21
Dredging Offshore Marine Land-Based Your partner for electrical system integration We take care of it.

Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Dredging Offshore Marine Land-Based

Your partner for electrical system integration

We take care of it.

Page 2: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

t

Bakker Sliedrecht has been designing, assembling, installing and maintaining complex electrical and automation systems for 100 years. With excellent service, Bakker Sliedrecht takes care of the desired performance of your assets during their entire lifetime.

Our roots are in the dredging industry. In the marine sector we also focus on

offshore applications. Onshore we provide drive systems and automation solutions

in the heavy industries and infrastructural engineering works. Furthermore we

supply complete solutions for critical power generation.

Bakker Sliedrecht is your partner for electrical solutions throughout the lifetime

of your assets. From the new build stage, trough operations and performing

renovations, you can rely on us for tailor made consulting, engineering,

installation and maintenance services. Wherever your operations may take place,

we are always able to support you 24/7 around the world.

It is with passion, know-how and craftsmanship that we ensure the performance and continuity of your operations.

We take care of it

We takecare of it.

We minimize operational risks

during a comfortable journey

We always create

a perfect fit

Tailor

Captain

Partner

Together we grow

& build solutions

Page 3: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

BAKKER SOLUTIONS COVER THE ENTIRE LIFETIME OF YOUR ASSET(S)

LIFETIME OF AN ASSET

A B C

A: Need for Asset (new)

Robust, modular, easy to service

Design electrical engineering

production assembly

installation commissioning

B: Operational (use)

Maximum uptime, limit

risks & costs, Service &

Maintenance

C: Extending the lifetime (re-use)

Retrofi ts & Conversions

Design electrical engineering production

assembly installation commisioning

(new)

Robust, modular, easy to service

electrical engineering

production assembly

installation commissioning

A: Need for Asset

Robust, modular, easy to service

electrical engineering

assembly

commissioning

C: Extending the lifetime (re-use)

Retrofi ts & Conversions

electrical engineering production

installation commisioning

Page 4: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Highly experienced in system integration

Effective and effi cient systemsAs a brand independent system integrator, Bakker Sliedrecht offers you freedom

of choice and fl exibility. We seamlessly integrate the components you prefer

into your installation. We have 100 years of experience in integrating systems

from various best-known manufacturers in both new-building projects and

refurbishments. Our understanding of the system yields you direct benefi ts in

terms of effectiveness, effi ciency and user convenience.

Single point of contact for a successful projectAt Bakker Sliedrecht, you have a single point of contact for the project execution;

you minimize costs and maximize the reliability and performance of your

installation. Bakker Sliedrecht offers you partial or total system integration; from

consultancy design, engineering and purchase to installation and commissioning.

PRODUCTS & SERVICES

Power generation & distribution

GeneratorsBakker Sliedrecht offers generators to produce electric power in a wide

range of designs to fi t every application. Our engineers will translate your

wishes and user situation to the choice of the most suitable generator. We

can supply the generators to you separately or integrate them into your

electrical installation.

Drive systemsYour installation environment calls for specifi c drive systems. As a brand

independent electrical system integrator, Bakker Sliedrecht uses its

knowledge to design, assemble and integrate custom-built drive systems.

Our experienced and expert engineers can confi gure drive systems for your

specifi c low- and high-voltage drives, enabling you to get the most out of

your motors with effi cient energy consumption.

Low voltage DrivesPower range: 1,5 kW – 5,600 kW

Output voltage: 380 V – 690 V

High voltage DrivesPower range: 250 kW – 10,000 kW

Output voltage: 2,3 kV – 4,16 kV

Our services for electrical installations:

Consultancy

Engineering

Delivery

Installation

Commissioning

Maintenance

Modifi cations

Page 5: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

PRODUCTS & SERVICES

Switchboards

Bakker Sliedrecht designs, assembles and integrates high-quality switchboards.

We supply switchboards and match the system to your demands. Our experienced

engineers design and build tailored switchboards at competitive prices. With

their modular cabinets, the switchboards always fi t within the dimensions of

your installation environment, taking full account of the applicable standards. In

addition, we offer you freedom of choice by integrating components from all the

well-known manufacturers. With our experience as an electrical system integrator,

we match the switchboards to the other systems within your electrical installation.

