13
ZPC – POWER AND ENERGY PROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Embed Size (px)

Citation preview

Page 1: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

ZPC – POWER AND ENERGY PROJECTS

PRESENTED BY: DOUGLAS CHINGOKAZIMBABWE POWER COMPANY

Page 2: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Overview Electricity is a crucial input into the industry’s production

cycle. Zimbabwe is plagued by a shortage of power. Reliable capacity is of the order of 1320 MW against a

demand of about 2200 MW. There is need for investments to be made in order to increase

the amount of reliable capacity. The increase in reliable capacity should be made available at a

competitive price.

Page 3: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Current Electricity Industry Structure

Ministry of Energy and Power Development

(MOEPD)

Zimbabwe Energy Regulatory Authority

(ZERA)

ZESA HoldingsRural

Electrification Agency (REA)

Zimbabwe Power Company

(ZPC)

Zimbabwe Electricity

Transmission and Distribution

Company (ZETDC)

POWERTELZESA

Enterprises (ZENT)

Page 4: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Proposed Electricity Industry Structure

ZERA

REGULATION

COMPACT MINISTRY OF ENERGY POLICY & PLANNING

National Grid

Services Company

ZPC

Licenses

IPPs

Bulk Supply Customers

ZEDCDistributor

1

Distributor 2

Distributor N

ZEDCRetailer 1

Retailer 2

Retailer 3

Retailer N

Page 5: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Power Supply Balance: Jan – Aug, 2013

Hwange28.67%

Kariba37.28%

Harare0.46%

Munyati1.44%

Bulawayo1.24%

Imports13.22%

Shortfall17.69%

Power Supply Balance: Jan - Aug, 2013

Page 6: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Daily Load Profi le

6

Page 7: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Jan Feb Mar Apr May Jun Jul Aug0

500

1000

1500

2000

2500

Strategy and Performance, Jan - Aug, 2013

Maximum Demand

Installed Capacity

Average Capacity

Pow

er (

MW

)

Gap AGap B

Gap C

Page 8: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Zimbabwe has vast energy sources at its disposal to increase the generation capacity. The increase in capacity has to be done at an affordable price. These include:

Coal – thermal power stations

Coal bed methane – thermal power stations

Hydropower

Solar energy

Action Plans

8

Page 9: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Power Generation Projects PROJECT DESCRIPTION COST (in

USD millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Kariba South Extension

2 x 150 MW generating units, adding to existing Kariba South Power Station. 

400 Design review in progress in parallel with financial close processes.

40 months

Hwange Expansion Construction of 2 x 300 MW generating units at Hwange.

1,300 Technical and Funding negotiations with CMEC.

42 months

Gairezi Hydro-Power 2 x 15 MW generating units, on the Gairezi River.

105 Geotechnical investigations in progress.

30 months

Page 10: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Power Generation Projects PROJECT DESCRIPTION COST (in

USD millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Hwange Life Extension

Investigations of the plant and implementation of the project.

500 Completed phase 1 of stage 1 ECORAM study.

5 years

Deka Pipeline Upgrade

Upgradation of the existing infrastructure and construction of a second pipeline.

28.6 Appointment of project consultant in tendering stage.

18 months

Harare Repowering

Boiler replacement with CFBC equipment.

85  Going through the tendering process for an EPC contractor.

24 months

Munyati Repowering

Boiler replacement with CFBC equipment.

90  Draft Request For Quotation stage.

24 months

Page 11: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Power Generation Projects PROJECT DESCRIPTION COST (in USD

millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Bulawayo Repowering

 Boiler replacement with CFBC equipment.

90  Draft RFQ stage. 24 months

Solar 3 x 100 MW (Gwanda, Plumtree, Munyati), 2 MW (Zvishavane).

400 Tendering for partner to develop 100 MW in progress.

9 months

Coal Bed Methane  CBM gas fired power plant projects.

580  Application for special grants in progress.

36 months

Batoka Gorge 4 x 200 MW generating units, along the Zambezi River.

2200  Bids for review of ESIA and Engineering feasibility studies. received,

6 years

Page 12: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

Projects Supply / Demand Curve

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

2036

2038

2040

2042

2044

2046

2048

2050

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

TOTAL

Forecast MD

En

ergy

(G

Wh

)

Page 13: ZPC – P OWER AND E NERGY P ROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

THANK YOU!