YAP HOSPITAL ELEC DWGS - IFC.pdf

Embed Size (px)

Citation preview

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    1/37

    6500080-00

    GENERAL NOTESELECTRICAL COVER SHEET

    ELECTYAP MEMORIAL HOSPITALREFURBISHMENTN.T.S

    B .M E GG IT T 2 2. 09 .0 9

    J . JO HN SO N 2 2. 09 .0 9

    H . J OS HI 2 3.0 4. 10

    E .S C HM ID T 2 3. 04 .1 0

    NHD

    SC

    NC

    PABX

    SURGERY LIGHTING BATTERY UNIT

    SCP

    SCC

    NCAP

    N

    RL

    A/C

    SYM BOL D ESCR IPTI ON

    FLUORESCENT LIGHT FITTING

    WALLMOUNTED LIGHT FITTING

    DOWN LIGHT

    PENDANT LIGHT

    CEILING FAN

    EXIT SIGN

    R

    NEW

    REMOVE

    RELOCATE

    HAND DRYER

    SWITCH / FAN SWITCH

    SWITCHBOARD/PANEL BOARD

    E EXISTING

    F

    EXISTING TELEPHONE FRAME TC1

    PRIVATE BRANCH EXCHANGE SYSTEM

    MAIN COMMUNICATIONS FRAME

    COMMUNICATION SWITCH

    FIRE ALARM CONTROL PANEL

    STAFF CALL PATIENT PENDANT

    STAFF CALL BUTTON

    STAFF CALL PULL CORD

    COMPRESSOR

    AIR CONDITIONING GRILL

    AIR CONDITIONING UNIT

    ELECTRICAL

    NURSE CALL INDICATOR LIGHT

    NURSE CALL ANNUNCIATOR PANEL

    GENERAL NOTES

    1. ALL DRAWINGS SHALL BE READ IN CONJUNCTION WI

    SPECIFICATION AND SCHEDULE

    2. THE ELECTRICAL SERVICES WORKS SHALL BE COOR

    WITH ALL OTHER TRADES AND SUIT THE SCHEDULIN

    3. THE ELECTRICAL INSTALLATION SHALL COMPLY WIT

    CURRENT EDITION OF NFPA 70(NATIONAL ELECTRIC

    WHERE PRACTICAL

    4. ALL EXISITING CEILING AND WALL MOUNTED LUMINA

    SHALLBE REMOVED ANDREPLACEDBYNEWFITTING

    SHOWN (UNO)

    5. ALL EXISITNG ILLUMINATED EXIT SIGNS SHALL BE RE

    AND REPLACED BY NEW FITTINGS AS SHOWN6. ALL EXISITNG LIGHT SWITCHES SHALL BE REMOVED

    REPLACED BY NEW SWITCHES

    7. ALL EXISITING POWER RECEPTACLES SHALL BE REM

    AND REPLACED BY NEW RECEPTACLES

    8. THE EXISITING VOICE AND DATA COMMUNICATION O

    AND WIRING SHALL BE REMOVED AND REPLACED BY

    STRUCTURED CABLING SYSTEM AS DETAILED.

    9. THE EXISITNG NURSE CALL SYSTEM SHALL BE REMO

    REPLACED BY A NEW NURSE CALL SYSTEM AS DETA

    10. EXISTING SERVICES TO BUILDING 12 TO BE RETAINE

    11. EXISITNG RADIO COMMUNICATIONS SYSTEM SERVIN

    BUILDINGS 3, 5 & 8 TO BE RETAINED AS IS.

    12. ALL EXISTING BATHROOM AND TOILET EXHAUST FAN

    CONTROLLERS TO BE REPLACED BY ELECTRONIC R

    TIMERS ACTIVATED BY LIGHT SWITCH.

    13. ALL EXISTING CEILING FANS TO BE REMOVED AND/O

    REPLACED AS DETAILED ON THE MECHANICAL DRAW

    REPLACE ALL FAN SPEED CONTROLLERS TO SUIT.

    14. ALL EXISTING SWITCHBOARDS TO HAVE CIRCUIT BR

    AND CHASSIS REPLACED AND TO HAVE MAIN SWITC

    WALL DOWNLIGHT

    LIGHTING SWITCH PANEL

    2 NEW DOUBLE RJ45 OUTLETS

    SINGLE RECEPTACLE

    DOUBLE DUPLEX RECEPTACLE

    RECEPTACLES

    FLOOR MOUNTED DUPLEX RECEPTACLE

    DUPLEX RECEPTACLE

    DUPLEX RECEPTACLE (GFCI TYPE)

    BLANK PLATE

    G

    F

    B

    AREA LIGHT

    C CLOCK OUTLET

    BD NEW COMMUNICATIONS BUILDINGDISTRIBUTOR

    SPECIAL RECEPTACLES

    abDENOTES LOCATED ABOVE BENCH HEIGHT

    SYM BOL D ESCR IPTI ON

    SYM BOL D ESCR IPTI ON

    COMMUNICATIONS

    SYM BOL D ESCR IPTI ON

    FIRE

    SYM BOL D ESCR IPTI ON

    NURSE CALL

    SYM BOL D ESCR IPTI ON

    HVAC

    PHOTOELECTRIC SENSORPE

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    NEW PA SPEAKER

    PE

    M NEW DESK TOP MICROPHONE

    1 ISSUED FORCONSTRUCTION SO JJ RJM 27.10.10

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    2/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    3/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    4/37

