MENERJI ELEKTRIK ÜRETIM A.Ş. YÜCE HEPP, AKSU RIVER IN GIRESUN REPORTING FORM FOR LAND ACQUISITION / SOCIAL IMPACTS OF PORTFOLIO PROJECTS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

YÜCE HEPP, AKSU RIVER IN GIRESUN REPORTING FORM FOR …€¦ · menerji elektrik Üretim a.Ş. yÜce hepp, aksu river in giresun reporting form for land acquisition / social impacts

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

MENERJI ELEKTRIK ÜRETIM A.Ş.

YÜCE HEPP, AKSU RIVER IN GIRESUN

REPORTING FORM FOR LAND

ACQUISITION / SOCIAL IMPACTS OF

PORTFOLIO PROJECTS

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb20439
Typewritten Text
RP762 v12

Reporting Form for Land Acquisition / Social Impacts of Portfolio Projects.

Name & Location of Sub-project: Yüce HEPP, Aksu River in Giresun.

Project Sponsor:Menerji Elektrik Üretim A.Ş. is the owner of the Yüce HEPP project.

Project cost: The investment cost of Yüce HEPP is 14,801,000 Euro (VAT and interest cost are not included)

Installed generation capacity (No. units X MW/unit): Yüce HEPP is not a reservoir type but run-off river hydropower plant with 11 MW with two equal sets of Francis type turbine. There is an EIA Not Required Certificate dated as 18.03.2009

Key Dates of implementation : The Public Participation Meeting was held on October 26, 2010. And Menerji Enerji has received “Public Benefit Document” in 16.10.2009

General Info : Yüce HEPP: a run-off-the river 11 MW hydropower plant of which around 65 % is constructed). The project is developed at a level of 868,4 meter at the regulator point and has average project flow of 3,1 m3/sec. Height of the water drop for the project is 367,68 meters and the length of the penstock will be 2.740 m. The project consists of a regulator, canal, penstock and turbines. There is a conveyance canal with a total length of 1.750 meters. The concrete works or tunnel drilling is already under construction. Two sets of horizantal type Francis turbines will be used along with the generators and the other complementary distribution equipment. In Yüce project, 83.933,759 m2 land is needed and all the private ownerhip type land transfers has been completed through expropriation whereas the transfers of the public type of lands which are used by third parties are completed through open negotiation. On the other hand the transfers of the public type of lands which are not used by third parties are not yet completed. The economic impacts of land acquisition are deemed to be very limited. For the expropriation of the immovable properties needed for the implementation of the project; an expropriation decision has been taken by the Energy Market Regulatory Board, pursuant to Article 15/c of the Electricity Market Law No. 4628 and Article 7 of the Expropriation Law No. 2942. Because the expropriation decision has enabled the enforcement of the “Council of Ministers Decree on the Application of Article 27 of Expropriation Law No. 2942 in the Expropriations to be Carried Out by the Energy Market Regulatory Authority” , published in the Official Gazette no. 25599 dated 30 September 2004, the Energy Market Regulatory Authority will file urgent expropriation lawsuits with the local Court of First Instance, with a request for the seizure of the immovable properties listed in the annexed list and the determination of expropriation fees. The estimated expropriation fees to be determined as a result of the on-site examination to be performed by the court expert witnesses as a result of these lawsuits will be listed by indicating the owners and shareholders of the immovable properties to be expropriated, and they will be deposited with the bank as ready for payment. The related persons may withdraw the expropriation fees from the mentioned bank branches, by presenting the ID cards, certificate of inheritance or power of attorney. For the finalization of these expropriation fees, the Energy Market Regulatory Authority Valuation Commission will also conduct a valuation work and conciliation meetings will be held on site through notices to be sent to the owners of properties. In order to judge the impacts of land acquisition the following points are considered; compliance with legal