Propulsion

Our electric propulsion and thruster systems are characterized by their optimum

of control and availability, effi cient power management and diesel engine load,

balanced fuel-oil consumption and emissions, a low vibration and noise level,

high redundancies and fl exible installation possibilities.

Bakker Sliedrecht offers low voltage and high voltage AC grid, DC bus, local

DC bus and hybrid propulsion concepts that can be modifi ed to meet your

requirements such as a specifi c sailing profi le or fuel saving.

Certifi cation

Page 6: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Automation & Control

Modular marine automation

The Bakker Integrated Modular Monitoring and Control system (BIMAC) is

specifi cally build for marine application and is the perfect automation solution

for vessel management. A clear visualization enables operators to quickly analyze

a situation, trace possible failures, and effi ciently control the systems. The

modular system can be confi gured to your needs with add-ons.

PRODUCTS & SERVICES

Simulation

Bakker Sliedrecht offers simulation

possibilities for testing designs which

save time compared to traditional mock-

up building. Testing a concept design

offers valuable insights on the behavior of

a ship during various circumstances. We

also offer the possibility to test designs for

certifi cations.

Add-ons:

Power monitoring

Exhaust gas monitoring

Watch responsibility

Tank level monitoring

History logging/Trending

NIMEA interfacing

Ballast control

Remote diagnostics

Alarm service

Page 7: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Service & Maintenance

Corrective maintenance

If your business process is threatened by a disruption in your electric installation,

you want to be able to depend on a reliable partner. You can count on Bakker

Sliedrecht’s 24/7 breakdown service for a fast response which limits the impact of

the disruption. Our engineers can be on the scene quickly around the world. Our

broad technical know-how combined with specifi c product knowledge ensures our

experienced service engineers are able to quickly assess and solve a disruption.

Preventive maintenance

Bakker Sliedrecht understands that downtime comes with high costs. With

preventive maintenance, you avoid downtime and corrective maintenance of

your automation, installations and drive systems. By planned inspections and

condition-based monitoring, together we deliver the lowest possible life cycle

costs. Preventive maintenance results in lower risks, lower costs and higher

returns for your organization.

PRODUCTS & SERVICES

Lifetime extension

Retrofi t

Eventually every installation becomes

obsolete due to long and intensive use or

changing circumstances. Bakker Sliedrecht

has broad experience with retrofi t projects to

extend the economic life of your electrical

installations. By only replacing components,

which are obsolete, you continue to get the

most out of your installation at the lowest

possible cost. As a brand independent system

integrator, we have extensive experience with

retrofi tting electrical installations.

Inspections & Measurements

LV / HV insulation measurement

Micro Ohm measurement

Power Quality Analysis

LV circuit breakers

Thermographic inspection

Protection relays inspection

Visual inspections

Equipment inspection

Page 8: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Subsea 7REEL LAY VESSEL SEVEN VEGA

Croonwolter&dros and Bakker Sliedrecht have obtained the order to engineer, manufacturer, install and commission the complete electrical installation of the new reel lay vessel that Royal IHC is building for Subsea 7.

The technologically advanced ship is intended for the installation of complex rigid fl owlines, including pipe-in-pipe and electrical trace heating systems. This cost-effective technology will address the market trends towards longer tie-back developments.

Delivery in 2020Delivery of the vessel is scheduled for the fi rst half 2020. To ensure timely delivery, the project team of Croonwolter&dros and Bakker is working on-site at the shipyard of Royal IHC in the Netherlands to ensure great collaboration between all key suppliers.

Successful collaboration Croonwolter&dros and Bakker SliedrechtThe integrated reel lay vessel will be the ninth vessel for Subsea 7 that will be fi tted with an electrical installation of Croonwolter&dros and Bakker Sliedrecht. These nine vessels were also designed and built by Royal IHC. Croonwolter&dros will focus on the low voltage installations, Bakker Sliedrecht will focus on the high voltage installations and drive

systems.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

REFERENCE PROJECTS

Specifi cations: 3 x Main switchboard 6,6 KV

3 x Auxiliary switchboards 440 V

7 x Water-cooled electrical drive systems for Indar thrusters

3 x Motors for Azimuth Indar thrusters 3,200 kW

2 x Motors for retractable Azimuth Indar thrusters 2,400 kW

2 x Motors for bow Indar thrusters 2,200 kW

Dynamic positioning design according Lloyds AAA requirements (DP3)