    6500080-00

    MAIN SWITCHBOARDSCHEMATIC

    ELECTYAP MEMORIAL HOSPITALREFURBISHMENTN.T.S

    B .M E GG IT T 2 4. 09 .0 9

    J . JO HN SO N 2 8. 09 .0 9

    H . J OS HI 2 3.0 4. 10

    E . S CH MI DT 2 3. 04 .1 00 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    EXISTING500kVA PADMOUNTED 13.8kV/208V

    TRANSFORMER

    ATS4NOTE5

    1 2 3 4 5 6 7 8 9

    ATS 2

    KWH

    1 2 3 41 2 3 4 5 6

    ATS3

    ATS1

    1400

    ~G

    NEW 400kVA CONTAINERISED

    PACKAGED GENERATOR SETWITH INTEGRALFUELTANK

    (ADDITIVE BID ITEM)

    NOTE5

    16 x1C x 600MCM

    NEWSUBMAINS

    DEQ4 DEQ5 DS14 DS15

    6PDT SW 6PDT SW

    NOTE 6

    EXISTING CHILLER CHANGE OVER ARRANGEMENTS

    NOTES:

    1. THESE ARRANGEMENTSAREBASEDON

    DATA AND AS SUCH MAYNOTBE TOTALL

    THIS CONTRACTOR SHALLVERIFY ALLD

    UPDATE THE DRAWINGTO REFLECT THE

    ARRANGEMENTS.

    2. REMOVE EXISTING GENERATOR AND RE

    150kVA PACKAGED GENERATOR.

    3. REPLACE ALLEXISTING SWITCHGEAR O

    SWITCHBOARDS,DS,DLS,DEQ, DCB AN

    WORK TO SUIT DECANTING PLANT OMIN

    INTERRUPTIONS.

    4. REMOVE CHILLERS AND ASSOCIATEDPU

    SUPPLY.

    5. PROVIDE NEW 400kVAGENERATOR, NEW

    BREAKER NEWSUBMAINSAND ATS4AS

    (ADDITIVE BID ITEMS).

    6. REMOVE EXISTING MANUAL CHANGE OV

    FORCHI LLERAND RECONNECT SUBMAI

    CIRCUITS DS 14AND DS15.7. REPLACE EXISTING SUBMAINS TO CHILL

    3 x 1C x500MCM WITH EXISTING NEUTR

    8. FIT SURGE SUPPRESSORS TOMAIN SWI

    ~GNOTE 2

    20

    NOTE5

    MAIN SWITCHBOARDDISTRIBUTION SWITCHBOARD DS25KA

    DLSLIFE & SAFETY BRANCH 25KA

    DEQEQUIPMENT BRANCH 25KA

    DCBCRITICAL BRANCH 25KA

    REPLACE EXTEND SUBMAIN

    TOSUIT NEW GENERATOR

    NOTE 7 NOTE 7

    8 x 1C x 350MCM

    0A FINAL READY TO ADVERTISE SET JJ JJ RJM 16.06.10

    (NOTE 5)

    1 ISSUED FORCONSTRUCTION JJ JJ RJM 27.10.10

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    5/37

    6500080-00

    NURSE CALL ANDCOMMUNICATION SCHEMATIC

    ELECTYAP MEMORIAL HOSPITALREFURBISHMENTN.T.S

    B .M E GG IT T 2 4. 09 .0 9

    J . JO HN SO N 2 8. 09 .0 9

    H . J OS HI 2 3.0 4. 10

    E . S CH MI DT 2 3. 04 .1 0

    NCAP

    4CORE OM350/125m MULTI-MODE FIBRE+

    4X 4PAIR CAT6 UTPBACKBONETO EACHCOMMS PATCH PANEL

    BD9

    FIBRE

    DATA

    VOICE

    FIELDRJ45CA T6 OUTLETS

    WIRELESS ACCESS

    POINTS

    BUILDING 9(SERVES BUILDINGS

    7,8&9)

    BD11

    FIBRE

    DATA

    VOICE

    FIELDRJ45CA T6 OUTLETS

    WIRELESS ACCESS

    POINTS

    BUILDING 11

    (SERVES BUILDING11)

    BD2

    FIBRE

    DATA

    VOICE

    FIELDRJ45CA T6 OUTLETS

    WIRELESS ACCESS

    POINTS

    BUILDING 2(SERVES BUILDINGS

    1,2, 3&4)

    BD5

    FIBRE

    DATA

    VOICE

    FIELD

    CAT 6 UTP

    HORIZONTAL CABLING

    RJ45CA T6 OUTLETS

    WIRELESS ACCESS

    POINTS

    BUILDING 5

    (SERVES BUILDINGS5,6& 10)

    BUILDING 9BUILDING 8

    BUILDING 7

    BUILDING 3

    BUILDING 2

    NEW NURSE CALL SYSTEM SCHEMATIC

    (LOCATION AT NURSES STATION)

    BUILDING 8

    CAT 6 UTP CAT 6 UTP

    CAT 6UTPCAT6UTP

    25PAIR CAT3 VOICE TIE TO EACH

    COMMS PATCHPANEL

    25PAIR CAT3VOICE TIE TO EACH

    COMMS PATCHPANEL

    UPGRADED IT PATCHPANEL

    RELOCATED FROM BUILDING 5TO

    NEW BUILDING ANNEX

    EXISITNGCOMMS FRAME-BUILDING5

    EXISITNGCOMMS FRAME-

    BUILDING3LOWER LEVEL

    EXISITNG

    TELEPHONE

    SWITCHBOARD

    EXISITNG

    PABX

    EXISITNG COPPER

    INCOMERSX

    EXISITNG COPPER REPLACED TOSUIT NEW

    PATCH PANEL LOCATION (50PAIR CAT 3)

