    BILL PRICE & DAVID ELDER // 7 NOVEMBER 2013

    07 NOVEMBER 2013

    Building Europes Tallest

    The Shard LondonBill Price & Dave Elder

    CTBUH AWARDS 2013

  • 7/23/2019 11 Shard Price

    3/67

    The Shard

    CTBUH AWARDS 2013 THE SHARD SLIDE 2

    1. Background2. Planning

    3. Design Development

    4. Safety

    5. Top Down & Basement

    6. Craneage

    7. Pre-Assembly

    8. The Spire

  • 7/23/2019 11 Shard Price

    4/67

    The Shard Location

    CTBUH AWARDS 2013 THE SHARD SLIDE 3

  • 7/23/2019 11 Shard Price

    5/67

    The Shard Location

    Canary WharfThe CityWest End

    Westminster Tower BridgeLondon Eye

    Parliament St PaulsJUBILEE LINE

    CTBUH AWARDS 2013 THE SHARD SLIDE 4

  • 7/23/2019 11 Shard Price

    6/67

    The Shard Location

    Guys and St Thomas GLA Tower Bridge

    Southwark Cathedral

    London Bridge Station

    More London Tower of London

    CTBUH AWARDS 2013 THE SHARD SLIDE 5

  • 7/23/2019 11 Shard Price

    7/67

    The Shard Height

    Freedom Tower

    541m

    Eiffel Tower

    324mThe Shard

    306m

    One Canada Square

    235m

    CTBUH AWARDS 2013 THE SHARD SLIDE 6

  • 7/23/2019 11 Shard Price

    8/67

    The Shard Team

    Client: Sellar Property Group on behalf of LBQ Ltd

    Architect: Renzo Piano Building Workshop / Adamson Associates

    Structural Engineer: WSP Group

    Services Engineer: Arup

    Project Manager: Turner + Townsend

    Cost Consultant: Davis Langdon

    Main Contractor: Mace

    CTBUH AWARDS 2013 THE SHARD SLIDE 7

  • 7/23/2019 11 Shard Price

    9/67

    The Shard Key Data

    Gross Internal Area 127,000m2

    Net Internal Area 85,000m2

    Residential 5,800m2

    Hotel 17,800m2

    Offices 55,600m2

    Retail 5,600m2

    CTBUH AWARDS 2013 THE SHARD SLIDE 8

    Volume of Concrete 54,000m3

    Weight of Steel 11,000 Tones

    Lifts 44

    Area of Faade 56,000m2

    Population 8,000

    Car Parking Spaces 48

  • 7/23/2019 11 Shard Price

    10/67

    The Shard Key People

    CTBUH AWARDS 2013 THE SHARD SLIDE 9

    IRVINE SELLAR

    KEN LIVINGSTONERENZO PIANO

  • 7/23/2019 11 Shard Price

    11/67

    The Shard Design Development

    Canaletto, The Thames & The City, 1746-47

    CTBUH AWARDS 2013 THE SHARD SLIDE 10

  • 7/23/2019 11 Shard Price

    12/67

    The Shard Design Development

    CTBUH AWARDS 2013 THE SHARD SLIDE 11

  • 7/23/2019 11 Shard Price

    13/67

    The Shard Design Development

    CTBUH AWARDS 2013 THE SHARD SLIDE 12

  • 7/23/2019 11 Shard Price

    14/67

    The Shard Design Development

    CTBUH AWARDS 2013 THE SHARD SLIDE 13

  • 7/23/2019 11 Shard Price

    15/67

    The Shard Design Development

    Celebration at Design museum, Irvine Sellar, Renzo Piano,

    Ken Livingstone and many others present

    Planning

    99 00 01 02 03 04 05

    Renzo Piano appointed

    Design Development

    Called in

    (July)

    Public

    Inquiry

    (April)

    Successful

    outcome (Nov)

    Submit

    (March)

    Approval

    March)

    CTBUH AWARDS 2013 THE SHARD SLIDE 14

  • 7/23/2019 11 Shard Price

    16/67

    The Shard Design Development

    Spire 75-87 (14)

    Viewing Gallery 68-72 (5)

    Plant 66-67 (2)

    Apartments 53-65 (13)

    Hotel 34-52 (19)

    Restaurants 31-33 (3)

    Plant 29-30 (2)

    Offices 04-28 (25)

    Reception, retail 00-03 (3)

    Basement plant B1-B3 (3)

