Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
MULTISPAN GABLEWITH GAZEBO END ATTACHED PATIO
STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.®
Your supplementary guide to building anATTACHED MULTISPAN GABLE VERANDAH or PATIO
WITH GAZEBO ENDThis set of instructions should be used in conjunction with the Stratco instruction brochure‘ Your complete guide to building an Attached OutbackVerandah, Patio or Carport'.Flat Verandahs Attached -
®
BEFORE YOU START
Carefully read these instructions, along with the Stratco Flat Verandahs AttachedInstructions. If you do not have all the necessary tools or information, contact Stratcofor advice. Before starting lay out all components and check them against thedelivery docket. The parts description identifies additional gable parts, and thecomponent layout diagram indicates their fastening position.
FINIALProvides decorationat the apex of thegable end frame.
PURLIN INTERSECTIONCOVER
TEMPLATE
Fastened to hiprafters to coverpurlins andattach deck.
Used to mark thepurlin cover forcutting aroundpurlins.
BEAM TO BEAM BRACKET
BEAM FILLER
Connects horizontalbeams.
Fills gapbetweenintersectingbeams.
PARTS DESCRIPTION 1
BARGE CAPThe barge cap coversthe area where thedeck finishes at portalframe.
SCREWS AND RIVETSFastener types vary dependingupon the connection, ensurecorrect fixings are used.
14 x 95
12 x 20
10 x 16
RIVET
RIDGE KNUCKLESlots inside the gable rafters toform connection at the ridge.
RIDGE CAPThis flashing covers theroof sheets at the gableridge and the Gazebo Endhips.
22 or 30 ENDRAFTERBRACKETConnects rafters toheader beam on aninfill gable.
º º END STRUTThe gable infill issupported by theend strut, whichconsists of a sectionof post.
22 or 30 ENDSTRUT PLATESecures the endstrut at the ridge.
º º
PURLINSPurlins provide support forcladding.
RAFTERSGable Raftersconsist of pre-cut120 Outbackbeam.
®
SOAKER FLASHINGThe soaker flashingwater proofs the rearof the gable andconceals the existinghouse gutter.
PERIMETERBRACKETThis bracketfastens therafters to thegazebo fasciabeam.
APEX BRACKETThis bracket fastens the hiprafters to the apex of the gableframe.
ANGLED INLINECONNECTORS
135°Angled PurlinConnector.
67.5° Angled InlineConnector.
BOLTSFastener types vary dependingupon the connection, ensurecorrect fixings are used.
M10 HEX
HEAD BOLT
M12 HEX
HEAD BOLT
CUPHEAD
BOLT
RAFTER TOVALLEYBRACKETThis bracketfastens therafter to thevalley beam.
SPACERSAre used to prevent the150 attachment beamfrom crushing.
HEADER BEAM BRACKETConnects end strut to headerbeam on an infill gable.
HEADER FLASHINGSRun along header beam toneatly finish the base ofinfill panels.
PANEL STRIPSDecorative strips fixed toinfill panels.
INFILL PANELCut to suit gable endframes.
POST BRACKET
POST CAP
Connects postto beam.
Fills gap betweenpost and beam.
7
8
9
10
6
5
4
3
2
1 Ridge Cap
Outback Deck
Purlin
Ridge Knuckle
Rafter
Valley Beam
Beam to Beam Bracket
®
®
Polycarbonate Sheet,
Outback Deck or CGI
Notched Beam Filler
15
14
13
12
11
Rafter to Valley Bracket
Post Bracket
Post
Front Fascia Beam
End Fascia Beam
Gutter
COMPONENT LAYOUT
1
4
7
10
32
6
8
12
11
5
137
15
14
9 1
GABLE FRAME(GAZEBO END)
2
COMPONENT LAYOUT
7
8
9
10
6
5
4
3
2
1 Ridge Cap
Purlin
Purlin Intersection Cover
Ridge Knuckle
Hip Rafter
Gazebo Fascia Beam
135
Gazebo Apex Bracket
Polycarbonate Sheet,
Outback Deck or CGI®
° Angled Purlin Connector
14
13
12
11
Rafter to Valley Bracket
Post Bracket
Post
67.5 Angled Inline Beam Connector
Perimeter Bracket
Hip Support Flashing
°
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
GAZEBO END
15
15
ADDITIONAL MATERIALS
These materials are needed to complete the job, but are notincluded in the basic kit price (they must be purchased asextra items, and their quantities specified):
Rafter strengthening brackets and channels to suit 150attachment beam for attaching gable to house.M12 bolts and nuts for fixing strengthening brackets to therafter.M12 bolts and nuts for fixing 150 attachment beam tostrengthening brackets.Fascia Brackets for attaching gable on end to house.M10 coach bolts and nuts for fixing fascia brackets to thehouse rafter.M8 masonary anchors for fixing Wall Brackets to masonary.
12x25 type 17 hex head screws for fixing SuspensionBrackets to timber.10x16 hex head screws for fixing Suspension Brackets tosteel fascia.Cover flashings (measurements required).Box gutter (measurements required).
These items are available at request:Infill PanelsPanel StripsFinialSoaker Flashing in lieu of Header FlashingPurlin Intersection Cap
OPTIONAL EXTRAS
1.0 INTRODUCTION
2.0 ATTACHING TO AN EXISTINGSTRUCTURE
2.1ATTACHING ON SIDE TO HOUSE
Please read these assembly instructions thoroughly beforecommencing the construction. Double check alldimensions, levels and bolting locations before cutting,screwing or bolting structural members. It is recommendedthat the persons erecting the structure have had someprevious building experience because some modificationsto the existing house structure are required.