    EXISITNG COPPER

    COMMUNICATION SCHEMATIC

    CAT6UTP

    HORIZONTAL CABLING

    CAT 6 UTP

    HORIZONTAL CABLING

    CAT6UTP

    HORIZONTAL CABLING

    EXISITNG

    NEW

    CD10A

    REMOVERE DUNDANT WIRING, TEST

    SYSTEM AND UPDATE RECORD CARDS.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FORCONSTRUCTION SO JJ RJM 27.10.10

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    6/37

    NHD

    NHD

    N1

    EHD

    F

    F

    NOTE2

    NOTE2

    EXISTING

    COMMUNICATION

    SWITCH (NOTE4)

    F

    WF1

    WF3

    WF1

    WF1

    WF1

    NEM3

    N

    EM3

    WF2

    NOTE3

    WF2

    N

    EM3

    NOTE3

    SF2

    N

    EM3

    NOTE3

    WF5

    WF1

    LS4/3

    N1/1

    N4/9

    NOTE6

    9ONLY FITTINGS

    N1/3

    NOTE7

    6ONLY FITTINGS

    8ONLY FITTINGS

    NOTE8

    N1/5

    N1/1

    LS4/3

    N1/1

    N1/1

    N4/5

    N1/1

    N1/3

    N4/9

    N1/5

    NEX1

    NOTE 12

    REMOVE REMNANTS

    OF OLD EXIT LIGHT

    2 4 6

    G

    F

    D

    B

    MALEWC

    FEMALE

    WC

    OFFICE

    WAITING

    PUBLICHEALTH

    EXAMINATION

    ROOM

    EXAMINATION

    ROOM

    DEMONSTRATION

    PHARMACY

    STORE

    6500080-01-E-0

    BUILDING 01LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    .-

    BUILDING 01 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    NOTES

    1. REFER DRAWING NO. 6500080-00-E-001FOR GENERAL

    NOTES AND LEGEND

    2. PROVIDE NEWHAND DRYERSAS SHOWN

    3. REPLACE EXISTING LIGHT SWITCH AND EXHAUST FAN

    CONTROLLER WITH A COMBINED ELECTRONIC SWITCH

    WITH RUN-ONTIMER.EXHAUSTFANS TO BE REPLACED.

    4. REMOVEEXISITING COMMS SWITCHAND PRESENT TOT

    HOSPITAL

    5. ALLNEW LUMINAIRES TYPESF1UNLESS NOTEDOTHERWISE

    6. REPLACE 12LUMINAIRES IN PHARMACY WITH9NEW

    LUMINAIRES

    7. REPLACE 9LUMINAIRESIN PUBLIC HEALTHWITH 6NEWLUMINAIRES

    8. REPLACE 11 LUMINAIRES INDEMONSTRATIONWITH 8NE

    LUMINAIRES9. EMERGENCYCIRCUITCB4/1SUPPLIESSELECTED

    LUMINAIRES IN BUILDING1

    10. MODIFY EXISTINGCIRCUITSUPPLYINGTOILET EXHAUSTFANSTO SUITNEW ROOF MOUNTEDEXHAUSTFAN

    11. PROVIDE 4OFF TYPE SF14LUMINAIRES WITHINROOF V

    TOILLUMINATE NEWACCESS WALKWAYCOMPLETEWIT

    NEWLOCALSWITCH

    12. REPLACE ALLEXISITNG SURFACE MOUNTED WEATHER

    RESISTANTLUMINAIRESWITH NEW TYPE SF12FITTINGS

    OFF)

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    7/37

    2

    2

    2

    2

    2

    22

    2

    2

    2

    2 2

    CB4/2

    CB4/4

    N1/7

    N1/4

    N1/6

    NOTE2

    N1/9,11

    CB4/6

    N1/2

    N1

    N1/8

    N1/10

    2

    ab ab

    ab

    ab

    ab

    ab ab ab

    NEW FIREALARM

    PANEL N1/14

    M

    M

    2 4 6

    G

    F

    D

    B

    MALE WC

    FEMALE

    WC

    OFFICE

    WAITING

    PUBLIC

    HEALTH

    EXAMINATION

    ROOM

    EXAMINATIONROOM

    DEMONSTRATION

    PHARMACY

    STORE

    6500080-01-E-0

    BUILDING 01RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    .-

    BUILDING 01 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    NOTES

    1. REPLACE ALLEXISTING RECEPTACLES.

    2. REPLACE EXISTING SURFACEMOUNTEDRACEWAY AND

    ASSOCIATEDRECEPTACLES.CONNECT NEWRECEPTACLES

    ALTERNATE CIRCUITSAS EXISTING.

    3. LOCATE NEW COMMS OUTLETSON WALLADJACENT POWER

    RECEPTACLES.

    4. ALL COMMS OUTLETS TOBE SERVEDFROM BUILDING2,BD2

    5 . N1/8&1 /10ARENEW.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    8/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    9/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    10/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    11/37

    12 13 14 15

    Ga

    G

    Fa

    F

    E

    D

    C

    H

    2

    2

    2

    2

    2

    2

    N3A/6

    NOTE 4

    N3A/4

    CB3/6

    EXISTING ISOLATORPOWER

    SYSTEM PANEL IS3LTOBE

    REPLACED.

    EXISTING EMERGENCYBATTERY

    UNIT TOBER EPLACED

    CB3EQ3AN3A

    IS3D/3

    IS3D/5

    IS3SNOTE5

    IS3S/5

    IS3S/3

    EXISTINGEMERGENCY BATTERY

    UNIT TO BE REPLACED

    NOTE 3

    IS3DNOTE5

    ab ab ab

    ab

    ab

    ab

    ab

    ab ab

    EXISTING X-RAY RECEPTACAL

    EXISTING X-RAY RECEPTACAL

    IS3L

    NOTE 5

    .- BUILDING 03 UPPER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-03-E-03

    BUILDING 03UPPER FLOOR

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES.

