‘Developing Papua New Guinea’s first diversified world-class resources platform’
UK – PNG Trade and Investment Conference London 16 June 2015
Mayur Resources Presentation
2
CONTENTS
1. Mayur Resources Overview - Developing a diversified world-class resources platform in PNG 3
2. Copper / Gold portfolio 7
3. Iron & Heavy Mineral Sands portfolio 12
4. Coal portfolio 17
5. Domestic Vertical Integration – Power and DRI/Steel Making 20
Developing a diversified world-class resources platform in PNG
A unique portfolio of projects under development…..
• Established in 2011
• Management Team with proven track record
• Highly experienced International Board
• 3 asset groups (Copper/Gold; Heavy Mineral Sands; Coal)
+ Vertical Integration (Iron/Steel & Power)
• 100% privately owned by small share holder base of Ultra High Net Worth
• Fully focused on PNG 3
Introduction to Mayur Resources
Mayur’s Mineral Development Platform
A Unique Diversified
Mineral Development
Platform in PNG
1st Mover -Export of Iron & Heavy Mineral Sands
‘Asia's New Low Cost Iron & Mineral Sands Precinct’
1 Mtpa ironsands (magnetite and zircon) project scalability
of 10 more projects in pipeline
Copper & Gold
‘Projects next to World Class Operations’’
1st Mover - Export of Low Ash Thermal Coal
‘The Next Indonesian Export Model’
1Mtpa Thermal coal (Asia’s superior coal 3% Ash & <0.5%
Sulphur
4
Introduction to Mayur Resources
1ST Direct Reduced Iron (DRI) & Steel Making in
PNG
1st Coal Fired Power in PNG lowest New Power Source
5
COPPER & GOLD IN PAPUA NEW GUINEA Leveraging PNG’s status as one of the world’s most prolific copper & gold provinces Port Moresby
Introduction - Copper & Gold Assets
• 4 EL’s granted
• Total area under exploration 1,193 km²
• Geological rationale based on finding and developing epithermal (volcanic arcs setting) and porphyry systems
6
Porphyry Systems - Projects
Name EL # Status Km2
1 Sideia* 2095 Granted 300
2 Basilaki * 2095 Granted
3 Sitipu 2040 Granted 249
Volcanic Arcs & Calderas – Projects
Name EL # Status Km2
1 Feni Island* 2096 Granted 385
2 Rambutyo 2094 Granted 259
*priority projects
Copper & Gold in PNG
Lihir – World’s 4th Largest Gold Mine
Feni – “potential to be the next Lihir”
Sideia & Basilaki – “ the forgotten mine workings of PNG”
Feni – The Next Lihir Style Reosurce
• Location - Adjacent to 4th Largest Gold Mine in the World
• Maiden Gold Resource – 650,000 Oz Au JORC (Inferred) Resource
• Best intercept 188.5m @ 1.00 g/t Au with associated copper porphyry results – best intercepts 0.4% copper over 80 metres
• Shallow drilling – up to 200 metres (future target depth 600 metres)
7
Copper & Gold in PNG
Over 200 drill holes (deepest hole < 300m)
Ambitle Is. Babase Is.
• Over USD 30m spent exploring Ambitle by numerous exploration companies over to find Kabang Target
EL2096
Port Moresby
EL2095 - Basilaki and Sideia Islands
Copper zone – Sideia Island. Gold in bedrock – Tunawada Prospect.
Two projects - Basilaki Island & Sideia Island (one tenement)
8
Basilaki Tunawada Cu-Au Project
• Multi-phase porphyry system
Sideia Is – Sideia Cu -Au Project
• PNG’s oldest copper workings dormant and forgotten for over 100 years
• Mayur rock chips up to 27.5% Cu, 3.92 g/t Au, 397ppm Mo
• Narrow vein copper mined 1800’s,
• Potential porphyry at depth.
Copper & Gold in PNG
EL2095 Port Moresby
Sideia Is.
Basilaki Is.
2 1
1
2
Two separate deposits on adjacent islands in Milne Bay Province
Rock Dating & Petrology
The Tunawada rocks 12.9Ma (million years old). same date range as world-class deposits in PNG Wafi-Golpu 13-14Ma, Frieda 11-14Ma.
