Page 1: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 1111

With Standard Construction Practices & Technical Data for Distribution Works

2010-11

Rev. 00

Page 2: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 2222

Contents

CHAPTER-1 An Account of Growth of Power Sector in J&K State. 1.1 Chronology of important events in J&K State…………………………............................................................6-12

CHAPTER-2

Organizational Structure, Profile and Details of Manpower

2.1 Organizational Structure……………………………………………………………………………………………...13

2.2 Profile of Various Wings of Power Development Department……………………………………………………14-15

2.3 Organizational Structure of M&RE Wing, Kashmir…………………………................................................... 16

2.4 Organizational Structure of M&RE Wing, Jammu………………...…………………………………. …………..17

2.5 Organizational Structure of S&O Wing, Kashmir……………………………………………………..……………18

2.6 Organizational Structure of S&O Wing, Jammu ……………………………………………………..…………….19

2.7 Organizational Structure of Planning & Design Wing, Jammu…………………………………………………....19

2.8 Organizational Structure of Procurement & Material Management Wing………………………………………..20

2.9 Organizational Structure of Commercial & Survey wing …………………………………………………..………20

2.10 Organizational Structure of Director TTIC…………………………………………………………………………..21 2.11 Year Wise Statement of No. of Employees………………………………………………................................... 22 2.12 Category Wise Sanctioned/Existing Strength of PDD Employees..………………………….……………………23-25

CHAPTER-3

Infrastructure Available 3.1 Abstract of Transformation Capacity & Line Length in J&K State……………………………………………… 26

3.2 Details of 220/132kV Transformation Capacity in Jammu & Kashmir Regions………………………….…… 27

3.3 Details of 132/33kV Transformation Capacity in Kashmir Region……………………………………………… 28-29

3.4 Details of 132/33kV Transformation Capacity in Jammu Region…………………………………………………30-31

3.5 Details of Transmission Lines at 220kV Level in Jammu & Kashmir Regions…………………………………..32

Page 3: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 3333

3.6 Details of Transmission Lines at 132kV Level in Kashmir Region…………..………….……………….………..33

3.7 Details of Transmission Lines at 132kV Level in Jammu Region………………………………………………....34

3.8 Circle-wise HL/LT Ratio at Distribution Level ………………….……………......................................................35

3.9 Abstract of 66/33/11/6.6 kV Sub stations of EM&RE Wing Jammu ……………………………………………….36

3.10 Capacity Wise list of 66/ 33/11/6.6 KV R/Stations of Jammu Province…………………………………………..37-44

3.11 Division wise Transformers and their capacities at 33/11 and 33/6.6 kV level in EM&RE Wing, Kashmir ….45

3.12 Capacity Wise list of 33/11 KV Sub Stations in EM&RE Wing, Kashmir………………………………….46-55

3.13 Capacity Wise list of 33/11 KV Sub Stations in EM&RE Wing, Kashmir………………………………….56

CHAPTER-4

Electric Power- Installed Capacity, Its Availability & Consumption 4.1 Electric Power-Installed Generating Capacity & Hydel Projects in Operation under

State & Central Sector........................ …………………………………………………………………………..57-58

4.2 Upcoming Power Houses under State and Central Sector…………………………………………………….59

4.3 Generation in Ladakh Region (Owned by JKPDD)……………………………………………………………..60

4.4 List of the DG Sets with Installed Capacities in Leh District………………………………………. ………….61-63

4.5 List of the DG Sets with Installed Capacities in Kargil District…………………………………………………64-65

4.6 List of the DG Sets with Installed Capacities in Keran,Gurez &Machil……………………………………..…66

4.7 Entitlement from CPSUs and Other External Sources………………………… ……………………………....67-68

4.8 Demand and Availability Scenario (POWER)………………………………... ……………………………….. 69

4.9 Demand and Availability Scenario (ENERGY)……………………………….................................................70

4.10 Seasonal Power Deficit…………………………………………………………………………….......................71

4.11 Year-wise Statement of Energy Consumption…………………………………………………………………...72

4.12 Year-wise Statement of Energy Purchased from Northern Grid …………………………………………….…73

4.13 Year-wise Statement of Self Generated Energy of State available to PDD……………………………… ….74

4.14 Gross Per Capita Power Consumption of J&K…………………………………………………………………...75

4.15 Average Cost of Supply (ACS), Average Revenue Realized (ARR) and AT&C Losses ……………………76-77

4.16 Bifurcation of Transmission and Distribution Losses for 2010-11………………………………………………78

Page 4: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 4444

CHAPTER-5

Electricity Consumers, Connected Load and Revenue Realization and Arrears 5.1 Category wise Number of Consumers as on 31-3-2011.………………………………………………………...79

5.2 Category wise Consumption for 2010-11…………………………………………………………………………..80

5.3 Category wise Connected Load (in MWs) ………………….……………………………………………………. 81

5.4 Metering Status upto 31-3-2011.………………………………………………………………………………….....82

5.5 Year wise Revenue Realization……………………………………………………………………………………...83

5.6 Category wise Revenue Realized for the period 2008-09 to 2010-11 in J&K..………………………………....84

5.7 Category wise Revenue Realized for 2008-09 to 2010-11 in respect of EM&RE wing Jammu ……………. 85

5.8 Category wise Revenue Realized for 2008-09 to 2010-11 in respect of EM&RE wing Kashmir …………….86

5.9 Category wise Subsidy Component for 2009-10 to 2010-11.........................................................................87

5.10 Arrears of Non Govt. and Govt. Consumers from 2002-03 to 2010-11 ……………………….……………….88 .

CHAPTER-6

Computerized Billing

6.1 Status of Computerized Billing EM&RE Wing, Jammu as on 31/03/2011……………………………….…….89

6.2 Status of Computerized Billing EM&RE Wing, Kashmir as on 31/03/2011……………………………………..90

CHAPTER-7

Schemes under Implementation 7.1 RGGY Schemes……………………………………………………………………………………………………….91

7.2 Districts wise REC Sanctioned/Approved Cost, Amount Released By REC, Expenditure under RGGVY....92

7.3 Physical Progress report ending 3/2011 under RGGVY ………………………………………………………….93

7.4 Accelerated Power Development and Reforms Programme (APDRP)……………………….…………………94-95

7.5 Summary of Achievements under APDRP ………………………………....…………………………………… 95

Page 5: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 5555

7.6 Scheme Wise Achievements…………………………………………………………………………..………. 96-98

7.7 Hon’ble Prime Ministers Reconstruction Programme……………………………………………………..… 99

7.8 New / Augmentation of Grid Station in Jammu & Kashmir Divisions…………………………….………... 100

7.9 Achievement Ending 03/2011……………………………………………………………………………………101

CHAPTER-8

Power Sector Reforms 8.1 Benchmarks Under Ist Tripartite MOU…………………………………..…………………………..……………102

8.2 Benchmarks Under IInd Tripartite MOU……………………………………………………………………….….103

8. 3 Benchmarks Under IIIrd Tripartite MOU………………………………………………….……………….……....104-106

8. 4 Targets and Achievements under Ist & IInd Tripartite MOUs…………………………………………….……..107

CHAPTER-9

STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR SUB-TRANSMISSION & DISTRIBUTION WORK 108

9.1 Recommended Type & Size of Multi core Cables/Single Core Cables ……………………………………...109-110

9.2 Current Rating of Distribution & Power transformers………………………………………………..…….…….111

9.3 Fuse ratings………………………………………………………………………………………………….. ….….112

9.4 CT Ratios applicable for HT/LT Metering………………………………………………………………………….113

9.5 Economic Design for Pre stressed Concrete Poles……………………………………………………….……...114

9.6 Specification of Swaged Type Steel Tubular Poles(IS 2713)……………………………………...…………….115-116

9.7 Weight per meter for various types of steel…………………………………………………………....................117

9.8 Rating of Capacitors for KVAR Compensation…………………………………………………………………….118

9.9 Extract from Record Note of meetings of KEECC………………………………………….. ……………………119-131

9.10 Construction Drawings for X arms, Substation-frame etc……………………………………….………………...132-146

Page 6: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 6666

Chapter-1

An Account of Growth of Power Sector in J&K State.

The State of Jammu & Kashmir is located in the Extreme North of India and is bound on the North by China and on the

South by Himachal Pradesh and Punjab and on the west by Pakistan. The State has a Population of 1,25,48,926 as per

provisional population figures of 2011 Census.

The state is traversed by three main rivers i.e. Indus, Jhelum and Chenab. The Indus traverses through Ladakh, while

the Jehlum flows through Kashmir and Chenab drains Jammu.

The average rainfall is about 100 Cms.

There are huge Glaciers in the state and the existence of high mountains with glaciers and rainfall makes it haven for

hydel generation.

As per preliminary survey an estimated potential of 16400 MWs of power has already been identified while the actual

potential is much more.

The state of Jammu and Kashmir was the second, next only to the state of Mysore State in having Hydro Power, as far

back as the 1st decade of this Century.

Power Developm ent Departm ent

Page 7: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 7777

1.1 CHRONOLOGY OF IMPORTANT EVENTS IN J&K POWER SYSTEM

� 1905

� 4×1 MVA,2.3KV, 25 Hz Mohra Power Project commissioned

� Head 430 feet (131 mtrs.), Pelton Wheel Turbine.

� 2nd in India after Mysore

� Constructed by General Electric (GE), America

Commissioned in 1905, Moharra Power Station served to light thousands of Kashmiri homes besides a small number of

small industrial units comprising rice huskers, flour and oil grinders, bandsaws, silk reeling, weaving, spinning and the like. The

only available route to Kashmir Valley those days was Jhelum Valley road ( Muzzafarabad road) along the banks of river

Jhelum. Heavy equipments could be easily transported to Mohra on this road. No formal transport was available other than

some horse driven carts and the only navigable area at that time was from Khannabal to Khadinyar.

25 Hz, AC power generated at 2300 Volts was stepped upto 30 kV for its transmission to Sopore, Braramulla and Srinagar.

30/2.3 kV Receiving Sub Stations were in operation at Silk Factory and Narwara in Srinagar, at Amargarh in Sopore and in

Baramulla. 2.3 kV Supply was also available at Pampore, Pattan, Tangmarg and Gulmarg.

Mohra was the only source of power supply in Kashmir Valley till the year 1955. In June,1955, 2x3 MW Ganderbal Hydel

Project was Commissioned. The Mohora however continued generating till July 1959 when it was struck by the unprecedented

floods in Jhelum. The flood waters hit the Power House, shearing its building longitudinally into two halves.

� 1948

� Work started for construction of Ganderbal Power House

The Sindh Valley Multipurpose Project with its power house at Ganderbal had been investigated in the forties. Civil works

were entrusted to the Irrigation Department while its electric works were to be done by the then Electrical and Mechanical

Department. Construction of Civil Works had been taken in hand in 1948. The electro-mechanical plant of 2x3 MW Capacity

was ordered from M/s Associated Electrical Industries Calcutta who supplied the Electrical Equipment of M/s Metropolitan

Vickers and matching Hydro Equipment made by Escherwyss, Switzerland.

Page 8: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 8888

� 1954

� Electrification in Anantnag, Khanabal, Bijbehara and Awantipora town started.

� Extension of 33 kV transmission line from Srinagar to Anantnag.

� 66 kV line (on wooden poles) from Pathankote (Punjab) Grid station to Canal (Jammu) sub station was commissioned.

� A real boost to power availability in the state.

� 1955

� Ganderbal Project commissioned by the then President of India, Dr Rajendra Prasad.

� Srinagar city was divided into two Zones , Zone 1 receiving 25 Hz, 230 V, 3Ø supply from Mohra and zone 2 receiving 50

Hz, 400-230 V, 3Ø supply from Ganderbal .

� 1957

� A project report for adding 9 MW to Ganderbal Project was approved.

� Mohra Power project was revived and its frequency was changed from 25 Hz to 50 Hz in order to meet the problem of

severe over loading .

� 1961

� Additional 9 MW Units of Ganderbal project commissioned.

� Old Mohra closed and abandoned.

� Ganderbal was the lone source of power

� 1962

� New Mohra (9MW) commissioned and synchronized through 66 kV over head line (on wooden poles) with Ganderbal.

� Local Grid to which two sources were connected came into existence for the first time in the state. (It was an extremely

exciting event for the Engineers).

� New 66kV transmission line from Sarna (Punjab) to Canal Sub Station (Jammu) on steel poles was commissioned.

� New transmission line from Samba to Gladni

Page 9: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 9999

� 1964

� Mini Hydel project (2× 350 kW) at Rajouri commissioned

� 1965

� Mini Hydel project (2× 350 kW) at Bhaderwah commissioned

� 1967-68

� 132 kV Transmission line between Kalakote – Janipur (Jammu) and Chenani was constructed by Electric Department

along with 22.5MVA, 132 / 66 kV Grid station at Janipora.

� 1969-70

� Three units (3×7.5 MW ) of Kalakote commissioned.

� Grid operation became a reality in Jammu region

� 1971-75

� Chenani power plant ( 3×5 MW ) commissioned.

� Parallel operation or synchronization with Punjab Grid between two generating station of state in Jammu on one side

and Punjab on the other was established.

� Jammu became surplus while Kashmir had shortage.

� Constitution of Jammu and Kashmir Electricity Board in pursuance of J&K Electricity Supply Act 1971.

� Upper Sindh–I (2×11.3 MW) commissioned.

� 1976-80

� A major event in the 1970s was interconnection of Kashmir and Jammu through 132 kV Udhampur Srinagar Double Circuit Line

(CSTL). At Banihal Tunnel, one circuit was laid overhead crossing Pir Panchal Top and 2nd through Banihal Tunnel as

Gas Filled Cables.

Page 10: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 10101010

� Advantages resulting from this interconnection:

• Boosted generation Capability.

• Stabilized the supply frequency .

• Reliable Power Supply.

• Increased efficiency of the system.

• Faults reduced to a large extent.

� Formation of POWER DEVELOPMENT DEPARTMENT headed by the Commissioner and Secretary to Govt.

� 1981-84

� 2X120 MVA, 220/132kV Grid Sub Station at Udhampur Commissioned.

� 1985-1990

� 120MVA, 220/132kV and 2X20 MVA, 132/33kV Grid Sub Station at Gladni (Jammu) commissioned on energization of

single circuit Sarna – Gladni Transmission Line.

� Salal HEP (Phase-I) of 345 MW commissioned in 1987.

� Stakna (4 MW) at Leh commissioned.

� Salal - Gladni 220 kV Single Circuit Transmission line no. 1 and line no. 2 energized.

� Gladni - Miran Sahib 132 kV Double Circuit line and Grid Sub Station at Bari Brahamna and Miran Saheb

commissioned.

� 35 MVAR Shunt at Pampore (supplied by Crompton & Greaves).

� Series Capacitor Bank at Wanpoh (supplied by BHEL). These measures were taken to increase the transmission

capacity of 132 kV CSTL from 60 MW to 155 MW.

� With the Commissioning of Salal ( HEP) which was thought to make up for the power deficit of the Kashmir Valley also,

department felt handicapped because in spite of surplus power in Jammu region there was no adequate transmission

facilities to Kashmir Valley in addition to Udhampur-Bemina 132-KV line, which could not carry more than 70 MW , while

as deficit in the valley was around 300 MW.

Page 11: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 11111111

� To overcome this problem, various options were considered like

� Reactive compensation (installation of 33 kV shunt capacitors at various Grid Stations and Series compensation

(Installation of Series Capacitor bank) of the line.

� Changing this Double Circuit line to HVDC link, a study was undertaken by the Department and the choice fell on

Compensation.

To manage the peak load by reviving Bemina Diesel or Gas Turbine.

� Lower Jhelum Hydel Project (105 MW ) was commissioned.

� 1990-2000

� Karnah HEP (2 MW) commissioned in 1991.

� 220kV Double Circuit Kishenpore – Pampore Transmission Line (KPTL) commissioned in 1996 to overcome

constraints in power transmission to Kashmir Valley.

� 345 MW Salal-II, commissioned in 1998.

� 220 kV Double Circuit Kishenpore – Pampore Transmission Line (KPTL) commissioned in 1996 to overcome

constraints in Power Transmission to Kashmir Valley. 220/132 kV Pampore Grid Station Commissioned in 1996.

� 220/132/33 kV Grid station at Zainakote commissioned in 1998.

� 480 MW, Uri-I alongwith its transmission system viz. 630MVA, 400/220 kV Wagoora Grid Sub Station and 400kV Uri-

Wagoora line commissioned in 1997.

� 2001-2011

� USHP-II, 105 MW Power Project commissioned at Kangan

� 400 kV Inter-regional Transmission Line between Kishenpur and Srinagar commissioned by PGCIL

� First ever Tariff Order for electricity determined and issued by JKSERC in March 2007.

� J&K PDD launched its website under URL: www.jkpdd.gov.in in 2007.

Page 12: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 12121212

� 390 MW Dulhasti Power House commissioned in 2007.

� 450 MW Baglihar HEP commissioned in October, 2008.

� Computerized billing of consumers of Jammu & Srinagar city completed in 2007-08.

� 160 MVA,220/132 kV Barn Grid Sub Station commissioned in 2008.

� 100MVA 132/33KV Grid station Bari-Brahmana-II Commissioned in 2008

� 20 MVA , 132/33 kV Draba Grid Station commissioned in 2008.

� 50MVA132/33 kV Grid Station Khanmoh Commissioned in April-2009

� 50 MVA 132/33 kV Gangyal Grid Station Commissioned in March-2009

� 50MVA132/33 kV Grid Station Tethar Commissioned in Oct -2009

� 50MVA132/33 kV Grid Station Mahanpur Commissioned in Aug -2009

� Second Tariff Order for electricity issued by JKSERC in Sep.2009.

� Third Tariff Order issued by SERC in April 2010

� Electricity Act 2010 notified by GoJ&K in April 2010

� 120 MWs HEP SEWA II on Ravi Basin commissioned in September 2010.

Page 13: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 13131313

Chapter-2 Organizational Structure, Profile and Details of Manpower

2.1 - Organizational Structure

Chief

Engineer

M&RE

Wing

Kashmir

Chief

Engineer

M&RE

Wing

Jammu

Chief

Engineer

S&O

Wing

Kashmir

Chief

Engineer

P&MM

Wing

(Moving)

Chief

Engineer

C&S

Wing

(Moving)

Chief

Engineer

S&O

Wing

Jammu

Chief

Engineer

P&D

Wing

(Moving)

Director Training, Testing,

Inspection and Commissioning Wing

(Moving)

Development Commissioner

(Power)

Page 14: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 14141414

2.2 - PROFILE OF VARIOUS WINGS OF POWER DEVLOPEMENT DEPARTMENT

� Maintenance & RE Wings

� Overall distribution at 66 & 33 kV level and below.

� Setting up, maintenance and operations of 66-33/11-6.6 kV Sub-transmission systems

� Setting up, maintenance and operations of 11kV/433V distribution system

� The billing of energy to consumers and collections

� The face of PDD in dealings with individual consumers.

� System and Operation Wings

� Overall transmission above 66 / 33 kV level.

� Setting up, maintenance and operations of 220/132/33 kV Grid stations

� Setting up, maintenance and operations of 220KV and 132 kV transmission lines.

� Planning & Design Wing

� Technical study and approval of Projects

� Setting up standards of quality control for projects

� Procurement process of equipment for Grid stations and transmission lines above 66/33 KV.

� Procurement and Material Management Wing

� Procurement of line material and equipment for the Sub-transmission level and below.

� Maintaining inventory of material for M&RE wings in its stores

Page 15: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 15151515

� Commercial and Survey Wing

� Power Purchases

� Scheduling at merit order

� Power arrangements under exchange with other states and agencies.

� Setting up, maintenance and operations of Communication network between different Grids and power houses

� Enforcement of power curtailments as per schedule for strict grid discipline

� Managing operations of the SLDC and Sub LDC

� Testing of Electric Protection for all electric installations

� Training, Testing, Inspection and Commissioning Wing

� Arranging training for the staff

� Technical Inspection of all new electric installations before their commissioning

� Setting Standards for Electric Contractors and issuing licenses after assessing their abilities

� Technical Investigation of all electric accidents

� Electrical testing and commissioning .

Page 16: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 16161616

2.3 - Organizational Structure, M&RE Wing, Kashmir

Circle-

Ist

Srinagar

Circle-

IInd

Srinagar

Circle-

North

Sopore

ED-Ist Srinagar

ED-IV Srinagar

STD-Ist

Srinagar

Central

Workshop

Pampore

ED-II Srinagar

ED-III Srinagar

ED-Budgam

STD-II,

Srinagar

ED-Baramulla

Circle-

South

Bijbehara

ag

ED-Handwara

ED-Sopore

ED-Sumbal

STD-Sopore

ED-

Anantnag

ED-

Kulgam

ED-

Bijbehara

STD-

Bijbehara

Circle-

Leh

ED-

Leh

ED-

Kargil

Direction Office, Srinagar

Circle-

South

Pulwama

ED-

Pulwama

STD-

Pulwama

ED-

Shopian

ED-Awantipora

aaa

Circle-

Ganderbal

ED-

Bandipora

ED-

Ganderbal

STD -

Ganderbal

Page 17: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 17171717

2.4 - Organizational Structure, M&RE Wing, Jammu

Circle

Ja mmu Circle-

Rajouri

Circle-

Batote

ED-Ist Jammu

ED-II Jammu

ED-III Jammu

STD-Ist Jammu

ED-Rajouri

ED-Poonch

ED-Batote

ED-Udhampur

STD-

Udhampur

STD-II Jammu

STD-IV

Kalakote

Direction Office, Jammu

Circle-

Kuthua

ED-Vijaypur

STD-

III,Kathua

ED-Kathua

Circle-

Kishtwar

ED-Doda

STD-

Doda

ED-

Kishtwar

ED-Reasi

Central

Workshop

Jammu

Page 18: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 18181818

2.5 - Organizational Structure, S&O Wing, Kashmir

Circle-Ist.