    2. ALLCOMMS OUTLETSTO BESERVEDFROMBUILD

    (BD2)LOCATE NEW COMMS OUTLETSADJACENTPO

    RECEPTACLES.

    3. EXISTING ELECTRICAL SUPPLYARRANGEMENTST

    STERALISERS TOBE RETAINED (N3A/13,EQ3/10).

    4. EXISTING ELECTRICAL SUPPLYARRANGEMENTST

    STILLTOBE RETAINED (EQ3/11).

    5. EXISTING ISOLATEDSYSTEMPANELTO BE REPLAC

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    12/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    13/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    14/37

    7 8 1110

    Fa

    Ga

    J

    H

    G

    F

    HWC

    WAITING

    AREA

    BILLING

    RECEPTION

    OFFICE

    BILLING/ BUSINESS&

    STAFF OFFICE

    EXAMINATION

    ROOM

    CORRIDOR

    STORE

    STORE

    JANITOR

    STORE

    EXAMINATION

    ROOM

    EXAMINATION

    ROOM

    MEDICAL

    SERVICES

    EXAMINATIONROOM

    EXAMINATION

    ROOM

    EXAMINATION

    ROOM

    ENTRANCE

    MALL

    RECEPTION EXISTING

    COMMUNICATION

    SWITCH(NOTE4)

    CB4

    EQ4

    LS4

    N4

    NOTE 2 NOTE 2

    NOTE 2 NOTE 2

    NOTE 2 NOTE 2

    NOTE 2

    NOTE 2

    RL

    R R

    WF1XRV2

    (NOTE3)

    EM3

    N

    NOTE2

    NOTE2

    NOTE2

    NOTE2

    RL

    WF1

    WF1

    XRV2

    (NOTE3)

    WF1

    EM3

    N

    SF2

    WF1 WF1 WF1 WF1

    EX1

    N

    NEW PANEL BOARD

    N4A

    NOTE6 N4/6

    SF12

    SF12 SF12

    SF12

    SF1SF1SF1SF1

    SF1SF1SF1SF1

    N4A/1

    N4/5 LS4/3N4/5 NOTE 9 LS4/3

    N4/2

    N4/2

    N4/4

    N4/4N4/2 LS4/3

    .-

    BUILDING 04 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-04-E-04

    BUILDING 04LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER DRAWING NO. 6500080-00-E-001FORGENERA

    NOTESANDLEGEND

    2. EXISTINGWEATHER RESISTANTFLUORESCENTFITT

    TOBE REPLACED

    3. EXISTINGX-RAYVIEWERSTO BE RETAINED

    4. REMOVE EXISITING COMMS SWITCHANDPRESENTT

    THE HOSPITAL

    5. ALLNEW LUMINAIRES TYPESF1UNO

    6. REMOVE REDUNDANT WIRINGFROMEXTERNALSEA

    AND MAKESAFE.

    7. EMERGENCY CIRCUITSCB4/1AND CB4/3 SUPPLY

    SELECTED LUMINAIRES IN BUILDING4.

    8. PROVIDE 4OFF TYPE SF14LUMINAIRES WITHINROOVOID TO LUMINAIRE NEWACCESS WALKWAY COMPL

    WITHNEW WALLSWITCH

    9. PROVIDENEWSUPPLYTO NEW EXHAUST FAN FROMPANELN4.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUEDFOR CONSTRUCTION JJ HJ RJM 27.10.10

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    15/37

    N4/19

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    NOTE 3

    NOTE3

    N4/16

    CB4/12

    N4/14 N4/18

    2

    N4A/2

    2

    NOTE 3

    HWU CB4

    EQ4

    LS4

    N4

    NOTE5

    N4A

    NEW FIRE ALARM

    PANELN4/31

    M

    7 8 1110

    Fa

    Ga

    J

    H

    G

    F

    HWC

    WAITING

    AREA

    BILLING

    RECEPTION

    OFFICE

    BILLING/ BUSINESS&

    STAFF OFFICE

    EXAMINATION

    ROOM

    CORRIDOR

    STORE

    STORE

    JANITOR

    STORE

    EXAMINATIONROOM

    EXAMINATION

    ROOM

    MEDICAL

    SERVICES

    EXAMINATIONROOM

    EXAMINATION

    ROOM

    EXAMINATION

    ROOM

    ENTRANCE

    MALL

    RECEPTION

    .-

    BUILDING 04 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-04-E-04

    BUILDING 04RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES.

    2. PROVIDE NEWCOMMS OUTLETS ADJACENTPOWER

    RECEPTACLES.