The builder or council is to ensure the existinghouse/structure is of a suitable structural integrity andcomplies with all the relevant Australian Building codes andstandards. For more information regarding the suitability ofthe house structure to accommodate the Stratco AttachedMultispan Gable, consult a structural engineer or a buildingauthority. It is the builders responsibility to ensure that theexisting house roof structure is strengthened correctly.
Refer to section 2.1 if attaching Multispan Gable on it’s sideto a house, section 2.2 if attaching on it’s end to a house orrefer to both sections if attaching the gable on it’s side andend.
A Stratco Multispan attached on it’s side to a house isattached to the existing eaves overhang at the fascia.
The first objective in the construction is to fix a structuralside beam along the fascia or wall, to which the Gable Unitis attached.
Most existing houses have not been designed for theattachment of portal framed gables to their side, thereforeadditional strengthening of the house rafters must beperformed.
In order to strengthen the existing house rafters, the rooftiles or roof sheets need to be lifted to expose the roofframe. Steel rafter brackets and channels are then boltedalong the house rafters. Refer to section 2.1.1.
A 150 mm Outba beam is bolted to the strengtheningbrackets at the fascia. Once the 150 attachment beam issecured to the house, the Gable Unit can be erected andfastened to the beam.
The first step is to determine the number of rafters whichneed to be strengthened and their location relative to theunit. You will have to lift some roof tiles or roof sheets todiscover the rafter positions and spacings. The number ofrafters which need to be strengthened is determined by thebuilder.
: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council or engineer.
Use an adjustable rafter strengthening bracket and onechannel for eaves overhangs up to 450 mm. Use anadjustable rafter strengthening bracket and two channelsfor eaves overhangs over 450 mm and up to and including600 mm, as shown in figure 4.
The adjustable rafter strengthening bracket is shown infigure 3. Please note that this bracket may not be suitablefor applications where the front face of the house gutter ishigher than 120 mm. In these cases please contact Stratcofor alternative solutions.
ck®
Note
2.1.1 RAFTER STRENGTHENING
4
ADJUSTABLE RAFTER STRENGTHENINGBRACKET 3
4
450mm EAVES OVERHANG
RAFTERSTRENGTHENING
BRACKET
M12 BOLT
TIMBER RAFTER
60x44x2.0 G450 GALVANISEDCHANNEL
600mm EAVES OVERHANG
RAFTERSTRENGTHENING
BRACKET
M12 BOLT
TIMBER RAFTER
60x44x2.0 G450 GALVANISEDCHANNEL
RAFTER
6
ENOUGH CLEARANCE FORROOF SHEETS TO RUN INTO
THE HOUSE GUTTER
FIX BRACKET AS CLOSEAS POSSIBLE TO THE BASE
OF THE GUTTER
RAFTERSTRENGTHENING
BRACKET
CGI, POLYCARBONATEOR
OUTBACK ROOF SHEET®
150 ATTACHMENTBEAM
Fixing the 150Attachment Beam in Place
After fixing all the brackets and channels, the 150attachment beam is fixed in place.
Prop up the 150 attachment beam in position with thedouble flange on top, the beam will need to be located at aheight on the bracket which allows clearance between thegable roof sheets and the gutter. Fix to the end plates of therafter bracket using two M12 bolts, with the bolt head on the150 attachment beam side. Insert spacers to prevent thebeam from crushing, and bolt in position, using nuts andwashers.
Do not over tighten bolts as this can lead to a visibleindentation due to the high gloss nature of the material.Refer to Figure 8 for fixing spacers.
Note:
5
Fixing Rafter Strengthening Brackets andChannels
The adjustable rafter strengthening bracket allows for anadjustment of pitch in the range of 15 to 30 degrees. Thedistance the bracket extends past the fascia is alsoadjustable to allow for standard gutters or box gutters with awidth of up to 200mm.
In conjunction with rafter strengthening brackets, channelsare fixed to the side of the house rafter (Figure 4). Thebottom end of the channel will be located at the base of thehouse rafter. Holes should be marked and pre-drilled in thechannels to suit the location of existing holes in the bracket.The channel will extend beyond the bracket so additionalholes are to be drilled in the channel at approximately500mm centres.
Initially the bracket T piece shall be fixed to the bracket armwith two M12 cup head bolts (hand tighten only), a springwasher is to be located between the standard M12 washerand nut (Figure 5). Mark the position of the bracket on thefascia and notch a rectangular hole in the fascia allowingthe bracket to be fed through the front of the fascia. The holemay need to be enlarged slightly if the M12 cup head boltsinterfere with the fascia.
5
BRACKET ARMT PIECE
TIGHTEN TO 35NmTORQUE
M12 WASHER
M12 SPRING WASHER
M12 NUTM12x40 CUP HEADBOLT
Insert the bracket through the fascia and fix with thechannel(s) to the house rafter using M12 hex head boltsthrough the existing holes in the bracket and further up thechannel(s) (Figure 7). Adjust the T piece so it is horizontaland has the appropriate extension past the fascia to allowfor fixing of the attachment beam. T piece connection boltsare to be tightened to a minimum 35Nm torque.