Srinagar

Circle-II

Srinagar

TLMD-I, Srinagar

TLMD-II,

Pampore

TLMD-III,Sopore

TLCD-I, Srinagar

TLCD-II, Srinagar

GCD, Srinagar

TLMD-

IV,Pampore

Direction Office, Srinagar

Page 19: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 19191919

2.6 - Organizational Structure, S&O Wing, Jammu

2.7- Organizational Structure, Planning & Design Wing

Circle-I.

Jammu

Circle-II

Jammu

TLMD-I, Jammu

TLMD-II, Jammu

TLMD-III, Udhampur

TLCD-I, Jammu

TLCD-II,Jammu

GCD,Jammu

P&D Circle, Srinagar P&D Circle, Jammu

Direction Office, Jammu

Direction Office, Moving

Page 20: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 20202020

2.8 - Organizational Structure, Procurement & Material Management Wing

2.9- Organizational Structure, Commercial & Survey Wing, Jammu

Purchase Circle, Srinagar Purchase Circle, Jammu

Elect. Central Store

Pampore

Elect. Central Store

Jammu

Survey Division, Srinagar

Commercial Division,

Srinagar

LDM&T Division ,

Srinagar

Survey Division, Jammu

Commercial Division,

Jammu

LDM&T Division, Jammu

Direction Office, Moving

Direction Office, Jammu

(CE Moving)

Circle Office-Srinagar

Page 21: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 21212121

2.10- Organizational Structure, Training, Testing, Inspection and Commissioning Wing

Inspection Division,

Srinagar

Inspection Division,

Jammu

Director

TTIC Wing Moving

Page 22: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 22222222

2.11 - Year Wise Statement of No. of Employees

S.No. Year No. of

Employees

1 1998-99 20500

2 1999-2000 20700

3 2000-01 20925

4 2001-02 21010

5 2002-03 21300

6 2003-04 21500

7 2004-05 22600

8 2005-06 22600

*9 2006-07 23274

*10 2007-08 23816

*11 2008-09 24862

*12 2009-10 26178

*13 2010-11 31010

* This includes 13325 No daily wagers as well

Page 23: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 23232323

2.12 CATEGORYWISE SANCTIONED/EXISTING STRENGTH(GAZETTED/NON-GAZETTED) OF VARIOUS WINGS OF

J&K PDD AS ON 31-03-2011

S.

No

Category of post

DCP Office M&RE

Wing

Kmr.

M&RE

Wing

Jammu

S&O Wing

Kmr.

S&O wing

Jammu

P&MM

Wing

C &S

Wing

P&D

Wing

Director

TTIC

Total Total

S* E* S E S E S E S E S E S E S E S E S E

1 Dev. Commissioner

Power J&K 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1

2 Chief Engineer 0 0 1 1 1 1 1 1 1 1 1 0 1 1 1 1 0 0 7 6

3 Superintending

Engineer 0 0 7 7 5 5 2 2 2 1 2 2 1 1 2 2 1 1 22 21

4 Executive

Engineer 2 2 27 26 20 20 8 8 7 7 8 7 6 5 7 7 2 2 87 84

5 Special Mobile

Magistrate 0 0 5 2 3 2 0 0 0 0 0 0 0 0 0 0 0 0 8 4

6 Asstt. Ex. Engineer

C/ E /M 2 0 113 76 96 71 29 22 28 14 25 22 24 12 15 10 7 5 339 232

7 Asstt. Engineer (E / C/M) 0 0 97 76 82 80 20 17 18 18 1 1 13 11 0 0 4 4 235 207

8 Jr. Engineer including

contractual. 3 3 429 379 328 328 130 130 132 123 67 67 94 94 23 23 4 4 1210 1151

9 Jr. Engineer

Civil 1 0 9 2 7 4 8 4 7 4 0 0 0 0 0 0 0 0 32 14

10 Senior

Foreman 0 0 60 40 45 20 25 10 20 5 0 0 5 0 0 0 0 0 155 75

11 Tech-I 0 0 100 100 82 82 0 0 29 8 0 0 10 6 0 0 4 1 225 197

12 Tech-II 0 0 223 223 122 103 29 19 32 21 0 0 1 1 0 0 6 1 413 368

13 Tech-III 0 0 1727 1426 1241 1195 211 181 261 207 0 0 439 30

4 0 0 38 24 3917 3337

14 Tracer 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1

15

Tech-IV

0 0 2833 2431 1469

1263 0 0 123 100 0 0 17 16 0 0 0 0 4442 3810

*S = Sanctioned; *E= Existing

Page 24: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 24242424

16

Helper/

Lineman/SBA/Bill

Distributor/TechV/Gate

keeper/Store Attendent/

Attendent

0 0 3433 1777 1963 1963 437 323 348 324 8 6 0 0 0 0 0 0 6189 4393

17 Meter Reader 0 0 497 453 160 153 1 1 1 0 0 0 0 0 0 0 0 0 659 607

18 Technician ITI 0 0 0 0 0 28 0 0 0 0 0 0 0 0 0 0 0 0 0 28

19 Geological Asstt. 0 0 0 0 2 0 1 1 1 1 0 0 0 0 0 0 0 0 4 2

20 Chief Accounts

Officer 0 0 1 1 1 1 0 0 0 0 1 1 0 0 0 0 0 0 3 3

21 Sr. Law Officer/Law Officer/

Legal Asstt. 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 2

22 Adm. Officer 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3 3

23 Accounts Officer /

Rev. Officer 1 1 4 1 4 1 1 1 0 0 3 2 2 1 1 1 0 0 16 8

24 Head Computer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 9

25 Dy. Director Pl. 1 0 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 5 3

26 Pvt. Secretary 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0

27 Asstt. Accounts

Officer 1 0 25 21 20 18 8 8 7 7 7 7 2 2 1 1 0 0 71 64

28 Section Officer 1 1 5 5 5 5 1 1 1 1 1 1 2 2 1 1 0 0 17 17

29 Sr. Stenographer 1 1 1 1 1 1 1 1 1 1 1 1 0 0 1 1 0 0 7 7

30 Statistical Officer 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 4 3

31 Jr. Stenographer 1 0 7 1 7 4 3 2 3 2 4 3 1 0 3 1 1 1 30 14

32 Head Asstt. 3 3 27 21 26 13 11 10 10 8 7 4 14 5 3 1 3 2 104 67

Page 25: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 25252525

33 Rev.

Superintendent 0 0 21 12 16 13 0 0 0 0 0 0 0 0 24 14 0 0 61 39

34 Sr. Asstt. 7 3 200 152 95 85 36 31 32 27 31 28 34 27 0 0 6 4 441 357

35 St. Asstt. 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0

36 Accounts Asstt. 1 0 18 12 17 12 7 6 0 0 12 9 0 0 1 1 0 0 56 40

37 Steno Typist 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1

38 Jr. Asstt. 15 13 395 307 105 136 53 47 44 34 52 36 62 55 34 28 11 8 771 664

39 Rev. Examiner 0 0 10 0 45 39 0 0 0 0 0 0 0 0 0 0 0 0 55 39

40 Ledger Clerk 0 0 0 0 96 96 0 0 0 0 0 0 0 0 0 0 0 0 96 96

41 Head Draftsman 1 1 3 1 20 20 2 2 7 7 3 3 2 2 1 1 1 1 40 38

42 Draftsman 0 0 29 18 26 21 10 10 9 8 17 9 1 1 9 7 3 1 104 75

43 Driver / Chauffer 1 1 63 46 66 54 25 23 26 24 22 9 16 14 3 2 3 3 225 176

44 Orderlies / Chowkidar /

Jamadar / Dak Runner 16 15 496 407 335 326 61 46 66 66 69 50 54 29 38 25 12 9 1147 973

45 Computer Operator 0 0 5 5 9 9 0 0 0 0 0 0 30 25 0 0 0 0 44 39

46 Computer Assistants (3050-

4910) 0 0 0 0 0 0 0 0 0 0 0 0 35 31 0 0 0 0 35 31

47 Cleaner 2610-3540 0 0 3 2 0 0 0 0 5 0 2 0 0 0 0 0 0 0 10 2

48 Lineman Grade I 0 0 398 296 3 2 0 0 0 0 0 0 0 0 0 0 0 0 401 298

49 Lineman Grade II 0 0 0 0 0 0 0 0 0 0 0 0 91 79 0 0 0 0 91 79

50 Daily Rated Workers/Casual

labours /N eed Base C/Ls 0 0 0 7571 0 4254 0 1227 0 257 0 9 0 7 0 0 0 0 0 13325

Total 21800 31010

Page 26: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 26262626

Chapter-3 Infrastructure Available as on 31-03-2011

3.1- Abstract Ab of Transformation capacity in J&K State

Description Jammu Kashmir Total

No MVA No MVA No/MVA

220/132 kV Grid Sub Stations 4 1590 2 900 6/2490.00

132/66-33 kV Grid Sub Stations 22 1422 20 1836.64 42/3258.64

a) 66/33 kV Sub Station 2 52.50 ….. ….. 2/52.50

b) 66/11 kV Sub Station 26 269.10 ….. ….. 26/269.10

c) 66/6.6 kV Sub Station 4 20.0 ….. ….. 4/20

a) 33/11 kV Sub Stations 196 1547.9 204 2279.70 400/3827.60

b) 33/6.6 kV Sub Stations 5 32.90 7 71.30 12/ 104.2

c)33/0.4 kV Sub Stations 1 5 7 62.55 8/67.55

d)11/0.43 kV Sub Stations 17561 2021.48 16939 2638.12 34500/4659.60

e)6.6/0.43 KV Sub-Stations 91 9.39 591 95.24 682/104.63

f)No of 11/6.6 KV feeders 800 712 1512

Abstract of Line Length of Transmission lines in J&K state

Description Jammu Kashmir Total

Ckt.Km Ckt. Km Ckt.Km

220 kV Line Length (Km) 422.26 200 622.26

132 kV Line Length (Km) 877.12 734 1611.12

66 kV Line Length (Km) 221.8 ….. 221.8

33 kV Line Length (Km) 2147.53 1766.00 3913.53

11 kV Line Length (Km) 15980.44 12370.51 28350.95

6.6 kV Line Length 157.30 175.00 332.30

LT Line Length(Km) 32916.376 27530.00 60446.375

Page 27: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 27272727

3.2 - Details of 220/132kV Transformation Capacity in Jammu & Kashmir

a) Kashmir Region

b) Jammu Region

S No.

Name of the 220/132 KV Grid

sub station

Capacity Date of commissioning of Grid Station

Name of the scheme under which sub station

constructed

No. of outgoing 132 KV feeders

Remarks

No. MVA / X-

MVA Total MVA

1 Gladni

3+1 spare

133.33 400 1985 State Sector

7

#2 160+150 310 2008

2 Udhampur 6+1

spare 40 240 1981 State Sector 5

3 Hira Nagar

3+1 spare

66.67 200 2001 State Sector 4

3+1 spare

40 120 1996

4 Barn 2(3Ph) 160 320 2008 PMRP 2

TOTAL 1590

S. No.

Name of the Grid Sub Station

Transformation Capacity Date of

Commissioning

Name of the scheme under which Sub Station

Constructed

No.of outgoing

132 kV feeders

Remarks

No MVA / Tfm.

Total (MVA)

1 Pampore 9 +1

50

450 +50 (spare

Jully-1996 220 kV Kishanpur-

Pampore Transmission Line Project

4

2 Zainakote 9+1 50 450 +50 (spare)

Dec.1998

300 MVA 220/132 kV Grid Station at Zainkote with 220 kV D/C Wagoora-Zainkote Transmission

Line

6 The Sub Station is having 33kV level

also

TOTAL 900+100

Page 28: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 28282828

3.3 - Details of 132/33 kV Transformation Capacity in Kashmir Region

Name of the Grid Sub Station

Transformation Capacity

TOTAL (MVA)

Date of Commissioning / Name of the scheme under

which Sub Station Constructed

No.of 33 kV

feeders Remarks

No MVA / Tfm.

Total (MVA)

Bemina 3 50 150

185.64 1973 6 6+1 5.94 35.64+5.94

Wanpoh

1 50 50

120 1973 6 2 20 40

2 15 30

Amargarh

1 50 50

95 1977 6 1 20 20

2 12.5 25

Habak 2 50 100

120 1981 6 1 20 20

Pampore 9+1 16.66 150+16.66

200 1982 10 50MVA capacity added

during 2007-08 1 50 50

Pattan 3 20 60 60 1990 5

Cheshmashahi

1 50 50

105 1987 4 2 20 40

1 15 15

Rawalpora 1 50 50

110 1993 6 3 20 60

Page 29: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 29292929

Name of the Grid Sub Station

Transformation Capacity

TOTAL (MVA)

Date of Commissioning / Name of the scheme under

which Sub Station Constructed

No.of 33 kV

feeders Remarks

No MVA / Tfm.

Total (MVA)

Arampora 2 1

20 50

40 50

90 1995

50MVA added in 2009-10 3

Wanganpora 6+1 25 150+25 150 1996 5

Zainkote 3 +1 25 75 +25 75 Dec.1998/Const.of 300

MVA 220/132kV Grid Stn Zainkote

3

Awantipora 3+1

1 25 50

75+25 50

125 1999/Const.of 75 MVA 50MVAadded in 2009

6 Added by virtue of Deposit

contribution.

Lassipora 3+1 25 75+25 75

05.04.2003 /Const.of 75 MVA 132/33 kV

G/Stn.Lassipora

4

Badampora

1 50 50

66 16.10.2004/Const.of 36

MVA 132/33kV G/Stn.Badampora

1

Augmented to 66MVA replacing 20MVA

transformer by 50MVA transformer during 2007-08

1 16 16

Kangan 1 20 20 20 29.04.2006/Const. of 20

MVA 132/33kV G/ Stn.Kangan

3

Sheree 1 50 50 50 06.05.2006/Const.of 50 MVA 132/33 kV G/ Stn.

Sheree 3

Mattan

1 50 50 50 23.09.2006/Const. of 50 MVA 132/33 kV G/Stn.

Mattan 2

Kulgam 2 20 40 40 02.12.2006/Const. of 40 MVA 132/33 kV G/Stn.

Kulgam 1

Khonmoh 1 50 50 50 2-10-2009 3 Under PMRP

Tethar 1 50 50 50 28-05-2009 3 Under PMRP

TOTAL 1836.64

Page 30: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 30303030

3.4 Details of 132/33 kV Transformation Capacity in Jammu Region

Name of the 132/66/33 KV

Grid sub station

Capacity Date of commi. Of

G/Stn

Name of the scheme under which sub station

constructed

No. of outgoing 66/33 KV feeders

Remarks

No. MVA / X-

MVA Total

132/66 KV

Kathua 2 50 100 1994 State sector 3 (66 KV)

Hira Nagar 1 50

72.5 1990 State sector 3 (66 KV) 3 7.5

Samba 2 50 100 2001 State sector 2 (66 KV)

132/33 KV

Gladni 2 50 100 1985 State sector 5

Bari Brahmana 2 50

131.50 1988 State sector 6

(132/33 KV) 50 (132/11) 31.5

1 31.5 1

Miran Sahib 1 50

90 1989 State sector 4 2 20

Janipur 2 50 100 1967 State sector 7 1 no. 50 MVA Xmer is under outage

& replaced b 31.5 MVA Xmer.of Jhajjar Kotli G/Stn.

Canal 2 50 100 1993 State sector 6

Akhnoor 1+1 20+20 40 1979 State sector 6

Jhajjar Kotli 2 31.50 70 1977 State sector 7 1 no. 31.5 MVA Xmer replaced by 15

MVA Xmer & shifted to Janipur G/Stn.

Udhampur

1 50 70 1981 State sector 4

1 20

Page 31: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 31313131

Batote 1+1 15+20 35 1978 State sector 4

Khellani 2 20 40 1995-96 State sector 2

NHPC (Kishtwar)

1 20 20 - NHPC 1

Sidhra 1 20 20 1995 State sector 3

Barn 2 20 40 2005 PMRP 2

Rajouri 3 20 60 1994-95 State sector 5

Kalakote 1 20 20 1987 State sector 1

Bari-Brahmana-II

2 50 100 2008 PMRP 2

Draba (Poonch) 1 20 20 2008 State sector 1

Gangyal 1 50 50 2009 PMRP 3

Mahanpur 1 50 50 2009 State sector

TOTAL 1422

Page 32: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 32323232

3.5 - Details of Transmission Lines at 220kV level in Jammu & Kashmir regions

a) Kashmir Region

b) Jammu Region

S.No

Name of the Double / Single ckt line

Line Length

Km Total Circuit

kms. Date of

Commissioning Name of the scheme under

which Line Constructed

1 Kishenpur-Pampore

(Pampore-Tethar Section) D/C Line

72 144 July.1996 220 kV Kishanpur-Pampore Transmission Line Project

2 Wagoora-Zainkote

D/C Line 28 56 Dec.1998

300 MVA 220/132 kV Grid Station at Zainkote with 220

kV D/C Wagoora-Zainkote Trans.

Line

Total 100 200

S.No. Name of the Double / Single

ckt line

Line Length Kms.

Total ckt. Kms.

Date of commissioning

Name of the scheme under which line constructed

1 220 KV D/C KPTL upto Tather 102.00 204..00 1996 State sector

2 220 KV S/C Udhampur - Sarna 124.00 124.00 1983 State sector

3 220 kV D/C Kishenpur-Barn 37.40 74.80 2008 PMRP

4 220KV D’C Miran-Sahib Bishnah 9.73 19.46 2010 PMRP

Total 273.13 422.26

Page 33: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 33333333

3.6 - Details of Transmission Lines at 132kV level in Kashmir Region

S.No. Name of the Double/Single Circuit Transmission Line

Total Circuit kms.

Date of Commissioning

Name of the scheme under which Line Constructed

Remarks

1 D/C CSTL

1973 Construction of 132 kV

Chenani-Srinagar Transmission Line

i Bemina-Rawalpora-Pampore 50.40

ii Pampore-Awantipora-Wanpoh 80.74

iii a. Wanpoh-Tether (D/C) 76.00

b. Wanpoh-Tether (S/C over Pir top) 4.00

2 Single Circuit USHP-I – Habak 50.00 1975 21.6 MW USHP Sumbal

3 D/C LJHP -Amargarh-Pattan- Zainakote 153.60 1977 105 MW LJHP Gantmulla

4 D/C Pampore – Chesmashahi 27.70 1987

5 D/C Chesmashahi – Habak 30.00 1987

6 D/C Amargarh - Arampora (Kupwara) 68.00 1995

7 D/C Bemina -Wanganpora- Habak 20.60 1996

8 D/C Bemina – Zainakote 19.00 Jan.1998 9 D/C Zainakote – Wanganpora 21.70 Dec.1998

10 D/C USHP-II – Habak 49.40 June.2002 105 MW USS-II Kangan

11 S/C Awantipora - Lassipora 24.70 05.04.2003 132 kV ALTL S/C line on D/C towers

12 D/C Ganderbal –Badampora 17.00 16.10.2004 132 kV GBTL

13 LILO of LJTL at Sheree 1.50 06.05.2006 Const.of 50 MVA 132/33 kV G/

Stn. Sheree

14 D/C Wanpoh-Mattan 19.20 23.09.2006 Const. of 50 MVA 132/33 kV

G/Stn. Mattan

Conductor on II circuit laid for 7Kms upto Lissar tapping point.

15 S/C Wanpoh-Kulgam 11.30 02.12.2006 Const. of 40 MVA 132/33 kV

G/Stn. Kulgam S/C line on D/C towers

16 LILO of Pampore-C/Shshi Line for Khammoh Grid station

7.4 28-05-2010 PMRP .

