Total Programmed - - - $559 $6,424 - - - $6,983
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 92/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200609 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$7,500
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSSTRAFFIC IMP: RS Air Basin SCAB RTP ID 200609
System Local HwyProjectLimits From Coulston to Riverview, Begin: 0 End:
DescriptionMT.VIEW WIDENING/EXTENSION PROJECT- WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OFSANTA ANA RIVER) (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $500 - - - - - - - $500
Total Preliminary Engineering $500 - - - - - - - $500ROW CITY FUNDS $1,000 - - - - - - - $1,000
Total Right of Way $1,000 - - - - - - - $1,000CON CITY FUNDS - $6,000 - - - - - - $6,000
Total Construction - $6,000 - - - - - - $6,000Total Programmed $1,500 $6,000 - - - - - - $7,500
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 93/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201169 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,060
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07263
System Local HwyProjectLimits From KENDALL DR. to 4OTH STREET, Begin: 0 End:
DescriptionH STREET FROM KENDALL DRIVE TO 40TH STREET WIDENING FROM 2-4 LANES
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $150 - - - - - - - $150
Total Preliminary Engineering $150 - - - - - - - $150ROW CITY FUNDS - $128 - - - - - - $128ROW DEVELOPER FEES - $120 - - - - - - $120
Total Right of Way - $248 - - - - - - $248CON CITY FUNDS - - $496 - - - - - $496CON DEVELOPER FEES - - $166 - - - - - $166
Total Construction - - $662 - - - - - $662Total Programmed $150 $248 $662 - - - - - $1,060
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 94/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201170 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$5,800
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANEADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID 4A07119
System Local HwyProjectLimits From STERLING AVE to VICTORIA, Begin: 0 End:
Description5TH STREET FROM STERLING AVE TO VICTORIA AVE WIDEN FROM 2-4 LANES.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $441 - - - - - - - $441
Total Preliminary Engineering $441 - - - - - - - $441ROW CITY FUNDS - $290 - - - - - - $290
Total Right of Way - $290 - - - - - - $290CON CITY FUNDS - - $5,069 - - - - - $5,069
Total Construction - - $5,069 - - - - - $5,069Total Programmed $441 $290 $5,069 - - - - - $5,800
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 95/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201181 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$3,200
LeadAgency
SANBERNARDINO,CITY OF
Modeling NO
County San Bernadino Primary Program Code NCR22 - SHOULDER WIDENING Air Basin SCAB RTP ID 4OM0701System Local HwyProjectLimits From to , Begin: 0 End:
Description3RD STREET FROM TIPPECANOE AVENUE TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TOVICTORIA AVENUE SHOULDER WIDENING AND MEDIANS- 1.25 MILES)(NO THROUGH LANE WIDENING)TOTALLENGTH 1.95 MILESFORMERLY PART OF PROJECT ID 200852
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS $243 - - - - - - - $243
Total Preliminary Engineering $243 - - - - - - - $243ROW CITY FUNDS $160 - - - - - - - $160
Total Right of Way $160 - - - - - - - $160CON CITY FUNDS - $2,797 - - - - - - $2,797
Total Construction - $2,797 - - - - - - $2,797Total Programmed $403 $2,797 - - - - - - $3,200
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 96/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20150012 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT- 93.127
TotalProject Cost$1,137
LeadAgency
SANBERNARDINO,CITY OF
Modeling NO
County San Bernadino Primary Program Code NCRH1 - INTERSECTIONIMPROVEMENTS/CHANNELIZATION Air Basin SCAB RTP ID SBD31903
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionFOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL,INTERSECTION IMPROVEMENTS/REALIGN INTERSECTION (0.11 MILE)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $12 - - - - - - - $12
Total Preliminary Engineering $12 - - - - - - - $12CON SBD CO MEASURE I - $1,125 - - - - - - $1,125
Total Construction - $1,125 - - - - - - $1,125Total Programmed $12 $1,125 - - - - - - $1,137
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 97/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD41316 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,288
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAN76 - ADDING A LANETHROUGH A BOTTLENECK: NRS Air Basin SCAB RTP ID SBD41316
System Local HwyProjectLimits From I10 to 1 MILE NORTH AND SOUTH, Begin: 0 End:
DescriptionMT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I - $200 - - - - - - $200
Total Preliminary Engineering - $200 - - - - - - $200ROW SBD CO MEASURE I - - - - $500 - - - $500
Total Right of Way - - - - $500 - - - $500CON CITY FUNDS - - - - - $1,574 - - $1,574CON SBD CO MEASURE I - - - - - $14 - - $14
Total Construction - - - - - $1,588 - - $1,588Total Programmed - $200 - - $500 $1,588 - - $2,288
