Zeuthen, January 16, 20Zeuthen, January 16, 200808
P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 11
The cosmic trigger for the The cosmic trigger for the Large PrototypeLarge Prototype
Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, Y. Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre, J.M.
Reymond, S. Turnbull
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 22
5 slabs on top
3 slabs at bottom
+4 perpendicular to limit the triggers to the detector length
Cosmics in March 08Beam summer 087 panels before end 09
Present layout:
12 slabs (+ 3 spare)
The Large The Large PrototypePrototype
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 33
Many possible combinations, for instance: 1 top + 1 bottom : central region of central panel3 top + 1 bottom : radial tracks on central panels3 top + 3 bottom : vertical tracks on most of the central regionRequires a ‘bridge’ to support the magnet and its movement system.
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 44
Organization is building-upOrganization is building-up T. Matsuda (KEK) : CoordinatorT. Matsuda (KEK) : Coordinator
+ Y. Kato, H. Kuroiwa : initial tests+ Y. Kato, H. Kuroiwa : initial tests INR Moscow, Y. Kudenko : slab manufacturingINR Moscow, Y. Kudenko : slab manufacturing DESY, K. Dehmelt : on-site installation, crates, DESY, K. Dehmelt : on-site installation, crates,
trigger logictrigger logic Saclay : readout, wrapping, mechanicsSaclay : readout, wrapping, mechanics
PC (scientific coordinator), Th. Chaminade (technical PC (scientific coordinator), Th. Chaminade (technical coordinator)coordinator)
J.-M. Reymond (head of the integration lab) : cooling J.-M. Reymond (head of the integration lab) : cooling systemsystem
M. Karolak, M. Riallot, S. Hervé : mechanical design, M. Karolak, M. Riallot, S. Hervé : mechanical design, wrappingwrapping
S. Turnbull, PC, F. Pierre : testsS. Turnbull, PC, F. Pierre : tests F. Sénée (Micromegas panel technical coordinator)F. Sénée (Micromegas panel technical coordinator)
Brussels (Brussels (G. De Lentdecker, X. Janssen) TLU, logging, interfacing
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 55
The trigger has to be in a field of order 0.4 T.
MPPC : multi-pixel photo counters (so-called Silicon PM) produced by Hamamatsu
100 pixels on 1 mm2. Each is a Photodiode in Geiger mode
Operation voltage :
Vbreakdown + fraction of a Volt
Requires accurate supplies about 70 V. Need to sort the MPPCs in Vbreakdown to reduce the number of supplies.
Signal: 3 mV/p.e. (20 p.e. per fiber end, measured by Yuri Kudenko)
Dark counting rate and Vbkd sensitive to temperature : needs good temperature control: Peltier devices + thermistances+controler
1mm
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 66
SLABS (INR Moscow)SLABS (INR Moscow)New design (wrt T2K SMRD) : U-shape groove
Extrusion and machining done (width 167mm)
light output measured : 19-20 each end
Shipping to Saclay scheduled for next week
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 77
Box with photocouplers, MPPC, R,C circuit,
Thermistance, Peltier device
Wavelength shifting fiber
Scintillator slab
Controller
Trigger logic
TLU
Supply
Temperature control: Jean-Marc Reymond
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 88
Mechanics can be simple: wrapped slabs maintained by U-shape bars
Al-mylar reflector being ordered
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 99
First step : hands on MPPCFirst step : hands on MPPC
Testbox assembledTestbox assembled Amplifiers (phillips?) to be Amplifiers (phillips?) to be
decideddecided 100 V Supply selected : Voltcraft 100 V Supply selected : Voltcraft
precision PS PPS 12008 (400 € precision PS PPS 12008 (400 € each), ready to order 4.each), ready to order 4.
Thanks to many advices (J-Ch Thanks to many advices (J-Ch Vannel, Erika Garutti, Japanese)Vannel, Erika Garutti, Japanese)
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 1010
Readout and thermal Readout and thermal regulation box designregulation box design
3 parts top, bottom parallel, bottom 3 parts top, bottom parallel, bottom perpendicular.perpendicular.
In each box: thermistance, peltier In each box: thermistance, peltier devicedevice
In a central place : controlerIn a central place : controler Design mechanics, system, cablesDesign mechanics, system, cables Light-tightness vs accessibilityLight-tightness vs accessibility Visit to DESY with Klaus Dehmelt before Visit to DESY with Klaus Dehmelt before
mid-Februarymid-February
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 1111
Conclusion and plansConclusion and plans Need a robust system: temperature Need a robust system: temperature
controlcontrol Slabs delivered next week (tbc)Slabs delivered next week (tbc) Wrapping in Saclay 2 weeks afterWrapping in Saclay 2 weeks after Installation in MarchInstallation in March Connexion to DAQ in MarchConnexion to DAQ in March
Zeuthen, January 16, 2008Zeuthen, January 16, 2008 P. Colas - LP cosmic triggerP. Colas - LP cosmic trigger 1212
The gain depends on Vbias, and Vbreakdown depends on the temperature
Requires both a stable and precise supply and a controlled temperature.