9
HEAVY MINERAL SANDS IN PNG Asia’s new 'world-class’ low cost iron and mineral sands precinct
Port Moresby
Introduction – Portfolio Highlights
• Multi Billion tonne mineralised province - potential to become the world’s largest iron and mineral sands precinct – 23,000 km²
• Flagship Orokolo Bay Project (EL2305)
Maiden JORC Resource (2012 JORC) of 64Mt @ 30%HM with a 150 Mt exploration target - being converted to JORC (drilling in progress)
Pre Feasibility Study completed in January 2015 (entered DFS)
• Targeting production of multiple heavy mineral products : magnetite, zircon, garnet, leucoxene,
• More than 10 projects in the pipeline across wider portfolio offering long term future growth
10
450 km
Iron & mineral sands in PNG
PAPUA NEW GUINEA
Thousands of Km’s of highly mineralised coastline under tenure
11
Huge project pipeline across the Gulf of Papua portfolio for generations to come
Iron & mineral sands in PNG
Summary of all historical exploration completed across the Gulf of Papua:
• 1000 Auger holes
• 491 Wacker holes
• 93 Vibracore holes
• 4 bulk samples
• 3,000+ grab samples
Target generation (from review of drilling and geomorph studies) has identified a pipeline of potential projects across the province that will provide long term development opportunity
Mayur Iron portfolio and project generation targets
Hisui
On shore Nearshore Offshore
Kiwai (near shore
Kiwai Is. (onshore)
Kiwai (off shore)
Aburai / Amunda Is.
Orimo Coast
Deception Bay
Cape Blackwood
Turama Delta
Paia Inlet
Malalaua
The Bluff
Aivau
Kerema Uamai
Parma Is.
OROKOLO BAY PROJECT – Timeline & Cost Curve
12
Iron & mineral sands in PNG
Pro
ject
De
velo
pm
en
t V
alu
e
OBP PRE PRODUCTION
PHASE: 100,000 t
OBP PHASE 1 (1 Mtpa)
2015 2016 2017 2018+
+ future upside across
wider portfolio
PHASE 2 (3 Mtpa)
• Pre Production Phase – Pilot Plant for market acceptance testing
• Phase 1 – Initial Production – Low prod. costs 1 Mtpa of Iron (Magnetite conc.) + 33-64 ktpa (40% zircon concentrate) @ $50m capex
• Phase 2 – Expand Production to 3 Mtpa (Magnetite) + 100-200 ktpa (40% zircon concentrate)
A
B
C
Lowest cost iron units in the
world
A B C
DMTU adjustment (-4%) TiO2 adjustment (-15%)
+ Zircon only (does not include benefit
of other Valuable HM)
Phased Timeline:
Lowest Global quartile cost position:
13
COAL IN PAPUA NEW GUINEA Opening up a new frontier for coal in Asia – ‘the next Kalimantan’
Port Moresby
Coal in PNG
‘PNG - A new frontier for Coal in Asia’
Coal exploration projects in PNG - consisting of:
• 4 granted tenements
• Secured exclusive Call Option to explore and acquire adjacent tenements
Together the licences make up the entirety of PNGs coal province closest to the coast
Access to low-cost transport infrastructure – barge coals on the Purari or Vailala Rivers that flow into the Gulf of Papua
Exploration programs completed – 4.1m and 3.2m coal seams outcropping at surface
• Develop international export of 1 Mtpa and domestic coal fired power with the PNG government
14
Overview of to Mayur’s coal projects
Coal exploration portfolio encompassing the entirety of PNG’s coal province within the Papuan Basin – 120km strike
Mayur’s coal - Gulf province
Above – 4.5m out-cropping coal seam and deep draft rivers in Gulf Province
15
Tenure covering 120 km strike - only 1% explored so far
Coal in PNG
PNG’s coal region in Gulf Province- proximity to rivers and coast for access to the seaborne market. Below - camp / drilling at Depot Creek
Gulf of Papua
25 km
• Depot Creek only covers 1.2km of the known 120km strike
• Mayur has 200+ million tonne provincial exploration target
• Coal quality (below) – low ash, low sulphur sub bituminous coal
