Contents LHC consolidation: tests completed in 2010
Projects completed in 2010
Test facility consolidation
Where are we now?
Planning
Foreseen Activities for 2011
3
LHC consolidation: tests completed in 2010 600A and 14kA connections : 2 sessions with screwed and crimped 600A
connection 1 test with 14kA screwed connections.
Pray-Hand: 3 tests ,12000 cycles up to 9kA, without kapton belt 2000 cycles up to3kA and 12000cycles up to 6kA
Factor was1.5 on current, 2.25 on forces and about 10 on lifetime No resistance degradation after cycling.
Diode: one session with thermal dependence and 4sessions of 4 diodes.
Copper Bar: A 4 cm defect was introduced in a 5m long copper bar
of cross section 20X10mm, to estimate the current carrying capacity of copper
in case of a default in a bus bar.
We were able to regulate at different stables temperatures (24k, 13k, 40k,…).
Defect machined out of the bar
4
Projects completed in 2010KIT Wiggler: 5 tests during the year. the goal was to ramp up to 175A, but only 156A have been reached.
TQS03: 3 tests – Aging with 1000 cycles up to11kA with a quench after each 150 cycles. - Loss measurements: electrically and by cryogenic measurements
of the dissipated power. - Magnetic measurements.
Russian Wiggler: one test with shielding (max current 120A).
HFM: SMC Component qualification at cold, test with dummy and real coils, powering one coil at 7784A.
MgB2: -5 tests of cables and wires samples during the year.
-2 bending tests with different radius.
HIE Isolde: Nb3Sn 2 tests of both impregnated and ceramic solenoids
5
Test facility Consolidation
Cryostat 1 ( aux)
Cryostat 2 (diode + CL)
Cryostat 3 ( FRESCA 2)
Cryostat 4 ( LONG)
Feed Box x SCL and FCM
Switch
Cryo Racks DAQ Racks DAQ Racks
Cryo Control
VERTICAL test benches &
Supercritical helium test station
6
Civil engineering started in March 2010
Dismounting Block 4 started on 15th of October 2010
Test facility Consolidation
Status in October 2010
7
Where are we now? Vertical station in SM18
First test expected March 2010
Bat 892-bloc4
Should be empty end of 2010
8
Déménagement bloc41 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 8
Fonctionnement bloc4 :
Avec 20KA, switch, barres cuivreAvec boite à vannes (possibilité tests avec PS 2KA et 600A)
Fonctionnement SM18
Génie Civil (4 puits) + 3 semaines Séchage
Obturation Puits, mise en sécurité
Plateforme
Fabrication Daniel P.
Pose plateforme + 2 potences (pour retour chaud + cables controles) Daniel P. Potences + modification DanielInstallation salle de contrôle Daniel P.
Installation électriques
Installation armoire secteur triphasée (support ?) + raccordement Nuno D. Raccordement NunoPose chemin de cables sous PF Jean-Claude G.Pose chemin de cables en périphérique de la PF NunoDistribution des prises secteurs + alimentations racks ?? +20KA Nuno
Tirage câbles Nuno ????
Mise en place racks electriques Mickael K. Julien H.
Installation cryogénie
Pose tuyauterie cryo (retour chaud, ballon, pompage …) ou Vladislav B., Patrick V. (TF)Raccordement rack cryo ST long Vladislav B., Patrick V. (TF)
Démontage et installation boite a vannes + raccordement electrique ?????? Vladislav B., Patrick V.
Alimentation et câbles de puissance
Démontage au bloc4 câbles de puissance (Alimentation, switch..) Jean-Claude G.Alimentation 20KA (Démontage, installation et révision) Hugues T., Patrick V. Switch thyristor + mécanique (Démontage, installation et révision) Knud D., Patrick V. Démontage au bloc4 et pose Barres de cuivre pour distribution 20KA Patric FredInstallation câbles de puissance (Alim., switch, PS-->B.barres + switch) Jean-Claude G.
Eau déminéralisée de refroidissement Frank Franck M.Alimentation 600A Hugues T., Patrick V. (TF)
Tourelles
Démontage tourelle ST Longue et installation Patrick Fred
Installation et cablage racks
Plc cryo.(cablage armoire, programmation, cablage extérieur)? Marco P., Christian G., Jerome F., FredPlc alimentations(cablage armoire, programmation, cablage extérieur)? David, Christian G., Jerome F., Michael K.
Système d'acquisition PXI (cablage)? Gaelle D., Frederic F.Rack alimentation chaufferette Michael K., Jerome F.
Supervision cryo. Marco P., Christian G. (TF)
Fonctionnement Station- Longue
Déplacement et installation cryostat Patrick V. (TF) et cryo.Rack cryo (raccordement) avec cryostat Patrick V. (TF)
Rack détection quenches (cablage)+ matrice de sécurité(cablage) Christian G., Michael K., Jerome F.(TF)Rack mesures magnétique (cablage) Guy D., Frederic F.Rack Plc automate (Raccordement et mise au point) Marco P, Christian G., Jerome F., Michael K. (TF)Rack acquisition PXI (Raccordement, cablage) Gaelle D., Frederic F.Rack instrumentation (Temp., Pression, chauffage…) Michael K., Christian G.Installation câbles de puissance (B.barres--> Leads + support) Jean-Claude G., Patrick V.
Fonctionnement SC-Link
CryoRack lecture (potentiels, températures)
Rack Plc automateCâbles puissance 13KA + supportModification et Installation Feedbox
semaine semaine semaine semaine semaine semaine semaine semaine semaine semaine semaine semaine mars-11 avr-11 mai-11sept-10 oct-10 nov-10 déc-10 janv-11 févr-11juin-10 juil-10 août-10
9
Foreseen activities for2011 HQ: in March or April @1,9K
SMC: From march for 4 models with several cool downs, 3months
Diodes: 4 runs of 4 diodes starting in August
HIE Isolde solenoids: starting in July
Wiggler for Clic: starting in July
SC Link and FCM from May and for 5 weeks