legislation (official document listing existing water usage rights in that region, public benefit decision for expropriation- appropriation), any evidence related to the public opposition, amount of expropriation area, land usage type (agricultural, pasture, forestry, arid), number of affected persons, and investing company’s intention for voluntary sale. Furthermore progress report of the project owner is followed, which informs the actual expropriation state. Although there will be a minor loss of agricultural land due to the limited use of private land, the overall impact on livelihoods in the river basin is not anticipated to be significant. Essentium group has several HEPP projects at the moment for which they hire permanent employees but the construction of the hydroelectric projects involves on outsourcing base with different contractor personnel. The company, being a Spanish based company tries to execute a Human Resources (HR) Policy and procedure with an international point of view which deals with its own employees, describing national labor requirements, hiring and terminating of contracts, working terms and conditions, employee motivation and awarding processes, occupational health and safety rules etc. Essentium Group(The owmner of Menerji A.Ş.) and Menerji A.Ş. does not discriminate on the basis of personal beliefs or characteristics, does not employ child or forced labour, and does not anticipate any retrenchment in the near future; in fact, the company is currently in an expansion phase. The quality of accomodation for laborers is, in general, satisfactorily serviced. Some improvement needs however were identified for the sub-contractors working at the site.

Inventory of Land & Assets Acquired from Private Owners : The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format.

Inventory of Public, Community, or State Land Acquired : The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format.

Public Awareness, Consultations, and Communication :

In accordance with the EIA requirements in Turkey, Yüce HEPP has held public hearing sessions for affected communities at its hydro power plant project site. A Public Participation Meeting was held on October 26, 2010 in the village of Güdül regarding the inhabitants of Yüce-Güdül-Çamlık villages in Giresun. The local stakeholders were invited to the meeting via announcements made from the Mukhtars’s Office. On the other hand, the public invitations were made via local newspaper. During the invitations, non-technical summary of the project was also shared with the stakeholders. To introduce project to the local people and to give details about how this project will impact their lives, a non-technical document is distributed all the participants and two presentations about the project. The information given in presentations was based on the non-technical summary of the project. The presentations mostly focused on how the project might have some environmental and social effects and how these issues will be mitigated by the investor. In addition to the project specific information, stakeholders were informed about the climate change issue and how the project will help the fight against climate change. After presentations, it was requested from the participants to ask questions related to the project. Also, to get an understanding about an overall perspective of stakeholders’ opinion on the project, a questionnaire with different questions was distributed to the participants. 42 participants filled in the questionnaire. The

questions are about the region, social and environmental impacts of the project and the presentation. This meeting is carried out with utmost emphasize since the company aims to end up with a Gold Certificate through this stage. Local stakeholders were informed that this meeting will not be the last meeting of its kind. There will be other meeting(s), as needed, to give feedback about what have been done for the issues raised in this meeting. Due to the steep nature of the terrain in the area, the social impacts associated with these projects are relatively limited. No other major environmental issues were apparent at environmental and social screening. The Company has a competent management staff and senior specialists at corporate level to provide coordinating support on individual projects and all their environmental, health and safety aspects. TSKB’s review indicates that local communities are supportive of these developments and that no community resistance to the construction of these projects has been identified to date. This is based on the outcomes of public hearings and TSKB site-level meetings with community leaders and some affected parties. Yüce’s initial approach for every project is to avoid social impacts, at any possible extent, particularly physical or economic displacement. As mentioned above, construction of the project to be supported by TSKB is currently underway and the land acquisition process is already completed. There are no indigenous peoples inhabiting the Project area.

Status of Land Acquisition : The The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format.

Other Measures or Assistance provided (beyond cash compensation) : A range of corporate social investments has been made at the project currently under construction; these include elements such as road improvements, donation of computers to local municipal libraries, construction of new village access routes, etc. . The company has hired local people wherever possible (roughly half the construction labour force comes from surrounding villages)

Identification of Vulnerable People : There are no vulnerable people inhabiting the Project area. It has been determined via meeting with Village Headmen.