Fix the bracket as close to the base of the gutter as possible(recommended distance 10mm from lowest end of gutter),as shown in figure 6.
The 150 attachment beam is to be fixed to the end plate toensure the carport roof sheets drain into the existing housegutter (Figure 6).
The 150 attachment beam becomes the base for the attachment of the Multispan gable unit. Figure 7 shows a unit attached atthe side.
7
CHANNEL EXTENSION
MULTISPAN GABLE ATTACHED AT THE SIDE
WEB OVERHANG
STUD WALL
TIMBER RAFTER
150 ATTACHMENT BEAM FIXED TORAFTER BRACKET WITH TWO
M12 BOLTS
GUTTER
150 ATTACHMENT BEAM
EAVES OVERHANG
BRICK WORK
RAFTER STRENGTHENING BRACKETATTACHED TO RAFTER WITH
6 (M12 HEX HEAD BOLTS)
RAFTER
EAVES PURLINFIXED TO
RAFTER USING14 x 95 SCREWS
To insert spacers drill 11 mm holes through the 150attachment beam. Then drill 16 mm holes on the outsideface only, ie, this time do not drill all the way through. Thiswill allow the spacer to slide in from the outside and stop atthe other side as shown in figure 8.
6
8
150 ATTACHMENT BEAM
SPACER
NUT
RAFTERSTRENGTHENING
BRACKET
M12 BOLT
DOUBLE FLANGE
ENLARGED HOLE(16 MM THIS SIDE ONLY)11 MM HOLE
WASHER
You would have ordered and received your custom madeflashings to cover the exposed brackets and holes throughfascia. Rivet flashings in place, figure 9 suggests asimplified flashing. You may however use your imaginationand design a flashing that suits your individual taste.
Note: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council or engineer.
If fixing a Multispan Gable on its end to a wall, twoalternatives are available. Purlins are fixed directly to thewall using 68mm wall brackets and valley beams using 150beam to wall brackets. This option will not require a reargable frame and back channel is fixed to the wall toaccommodate sheets running along the wall. The otheralternative requires valley beams be fixed to the wall and arear gable frame installed for fixing purlins. The rear gableframe will need to be slightly offset from the wall to allow theappropriate bracket fixing.
If fixing a Multispan Gable on its end with suspensionbrackets to a fascia (Figure 10), typically a soaker flashingis used. In this case the gable rafter at the rear of the unit
2.2 ATTACHING ON END TO HOUSE
450
600
1800
1900
300
400
EavesOverhang
(mm)
Channel ExtensionBeyond Birds Mouth
(mm)Web Overhang
(mm)
Recommended Channel Extension
CHANNEL
WASHER
9COVER FLASHING(OPTIONAL)RIVET
RIVET
STRENGTHENINGBRACKET
FASCIA
150 ATTACHMENTBEAM
HOUSEGUTTER
Measure the distance between rafter ends, O, to checkvalley beam spacing (Figure 13).
13
GABLE OPENING (O)
12
2 (12 X 20 HEX HEAD SELFDRILLING SCREWS) EACHSIDE OF BOTH RAFTERS
2 (12 X 20 HEX HEAD SELFDRILLING SCREWS) THROUGH
TOP OF BOTH RAFTERS
11
OPEN GABLE RAFTER
INFILL GABLE RAFTER
7
Insert ridge knuckle into the pre-cut rafters and screwtogether using two 12x20 hex head self drilling screws bothsides of each rafter and two 12x20 hex head self drillingscrews through the top (double flange side) of each rafter.
Pilot holes indicate screw locations as shown in figure 12.Make sure that the two ends are flush at the connection,leaving no gaps.
10
120 GABLE RAFTERINFILL PANEL
GUTTER
SOFFIT LINING
SUSPENSIONBRACKET
VALLEY BEAM
BACK CHANNEL
STEEL FASCIA BRACKET(ATTACHED TO RAFTERAND BACK CHANNEL)
3.0 GABLE FRAMEASSEMBLY
IMPORTANT:
Note:
Ensure that the double flange portion is atthe top when installing all beams and rafters.
The rafters are supplied pre-cut and drilled at theridge as shown in figure 11.
is to be 153mm from the house fascia in order toaccommodate a standard soaker flashing (refer Figures 24and 25).
If your house gutter is wider than 150mm a custommade soaker flashing will need to be ordered and the rafterset back adjusted to suit.
If fixing a Multispan Gable on its end to an attachmentbeam, elevated to the existing house gutter height, theattachment beam is to be as close as possible (within 5mm)to the outside face of the gutter (Figure 26). The 150attachment beam is fixed to rafter strengthening bracketsas detailed in section 2.1.1.
It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council or engineer.
Note:
Note:
2.2.1 FASCIASTRENGTHENING
Steel fascia brackets are generally fastened at 1200mmcentres to fascia and rafters (Figure 10). It is the buildersresponsibility to determine the adequacy of the fascia andrafters and the frequency of brackets for each individualsituation.
SOAKER FLASHING
8
A Gazebo Apex Flashing is secured with rivets behind theapex bracket and will cover gaps created by purlinintersection covers (Section 9.3).
For side attached units fix the rafter to valley bracket to thevalley beam (150 attachment beam will be considered avalley beam) at the correct rafter positions (refer Section 6)using six 12x20 hex head screws per bracket through thepre-drilled holes (Figure 15). Please note the bottom face ofthe bracket lines up with the bottom edge of the lowergroove in the valley beam for 150 beams (Figure 15). Checkpositions before drilling.