Alarm, monitoring, and control systems

Navigation and communication equipment

Main power supply for all mission equipment

Complete lighting installation

Complete cable installation and connection

Integrating all electrical systems of the most technologically advanced vessel

Bakker Sliedrecht and Croonwolter&dros will integrate all electrical

installations of the most technologically advanced vessel to date. Key

elements of the scope are:

OFFSHORE

Page 9: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Project scope:

Integration entire electrical installation

Generators

HV main switchboards

690 V switchboards

440 V switchboards

HV electrical drive systems

ABB ACS 880 low voltage multidrive systems

Transformers

Propulsion motors

Bow thrusters

Jet pump motor

Inboard dredge pumps

Cutter motors

Submersible motor

Winch motors

DEMECSD Spartacus

Bakker Sliedrecht is responsible for the engineering, delivery, and commissioning of the electrical power plant and auxiliary electrical installations for the world’s most powerful cutter suction dredger (CSD) Spartacus.

Royal IHC is building the CSD for DEME. Creating the power electrical

plant for the world’s most powerful CSD With a total installed power

of 44.180 kW, ‘Spartacus’ will be the most powerful Cutter Suction

Dredger that has ever been built. The vessel’s power will enable her to

cut harder soils at speeds that have not been possible before. Bakker

Sliedrecht is responsible for delivering the power electrical plant that

will generate and distribute power throughout the CSD. We are also

responsible for the integration of the entire electrical installation.

Low voltage multidrive systemsThe Spartacus will be equipped with the brand-new ABB ACS 880

liquid-cooled low voltage multidrive system. The new model of ABB

has a very high power density, yielding a lot of power out of a small

footprint. The ABB ACS 880 is maintenance friendly and already

compliant with future regulations.

Delivery in 2019The Spartacus will be delivered to DEME in 2019.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

DREDGING

Page 10: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Van Oord - BravenesFall pipe vessel

Bravenes of van Oord is one of the most innovative subsea rock installation vessels in the world. Electrical installation company Bakker Sliedrecht functioned as the coordinating contractor in the installation and the integration of the advanced technology that makes the vessel special.

DP 2-3 system

To guarantee pinpoint accuracy, the Braveness is designed with a DP 2

and 3 system, with four thrusters at the front and two at the rear, holding

the 154 meters long and 28 meters wide vessel in place and allow it to

safely operate close to offshore structures. For the DP system, Bakker

Sliedrecht had to double install all electro-technical installations and

drive systems. If the energy on one side of the system fails, the other side

takes over and the vessels stays in position.

Electrical system integration

During the construction, Bakker Sliedrecht was responsible for the

integration of all electrical systems and the coordination of participating

E-parties. Van Oord had the Bravenes built at the Sinopacifi c

Shipbuilding’s Ningbo shipyard in China. A technical innovation Bakker

Sliedrecht supplied are the active fi lter solutions in combination with the

electric drive systems. They save space and energy and prevent harmonic

distortion and thus the risk of energy losses, failure of electronic

equipment and overload.

REFERENCE PROJECTSMARINE

Specifi cations:

4 Main ac generators 2x 3200 kVA, 2x 4689 kVA

4 Transformers 1500 kVA

8 Switchboards (690v, 440v and 230v)

14x (multi) Drive systems

4x Squirrel induction motors 690v

Automation system

Vessel management

DP 2 & 3

Page 11: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Van OordTrailing suction hopper dredger Volvox Terranova

While working on a project in Indonesia, trailing suction hopper dredger Volvox Terranova was heavily damaged by an old sea mine.

Van Oord decided to repair and modernize their vessel at the same time.

Bakker Sliedrecht was part of this great project and got the assignment

to modify the suction tube confi guration and restore the electrical

installations.

Modifi cation of suction tube

To increase production, the confi guration of the suction tube was

changed. The two submersible motors in the suction tube were

replaced by one motor that is more powerful. In addition, a new

electrical drive system was installed that powers both the jet pump

as the dredging pump.