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 98/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD41317 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$1,655
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX60 - BRIDGE RESTORATION &REPLACEMENT- LN ADDITIONS: RS Air Basin SCAB RTP ID SBD41317
System Local HwyProjectLimits From MISSION CREEK to MT. VIEW, Begin: 0 End:
DescriptionMT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTINGBRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACHDIRECTION)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $248 - - - - - - $248
Total Preliminary Engineering - $248 - - - - - - $248ROW CITY FUNDS - - - - $200 - - - $200
Total Right of Way - - - - $200 - - - $200CON CITY FUNDS - - - - - $1,207 - - $1,207
Total Construction - - - - - $1,207 - - $1,207Total Programmed - $248 - - $200 $1,207 - - $1,655
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOTA… 99/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD59019 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$3,264
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP -LANE ADD'S ( NO HOV LANES): RS Air Basin SCAB RTP ID SBD59019
System Local HwyProjectLimits From JOHNSON LANE to ELECTRIC AVE, Begin: 0 End:
Description40TH ST. FROM JOHNSON LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2TO 4 LANES (1,200FT.)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $200 - - - - - - - $200
Total Preliminary Engineering $200 - - - - - - - $200ROW DEVELOPER FEES - $370 - - - - - - $370ROW SBD CO MEASURE I - $710 - - - - - - $710
Total Right of Way - $1,080 - - - - - - $1,080CON AGENCY - - $1,984 - - - - - $1,984
Total Construction - - $1,984 - - - - - $1,984Total Programmed $200 $1,080 $1,984 - - - - - $3,264
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 100/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD59021 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$17,628
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program CodeCAX66 - NEWCONNECTNS/CROSS TRAFFICIMP: RS
Air Basin SCAB RTP ID SBD59021
System Local HwyProjectLimits From HANFORD ST to FOOTHILL BLVD., Begin: 0 End:
DescriptionSTATE STREET FROM HANFORD ST TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE DEVELOPER FEES $830 - - - - - - - $830PE SBD CO MEASURE I $1,731 - - - - - - - $1,731
Total Preliminary Engineering $2,561 - - - - - - - $2,561ROW DEVELOPER FEES - $2,942 - - - - - - $2,942ROW SBD CO MEASURE I - $6,138 - - - - - - $6,138
Total Right of Way - $9,080 - - - - - - $9,080CON DEVELOPER FEES - - $1,940 - - - - - $1,940CON SBD CO MEASURE I - - $4,047 - - - - - $4,047
Total Construction - - $5,987 - - - - - $5,987Total Programmed $2,561 $9,080 $5,987 - - - - - $17,628
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 101/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD59023 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$22,000
LeadAgency
SANBERNARDINO,CITY OF
Modeling YES
County San Bernadino Primary Program Code CAX67 - NEW HIGHWAY (NO HOVLANE): RS Air Basin SCAB RTP ID SBD59023
System Local HwyProjectLimits From KENDALL DR. to I-215, Begin: 0 End:
DescriptionCAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY - CONSTRUCT (4) LANE ROADWAY- BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - - - - - $2,000 - - $2,000
Total Preliminary Engineering - - - - - $2,000 - - $2,000CON CITY FUNDS - - - - - - - $40,000 $40,000
Total Construction - - - - - - - $40,000 $40,000Total Programmed - - - - - $2,000 - $40,000 $42,000
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 102/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201101 FTIP Amendment San Bernardino County Transportation Authority(SBCTA) 19-00
ConformCategory
NON-EXEMPT
TotalProject Cost$2,200
LeadAgency UPLAND Modeling YES
County SanBernadino Primary Program Code CAX63 - HIGHWAY/ROAD IMP - LANE ADD'S
( NO HOV LANES): RS Air Basin SCAB RTP ID 200630
System LocalHwy
ProjectLimits From Monte Vista to Benson, Begin: 0 End:
DescriptionARROW ROUTE WIDENING FROM 2 TO 4 LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTEVISTA AVENUE TO CENTRAL AVENUE
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalROW CITY FUNDS - - $200 - - - - - $200
Total Right of Way - - $200 - - - - - $200CON CITY FUNDS - - - $200 - - - - $200CON DEVELOPER FEES - - - $710 - - - - $710CON SBD CO MEASURE I - - - $1,090 - - - - $1,090
Total Construction - - - $2,000 - - - - $2,000Total Programmed - - $200 $2,000 - - - - $2,200
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 103/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 201103 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-00
ConformCategory
EXEMPT -93.126
TotalProject Cost$5,300
LeadAgency UPLAND Modeling NO
County SanBernadino Primary Program Code NCN95 - LEFT TURN LANE(S) Air Basin SCAB RTP ID 4OM0701
System LocalHwy
ProjectLimits From to , Begin: 0 End:
DescriptionFOOTHILL BOULEVARD BOTTLENECK AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALLRIGHT TURN LANES AT MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTERDRAINAGE, ROADWAY REHAB.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE CITY FUNDS - $300 - - - - - - $300
Total Preliminary Engineering - $300 - - - - - - $300ROW CITY FUNDS - - $5,000 - - - - - $5,000
Total Right of Way - - $5,000 - - - - - $5,000Total Programmed - $300 $5,000 - - - - - $5,300
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 104/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20151501 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-13
ConformCategory
EXEMPT -93.126
TotalProject Cost$850
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (State - Non SRTS): Projects are consistent with 40CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized). Tollcredits to match ATP.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM $72 $557 - - - - - - $629CON CITY FUNDS - $221 - - - - - - $221
Total Construction $72 $778 - - - - - - $850Total Programmed $72 $778 - - - - - - $850
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 105/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20151502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$11,508
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Projects for Safety Imprvmnts - (State - SRTS): Projects consistent w/ 40 CFR Part 93.126 Exempt Tables 2&3 categories -Railroad/highway crossing, safer non-Fed-aid system roads, shoulder imprvmnts, traffic control devices and operating assistance otherthan signalization projects, intersection signalization projects at individual intersections, pvmnt marking. Toll Credits to match ATP
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM $522 $343 - - - - - - $865
Total Preliminary Engineering $522 $343 - - - - - - $865ROW ACTIVE TRANSPORTATION PROGRAM $26 $60 - - - - - - $86
Total Right of Way $26 $60 - - - - - - $86CON ACTIVE TRANSPORTATION PROGRAM - $2,334 $2,613 $3,636 - - - - $8,583CON CITY FUNDS - $380 $685 $909 - - - - $1,974
Total Construction - $2,714 $3,298 $4,545 - - - - $10,557Total Programmed $548 $3,117 $3,298 $4,545 - - - - $11,508
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 106/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20151503 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
EXEMPT -93.126
TotalProject Cost$376
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (MPO - Non SRTS): Projects are consistent with40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized). Tollcredits to match ATP.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM - $301 - - - - - - $301CON CITY FUNDS - $75 - - - - - - $75
Total Construction - $376 - - - - - - $376Total Programmed - $376 - - - - - - $376
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 107/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20151504 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-01
ConformCategory
EXEMPT -93.126
TotalProject Cost$4,980
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR25 - BICYCLE & PEDESTRAINFACILITIES-UPGRADE Air Basin SCAB RTP ID 7120004
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Prjcts for Sfty Imprvmnts (MPO - SRTS): Projects consistent with 40 CFR Part 93.126 Exempt Tables 2/3 categories -railroad/highway crossing, safer non-Fed-aid system rds, shlder imprvmnts, traffic control devices and op. assistance other thansignalization projects, Intersection signalization projects at individual intersections, pavement marking demo. Tolls credit to match ATP.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON ACTIVE TRANSPORTATION PROGRAM $1,222 $1,074 $2,420 - - - - - $4,716CON CITY FUNDS $264 - - - - - - - $264
Total Construction $1,486 $1,074 $2,420 - - - - - $4,980Total Programmed $1,486 $1,074 $2,420 - - - - - $4,980
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 108/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20170802 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09
ConformCategory
EXEMPT -93.126
TotalProject Cost$10,955
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin RTP ID SBDLS08
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionIN BARSTOW: N. 1ST AVENUE OVER BNSF RAILWAY UP RR AMTRAK 0.2 MI N. MAIN STREET (BRIDGE NO 54C0088)REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE. EXISTING BRIDGE TO BE REMOVED. Toll Credits to matchEARREPU funds. HBP project no. 3834
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SBD CO MEASURE I $794 - - - - - - - $794
Total Preliminary Engineering $794 - - - - - - - $794ROW 2016 EARMARK REPURPOSING - $2,591 - - - - - - $2,591ROW SBD CO MEASURE I - $1,835 - - - - - - $1,835
Total Right of Way - $4,426 - - - - - - $4,426CON SBD CO MEASURE I - - $5,735 - - - - - $5,735
Total Construction - - $5,735 - - - - - $5,735Total Programmed $794 $4,426 $5,735 - - - - - $10,955
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 109/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20171402 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$23,006
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 4TL104