If any intermediate columns are required, measure thevalley beam marking where they meet. Fasten postbrackets as explained in ‘Outback Flat AttachedVerandahs, Patios & Carports’ under “FRONT FASCIABEAM”.
Support the second valley beam at the spacing determinedin part 3.0 on adjustable construction props.
4.0 VALLEY BEAMASSEMBLY
4.1 SIDEATTACHED
3.1 APEX BRACKET
The Gazebo Apex bracket is to be fixed to the front face ofthe front gable frame at the apex. The bracket is to belocated so the bottom edge of the apex bracket is in-linewith the top edge of the bottom chamfer of the gable framerafters. The apex bracket is to be located centrally at theapex and fixed through the pre-drilled holes using 12x20hex head screws (Figure 14).
14
APEX BRACKET
RAFTER
12x20 HEX HEADSCREWS
12x20 HEX HEADSCREWS
SIDE FIXINGTAB
A
A
SECTION A-A
4.2 ENDATTACHED
For units attached on the end to a wall, wall brackets arepositioned at either side of the gable opening at the spacingdetermined in part 3.0. The first bracket is fastened to thewall with two M8x65mm masonry anchors. The curved legsof the bracket are located at the top and the highest point ofthe wall bracket will be 15mm below the top of the beam(Figure 16).
Pivot the first valley beam (double flange on top) up into thewall bracket so the curved legs locate against the top flute ofthe beam. The valley beam is fastened to the wall bracketwith 10x16 hex head screws in the pre-drilled holes whilethe opposite end is supported on adjustable constructionprops.
40
150 VALLEYBEAM
150 VALLEY BEAM WITH 30°RAFTER TO VALLEY BRACKET
30
25
150 VALLEY BEAM WITH 22°RAFTER TO VALLEY BRACKET
20
25
BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THELOWER GROOVE
15
BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THELOWER GROOVE
25
25
9
For units attached on the end to a fascia, suspensionbrackets are positioned at either side of the gable openingat the spacing determined in section 3.0 (Figure 13). Thetop tab of the suspension bracket must be locatedbetween the fascia and back channel. A minimum of two10x16 hex head screws are fixed through back channel,suspension bracket and steel fascia while two 12x25 type17 screws are used to fix through back channel,suspension bracket and timber (Figure 17).
If back channel is not present, (ie, no adjacent flatroof) locate washer plate behind steel fascia atsuspension bracket. Fix through bracket, fascia and plate.
The first valley beam is fastened into the suspensionbracket with 10x16 hex head screws through the dimpleswhile the opposite end is supported on adjustableconstruction props.
Note:
16
WALLBRACKET
TWO 10x16HEX HEAD SELF
DRILLING SCREWSEITHER SIDE
TWO M8x65 MASONARY ANCHORSor
TWO 6mm DIAMETER SCREWBOLTSWITH A MINIMUM EMBEDMENT OF 45mm
MINIMUM EDGE DISTANCE OF BOLTS &SCREWS IS (10 x dia)
15mm
17
OUTBACKDECK
®
1.0mm STEPPEDBACK CHANNEL
VALLEY EAMB
SUSPENSIONBRACKET
10x16 HEX HEAD SCREWS TO STEEL12x25 TYPE 17 SCREWS TO TIMBER
For units attached on the end to an attachment beam(Figure 26), beam to beam brackets are positioned at eitherside of the gable opening at the spacing determined insection 3.0 (Figure 13).
18TWO 10x16 HEX
HEAD SELF DRILLINGSCREWS EITHER SIDE
BEAM TOBEAM BRACKET
BEAM FILLER
ATTACHMENT(HEADER) BEAM
TWO 10x16 HEX HEADSELF DRILLING SCREWS
If any intermediate columns are required measure thevalley beam marking where they meet. Fasten postbrackets as explained in the installation guide ‘Outback FlatAttached Verandahs, Patios & Carports’ under “FRONTFASCIA BEAM”. This can be done before valley beams arefixed in place.
Support the second valley beam on adjustable constructionprops but do not fix to the wall, fascia or attachment beamuntil the front gable frame has been attached.
Fix the rafter to valley brackets to the valley beam at thecorrect rafter positions (refer Section 6). Fixing details asindicated in section 4.1.
Attach the in-line connector brackets back to back usingM10 bolts and nuts in the holes provided (Figure 19).Ensure the constructed bracket makes the requiredinternal angle of 135 degrees.
Slide the in-line connector into the valley beam and fixusing two 12x20 hex head screws to the outside face of thebeam only. Fix one of the three Gazebo Fascia Beams tothe protruding half of the in-line connector using two 12x20hex head screws to the outside face of the beam ensuringboth beams are flush with one another. Support the firstgazebo fascia beam on an adjustable construction prop.
Repeat the above process on the centre gazebo fasciabeam. Fix the remaining in-line connectors to the free endsof the fascia and valley beams. The final gazebo fasciabeam is now be fixed in place.
5.0 GAZEBO FASCIABEAMS .
Fix beam to beam brackets to the attachment beam(header beam) with two 10x16 hex head screws so theyclamp the beam filler to the beam (Figure 18).
The first valley beam is fastened over the beam to beambracket with two 10x16 hex head screws either side whilethe opposite end is supported on adjustable constructionprops.