    CTBUH AWARDS 2013 THE SHARD SLIDE 15

  • 7/23/2019 11 Shard Price

    17/67

    The Shard Design Development

    CTBUH AWARDS 2013 THE SHARD SLIDE 16

  • 7/23/2019 11 Shard Price

    18/67

    The Shard Design Development

    CTBUH AWARDS 2013 THE SHARD SLIDE 17

  • 7/23/2019 11 Shard Price

    19/67

    The Shard Wind Tunnel

    CTBUH AWARDS 2013 THE SHARD SLIDE 18

  • 7/23/2019 11 Shard Price

    20/67

    The Shard The Core: Shear Walls

    CTBUH AWARDS 2013 THE SHARD SLIDE 19

  • 7/23/2019 11 Shard Price

    21/67

    The Shard The Core: Wing Walls

    CTBUH AWARDS 2013 THE SHARD SLIDE 20

  • 7/23/2019 11 Shard Price

    22/67

    The Shard The Core: Hat Truss

    CTBUH AWARDS 2013 THE SHARD SLIDE 21

  • 7/23/2019 11 Shard Price

    23/67

    The Shard Office Levels

    L09

    CTBUH AWARDS 2013 THE SHARD SLIDE 22

  • 7/23/2019 11 Shard Price

    24/67

    The Shard Office Levels

    CTBUH AWARDS 2013 THE SHARD SLIDE 23

  • 7/23/2019 11 Shard Price

    25/67

    The Shard Hotel & Residential

    L45

    CTBUH AWARDS 2013 THE SHARD SLIDE 24

  • 7/23/2019 11 Shard Price

    26/67

    The Shard Floors: Steel V Concrete

    CTBUH AWARDS 2013 THE SHARD SLIDE 25

  • 7/23/2019 11 Shard Price

    27/67

    The Shard Terminology

    CTBUH AWARDS 2013 THE SHARD SLIDE 26

  • 7/23/2019 11 Shard Price

    28/67

    The Shard Transfers

    CTBUH AWARDS 2013 THE SHARD SLIDE 27

  • 7/23/2019 11 Shard Price

    29/67

    The Shard Cladding

    CTBUH AWARDS 2013 THE SHARD SLIDE 28

  • 7/23/2019 11 Shard Price

    30/67

    The Shard Plant

    CTBUH AWARDS 2013 THE SHARD SLIDE 29

  • 7/23/2019 11 Shard Price

    31/67

    The Shard Plant

    CTBUH AWARDS 2013 THE SHARD SLIDE 30

  • 7/23/2019 11 Shard Price

    32/67

    The Shard Plant

    CTBUH AWARDS 2013 THE SHARD SLIDE 31

  • 7/23/2019 11 Shard Price

    33/67

    The Shard Sustainability

    Public transport hub

    Mixed use building

    Local jobs and training

    BREEAM Excellent achievedTriple skin intelligent faade

    CTBUH AWARDS 2013 THE SHARD SLIDE 32

  • 7/23/2019 11 Shard Price

    34/67

    The Shard Sustainability

    95% of demolition materials recycled

    50% of steelwork from recycled sources

    70% GGBs in basement slab (saving 700 tonnes of cement)