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Projects for Bicycle and pedestrian facilities - Non - Motorized (ATP Cycle 3 State/MPO): Projects are consistent with 40 CFRPart 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (Non-motorized)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM $479 - $157 - - - - - $636PE ACTIVE TRANSPORTATION PROGRAM - MPO $15 - $52 - - - - - $67PE CITY FUNDS $103 - $13 - - - - - $116
Total Preliminary Engineering $597 - $222 - - - - - $819ROW ACTIVE TRANSPORTATION PROGRAM $42 - $191 - - - - - $233ROW ACTIVE TRANSPORTATION PROGRAM - MPO - - $978 - - - - - $978ROW CITY FUNDS $8 - $205 - - - - - $213
Total Right of Way $50 - $1,374 - - - - - $1,424CON ACTIVE TRANSPORTATION PROGRAM $792 $3,137 $1,888 $1,560 - - - - $7,377CON ACTIVE TRANSPORTATION PROGRAM - MPO - - $1,662 $7,461 - - - - $9,123CON CITY FUNDS $207 $943 $840 $2,273 - - - - $4,263
Total Construction $999 $4,080 $4,390 $11,294 - - - - $20,763Total Programmed $1,646 $4,080 $5,986 $11,294 - - - - $23,006
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 110/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20190701 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-09
ConformCategory
EXEMPT -93.126
TotalProject Cost$15,027
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCN25 - BICYCLE & PEDESTRAINFACILITIES-NEW Air Basin SCAB RTP ID 4TL104
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGrouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 4 (Statewide- Toll Credit to match ATP): Projects areconsistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - - $504 $403 - - - - $907PE CITY FUNDS - - $7 $11 - - - - $18
Total Preliminary Engineering - - $511 $414 - - - - $925ROW ACTIVE TRANSPORTATION PROGRAM - - $928 $125 - - - - $1,053ROW CITY FUNDS - - $180 $5 - - - - $185
Total Right of Way - - $1,108 $130 - - - - $1,238CON ACTIVE TRANSPORTATION PROGRAM - - $1,049 $6,177 $1,846 $2,108 - - $11,180CON CITY FUNDS - - $553 $1,054 - $77 - - $1,684
Total Construction - - $1,602 $7,231 $1,846 $2,185 - - $12,864Total Programmed - - $3,221 $7,775 $1,846 $2,185 - - $15,027
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 111/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD31905 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
EXEMPT -93.126
TotalProject Cost$172,685
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin SCAB RTP ID SBD31905
System Local HwyProjectLimits From n/a to n/a, Begin: 0 End:
DescriptionMT. VERNON AVENUE BRIDGE (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH4 LANE BRIDGE FROM RIALTO AVE TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66)(BRIDGE NO 54C0066)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $6,157 - - - - - - - $6,157PE CITY FUNDS $797 - - - - - - - $797
Total Preliminary Engineering $6,954 - - - - - - - $6,954ROW BRIDGE - LOCAL - - - $10,000 $15,000 $46,173 - - $71,173ROW CITY FUNDS - $9,221 - - - - - - $9,221ROW LOCAL ADVANCE CONSTRUCTION - $71,173 - $-10,000$-15,000$-46,173 - - -
Total Right of Way - $80,394 - - - - - - $80,394CON BRIDGE - LOCAL - - - - - $75,549 - - $75,549CON CITY FUNDS - - $9,788 - - $-447 - - $9,341CON LOCAL ADVANCE CONSTRUCTION - - $75,549 - - $-75,549 - - -CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - $447 - - $447
Total Construction - - $85,337 - - - - - $85,337Total Programmed $6,954 $80,394 $85,337 - - - - - $172,685
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 112/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBDLS08 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$289,886
LeadAgency
VARIOUSAGENCIES Modeling NO
County San Bernadino Primary Program Code NCR36 - BRIDGE RESTORATION &REPLC (NO LN ADD) Air Basin SCAB RTP ID SBDLS08
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionGROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM -PROJECTS ARECONSISTENT WITH 40 CFR PART 93.126, 127, 128 EXEMPT TABLES 2 & 3
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalCON AGENCY $3,006 $242 $7,823 $2,238 $2,001 $449 $1,410 $30,756 $47,925CON BRIDGE - LOCAL $23,203 $1,826 $1,900 $17,275 $15,443 $3,465 $11,372 $364,564$439,048CON LOCAL - ADVANCED CONSTRUCTION - $44 $58,480 - - - - $-117,048 $-58,524CON LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT - - - - - - $63 $1,020 $1,083
Total Construction $26,209 $2,112 $68,203 $19,513 $17,444 $3,914 $12,845 $279,292$429,532Total Programmed $26,209 $2,112 $68,203 $19,513 $17,444 $3,914 $12,845 $279,292$429,532
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 113/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 200866 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-15
ConformCategory
EXEMPT -93.126
TotalProject Cost$11,298
LeadAgency VICTORVILLE Modeling NO
County San Bernadino Primary Program Code NCR78 - SEISMIC RETROFIT Air Basin MDAB RTP ID REG0701System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionBRIDGE NO. 54C0547, BEAR VALLEY ROAD, OVER BNSF RY, AMTRAK, & UP RR, 3.8 MI E OF ROUTE I-15. Widen 6 lanebridge to 7 lanes (median turn lane) and seismically retrofitting existing bridge.
