Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
YOUR BUILT FORM AND STRATA TITLING PARTNERS.
TEAMWORK. INNOVATION. KNOWLEDGE.
3
3.34
3.71
10.39
22.53
20.34
9.24
3.45
9.98
4.84
6.56
30.2
3.712.74
7.3
24.91
5.43
5.12
134°55'15"
134°55'15"
90°9
'30"
135°
3'13
5°3'
134°57'
134°57'134°57'
90° 27
0°90
°6'
90°6
'
89°54'
89°50'30"
1293m² 2
80m²
33b (Sewerage)EASEMENT
REG 33 (b)SEC 167 OF THE P.& D. ACT THIS PLAN LOT 2 WATER CORPORATION
(Intrusion)EASEMENT THIS PLAN LOT 1
SEC 136C OF THE T.L.A. LOT 1
0.2
SURVEYOR'S CERTIFICATE - REG 54
ADDRESS OF PARCEL
NAME OF SCHEME
PLAN OF
CERTIFICATE OF TITLE
LOCAL GOVERNMENT
FIELD RECORD
MANAGEMENT STATEMENT NO
which it is lodged.complies with the relevant written law(s) in relation toundertaken for the purposes of this plan and that it [* delete if inapplicable] records,(b) *calculations from measurements recorded in the field(a) *survey; and/or representation of the - hereby certify that this plan is accurate and is a correctI,
LICENSED SURVEYOR DATE
LODGED
DATE FEE PAID ASSESS No.
EXAMINED
DATE
WESTERN AUSTRALIAN PLANNING COMMISSION
Delegated under S.16 P&D Act 2005 DATE
W.A.P.C. REF:Certificate of Approval of W.A.P.C. under Section 25B(2) of
PLAN APPROVED
(S. 18 Licensed Surveyors Act 1909)INSPECTOR OF PLANS AND SURVEYS DATE
IN ORDER FOR DEALINGSSUBJECT TO
REGISTERED
DATE REGISTRAR OF TITLES SEAL
APPLICATION
FOR REGISTRAR OF TITLES DATE
AMENDMENT AUTHORISED BY DATEVERSIONHELD BY LANDGATE IN DIGITAL FORMAT ONLYSURVEY-STRATA PLAN
DP 400939ON
LOT 262
Volume 2892 Folio 352
CITY OF FREMANTLE
127409
FREMANTLE56 BELLEVUE TERRACE
FREMANTLE, W.A., 616056 BELLEVUE TERRACE
Matthew DUNN
895-13
GOVERNMENT OFWESTERN AUSTRALIA
Strata Titles Act 1985
90°6
' 1.5
30.2
1.589°54'
270°
90°1 90°9
'30"
10.98
(15.1)
1.41
134°55'15"
CP 3
336m²
20.34
1.32
1.32
0.150.15
90°
90°
CP 3
3.45
135°
3'
1
270°
270°
1.34
1.34
0.220.22
90°
90°
270°
270°
3
3
P
(35.3)
33b
THIS PLAN LOT 2
SEE ENLG 'A1'
Not to ScaleENLARGEMENT 'A1'
261
25
28
30
DP 400939
P 420
P 420
(SP 11706)P 420
4
(SP 8234)D 40314
3D 14581
29
0.65
0.75
0.07
90°6
'
0.1
NOT TO SCALE A - A
CROSS SECTION
1
CP 3
14H
0.15
0.1520.34m AHD
20.84m AHD
1
CP 3
14H
0.22
0.2220.34m AHD
20.84m AHD
NOT TO SCALE B - B
CROSS SECTION
A
2
14H14H 2
14H
14H 2
A
B
B
REG 14H OF THE STGR 1996
Pby Underground Cable)
(Transmission of ElectricityEASEMENT
14H,
14H 220.34m - 20.84m AHD
LIMITED IN HEIGHT
N
YEVRUS
GNM
EAST OF CORNERPEG 0.1 SOUTH
FLOOR LEVEL = 18.77m AHD
FLOOR LEVEL = 18.77m AHD
0.5
0.5
0.5
0.5
1.57
1.57
(SP 16133)P 420
6.68
6.68
8
8
LOT CP 3
FINAL
0
ALL DISTANCES ARE IN METRES
255 SCALE 1 : 300 @ A3
SUBJECT PURPOSE STATUTORY REFERENCE COMMENTS
INTERESTS AND NOTIFICATIONS
ORIGIN LAND BURDENED BENEFIT TO
.CSD68221 - SP300613sp-001bMNG Ref : OF 01 SHEETSSHEET 01
68221
TERRACE
BELLEVUE
E m ail: in fo @ m n gsu rve y.co m .auFax: (0 8) 6 43 6 15 00Te l: (0 8) 6 43 6 15 99P O B o x 3 526 , Su cce ss W .A . 6 96 4M C M U LLEN N O LA N G R O U P
MINIMISE YOUR RISK. MAXIMISE YOUR RETURNS.
