Groundwater Storage1. Upper Kittitas Shallow Aquifer Recharge2. Yakima City Aquifer Storage and Recovery 3. Toppinish Fan Aquifer Recharge
Structural and Operational Changes1. Cle Elum Pool Raise2. Keechelus to Kachess Conveyance
Surface Water Storage1. Kachess Drought Relief Pumping Plant
Water Bank/Exchange ProgramsBasin Wide
Habitat Enhancement (2013-2017)1. Manastash Creek Conservation and Tributary
Enhancement Project2. Toppenish Creek Habitat Restoration3. Bateman Island Causeway Modification
Conceptual Design/Outreach/Permitting4. Bull Trout Habitat Improvements5. Gold Creek Habitat Assessment and Conceptual
Design6. Reed Diversion design Barrier Removal 7. Little Rattlesnake Road Decommissioning8. Cle Elum River Side Channel Restoration Project,
Phase 29. Gap-to-Gap Property Acquisitions10. Upper Wapato Riparian Restoration11. Ellensburg Water Company / Coleman Creek
Restoration12. Reed Diversion Barrier Removal 13. Trout Meadows Acquisition / Enhancement14. Manastash/ Little Naches Land Acquisition15. Gap-to-Gap Outfall Relocation, Land Acquisition
and Levee Removal design and Restoration16. Cowiche Easement/Design17. South Fork Tieton Bull Trout Passage Feasibility
and Design18. Yakima Rivermile 89.5 Levee Breach19. Island Road Floodplain Reconnection - Toppenish
Creek20. Toppenish Creek - 3-way Levee Setback21. Teanaway/Indian Creek Restoration22. Teanaway Habitat Restoration23. Upper Yakima Floodplain Acquisition and Design
Ringer Loop Road24. Teanaway Acquisition25. KRD Tributary Supplementation
1
2
5
8
1411
126
7
13
15 9
10
2
3
5 47
6
3 2
16
1
2
12 1
8
9
8
9
10 11 13
14
1
1617
18
19 20
2122
23
Locations are Approximate
15
24
12
3
Agricultural Conservation (2013-2017)1. KRD 13.6, 13.8 Lateral Piping Project2. Wapato Irrigation Project (WIP) Piping Lateral
4-414C3. WIP Piping Satus East Lateral E734. Manastash Creek, Anderson Diversion Irrigation
Water Acquisition5. Manastash Creek Sprinkler Conversions6. Yakima-Tieton ID Diversion Relocation Feasability
Study7. Manastash – Consolidated Pipeline & Manastash
Water Ditch Association (MWDA) Pipeline Construction
8. KID Reregulation Reservoir Design9. KRD North Branch Canal Lining10. WIP Unit 2 Upper Dam Rebuild and Lower Dam
Removal11. WIP Piping of Unit 2 L672 and Headwaters Rebuild12. WIP Lining of Unit 2 (167+20 to 173+80)13. WIP Water Conservation Plan14. City of Yakima Xeriscape Demonstration Project15. Reed Pipeline Design 16. Kennewick Irrigation District (KID) Division IV Lining
Fish Passage1. Cle Elum Dam2. Tieton (Rimrock) Dam
10.19.17Pub #16-12-009
1
Yakima Basin Integrated PlanInitial Development Projects
25