Restoring the electrical system

As the blast wave of the sea mine was very powerful, damage was

caused throughout the ship. Therefore, Bakker Sliedrecht inspected

and repaired the entire electrical system from power generation to

power distribution.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

REFERENCE PROJECTS

Specifi cations:

Electrical drive system

Submersible motor 6,000kW

Transformer 4,800 kVA

Transformer 6,000 kVA

Main switchboard 690 V

Inspection electrical installation

Upgrade vessel management system

Upgrade Scada system

Renewing fi re detection system

Renewing cabling

Installation suction pipe

DREDGING

Page 12: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Jan De Nul GroupJDN 8069 Cutter suction dredger

Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s largest cutter suction dredger, JDN 8069, that is being built for Jan De Nul Group.

JDN 8069 is being equipped with very powerful drive systems of

8,500 kW. This makes the new vessel signifi cantly stronger than

existing cutter suction dredgers. The powerful drive system crushes

rock faster, increasing production.

A high reliability of the inboard pump drive systems is very important

to Jan De Nul Group. Therefore, Bakker Sliedrecht is installing

redundant inboard pump drive systems. To ensure the reliability of the

drive systems, Bakker Sliedrecht is delivering a spare part package of

critical components.

Bakker Sliedrecht will take care of the commissioning on site at a later

stage. The JDN 8069 will be operational in 2019.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

REFERENCE PROJECTS

Specifi cations:

2x inboard pump drive systems of 8,500 kW

Submerged pump drive system of 8,500 kW

Cutter/propulsion drive system of 8,500 kW

4x additional drive systems to power auxiliaries

BIMAC vessel management system

DREDGING

Page 13: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Scope of delivery:

2 x 6,6 KV distribution board

4 x motors 660V for the submersible azimuth thrusters

8 x Transformers 6,6 kVA

2 x Transformers 99kVA

4 x Frequency converter LC ABB ACS880

1 x UPS 30kVA

4 x Motor Control Centers LV

2 x Auxiliary switchboard 440V

30 x lighting and power distribution panels

OFFSHORE

BoskalisBokalift 1 – conversion - 2018

Bakker Sliedrecht has played an important part in the conversion of Boskalis’ heavytransport vessel (HTV) Finesse into transport and installation crane vessel (HLV) Bokalift 1.

During the conversion Bakker Sliedrecht was responsible for the

supervision and coordination between the client and all participating

electro technical parties. During the conversion, the large ballasting

tanks, which made the heavy transport vessel semi-submersible, were

converted to give way to the requirements of diesel generators and

switchboards. These are necessary for the new thrusters, which keep

the ship in position. Because of DP2, Bakker Sliedrecht had to double

install all electrical installations and drive systems - existing and new -

in order to guarantee safe operations of the systems at all time.

Bakker Sliedrecht coordinated all installations and the commissioning.

All electrical installations, switchboards, engines and generators were

produced in Sliedrecht or elsewhere in Europe and then transported

to the yard in Singapore. In the second phase, the company assisted

in the installation of the crane. In the third phase, the crane vessel was

subjected to a large number of tests in the Failure Mode and Effects

Analysis (FMEA) at the coast of Cape Town.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

Page 14: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

BigRoll4 MC Class Module Carrier vessels DP2 prepared

Bakker Sliedrecht has delivered the electrical systems of four Module Carrier (MC-class) vessels.

The DP 2 prepared 1A Ice Class vessels are specifi cally designed for

the marine transportation of major modules and equipment to some of

the most remote areas on the planet. Bakker Sliedrecht participated in

the design of the innovative propulsion confi guration that focuses on

low fuel consumption, resulting in lower operational costs.

Successful integration of all electrical systems

As an electrical system integrator, Bakker Sliedrecht has been fully

responsible for the successful integration of all electrical systems,

including engineering, assembly, installation, and commissioning.

Bakker Sliedrecht participated in the vessels’ sea trials that were

conducted successfully in China.