    3. PROVIDE NEWRECEPTACLES ONNEWWALL CONNECTED

    NEW CIRCUIT N4A/3

    4. ALLCOMMS OUTLETS TOBE SERVEDFROM BUILDING 2(CP

    5. ALLOW TORECONNECTTO NEW REPLACEMENT HOTWATE

    UNIT (HWU)45kW125A

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    16/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    17/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    18/37

    FHR

    HWC

    DINING

    ROOM

    DRY

    STORAGE

    WC

    KITCHEN

    STORE

    LAUNDRY

    REFUSE

    JANITOR

    EQ6 N6A

    NOTE 2

    N

    N

    WF4

    WF4

    WF4

    RD1 RD1 RD1 RD1 RD1 RD1 RD1 RD1

    N6

    WF5

    EX1

    N

    SF4

    SF10 SF10

    SF10

    SF10

    SF10

    SF10

    SF10 SF10

    SF10 SF10SF10

    SF10

    SF10

    SF10

    WF7

    SF9 SF9

    SF9SF9

    SF9 SF9

    SF9SF9

    WF1

    LS8/3

    EX1

    N

    EX1

    N

    FEX1

    N

    N6/3

    N6A/1

    N6/1N6/3

    EXISTING CEILINGFANS

    TO BEREPLACED

    N3/3

    N6/3

    .-

    BUILDING 06 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-06-E-06

    BUILDING 06LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. REFURBISH EXISTING LIGHTS WITHIN KITCHEN EXHAU

    HOOD (4 OFF INCANDESCENT LAMPS)

    3. EXISTINGREDUNDANTCABLINGTO OLD HOT WATER TOBE MADE OFF

    4. ALLNEW LUMINAIRES TYPESF1UNO

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    19/37

    FHR

    HWC

    DINING

    ROOM

    DRY

    STORAGE

    WC

    KITCHEN

    STORE

    LAUNDRY

    REFUSE

    JANITOR

    N6A

    N6

    WDWD

    DRYER

    WASHER

    NOTE2

    HOT WATER

    CYLINDER

    WASHER

    N6A/6

    NOTE3

    EQ6

    N6/5

    N6/2

    EXISTINGA/C UNIT

    TOBE RETAINED.

    ab

    N6/22EWH4 9kW 2PHASE

    NOTE 4 N6/12

    ab ab

    N6/8

    .-

    BUILDING 06 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-06-E-06

    BUILDING 06RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES.

    2. RETAIN EXISTINGSUPPLYARRANGEMENT TO HOT WATER

    CYLINDERWASHING MACHINES ANDDRYERSINLAUNDRY.

    REMOVE REDUNDANT 3 PHASE SUPPLY TO OLD HOT WATER

    CYLINDERA ND MAKEGOOD.

    3. RETAIN EXISTINGSUPPLYARRANGEMENT TO KITCHEN HOO

    AND COOKINGEQUIPMENT.ALLOW TO RECONNECT TOREPLACEMENT WASTE DISPOSERS (WD).

    4. RECONNECTEXISTING HOT WATER UNIT (EWH4TOPANEL

    BOARD N6(CURRENTLY SERVEDFR OM MAIN SWITCHBOARDCONTRACTOR TO CHECK EXISTING LOADO NBOARD N6AND

    CONFIRM.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    20/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    21/37

    G G

    F

    G G

    B

    NOTE4

    B

    N8/10 N8/11

    NOTE4

    N8/12 N8/13

    N8/10,12

    N8/11,13

    CB8/3,13

    NOTE3N8/15

    (NOTE4)CB8/2

    N8/15N8/17

    N8/16

    N8/16

    (NOTE4)

    N8/15,17

    N8/16,18

    NOTE5

    ab

    NOTE 6

    19

    BB

    CC

    DD

    EE

    GG

    JJ

    KK

    LL

    MM

    20 21 22 23 24 25

    PEDIATRICS

    WARD

    NEW

    LABOUR

    ROOM

    PEDIATRICS

    ISOLATION

    CORRIDOR

    NEWDELIVERY

    ROOM

    PEDIATRICS

    ISOLATION

    PEDIATRICS

    WARD

    MATERNITYWARD

    CURTAIN

    WC

    SHOWER

    WC

    SHOWER

    CORRIDOR

    UP

    BUILDING6

    CORRIDOR

    WCWC

    .-

    BUILDING 07 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-07-E-07

    BUILDING 07RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES.

    2. RECEPTACLESFEDFROMSWITCHBOARDS IN BUILD

    3. REMOVE EXISTINGRECEPTACLES AND ASSOCIATED

    FROMWALL(TO BEDEMOLISHED).

    4. RECEPTACLESINWET AREAS TOINCORPORATEINTE

    GROUND FAULT INTERRUPTER.

    5. CONTRACTOR TO CONFIRM CIRCUIT NUMBER.

    6. PROVIDE POWER SUPPLYTO NEWMAGNETICHOLD O

    DEVICES TO NEWFIRE RATEDDOORS.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    22/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    23/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    24/37

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    25/37

    4-BED MEDICAL/

    SURGICAL WARD

    4-BED MEDICAL/

    SURGICAL WARD

    NURSESL OUNGE

    2-BED MEDICAL/

    SURGICAL WARD

    2-BED MEDICAL/

    SURGICAL WARD

    2-BED MEDICAL/

    SURGICAL WARD

    CHIEF NURSE

    OFFICE

    TRAINING ROOM

    CORRIDORCORRIDOR

    F

    B

    B

    N8/22,24

    N8/33,2

    A/C

    2

    2

    2N8/25,27

    A/C

    F CB8/3,13

    N8/28,30

    A/C

    2

    2

    N8/29,31

    2

    2

    N8/29N8/28

    NEW PATCHPANEL

    NOTE3NOTE4

    NOTE4

    2

    HWU

    NEW 2.4kW HOT WATERUNIT

    ANDCIRCULATINGPUMP

    (1kW). N8/47

    BUILDING 09 FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-09-E-09

    BUILDING 09ELECTRICAL LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES.