19
INLINE CONNECTOR
12x20 HEX HEAD SCREW
M10 BOLT
GAZEBO FASCIA BEAMS
20
POST BRACKET
GAZEBO FASCIABEAMS
With all the gazebo fascia beams secured, post bracketsare to be fastened approximately 60mm from the fasciabeam joins (Figure 20), allowing for perimeter brackets andpost caps. Refer to, ‘Your complete guide to building anattached verandah, patio or carport’ under “FRONTFASCIABEAM” for post bracket fixing details.
6.0 GABLE FRAME CONNECTION
Note: Be aware that gable frames are always 120 beamsand valley beams are always 150 beams for Multispan unitswith a gazebo end.
The front gable frame will need to be set back from the frontof the valley beams to accommodate the gazebo end. Referto Figure 21 and Table 1 for set back distance.
The rafter to valley brackets will have been attached to thevalley beams using six 12x20 hex head screws (Figure 15,Section 4) at the location determined from Table 1 (Figure21).
6.1 GABLE FRAMES(Figure 1) 150
VALLEY BEAM
120 RAFTER
RAFTER TO VALLEYBRACKET
22
Fix the gable rafters into the rafter to valley brackets withtwo 12x 20 hex head screws either side (Figure 22).
VALLEY BEAM
21
RAFTER
A(S
ET
BA
CK
)
RAFTER TO VALLEYBRACKET
Table 1Interpolation may be used to determine valuesbetween those shown.All lengths in millimetres (mm).
OPENING, O A(Set Back)
1200150018002100240027003000330036003900420045004800510054005700600063006600
1022108411471209
13331395
277339401463525587649712774836898960
1271
TWO 12x20 HEX HEADSCREWS EITHER SIDE
If attached on the end, attach the second valley beam intothe wall or suspension bracket.
If the unit includes rear infill a rear header beam isrequired and must be installed before fixing the secondvalley beam in position, refer section 6.2.
Intermediate frames should be spaced evenly and fixed intorafter to valley brackets as previously described.
A rear gable frame without a header beam is fixed as per anintermediate frame.
Note:
10
60mm
6.2. REAR INFILL
A rear header beam will be required if the unit includes infillto the rear gable frame. For units attached at the rear withsuspension brackets, the rear header is fixed betweenvalley beams using beam to beam brackets. If fixed at therear to an attachment beam (Figure 26), the attachmentbeam becomes the header (valley beams are fixed to theheader beam) and if attached on the side the rear header isfixed to the attachment beam with beam to beam brackets.
Attach end rafter brackets to the rear header beam atspacing, O, as determined in section 3 using six 10x16hex head self drilling screws (Figure 23).
Fasten the rafters that form the end gable frame over theend rafter brackets with a minimum of two 10x16 hexhead screws either side (Figure 23).
Refer section 14 for details of fixing infill panels to gableframes.
6.2.1 SOAKER FLASHING
In the case of a rear infill panel, a soaker flashing is used toconceal the existing house gutter, waterproof the rear endof the gable and neatly finish the base of the infill panel(Figure 24).
The rear gable frame and header beam are positioned 153mm from the house fascia in order to accommodate thestandard soaker flashing which is optional with theOutback unit (Figure 25). The frame is fixed on the rearheader over end rafter brackets (Figure 23).
Fix the standard soaker flashing into position on top of theback channel and underneath the gutter. Infill panels mustbe fixed with split tail soft pull rivets at 500mm centres aminimum of 20 mm above the pan of the soaker flashing.This will reduce the possibility of moisture being absorbedinto the sheet.
Refer section 14 for details of fixing infill panels to gableframes.
®
25
120 GABLE RAFTERINFILL PANNEL
GUTTER
SOFFIT LINING
SUSPENSIONBRACKET
20mm GAP
VALLEY BEAM
BACK CHANNEL
153MM
SPLIT TAIL SOFTPULL RIVETS
24
SOAKERFLASHING
SOAKER FLASHING
Note:
1. If your house gutter is wider than 150 mm a custom madesoaker flashing will need to be ordered to the requireddimensions. The rafter setback will need to be adjusted tosuit.
2. Do not form stop ends at either end of the soaker flashing.
3. Soaker flashing is not to come in contact with the base ofthe house gutter.
6.2.2 HEADER FLASHING
When a gable is fixed at the rear to an attachment beam,elevated to the existing house gutter height, typically aheader flashing is used in conjunction with the rear infill. Inthis case, the rear attachment beam is considered aheader, and along with the rear gable frame is fixed as closeas possible (within 5mm) to the existing gutter in order toaccommodate the header flashing. The gable frame is fixedon the rear header over end rafter brackets (Figure 23).
Fix the header flashing into position over the existing gutterlip with rivets. Infill panels are located behind the headerflashing and fixed with split tail soft pull rivets at 500mmcentres (Figure 26).
Refer section 14 for details of fixing infill panels to gableframes.
11
23
END RAFTERBRACKET
HEADER BEAM
RAFTER
ATTACH RAFTER TOBRACKET USING A MINIMUM
OF TWO 10x16 HEX HEADSELF DRILLING SCREWS
EACH SIDE
ATTACH END RAFTERBRACKET USING A MINIMUM
OF SIX 10x16 HEX HEADSELF DRILLING SCREWS
26
STRENGTHENINGBRACKET
FASCIA
150 ATTACHMENTBEAM
HOUSEGUTTER
INFILL PANEL HEADER FLASHING
SPLIT TAILSOFT PULL RIVET
27
PERIMETER BRACKET
12x20 HEX HEADSCREWS
GAZEBO FASCIABEAMS
7.0 PERIMETER BRACKETS
Perimeter brackets are to be located at the internal join ofthe gazebo fascia beams so the bottom face of the bracketis in-line with the bottom of the lower groove in the beams(Figure 27). Brackets are to be fastened to the gazebofascia beams using four 12x20 hex head screws throughthe pre-drilled holes.