17 LILO of CSTL at Tethar 0.9 02-10-2010 PMRP

TOTAL 734.00

Page 34: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 34343434

3.7 - Details of Transmission Lines at 132kV level in Jammu Region

S.No. Name of the Double / Single ckt line Total ckt. Kms. Date of

commissioning Name of the scheme under which

line constructed

1 132 KV D/C Ring Main around Jammu city 136.56 2000 State sector

2 132 KV D/C Udhampur - Bemina upto Thather (CSTL) 166.00 1974 State sector

3 132 KV S/C Janipur – Kalakote 77.00 1968 State sector

4 132 KV S/C Chenani-Udhampur-J. Kotli 52.50 1967 State sector

5 132 KV S/C Janipur – Gladni 7.70 1985 State sector

6 132 KV D/C Gladni - Hira Nagar 84.46 1987 State sector

7 132 KV D/C Hira Nagar – Kathua 76.00 1990-91 State sector

8 132 KV D/C Gladni - Bari Brahmana 30.12 1987 State sector

9 132 KV D/C Bari Brahmana - Miran Sahib 27.76 1988 State sector

10 132 KV D/C Miran Sahib – Canal 32.18 1988 State sector

11 132 KV D/C Barn – Janipur 29.58 2005 State sector

12 132 KV D/C Kalakote – Rajouri 57.00 1994 State sector

13 132 KV D/C Tap line for Samba 3.62 2001 State sector

14 132 KV D/C Tap line for Grid Stn B.B-II 5.40 2007 PMRP

15 132 KV D/C Rajouri –Draba Line 70.24 2008 PMRP

16 LILO 132 kV for Gangyal 2.00 2009 PMRP

17 132KV Barn-Siot alongwith LILO(Akhnoor Section) 19.102 38.204 PMRP

TOTAL 877.12

Page 35: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 35353535

3.8 - Circle-wise HT/LT Ratio at Distribution Level as on 31-03-2011

S.No. Name of Circle HT/LT Ratio

1 Circle-Ist, Jammu 1 : 2.16

2 Circle – 2nd Kuthua 1 : 1.64

3 Circle Rajouri 1 : 1.92

4 Circle Batote 1 : 1.68

5 Circle Kishtwar 1 : 1.31

6 Circle-I, Srinagar 1 : 2.42

7 Circle-2, srinagar 1 : 2.48

8 Circle-Ganderbal 1 : 2.37

9 Circle-South Bijbehara 1: 2.08

10 Circle-South Pulwama 1: 2.20

11 Circle-North,Sopore 1: 2.30

12 Crcle-Leh, Ladakh 1 : 1.61

Page 36: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 36363636

3.9 Abstract of 66/33/11/6.6 KVA Sub-Stations of EM&RE Wing, Jammu.

S.No. Name of Sub Station

Capacity MVA Total MVA

No. of Feeders

1.25 1.6 1.87 2.5 3.0 3.15 4.00 5.00 6.00 6.3 10.00 15.00 20.00 31.50

1 . STD-I, Jammu

0 0 0 2 0 13 3 1 0 26 29 0

0 516.75 178

2 . STD-II, Jammu

0 0 0 0 0 2 3 3 0 34 30 0 0 1 579 203

3 . STD-III, Kathua

0 1 0 3 0 8 0 14 0 5 15 1 2 0 334.5 100

4 . STD-IV, Kalakote

2 5 0 2 0 21 0 3 0 12 2 0 0 0 192.25 123

5 . STD- Udhampur

0 1 0 2 0 11 2 2 0 19 3 0 0 0 208.95 139

6 . STD-Doda

0 0 0 1 0 6 2 2 0 5 2 0 0 0 90.9 57

G. Total

2 7 0 10 0 61 10 25 0 101 81 1 2 1 1922.35 800

Page 37: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 37373737

3.10 Capacity wise List of 66/33/11/6.6 KVA Sub-Station of Elect. Maintt. & RE Wing, Jammu.

S #

Name of Sub Station voltage Level of

R/Station

Capacity MVA

Total MVA

No. of Feeders

1.25 1.6 1.87 2.5 3.0 3.15 4.00 5.00 6.00 6.3 10.00 15.00 20.00 31.50

STD-I, Jammu

1 New Secretariat 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 8

2 Residency 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0

0 16.30 6

3 Wazarat 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 3

4 Medical 33/11kV 0 0 0 0 0 0 0 0 0 1 2 0

0 26.30 8

5 Parade 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 2

6 Canal 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 6

7 Company Bagh 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 4

8 Sheetli 33/11kV 0 0 0 0 0 0 0 0 0 3 2 0

0 38.90 4

9 Nagrota 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

10 Dhounthaly 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0

0 16.30 7

11 Jindhrah 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 6

12 Jajjar Kotli 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

13 Dansal 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

14 Janipur 33/11kV 0 0 0 0 0 0 0 0 0 0 3 0

0 30.00 13

15 Denis gate 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 2

16 Purkhoo 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 4

17 Shamachak 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 1

18 Akhnoor 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 8

19 Jourian 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 4

20 Pahariwala 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

21 Khour 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

22 Barmal 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 2

23 Sohal Bhalwal 33/11kV 0 0 0 0 0 1 0 0 0 0 1 0 0 13.15 2

Page 38: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 38383838

24 Sarote 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

25 Tanda 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0

0 5.00 3

26 Maira Mandrian 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

27 Chowki Choura 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

28 Pargwal 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

29 Balli Gulaba 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

30 Subash Nagar 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0

0 16.30 4

31 Roop Nagar 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 3

32 Bantalab 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 4

33 Thather 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

34 Bhalwal 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

35 Marh 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

36 Gajansoo 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

37 Toph Sherkhania 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0

0 16.30 4

38 Muthi 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 5

39 Talab Tillo 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

40 Udhwywala 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 3

41 Kanachak 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

42 Batera 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 1

43 Machillian 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

44 Gharata 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0

0 4.00 2

45 Bohri 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 2

46 Nagrota-II 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 4

47 Superspeciality Hosp

33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 2

48 Planwala 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

49 Kleeth 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

50 Jogwan 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

Total

0 0 0 0 0 13 2 1 0 25 29 0

0 501.45 173

51 Ranjan 33/6.6

kV 0 0 0 2 0 0 0 0 0 0 0 0

0 5.00 2

52 Trilokpur 33/6.6

KV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 1

53 Gho-Manhasan 33/6.6

kV 0 0 0 0 0 0 1 0 0 0 0 0

0 4.00 2

Total

0 0 0 2 0 0 1 0 0 1 0 0

0 15.30 5

Page 39: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 39393939

STD-II, Jammu

54 Samba-I 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0

0 5.00 3

55 Samba-II 66/11kV 0 0 0 0 0 0 1 1 0 0 0 0

0 9.00 3

56 IGC-I Samba 66/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 6

57 IGC-II Samba 66/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 8

Total

0 0 0 0 0 0 1 2 0 0 4 0

0 54.00 20

58 Chatha 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 5

59 Parladpur 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

60 Gadigarh 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

61 Satwari 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 6

62 Miltary Cantt 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

63 Sunderpur 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 6

64 Badyal Brahmana 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

65 Rangpur Mulana 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

66 Chakroi 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

67 Bishnah 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 3

68 Chak Hasla 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

69 Salehar 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 5

70 Miran Sahib 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 5

71 Shatraiyan 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0

0 4.00 2

72 Kullian 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

73 Chak Shera 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0

0 10.00 4

74 Suhagpur 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 2

75 Biaspur 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

76 Nandpur 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 4

77 Seora 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

78 Ashok Nagar 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

79 JDA Complex 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 6

80 Railway Complex 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 6

Page 40: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 40404040

81 Nanak nagar 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 7

82 Gangyal 33/11kV 0 0 0 0 0 0 0 0 0 0 3 0 0 30.00 7

83 Trikuta Nagar 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

84 Channi Himmat 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 5

85 Transport Nagar 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

86 Bathindi 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

87 Babliana 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

88 Sainik Colony 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

89 Sidhra 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

90 Malhori Jagir 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 1

91 Greater Kailash 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

92 BB-II 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0 20.00 5

93 BB-I 33/11kV 0 0 0 0 0 0 0 0 0 0 3 0 1 61.50 12

94 Raya 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 5

95 Birpur Complex 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

96 Smailpur 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 3

97 Ramgarh 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 4

98 Vijaypur 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 3

99 Gurha 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3

100 Mandal 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 2

101 Kartholi 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 4

102 Rangoor 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

103 Jakh 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

104 Sarore 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

105 Ratnu chak 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

106 Bahu Fort 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 5

Total 0 0 0 0 0 2 2 1 0 34 26 0 1 525.00 183

Page 41: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 41414141

STD Kuthua

107 Hatli village 66/33/11kV 0 0 0 1 0 0 0 0 0 0 1 0 0 0 12.50 3

108 Hiranagar 66/33/11kV 0 0 0 0 0 0 0 0 0 0 2 0 1 0 40.00 7

Total 0 0 0 1 0 0 0 0 0 0 3 0 1 0 52.50 10

109 Hatlimore 66/11kV 0 0 0 0 0 1 0 0 0 1 1 0 1 0 33.15 11

110 Keerian Gandyal 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 1

111 Lakhanpur 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

112 Basantpur 66/11kV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 1

113 C.T.M 66/11kV 0 0 0 0 0 0 0 0 0 0 1 1 0 0 25.00 1

114 Knit Fab 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

115 Industry 66/11kV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 2

116 Nagri 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

117 Palli 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

118 Nanan 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 2

119 Changran 66/11kV 0 0 0 0 0 0 0 1 0 0 1 0 0 0 15.00 3

120 Taraf Pajwal 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 0

121 Ghagwal 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3

122 Chann Arorian 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2

123 Marheen 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

124 Nichila 66/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

125 Rajpura 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3

126 Sherpur 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

127 Pharpur 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2

128 Hatlimori-II 66/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3

129 Barnoti 66/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 1

130 Palli -II 66/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Total 0 0 0 1 0 2 0 9 0 2 12 1 1 0 215.10 58

131 Lift irr.Lakhanpur-1 66/6.6kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

132 Lift irr.Lakhanpur-II 66/6.6kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

133 Lift irr.Basantpur-I 66/6.6kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

134 Lift irr.Basantpur-II 66/6.6kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

Total 0 0 0 0 0 0 0 4 0 0 0 0 0 0 20.00 4 Total

Page 42: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 42424242

135 Challan Prajali 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

136 Phinter 33/11kV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 6

137 Ramkot 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

138 Kalyal 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

139 Mahanpur 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

140 Basohli 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4

141 Bhoond 33/11kV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3

142 Bani 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

143 Bagan 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

144 Machaddi 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 1

145 Martha Nagrota 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

Total

0 1 0 1 0 6 0 1 0 3 0 0 0 0 46.90 28

STD-IV, Kalakote

146 Kalakote 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5

147 Siot 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

148 Sunderbani 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5

149 Phall 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

150 Sunderbani 33/11kV 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2.50 1

151 Nowshera 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 10

152 Chowki-Hundan 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2

153 Kangri 33/11kV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3

154 Marchola 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

155 Mogla 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2

156 Kheora 33/11kV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 6

157 Thudi 33/11kV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 10

158 Darhal 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

159 Manjakote 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

160 Thannamandi 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4

161 Dhanwan 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

162 Dhangri 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

163 Kotranka 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

164 Darhali Bridge 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

165 Palma 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

166 Sial Suri 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Page 43: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 43434343

167 Kamsar 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 7

168 Haveli 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3

169 Gulpur 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3

170 Jhallas 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3

171 Chandak 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

172 Mandi 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

173 Lassana 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

174 Surankote 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5

175 Draba 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

176 J.W.G 33/11kV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 2

177 B.G 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3

178 Mendhar 33/11kV 0 0 0 0 0 2 0 0 0 0 0 0 0 0 6.30 4

179 Mankote 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

180 Jhallas-II 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

181 Budhal 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

182 Bandi Chechian 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

183 Solki 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 0

184 Loran 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

185 Chatral 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

186 Rajal 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 0

187 Qila Daral 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 0

Total

2 5 0 2 0 21 0 2 0 12 2 0 0 0 187.25 122

188 Kala-koteII 33/6.6kV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

STD- Udhampur

189 Dairy farm 33/11kV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 10

190 Devik 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 7

191 Dhar Road 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 6

192 Ramnagar 33/11kV 0 0 0 1 0 0 0 0 0 1 0 0 0 8.80 6

193 Phalatta 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 5

194 Jakhani 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 4

195 Battal Ballian 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

196 Stanev 33/11kV 0 0 0 0 0 1 1 0 0 1 0 0 0 13.45 5

197 Chenani 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 5

198 Pathi 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3

199 Battaql 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 4

200 Dhuna 33/11kV 0 1 0 0 0 0 0 0 0 0 0 0 0 1.60 2

Page 44: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 44444444

201 Jib 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

202 Katra 33/11kV 0 0 0 0 0 0 0 0 0 0 2 0

0 20.00 9

203 Tarakote 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 4

204 Reasi 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 7

205 Pouni 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

206 Panthal 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 6

207 Dharmari 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 4

208 SMVD University 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

209 Dharmound 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 4

210 Meetra (Ramban) 33/11kV 0 0 0 0 0 1 0 0 0 1 0 0

0 9.45 7

211 Ramsoo 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

212 Banihal 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 7

213 Assar 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

214 Patnitop 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

215 Tethar 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0

0 4.00 3

216 Sangaldan 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 4

217 Johnu 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

218 Sarhbaga 33/11kV 0 0 0 1 0 0 0 0 0 0 0 0

0 2.50 3

Total

0 1 0 2 0 11 2 2 0 19 3 0 0 0 208.95 139

STD-Doda

219 Doda 33/11kV 0 0 0 0 0 0 0 0 0 2 0 0

0 12.60 4

220 Thathri 33/11kV 0 0 0 0 0 0 0 0 0 1 0 0

0 6.30 3

221 Prem Nagar 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 5

222 Bhalla 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 4

223 Gandoh 33/11kV 0 0 0 0 0 0 0 1 0 0 0 0

0 5.00 6

224 Bhaderwah 33/11kV 0 0 0 0 0 0 0 1 0 1 0 0

0 11.30 6

225 ganika 33/11kV 0 0 0 1 0 0 0 0 0 0 0 0

0 2.50 3

226 Changa 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 2

227 Bhatyas 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

228 Dallian (Bhaderwah) 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0

0 4.00 3

229 Sappa (Army) 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 1

230 Kishtwar 33/11kV 0 0 0 0 0 0 0 0 0 1 2 0

0 26.30 6

231 Mandal 33/11kV 0 0 0 0 0 0 0 0 0 0 0 0

0 0.00 4

232 Dedpeth 33/11kV 0 0 0 0 0 1 0 0 0 0 0 0

0 3.15 3

233 Dod-II 33/11kV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 4

Total 0 0 0 1 0 6 2 2 0 5 2 0 0 0 90.90 57

Page 45: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 45454545

3.11 Division wise Transformers and their capacities at 33/11 and 33/6.6 kV level in EM&RE Wing, Kashmir

S.No

Name of Sub Station Capacity (MVA)

Total MVA No. of Out-

going feeders 2.5 3.15 3.75 4 5 6.3 10

1 STD - Ist Srinagar (33/11 kV)

0 0 0 0 3 31 32 530.30 109

2 STD - Ist Srinagar (33/6.6 kV)

0 1 1 1 1 5 0 47.40 16

3 STD - IInd Srinagar 0 1 0 2 4 46 28 600.95 156

4 STD - Sopore 0 11 0 5 3 32 13 401.25 159

5 STD - Bijbehara 0 3 0 2 1 30 14 351.45 117

6 STD -Ganderbal 1 6 0 2 1 18 3 177.80 68

7 STD -Pulwama (33/11 kV)

1 7 0 5 2 18 5 217.95 80

8 STD - Pulwama (33/6.6 kV)

0 0 0 0 1 3 0 23.90 7

Total No / MVA 2 29 1 17 16 183 95 2351 712

Page 46: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 46464646

3.12 Capacity wise List of 33/11 KVA Sub-Station of Elect. Maintt. & RE Wing, Kashmir.

STD - Ist Srinagar

S # Sub Station Capacity (MVA)

Total MVA No. of Out-going

feeders 2.5 3.15 4 5 6.3 10

1 Ahmad Nagar 0 0 0 0 1 0 6.3 2

2 Awanta Bhawan 0 0 0 0 2 0 12.6 2

3 B.A.M. Khan 0 0 0 0 3 0 18.9 4

4 Bagwanpora 0 0 0 0 0 2 20 2

5 Balhama 0 0 0 0 1 0 6.3 4

6 Barbarshah 0 0 0 0 0 2 20 2

7 Brane 0 0 0 0 0 2 20 3

8 Buchwara 0 0 0 0 0 2 20 2

9 Centaur 0 0 0 0 2 0 12.6 4

10 Fateh kadal 0 0 0 0 0 2 20 4

11 Habak 0 0 0 0 3 0 18.9 3

12 Harwan 0 0 0 0 2 0 12.6 2

13 Illahi Bagh 0 0 0 0 2 0 12.6 2

14 Kathidarwaza 0 0 0 0 3 0 18.9 4

15 Kawdara 0 0 0 0 0 2 20 3

16 Khanyar 0 0 0 0 1 2 26.3 5

17 Khayam 0 0 0 0 0 2 20 4

19 Lal Bazar 0 0 0 1 0 1 15 3

20 Mughal Masjid 0 0 0 0 0 2 20 11

21 Nedous 0 0 0 0 2 0 12.6 2

22 Nishat 0 0 0 0 0 2 20 4

23 Basantbagh 0 0 0 0 0 2 20 3

24 Omer Hair 0 0 0 0 2 0 12.6 2

Page 47: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 47474747

S # Sub Station Capacity (MVA)

Total MVA No. of Out-going

feeders 2.5 3.15 4 5 6.3 10

25 Rainawari 0 0 0 0 0 2 20 4

26 Shalimar 0 0 0 0 2 0 12.6 3

27 Sidco F P Khunmoh 0 0 0 1 0 0 5 2

28 Sonwar 0 0 0 0 0 2 20 4

29 Soura 0 0 0 0 1 2 26.3 5

30 T.R.C. 0 0 0 0 0 2 20 6

31 Tailbal (Burzahama) 0 0 0 0 1 0 6.3 1

32 Zakoora 0 0 0 1 0 1 15 3

33 Zoonimar 0 0 0 0 1 0 6.3 1

34 Hazratbal 0 0 0 0 2 0 12.6 3

Total 0 0 0 3 31 32 530.3 109

STD - IInd Srinagar

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

1 B.K.Pora 0 0 0 0 2 0 12.6 3

2 Baghi-Mehtab 0 0 0 0 2 0 12.6 4

3 Batmalloo 0 0 0 0 0 2 20 2

4 Beerwah 0 0 0 1 1 0 11.3 6

5 Bemina-IInd 0 0 0 0 1 2 26.3 4

6 Bemina-Ist 0 0 0 0 2 0 12.6 5

7 Bone & Joint Hospital 0 0 0 0 2 0 12.6 4

8 Brenwar 0 0 0 0 1 0 6.3 2

9 Budgam 0 0 1 0 0 2 24 7

Page 48: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 48484848

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

9 Budgam 0 0 1 0 0 2 24 7

10 Chadoora 0 0 0 0 2 1 22.6 5

11 Chanapora 0 0 0 0 0 2 20 5

12 Chari Shareef 0 0 0 0 2 0 12.6 6

13 Danderkhah 0 0 0 0 2 0 12.6 3

14 Exhibition 0 0 0 0 0 2 20 4

15 Ichgam 0 0 0 0 1 0 6.3 2

16 J V C (Bemina III) 0 0 0 0 1 0 6.3 2

17 Jawaharnagar 0 0 0 0 0 2 20 2

18 K.P.Bagh 0 0 0 0 2 0 12.6 4

19 Karan Nagar 0 0 0 0 0 2 20 7

20 Khag 0 0 0 0 1 0 6.3 3

21 Khan Sahib 0 0 0 0 1 0 6.3 4

22 Kremshore 0 0 0 1 0 1 15 4

23 M.R.Gunj 0 0 0 0 2 0 12.6 5

24 Magam 0 0 0 1 1 0 11.3 3

25 Nagam 0 0 1 1 0 0 9 2

26 Narbal 0 1 0 0 2 0 15.75 5

27 Peerbagh 0 0 0 0 2 0 12.6 3

28 Rajbagh 0 0 0 0 0 2 20 4

29 Rangreth 0 0 0 0 0 2 20 4

30 Rawalpora 0 0 0 0 0 2 20 4

31 Safa Kadal 0 0 0 0 0 2 20 4

Page 49: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 49494949

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

32 Shalistore 0 0 0 0 0 2 20 3

33 Shalteng 0 0 0 0 2 0 12.6 5

34 Shariefabad 0 0 0 0 1 0 6.3 1

35 Shreen bagh 0 0 0 0 2 0 12.6 4

36 Silk Factory 0 0 0 0 3 0 18.9 5

37 Syed Hamid pora 0 0 0 0 2 0 12.6 3

38 Wadwan 0 0 0 0 1 0 6.3 2

39 Wanganpora 0 0 0 0 1 0 6.3 1

40 Zainakoot 0 0 0 0 1 1 16.3 8

41 Narkara 0 0 0 0 0 1 10 1

42 Bakshipora 0 0 0 0 1 0 6.3 1

43 PC Depot 0 0 0 0 2 0 12.6 2

Total 0 1 2 4 46 28 600.95 156

STD - Sopore

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

1 Arampora 0 0 0 0 2 0 12.6 2

2 Audoora 0 0 0 0 1 0 6.3 4

3 Baramulla-II 0 0 0 0 1 1 16.3 3

4 Baramulla-Ist 0 0 0 0 0 2 20 7

5 Cable Car 0 1 0 0 0 0 3.15 2

6 Chandoosa 0 0 0 0 1 0 6.3 2

Page 50: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 50505050

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

7 Chakloo Rafiabad 0 0 0 0 1 0 6.3 3

8 Chogul 0 0 0 0 1 0 6.3 2

9 Delina 0 0 0 0 2 0 12.6 3

10 Dooru Sopore 0 0 0 0 1 0 6.3 3

11 Dhobiwan 0 1 0 0 0 0 3.15 2

12 Drugmulla 0 0 0 0 1 0 6.3 3

13 Drungbal 0 0 0 0 1 0 6.3 2

14 Ganapora 0 0 0 0 1 0 6.3 3

15 Gulmarg 0 0 1 0 0 0 4 4

16 Hamray 0 1 1 0 0 0 7.15 3

17 Handwara 0 0 0 1 1 0 11.3 6

18 Kangamdar (Pattan) 0 0 0 0 1 0 6.3 2

19 Kanilbagh 0 0 0 0 1 0 6.3 3

20 Khumriyal 0 0 0 0 1 0 6.3 3

21 Kralpora 0 0 0 0 0 1 10 4

22 Krusan 0 0 0 0 0 1 10 4

23 Kunzar 0 0 1 0 1 0 10.3 3

24 Ladoora 0 2 0 0 0 0 6.3 4

25 Malpora Narwah 0 0 0 0 1 0 6.3 2

26 Nowpora 0 0 0 0 1 0 6.3 3

27 Nowshera 0 0 1 0 0 0 4 2

28 Panzipora Tarzoo,Sopore 0 1 0 0 0 0 3.15 2

24 Ladoora 0 2 0 0 0 0 6.3 4

25 Malpora Narwah 0 0 0 0 1 0 6.3 2

26 Nowpora 0 0 0 0 1 0 6.3 3

Page 51: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 51515151

S #

Sub Station

Capacity (MVA) Total MVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 10

26 Nowpora 0 0 0 0 1 0 6.3 3

27 Nowshera 0 0 1 0 0 0 4 2

29 Pattan 0 0 0 0 1 1 16.3 3

30 Rohama 0 0 0 0 1 0 6.3 3

31 Rampora Uri 0 0 0 0 1 0 6.3 3

32 Sangrama 0 0 0 0 1 0 6.3 3

33 Seeloo 0 0 0 0 0 1 10 5

34 Sheeri 0 0 0 1 0 0 5 3

35 Singhpora 0 0 0 0 1 0 6.3 2

36 Sopore- 2nd 0 0 0 0 1 1 16.3 5

37 Sopore-1st 0 0 0 0 0 2 20 6

38 Tangdar 0 0 0 0 1 0 6.3 4

39 Tangmarg 0 1 0 0 0 1 13.15 4

40 Tikker Kupwara 0 0 0 0 0 2 20 8

41 Trehgam 0 0 0 0 1 0 6.3 2

42 Uri Salamabad 0 0 0 0 1 0 6.3 4

43 Wagoora 0 1 0 1 0 0 8.15 4

44 Watlab 0 0 0 0 1 0 6.3 3

45 Watrigam 0 1 0 0 1 0 9.45 5

46 Willgam (Doolipora) 0 0 1 0 1 0 10.3 3

47 Zachaldara 0 2 0 0 0 0 6.3 3

TOTAL 0 11 5 3 32 13 401.25 159

Page 52: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 52525252

STD - Ganderbal

S # Sub Station Capacity (MVA) Total

MVA No. of Out-

going feeders 2.5 3.15 4 5 6.3 10

1 Ajas 0 0 0 1 0 0 5 3

2 Aloosa 0 0 0 0 1 0 6.3 2

3 Ajar Bandipora 0 0 0 0 2 1 22.6 6

4 Mansbal 0 0 0 0 1 0 6.3 3

5 Markundal 0 0 0 0 2 0 12.6 5

6 Nadihal 0 0 1 0 0 0 4 2

7 Shadipora 0 1 1 0 0 7.15 3

8 Hajin 0 2 0 0 0 0 6.3 4

9 Ganderbal 1 0 0 0 2 0 15.1 5

10 Manigam 0 0 0 0 1 0 6.3 4

11 Nagbal 0 0 0 0 1 0 6.3 1

12 Alesteng 0 0 0 0 1 0 6.3 2

13 Tulla Bagh 0 0 0 0 1 0 6.3 3

14 Ganda Singh 0 1 0 0 0 0 3.15 2

15 Lar 0 0 0 0 1 0 6.3 3

16 Kheer Bhawani 0 1 0 0 0 0 3.15 2

17 Doderhama 0 0 0 0 3 0 18.9 5

18 Khurhama 0 0 0 0 2 0 12.6 4

19 Kangan 0 0 0 0 0 1 10 4

20 Wussan 0 0 0 0 0 1 10 3

21 Surfraw 0 1 0 0 0 0 3.15 2

Total 1 6 2 1 18 3 177.8 68

Page 53: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 53535353

STD Pulwama

S.No 33/11 kV sub station

Name

Capacity (MVA)