Upcoming project development milestones:
- Declaring JORC
- Completing PFS
- Market testing (bulk sampling)
- International Offtake
- Commence DFS
Depot Creek – average analysis*
TM 21.24 %
IM 12.5 %
Ash 2.52 %
VM 43.7 %
TS 0.36 %
GAR kcal/kg 5,128 *All results are on an air dried basis; samples from out-cropping coal seams
total Strike length =
120 km
Miha Creek (Coal)
Depot Creek (Coal)
Port Moresby
N
Orokolo Bay (Mineral Sands)
Vialala River
Purari River
DOMESTIC VERTICAL INTEGRATION
COAL POWER GENERATION
Port Moresby
DRI & STEEL MAKING
17
Developing new coal fired power in PNG to deliver economic growth
Coal Power Generation in PNG
• Reduce PNGs current reliance on high cost diesel power & open up Manufacturing sector
• Develop clean and efficient coal fired power stations (30-100MW) to serve PNGs major cities and industrial hubs (Port Moresby, Lae, Madang etc) – 13% of PNG population have electricity (70% targeted)
Providing access to cheaper energy to enable economic growth in PNG
Port Moresby (100MW)
Lae (100MW)
Madang (100MW)
Potential locations for coal fired power plants
Mayur’s coal province
Proposed Economic corridors in PNG (blue shading) Source – PNG Development Strategic Plan 2010- 2030
Provision of cheap and reliable power for PNGs growing population and economy
Address PNGs energy demand shortfall – forecast to be circa 700MW by 2030 due to 5 fold
increase in power demand.
Mayur Coal spec. range
Kcal* 4,000 – 4,500
Ash 2.5% - 3.7%
Sulphur <0.4%
100 MW power plant requires
approx. 400,000 tonnes coal per
year
PNG POWER GENERATION
PNG COAL SUPPLY
*Net as received basis
Mines - Owen Stanley Range(100MW)
40-50% OF PNG’s POWER GENERATION^
Coal based DRI Steel Making Opportunity in Gulf Province, PNG
Potential for iron & steel making in PNG
Coal and iron within the same region in PNG – a unique opportunity to develop a steel industry in SE Asia
18
Gulf of Papua
100 km
(Iron ore)
(Coal)
• Iron and Coal co-located on coast next to Asian market
• Low cost extraction suitable as stand alone export commodities
• Proposed LNG gas pipeline adjacent to tenure
Potential site for DRI plant
Gas fields (Total Inter-Oil)
Port / Anchorage
Strategic ‘first mover’ vertical
integration (coal and iron)
opportunity
Unlocking low raw material input costs –
<US$60 per tonne of iron produced
Cheap power source - captive
coal (owned) and proximity to
major gas projects
Various technology
options (proven and new DRI and steel processes)
Government support to value add via vertical
integration
Preliminary studies complete with technology providers (China /India/Europe)
DRI & Steel Making – Value add in PNG via vertical integration
Potential for iron & steel making in PNG
19
Low captive commodity cost, raw materials co-located on coast, close to market, low energy cost, low labour cost
ADDITIONAL “VALUE CAPTURE”
(Low cost labour and energy costs)
1 tonne of pig iron = USD100/t
VA
LUE DRI
EAF
Formed Steel
MAYUR CONTROLLED MAYUR FIRST MOVER
Bulk Commodity (export grade) &
Domestic Iron/Steel Production
Iron
Coal Quartile 1 – Global Cost Curve
PNGs next iron making centre in
Asia
=
Coal Ironsands Pig Iron
Steel (export or domestic)
DRI Plant - RHF
MR Iron PNG Pte Ltd
MR Energy PNG Pte Ltd
Mayur Iron PNG Ltd
Singapore
PNG Mayur Energy PNG Ltd
MR PNG DRI & Steel Making Pte Ltd
Mayur PNG DRI & Steel Making Ltd
Mayur Resources Group Structure - Domestic Vertical Integration
Raw materials supplied for DRI/Steel and Power as follows:
Domestic Vertical Integration - Summary
20
EXPORT
PNG POWER GEN.
PNG IRON ORE SUPPLY
IRON ORE (2t x $18.5/t)
$37/t
COAL (Reductant) + COAL (Power) & MAINTENANCE
$60/t
PNG DRI & STEEL MAKING PNG COAL SUPPLY Input costs <$100/t