REFERENCE PROJECTS

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

Specifi cations:

Complete electrical design

BIMAC vessel management system

4x alternators 6,6 kV

2 x main switchboards 6,6 kV

2 x HV propulsion systems 5,000 kW

3 x LV thruster drive systems 1,500 kW

4 x distribution transformers 1,500 kVA

Harbour- and emergency generator set

OFFSHORE

Page 15: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Scope of the project:

690 V main switchboards

2 x 440 V auxiliary switchboards

3 x Drive systems

Electrical cabling

BIMAC vessel management system

Integration of all main electrical systems

OFFSHORE

Damen Shipyards GroupBIBBY WAVEMASTER 1 SOV DP

Bakker Sliedrecht has delivered the main electrical installations of the Bibby WaveMaster 1 to Damen Shipyards Group. This Service Operations Vessel (SOV) is the fi rst vessel purpose-built for the transfer and accommodation of offshore personnel and aims to maximize working time.

Responsible for all main electrical installations

Bakker Sliedrecht was responsible for the supply and integration of all

main electrical installations. Key elements of this project were the design,

fabrication, installation and commissioning of the main switchboard,

two auxiliary switchboards and three drive systems. All drive systems are

equipped with an active fi lter that saves space on board and creates a clean

power supply by eliminating harmonic distortion.

BIMAC vessel management system

Bakker Sliedrecht’s Vessel management system BIMAC was also installed.

Bakker Sliedrecht developed BIMAC especially for marine applications. The

user-friendly vessel management system manages all main and auxiliary

functions of the Bibby WaveMaster 1.

Successful delivery according to schedule

The electrical installations of the Bibby WaveMaster 1 were delivered to

Damen Shipyards Group according the tight schedule.

Page 16: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

HUTACSD Huta 14

Bakker Sliedrecht replaces sand pump drive of cutter suction dredger Huta 14

Bakker Sliedrecht has successfully replaced the sand pump drive

of the cutter suction dredger Huta 14. The replacement of the sand

pump drive was part of an extensive renovation project that was carried

out in cooperation with Royal IHC.

Delivery of new sand pump drive

Bakker Sliedrecht was responsible for the engineering, assembly, and

commissioning of the sand pump drive that will improve the effi ciency

of the dredger. The integration of the electrical system was executed

on site in Saudi Arabia as technical documentation was not always

available. The technical crews of Huta and Bakker Sliedrecht worked

closely together to install the new sand pump drive on board the vessel.

Integration of three new diesel engines During the renovation project,

Royal IHC replaced three main diesel engines. Bakker Sliedrecht

integrated them into the electrical system of the vessels.

Supervision Electrical activities

The technical crews of Huta and Bakker Sliedrecht worked closely

together to install the new sand pump drive on board the vessel. This

includes placing, connecting, and testing new cables.

REFERENCE PROJECTSDREDGING

Scope of the project regarding the sand pump drive:

Sand pump motor 2,200 kW

Water-cooled frequency converter

Transformer

Cabling

Site engineering

Super vision

Page 17: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Specifi cations:

Electrical hook up J-lay installation

Electrical hook up pipe handling installation

Life time extension main electrical installations

Lloyds 5-year survey HV distribution

OFFSHORE

Heerema Marine ContractorsBalder life time extension

Heerema Marine contractors launched a lifetime extension program for the Balder, one of their deep-water construction vessels.

Bakker Sliedrecht played a vital role, working on three key projects of

this lifetime extension program.

Electrical hook up J-lay pipe installation

For Huisman, Bakker Sliedrecht was acting as a subcontractor for the

electrical hook up of the J-lay installation. During the Balder’s transit

from the Gulf of Mexico to the project location in Holland we already

retrofi tted all tower related drives and controls.

Electrical hook-up multiple joint pipe handling installation

Together with IHC SAS, Bakker Sliedrecht worked on the electrical

hook-up of the pipe handling installation on deck.

Lifetime extension of Balder’s main electrical installations

For Heerema, Bakker Sliedrecht extended the lifetime of the Balder’s

main electrical installations such as drive systems and switchboards.

We have also taken care of Lloyds 5-year survey of the high voltage

distribution, involving the dynamic positioning system.

Page 18: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

DEMEDP offshore installation vessel - Orion

Bakker Sliedrecht has been awarded a contract for the engineering, delivery, and commissioning of the main electrical power package of the offshore installation vessel Orion.

The DP3 vessel will feature an unrivalled combination of exceptionally

high transport and load capacity, impressive lifting heights and green

technology. The vessel will be built at COSCO Qidong in China. Orion’

will be deployed by DEME’s subsidiary GeoSea for the construction of the

largest offshore wind farms and deliver offshore construction services.