    2. RECEPTACLESFEDFROMSWITCHBOARDS IN BUILD

    3. NEW PATCH PANELTO BE HINGED12U WALLMOUNT

    PANEL WITHLOCKABLE GLASSDOOR

    4. PROVIDE NEWPOWER SUPPLYTO NEW MAGNETICHOPENDEVICESFITTED TONEWFIRE RATED DOORS.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    26/37

    10987

    R

    Q

    P

    O

    FHR

    OPERATORY OPERATORY OPERATORYPRIVATE

    OFFICE

    CORRIDOR

    LAB

    DARKROOM

    (original)

    STERILE

    ROOMENTRY SECRETARY/

    RECEPTIONIST

    MULTI

    PURPOSE

    ROOM

    DARK ROOM

    BUILDING5

    CORRIDOR

    PLANT ROOM

    DB

    A/C

    R

    N N

    N N

    R R

    SF2

    SF2

    EX1

    SF6

    SF7

    DELETEEXIT SIGN

    EX1

    N10/3LS4/6N10/3

    N10/1

    N10/1

    N10/1

    NOTE 4

    NOTE7 EX1

    N

    NOTE5EXISITNG UNIT TOBE

    REPLACED

    NOTE8

    NOTE9WF6

    .-

    BUILDING 10 UPPER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-10-E-10

    BUILDING 10UPPER LEVEL

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. ALLNEW LUMINAIRES TYPESF1UNO

    3. REPLACEEXISTINGLIGHTSWITCH AND EXHAUST FAN

    CONTROLLER WITHA COMBINEDELECTRONIC SWITCHWIT

    RUN-ONTIMER

    4. REMOVE REDUNDANT WIRINGFROM EXTERNALSEATING A

    MAKESAFE

    5. CONTRACTORTO VERIFYCIRCUIT DETAILS FOREXISTING

    FINANCE OFFICE

    6. EMERGENCY CIRCUIT LS4/6SUPPLIES SELECTED LUMINAIRIN BUILDING 10

    7. PROVIDE 4OFF TYPE SF14LUMINAIRES WITHINROOF VOID

    TO ILLUMINATENEWACCESS WALKWAYCOMPLETEWITHNEWLOCALSWITCH

    8. LIGHT SWITCH TO ALSOCONTROLNEWFRESH AIRFAN

    (REFERDWG H-101)

    9. SAFE LIGHT CONTROLLED BY SWITCH ADJACENT TODOOR

    WHITE LIGHT CONTROLLEDBY P ULLCORDSWITCH.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    27/37

    10987

    R

    Q

    P

    O

    FHR

    OPERATORY OPERATORY OPERATORYPRIVATE

    OFFICE

    CORRIDOR

    LAB

    DARKROOM

    (original)

    STERILE

    ROOMENTRY SECRETARY/

    RECEPTIONIST

    MULTI

    PURPOSEROOM

    DARKROOM

    BUILDING5

    CORRIDOR

    PLANT ROOM

    2 2

    222

    DB

    N10/12

    N10/11

    EXISTINGARRANGEMENTSIN

    THESE3 ROOMSTO BERETAINED

    REPLACEEXISTING SURFACE

    MOUNTEDRACEWAY (NOTE3)

    EXISTINGPANEL BOARDAND

    ASSOCIATEDCIRCUITSTO BERETAINED

    N10/6,8,10

    N10/20 (NEW CIRCUIT)

    PROVIDENEW RECEPTACLESAND

    ASSOCIATEDWIRING TOFINANCE

    2

    N10/7

    2

    2

    N10/5

    2

    N10/26

    (NEW CIRCUIT)

    ab

    abM

    .-

    BUILDING 10 UPPER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-10-E-10

    BUILDING 10 UPPERRECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTINGRECEPTACLES UNO.

    2. LOCATENEW COMMS OUTLETS ADJACENTPOWER

    RECEPTACLES.

    3. NEWRACEWAYTOINCORPORATERECEPTACLES AT18"

    CENTRES.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    28/37

    10987

    R

    Q

    P

    O

    FHR

    VOC. REHAB.

    ASSIST. AND

    SECRETARY

    VOC. REHAB.

    ADMINISTRATOR

    CORRIDOR

    STORAGE/

    PLANT ROOM

    ENVIRONMENTAL

    HEALTH

    ENVIRONMENTAL

    LABORATORY

    WC N10

    NHD

    EQ10F

    AHUK

    EX1

    NOTE3

    SF5

    SF8

    SF8

    N10/2 N10/4

    N10/4LS4/6

    SF5

    SF11

    LOCATED UNDER

    DECKABOVE.

    .-

    BUILDING 10 LOWER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-10-E-10

    BUILDING 10LOWER LEVEL

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. ALLNEW LUMINAIRES TYPESF1UNO

    3. REPLACE EXISTING LIGHT SWITCH AND EXHAUST FAN

    CONTROLLER WITH A COMBINED ELECTRONIC SWITCHW

    RUN-ON TIMER

    4. EMERGENCYCIRCUIT LS4/6SUPPLIESSELECTED

    LUMINAIRES IN BUILDING10

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    29/37

    10987

    R

    Q

    P

    O

    FHR

    VOC. REHAB.

    ASSIST. AND

    SECRETARY

    VOC. REHAB.

    ADMINISTRATOR

    CORRIDOR

    STORAGE/

    PLANT ROOM

    ENVIRONMENTAL

    HEALTH

    ENVIRONMENTAL

    LABORATORY

    WC

    F F

    EQ10N10

    2

    2

    2

    2

    2

    2

    2

    N10/15

    N10/17

    N10/9

    AHU'K'

    N10/18

    .-

    BUILDING 10 LOWER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-10-E-10

    BUILDING 10LOWER LEVEL

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REPLACE ALLEXISTING RECEPTACLESUNO.

