PREPARATION FOR FILLING
OF
WATER-WAYS AT AMBUKLAO
8/2/2019 110427 Prep for Water Filling
2/14
2
FILLING OPERATION
Filling is made by use of two pumps at the intake, one pump is spare for theother. Use of the gate is not permitted.
Filling shall be made in a controlled manner, not exceeding an average pressure
increase of 5 m/hour. Stops in the filling is done to record the drawdown over
time, and to obtain the average filling speed.
During filling and stops, the level of water in the shaft shall be recorded, both
automatically and manually.
10 stops for water level monitoring is planned.
Increasing the water level to the next stop may take place when the water
drawdown is levelling out. This is considered when the drawdown is 2 - 3 m/h.
At firsts stops several refilling may be required before we may observe a
levelling out.
Before filling starts, various works needs to be done and items controlled.
Checklist is made for this purpose.
The filling is expected to take approximate 4 days.
8/2/2019 110427 Prep for Water Filling
3/14
3
Observation
stages
Initial Water
level
Volume of
waterway
(excl chamber)
to level
Estimated
Duration of stop
Maximum
drawdown before
re-filling Main Purpose
Elevation in m Hours Elevation in m
stage 1 6233105
2 N/A Record lekages in mechanical systems. Test of instrumentation,bypass valves ror emptying waterways
Stage 2 660
3401
2 N/A Check of adit gate, major lekages through gate concrete/rock,
lekages from mechanical system, instrumentation, V-notche
readings, pressure readings, other general leakage observations
Stage 3 680440
12 650 General leakage and pressure registation
Staeg 4 700
440
9 670 General leakage and pressure registation
Stage 5 710220
6 680 General leakage and pressure registation
Stage 6 720220
6 690 General leakage and pressure registation
Stage 7 730220
6 700 General leakage and pressure registation
Stage 8 740220
8 710 General leakage and pressure registation
Stage 9 746130
8 710 General leakage and pressure registation
Stage 10 752 130 8 715 General leakage and pressure registation
FILLING PROGRAM
8/2/2019 110427 Prep for Water Filling
4/14
4
TENTATIVE FILLING PLAN
600
610
620
630
640
650
660
670
680
690
700
710
720
730
740
750
760
0 10 20 30 40 50 60 70 80 90 100
HOURS FROM START OF FILLING
WATERLEVE
8/2/2019 110427 Prep for Water Filling
5/145
CHECKLISTS
Civils works
ME works
8/2/2019 110427 Prep for Water Filling
6/146
MONITORING PROGRAM
In addition to monitor the water level in the water way, the following
monitoring points shall be regularly monitored:
Pressure behind lining in manifold area
Pore pressure monitoring points in Access to Power House and outside
adit plug.
Leakage points in Access tunnel/valve Chamber, existing and New
Leakages over v-notches
Total leakage recorded in pump sump.
8/2/2019 110427 Prep for Water Filling
7/147
8/2/2019 110427 Prep for Water Filling
8/148
Monitoring
Stops
Waterat
maximum
elevationCriteriafor
LevellingOFF
Acceptable leakage
throughadit
plug
Increasedleakageat
leakagepoints
AcceptabLe
INCREASEDleakage
topump
sump
Increasedrockpore
pressurecombined
withcorresponding
increasedleakage
m/h l/min l/min l/min barandl/min
1) 2) 3) 4) 5)
stage1 623 N/A N/A 0 0 *)
Stage2 660 N/A 13,8 0 20 *)
Stage3 680 2 21,7 5 100 *)
Stage4 700 2 29,5 7,5 200 *)
Stage5 710 2 33,5 10 300 *)
Stage6 720 2,5 37,4 12,5 375 *)
Stage7 730 2,5 41,3 15 420 *)
Stage8 740 2,5 45,3 17,5 450 *)
Stage9 746 2,5 47,6 18,5 476 *)
Stage10 752 2,5 50 20 500 *)
1)
2)
3)
4)
5)
6)
Anyrockfallinaccesstoaditplugmaycallforimmediatestopoffilling,andtheneed fordischargeofwater
shall
be
assessed,
together
with
be
need
of
drilling
pressure
relief
holes
and
installing
additional
bolts.