    Natural ventilation10% Co2 saving annually from use of CHP

    CTBUH AWARDS 2013 THE SHARD SLIDE 33

  • 7/23/2019 11 Shard Price

    35/67

    The Shard Preconstruction

    CTBUH AWARDS 2013 THE SHARD SLIDE 34

  • 7/23/2019 11 Shard Price

    36/67

    The Shard Location

    CTBUH AWARDS 2013 THE SHARD SLIDE 35

  • 7/23/2019 11 Shard Price

    37/67

    The Shard Project Charter

    Challenge

    Construct the Tallest Building in Europe above

    London Bridge Station

    Objectives

    Safely to work safely home

    Be at one with our neighbours

    Deliver on time and on budget

    Commitment

    One team culture committed to success of The Shard

    A mind-set to keep the project ahead of the curve

    A team that continuously delivers value

    CTBUH AWARDS 2013 THE SHARD SLIDE 36

  • 7/23/2019 11 Shard Price

    38/67

    The Shard Health & Safety

    CTBUH AWARDS 2013 THE SHARD SLIDE 37

    safely to work safely home 8 Million Man hours worked

    250 million commuters thro London Bridge Station

  • 7/23/2019 11 Shard Price

    39/67

    The Shard Construction Program

    2009 2010 2011 2012 2013

    01. Piling

    02. Ground Floor

    03. Top Down Construction

    04. Steelframe (L00-L40)

    05. Concrete Core

    06. Concrete Frame (L40-L72)

    07. Cladding

    08. Spire (L72-L87)

    09. Plant/MEP Installations

    10. Physical Completion

    10. Fit Out

    11. Project Completion

    Logistics Personnel

    Snagging & Final Clean

    External Works

    Station Works

    Internal Walls/Builderswork

    S&C FinishesLift & Escalator Installations

    MEP Installations & Equipment

    Cladding & Envelope

    Steelwork

    Main Core & Superstructure Concrete

    1500

    1000

    500

    London 2012

    Games

    CTBUH AWARDS 2013 THE SHARD SLIDE 38

  • 7/23/2019 11 Shard Price

    40/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 39

  • 7/23/2019 11 Shard Price

    41/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 40

  • 7/23/2019 11 Shard Price

    42/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 41

  • 7/23/2019 11 Shard Price

    43/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 42

  • 7/23/2019 11 Shard Price

    44/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 43

  • 7/23/2019 11 Shard Price

    45/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 44

  • 7/23/2019 11 Shard Price

    46/67

    The Shard Core Constraints

    CTBUH AWARDS 2013 THE SHARD SLIDE 45

  • 7/23/2019 11 Shard Price

    47/67

    The Shard Basement Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 46

  • 7/23/2019 11 Shard Price

    48/67

    The Shard Basement Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 47

  • 7/23/2019 11 Shard Price

    49/67

    The Shard Top Down Core Construction

    CTBUH AWARDS 2013 THE SHARD SLIDE 48

  • 7/23/2019 11 Shard Price

    50/67

    The Shard Craneage Strategy

    Dont compromise on crane positions, consider

    the optimum location for each stage of the project

    Crane strategy need to adapt the

    progress on the works

    CTBUH AWARDS 2013 THE SHARD SLIDE 49

  • 7/23/2019 11 Shard Price

    51/67

    The Shard Craneage Strategy

    CTBUH AWARDS 2013 THE SHARD SLIDE 50

  • 7/23/2019 11 Shard Price

    52/67

    The Shard Craneage Strategy

    CTBUH AWARDS 2013 THE SHARD SLIDE 51

  • 7/23/2019 11 Shard Price

    53/67

    The Shard Craneage Strategy

    CTBUH AWARDS 2013 THE SHARD SLIDE 52

  • 7/23/2019 11 Shard Price

    54/67

    The Shard Craneage Strategy

    CTBUH AWARDS 2013 THE SHARD SLIDE 53

  • 7/23/2019 11 Shard Price

    55/67

    The Shard British Weather/Downtime

    CTBUH AWARDS 2013 THE SHARD SLIDE 54

  • 7/23/2019 11 Shard Price

    56/67

    The Shard British Weather/Downtime

    CTBUH AWARDS 2013 THE SHARD SLIDE 55

    Affected by season

    Affected by height

    Activity

    Unpredictable at Height

    2010

    2011

    2012

    Height 0m to 100m

    Height 100m to 200m

    Height 200m to 300m

    J F M A M J J A S O N D

    21% 19% 24% 17% 24% 21% 23% 15% 52% 51% 44% 41%

    J F M A M J J A S O N D

    10% 8% 17% 7% 0% 6% 16% 16% 30% 29% 34% 27%

    J F M A M J J A S O N D

    80% 68% 68% 54% 53%

  • 7/23/2019 11 Shard Price

    57/67

    The Shard Hoists

    CTBUH AWARDS 2013 THE SHARD SLIDE 56

    http://www.cybertects.co.uk/gallery2/v/architecture/london/shard/20100525_0136.jpg.html?g2_imageViewsIndex=1
  • 7/23/2019 11 Shard Price

    58/67

    The Shard Cladding

    CTBUH AWARDS 2013 THE SHARD SLIDE 57

  • 7/23/2019 11 Shard Price

    59/67

    The Shard Jump Lifts

    CTBUH AWARDS 2013 THE SHARD SLIDE 58

    Deflection deck

    Protection deck

    Working Deck

    Install Platform

    Cathead

    Elevator

    Doors

    Rope Drum

  • 7/23/2019 11 Shard Price

    60/67

    The Shard Jump Lifts

    CTBUH AWARDS 2013 THE SHARD SLIDE 59

  • 7/23/2019 11 Shard Price

    61/67

    The Shard RC Frame/Screens

    CTBUH AWARDS 2013 THE SHARD SLIDE 60

  • 7/23/2019 11 Shard Price

    62/67

    The Shard Pre-Assembly: Plant

    CTBUH AWARDS 2013 THE SHARD SLIDE 61

  • 7/23/2019 11 Shard Price

    63/67

    The Shard Pre-Assembly: Spire

    CTBUH AWARDS 2013 THE SHARD SLIDE 62

  • 7/23/2019 11 Shard Price

    64/67

    The Shard Pre-Assembly: Spire

    CTBUH AWARDS 2013 THE SHARD SLIDE 63

  • 7/23/2019 11 Shard Price

    65/67

    The Shard Pre-Assembly: Spire

    CTBUH AWARDS 2013 THE SHARD SLIDE 64

    March 2012

  • 7/23/2019 11 Shard Price

    66/67

    The Shard The Spire

    CTBUH AWARDS 2013 THE SHARD SLIDE 65

    May/June 2012

  • 7/23/2019 11 Shard Price

    67/67

    The Shard Inauguration Ceremony

    July 2012