12
8.0 GAZEBO HIP RAFTERS
Having all the Perimeter Brackets in place will allow raftersto be located. The two shorter rafters are to be positionedclosest to the end gable frame on either side. It is importantthat rafters are firstly fixed at the apex, position rafters overthe apex bracket tabs so the cut face of the rafter is flushwith the face of the bracket.
Two 12x20 hex head screws are used to fix the rafter to thetab with the first screw being located 20mm from the frontface of the bracket and the second 20mm from the firstscrew (Figure 28). This process is repeated for the twointernal gazebo hip rafters.
HIP RAFTERS
12x20 HEX HEAD SCREWS
GAZEBO APEXBRACKET
INTERNAL HIPRAFTER
GAZEBO APEXBRACKET
20
20
28
With all gazebo rafters fixed at the apex they can befastened to the perimeter brackets. Fix rafters through thebase of the perimeter brackets using two 12x20 hex headscrews at a minimum spacing of 30mm. As a smalltolerance is allowed for at this bracket it is important that thescrews are located at least 20mm from the bracket edgeand the bottom edge of the rafter (Figure 29).
9.0 PURLINS
9.1 CUTTING PURLINS
The location of all the purlins must be known before anypurlins are to be cut. The top purlin is positioned a maximumof 100mm from the gable ridge (Figure 30) and ends at thefront edge of the gable frame on either side. The end of thispurlin is cut straight to be left flush with the top of the rafterchamfer (Figure 31).
The lowest purlin shall be a maximum 50mm from the valleybeam (Figure 30) and any intermediate purlins are spacedevenly on rafters, ensuring maximum recommended deckend spans are not exceeded. Both the lowest purlin andintermediate purlin/s will follow the shape of the gazebo endand therefore purlins will need to be mitred at 67.5 to lengthto suit this shape. The highest edge of the gazebo endpurlins will end at the centre of the top face of gazebo hiprafters. Refer to Figure 31 for further details.
It is recommended the three lowest purlins aroundthe front of the gable end are set as low as possible on thehip rafters to eliminate any gap between purlins and gazebofascia beams. It is not critical that the level of the lowestpurlins exactly match the purlins adjacent to the valleybeams.
°
Note:
HIPRAFTER
PERIMETER BEAMBRACKET
GAZEBO FASCIABEAM
12x20 HEX HEADSCREWS
>20
>30
>20
29
31CENTRE LINE
HIP RAFTER
PURLINS
67.5° MITRE
STRAIGHTCUT
9.2 ATTACHING PURLINS
Where purlins are continuous over rafters they are fixed inposition using 14x95 hex head self drilling screws. If it isnecessary for purlins to be broken over standard gableframes (ie, purlins continue in the same direction past a join)a 68mm in-line purlin connector is used.
By drilling pilot holes and screwing through the top ofthe purlin before lifting it into position, the process ofscrewing into the rafters is made easier. Pilot holes shouldalso be drilled through rafters at the fixing location.
In the case of purlin joins which occur over a gazebo hiprafter an angled purlin connector will be required. Fix purlinstogether using 12x20 hex head screws. A 14x95 hex headself drilling screw is fastened through the connector to holdpurlins to the rafter (Figure 32). A gap will be noticed at thelower edge of the purlin join but this will not be seen afterinstallation of the purlin intersection cover.
If purlins do not align (ie, lowest gazebo end purlins andlowest gable purlins) they may be screwed directly into hiprafters.
Note:
30
MAX 100 mm
50 mm
PURLIN
120 RAFTER
VALLEYBEAM
RIDGE
(MAX)
13
PURLINS
14
Note: Purlin Intersection Caps are available as an optionalextra and can be used to fill the small gap between the purlinand the template cut out. Caps are riveted to the side of thepurlin cover.
With the exception of Gazebo Ends with Outback®
deck, hipsupport flashings ( Figure 2) are secured directly over purlinintersection covers to hide roof sheeting cuts. Fix theflashing to purlins at each purlin junction using a single riveteither side of the flashing.
Mitre hip support flashings at the apex for a neat finish.
Connect the gutter to the flat roof Outbacks as described in
Assemble the remaining framework of the verandah as perthe installation guide ‘Outback Flat Attached Verandahs,Patios & Carports’.
Fix the posts, as described in the instruction brochure under"COLUMNS AND FOOTINGS” or "ALTERNATIVEFOOTING".
Note: All adjustable construction props are to be left inposition until decking is attached and concrete is set.
‘Outback Flat Attached Verandahs, Patios & Carports’.Gutters will need to be mitred at the point the flat roof unitmeets the gable and around the front of the gazebo end. Allgutter joins are to be waterproofed with silicon.
Where there is no flat roof adjacent to the gable, the gutter isattached with gutter straps and flat connecting strips whichare fixed to the valley beam. Cut the strip into sections andrivet at 1000 mm intervals to the valley beam. Fix the gutterto the strip with rivets as shown in figure 34. Once decking isattached (Section 12.0) the gutter is secured to the roofsheeting using gutter straps at maximum 1200mmintervals. Gutter straps may need to be bent slightly so theycan be rivetted to the roof sheets. Waterproof rivets withsilicone.