    2. LOCATE NEW COMMS OUTLETSADJACENTPOWER

    RECEPTACLES.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    30/37

    4 5321

    C

    B

    A

    MAINTENANCE OFFICE MAINTENANCE SHOP

    STORAGE

    MENTAL HEALTHOFFICEMEDICAL STORAGE

    MENTAL HEALTHRECEPTION/OFFICE

    STAIR

    EXISTINGROOF BELOW

    EXISTING

    CANOPY BELOW

    FALL

    EXISTING COMMUNICATION

    SWITCH(NOTE 3)

    N11A

    F

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    A/C

    SF1 SF1

    SF1 SF1

    SF9

    SF9 SF9

    SF9

    SF9

    SF9

    SF9

    SF9

    SF9 SF9

    SF9SF9

    SF9 SF9

    SF8 SF8

    SF8

    SF2

    WF1 WF1

    SF1 SF1

    SF1 SF1

    SF1 SF1

    SF1 SF1

    EXISTING DAYLIGHT

    SENSOR ON ROOF

    WF1

    N

    N11A/14

    EX1

    N

    EX1

    N

    N11A/14N11A/13

    N11A/12

    REMOVE EXISTING

    FLOODLIGHTSANDPIR

    PE NOTE3

    BUILDING 11 UPPER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-11-E-1

    BUILDING 11UPPER FLOOR

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. REPLACE ALLEXISTING INCANDESCENTFITTINGSI

    STOREWITH NEWFLUORESCENTLUMINAIRES

    3. PROVIDE NEW DAYLIGHT SENSORONROOF INPLA

    OF EXISTING.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    31/37

    2

    2

    N11A

    2

    2

    S

    ab

    S

    22

    2

    2

    2

    2

    2

    BD11

    NOTE 3

    NOTE 4

    NOTE 4

    NEW PATCH

    PANELNOTE5

    NOTE 4

    NOTE 4

    N11A/6

    N11A/5

    NOTE4

    EXISTINGAERIAL COMMS

    CABLING FROM BUILDING

    8TO BERE-USEDN11A/1N11A/2 N11A/3 N11A/4

    ab

    ab

    4 5321

    C

    B

    A

    MAINTENANCE OFFICE MAINTENANCE SHOP

    STORAGE

    MENTAL HEALTHOFFICEMEDICAL STORAGE

    MENTAL HEALTH

    RECEPTION/OFFICE

    STAIR

    EXISTING

    ROOF BELOW

    EXISTING

    CANOPY BELOW

    FALL

    .-

    BUILDING 11 PROPOSED FIRST FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-11-E-1

    BUILDING 11UPPER FLOOR

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REMOVEALL EXISTING RECEPTACLES ANDOUTLETS AND

    ASSOCIATED TRUNKING ANDWIRINGFROMBUILDING 11AND

    PROVIDENEWSERVICESAS NOTED.

    2. WIRINGTO BEINSTALLED WITHIN HOLLOWPARTITIONS OR

    SURFACE MOUNTED ON BLOCKWALLS.

    3. ALLRECEPTACLES IN MAINTENANCE SHOPTO BEMETALCLAD

    INDUSTRIALTYPE.

    4. MODIFYEXISTINGCIRCUITSFEEDING HVAC SPLIT UNITSTOSUIT

    NEW REPLACEMENT UNITS AND NEW LOCATIONS (N11A/7-11).

    5. NEW PATCH PANEL TOBE HINGED 18UWALLMOUNTED PANEL

    WITH LOCKABLE GLASS DOOR.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    32/37

    1 2 3 4 5

    C

    B

    A

    OFFICE

    MAINTENANCE STORAGE

    HYPERBARIC CHAMBER

    COMMUNITYHEALTH

    CENTRE

    OFFICE

    CLASSROOM

    WCSTORE

    COMPRESSOR

    FALL

    EXECTUIVE DIRECTOR

    CONFERENCE

    STAFF LOUNGE

    ADMIN.

    UP

    N11B

    A/CA/C

    A/C

    A/C

    SF1

    SF1 SF1

    SF1

    SF9 SF9

    SF9

    SF9

    SF8

    SF8

    WF1

    N

    WF1

    N

    SF1

    N11B/3

    N11B/3N11B/1EXISTINGELECTRICALARRANGEMENT TOBERETAINEDAS-IS

    BUILDING 11 LOWER FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-11-E-1

    BUILDING 11LOWER FLOOR

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. REPLACE ALLEXISTINGINCANDESCENTFITTINGS

    STORE WITH NEWFLUORESCENT LUMINAIRES

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    33/37

    2

    N11B

    2

    NOTE3

    N11B/5N11B/2

    2

    N11B/4

    NOTE3

    NOTE 4

    NOTE3

    PROVIDENEW 3 PHASE

    SUPPLYTO EXISTING

    HYPERBARICCHAMBER

    COMPRESSOR N11B/6

    EXISTINGELECTRICAL

    ARRANGEMENT TO BE

    RETAINEDAS-IS

    1 2 3 4 5

    C

    B

    A

    OFFICE

    MAINTENANCE STORAGE

    HYPERBARIC CHAMBER

    COMMUNITYHEALTH

    CENTRE

    OFFICE

    CLASSROOM

    WC STORE

    COMPRESSOR

    FALL

    EXECTUIVE DIRECTOR

    CONFERENCE

    STAFF LOUNGE

    ADMIN.

    UP

    .-

    BUILDING 11 PROPOSED GROUND FLOOR PLANYAP STATE HOSPITAL 3/32" = 1'

    6500080-11-E-1

    BUILDING 11LOWER FLOOR

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REMOVE ALLEXISTING RECEPTACLES AND OUTLETSAND

    ASSOCIATED TRUNKING ANDWIRINGFROMBUILDING11AND

    PROVIDE NEW SERVICESAS NOTED.