Time is money, especially in the land and property
development sector, which is why we’ve developed
a specialised strata titling solution for developers. A
solution that combines leading-edge technologies with
our built form expertise to expedite the entire titling
process, so you can realise the potential and profit in
your development as quickly as possible.
From strata title registrations to final strata plans
Whether you have a 2 or 20 lot residential or commercial
development, or even a 200-lot mixed use project in
the pipeline, we have the market leading built form
and strata titling capabilities you need to make your
development a success.
Here at MNG, you and your development will
benefit from our:
• Teamwork.
Harness our project management, licensing,
land tenure and mapping expertise, as well as
our project administration team – with strong
relationships with local authorities and government
bodies, they focus solely on driving your approvals
to fruition.
• Innovation.
Gain an advantage with our advanced terrestrial,
mobile and aerial laser scanning solutions and 3D
visualisation, modelling and sub-surface mapping
technologies, including our hologram studio.
• Knowledge.
Access a greater breadth and depth of information,
insights and intelligence than ever before and stay up
to date with our online portal and proprietary MNG
Access tracking system, which enables you to monitor
the progress of your approvals in real time.
• Improve planning decisions• Minimise approval timeframes• Expedite valuations and sales
AWARD-WINNING EXCELLENCEOur surveying and spatial information expertise has earned over 60 industry awards for excellence.
OUR CAPABILITIES. YOUR ADVANTAGE.
Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment and monitoring surveys, we also provide specialist guidance on strata titles, and registration advice.
With a dedicated project manager and project assistant assigned to your development – two points of contact instead of one – you’ll benefit from a team focussed on achieving titles.
Early Intervention We can work with your Architect and Town Planning consultant team to alleviate any potential tenure complications before they arise.
Fully Integrated ServiceBenefit from efficiencies and cost savings only a fully integrated service can provide, from sourcing unit entitlements and management statements, to draft strata plans, to construction setout to preparation of final strata plans and titles.
Title registration administration and clearance tracking Your dedicated project assistant will submit and track your development’s title applications, utilising our working relationships with government bodies and local authorities to expedite approvals.
What’s more, you’ll be able to track the progress of your registration through our MNG Access title registration and clearance tracking system. Simply log in to our secure online portal to track and access in real time:
• communications with authorities• progress of approvals• a copy of relevant Approvals• a copy of the Strata Plan• a copy of legal documents• when the Strata Plan was placed ‘In Order For Dealings’• when the Strata Plan was titled• send an email enquiry to your project manager
Innovative solutions for built formMake better informed decisions with our leading edge technologies during planning, marketing and build needs.
