Now we dry…
• All the GEMs are in.• All the tests are done (twice):
– Capacitance while connected.– Voltages on cables.
• Glove Box being used as dryer:– 50 cfm….~1400 liters/minute.– 4.5 ppm and falling…
3
Odds and Ends:
• Schedule:– Dry the detector all this week.– Remove from glove box Monday Oct 9.– Ship to BNL Monday October 16.
• Flashing the detector.– I personally don’t like the LED option:
• QE at 250 nm is probably dominated by thermal noise.• The real test is QE at low wavelengths!
– The only reason that we can’t flash normal lamps is that Hamamatsu uses transformers.
• I am 100% certain we can flash a normal lamp.• Transformer in base is removable and non-magnetic circuit is
easy to design and build.• So…put 4 lamps on the detector…put electronics far far
away.