    2. WIRING TOBE INSTALLED TO BE HOLLOW PARTITIONS OR

    SURFACE MOUNTED ONBLOCK WALLS.

    3. MODIFYEXISTINGCIRCUITS FEEDINGHVAC SPLIT UNITSTO S

    NEW REPLACEMENT UNITS AND NEW LOCATIONS (N11B/8-12).

    4. PROVIDE NEW 3 PHASE SUPPLYTO NEW LIFT N11B/7.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    34/37

    10 10A 11 12A 13A

    R

    P

    Q

    O

    UP

    STAFF

    OFFICE

    I.T.

    OFFICE

    DEPUTY

    DIRECTOR

    HOSPITAL

    ADMINISTRATOR

    DIRECTORSOFFICE

    CONFERENCE

    ROOM

    W04 W01

    W01

    W01

    STAFF

    LOUNGE

    WC

    WC

    NHD

    NHD

    RD2

    EX1

    SF12 SF12

    RD2

    NEW IT SERVERRACK

    N10B

    N10B/3

    N10B/3

    N10B/3N10B/1N10B/2N10B/1

    N10B/4

    N10B/5

    N10B/1

    AHU-D

    N10A/11N10A/10

    EXHAUST

    FAN

    N10B/12

    .-

    BUILDING 10A UPPER FLOORYAP STATE HOSPITAL 3/32" = 1'

    6500080-15-E-15

    BUILDING 10 ANNEXUPPER LEVEL

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. ALL LUMINAIRES TYPE RF1UNO

    3. ALLSERVICES NEW

    4. PROVIDE 3OFF TYPE SF14LUMINAIRES WITHIN ROOF

    TOILLUMIN ATE ACCESS WALKWAY TO AHU,COMPLET

    WITHLOCALSWITCH.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    35/37

    10 10A 11 12A 13A

    R

    P

    Q

    O

    UP

    STAFF

    OFFICE

    I.T.

    OFFICE

    DEPUTY

    DIRECTOR

    HOSPITAL

    ADMINISTRATOR

    DIRECTORSOFFICE

    CONFERENCE

    ROOM

    STAFF

    LOUNGE

    WC

    WC

    2 22

    2N10B

    2

    ab

    ab

    ab

    G

    G 2 2

    2

    2

    2 2 2 2

    2

    2

    2 2

    2

    2

    N10B/7

    N10B/6

    N10B/11 N10B/10

    N10B/9

    N10B/8

    .-

    BUILDING 10 ANNEXYAP STATE HOSPITAL 3/32" = 1'

    6500080-15-E-15

    BUILDING 10 ANNEXUPPER LEVEL

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. MOUNTRECEPTACLES IN TOILETS AT 48"ABOVEFLOOR.

    2. MOUNTRECEPTACLES IN STAFFLOUNGEABOVE JOINERY.

    3. ALLOTHER OUTLETS TO BE LOCATED 12"ABOVE FLOOR.

    0 FINAL READY TO ADVERTISE SET SO J J R JM 2 3. 04 .1 0

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

    NOTES

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    36/37

    10 10A 11 12A 13A

    R

    P

    Q

    O

    UP

    MALE WC

    FEMALE

    WC

    ELECTRICAL/

    JANITOR

    EQUIPMENT

    CUP'D

    OFFICE

    TRAINING

    ROOM-1

    TRAINING

    ROOM-2N10A

    NHDNHD

    RD2

    RD2

    RD2 RD2

    SF2

    EX1

    SF12

    EX1

    SF2

    EM3EM3 EX1EX1

    N10A/2N10A/3N10A/4 N10A/1

    N10A/1

    .-

    BUILDING 10A LOWER FLOORYAP STATE HOSPITAL 3/32" = 1'

    6500080-15-E-15

    BUILDING 10 ANNEXLOWER LEVEL

    LIGHTING LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. REFER TO DRAWING NO.6500080-00-E-001

    2. ALLLUMINAIRESTYPE RF1UNO

    3. ALLSERVICES NEW

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0

  • 7/29/2019 YAP HOSPITAL ELEC DWGS - IFC.pdf

    37/37

    N10A

    2

    GG

    2 2 2

    2 2

    2

    N10A/6 N10A/7

    N10A/8

    10 10A 11 12A 13A

    R

    P

    Q

    O

    UP

    MALEWC

    FEMALEWC

    ELECTRICAL/

    JANITOR

    EQUIPMENT

    CUP'D

    OFFICE

    TRAINING

    ROOM-1

    TRAINING

    ROOM-2

    13A

    .-

    BUILDING 10 ANNEXYAP STATE HOSPITAL 3/32" = 1'

    6500080-15-E-15

    BUILDING 10 ANNEXLOWER LEVEL

    RECEPTACLE LAYOUT

    ELECTRICAYAP MEMORIAL HOSPITALREFURBISHMENT3/32"=1'(1:128)

    B . ME GG IT T 2 2 .0 9. 09

    J . JO HN SO N 2 2 .0 9. 09

    H . J OS HI 2 3.0 4.1 0

    E . S CH MI DT 2 3 .0 4. 10

    NOTES

    1. MOUNT RECEPTACLESIN TOILETS AT 48"ABOVE FLOOR.

    2. ALLOTHER OUTLETS TOBE LOCATED AT 12"ABOVE FLOOR.

    0 FINAL READY TO ADVERTISE SET SO JJ RJM 23.04.10

    1 ISSUED FOR CONSTRUCTION SO J J R JM 2 7. 10 .1 0