Total Capacity (in MVA)

No. of o/g Feeders

2.5 3.15 4 5 6.3 10

1 Lassipora 0 0 0 0 0 1 10 3

2 Pulwama 0 0 0 0 0 2 20 7

3 Keegam 0 0 0 0 1 0 6.3 2

4 Shadimargh 0 0 0 1 1 0 11.3 4

5 Mitrigam 0 1 0 0 1 0 9.45 3

6 Reshipora 0 0 0 0 2 0 12.6 4

7 Landoora 0 0 0 0 1 0 6.3 4

8 Shopian(Gagren) 0 0 0 0 2 0 12.6 4

9 Pinjoora 0 0 1 0 0 0 4 2

10 Batpora 0 0 0 0 1 0 6.3 3

11 Chowdrigund 0 0 0 0 1 0 6.3 3

12 Konibal 0 0 1 0 1 0 10.3 4

13 Lethpora 0 0 1 1 0 0 9 3

14 Kakapora 0 0 0 0 1 0 6.3 2

15 Newa 0 0 1 0 1 0 10.3 3

16 Tral 0 0 0 0 0 2 20 5

17 Lurgam 0 1 0 0 1 0 9.45 3

18 Lalgam 1 1 0 0 0 0 5.65 2

19 Chewa 0 0 0 0 1 0 6.3 3

20 Awantipora 0 0 0 0 2 0 12.6 7

21 Naroo 0 1 0 0 1 0 9.45 3

22 KachachKoot 0 1 1 0 0 0 7.15 3

23 Nowgam Panzgam 0 2 0 0 0 0 6.3 3

Total 1 7 5 2 18 5 217.95 80

Page 54: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 54545454

STD - Bijbehara

S # Sub Station Capacity (MVA) Total

MVA No. of Out-going

feeders 2.5 3.15 4 5 6.3 10

1 Achabal 0 0 0 0 2 0 12.6 4

2 Aishmuqam 0 0 0 0 1 0 6.3 4

3 Akura 0 0 0 0 1 0 6.3 3

4 Arwani 0 0 0 0 1 0 6.3 3

5 Ashajipora 0 0 0 0 0 2 20 4

6 D.H.pora 0 0 0 0 0 1 10 4

7 Dialgam 0 0 0 0 1 0 6.3 3

8 Dooru 0 0 0 1 0 1 15 3

9 Harnag 0 0 0 0 2 0 12.6 3

10 Hiller 0 0 0 0 1 0 6.3 3

11 Hiller Dooru 0 0 0 0 1 0 6.3 3

12 Hutmurah 0 0 0 0 2 0 12.6 3

13 Janglat Mandi 0 1 0 0 1 0 9.45 3

14 Khiram 0 0 0 0 1 0 6.3 2

15 Kokernag 0 0 0 0 1 1 16.3 3

16 Kulgam 0 0 0 0 0 2 20 4

17 Kund 0 1 0 0 0 0 3.15 2

Page 55: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 55555555

S # Sub Station Capacity (MVA) Total

MVA No. of Out-going

feeders 2.5 3.15 4 5 6.3 10

18 Malaknag 0 0 0 0 1 0 6.3 3

19 Mattan, Gopalpora 0 0 0 0 1 0 6.3 3

20 Mir Bazar 0 0 0 0 1 0 6.3 4

21 Nai Basti, Anantnag 0 0 0 0 1 0 6.3 3

22 Nillow 0 0 0 0 2 0 12.6 3

23 Nowgam (Chowgund) 0 1 0 0 0 0 3.15 2

24 Nowgam (Shangus) 0 0 0 0 1 1 16.3 3

25 Pahalgam 0 0 0 0 1 0 6.3 5

26 Qaimoh 0 0 1 0 0 1 14 3

27 Qazigund 0 0 0 0 0 1 10 4

28 Salia 0 0 0 0 1 0 6.3 2

29 Saller 0 0 0 0 1 0 6.3 3

30 Sangam 0 0 0 0 0 2 20 4

31 Sarnal 0 0 0 0 0 2 20 7

32 Shankerpora 0 0 0 0 1 0 6.3 3

33 Sicop Bijbehara 0 0 0 0 1 0 6.3 3

34 Veeri, Bijbehara 0 0 0 0 1 0 6.3 3

35 Yaripora 0 0 0 0 2 0 12.6 3

36 Zirpora 0 0 1 0 0 0 4 2

Total 0 3 2 1 30 14 351.45 117

Page 56: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 56565656

3.13 CAPACITY-WISE LIST OF 33 / 6.6 kV SUB STATIONS OF M&RE WING KMR.

STD-Ist, Srinagar

S.No Sub Station Capacity MVA

Total Cap. No. of Out-

going feeders 3.15 3.75 4 5 6.3 (MVA)

1 Badami Bagh 0 0 0 0 2 12.6 4

2 Khonmoh 1 0 0 0 1 9.45 4

3 Pantha Chowk 0 0 0 1 0 5 2

4 Pampore-I 0 1 1 0 2 20.35 6

5 Pampore -II 0 0 0 1 1 2.00 3

6 Khrew 0 0 0 0 1 6.3 2

7 Wuyan 0 0 0 0 1 6.30 2

Total 1 1 1 2 8 62.00 23

Page 57: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 57575757

CHAPTER 4

4.1 ELECTRIC POWER-INSTALLED CAPACITY STATE SECTOR

UNDER POWER DEVELOPMENT CORPORATION

HYDRO 758.70 MW

TOTAL NO. OF HYDEL PROJECTS 20

THERMAL 175MW

TOTAL NO. OF THERMAL PROJECTS(Operated only in case of emergency in view of high per unit generation cost) 2

UNDER POWER DEVELOPMENT DEPARTMENT

DIESEL 31.667 MW

CENTRAL SECTOR

HYDRO 1680 MW

TOTAL NO. OF HYDEL PROJECTS 4

INDEPENDENT POWER PRODUCERS Hydro 17.5 Total No of Hydel Projects 2

POWER HOUSES UNDER OPERATION IN THE STATE

Name of Power House Configuration Installed Capacity in MW

STATE SECTOR

Jhelum River Basin

Lower Jhelum 3 x 35 105

Upper Sindh-I 2x11.3 22.6

Ganderbal 2x3+2x4.5 15

Page 58: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 58585858

Upper Sindh-II 3x35 105

Pahalgam 2 x 1.5 3

Karnah 2x1 2

Chenab Basin

Chenani-I 5x4.66 23.3

Chennai-II 2x1 2

Chenani-III 3x2.5 7.5

Bhaderwah 2 x 0.5 1 Baglihar 3x150 450

SUB TOTAL 736.40

Ravi Basin

Sewa-III 3x3 9

Indus Basin

Iqbal 3x1.25 3.75

Hunder 2x0.20 0.4

Sumoor 2x0.05 0.1

Igo-Mercellong 2x1.50 3

Haftal 2x0.50 1

Marpachoo 3x0.25 0.75

Bazgo 2x0.15 0.3

Stakna (with J&KPDD) 2x2 4

SUB TOTAL 22.3

TOTAL 758.70 Independent Power Producers(IPP)

Athwatoo 2X5 10

Branwar 3X2.5 7.5

TOTAL 17.50

CENTRAL SECTOR

Salal HEP 6x115 690

Uri –I 4x120 480

Dul-Hasti 3x130 390

Sewa-II 2X60 120

Total 1680

Note: Out of 450 MW Bhagliar project only 225 MW power is available to J&K PDD

Page 59: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 59595959

4.2 UPCOMINGPOWER HOUSES IN THE STATE

Name of Power Project Capacity in MW

A) STATE SECTOR (JKSPDC)

Sawalkote 1200

Baglihar Stage-II 450

Kirrthai-I (Doda) 240

Ganderbal 93

Lower Kalnai (Doda & Kishtwar) 50

Parnai (Poonch) 37.5

Pahalgam (3rd Unit) 1.5

Matchil 0.35

Baderwah (3rd Unit) 0.5

Sanjak 1.26

IPP - Ratle 690

Sub Total 2764.11 B) CENTRAL SECTOR (NHPC)

Bursar (Kishtwar) 1020

Kishenganaga (Bandipora) 330

Uri-II 240

Nimo Bazgo (Leh) 45

Chutak (Kargil) 44

Sub Total 1679 C) CHENAB VALLEY POWER PROJECTS PRIVATE LTD. (CVPPL) Pukuldul (Kishtwar) 1000 Kiru (Kishtwar) 600 Kawar (Kishtwar) 520

Total 2120 Grand Total 6563.11

Page 60: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 60606060

4.3 - GENRATION IN LADAKH REGION (Owned by JKPDD)

Installed Capacity: MW Energy Genrated : MU

S.No Power Station

2008-09 (A) 2009-10(A) 2010-11 (A) 2011-12 (E)

Installed Capacity

Energy Genrated

Installed Capacity

Energy Genrated

Installed Capacity

Energy Genrated

Installed Capacity

Energy Genrated

I. THERMAL

a Diesel 20.92 16.64 25.745 19.90 28.97 19.60 29.50 20.00

Total (T) 20.92 16.64 25.745 19.90 28.97 19.60 29.50 20.00

II. HYDEL

a. Stakna 4.00 5.59 4.00 4.88 4.00 3.98 0.00 0.00

Total (H) 4.00 5.59 4.00 4.88 4.00 3.98 0.00 0.00

GRAND TOTAL (I+II) 24.92 22.23 29.745 24.78 32.97 23.58 29.50 20.00

Page 61: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 61616161

4.4 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN LEH DISTRICT

S.No. Name of the D.G station/Location No. of Units (Nos.)

Capacity of each Unit (KVA)

Total Installed Capacity (KVA)

1 4.5 MVA Choglamsar 3 1500 4500

2 4.5 MW New Choglamsar 5 750 3750

3 1500 4500

3 1 MW Leh 2 750 1500

4 Nyoma 1 160 160

5 Tangtse 1 250 250

6 Chumathang 1 160 160

7 Kungiam 1 160 160

8 Hemis 1 75 75

9 Anlay 1 160 160

10 Rongo 1 75 75

11 Tsaga 1 75 75

12 Korzok 1 82.5 82.5

13 Puga 1 10 10

14 Saspol 1 160 160

15 Temisgam 1 160 160

16 Tia 1 160 160

17 Khalsi 1 250 250

Page 62: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 62626262

18 Lamayuru 1 160 160

19 Domkhar 1 160 160

20 Skurbuchan 1 250 250

21 Hemisshukpachan 1 160 160

22 Alchi 1 160 160

23 Mangue 1 100 100

24 Wanla 1 320 320

25 Sku Kaya 1 30 30

26 Rumbak 1 10 10

27 Hanu 1 125 125

28 Bema 1 75 75

29 Achmathang 1 200 200

30 Phyang Gonpa 1 12 12

31 Deskit-I 1 250 250

32 Deskit-II 1 160 160

33 Turtuk 1 125 125

34 Bogdang 1 75 75

35 Panamik 1 160 160

36 Chamshain 1 75 75

37 Tigger 1 320 320

38 Tyakshi 1 160 160

Page 63: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 63636363

39 Hundri 1 35 35

40 Chulunngkha 1 35 35

41 Charasa 1 30 30

42 Kuri 1 30 30

43 Tongsted 1 30 30

44 Odmaroo 1 30 30

45 Murgi 1 15 15

46 Nungsted 1 15 15

47 Khemi 1 15 15

48 Burma 1 15 15

49 Gontoo 1 12.5 12.5

Total 59

19537

Page 64: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 64646464

4.5 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN KARGIL DISTRICT

S.No. Name of the Power House No.of

Units(Nos.) Capacity of each Unit

(KVA) Total Installed Capacity (KVA)

1 2 MW 9 250 2250

2

New DG Stn. Khurbathang 2 750

6040 New DG Stations 3 1500

Auxillary 1 40

3 Mulbeck 1 250 250

4 Shargole 1 250 250

5 Khangral 1 320 320

6 Haniskot 1 75 75

7 Chiktan 1 160 160

8 Hagnis 1 160 160

9 Shakar 1 320 320

10 Y-Kharboo 1 75 75

11 Shakar Rong 1 30 30

12 Sanjak 1 75 75

13 Batalik 1 160 160

1 75 75

14 Silmoo 1 160 160

15 Garkone 1 75 75

16 Padum 1 250 250

1 160 160

17 Junkhore 1 160 160

18 Sani 1 160 160

19 Karsha 1 380 320

20 Parkachik 1 75 75

21 Panikhar 1 250 250

Page 65: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 65656565

22 Nam-Suru 1 250 250

23 Purtikchey 1 160 160

24 Sangrah 1 160 160

25 Sankoo 1 320 320

1 160 160

26 Lankarchey 1 160 160

27 Stakpa 1 125 125

28 Saliskote 1 250 250

Trespone

1 250 250

29 1 250 250

30 Thasgam 1 160 160

31 Drass

1 250 250

1 320 320

1 160 160

32 Pandrass 1 75 75

33 Matayeen 1 75 75

34 Barsoo 1 160 160

35 Phey 1 320 320

36 Tambis 1 320 320

37 Kharboo 1 200 200

38 Choskore 1 250 250

39 Kharcheykhar 1 200 200

Total 58 16425

Page 66: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 66666666

4.6 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN GUREZ,MACHIL AND KERAN

S.No. Name of the D.G station/Location

No. of Units (Nos.)

Capacity of each Unit (KVA)

Total Installed Capacity (KVA)

A Gurez

1 Kanzalwan 1 320 320

2 Dawar 1+1 250+320 570

3 Wanpora 1 250 250

4 Tarbal 1 100 100

5 Bagtoor 1 75 100

6 Nayal 1 75 75

7 Achoora 1 75 75

8 Churwan 1 200 200

9 Burnai 1 75 75

10 Bodugam 1 200 200

11 Gujran 1 75 75

12 Zedgay 1 250 20

13 Koragbal 1 62.5 62.5

14 Khprihaijin 1 20 20

15 Hassangam 1 100 100

16 Purana Tulal/Sheikhpora 1 320 320

17 Buglender 1 320 320

18 Neeru 1 100 100

Total 2982.5

B

Machil 1 320 320

C

Keran 1 320 320

GRAND TOTAL 3622.5

Page 67: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 67676767

4.7 Entitlement from CPSUs and Other External Sources

Jammu and Kashmir Share in CPSUs and Joint Ventures (JVs) as on 31-03-2011

S.No. Name of Power House Installed Capacity

(MW)

%age share for

J&K Share in MWs

%age Share in

MWs

Share in

MWs

1 2 3 Firm Non-Firm

NTPC

1 Anta 419 6.92 29 2.18 9

2 Auraiya 663 6.64 44 1.51 10

3 Dadri (G) 830 6.75 56 1.01 8

4 Unchahar-1 420 3.33 14 0.69 3

5 Unchahar-2 420 7.14 30 2.18 9

6 Unchahar-3 210 6.19 13 2.14 4

7 Rihand-1 1000 7.00 70 2.16 22

8 Rihand-2 1000 9.40 94 2.18 22

9 Singrouli 2000 0.00 00 2.18 44

10 Jhajjar 500 0.00 00 1.39 7

11 Tlchr 1000 00 00 00 00

12 Khlgn I 840 00 00 00 00

13 Khlgn II 1000 00 00 00 00

Sub-Total 350 138 NPC

1 NAPP 440 7.50 33 2.11 9 2 RAPP-B3-B4 440 7.95 35 0.00 0 3 RAPP-C 440 0.00 0 3.88 17 68 26

NHPC

3 Salal 690 34.39 237 0 0

4 Tanakpur 94 7.68 7 0 0

1 Chamera I 540 3.9 21 0 0

2 Chamera II 300 6.33 19 2.61 8

5 Uri 480 33.96 163 0 0

7 Dul hasti 390 21.15 82 2.17 8

6 Dhaulinganga 280 6.07 17 2.18 6

7 Sewa-2 120 19.17 23 2.61 3

Sub-Total 569 25

Page 68: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 68686868

C- SJVNL(JV)

1 N-Jhakahri 1500 7 105 1.44 22

D- Eastern Region

1 FAKKA 1600 0.65 14 0 0

2 KHLGN-I 840 3.69 31 0 0

3 KHLGN-II 1500 2.87 43 2.69 40

4 MEHA-6 250 7.08 18 0 0

Sub-total 105 40

TEHRI 1000 4.80 48 1.44 14

Tala 1020 0.00 0 1.77 18

Total 1246 283

GRAND TOTAL 1530

Page 69: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 69696969

4.8 - Demand And Availability Scenario Peak (POWER)

MW

Year 2004-05(A) 2005-06(A) 2006-07

(A) 2007 -08 (A) 2008-09 (A) 2009-10 (A) 20010-11 20011-12(RE)

Peak Demand 1706 1800 1925 2020 2120 2290 2425 2500

Peak Met 1350 1242 1306 1350 1340 1407 1550 1650

Peak Deficit 356 558 619 670 780 883 875 850

Peak Deficit (%) 20.87% 31.00% 32.16% 33.17% 36.79% 38.56% 36.08% 34.00%

Page 70: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 70707070

4.9 - Demand And Availability Scenario (ENERGY)

MU

YEAR 2004-05(A) 2005-06(A) 2006-07 (A) 2007 -08 (A) 2008-09(A) 2009-10(A) 2010-11 (A 2011-12

(RE)

Energy Requirment 9640 10503 11343 14037 14750 15656 16544 17323

Restricted Energy Availability

7306 7916.38 8236.53 8743.96 9147.21 10370 10667.00 10972.06

Energy Deficit 2334 2586.62 3106.47 5293.04 5602.79 5286 5877 5570

Energy Deficit (%) 24.21% 24.63% 27.39% 37.71% 37.99% 33.76% 35.52% 32.15%

Page 71: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 71717171

4.10 Seasonal Power Deficit (Minimum-Maximum) (MWs)

S.No. Particular

Year 2010-11 (A) Year 2011-12 (E)

Summer Winter Summer Winter

I. Unrestricted Demand 2130 2425 2200 2500

II. Restricted Demand 1388 1550 1436 1650

III.