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE BRIDGE - LOCAL $620 - - - - - - - $620PE CITY FUNDS $80 - - - - - - - $80
Total Preliminary Engineering $700 - - - - - - - $700ROW BRIDGE - LOCAL $133 - $168 - - - - - $301ROW CITY FUNDS $17 - $22 - - - - - $39
Total Right of Way $150 - $190 - - - - - $340CON BRIDGE - LOCAL - - - - $5,540 - - - $5,540CON CITY FUNDS - - - - $718 - - - $718CON STP LOCAL - - $4,000 - - - - - $4,000
Total Construction - - $4,000 - $6,258 - - - $10,258Total Programmed $850 - $4,190 - $6,258 - - - $11,298
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 114/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID SBD97147 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-07
ConformCategory
NON-EXEMPT
TotalProject Cost$48,513
LeadAgency VICTORVILLE Modeling YES
County San Bernadino Primary Program Code CAX66 - NEW CONNECTNS/CROSSTRAFFIC IMP: RS Air Basin RTP ID SBD97147
System Local HwyProjectLimits From HESPERIA RD to RIDGECREST ROAD, Begin: 0 End:
DescriptionGREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD (TollCredits used to match EARREPU, SEC112, HIP & STP)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE SECTION 112 $230 - - - - - - - $230PE SECTION 117 $2,958 - - - - - - - $2,958
Total Preliminary Engineering $3,188 - - - - - - - $3,188ROW 2016 EARMARK REPURPOSING - $4,219 - - - - - - $4,219ROW SBD CO MEASURE I - $500 - - - - - - $500ROW SECTION 112 $760 - - - - - - - $760
Total Right of Way $760 $4,719 - - - - - - $5,479CON AGENCY - - $4,219 - - - - - $4,219CON CITY FUNDS - - $16,818 - - - - - $16,818CON HIGHWAY INFRASTRUCTURE PROGRAM (HIP) - - $7,545 - - - - - $7,545CON STP LOCAL - - $11,264 - - - - - $11,264
Total Construction - - $39,846 - - - - - $39,846Total Programmed $3,948 $4,719 $39,846 - - - - - $48,513
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 115/116
2019 Federal Transportation Improvement ProgramSan Bernardino County
Local Highway - Project ListingIncluding Amendments 1-11 and 13-19_21
(In $000`s)
FTIP ID 20170502 FTIP Amendment San Bernardino County TransportationAuthority (SBCTA) 19-02
ConformCategory
EXEMPT -93.126
TotalProject Cost$779
LeadAgency
YUCCAVALLEY Modeling NO
County SanBernadino Primary Program Code NCN27 - PEDESTRIAN FACILITIES-NEW Air Basin RTP ID 0A6410
System Local HwyProjectLimits From to , Begin: 0 End:
DescriptionYucca Valley: Little League Drive Pedestrian Improvements (ATP Cycle 3 - Statewide Component)
Phase Fund Source (in $000s) Prior 18/19 19/20 20/21 21/22 22/23 23/24 Future TotalPE ACTIVE TRANSPORTATION PROGRAM - - $68 - - - - - $68
Total Preliminary Engineering - - $68 - - - - - $68CON ACTIVE TRANSPORTATION PROGRAM - - - $554 - - - - $554CON AGENCY - - - $157 - - - - $157
Total Construction - - - $711 - - - - $711Total Programmed - - $68 $711 - - - - $779
5/12/2020 Public Project Listings
https://scag.ecointeractive.com/secure/report_fed_type_pj_list_all.asp?CMD=report&FFY_TYPE=&PUBLIC_FILTER=&MC_GROUP=&ONLYTOT… 116/116
5/12/2020 Public Project Listings