MT PARK 63(1) Tom Miner Creek Road Capital Improvements Project Construction Newsletter

For questions regarding the project contact:

Matt Bean - WFL PE

(360) 607-4061

[email protected]

CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter, SC 29150

TheTomMinerCreekRoadCapitalImprovementsProjectislocatedapproxi-mately40milesSouthwestofLivingston,MontanainParadiseValley.Thepro-jectworkconsistsofremovalandreplacementofthetwodeterioratingshortspanconcretebridgesoverTomMinerCreekandRockCreek.TheexistingbridgeswillbereplacedwithlongerandwiderGRS-IBSbridges,riprapprotec-tion,andguardrail.TheprojectwillalsoincludesomerehabilitationworkontheCarbellaTrussBridgeconsistingofreplacingtheexistingbridgedeckandrepairingsomeofthetrussmembers.

Traf icControl

CurrentOperations

ConstructionsignsareinplacedfortheRockCreekandTomMinerworksites.Flaggersmaybeutilizedtocontroltheworkzones,ifnecessary.Forlargervehicletraf icutilizingtheRockCreekBridgebeawareofconstructiontraf icandpersonnelattheworksiteduringworkinghours.Pleaseslowdownanddrivesafelythroughtheworkareas.

WorkontheTomMinerprojectissettoresumeJune10,2019.TheContractorwillberemobilizingtotheprojecttocompletetheremainingroadworkattheRockCreekandTomMinersites.BeginningnextMondaytheContractorwillbegintheroadwayexcavation, inalriprap,culvertinstallation,andaggregateplacementworkfortheRockCreeksite.WorkattheTomMinersitewillalsobeoccurringintermittentlyorwhentheRockCreeksiteiscompleted.Workontheprojectisanticipatedtobecom-pletedbythebeginningofJuly.TheContractorisscheduledtoworkMondaythroughSaturdayfrom7:00a.m.to5:30p.m.untilworkiscompleted.TheRockCreekBridgewillremainopentotraf icthroughoutthecompletionoftheremainingwork.Lightvehicletraf icisencouragedtousetheCarbellaBridgetoavoidconstructiondelays.LargervehicleswillbeabletoutilizetheRockCreekBridgeduringworkhoursbutareencouragedtousethebridgeoutsideofworkhoursasmuchaspossibletoavoidconstructiondelays.

Page 2: 06-04-2019 MT PARK 63(1) Newsletter · 2019-06-04 · Matt Bean - WFL PE (360) 607-4061 matthew.bean@dot.gov CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter,

Construction Photos

Page 2 MT PARK 63(1)

The Tom Miner Creek site where riprap, ap-proach construction, ag-gregate placement and finishing, and other mi-nor items of work re-main to be completed.

The Rock Creek Bridge site where riprap, road-way excavation, aggregate placement, culvert instal-lation, and other minor items of work remain to be completed.