Power Availability

(i) Self Generated 200-400 150-300 375-600 150-300

(ii) CPSUs 750-1150 450-950 700-1150 500-950

Total (i+ii) 950-1550 600-1200 1075-1750 650-1250

IV. Deficit(-) 162 to -438 -350 to -950 +314 to -361 -400 to -1000

*Summer = 8 hours curtailment

Winter = 10 hours curtailment

Page 72: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 72727272

4.11 - Year Wise Statement of Energy Consumption

S.No Year Energy Purchased

(MU)

1 1998-99 5429.57

2 1999-2000 4978.65

3 2000-01 5374.65

4 2001-02 5606.04

5 2002-03 6280.38

6 2003-04 7148.29

7 2004-05 7306.36

8 2005-06 7916.38

9 2006-07 8236.53

10 2007-08 8743.96

11 2008-09 9147.21

12 2009-10 10370.65

13 2010-11 10667.23

14 2011-12(E) 10972.06

Page 73: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 73737373

4.12 - Year Wise Statement of Energy Purchased from Northern Grid

S.No Year Energy

Purchased MU

1 1997-98 3966.53

2 1998-99 4723.38

3 1999-2000 2637.69

4 2000-01 4808.30

5 2001-02 4989.48

6 2002-03 5778.65

7 2003-04 6232.70

8 2004-05 6560.71

9 2005-06 7045.91

10 2006-07 7265.19

11 2007-08 7873.40

12 2008-09 7488.62

13 2009-10 8269.424

14 2010-11 8356.41

15 2011-12(E) 8578.09

Page 74: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 74747474

4.13 - Year Wise Statement of Self-Generated Energy of State Available to PDD

S.No Year Energy (MU)

1 1997-98 951.36

2 1998-99 713.32

3 1999-2000 638.34

4 2000-01 572.07

5 2001-02 622.78

6 2002-03 506.80

7 2003-04 924.84

8 2004-05 745.66

9 2005-06 870.47

10 2006-07 971.34

11 2007-08 879.34

12 2008-09 1658.58

12 2009-10 2101.23

13 2010-11 2310.82

14 2011-12(E) 2393.97

Page 75: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 75757575

4.14 - Gross Per Capita Power Consumption of Jammu & Kashmir State

S.No Year Consumption

(MU) Population

(Million)

Per Capita Consumption

(kWHr)

1 1998-99 5429.57 9.24

587.62

2 1999-2000 4978.65 9.50 524.07

3 2000-01 5374.65 9.78 549.56

4 2001-02 5606.04 10.14 552.66

5 2002-03 6280.38 10.41 603.22

6 2003-04 7148.29 10.68 669.37

7 2004-05 7306.36 10.95 667.44

8 2005-06 7916.38 11.25 703.80

9 2006-07 8236.53 11.52 715.24

10 2007-08 8752.75 11.78 742.80

11 2008-09 9147.217 12.05 759.03

12 2009-10 10370.65 12.32 841.85

13 2010-11 10667.229 12.55 849.98

14 2011-12(E)

10972 12.82 856.00

*Population source: www.censusindia.gov.in

Page 76: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 76767676

4.15 - Calculation of Gap between Average Cost of Supply(ACS) and Average Revenue Realised (ARR) and AT&C Losses

S# ITEM Unit 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

(Projected)

1. Self Generation in State MU 506.8 924.84 745.66 870.47 971.34 870.56 1649.07 2101.23 2310.8 2408.850

2. Import from CPSUs MU 5778.65 6232.7 6560.71 7045.91 7265.19 7873.4 7776.5 8269.424 8356.4 8578.090

3. Total Energy (1+2)Total Energy (1+2)Total Energy (1+2)Total Energy (1+2) MU 6285.45 7157.54 7306.37 7916.38 8236.53 8743.96 9425.57 10370.65 10667 10986.940

4. Billed Energy MU 3326 3718.8 3856 4188.55 4030.84 3331.6 3478 3833 4041.1 4699.120

5. Billing Efficiency (4/3x100) 52.92 51.96 52.78 52.91 48.94 38.10 36.90 36.96 37.88 42.77

6. EnerEnerEnerEnergy Costs gy Costs gy Costs gy Costs

7. i. Power Purchased from CPSUs Cr. 1267.85 1343.15 1339.62 1671.51 1415.45 1744.34 1459.5 1996.712 2157.6 2297.26

8. ii. Power Purchased from State Cr. 103.99 107.72 103.88 124.76 129.86 81.43 324.18 546.697 639.53 652.32

9. TTTTotal Power Purchase Cost (6+7)otal Power Purchase Cost (6+7)otal Power Purchase Cost (6+7)otal Power Purchase Cost (6+7) Cr. 1371.84 1450.87 1443.5 1796.27 1545.31 1825.77 1783.68 2543.409 2797.2 2949.58

10. I. O&M Cr. 18.12 26.27 32.43 28.28 28.78 41.27 43.34 55.35 48.72 55.36

11. ii. Establishment Cr. 105.8 115.07 155.59 123.93 211.52 288.95 237.58 339.04 410.82 432.15

12. iii. Depreciation Cr. 48.07 49.1 55.1 57.15 58.52 62.58 68.94 82.73 87.85 105.14

13. iv. Intrest Cr. 32.87 22 32.89 22.67 21.46 16.97 14.37 14.97 11.2 12.99

14. Total Cost of Total Cost of Total Cost of Total Cost of Supply(9+10+11+12+13) Supply(9+10+11+12+13) Supply(9+10+11+12+13) Supply(9+10+11+12+13) Cr. 1576.7 1663.31 1719.51 2028.3 1865.59 2235.54 2147.91 3035.499 3355.8 3555.22

Page 77: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 77777777

15. Cost of Supply* (After losses I,e Cost of Supply* (After losses I,e Cost of Supply* (After losses I,e Cost of Supply* (After losses I,e on billed energy) (14/4) on billed energy) (14/4) on billed energy) (14/4) on billed energy) (14/4)

Paisa/U 474.05 447.27 445.93 484.25 462.83 671.01 617.57 791.94 830.41 756.57

16.

Average Cost of Supply**(Before Average Cost of Supply**(Before Average Cost of Supply**(Before Average Cost of Supply**(Before Losses i,e on input energy) ACS Losses i,e on input energy) ACS Losses i,e on input energy) ACS Losses i,e on input energy) ACS (14/3) *100 (14/3) *100 (14/3) *100 (14/3) *100 Paisa/ Unit 250.85 232.39 235.34 256.22 226.50 255.67 227.88 292.70 314.59 323.59

17. Pure Revenue Billed or Assessed Pure Revenue Billed or Assessed Pure Revenue Billed or Assessed Pure Revenue Billed or Assessed (Gross) (Gross) (Gross) (Gross) Cr. 446.44 549 543.70 590.59 592.53 816.24 829.50 928.13 1180.78 1457.00

18. Average Revenue Average Revenue Average Revenue Average Revenue RealizedRealizedRealizedRealized (ARR) (ARR) (ARR) (ARR) (17/3)(17/3)(17/3)(17/3) Paisa/U 71 77 74 74 72 93.34 90.99 89.50 110.69 132.61

19. Gap between ACS and ARR Gap between ACS and ARR Gap between ACS and ARR Gap between ACS and ARR (ACS(ACS(ACS(ACS----ARR) (16ARR) (16ARR) (16ARR) (16----18)18)18)18) Paisa/ Paisa/ Paisa/ Paisa/ UnitUnitUnitUnit 179.85 155.39 161.34 182.22 154.50 162.33 136.89 203.21 203.89 190.97

20. Revenue Revenue Revenue Revenue RealizedRealizedRealizedRealized (without ED) (without ED) (without ED) (without ED) Cr. 293.65 308.67 341.47 371.54 393.41 591.97 628 702.30 801.00 1457.00

21. Average TariffAverage TariffAverage TariffAverage Tariff Rs./Unit 1.34 1.41 1.41 1.41 1.47 2.45 2.385 2.42 2.92 3.10

22. Collection Efficiency (20/17*100)Collection Efficiency (20/17*100)Collection Efficiency (20/17*100)Collection Efficiency (20/17*100) % 65.78 56.22 62.95 63.06 66.28 69.74 75.71 75.67 67.84 100.00

23. Energy Energy Energy Energy RealizedRealizedRealizedRealized (22X4)(22X4)(22X4)(22X4) MU 2187.84 2090.71 2427.35 2641.30 2671.64 2323.46 2633.12 2900.37 2741.33 4699.12

24. T&D LossesT&D LossesT&D LossesT&D Losses (3(3(3(3----4)/3*1004)/3*1004)/3*1004)/3*100 % 47.08 48.04 47.22 47.09 51.06 61.90 63.10 63.04 62.12 57.23

25. AT&C Losses AT&C Losses AT&C Losses AT&C Losses (3(3(3(3----23)/3*10023)/3*10023)/3*10023)/3*100 % 65.19 70.79 66.78 66.64 67.56 73.43 72.06 72.03 74.30 57.23

Note: 1. Power purchase cost is as per the billing and may be at variance with the budgetary figures.

2. The figures in this table may be at variance with the Resources Plan and Tariff Order due to compiling of these documents at

different occasions of the financial year.

Page 78: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 78787878

4.16 – Bifurcation of T&D Losses for 2010-2011

ENERGY PURCHASED FROM CPSUs ( A) 8356.413

SELF GENERATION OF THE STATE (B) 2310.816

TOTAL ENERGY INPUT(C=A+B) 10667.23

INTER STATE TRANSMISSION LOSSES i.e. POOL LOSSES (D= 4.87 % OF A) 406.9573

NET ENERGY INPUT TO THE STATE (E=C-D) 10260.27

INTRA STATE TRANSMISSION LOSSES i.e. LOSSES AT 200/132 kV LEVEL ( F=5.45 % OF E)

559.18

ENERGY AVAILABLE FOR DISTRIBUTION AT 33 kV LEVEL (G=E-F) 9701.09

ENERGY BILLED H 4041.08

DISTRIBUTION LOSSES i.e. (I= G-H) AT 33/11/6.6/.4 kV LEVEL 5660.01

DISTRIBUTION LOSSES (J= I/Cx100) 53.06

Note:- Since J&K PDD is looking after both Transmission and distribution sectors, the T&D losses for both of these sectors are of the order of 62.12 %, out of which distribution losses are of the order of 53.06 %

Page 79: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 79797979

Chapter 5

Electricity Consumers, Connected Load and Revenue Realization

5.1 - Category Wise Number of Consumers as on 31-03-2011

S.No Category Jammu (No.) Kashmir

(with Ladakh) (No.)

Total (No.)

1 Domestic 483099 602316 1085415

2 Non- Domestic/

Commercial 76520 69323 145843

3 LT Industrial 8562 10069 18631

4 HT Industrial 485 441 926

5 HT Power Intensive

Intensity 13 0 13

6 Irrigation/ Agriculture 14623 384 15007

7 Public Lighting 178 199 377

8 LT Public Water

Works 1159 399 1558

9 HT Public Water

Works 33 193 226

10 State/ Central Deptt. 4941 4289 9230

11 General Purpose

Bulk Supply 105 38 143

Total 589718 687651 1277369

Page 80: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 80808080

5.2 - Category-wise Consumption for 2010-11

S.No Category Jammu

MU Kashmir

MU J&K MU

%age

1 Domestic 501.28 754.65 1255.93

31.07

2 Non- Domestic/

Commercial 186.8 162.30 349.10 8.64

3 Industrial 648.38 168.16 816.54 20.20

4 Irrigation/

Agriculture 194.97 3.13 198.10 4.90

5 Public Lighting 24.23 4.84 29.07 0.72

6 Public Water

Works 315.79 270.25 586.04 14.50

7 State/ Central

Deptt. 351.3 360.00 711.20 17.60

8 General

Purpose Bulk Supply

77.44 17.66 95.10 2.35

Total 2300.19 1740.89 4041.08

Page 81: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 81818181

5.3 - Category Wise Connected Load (in MWs) as on 31-03-2011

S.No Category Connected

Load Jammu (MW)

Connected Load

Kashmir (MW)

J&K Connected Load

(MWs)

1 Domestic 297.529 298.9 596.429

2 Non- Domestic/

Commercial 78.58 90.78 169.36

3 LT Industrial 130.028 85.89 215.918

4 HT Industrial 152.028 52.38 204.408

5 HT Power

Intensive Industry 25.02 0 25.02

6 Irrigation/

Agriculture 74.931 36.34 111.271

7 Public Lighting 3.704 1.93 5.634

8 LT Public Water

Works 46.04 13.03 59.07

9 HT Public Water

Works 7.839 6.28 14.119

10 State/ Central

Deptt. 77.154 69.75 146.904

11 General Purpose

Bulk Supply 29.97 10.95 40.92

Total 922.823 666.23 1589.053

Page 82: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 82828282

Metering Status upto 31-03-2011

Description Jammu Kashmir Total

Total Consumers 589718 687651 1277369

Electronic Meters 282739 226946 509685

Percentage Electronic Metering 47.94 33.00 39.90

Electromechanical Meters 130669 0 130669

Percentage Electromechanical Metering 22.16 0 10.5

Total meters 413408 226946 640354

Total Percentage Metering 70.10 33.00 50.13

Page 83: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 83838383

5.5 - Year-wise Revenue Realization

S# Year Total Revenue

Realization (Cr)

ED (Crs)

Rev. Pure+Misc.

(Crs)

1 2001-02 267.39 27.54 239.85

2 2002-03 323.19 29.14 294.05

3 2003-04 342.62 33.1 309.52

4 2004-05 398.77 54.75 344.02

5 2005-06 436.20 64.46 371.74

6 2006-07 455.47 60.21 395.26

7 2007-08 693.24 99.31 593.93

8 2008-09 737.51 108.00 629.51

9 2009-10 823.53 120.32 703.21

10 2010-11 950.4 147.58 802.82

Page 84: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 84848484

5.6 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in J&K

Rs in Crores

S.No. Category of Consumres

2008-09 2009-10 2010-11

Pure Revenue

ED Total Pure

Revenue ED Total

Pure Revenue

ED Total

1 . Domestic 105.75 23.99 129.73 136.56 29.95 166.51 170.52 38.48 209.00

2 . N. Domestic/ Commercial 61.34 13.25 74.59 58.27 12.50 70.77 80.07 18.25 98.32

3 . Irri/Agriculture 32.66 7.71 40.37 31.18 6.84 38.02 31.47 7.24 38.71

4 . State/Central 166.34 8.16 174.50 202.67 11.16 213.83 208.38 11.82 220.20

5 . Public Lighting 0.04 0.01 0.05 0.02 0.01 0.03 0.11 0.03 0.14

6 . L.T Industrial 48.85 17.67 66.52 29.44 6.44 35.88 39.00 9.02 48.02

7 . H.T Industrial 78.42 17.08 95.50 112.36 24.98 137.34 132.60 30.61 163.21

8 . Power Intensive Industries 15.65 2.21 17.87 32.11 6.95 39.06 24.17 7.70 31.87

9 . L. T Public Water Works 60.70 12.57 73.27 64.72 14.12 78.84 68.18 16.67 84.85

10 . H. T Public Water Works 21.44 3.46 24.90 17.28 3.95 21.23 15.82 2.19 18.01

11 . Gen. Purpose Bulk Supply 36.90 1.81 38.71 17.26 3.42 20.68 30.59 5.57 36.16

Total:- 628.10 107.91 736.01 701.87 120.32 822.19 800.91 147.58 948.49

Rev. Miscl. 1.91

Grand Total 950.40

Page 85: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 85858585

5.7 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in respect of Elect. Maintt. & RE Wing, Jammu

(Rs. in Crores)

S.No. Category of Consumres

2008-09 2009-2010 2010-11

Pure Revenue

Electricity Duty

Total: Pure

Revenue Electricity

Duty Total:

Pure Revenue

Electricity Duty

Total:

1 . Domestic 42.65 9.95 52.59 51.65 11.25 62.90 67.41 15.80 83.21

2 . N. Domestic/ Commercial 30.07 6.61 36.68 32.88 7.16 40.04 43.45 10.19 53.64

3 . Irri/Agriculture 22.58 5.38 27.96 21.93 4.78 26.71 21.90 5.14 27.04

4 . State/Central 91.74 2.17 93.91 122.68 4.97 127.65 122.97 5.01 127.98

5 . Public Lighting 0.00 0.00 0.00 0.02 0.01 0.03 0.06 0.02 0.08

6 . L.T Industrial 31.07 12.51 43.58 20.35 4.44 24.79 29.98 7.03 37.01

7 . H.T Industrial 64.69 13.09 77.78 80.62 17.58 98.20 98.65 23.14 121.79

8 . Power Intensive Industries 15.65 2.21 17.87 32.11 6.95 39.06 24.17 5.67 29.84

9 . L. T Public Water Works 52.86 10.83 63.69 57.11 12.45 69.56 58.95 13.83 72.78

10 . H. T Public Water Works 9.34 0.78 10.12 5.31 1.16 6.47 2.91 0.68 3.59

11 . Gen. Purpose Bulk Supply 33.84 1.15 34.99 9.70 2.10 11.80 23.75 5.57 29.32

Total:- 394.50 64.67 459.17 434.36 72.85 507.21 494.20 92.08 586.28

Rev. Miscl. 0.90

Grand Total 587.18

Page 86: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 86868686

5.8 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in respect of Elect. Maintt. & RE Wing, Kashmir

(Rs. in Crores)

S.No.

Category of Consumres 2008-09 2009-10 2010-11

Pure Revenue

Electricity Duty

Total: Pure Revenue Electricity

Duty Total:

Pure Revenue

Electricity Duty

Total:

1 . Domestic 63.10 14.04 77.14 84.91 18.70 103.61 103.11 22.68 125.79

2 . N. Domestic/ Commercial 31.27 6.64 37.91 25.39 5.34 30.73 36.62 8.06 44.68

3 . Irri/Agriculture 10.08 2.33 12.41 9.25 2.06 11.31 9.57 2.10 11.67

4 . State/Central 74.60 5.99 80.59 79.99 6.19 86.18 85.41 6.81 92.22

5 . Public Lighting 0.04 0.01 0.05 0.0006 0.0001 0.0007 0.05 0.01 0.06

6 . L.T Industrial 17.78 5.16 22.94 9.09 2.00 11.09 9.02 1.99 11.01

7 . H.T Industrial 13.73 3.99 17.72 31.74 7.40 39.14 33.95 7.47 41.42

8 . Power Intensive Industries 0.00 0.00 0.00 0.00 0.00 0 0.00 2.03 2.03

9 . L. T Public Water Works 7.84 1.74 9.58 7.61 1.67 9.28 9.23 2.84 12.07

10 . H. T Public Water Works 12.10 2.68 14.78 11.97 2.79 14.76 12.91 1.51 14.42

11 . Gen. Purpose Bulk Supply 3.06 0.66 3.72 7.56 1.32 8.88 6.84 0.00 6.84

Total:- 233.60 43.24 276.84 267.511 47.4701 314.981 306.71 55.50 362.21

Rev. Miscl. 1.01

Grand Total 363.22

Page 87: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 87878787

5.9 CATEGORYWISE SUBSIDY COMPONENT FOR 2009-10 & 2010-11

S# Name of Category

2009-10 2010-11

Energy Billed(MU)

Per unit Cost of

supply(Rs)

Cost of Supply(Crs)

Revenue Billed(Crs)

Subsidy (Crs)

%age subsidy

Energy Billed(MU)

Per unit Cost of

supply(Rs)

Cost of Supply(Crs)

Revenue Billed(Crs)

Subsidy (Crs)

%age subsidy

1 Domestic 1380.00

7.92 1092.96 195.05 897.91 82.15 1255.93 8.30 1042.42 178.34 864.08 82.89

2 Commercial 295.00

7.92 233.64 67.85 165.79 70.96349.10

8.30 289.75 93.91 195.85 67.59

3 LT Industrial 202.00

7.92 159.98 42.62 117.36 73.36239.34

8.30 198.65 58.88 139.77 70.36

4 HT Industrial 528.00

7.92 418.18 138.34 279.84 66.92454.57

8.30 377.29 132.28 245.01 64.94

5 HT Power Intensive 126.00

7.92 99.79 38.56 61.23 61.36122.63

8.30 101.78 40.47 61.32 60.24

6 Irrigation/Agr. 295.00

7.92 233.64 38.06 195.58 83.71198.1

8.30 164.42 28.13 136.29 82.89

7 Public lighting 14.00

7.92 11.09 4.62 6.47 58.3329.07

8.30 24.13 11.77 12.35 51.20

8 LT Public Water Works 295.00

7.92 233.64 97.35 136.29 58.33307.14

8.30 254.93 123.78 131.15 51.45

9 HT Public Water Works 88.00

7.92 69.70 27.54 42.16 60.49278.9

8.30 231.49 104.87 126.62 54.70

10 State Central Deptt 532.00

7.92 421.34 252.17 169.17 40.15711.2

8.30 590.30 348.49 241.81 40.96

11 General Purpose Bulk 78.00

7.92 61.78 25.97 35.81 57.9695.1

8.30 78.93 35.95 42.99 54.46

Total

3833.00 3035.736

928.13 2107.606

4041.08

3365.75 1173.59 2197.24

Page 88: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 88888888

5.10 - Arrears of Non Govt. and Govt. Consumers From 2002-03 to 2010-11 (Rs Crores)

S.No Year

Jammu (A)

Kashmir (B)

Total

Grand Total

Non Govt. Govt.

Deptts. Total (A) Non Govt.

Govt. Deptts.

Total (B) Non Govt. Govt.

Deptts.

1 2 3 4=2+3 5 6 7=5+6 8=2+5 9=3+6 10=8+9

1 2002-03 18.54 239.76 258.3 128.05 113.47 241.52 146.59 353.23 499.82

2 2003-04 37.39 282.3 319.69 156.27 127.35 283.62 193.66 409.65 603.31

3 2004-05 81.21 311.51 392.72 170.14 188.17 358.31 251.35 499.68 751.03

4 2005-06 101.70 377.31 479.01 158.96 194.82 353.78 260.66 572.13 832.79

5 2006-07 101.72 424.46 526.18 165.69 207.83 373.52 267.41 632.29 899.7

6 2007-08 74.84 443.65 518.49 189.11 218.7 407.81 263.95 662.35 926.3

7 2008-09 95.12 448.74 543.86 205.58 223.08 428.66 300.7 671.82 972.52

8 2009-10 121.59 445.01 566.60 191.97 228.83 420.8 313.56 673.84 987.4

9 2010-11 149.36 505.86 655.22 197.5 233.53 431.03 346.86 739.39 1086.25

Page 89: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 89898989

CHAPTER 6 Computerized Billing

6.1 - STATUS OF COMPUTERISED BILLING IN EM&RE WING JAMMU AS ON 31/03/2011.