Ifpressureincreaseswithsamerateandcorrespondingtoactualwaterpressurefromthetunnelatactual
elevationcombinedwithcorrespondingincreasedwaterleakage,fillingmaybestopped.
TENTATIVETRESHOLDVALUESTOSTOPFILLINGFORFURTHERASSESSMENTOFTHESITUATION
Ifthe
drawdown
suddenly
increases
during
stops,
together
with
falling
water
level,
filling
should
stop.
at
the
firststopsdrawdownmaybeashighas15 20m/hourduetofillingofpplugchamber.Anyaccidentalstop
duringfillingshallimmediatelybereportedfromIntake tocontrolsenter.
Highlekagesatlowpressuremaycallforadditional groutingoftheplug
Iflekagesshowtendenstoincrease duringmonitoringstopscombinedwithcolouredwater indicatingwasking
out,lowervaluestostopgroutingmayberequired.
Thetotalcapacityofthepumpsisumpis120l/s(or7200l/min) Ifpumpstops,fillingshallalsostop,andany
needto
start
discharging
water
shall
be
assessed.
Any
accidental
inflows
getting
close
to
pump
capacity
call
for
immediatestopoffillinganddischargeofwater.
8/2/2019 110427 Prep for Water Filling
9/149
Monitoring
Stops
Waterat
maximumelevation
Approx.max.
pressureat
Manometer
levelATPH,el
620
Approx.max
Pressureat
manometer
levelatAdit
PlugEl.625
bar bar
Pressuregauges Vnoche s Leakagepoints Pumpsump
Water
pressure
behindlining
Water
elevation
shaft
Basicreading
stage1 623 0,3 0 One
time One
time One
time One
time one
time 30
min
Stage2 660 4 3,5 60min 60min 60min 60min 60min 30min
Stage3 680 6 5,5 60min 60min 60min 60min 60min 30min
Stage4 700 8 7,5 60min 60min 60min 60min 60min 30min
Stage5 710 9 8,5 60min 60min 60min 60min 60min 30min
Stage6 720 10 9,5 30min 60min 60min 60min 60min 30min
Stage7 730 11 10,5 30min 60min 60min 60min 60min 30min
Stage8 740 12 11,5 30
min 60
min 30
min 60
min 60
min 30
min
Stage9 746 12,6 12,1 30min 30min 30min 60min 60min 20min
Stage10 752 13,2 12,7 30min 30min 30min 60min 60min 20min
Notes:
PumpSump:
Pressuregauges:
Leakagepoint: AnymajorincreaseofleakagesatleakagepointsornewlekagesshallimmediatelybereportedtoShiftManager.
Doublereadingshallbemadeifincreasedleakageisrecordedtoavoidmistakes.
Followingobservedeventsfrequencyofreadingsmayneedtobeadjusted
Frequencyofreadingevery
Readingsisdoneautomaticallybyregisteringstopandstarttimeofthepumps.Monitoringpersonnelisrequiredto
obtain
actual
reading
at
frequency
indicted
for
further
reporting
to
management
Anysuddenincreaseinpressureupto tomaximumlevelfortherespectivemanometerandstageofmonitoring,see
above,shallimmediatelybereporedtoShiftManager.