• Laser scanning• BIM, Revit modelling• 3D visualisations• Sub-surface mapping
Make better informed decisions with our leading edge technologies during planning, marketing and building needs.
mngsurvey.com.au | 1800 MNG SURVEY
UNLODGED VERSION
UN
LOD
GED
VER
SIO
N
UNLODGED VERSION
UN
LOD
GED
VER
SION
ARE SUBJECT TO FINAL SURVEYALL AREAS AND DIMENSIONSDRAFT
SEE "HASSELL" - DRAWINGS "A_1004.DWG" - DATE 13/01/2016DRAFT STRATA PLAN - SUBJECT TO CONSTRUCTION
STRATA PLAN
HELD BY LANDGATE IN DIGITAL FORMAT ONLY
STRATA TITLES ACT 1985.SECTION 3(2)(a) OF THE SURFACE OF THE CEILING, AS PROVIDED BYWALLS, THE UPPER SURFACE OF THE FLOOR AND THE UNDERSHOWN ON THE STRATA PLAN ARE THE INNER SURFACES OF THETHE BOUNDARIES OF THE LOTS OR PARTS OF THE LOTS WHICH ARE BUILDINGS
0 205
ALL DISTANCES ARE IN METRES
SCALE 1 : 250 @ A2
N
Y E V R U S
G N M
OF THE BUILDING TO THE INNER SURFACE OF THE BALUSTRADING.THE BOUNDARIES OF THE BALCONIES ARE FROM THE EXTERNAL SURFACE
OF THE BALCONY FLOOR TO THE UNDER SURFACE OF THE BALCONY CEILING.THE STRATUM OF THE BALCONIES EXTENDS FROM THE UPPER SURFACE
= PILLAR (COMMON PROPERTY)
B = BALCONY
ARE COMMON PROPERTY.ALL STRUCTURAL CUBIC SPACE AND WALLS EXTERNAL TO THE BUILDING
should be obtained for such purposes.a LANDGATE APPROVED copy
- Not intended for design use,- Subject to change without notice- Current as atThis version is
LANDGATE AUDITSUBJECT TO
UNLODGED VERSIONPRELIMINARY ONLY
15/09/2016
OF SHEETS
315715sp-001eMNG Ref:
SHEET 13
Lift
Stairs
Lift
Stairs
Lift
Stairs
Pt 4265m²
Duct
Duct Duct Duct Duct
DuctDuct
Pt 42B 10m²
Pt 4377m²
(118m²)
Pt 43B 11m²
Pt 44B 11m²
Pt 4477m²
(118m²)
Pt 45B 10m²
Pt 4565m²
Pt 47B 10m²
Pt 4777m²
(117m²)
Pt 4077m²
(116m²)Pt 40B 10m²
Pt 13555m²
Pt 13410m²B
Duct Duct
DuctDuctDuct
Pt 136
(120m²)77m²
10m²B
Pt 129
Pt 129
(119m²)77m²
9m²B
Pt 130
Pt 13055m²
Pt 13110m²B
Pt 13165m²
Pt 13211m²B
Pt 132
(118m²)77m²
Pt 13311m²B
Pt 133
(118m²)77m²
Pt 13466m²
9m²B
Pt 89
Pt 8956m²
Pt 9010m²B
Pt 90
(117m²)77m²
Pt 8310m²B
Pt 83
(117m²)77m²
Pt 86B 11m²
Pt 86
(118m²)77m²
Pt 8711m²B
Pt 87
(124m²)77m²
Pt 8810m²B
Pt 8865m²
Pt 4155m²
Pt 419m²B
Pt 469m²B
Pt 4656m²
Pt 8456m²
Pt 849m²B
Pt 136
10m²B
Pt 13510m²
B
Pt 85B 10m²
Pt 8565m²
FIFTH FLOOR PLAN
7300015
(91m²)
(78m²)
(93m²)
(79m²) (79m²)
(96m²)(93m²)
(79m²) (78m²)
(93m²) (94m²)
(79m²)
TEAMWORK. INNOVATION. KNOWLEDGE.
MNG SERVICESMNG offer a full suite of surveying services
• Land Surveying
• Land Tenure
• Subdivisions and Land Development
• Builtform and Survey Strata
• 3D Terrestrial, Mobile, and Aerial Laser Scanning
• Mapping Services
• Hydrographic Surveys
• Cartographic Services
• 3D Visualisation
• Geographic Information Systems (GIS)
• Sub-surface Mapping and Investigations
Head Office Level 1, 2 Sabre Crescent, Jandakot WA 6164
P 1800 MNG SURVEY
W mngsurvey.com.au