Grievance Redress : There is no grievance until now for the construction of this HEPP project. The relations between the people at the construction site and the villagers and headmen are held positive all the time. Local people generally complaint that this meeting should be made very earlier. Also some of them it was very beneficiary and should be repeated every two months. The village headmen makes the necessary action related with the complaints. In other words, the village headmen is the key person to register grievances or complaints, and he/she makes the necessary steps to solve the problems. Discussions with village Headmen and affected persons confirmed that the EIA consultation meetings have been the primary source of project information to date for local communities. In addition to the formal EIA meetings, a series of informal meetings have been held with all households whose land are to be impacted by the project, in order to define the extent of affected property and to define and negotiate compensation amounts. Stakeholder engagement beyond the EIA meetings and one-to-one discussions around land acquisition has been relatively informal to date, but based on interviews with community leaders, community-project relations are positive, mainly due to the large proportion of locally employed persons active at this phase of project development.

TürüOWNERSHIP Type

1

2

3

4

5

6

Önemli Not: Arazi ediniminde 6 farklı yöntem bulunmaktadır. Her satır ile ilgili açıklama aşağıda verilmektedir.1-) Özel şahıstan rızaen satın alma2-) Özel şahıstan kamulaştırma ile alma3-) 3. şahıs kullanımındaki kamu malının 3. şahsın rızasıyla yatırımcıya devri (zilyetli veya işgalen kullanım veya kiralama)4-) 3. şahıs kullanımındaki kamu malının 3. şahsın rızası olmadan mahkeme yoluyle kullanım hakkının alınması5 ve 6-) Hazine veya orman arazisinin yatırımcıya devri.

Not Completed .....

Completed .....Not Completed .....

Completed 13,772.200

CompletedNot Completed 5,118.700

.....

Completed 32,219.330Not Completed .....

Completed 32,823.529

TAHSİS - APPROPRIATION

MAHKEME KARARI İLE - COURT DECISION

ÖZEL KİŞİLİK - PRIVATE OWNERSHIP

ÖZEL KİŞİLİK - PRIVATE OWNERSHIP

KAMU MALI (3. ŞAHIS KULLANIMINDA OLAN) - PUBLIC OWNERSHIP (USED BY THIRD PARTIES)

KAMU MALI (3. ŞAHIS KULLANIMINDA OLAN) - PUBLIC OWNERSHIP (USED BY THIRD PARTIES)

ORMAN ARAZİSİ (3. ŞAHIS KULLANIMINDA OLMAYAN) - FORESTARY AREA (NOT USED BY THIRD PARTIES)

KAMU MALI (3. ŞAHIS KULLANIMINDA OLMAYAN) - PUBLIC OWNERSHIP (NOT USED BY THIRD PARTIES)

TAHSİS - APPROPRIATION

KAMULAŞTIRILACAK TAŞINMAZ MALLAR LİSTESİ (ALAN-m2)LİST OF REAL ESTATE TO BE EXPROPRIATED (m2)

NİTELİK TOPLAM

Not Completed

RIZAEN - OPEN NEGOTIATION

KAMULAŞTIRMA - EXPROPRIATION

TOTAL AREAStatus

CompletedNot Completed

.....

