Upload
emmeline-butler
View
216
Download
0
Embed Size (px)
Citation preview
XXVI workshop on resent developments inHigh Energy Physics and Cosmology
Ancient Olympia ,16-19 April 2008
Tsarouchas CharilaosNTUA
Detector Control SystemMDT Electronics
MDT DCS ELTX PROJECT
• Values to be controlled – monitored
• Project architecture
• FSM hierarchy and FSM creation
• Alarm screen
• User Interface operation
• Overview
Presentation of :
Charilaos Tsarouchas , CERN ATM group , NTUAthens
Values to be controlled – monitored
mezz card
CSM card
Monitor of:• Mezz Temperature value• Mezz V analog value• Mezz V digital value• CSM all provided values (e.g. CSM temperature, 2.5 V ref. value)
What this system has to offer as a Detector Control System1. hardware to be controlled and monitored2. interaction with other systems (LV)
PS1PS2
Atonr_conf
Atonr
Mezz number Mezz mappingMezz maskingElectronic view
Sens masking
Overview of ELTX DCS Architecture
The main asset of the project is the gathering of information spread in several DCS pcs and DBs
mdm1mdm2mdm8
ELTX
30”
3*14138 sensors
700 LV channels
pvssoracle
History of all important values
FSM hierarchy and Architecture
The FSM is the main tool for the implementation of the full control hierarchy in ATLAS
MDT_Eltx
ECA BA BC ECC
SECTOR01 SECTOR02 SECTOR16
BIS1A02 …
…
corresponding node picture
Propagation of Information
MDT_Eltx
ECA BA BC ECC
SECTOR01 SECTOR02 SECTOR16
BIS1A02 …
…
BIS1A02
SECTOR02
BA
MDT_Eltx
Chamber LV ON -> OFF
FSM is the heart of DCS , it organizes the devices / logical nodes in a parent –childrenstructure.
ALARM Mechanism
1. node state 2. csm state 3. csm 2.5V ref V
4. Mezz Temperature 5. Mezz Analog V6. Mezzanine Digital V7. CSM temperature8. CSM 2.5V ref V
The alarm screen is the first user inteactive mechanism
Picture of MDT ELTX panlel ( 28.01.08 11:25)Snapshot taken in the last M run ( about 10 sectors commisioned)
Sector level panel
Chamber level panel
Bad sensorValue Triggers The alarm
Interactive features
1.Check the OPC server from PS machines.In case of stop of opc server a mail and a SMS message is sent to:- the ELTX expert (Charilaos Tsarouchas)- The PS expert (Eleni Mountricha)
2.Debug panel of chambers in state UNKNOWN
ATLAS CR environment outside world
The ELTX 4 piece puzzle
Each piece can work alone but in order to have a real online status of out detectorall pieces should run in parallel and communicate each other.
lets make
it run …