S.No. CIRCLE DIVISION TOTAL SUB DIVISIONS

HARDWARE PROCURED & INSTALLED

HARDWARE PROCURED

BUT NOT INSTALLED

HARDWARE YET TO BE PROCURED

1 Circle Ist

ED-I Jammu 4 4 0 0

ED-I I Jammu 4 4 0 0

ED-III Jammu 4 4 0 0

2 Circle Kathua ED- VIJAYPUR 4 4 0 0

ED- KATHUA 5 5 0 0

3 Circle Rajouri ED- RAJOURI 5 1 0 4

ED -POONCH 4 0 0 4

4 Circle Batote

ED-Udhampur 4 2 0 2

ED-Reasi 3 1 0 2

ED- BATOTE 3 1 0 2

5 Circle Kishtwar ED- DODA 3 1 0 2

ED-KISHTWAR 4 1 0 3

TOTAL EM&RE WING JAMMU 47 28 0 19

Page 90: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 90909090

6.2 - STATUS OF COMPUTERISED BILLING IN EM&RE WING, KASHMIR AS ON 31/03/2011

S.No. CIRCLE DIVISION TOTAL SUB DIVISIONS

HARDWARE PROCURED &

INSTALLED

HARDWARE PROCURED

BUT NOT INSTALLED

HARDWARE YET TO BE PROCURED

1 Circle Ist

DIV-I BASANT BAGH 5 5 0 0

DIV-IV KHANYAR 5 5 0 0

TOTAL 10 10 0 0

2 Circle IInd

DIV-II RAJ BAGH 5 5 0 0

DIV-III SHEREEN BAGH 5 5 0 0

DIV-VI BADGAM 5 4 0 0

TOTAL 15 14 0 1

3 Bejbehara

DIV-ANANTNAG 3 1 0 2

DIV-BIJBEHARA 3 3 0 0

DIV-KULGAM 3 2 0 1

TOTAL 9 6 0 3

4 Sopore

DIV-BARAMULLA 5 4 0 1

DIV-SOPORE 4 4 0 0

DIV-HANDWARA 5 2 0 3

DIV-SUMBAL 4 2 0 2

TOTAL 18 12 0 6

5 Ganderbal

DIV-V GANDERBAL 4 4 0 0

DIV-BANDIPORA 3 3 0 0

TOTAL 7 7 0 0

6 Pulwama

DIV-PULWAMA 3 2 0 1

DIV-AWANTIPORA 3 3 0 0

DIV-SHOPIAN 3 0 0 3

TOTAL 9 5 0 4

7 Circle Leh

DIV-LEH 2 0 0 2

DIV-KARGIL 2 0 0 2

TOTAL 4 0 0 4

TOTAL EM&RE WING KASHMIR 72 54 0 18

Page 91: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 91919191

CHAPTER 7

Schemes under implementation

7.1 - RGGVY:

• RGGVY is basically a scheme for 100% Rural Electrification.

• 14 Schemes covering whole of J&K State were submitted to REC at a total estimated DPR (Detailed Project

Report) cost of Rs. 637.39 crores. All these schemes have been sanctioned by REC at a cost of Rs.

821.62crores

• Above RGGVY Schemes envisages electrification of 365 no. virgin villages, un-electrified villages and de-

electrified villages, which are financially viable for electrification within the Grid System.

• 303682 no. Rural Household connections are proposed to be provided under these RGGVY schemes.

• 96321 no. BPL households are earmarked to be electrified free of cost and 5889 no. already electrified villages

to be covered for intensive electrification under the scheme.

• As per guidelines of RGGVY, the execution of work for 7 districts each has been ensured to NHPC and

J&KSPDC as under:

NHPC: Udhampur, Kathua, Jammu, Srinagar, Budgam, Leh and Kargil.

J&KSPDC: Kupwara, Anantnag, Doda, Baramullah, Pulwama, Rajouri and Poonch.

Page 92: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 92929292

7.2 - Districts wise REC Sanctioned/Approved Cost, Amount Released by REC, Expenditure under RGGVY

S.No. Districts DPR

(Rs in Lacs)

REC Sanctioned/ Approved cost ( Rs. in lacs)

Amount Released by REC

(Rs.in Lacs.)

Expenditure till ending 03/2011

(Rs.in Lacs.)

Sanctioned Schemes

A) JAMMU

1 Rajouri 6910.41 4335.00 1318.00 1270.00

2 Udhampur 5602.00 4116.36 3140.00 3078.00

3 Kathua 5477.07 3229.76 2868.00 2572.00

4 Jammu 5174.05 3546.21 3106.00 2401.00

5 Doda 7251.65 5005.00 1596.00 12.00

6 Poonch 5476.32 2137.00 645.00 631.00

A Sub-Total 35891.5 22369.3 12673 11152

B) KASHMIR

1 Kupwara 2426.35 2815.29 2297.00 1463.00

2 Anantnag 5830.00 6388.00 5584.00 4485.00

3 Baramullah 3392.40 1976.00 618.00 256.00

4 Pulwama 4057.83 2413.00 761.00 313.00

5 Budgam 917.00 811.29 326.00 260.00

6 Srinagar 1389.00 1170.00 878.00 476.00

B Sub-Total 18012.58 15573.6 10464.00 7253.00

C) LADAKH

1 Leh 26645.27 28807.00 25637.00 20251.00

2 Kargil 24623.46 15413.00 13726.00 11199.00

C Sub-Total 51268.73 44220.00 39363.00 31450.00

A+B+C G. Total: 105172.80 82162.91 62500.00 49855.00

Page 93: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 93939393

7.3 Physical progress Report ending 3/2011 under RGGVY

S.N

o

Nam

e o

f D

istr

ict

Co

de N

o

Imp

le-m

en

tin

g A

gen

cy

Targ

et

No

. o

f u

n-e

lectr

ifie

d/

de-e

lectr

ifie

d v

illa

ges.

Cu

m.A

ch

. O

f u

n-e

lectr

ifie

d/

de-e

lectr

ifie

d v

illa

ges.

No

. o

f ele

ctr

ifie

d v

illa

ges c

overe

d

for

HH

s e

lectr

ictr

if-i

cati

on

.

Cu

m.A

ch

. O

n a

cco

un

t O

f e

lectr

ifie

d

vil

lag

es

co

vere

d f

or

HH

s e

lectr

ictr

if-i

cati

on

..

To

tal

villa

ges c

overe

d f

or

H

Hs c

on

nect-

ion

s

Targ

et

No

. o

f u

n-e

lectr

ifie

d/

de-e

lectr

ifie

d h

am

lets

Cu

m.A

hie

vem

en

ts o

f u

n-e

lectr

ifie

d/

de-e

lectr

ifie

d h

am

lets

No

. o

f ele

ctr

ifie

d h

ab

itati

on

s c

overe

d

for

HH

s e

lect-

rifi

cati

on

.

Cu

m.A

ch

. O

n a

cco

un

t O

f e

lectr

ifie

d

hab

itati

on

s c

overe

d

for

HH

s

ele

ctr

ictr

if-i

cati

on

..

To

tal

ham

lets

co

vere

d f

or

ele

ctr

ific

ati

on

.

To

tal

No

. o

f h

ou

seh

old

s t

o b

e

ele

ctr

ifie

d i

n t

he s

ch

em

e

( in

clu

din

g B

PL

ho

useh

old

s)

A

s p

er

sch

em

e

No

. o

f B

PL

co

nn

ecti

on

s i

n R

HH

Cu

m.A

ch

. O

f h

ou

seh

old

e

lectr

ifir

ed

in

th

e s

ch

em

e

incl. B

PL

HH

S

1 Srinagar 900040 NHPC 7 4 161 0 168 304 0 550 49 854 9212 3748 1707

2 Baramulla 900034 SPDC 22 0 Survey

U/P 0

Survey U/P

172 0 0 0 172 15994 0 0

3 Pulwama 900036 SDPC 19 0 Survey

U/P 0

Survey U/P

333 0 0 0 33 20606 0 0

4 Budgam 900039 NHPC 9 1 461 0 470 1418 71 130 1 1548 10135 1519 100

5 Kupwara 900001 SPDC 33 16 332 0 373 196 373 0 74 196 8099 5308 1100

6 Anantnag 900002 SPDC 5 4 600 0 605 596 0 0 0 596 27016 13821 3316

7 Leh 900043 NHPC 35 20 77 0 112 136 0 147 1965 283 6909 3755 2101

8 Kargil 900042 NHPC 27 11 101 0 128 118 0 458 585 576 1614 1038 585

9 Jammu 900035 NHPC 0 0 1019 845 1019 1375 78 4511 289 5886 36697 6314 6914

10 Kathua 900005 NHPC 44 44 534 501 578 604 0 1110 1061 1714 31632 6461 6461

11 Rajouri 900037 SPDC 98 0 158 0 248 864 0 0 0 687 41092 5127 0

12 Poonch 900049 SPDC 26 0 104 0 105 250 17 0 0 250 7288 1328 0

13 Udhampur 900005 NHPC 18 18 578 333 596 1345 0 1367 440 2712 59357 47902 11279

14 Doda 900033 SPDC 22 0 132 0 154 253 0 0 0 253 28031 0 0

Total: 365 118 1679 7964 539 8273 4464 15760 303682 96321 33563

Page 94: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 94949494

4 -Accelerated Power Development and Reforms Programme (APDRP)

Under the program, Government of India has sanctioned 6 No Schemes so far, with the main objectives as:

1. Reduction in AT and C Losses.

2. Infrastructure Development and Strengthen.

3. 100% metering of all categories of consumers.

The details of sanctioned / ongoing Schemes are as under. (Rs. in Crores)

District Circle Cost of

the Scheme

Year of Sanctioned

Amount Released

ending 3/2010

Expenditure, ending 3/2010

Srinagar and Budgam

Electric Circle-I and II., Srinagar

227.03 2002-03 215.73 189.537

Jammu EM & RE, Circle-I, Jammu

174.07 2002-03 167.63 165.351

Kathua, Rajouri and Poonch

EM & RE , Circle-II, Jammu

145.55 2004-05 117.03 113.309

Doda and Udampur

EM & RE, Circle-III, Jammu

95.62 2004-05 86.52 82.943

Baramulla and Kupwara

EM & RE, Circle-North, Kashmir

240.08 2004-05 121.53 117.983

Anantnag and Pulwama

EM & RE, Circle- South, Kashmir

217.78 2004-05 121.69 109.884

P&MM Wing for procurement of Consumer meters

6.53 6.51

One more scheme with scheme cost of Rs. 48.73 Crores under APDRP for Leh Circle covering both districts Leh and

Kargil of Ladakh region has been approved by CEA and is awaiting release of funds by Ministry of Finance (Govt. of India)

Page 95: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 95959595

The following is the scheme coverage of APDRP Schemes

S.No. Name of scheme Unit Quantity

1. Construction of Sub Station Nos/MVA 113/928

2. Construction of Distribution Sub Stations Nos/MVA 10862/1243

3. Augmentation of R/Stations Nos/MVA 76/457.6

4. Augmentation of Distribution Sub Stations Nos/MVA 2965/315.83

5. Erection of 66/33 KV Lines KM 1235

6. Erection of 11 KV Lines KM 5451

7. LT Lines KM 8100

7.5 - Summary of Achievements under APDRP ending 03/2010

Object Unit Completed U/Progress

33/11 KV New Sub Stations No. 77 41

11/0.4 KV New Distribution Sub/Stations No. 5701 293

Augmentation of 33/11 KV Sub Stations No. 107 05

Augmentation of 11/0.4 KV Distribution Sub/Stations No. 3637 80

Installation of consumer meters No. 492508 56395

Page 96: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 96969696

7.6 – Scheme wise Achievement (APDRP)

District Srinagar and Budgam

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 20 4

2 11/0.4 KV New Distribution Sub/Stations

No. 1510 38

3 Augmentation of 33/11 KV Sub Stations

No. 12 0

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 378 3

5 Installation of consumer meters No. 154601 0

District Anantnag and Pulwama

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 13 16

2 11/0.4 KV New Distribution Sub/Stations

No. 738 115

3 Augmentation of 33/11 KV Sub Stations

No. 18 01

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 395 46

5 Installation of consumer meters No. 514460 957

Page 97: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 97979797

District Baramulla and Kupwara

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 5 7

2 11/0.4 KV New Distribution Sub/Stations

No. 1163 176

3 Augmentation of 33/11 KV Sub Stations

No. 14 0

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 402 31

5 Installation of consumer meters No. 39404 18016

District Jammu

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 22 4

2 11/0.4 KV New Distribution Sub/Stations

No. 1281 0

3 Augmentation of 33/11 KV Sub Stations

No. 28 0

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 950 0

5 Installation of consumer meters No. 156129 18661

Page 98: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 98989898

District Kathua, Rajouri and Poonch

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 13 7

2 11/0.4 KV New Distribution Sub/Stations

No. 824 2

3 Augmentation of 33/11 KV Sub Stations

No. 9 4

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 535 3

5 Installation of consumer meters No. 45814 0

District Doda and Udhampur

S.No Description Unit Completed U/Progress

1 33/11 KV New Sub Stations No. 4 3

2 11/0.4 KV New Distribution Sub/Stations

No. 414 0

3 Augmentation of 33/11 KV Sub Stations

No. 10 0

4 Augmentation of 11/0.4 KV Distribution Sub/Stations

No. 405 0

5 Installation of consumer meters No. 42570 100

Page 99: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 99999999

7.7- Hon’ble Prime Ministers Reconstruction Programme.

The Hon`ble Prime Minster during his visit of J&K in November, 2004 announced a Re-construction Plan

infrastructure for J&K and the objective of Schemes under the Re-Construction program is develop infrastructure at 220KV

and 132KV level by way of construction/ Augmentation of Grid Stations, construction of New lines and thickning of

Conductor of Existing lines. Originally the project was estimated to cost of Rs. 707.00 Crores based on cost data 2003. the

project was scrutinized by CEA and on their observations , the project was revised to the cost of Rs. 1006.51 crores The

CEA subsequently advised to revise the Project Report necessitated due to further cost escalation during the intervening

period. Accordingly, the revised project amounting to Rs. 1351.00 Crores was furnished to CEA for approval and finally the

Project Report was approved for 1350.00 Crores. Out of this cost, an amount of Rs. 920.20 Crores has been spent

ending 03/2011

The Scheme envisages construction/ augmentation of following transformation and Transmission capacities.

o Construction of 7 No. new 220/132 KVA, Grid sub Stations of 1880 MVA capacity.

o Augmentation of 1 No. , 220/13 KVA, Grid Sub Station of 150 MVA Capacity.

o Construction of 22 No., 132/33 Grid Sub Stations of 1180 MVA Capacity.

o Augmentation of 4 No. 132/66-33 Grid Sub Stations of 160 MVA Capacity.

o Laying of 373.5 Km of 220KV, D/C, Transmission Lines.

o Laying of 446.35 Km of 132KV, D/C, S/C transmission Lines.

Besides, the Scheme includes other works like Stringing of II Circuit of existing 220KV, D/C Transmission

Lines (40.40 Km), Stringing of II Circuit of 132 KV, D/C, Transmission lines (21.00 Km), thickening of conductor etc.

Page 100: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 100100100100

7.8 - New / Augmentation of Grid Stations in Jammu & Kashmir Divisions:

Kashmir Division:

• B u d g a m ( 3 2 0 / 1 0 0 M V A ) • M i r b a z a r ( A n a n t n a g )

• A m a r g a r h ( 3 2 0 M V A )

• A l u e s t a n g h ( 3 2 0 / 1 0 0 M V A ) • S h o p i a n ( 5 0 M V A )

• B a n d i p o r ( 5 0 M V A )

• L i s s a r ( 5 0 M V A )

• K h a n m o h ( 5 0 M V A • B a n i h a l ( T e t h e r ) ( 5 0 M V A )

• V i l g a m

• M a g a m ( 5 0 M V A ) a n d

• A u g m e n t a t i o n o f Z a n a k o t e / P a m p o r e G r i d S t a t i o n s .

Jammu Division:

• 2 N o . i n B i s h n a ( 2 X 1 6 0 M V A a n d 1 0 0 M V A ) • 2 N o . i n R a m b a n ( 3 X 4 0 M V A a n d 2 0 M V A )

• K i s h t w a r ( 2 x 1 6 0 M V A )

• K a t t r a ( 1 x 5 0 M V A ) • B h a l e s s a ( 2 0 M V A

• P o o n i c h e c k ( 5 0 M V A )

• B a t t a l m a n w a l ( 5 0 M V A )

• C h a n d a k , S i o t ( 2 0 M V A ) • B a r i b r a h m n a - I I ( 2 x 5 0 M V A )

• G a n g y a l ( 1 x 5 0 M V A )

• S i o t ( ( 5 0 M V A )

• A u g m e n t a t i o n o f K a t h u a , S a m b a a n d H i r a n a g a r G r i d S t a t i o n s .

The first ever State owned 132 KV Transmission Line from Ramban to Kishtwar and Rajouri-Poonch, ring around Jammu cities are included in the package which are based on Technical requirement and survey done by CEA. The power requirements under the Plan for Industries have been given due focus and priority.

Page 101: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 101101101101

7.9- Achievements ending 03/2011

Jammu

• 220/132/kV, 320MVA Barn Grid Sub Station Commissioned alongwith allied 132/33kV, 40 MVA transformer.

• 132/33kV, 100 MVA Bari Brahamana-II Grid Sub Station Commissioned.

• 132/33kV, 50 MVA Gangyal Grid Sub Station Commissioned.

• Augmentation of 132/66 KV Grid Sub Station Kuthua from 70 MVA to 100 MVA copmleted

• Augmentation of 132/66 KV Grid Sub Station Samba from 50 MVA to 100 MVA

• Augmentation of 132/33 KV Grid Sub Station Hira Nagar from 42.5 MVA to 72.5 MVA

• 132kV D/C Rajouri-Draba Line Commissioned • 132/33 kV , 50 MVA Grid Station Gangyal commissioned

• LILO of 132, Gladni-Miran Sahib Transmission Line for Grid Station Gangyal.

• 220 kV D/C Burn-Kishenpur Transmission Line completed in

• 220 kV D/C Miran Sahab-Bishnah.Transmission Line commissioned

• 132 kV Barn-Siot alongwith LILO(Akhnoor section) Transmission Line commissioned

• LILO of 132 KV D/C , Gladni-Hiranagar Transmission Line for Grid Station Bari Brahmana-II completed.

• 132 KV D/C Barn-Katra Transmission line completed.

• Stringing of conductor on II circuit of 132KV Burn-Reasi Transmission line completed. • LILO of 132 KV D/C , CSTL-I for G/Stn Ramban completed.

• Reconductoring and stabilization of 132KV S/C Gladni-Janipur transmission line completed

• Reconductoring of 132KV D/C Ring main around Jammu city completed

Kashmir

• Augmentation of 220/132KV Grid Sub Station Zainakote from 300 MVA to 450 MVA

• Augmentation of 132/33KV Grid Sub Station Pampore from 150 MVA to 200 MVA

• Construction of 50MVA,132/33KV Grid station Tethar completed & Commissioned in 10/09

• Construction of 50MVA,132/33KV Grid station Khonmoh completed & Commissioned in 5/09

• LILO of Pampore-cheshmashahi line for Khonmoh Grid station.

• LILO of CSTL at Tethar for Grid station Tethar..

Page 102: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 102102102102

Chapter- 8

Power Sector Reforms

With a view to reform power sector, three tripartite MOUs have been signed so far between J&K PDD, Planning

Commission, GOI and Ministry of Finance GOI. Bench marks were fixed under these MOUs in a phased manner from

the date of signing. In respect of Ist and 2nd tripartite MOUs, benchmarks have been achieved by and large as has been

duly certified by the Independent Auditor, M/S Batliboi Consultants. The details of these benchmarks are as under:

8.1 Bench Marks under 1st Tripartite MOU:

Phase-I

1. Independent Auditor approved by Planning Commission to be appointed upon signing of MOU.

2. SERC to give tariff order.

3. All 11 kV feeders metered using electronic meters.

4. Energy Accounting for each 11kV feeder to be instituted with responsibility assigned to specific JE.

5. Formation of Distinct distribution profit centers with responsibilities of energy flow accounting.

6. Filing of ARR before the SERC by J&K PDD.

Phase-II

1. Total revenue for the preceding 12 months period must at least equal to 40% of the bulk power purchase cost

for the same period. (This may be achieved by a combination of improved billing, collection and tariff hikes.).

2. Specific Proposal of PDD for reduction of Est. and O&M Cost by Rs. 15.00 Crores.

3. Computerized billing covering at least 40%of the billed energy.

4. Consumer metering to be 50%

Page 103: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 103103103103

8.2 Bench Marks under 2nd Tripartite MOU:

1. Certification of Benchmarks established under the MoU by an independent auditor.

2. Filing of ARR for the year 2008-09 before JKSERC.

3. SERC to issue Tariff Order for 2008-09

4. Full energy flow audit for the preceding twelve months covering all major consumers with a load of

25kVA or more. Audit should cover energy (kWh) supplied, energy billed and cash collected to such

consumers.

5. Capacitor banks to be added at sub-station/feeders that feed energy to at least 65 % of the consumers

covered under paragraph 4 above at 33 kV and below.

6. Total cash collected from the large consumers under para 4 above should be at least 70 % of the

amount billed.

7. Total cash collected for the preceding 12 months period must at least equal 50 % of the bulk power

purchase cost for the same period. In case this milestone is achieved, the milestones under para 4 and

6 will be subsumed in this milestone.

8. Computerized billing covering at least 65 % of the billed energy.

9. Sixty five percent consumer metering in place.

10. Specific proposal for reduction of establishment and O & M cost for the period of the second MOU to

Rs 20 Crs inclusive of Rs 15 Crs saved under the first MOU.

11. JKPDD to submit a blue print for turn around of the power sector in J&K within 6 months from the date

of this MOU.

Page 104: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 104104104104

8.3 Bench Marks under 3rd Tripartite MOU:

A. Basic Premise of Reforms Roadmap

a GOJK will take steps to reduce T&D losses by at least 3% considering the guidelines of Restructured APDRP issued by Ministry of Power.

b Detailed Terms of Reference (TORS) for carrying out system and commercial studies for strategizing action on the basis of a SWOT analysis of the transmission and distribution sector so as to reduce AT&C losses shall be framed by GOJK in consultation with the Ministry of Power (Central Electricity Authority).

c While framing the TORs, GOJK shall make use of available reports such as the Blue Print on PDD being prepared by TERI.

B. Independent Auditors.

a Certification of the conditions (benchmarks) established under this MOU shall be done by an independent Auditor,

b The auditor, so appointed, will be used by GOJK effectively.