TOPLAM 83,933.759

RIZAEN - OPEN NEGOTIATION

1 GİRESUN DERELİ KÜÇÜKAHMET KOTANA G40C09B3A 145 HASAN BASRİ Ü İ

FULL SHARE n.a Two Storey Wooden

18370.07 1814.94 PenstockAYDIN ATAY 5/6 n.a

ZEYNEP AKIL 1/6 n.a

3 GİRESUN DERELİ KÜÇÜKAHMET KOTANA G40C09B3A 145 HASAN BASRİ GÜZELBİLEN FULL SHARE n.a 12621.17 4666.12Penstock

and Power

4 GİRESUN DERELİ KÜÇÜKAHMET KÜÇÜKAHMET G40C05D 101 ( DAVALI =2009/136 ) FULL SHARE n.a 2098349.10 9968.29 Penstock

5 GİRESUN DERELİ GÜDÜLERİKLİK VE

KİREÇ ÇUKURU

G40C10D 111 ( DAVALI =2008/23-26 ) FULL SHAREn.a

10484315.19 3241.63 Weir Area

6 GİRESUN DERELİ GÜDÜL PITIRAK G40C10D1B 131 MUSTAFA DURMUŞ FULL SHARE n.a 3717.61 20.63 Derivation Tunnel

7 GİRESUN DERELİ GÜDÜL KADI OĞLU G40C10D1B 147 KADiR OKUR FULL SHARE

n.a

Two Storey Wooden House and hazelnut

garden5992.24

597.92 (Garden of the house)

Derivation Tunnel

8 GİRESUN DERELİ GÜDÜL KADI OĞLU G40C10D1B 150 KADiR OKUR FULL SHARE n.a 830.78 264.95 Derivation Tunnel

9 GİRESUN DERELİ GÜDÜL KADI OĞLU G40C10D1B 153 KADiR OKUR FULL SHARE n.a 1784.26 56.22 Derivation Tunnel

10 GİRESUN DERELİ GÜDÜL CAMİ YANI G40C10D1B 179 DURSUN ALİ ASLAN FULL SHAREn.a

Wooden House and hazelnut garden 5141.96

328.37 (Garden of the house)

Storage Area

11 GİRESUN DERELİ GÜDÜL CAMİ YANI G40C10D1B 179 YUSUF ASLAN FULL SHARE n.a 1524.05 1524.05 Storage Area

12 GİRESUN DERELİ GÜDÜL CAMİ YANI G40C10D1B 180 İPEK OKUSAL FULL SHARE n.a 2376.43 600.98 Storage Area

13 GİRESUN DERELİ GÜDÜL CAMİ YANI G40C10D1B 180 GÜLLÜ OKUSAL FULL SHARE n.a 1324.38 1324.38 Storage Area

14 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 HASAN ATAR FULL SHARE n.a 2878.63 200.83 Connection Road

15 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 ALİ ATAR FULL SHARE n.a Grass 1089.20 224.58 Connection Road

16 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 HASAN ATAR FULL SHARE n.a 2716.33 637.78 Connection Road

17 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 ALİ ATAR FULL SHARE n.a 2984.29 568.09 Connection Road

KAMULAŞTIRILACAK TAŞINMAZ MALLAR LİSTESİ - EXPROPRIATION LIST

PR

OV

INC

E

TOWN DISTRICT TYPE OF TRANSFER

SE

CTI

ON

NO

PO

INT

NO

PLO

T N

O

OWNERS

TYP

E O

F R

EA

L E

STA

TE

NAME - SURNAME RATE OF SHARETOTAL AREA

(m²)

EXPROPRIATED

AREA (m²)

REASON FOR

EXPROPRIATION

STATUS

KÜÇÜKAHMET KOTANA G40C09B3A 1165.70 Penstock

Hazelnut Garden

2 GİRESUN DERELİ 145 Hazelnut Garden

Hazelnut Garden

Owner’s/user’s total land holding (ha); % taken for

project.

MED

İYO

R(E

MR

AC

OM

MIT

TEE

DEC

ISIO

NIS

R

OC

EDU

RE

IS O

N-G

OIN

G)

Hazelnut Garden

Hazelnut Garden

Hazelnut Garden

Hazelnut Garden

3675.78

18 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 HASAN ATAR FULL SHARE n.a 6731.29 1062.63 Connection Road

19 GİRESUN DERELİ GÜDÜL MERYEM ANA G40C10D1B 223 ALİ ATAR FULL SHARE n.a 6228.65 1064.74 Connection Road

20 GİRESUN DERELİ YÜCE ÇUBUK MAHALLESG40C15A1B 107 MEHMET BAYRAK FULL SHARE

n.a

Two Storey Wooden House and hazelnut

garden14358.70 Garden of the İletim Kanalı

21 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1B 108 AYHAN YAYLI FULL SHARE n.a 1758.85 27.42 Conveyance Canal