Empowering the fi rst next generation offshore installation vessel

With a total installed electrical power of 44,180 kW, ‘Orion’ will be

equipped with a high-tech crane with lifting capacity of 3,000 tonnes

at more than 50 meters. The loads can be lifted to an unrivalled height

of more than 170 m. Deck space has been maximized to provide

exceptionally high transport and load capacity. The vessel can take the

heaviest monopiles, jackets, wind turbine components and structures in

a single shipment. With this unmatched combination of high load and

lifting capacity, ‘Orion’ can transport and install the next generation of

giant multi-megawatt wind turbines.

Powerful ABB ACS 880 low voltage multi-drive systems

The Orion will be equipped with the brand-new ABB ACS 880 liquid-

cooled low voltage multidrive system. The new model has a very high power

density, yielding a lot of power out of a small footprint. The ABB ACS 880

is maintenance friendly and already compliant with future regulations.

REFERENCE PROJECTSOFFSHORE

Specifi cations:

4 x Indar generators

4 x Indar main propulsion electrical motors

2 x Retractable thruster motors

2 x Tunnel thrusters

2 x 11 kV switchboard

2 x 690 V switchboards

4 x 440 V switchboards for DP essentials

2 x LV electrical drive systems for eight point mooring system

4 x LV electrical drive systems for azimuth thrusters

2 x LV electrical drive systems for bow thrusters

2 x LV electrical drive systems for retractable thruster

Integrated automation system

Electrical system integration incl. construction supervision

Commissioning and sea trials

Page 19: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Specifi cations:

(retrofi t) Engineering

Assembly

Installation

Commissioning

MARINE

TESOLifetime extension ferry Dokter Wagemaker

Bakker Sliedrecht advised TESO to replace the almost obsolete frequency drives in order to guarantee the reliability and availability of the vessel during its entire lifetime.

First use of ABB ACS 880 liquid cooled drive converter worldwide

To extend the lifetime of the propulsion system, four existing ABB ACS

600 drive converters were replaced by the new ABB ACS 880 liquid

cooled type. This solution is certifi ed by various maritime classifi cation

bureaus. The Dokter Wagemaker is the fi rst vessel in the world with the

ABB ACS 880 liquid cooled drive converters.

TESO is benefi tting from the drive converter upgrade because of:

Higher effi ciency

Reduced maintenance costs

Control platform can be used for a wider range of applications

Greater availability of spare parts and service

First vessel worldwide with the ABB ACS 880 liquid-cooled drive converters.

Page 20: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

REFERENCE PROJECTS

Specifi cations:

Turn Key project

Complete electrical installation

Engineering, manufacturing, installation,

and commisioning

Water-cooled frequency drives

Kongsberg DP 2/3 system

Redundant energy system up to 6x 4,100 kVA

3 x 2,950 kW azimuth thrusters

2 x retractable azimuth thrusters 2,400 kW

2 x bowthrusters 2,200 kW

Subsea 78 Pipe lay, fl ex lay and diving support vessels DP2/3

For Subsea 7, we executed the engineering, manufacturing and mounting of the complete electrical installation on turn-key bases. These electrical installations are both high and low voltage.

The installation includes a redundant energy system 6x3,600 kVA with

low and high voltage switchboard and a propulsion system consisting

of 3x2,950 kW azimuth propellers, situated in the aft ship and two

rudder propellers situated in the fore ship of 2,400 kW each, as well

as a 2,200 kW bowthruster. These systems are fed and controlled by

Bakker Sliedrecht’s direct water-cooled compact frequency drives. The

vessels have a DP 2/3 Kongsberg installation, which were supplied and

implemented by Combination Croon Bakker.

Do you have any questions? call us: +31(0)184 43 66 66

or mail us: [email protected]

OFFSHORE

Page 21: Your partner for electrical system integration€¦ · JDN 8069 Cutter suction dredger Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for the world’s

Visiting address

Leeghwaterstraat 55

3364 AE Sliedrecht

The Netherlands

We take care of it.

Mail address

P.O. Box 25

3360 AA Sliedrecht

The Netherlands

� +31(0)184 43 66 66

[email protected]

� www.bakkersliedrecht.com

� /bakkersliedrecht

20

19

2