FREQUENCY OF READINGS
8/2/2019 110427 Prep for Water Filling
10/1410
Team/Personnel Position Responsibility/Main taskDay shift Night Shift Day shift Night Shift Day shift Night Shift Day shift Night Shift Day shift Night Shift
8-20 20 - 8 8-20 20 - 8 8-20 20 - 8 8-20 20 - 8 8-20 20 - 8
Team 1
Svein Kvaalen Shift Manager
Overall responsible, Special task: direct
filling operation occurring at his
shift/Instructions to contractors
Tarald nomeland Dep. Shift manager
Dep. to shift Manager, Main responsibility
monitoring/ Special grouting taskplanner
Gil Geologist
Joseph Inspector/Engineer
Max
Eric
Vic Computer assitance
Office Backup/Adding data in Excel/making
plans etc/making site instrutions
From MCD
Kaos
From Andrits
Hansulrich Lirgg
Team 2
Terje Ellefsrd Shift Manager
Shift responsible, Special task: direct filling
operation occurring at his shift/Instructions
to contractors
Jan Idar kollstrm Dep Shift manager
Dep. to shift Manager, Main responsibility
monitoring/ Special grouting task planner
Val Inspector/Engineer
Dominique Inspector/Engineer
George Inspector/Engineer
Tom Inspector/Engineer
Rhodora Computer assistance
Office Backup/Adding data in Excel/making
plans etc/making site instrutions
From MCD
John
From Andrits
Severino Diriwachter In Charge
Day 1 Day 2 Day 3 Day 5Day 4
Leakage/pore pressure monitoring -observe
chaniges in leakage pattern, grouting follow
up etc. V-notch/pump pit observations,
Water level and lining pressure records
Leakage/pore pressure monitoring -observe
chaniges in leakage pattern, grouting follow
up etc. V-notch/pump pit observations,
Water level and lining pressure records
Filling records, Backup ME
failures/inspections
Filling records, Backup MEfailures/inspections
Prepareness for grout drilling, grouting,
sleeve installation, discharge valve
operation, safety
Prepareness for grout drilling, grouting,
sleeve installation, discharge valve
operation, safety
SHIFT PLAN/RESPONSIBILITY
8/2/2019 110427 Prep for Water Filling
11/1411
For monitoring works, each shift shall have 2 groups of 2 persons
each, who will divide the area geographically between each other.
There shall always be minimum 2 persons in the tunnel.
If one persons leave the tunnel, this shall be reported to the other
group.
All persons in the monitoring team shall be able to read pressure
gauges, v notches and record water leakages and receive training for
this.
Max and Gil is requested to perform this training. For this purpose a
minimum of 2 records per week to be made until filling start shall be
made by the groups
All monitoring points shall be shown on one drawing. The control room in the switchyard shall be command centre for the
filling operation
8/2/2019 110427 Prep for Water Filling
12/1412
SAFETY
MCD as main contractor will have overall responsibility for safety
A meeting will be conducted with the contractors at Site to go through
the filling operation and to identify the inherent risks
The following items are identified as important for the filling operation:
Communication
Sandbags outside valve chamber
Awareness and procedures of evacuation and escape routes
Safety gears (Flash lights)
Procedure for operation of discharge valves
No touch policy being in Power House and valve chamber
8/2/2019 110427 Prep for Water Filling
13/1413
SUPPORT FROM CONTRACTORS:
MCD:
Installation and operation of pumps at the intake. There shall be 2 operators at each shift.
Operation of discharge valves in Valve chamber. There shall be 2 operators at each shift.
Arrange communication: 2 radio with the monitoring teams, one radio at Intake, one at
valve chamber, one in Control room, one at shift Manager (Engineer) + backup and
battery charging facilitates. Name of those who shall carry radios shall be given to MCD
Team of skilled and unskilled workers to do grout drilling, grouting, sleeve setting and
other works required ( Handling of sandbags etc).
Personnel Safety of the operation
At Intake and valve-chamber, there shall always be one operator present even during meal
breaks. Names of operators, and works superintendant to be provided.
ANDRITZ: Operation/safeguarding data from monitoring equipment for water levels, Toother works required on Mechanical/electrical installations.
THE ENGINEERS DUTIES:
Overall management and decision making during the filling operation
Monitoring works inside the tunnels
8/2/2019 110427 Prep for Water Filling
14/1414
OTHER MATTERS
SAFETY MEETING WITH CONTRACTORS
PLANNING MEETINGS WITH CONTRACTORS
BASIC READINGS BEFORE START OF FILLING
CLOSE OUT OF CHECK LISTS
ON SCHEDULE TO START FILLING BY MAY 2, 2011
KICK OFF MEETING
SAFE JOB ANALYSIS