22 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1B 108 MUSA YAYLI FULL SHARE n.a 1684.63 216.49 Conveyance Canal

23 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1B 108 ALİ YAYLI FULL SHARE

n.a

Wooden House and hazelnut garden and

hey house5804.74

1094.66 (Garden of the house)

Weir Area

24 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1C 108 MUSA YAYLI FULL SHARE n.a 1498.89 214.82 Weir Area25 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1C 108 AYHAN YAYLI FULL SHARE n.a 1447.71 133.30 Weir Area26 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1C 108 PENPE YAYLI FULL SHARE n.a 1047.32 74.92 Weir Area27 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1C 108 KIYMET YAYLI FULL SHARE n.a 1046.29 86.82 Weir Area28 GİRESUN DERELİ YÜCE YAYLAOĞLU G40C15A1C 108 ABDULLAH YAYLI FULL SHARE n.a 2945.60 47.14 Weir Area

29 GİRESUN DERELİ YÜCE SARAYCIK G40C15A1D 216 KEMAL TÜFEKÇİ FULL SHAREn.a

1709.46408.1

(Garden of the house)

Weir Area

30 GİRESUN DERELİ ÇAMLI ARPA ÇUKURU G40C10D 105( DAVALI = 2008/13 ) FULL SHARE

n.a643798.03

562.28 (Garden of the house)

onveyance Can

Hazelnut Garden

Hazelnut Garden

Hey House and Field

Hazelnut Garden

Hazelnut Garden and Field

Hey House and Field KAM

ULA

ŞTIR

MA

SÜR

ECİ

DEV

AMTA

KEN

AN

D E

XPR

OPR

IATI

ON

PR

EXPR

OPR

IATI

ON

1 GİRESUN DERELİ KÜÇÜKAHMET G40C09B3A 145 55 MALİYE HAZİNESİ FULL

SHARE Raw ground soil 147292.73 1201.73 Power Plant and tailweg Continuing Appropriation

2 GİRESUN DERELİ YÜCE G40C15A1B 271 10 MALİYE HAZİNESİ FULL

SHARE Raw ground soil 2414.64 1039.91 Conveyance Canal Continuing Appropriation

3 GİRESUN DERELİ YÜCE G40C15A1B 107 1 MALİYE HAZİNESİ FULL

SHARE Raw ground soil 2843.00 1584.34 Conveyance Canal Continuing Appropriation

4 GİRESUN DERELİ YÜCE G40C15A1B 108 6 MALİYE HAZİNESİ FULL

SHARE Raw ground soil 1477.57 1292.72 Conveyance Canal Continuing Appropriation

5118.7

HİSSE ORANI

TYPE OF TRANSFER

DEVİR ŞEKLİ

TOTAL AREA (m²)

ACQUISITION AREA

(m²)

REASON FOR ACQUISITION STATUS

ARAZİYİ KULLANANLARIN

TAŞ

INM

AZI

N

CİN

Sİ TAŞINMAZI

N YÜZÖLÇÜM

Ü (m²)

DEVİR ALINACAK

ALANIN YÜZÖLÇÜM

Ü (m²)

ARAZİ DEVRİNİN AMACI***

SON DURUM

PLO

T N

O LAND USERS

TYP

E O

F R

EA

L E

STA

TE

PA

RS

EL

NO

ADI SOYADI *

NAME - SURNAME RATE OF SHARE

SIR

A N

O

İLİ İLÇESİ KÖYÜ

PA

FTA

NO

AD

A N

O

DEVLETTTEN DEVİR ALINAN YADA KULLANIM HAKKI DEVRİ ALINAN TAŞINMAZ MALLAR LİSTESİ - LIST OF PUBLIC LANDS

PR

OV

INC

E

TOWN DISTRICT

SE

CTI

ON

NO

PO

INT

NO

GİRESUN DERELİ G40C05D 101 1 2098349.10 9968.29 Penstock CompletedGİRESUN DERELİ G40C10D 111 1 10484315.19 3241.63 Weir Area CompletedGİRESUN DERELİ G40C10D 105 1 643798.03 562.28 Conveyance Canal Completed

