Upload
bartholomew-burke
View
213
Download
1
Tags:
Embed Size (px)
Citation preview
Yarkon Park – Accessible Israel Trail on the Yarkon River – Stage A
KKL-JNFAccess IsraelIsrael Government Tourist
CorporationNational Insurance Institute of
IsraelIsrael Nature and Parks
AuthorityYarkon Drainage AuthoritySouthern Sharon Regional
CouncilPetah TikvaHod HaSharon
Accessible Yarkon Trail – Concrete House Section
Petah Tikva – Segula Industrial Area
Existing trail on right bank
Planned trail on right bank
Existing trail on left bank
Paths to surrounding
communities
National Park (entrance fee)
Entrance
Existing bridge
Planned bridge
Baptist Village
Hod HaSharon
Constructed wetlands
Bet Leah
Southern Sharon Regional Council
Yarkon Sources National Park
Train bridge
Water lily pool
A
B
C
D
EF
PP
Concrete House1.2 km + entrance
Yarkonim Junction
Accessible Yarkon Trail – Concrete House Section – current stateBicycle trail (stabilized bedding) and bridge – 2011
MeanderEnd of the existing asphalt
Bedding road for vehicles On an existing farming road
New parking areaRoad – bedding with fine aggregate finish connected to the grove – surface for passenger disembarkation and a number of accessible concrete parking bays
Road 5
Baptist Village
Accessible trail On the existing bicycle trail up to the northern edge – the meander (350 m)
Concrete house
Yarkon River
Yarkon River
Footbridge
north
Agricu
ltura
l fie
ld
Agricu
ltura
l fie
ld י
Accessible Yarkon Trail – Concrete House Section
Accessible trail – concrete finish Along the river through the grove,ca. 100 m from the Concrete House to the footbridge
Accessible trail –stabilized bedding finishOn the existing bicycle trail down to the southern edge – Baptist Village (750 m)
Accessible Yarkon Trail – Middle Section
פיתוח סביב בית הבטוןתכנון ראשוני
לפי אדר' אלונה ליפשיץעבור רט"ג
New parking areaRoad – bedding with fine aggregate finish connected to the grove – surface for passenger disembarkation and a number of accessible concrete parking bays
Accessible trail – concrete finishAlong the river through the grove, ca. 100 m from the Concrete House to the footbridge
Accessible trail – stabilized bedding finishOn the existing bicycle trail down to the southern edge – Baptist Village (750 m)
Planting program – new plantings in the recreation area
Existing trees
Native shade treesBlack mulberryFigKermes oakEuropean hackberryEuphrates poplar
Existing reed beds
Riparian vegetationTo create a buffer and hide fencesCommon reedEgyptian sugar caneLilac chaste tree
Concrete
house
Herbaceous groundcover plantsTo provide an open view from a distanceHairy bread-grassBulbs, corms and seeds of tall plants: marine squill, garlic, common asphodel, bristly hollyhock
Yarkon
River
Preserving the open view
מגודר צינור
Furnishings from eucalyptus logs
Furnishings from eucalyptus logs – details