C. Corporate governance

a GOJK shall take steps to restructure the T&D sector.

b GOJK shall take steps to unbundle the transmission functions being carried out by the Government as departmental activity.

c GOJK shall take steps to establish a transmission company (TRANSCO) under the companies Act. 1956.

d The relations between company’s management, its board of directors, its shareholders and the other involved stakeholder bodies in the Corporation shall be defined in the Memorandum/Articles of Association of the TRANSCO for clearly delineating parameters of corporate governance in the transmission sector.

e Reforms in the Distribution Sector shall be continued.

f A road map for addressing consumer grievances shall be laid out considering the emphasis given in the guidelines of R_APDRP.

Page 105: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 105105105105

g Steps shall be taken to make the State Load Dispatch Centre (SLDC) function without the control of the T&D utility, under the direct control of GOJK, as on interim measure, before autonomous SLDC comes into being.

D. Energy Accounting.

a GOJK will issue detailed guidelines for Energy Accounting in case of 11 KV feeders and above for effective monitoring through regular inspections at different levels.

b GOJK will fix responsibility at different levels of supervisory engineers for inspection of installations for demand vis-à-vis load as per agreement with the utility (department).

c

GOJK will carry out quick studies to pin point high loss areas in the coming six months. Based on the studies, the high loss areas and installations shall be addressed through a range of specific measures such as electronic metering, adherence to publicized curtailment schedule, timely billing and monitoring of revenue recovery.

d A web based Management Information System (MIS) shall be put in place by dovetailing APDRP or R-APDRP or other funds to monitor and take corrective steps on progress in reducing AT&C loss parameters. The MIS shall be put in place within 12 months.

e Full energy flow audit for the preceding twelve months covering all major consumers with a load of 25 KVA or more. Audit should cover energy (kWh) supplied to such consumers, energy billed to such consumers and cash collected from such consumers.

f Capacitor banks to be added at sub stations/feeders that feed energy to at least 75% of the consumers covered under paragraph “e” above at 33 KV and below.

g

Considering the fact that due to law and order disturbances in the summer of 2008, electronic meters were damaged by miscreants in Jammu division and that a large number of meters earlier installed in Kashmir Division have become non functional, 100% of the meters installed under earlier two MOU will be made functional.

a

Considering the fact that J&K is integrated with the rest of the country in respect of the flow of electrical energy, and also, considering the fact that power sector of the country is managed under the overall provisions contained in the Central Electricity Act, 2003 which is not yet applicable to the State of J&K, GOJK will place before its legislature, within next six months, for consideration and adoption an Electricity Act on the lines of the Central Electricity Act, 2003.

Page 106: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 106106106106

b Considering the importance of energy conservation, GOJK will place before its legislature, within next twelve months, for consideration and adoption energy Conservation Act on the lines of the Central Energy Conservation Act, 2001.

c. GOJK will take steps to bring in legislation for adoption by Regulator (SERC),of tariff determined through competitive bidding, so as to reduce regulatory risk in projects and also to align the power sector of J&K with the rest of the country.

F Regulatory Related Issues

a GOJK will file ARR for the year 2009-10 before the J&K State Electricity Regulatory Commission.

G. Commercial Issues

a Total cash collected from the larger consumers under paragraph “D-(e)” above should be at least 85% of the amount billed.

b Total cash collected for the preceding 12 months period must be at least equal to 60% of the bulk power purchase cost.

c Computerized billing covering at least 75% of the billed energy.

H. Dovetailing of Schemes.

a GOJK will establish a Single Nodal Agency in the Power Development Department for dovetailing various schemes being implemented in the State in the power sector such as RGGVY, APDRP, R-APDRP, PMRP (T&D sector) etc. with the power Reform Grant for deriving optimum benefits from the investments.

b Various reports on Power Sector including the Blue Print for Turn Around of the power sector being prepared by TERI and outcome of studies mentioned in this MOU shall be referred to while dovetailing the schemes.

c System strengthening and up-gradation will be carried out as per the Detailed Project Reports prepared under RGGVY, PMRP, APDRP (X Plan) and R-APDRP.

d Dovetailing of schemes will also consider felt needs to people expressed by public representatives.

Page 107: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 107107107107

8.4 Targets and achievement of benchmarks under Ist, 2nd & 3rd Tripartite MOU

S.No Description of Benchmark

Ist Tripartite MoU

signed on August 24, 2006

(for period September 2006

to August 2007)

2nd Tripartite MoU

signed on

February 29, 2008

(for period September

2007 to August 2008)

3rd Tripartite MoU

Target Achievement Target Achievement Target Achievement

1. Appoint of Independent Auditor 100% 100% 100% 100% 100% 100%

2. Feeder metering 100% 100% Nil - Nil -

3. Energy Accounting of Feeders,

Designation of JEs as feeder managers 100% 100%

Nil -

Nil -

4. Establishment of distribution profit

centers with responsibility of energy

flow accounting

100% 100%

Nil -

Nil -

5. Filing of ARR/ Issuance of Tariff Order

by JKSERC 100% 100% 100% 100%

6. Revenue Collection as %age of Power

Purchase Cost 40% 40.06% 50% 35.92% 44.57 28.86%

7. Proposal of PDD for reduction of Est. &

O&M cost by 15 Crores in Ist Tripartite

MoU and by 20 Crores in 2nd

Tripartite

MoU

100% 100% 100% 100%

8. Computerization of billed energy 40% 40% 65%

64.38% ending

9/ 2008

60.72%

9. Consumer metering 50% 49.54% 65%

48.95% ending

9/2008

55.04%

10. Energy flow audit of 25kVA and above

connections Nil - 100% 100%

11. Capacitor banks to be added at S/Stns

and Feeders of 25kVA and above

connections

Nil - 65% 59.36%

12. Cash Collected from Consumers with

load 25kVA and above Nil - 70% 75.29%

Page 108: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 108108108108

Chapter 9

STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR SUB TRANSMISSION & DISTRIBUTION WORK

IMPORTANT NOTES:-

i. Since errors and omissions in this chapter cannot be ruled out, standard drawings, tables & other data in this section are for guidelines only. Practicing Engineers are requested to refer to the original source of data. The DCP’s office does not bare any responsibility for any damage or loss which may occur as a consequence of implementation of any erroneous drawing or data in this section.

ii. Any suggestions for rectification/improvement may please be emailed at [email protected]

Page 109: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 109109109109

9.1 RECOMMENDED TYPE AND SIZE OF MULTI-CORE CABLES REC CONSTRUCTION STANDARD

F-8

Distribution Transformer

Capacity in kVA Type

Size (Nominal area of Cross Section)

25 PVC insulated and sheathed un-armoured four core alumunium cable 16mm2.

63

PVC insulated and sheathed un-armoured four core alumunium cable with reduced neutral conductor

70mm2.

OR

PVC insulated and sheathed alumunium armoured three core solid alumunium conductored cable

70mm2.

100

PVC insulated and sheathed un-armoured four core alumunium cable with reduced neutral conductor

120mm2.

OR

PVC insulated and sheathed alumunium armoured three core solid alumunium conductored cable

120mm2.

Note:

1 The cable would be laid in air.

2 In case of PVC armoured cables, aluminum amour shall serve as neutral for 63 and 100 KVA distribution transformer centers.

3 Size of reduced neutral conductor shall comply with the main -neutral conductor combination as per IS:1554 (Part-I)-1976

4 Type and size of single core cables which can be used for the same purpose are given in REC construction standard F-18

Page 110: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 110110110110

RECOMMENDED TYPE AND SIZE OF SINGLE CORE CABLES

REC CONSTRUCTION STANDARD

F-18

Distribution Transformer Capacity

in kVA Type

Size (Nominal area of Cross Section)

25

PVC insulated and sheathed un-armoured aluminium conductor cable

10mm2

63

PVC insulated and sheathed un-armoured aluminium conductor cable

50mm2.

100

PVC insulated and sheathed un-armoured aluminium conductor cable

120mm2.

Note:

1 The cable would be laid in air.

2 The cables shall be as per IS:1554(part-1)-1976

3 Type and size of single core cables which can be used for the same purpose are given in REC construction standard F-8

Recommended cable dimensions for service lines

Max. load Current marked on meter

Copper conductor- Cross

section

Aluminium conductor--

Cross section Type of cable Insulation peel off length

(mm). Remarks

≤ 10A 4.0mm2 N/A Single / multi core

≤ 20A 6.0mm2 N/A Single / multi core

As recommended by meter manufacturer or measured

terminal hole depth +2.0mm

Reference standard: IS7098 (Part-1) and

IS:1554 (Part-1)

≤ 30A 10mm2 16mm

2 Single / multi core

≤60A 16mm2 25mm

2 Single / multi core

≤80A 25mm2 N/A Minimum -25mm

2

≤100A 35mm2 N/A Minimum -35mm

2

Notes:

� Always use multi-strands conductor instead of solid conductor � Manufacturer’s instruction should be followed while using lugs for terminations � Do not use any lugs for floating cage type terminals

Page 111: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 111111111111

9.2 CURRENT RATING OF DISTRIBUTION & POWER TRANSFORMERS

Voltage Ratio: 11/.433 kV

Transformer Capacity kVA 11 kV side LV Side

16 0.84 21.33

25 1.31 33.34

63 3.31 84.00

100 5.25 133.34

250 13.12 333.35

400 21.00 533.36

630 33.07 840.05

1000 52.49 1333.41

Voltage Ratio: 33/11 kV

Transformer Capacity MVA 33 kV side 11 kV Side

1.0 17.50 52.49

3.2 55.11 165.34

5.0 87.48 262.44

6.3 110.22 330.67

10.0 174.96 524.88

Voltage Ratio: 132/33 kV

Transformer Capacity MVA 132 kV side 33 kV Side

20.0 87.48 349.92

50.0 218.70 874.80

Voltage Ratio: 220/132 kV

Transformer Capacity MVA 220 kV side 132 kV side

150.0 393.66 656.10

Page 112: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 112112112112

9.3 FUSE RATING:

The size of tinned copper fuse wire for use on HV and LV side of the transformer should be as follows:

3 phase Transformer

Capacity in KVA

Size of T. C. - Fuse

11 KV LV

mm(SWG) mm (SWG)

25 0.160 (38) 0.800 (21)

50 0.224(34) 1.25 (18)

63 0.224(34) 2 of 1.25 (18)

75 0.224(34) 2 of 1.25 (18)

100 0.315(30) 2 of 1.40 (17)

The size of tinned copper fuse wire if used at 33 KV and 11 KV side of the transformer shall be as follows: -

3 phase Transformer Capacity kVA

Size of T.C. Fuse wire

33 KV/ mm (SWG) 11KV / mm(SWG)

5000 1.80 (15) -

3150 1.25 (18) -

1600 0.80 (21) -

630 0.63 (23) 0.90 (20)

Source: RE Standards

Page 113: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 113113113113

9.4 CT RATIOS APPLICABLE FOR HT METERING

Page 114: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 114114114114

9.5

Page 115: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 115115115115

9.6 SPECIFICATION OF SWAGED TYPE STEEL TUBULAR POLES AS PER IS2715 WIDELY USED IN J&K POWER DEVELOPMENT DEPARTMENT

Designation

Over all length

Planting depth

Load applied

from top at a

distance of

Hgt. above

ground H

Length

Outside

diameter and

thickness of

sections

App. Wt of Ple

Breaking Load

Cripping Load

Working

Load

Load for

permannentset

not exceeding

13 m

m

Load for

temporary

delection of

157.5 m

m

Bt

m

h3

Md

l

h2

To

p

h1

Btm

h3

Mdl

h2

Top

h1

Col

14(2)

Col

13

(2.5

) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

(m) m m m m m m m mm mm mm kg (kg) N n N N N

(kg) (kg) (kg) (kg) (kg)

410SP

7.5 1.25 0.3 6.25 4.5 1.5 1.5

139.7 114.

3 88.9

103

4630 3280 1650 1850 2250 1480

-8 x x x -472 -335 -168 -189 -229 -151

4.85 3.65 3.25

410SP

7.5 1.25 0.3 6.25 4.5 1.5 1.5

139.7 114.

3 88.9

110

5100 3620 1810 2040 2480 1600

-9 x x x -520 -369 -185 -208 -253 -163

5.4 3.65 3.25

410SP

8 1.5 0.3 6.5 4.5 1.75

1.75

139.7 114.

3 88.9

111

4440 3160 1580 1770 2160 1280

-14 x x x -453 -322 -161 -181 -220 -131

4.85 4.5 3.25

410

8 1.5 0.3 6.5 4.5 1.75

1.75

139.7 114.

3 88.9

119

4890 3470 1740 1960 2380 1380

SP-15 x x x -499 -354 -177 -200 -243 -140

5.4 4.5 3.25

410

9 1.5 0.3 7.5 5 2 2 165.1 x 4.50

139.7 x

4.50

114.3

147 5070 (517)

3600 (367)

1800 (184)

2030 (207)

2460 (251)

1360 (139)

SP-31 x

3.65

410

9 1.5 0.3 7.5 5 2 2 165.1 x 4.85

139.7 x

4.50

114.3

154 5430 (554)

3850 (393)

1930 (197)

2180 (222)

2640 (269)

1430 (146)

SP-32 x

3.65

410

9 1.5 0.3 7.5 5 2 2 165.1 x 5.40

139.7 x

4.50

114.3

164 6000 (612)

4270 (435)

2130 (217)

2410 (245)

2910 (297)

1540 (157)

SP-33 x

3.65

Page 116: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 116116116116

410

11 1.8 0.6 9.2 5.6 2.7 2.7 193.7 x 4.85

165.1 x

4.50

139.7

227 6370 (650)

4530 (462)

2260 (231)

2550 (260)

3100 (316)

1270 (130)

SP-55 x

4.5

410

11 1.8 0.6 9.2 5.6 2.7 2.7 193.7 x 5.40

165.1 x

4.50

139.7

241 6990 (713)

4820 (502)

2480 (253)

2790 (285)

3400 (347)

1370 (140)

SP-56 x

4.5

410

11 1.8 0.6 9.2 5.6 2.7 2.7 193.7 x 5.90

165.1 x

4.85

139.7

256 7620 (777)

5410 (552)

2710 (276)

3050 (311)

3710 (378)

1470 (150)

SP-57 x

4.5

410

Sp-69

13 2.00 0.60 11.00 5.80 3.6 3.6 193.7 X5.90

165..1x5.4

0

139.7x4.5

302 6300 (642)

4470 (456)

2240 (228)

2520 (257)

3060 (312)

794 (81)

410

13 2 0.6 11 5.8 3.6 3.6 219.1 x 5.60

193.7 x

4.85

165.1

333 7720 (787)

5480 (559)

2740 (279)

3090 (315)

3750 (382)

1160 (118)

SP-71 x

4.5

410

13 2 0.6 11 5.8 3.6 3.6 219.1 x 5.90

193.7 x

4.85

165.1

343 8120 (828)

5770 (588)

2880 (294)

3250 (331)

3940 (402)

1190 (121)

SP-72 x

4.5

410

14.5 2 0.6 12.5 6.5 4 4 219.1 x 5.60

193.7 x

4.85

165.1

370 6750 (688)

4790 (488)

2390 (244)

2700 (275)

3780 (334)

775 (79) SP-75 x

4.5

410

14.5 2 0.6 12.5 6.5 4 4 219.1 x 5.90

193.7 x

4.85

165.1

380 7100 (724)

5040 (514)

2520 (257)

2840 (290)

3450 (352)

794 (81) SP-76 x

4.5

410

16 2.3 0.6 13.7 7 4.5 4.5 219.1 x 5.60

193.7 x

4.85

165.1

405 6130 (625)

4350 (444)

2180 (222)

2450 (250)

2980 (304)

569 (58) SP-79 x

4.5

410

16 2.3 0.6 13.7 7 4.5 4.5 219.1 x 5.90

193.7 x

4.85

165.1

416 6440 (657)

4570 (466)

2280 (233(

2580 (263)

3130 (319)

588 (60) SP-80 x

4.5

RECOMMENDED SHADES FOR PAINTING ST POLES

1. Poles should be painted in Silver or orange only, as these colours are conspicuous and therefore safe for traffic and pedestrians.

2. Paint the poles with black and yellow strips upto the height of 180 CM, so as to protect them against the possible damage during the night by fast moving vehicles.

3. Green paint is not recommended, since it conveys safety and is used to identify earth conductors

Page 117: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 117117117117

9.7

Page 118: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 118118118118

9.8 RATING OF CAPACITORS FOR kVAR COMPENSATION

S# Rating of Individual Induction Motor kVAR rating of LT Capacitor

1 3BHP and above upto 5BHP 1

2 Above 5 BHP to 7.5 BHP 2

3 Above 7.5 BHP to 10 BHP 3

4 Above 10 BHP to 15 BHP 4

5 Above 15 BHP to 20 BHP 5

6 Above 20 BHP to 30 BHP 6

7 Above 30 BHP to 40 BHP 7

8 Above 40 BHP to 50 BHP 8

9 Above 50 BHP to 100 BHP 9

10 Above 100 HP As approved by the utility

Page 119: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 119119119119

9.9 Extracts from Record note of meetings of Coordination Committee constituted vide Development Commissioner (Power) communication no. DC/PD/TO-I/51/1659-1667 Dated 17-06-2005.

A) Pole Erection

� The planting depth of poles up to and including 9Mtr. Shall be 1500mm (REC Construction standards).

� The planting depth of poles of 11Mtr. Length shall be 1.83 Mtr. (One – sixth of pole length) (CBIP publication no 58).

� PCC Poles shall be provided with base plates as per REC construction drawing no. K-1.

� Base Plates for steel tubular poles shall be provided with a hole and shall be welded to pole bottom.

� Steel tubular poles shall be provided with steel pole cap.

� Drilling of holes in steel tubular shall be avoided as far as possible. Back up clamps shall be used to fix cross arms/

cross braces.

� All HT/LT poles shall be earthed as per REC standard drawing no. J-1. (REC construction drawings, J&K PDD

Earthing Booklet Page No. 12)

� At tension points PCC poles shall be installed in Transverse/ Lateral Position.

� The Steel Tubular poles shall be concrete bottomed.

� Earthing spiral shall be kept outside concrete portion.

� Two pole, Three pole and four pole structures shall be provided with cross bracings as per REC construction drawing

no. A-21.

B) Guys for Overhead lines

� The 33kV, 11kV and LT poles at angle locations (greater than 50o ), dead ends, tap off and tension points shall be

provided with guys.

Page 120: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 120120120120

� Various accessories of guys shall be as per REC construction drawing no. G-1.

� Accessories of guys shall be assembled as per REC construction drawing no. G-3.

� The no. of guys for various angle locations shall be as per REC Construction Standard G-5 to G-9.

� The guy angle shall be 30 o to 45 o as per REC construction drawing no. G-3.

� Anchor plate (or guy stone) shall be provided as per REC construction drawing no. K-1 and K-4.

� Turn buckle shall be mounted at the pole end of the guy and guy wire shall be so fixed that the turn buckle is half

way in the working position thus giving the maximum movement for tightening or loosening.

� Minimum two no. Guys shall be provided to two-pole structure of each distribution sub station.

� For two pole tension points minimum four guys along the line two in each direction shall be provided.

� Storm guys shall be provided for each section of line because Kashmir Valley is in wind zone of 100 Kg/cm2

(greater than 50 Kg/cm2). (CBIP Publication no. 88 Page 123)

� Fixing of guys to trees, buildings, structures, poles, pipe lines etc. Shall not be allowed in any case whatsoever.

� Guy strain insulators: These are used in the guys so that in case of any mishap if the live conductor comes into

contact with the guy wire and continues to be in contact and if the line does not trip then the bottom portion of the

guy wire would have no voltage due to the insulation provided by the guy insulator. The insulator is fixed between the

guy wire almost in middle. The bottom portion of the wire thus gets insulated. Any human being or animal if coming

in contact with the bottom portion of the guy-wire will be provided safety. No guy insulator shall be installed less than

2.6m from the ground. (CBIP Publication no. 88 Page 39,40 and 124)

Two types of insulators are standardized:

(i) A type for 415/240 V lines

(ii) C type for 11kV lines.

Two C-type insulators are used in series for 33kV lines.

The minimum failing load for A type insulator is 44kN and for C type insulator is 88 kN. � If space for installation of normal guys is not available then fly guy, bow guy and strut shall be used as per REC

construction standard no. G-4.

Page 121: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 121121121121

C) ACSR for Overhead Lines

Nomenclature/ Dimensions:

The conductors shall be specified by their code names and the cross sectional area shall be mentioned in sq. mm only.

Equivalent copper area in sq. inch is no longer being used. Given below is an example to convert conductor sizes into

sq. mm if it is given in equivalent copper area in sq. inch:

Size of ACSR Dog in equivalent Copper area = 0.1 inch2

= 0.1 X 25.4 X 25.4 = 64.51 mm2 Conductivity of Copper = 1.6 X Conductivity of Aluminum (for same area of copper)

Therefore cross sectional area of ACSR Dog in sq. mm = 1.6 X 64.51=100 mm2 (Approx) Following table gives technical details of conductors widely used in Sub Transmission and Distribution networks:

Code Name of ACSR

Equivalent Copper

Area (Inch2)

Nominal Al. Area in mm2

Stranding and wire diameter

(mm)

Approx. Mass

(Kg/Km.)

Calculated Resistance

at 200 C (Ohm/Km)

Approx. calculated breaking

load) KN

Current rating for Ambient Temperature

of 350 C (Amp)

Al Steel

Squirrel 0.02 20 6/ 2.11 1/ 2.11 85 1.394 7.61 110 Weasel 0.03 30 6/2.59 1/2.59 128 0.9289 11.12 145 Rabbit 0.05 50 6/3.35 1/3.35 214 0.5524 18.25 200 Racoon 0.08 80 6/4.09 1/4.09 319 0.3712 26.91 255 Dog 0.1 100 6/4.72 7/1.57 394 0.2792 32.41 305 Leopard 0.125 125 30/2.36 7/2.36 603.8 0.2221 56.56 380 Wolf 0.15 150 30/2.59 7/2.59 727.4 0.1844 67.59 420 Panther 0.2 200 30/3.00 7/3.00 976.0 0.1375 89.66 510

REC Specification 1/1971 (Revised 1993) Table-II, IS 398 -1961

Page 122: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 122122122122

The design of conductor shall be based on Voltage Regulation, Thermal rating and mechanical loading.