The above method is also used to fix gutter around the frontof the gazebo perimeter beams.
®
10.0 REMAINING FRAMEASSEMBLY
11.0 GUTTERING
33
14x95 HEX HEADSCREW
12x20 HEX HEADSCREWS
PURLININTERSECTION
COVER
TEMPLATECUT OUT
PURLINS
HIP RAFTER
CONNECTION DETAIL
RIVET
STEEL STRIP RIVETTED AT1000mm INTERVALS TO
VALLEY BEAM AND GUTTER
34150 VALLEY
BEAM
GUTTER
120RAFTER
32
RAFTER
PURLIN
PURLIN
PURLINCONNECTION
12x20 HEX HEADSCREWS
12x20 HEX HEADSCREWS
14x95 HEX HEADSCREWS
9.3 PURLIN INTERSECTION COVER
The purlin intersection covers are used to cover any gaps atpurlin joins and also to attach decking. The location ofpurlins are to be marked along each side of the purlinintersection cover and the cover is then cut with tin snips toallow a tight fit over purlins. The template provided will allowthe cut shape to be marked on the cover at the location ofeach purlin.
The purlin intersection cover is now riveted on either side tothe chamfer of the rafter, rivets are to be located a maximumof 50mm from purlins on both the higher and lower sidesand at spacings of no more than 300mm (Figure 33)
Each cover should be mitred at the apex to finish flush withthe gazebo apex flashing.
.
UNIVERSALDECK STRAP
15
35
OUTBACK DECK RUNNINGPARALLEL TO 150 VALLEY BEAM
®
150 VALLEY BEAM
OUTBACKDECK
®
BITUMEN IMPREGNATEDFOAM INSERT
BACK CHANNEL(UPSIDE DOWN)
ROOFING
120 RAFTER
68 PURLIN
36
OUTBACK DECK RUNNINGPERPENDICULAR TO 150 VALLEY BEAM
®
150 VALLEY BEAM
OUTBACKDECK
®
BITUMENIMPREGNATEDFOAM
BACK CHANNEL(UPSIDE DOWN)
ROOFING
120 RAFTER
68 PURLIN
12.2 MULTISPAN GABLE
When attaching the decking to the gable, start from the rear(non gazebo end) on one side of the gable, aligning thesheets so as to avoid the purlin fixing screws.
If the deck of the flat roof section runs perpendicular to thevalley beams, align the ribs of the gable decking up with theflat roof section. Fix the decking so that it is level with the topof the flat deck, and so there is a maximum 100 mm gap atthe ridge (Figure 37).
37
POLYCARBONATEOR CGI
ROOF SHEET
NO BACKCHANNELREQUIRED
PURLINFIXING SCREW
MAX100 MM
12.3 GAZEBO END
At the point when less than one full sheet is required to passthe centreline of the front gable frame on one side, theGazebo End decking will need to be cut to suit. Refer tofigure 39 for cutting order and laying direction.
Continue laying deck past the end gable frame (Section 1,Figure 39) and cut the sheeting along the centreline of thepurlin intersection cover. The offcuts from this section areused in section 2 but deck is layed in the opposite directionas shown by the arrow in figure 39. When all offcuts areutilised begin with new sheeting.
This process is continued around the front of the GazeboEnd and back down the side of the Multispan Gable (i.e.Offcuts from section 2 are used in section 3 with deck beinglayed in the direction shown in figure 39, offcuts fromsection 3 are used in section 4 and so on).
The centreline of the purlin intersection covers areused to mark the sheets for cutting. Sheets are to be takendown from the framework to be cut. It is recommendedsheeting is supported in a horizontal plane off the ground ata comfortable height for cutting.
All sheeting which ends at the apex is to be cut to a point soit meets directly above the centre of the end gable frame.
Gazebo end decking will need to overhang the last purlinand gazebo fascia beams allowing water to flow directlyinto the gutter (Figure 34). It may be necessary to notch thetop of the backchannel on the valley beams to avoidinterference with roof sheets at the first gazebo corner.
The edge of roof sheeting, running along hips, is to be fixedthrough the hip support flashing and into the purlinintersection cover.
Note:
12.0 ATTACH DECKING
12.1 FLAT ROOF
Attach the decking to the flat roof verandah first as laid outunder "THE DECKING" (‘Outback Flat AttachedVerandahs, Patios & Carports’), starting from the valleybeam and working away, on both sides.
The back channel is attached upside down (the shorter legon top) along valley beams to assist the fixing of decking.(Figures 35 and 36). The channel extends to the end of thevalley beams.
Figure 35 shows the back channel and Outback deckrunning parallel fixed to a 150 valley beam. Figure 36shows the back channel and Outback deck runningperpendicular to a 150 valley beam.
®
®
When using polycarbonate or corrugated roofing no backchannel is required at the ridge. When Outback deck isused, back channel is required at the ridge, and is suppliedwith the unit (Figure 40).
Two piece back channel is required at the ridge. WhenOutback deck is used, back channel is required at theridge, and is supplied with the unit (Figure 40).
®
®
16
39
12.3.1 OUTBACK DECK®
For Outback deck a special two piece backchannel will berequired and is to be located along the purlin cover beforethe decking is fastened in place (Figure 38). The flashingsare screwed to the purlin cover using 12x20 hex headscrews at 500mm centres on alternating sides of theshallow ridge. Outback deck is riveted to the base flashingat 250mm centres
®
®
.