TOTAL (m2) 13,772.20

REASON FOR ACQUISITION STATUS TYPE OF

TRANSFERNAME - SURNAME

RATE OF SHARE

Tahsis

TYP

E O

F R

EA

L E

STA

TE

TOTAL AREA (m²) ACQUISITION AREA (m²)TOWN DISTRICT

SE

CTI

ON

N

PO

INT

NO

PLO

T N

O LAND USERS

Open negotiation Tahsis-Appropriation

ExpropriationOpen negotiation

HALİL OKUSAL 344 ADA 1 PARSELGÜLHATUN KÜÇÜKAYDIN 140 ADA 5 PARSELHASAN BASRİ GÜZELBİLEN 145 ADA 70 PARSELÇOŞKUN ATAR DİNAMİT DEPOSU ARSASIREMZİ BAŞ 341 ADA 2 PARSELALİ ATAR / HASAN ATAR 223 ADA 35-36-37-38-39-48 PARSELREMZİ BAŞ 341 ADA 2 PARSELALİ ATAR 332 ADA 4 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIREMZİ BAŞ 341 ADA 2 PARSELMUSTAFA MINDIK REGÜLATÖR 2HASAN BASRİ GÜZELBİLEN 145 ADA 70 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIDERELİ ORMAN İŞLETME MÜD YÜKLEME HAVUZU AĞAÇ KESİMİREMZİ BAŞ 341 ADA 2 PARSELALİ ATAR 332 ADA 4 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIREMZİ BAŞ 341 ADA 2 PARSELDERELİ ORMAN İŞLETME MÜD YÜKLEME HAVUZU AĞAÇ KESİMİAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIREMZİ BAŞ 341 ADA 2 PARSELALİ ATAR 332 ADA 4 PARSELDERELİ YÜKSEK OKUL YAPTIRMA YAŞATMA DERNEĞİNE VERİLEN ÇEK SALİH EVCİ YÜKLEME YOLUAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIALİ KÜÇÜKAYDIN VE ORT. 140 /5,6,7,8,9,10,11,12 40/3- 103/ 103/,42,43,DERELİ YÜKSEK OKUL YAPTIRMA YAŞATMA DERNEĞİNE VERİLEN ÇEK REMZİ BAŞ 341 ADA 2 PARSELMÜHİTTİN ALBAKAN VE ORT 193 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIÇOŞKUN ATAR SÖZLEŞME YAPILMADIREMZİ BAŞ 341 ADA 2 PARSELMUSTAFA KAHRAMAN VE ORT 341 ADA 3 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASI

GİRESUN YÜCE HES PROJESİ İÇİN KİRALANMIŞ ARSALAR

ADI SOYADI- Name Surname ADA PARSEL- Point No and Plot No

AYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIMUSTAFA OKUSAL 341 ADA 4 PARSELREMZİ BAŞ 341 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHALİL OKUSAL 344 ADA 1 PARSELREMZİ BAŞ 341 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHALİL OKUSAL 344 ADA 1 PARSELREMZİ BAŞ 341 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHALİL OKUSAL 344 ADA 1 PARSELREMZİ BAŞ 341 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHALİL OKUSAL 344 ADA 1 PARSELREMZİ BAŞ 341 ADA 2 PARSELAHMET ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIHAYDAR ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIAYDIN ATAY K.AHMET KÖYÜ EV VE ARAZİ KİRASIREMZİ BAŞ 341 ADA 2 PARSELREMZİ BAŞ 341 ADA 2 PARSEL