The conductor for overhead lines shall be designed with following regulation:

( CBIP Publication no 198 page 10)

The calculation for voltage regulation shall be based on KW-KM for 1% voltage drop to be taken from following REC Construction Standards:

Nominal voltage of line Reference to REC construction standard for

KW-KM

LT Lines B-9

11kV A-9

33kV M-12

General Guidelines for Installation of ACSR

� For 11kV lines, at straight runs and light angles (00 to 100) pin insulators shall be used. The conductor shall be tied to the

insulator at the top groove at straight runs and to side groove on top of insulator through helically formed fittings (REC

Construction drawing no. C-3 and C-4).

� Tying of conductor to insulator skirt shall not be allowed in any case whatsoever. It reduces the creepage path of insulator

and causes surface flashover and earth fault in dirty, humid and rainy conditions and leads to premature failure of insulator.

� Use of pin insulator at sharp angles, tap off points and dead ends for taking conductor load shall not be allowed in any case

whatsoever. Pin insulator is not designed for such applications.

� At sharp angles, tap off points and dead ends disc insulators shall be used as per REC Construction drawing no. C-5.

� Tension points caused by ascend or descend of terrain shall be provided with disc insulators.

Nominal voltage of line Voltage Regulation

33kV 9%

11kV 9%

LT Lines 6%

Page 123: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 123123123123

� The shackle insulators at straight runs shall be installed such that D-fitting of insulator is at right angles to the conductor and

at dead ends the D-fitting is in line of the conductor. This will require installation of poles in such a way that holes provided for

fixing insulators are at right angles to the conductor at straight runs and in line to the conductor at tension points and dead

ends. (REC Construction drawing no. D-6).

� Conductor joints shall be crimped. Crimping sleeves shall be used for this purpose as per REC construction drawing no. E-26.

� The conductor shall be strung at specified sag and tension as per REC construction drawing no. E2 to E22. The sag chart

pertaining to 100Kg/m2 wind zone shall be used from REC standards.

� 11kV main lines in Srinagar City and Towns shall be constructed with ACSR Dog (100 mm2 ). However the tap lines and in

rural areas lower sizes of ACSR can be used.

Clearances of Sub Transmission and Distribution Lines

The clearances of 33KV, 11KV and LT lines from ground and from buildings shall be as per J&K Electricity Rules which are as under:

(a) Minimum clearance above ground of the lowest conductor:

Line Voltage (Phase to phase)

Clearance across street (Mts)

Along Street (Mts)

Elsewhere than along or across any street (Mts)

LT Lines 5.791 5.486 4.572 11kV Lines 6.069 5.791 4.572 33kV Lines 6.965 6.965 5.182

(J&K Electricity Rules 1978 page 44) (b) Clearance from buildings

Where an electrical line passes above or adjacent to or terminates on any building, the following minimum clearance from any accessible point, on the basis of maximum sag shall be observed:

S.No Line Voltage (Phase to phase)

Vertical Clearance from highest point of building

(Mts)

Horizontal Clearance from nearest point of building (Mts)

1 LT Lines 2.439 1.219

2 11kV Lines 3.658 1.319

3 33kV Lines 3.658 1.529

(J&K Electricity Rules 1978 page 45&46) Note: The horizontal clearances shall be measured when the line is at a maximum deflection from the vertical due to wind

pressure.

Page 124: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 124124124124

(c) Phase to phase Clearances

The phase-to-phase clearances of 33kV, 11kV and LT lines shall be as per Rural Electrification Corporation Construction Standards, which are as under:

S.No Line Voltage (Phase to

phase) Minimum Phase to Phase

Clearance (mm) Preferred configuration

1 LT Lines 300 Vertical

450 Horizontal

2 11kV Lines 1070 Triangular on V-Cross Arm

3 33kV Lines 1525 Triangular on V-Cross Arm

The preferred configuration for LT lines is vertical due to economic considerations.

11kV/ 433V Distribution Sub Station Installation

(a) Clearances: As per REC standard specification no. F-1, F-2, F-3 and F-4 and TATA Consultants report on remodeling of distribution scheme in Srinagar City, following clearances shall be maintained for 11/0.433kV Sub Stations:

Description Pole mounted

Transformer

Pad mounted

Transformer

References

Capacity Up to and including 250kVA

Above 250KVA

TATA Consultants report, Drg. No. 7-3

Phase to Phase spacing of down conductors

760mm 460mm REC Standards Drg. No. F1,F2,F3 and F4, TATA Consultants report, Drg. No. 7-3

Phase to ground clearance of down conductors (Horizontal)

460mm 460mm REC Standards Drg. No. F1,F2,F3 and F4, TATA Consultants report, Drg. No. 7-3

HT terminal of 11kV bushing upto ground

5440 mm

2200 mm

REC Standards Drg. No. F1,F2,F3 and F4, TATA Consultants report, Drg. No. 7- 4

Note : The transformer jumpers and bushing terminals of pad mounted transformers shall be insulated with PVC

sleeves or coated with epoxy compound.

Page 125: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 125125125125

(b) Earthing

1. Three independent earths shall be provided to 11/0.433kV Sub Stations as per REC Construction Drawing no. F-

5 and F-10

2. To one of the earth electrodes one direct connection shall be provided from three Lightening Arresters.

3. To each of remaining two electrodes

(a) one separate connection from the neutral of the transformer.

(b) one separate connection from the transformer body and the handle of 11kV AB switch.

(c.) one separate connection from the earthing of poles.

4. The earthing electrodes shall be 2.5meter perforated GI pipe 40mm dia or 20mm GI rod as per REC construction

drawing no. J-1 (c.) 11kV Air Break Switches

11kV link sets shall not be used henceforth. The link sets are a safety hazard. Instead 3-phase gang operated Air Break

Switches shall be used. The air break switches shall be installed as per REC Construction Drawing no. F-2, F-3 and F-4.

Earthing of 33/11kV Sub Stations

� An earth mat shall be laid inside 33/11kV sub station designed as per standard practice. The earth mat shall be

designed so that step and touch potential is kept within 32 volts.

� The minimum size of steel electrodes shall be 22mm dia and 3 mtrs long buried in ground at a minimum depth of

750mm.

� The number of electrodes required in a sub station may be selected in such a way that each rod does not carry

more than 500 Amps of ground fault current. The number of electrodes may have to be increased if the combined

earthing resistance exceeds 2 ohms. .

� The electrodes shall be uniformly distributed within the sub station area. Spacing between the electrodes shall be

more than twice the depth of the electrodes driven below ground level so as to keep resistance to minimum.

Page 126: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 126126126126

� The top end of the earth electrode shall be interconnected with steel flat of minimum size of 50X6 mm.

� Separate earthing electrodes shall be driven for neutral point of power and auxiliary power transformers and for

each lightening arrester. These electrodes shall be interconnected to main earth mat.

� An earth ring shall be formed around sub station at a distance of 2 meters to earth the sub station fencing. This ring

shall be interconnected to the main mesh. Alternate fencing posts shall be earthed.

� Sufficient risers shall be provided to earth non current carrying parts such as tank of power transformer, frame work

of circuit breaker, Isolator operating handle, all steel structures, power cable sheath and armour. Each connection

shall be made in duplicate so as to ensure that at least one safety earth remains in case any one of the two fails.

� The risers to equipment or risers to steel structure shall not be welded. All these connections shall be bolted. The

risers shall be connected to steel structures through bolts/nuts of minimum size of 16mm and the riser to

equipment connection shall be through the bolts/nuts provided with the equipment by manufacturer.

� The risers shall not be embedded in concrete.

� All welded mesh joints shall be painted with red lead and aluminum and later coated with bituminous.

� The power cables shall be grounded at one end only. If the cables are grounded at both ends, the induced currents

flow through a continuous loop formed by armor/ sheath through ground and may damage the cable and/or

termination due to overheating.

� Crushed rock may be used as surface layer as it provides high resistivity, keeps away the reptiles and also avoids

formation of pools of oil in case of leakage. It also helps in presence of moisture in the under layer of soil and thus

helps in maintaining low resistivity.

� Crushed rock of size 3cm to 5cm to a depth of approximately 10 cm may be spread in the yard area. Electric

equipments and structures supporting live conductors may be surrounded be a surface layer of crushed rock within

a distance of above two meters. This is so as a person is not likely to be exposed to touch voltage when he is two

meters away from any live equipment or structure swith yard.

(Source : REC Earthing Manual; PDD Earthing Booklet; PDD Const. Practice)

Page 127: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 127127127127

Electrical Clearances in 33/11kV Sub Stations (Sub Stations)

� Minimum phase – phase clearance of 33kV Bus shall be 1200mm.(REC Construction Drawing no. L-1)

� Minimum phase – column clearance of outermost conductors of 33kV Bus shall be 1050mm. (REC Construction

Drawing no. L-1)

� Minimum Phase to ground clearance of 33kV Bus shall be 4500mm.(REC Construction Drawing no. L-1)

� Minimum ground clearance of HV terminal of 33KV Circuit Breaker and 33/11kV Transformer shall be 3660mm.

� Minimum phase – phase clearance on 11kV gantry shall be 900mm .(REC Construction Drawing no. L-1)

� Minimum distance from 33kV switchyard up to control room shall be 7500mm (REC Construction Drawing no.

L-1)

� Minimum spacing between 11kV panels and control room wall shall be 1000mm (with back door open)

Tilting of V-Cross Arms

Some field engineers have approached the committee with complaint regarding tilting of V-Cross Arms at angle locations. The

committee examined the issue and following clarifications are hereby given:

� The tilting problem has been noticed mostly at angle locations more than 100 .

� The committee has recommended V-Cross arm for tangent locations (straight runs) and light angles (upto100) only. For

angle locations 100 to 600 two pole structure shall be used and for angle locations 600 to 900 4 pole structure shall be used.

(KEECC Record note no dated 09-07-2005 ) (REC Construction Drawing no. A-10)

� At some locations the cross arms have slipped and/ or tilted because back clamp for the cross arm was not fabricated as

per REC Construction drawing no. K-2. Please note 20mm gap is to be left between the cross arm and back clamp after

firm tightening

� Still if the field engineers have apprehensions that the cross arm may slip/ tilt they can use supporting braces as per

enclosed drawing (CBIP publication no 88 page 58 )

Page 128: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 128128128128

� Standardized V-Cross arm has been in use in the country since September 1972. This cross arm is considered to be the

best choice of power engineers all over the country in view of its advantage of reducing the bird faults considerably. Due to

this advantage Central Board of Irrigation and Power has also upheld its use. TATA consultants have also recommended its

use in Srinagar and Jammu Cities. REC has again standardized this cross arm for RGGVY Schemes (REC Guide Line for

RGGVY Schemes- Attachment-I)

� Since Kashmir Valley is gifted with vast variety of birds some of which are large sized like crows, Kites, Vultures etc. the bird

faults are very common here. The bird sits on the flat cross arm and its beak or tail touches the live conductor resulting in

earth fault. This problem was not widespread earlier because wooden poles and wooden cross arms were used in Sub

Transmission and Distribution System in Kashmir Valley. These poles/ cross arms provided sufficient insulation to ground.

Ever since the wooden poles and wooden cross arms have been replaced by Steel/PCC poles and steel cross arms, the

occurrence of bird faults has become a regular feature reducing reliability of power supply.

� The V-cross arm has been designed in such a way that bird cannot sit on it due to its slanting design.

� Under the circumstances the committee considers the V-Cross Arm is the best choice for Sub Transmission and Distribution

System in Kashmir Valley for reliability and safety of the system.

HVDS (High voltage distribution system)

HVDS stands for High Voltage System. In this system high voltage line is drawn as near the load as possible and

small capacity distribution transformer is installed. This system is best suited to meet scattered rural loads. The advantages of this system are:

(i) Reduction in losses because LT line length is reduced.

(ii) Improvement in voltage at the consumers premises.

(iii) Theft of energy by direct tapping of long LT lines eliminated.

(iv) Frequent faults on LT side are reduced.

(v) Failure of Transformers prevented because transformer is feeding 3-5 consumers and these consumers have

sense of belonging of the transformer and they take care of the transformer.

Page 129: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 129129129129

REC specification no. 50/1987 specifies the Single Phase Distribution Transformers. Fig.1, Fig.2, Fig.4 and fig.5 attached to

this specification gives the connection diagram of the single phase transformers. In each drawing continues 11kV neutral is shown on

HT side connected to the transformer. In order to accomplish this scheme a continuous neutral shall have to be run on existing poles

from the star point of 33/11kV Power Transformer right up to the distribution sub station.

The prevailing practice of HVDS in Kashmir Valley is to use a single conductor for HVDS transformer. The other terminal of

HT winding of the single-phase transformer is grounded locally. This connection is nothing but Single Wire Earth Return System

(SWER).

REC specification no 14/1979 specifies SWER distribution transformers. This specification was issued for gaining experience

only. REC did not issue any construction standard for SWER system till 1994. The REC standards available with the committee

are amended up to 30-07-1994.

The committee tried to obtain information from World Wide Web on SWER systems and following are the findings:

� A record note regarding HVDS (High Voltage Distribution System) was issued on 23-09-2005. The issue remained

inconclusive at that time because of non-availability of sufficient information on the subject.

� REC has recently issued Standard Technical Specification (Specification No. 75/2005) for 5kVA HVDS

Transformers, wherein it has been made clear that in case of single phase 11/√√√√3 HVDS transformers, 3 ph., 4

Wire system at 11kV (with separate neutral wire running continuously from 33/11kV sub-station) shall be

adopted and proper earthing of neutral wire separately at both ends shall be ensured. In view of this

development the committee decided to issue following guideline for construction of HVDS substations:

� The standard rating of HVDS transformers shall be 5, 6.3, 10 & 16kVA for 11/√3 (Phase to Neutral) transformers

and 10 & 16kVA for 11kV (Phase to Phase) transformers. (REC Specification no. 50/1987 & 75/2005)

� 5kVA transformers will be of great help in feeding small habitations were small loads are to be supplied in rural

areas. Also 5kVA transformers can be used as a dedicated transformer for every consumer in urban area. (Fore-

word to REC Specification no. 75/2005)

� The 3 phase and 2 phase HVDS transformers shall be fed from 3 wire 11kV system in conventional manner.

However in case of single phase HVDS transformers (11/√3 kV primary), 3 Ph, 4 wire system at 11kV with

separate neutral wire running continuously from 33/11kV sub-station shall be adopted and proper earthing of

neutral wire separately at both ends shall be ensured. (REC Specification no. 50/1987 & 75/2005)

Page 130: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 130130130130

� The transformers shall be mounted on single poles. The neutral wire shall be of minimum size ACSR/AAAC

recommended for 11kV by REC (eg ACSR 7/2.11mm, 20mm2 aluminum area)( REC Specification no. 1/1970

revised 1993 & A-32, F-13& F14)

� The neutral shall be run on LT shackle insulators installed on 11kV pole directly through D-clamps. The point of

attachment of neutral wire shall be 800mm below lowermost 11kV phase conductors.( REC Specification no. A-16)

� The single phase HVDS transformers shall be distributed equally on the 3 phases of 11kV system to ensure

balancing of load at 33/11kV sub station feeding the single phase HVDS system.

METER INSTALLATION

� In view of ongoing metering drive in the department a guideline was issued for consumer meter installation for wall

mounted and pole mounted meters. However APDRP task force set up by Ministry of Power has devised a

comprehensive guideline for meter installation. It was decided to issue the same to the field engineers for

implementation. This guideline supersedes the guideline devised by the committee.

� The first Para of the guideline states: “Choose a location where the meter will be protected from exposure to direct

sunlight and rainwater. The location should be away from children's approach and should have enough ventilation

and light for meter installation, testing, meter reading, etc. There should be free space for meter mains fuse

installation and maintenance”.

� In view of above and also for convenience of downloading the readings from meter to the AMR/ Laptop computer

the committee felt that meters shall be installed on walls of the consumer installations only. However in case of

extreme necessity where installation on wall is not feasible or for the purpose of exposing of unscrupulous

consumers, the meters may be installed on poles as per guideline issued by the committee earlier.

� The present practice of tying the meters to poles, especially in Srinagar city, with steel standards without clamps,

lugs and meter seal and with undersized service line is a sub standard practice and shall not be acceptable to

inspection wing.

Page 131: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 131131131131

TECHNICAL SPECIFICATION FOR CROSS-ARMS FOR 33 kV AND 11 kV OVERHEAD POWER LINES

1.0 ‘V’ SHAPE M.S. CROSS ARM WITH CLAMPS

1.1 X-arms shall be made out of 100 x 50 x 6 mm and 75 x 40 x 6 mm M.S. Channel for 33KV and 75x40X6mm for

11KV.

1.2 The cross arm shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.3 The X-arm should not be welded/ jointed at any place except as specified.

1.4 The clamps for the X-arm shall be of G.I. & shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.5 The clamps shall be designed to fit for the specified rail & PSC poles.

2.0 Shape & Size

2.1 The cross arms shall be of MS channel.

2.2 The cross arms shall have two holes of 22 mm dia (for 11kV line) and 26 mm dia (for 33kV line) for fixing of pin

insulators. The center-to-centre distance between the holes shall be 1070 mm (for 11kV) and 1525 mm (for 33kV)

and holes shall be in the middle of the top width of cross arm.

2.3 If required by the owner, holes of specified size and spacing shall also be provided for fixing of pole back clamp to

suit the pole.

3.0 Marking

The following information shall be marked on each cross arm:

a) Manufacturer’s name or trademark.

b) Year of manufacture

Page 132: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 132132132132

9.10 COSNTRUCTION DRAWINGS OF

CROSS ARMS, SUB STATION FRAME ETC

Page 133: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 133133133133

1 2

3 4

Unstable Configuration

Each pole demands a guy

Prone to bird fauts

High reactive drop

Needs poles of high strength

Not speicified in standards

Hence not recommonded

Unstable Configuration

Each pole demands a guy

Prone to bird faults

High reactive drop

Needs poles of high strength

Very difficult to get phase clearance

Not speicified in standards

Hence not recommonded

Very difficult to get phase phase clearance

Prone to bird fauts

High reactive drop

Not speicified in standards

Hence not recommonded

Unstable Configuration

Each pole demands a guy

Prone to bird faults

Needs poles of high strength

Not specified in standards

Hence not recommended

SU STANDARD CROSS ARMS AND CONDUCTOR CONFIGURATION ( 5 Cases)

Page 134: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 134134134134

5

Prone to bird faults

Not specified in standards

Not recommended for straight runs

CONDUCTOR FORMATION AND CLEARENCE OF 11 KV AND 33 KV LINES

1070

100

100

650 75x40 mm MS Channel

PCC/ST Pole

75x40 mm MS Channel V Cross Arm ( Refer to REC drawing No A-6)

11KV LINES (TANGENT LOCATIONS

100x50 mm MS Channel Piece welded on 75x40 MS Channel

PCC/ST Pole

100x50 mm MS Channel V Cross Arm (Refer to REC drawing No A-6)

33 KV LINES (TANGENT LOCATIONS

50X6 mm MS Strip

1525

100

100

1320

Page 135: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 135135135135

Page 136: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 136136136136

Page 137: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 137137137137

Page 138: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 138138138138

Page 139: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 139139139139

Page 140: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 140140140140

Page 141: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 141141141141

Page 142: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 142142142142

Suspension and Dead end clamps for Aerial Bunched Cable (ABC)

Page 143: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 143143143143

Page 144: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 144144144144

INSTALATTION OF METERS ON PCC & ST POLES

Leave 20mm for tightening

4 no 5X30 mm bolts with nuts and washers

25X4 mm MS

Clamp

PCC Pole

Leave 20mm for tightening

4 no 5X30 mm bolts with nuts and washers

25X4 mm MS Clamp

PCC Pole

Leave 20mm for tightening

4 no 5X30 mm bolts with nuts and washers

25X4 mm MS Clamp

Electronic Meter

Electronic Meter

ST Pole

Electronic Meter

Page 145: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 145145145145

Note:- This Drawing is Not to Scale

Combined 3 Phase CT/PT

33 kV incoming Line

33 KV Isolator

Weather Proof Meter Box

33/11 KV Power Transformer

33 KV DO Fuse

75 mm GI Pipe (threaded both ends) 4000 mm

ACSR

ACSR

Title :- 33 kV Consumer Metering Scheme Drawing No. :- Drg-33 kVMTR-1 Drawn By :- Checked By:-

Surge Arrestor

Combined

3 Phase

CT/PT Unit

Page 146: Year Book 2010-11-A - Power Development Department Organizational Structure of M&RE Wing, Jammu………………... . …………..17 2.5 Organizational Structure of S&O Wing, Kashmir

YEAR BOOK 2010-11 Page 146146146146

0

0

0

0

0

0

0

1625

710 710

710

710

1

0

15

00

SR.NO DESCRIPTION

1 11 KV EPOXY CAST CT 3 NOS.

2 11 KV EPOXY CAST 3 Ø PT 1 NO.

3 MOUNTING CHANNEL 2 NOS. SIZE 100X50X50

4 BUSBAR TO CONNECT THE CTS 40 mm COPPER STRIP

5 BUSBAR TO CONNECT THE PTS FLEXIBLE COPPER PLATE

6 SIZE OF MS PLATE 2 mm

7 SIZE OF WIREMESH SQUARE OF 35 mm

8 SIZE OF ACRYLIC SHEET 3 mm

9 RS 232 PORT

10 HINGED COVER FOR RS 232 PORT WITH LOCKING ARRANGEMENT

TITLE : 11 kV Consumer Metering Scheme