For Outback deck slide back channel over the ridge end ofthe deck and rivet into place. Position the ridge cap over thetwo back channels and screw or rivet into the channel(Figure 40).
For polycarbonate and corrugated roofing screw or rivet(depending on ridge cap style) the ridge cap directly ontothe top of the deck. Waterproof rivets with silicone.
Do not rivet to polycarbonate decking, screw only.
®
Note:
13.0 RIDGE CAPPING
13.1 MAIN RIDGE
3
2
1
DECKING
GAZEBO END
4
5
OFFCUT FROM SECTION 1
TWO PIECE BACKCHANNEL
OUTBACK DECK®
38
PURLIN
HIP RAFTER
PURLIN COVER
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
BIP FOAM
SHEET RIVETED TOBASE FLASHING
RIDGE CAP
40
BACK CHANNEL
RIDGE CAP
OUTBACK DECK®
17
14.1 HEADER BEAM WITH GUTTER
Attach the header flashing to the rear gutter lip with rivets.Infill panels are fixed through the top groove of rafters andthe end strut with 8x35mm self embedding teks at 500mmcentres in non-cyclonic areas and 250mm centres incyclonic areas. Panels are fixed at the base through theheader flashing with split tail soft pull rivets at 500mmcentres (Figure 43).
INFILL PANEL
43
GUTTER
HEADER FLASHING
SPLIT TAIL SOFTPULL RIVETS
HEADER BEAM
14.0 INFILL PANELS
Two styles of header flashings are available to neatly finishthe base of infill panels, one is used on header beams withgutter and the other for headers without gutter. Gable infillpanels are to be cut in triangular shapes to fit the end frame.Panels can be painted to the desired colour beforeinstalling.
End struts are fixed mid-span of the header to a headerbeam bracket at the base and an end strut plate at the ridge(Figure 42).
HEADER BEAM
INFILL PANEL
44
8x35mm SELFEMBEDDING TEK
10x16 HEX HEAD SELFDRILLING SCREWS
HEADER FLASHING
15.0 ATTACHING BARGE CAPPING
If barge capping is required at the opposite end to thegazebo, attach the barge cap by screwing the lower lip tothe rafter and screw the top section to the purlin through thedeck, as shown in figure 45. Mitre the barge at the apex ofthe gable for a neat finish. Run the barge cap along thegable section to where it meets the flat verandah deck andfinish neatly.
If infill panels have been installed, the lower lip of the bargecapping should cover the panel screws to give a neat finish.
14.2 HEADER BEAM WITHOUT GUTTER
Infill panels are fixed through the top groove of rafters andthe lower groove of the header beam with 8x35mm selfembedding teks. Fix at 500mm centres in non-cyclonicareas and 250mm centres in cyclonic areas. Panels arefixed to the end strut at the same spacings. Attach theheader flashing to the underside of the header beam with10x16 hex head screws to neatly finish the base of the infillpanels (Figure 44).
42
FIX TO FRONT OF RIDGEWITH 2 12x20 HEX HEADSELF DRILLING SCREWS
FIX TO STRUT WITH2 10x16 HEX HEAD SELFDRILLING SCREWS
FIX STRUT TO BRACKETWITH 2 10x16 HEX HEADSELF DRILLING SCREWSEITHER SIDE
FIX BRACKET TO HEADERWITH 2 10x16 HEX HEADSELF DRILLING SCREWS
13.2 GAZEBO END CAPPING
Ridge cap is also used over all gazebo end rafters toconceal the line in the deck. For Outback deck a specialback channel is required and should have been installed asdescribed in section 12.3.1. The ridge cap is positionedover the channels and screwed in place through thechannels (Figure 38). For Polycarbonate and corrugateddecking the cap is screwed directly to the top of the deck.Ridge capping will need to be cut to meet a point at theapex as detailed in figure 41. Allow an approximate 20mmoverlap at the ridge. The capping is to be fully silicon sealedat the apex for waterproofing.
®
41
20mm OVERLAP
FRONT GABLE FRAME
RIDGE CAPPING
18
16.0 HELPFUL TIPS
Leave plastic coating on members until they are about tobe fastened to the structure. This will help preventscratching of the coloured finish.
Sweep the roof and clean gutters after the completion ofwork. Ensure any swarf and rivet stubs are removed asthey can cause unsightly rust stains.
Do not allow soil to remain in permanent contact with thecolumns, as corrosion will result in the base of thecolumn. Refer to the “Selection, Use and Maintenance ofStratco Steel Products” brochure for complete details ofthe maintenance requirements.
Double check all measurements and drilling locationsbefore proceeding.
Regularly check framework for squareness and verticalalignment to make sure it hasn't moved duringconstruction.
Purlin Overhang
BARGE CAP
RIVET
RAFTER
ROOFING14 x 95 HEX HEAD
SELF DRILLING SCREWS
PURLIN
No Purlin Overhang
BARGE CAP
12x35mm ROOFINGSCREWS
END OFPURLIN INLINE WITHRAFTER CHAMFER
RAFTER
ROOFING
14 x 95 HEX HEADSELF DRILLING SCREWS
PURLIN
ATTACH THROUGHDECK AND PURLIN
ATTACH THROUGHDECK AND PURLIN
45