XTRA POWER ENERGY SYSTEMS

JMSB CONSULTING ELLIOTT ALTILIA MATTHEW BECK SIMON FOUCHER LYSIANE PROULX

Page 2: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

HOW CAN XTRA POWER RECONFIGURE ITS SUPPLY

CHAIN TO ENSURE LONG TERM SUCCESS?

Supply? Demand?

Relationships?

Growth? Profit?

Staffing?

Page 3: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RECONFIGURE CLOSED-LOOP SUPPLY CHAIN

•  Partner with DLSP •  Integrate Dolphin Power materials •  Partner with Harley in Y3

Address logistics issues

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

SWITCHING LOGISTICS IS ESSENTIAL TO ADDRESSING THE MARKET

•  Leverage ERP for orders/pickups •  IT platform for on-going feedback •  Retailer program for recycling

Improve retailer

relationships

•  Increase plant staffing •  Integrate ERP (leverage partners) •  Government relations

Prepare for increased

production capacity

Investment: Rs 42M Staff

Rs 200K Marketing Rs 100K ERP

Timeline: 3 Years

Benefit: Profit: Rs 585M

Page 4: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

KEY FINDINGS

Page 5: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

HIGH DEMAND LEADS TO HIGH MARKET GROWTH AND COMPETITION

↑25% Market

Split Market Competitive

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

XTRA POWER NEEDS TO BETTER LOGISTICS TO COMPETE

Demand is greater then supply

Price

Efficient Logistics

After Sales Service

↑25% Market

Split Market Competitive

Page 6: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

THE CLOSED LOOP SYSTEM IS CURRENTLY BROKEN

Cretto Logistics

Xtra Manufacturing

Plant (assembly)

Cretto Logistics Retailer

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

ABILITY TO CLOSE THE LOOP EFFICIENTLY WILL

Galaxy

Avani International

Cretto Logistics

Customers

Plastic Casting Lead Terminal

Lead Plate Battery Acid

Cretto Logistics

Page 7: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

PARTNER EVALUATION: LOGISTICS

Cretto

•  8 year relationship • One of largest provider in India •  20% MS in Delhi •  Network of retailers •  Volume player •  Complaints, little responsiveness

DLSP

•  No relationship •  ERP usage •  Reliable, consistent •  Condition: sole provider of lead

plate & electro.

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Cretto DLSP Lead time (days) 12 (one of highest) 4 (lowest) RS /kg of load/km travelled 1.6 2.35

Page 8: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

PARTNER EVALUATION: ACID AND LEAD PLATES

Avani

•  Long-standing relationship •  Supply 2 most imp. components •  Negligible inbound logistics cost •  Decreasing market shares

Dolphin Power Limited

•  No relationship •  Reduced lead time •  Dolphin Power: fast growth, top

10 supplier •  Synergies with DLPS

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Avani DPL Cost of supplies (Rs / cell) 400-1450 535 to 1800 Lead time Industry average: 7

8 4

Distance 63Km 36km

A 40% REDUCTION IN LEAD TIME WILL DOUBLE THE EFFICIENCY

Page 9: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

PARTNER EVALUATION: LEAD TERMINALS AND PLASTIC CASINGS

Galaxy

•  Relationship •  Quality supplies •  Negligible inbound logistics

cost

Harley Power

•  No relationship •  Reduced lead time

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

2/3 LEAD TIME LEADS TO 25% INCREASE IN EFFICIENCY

Galaxy Harley Power Price Rs / unit 200 220 Lead time 6 4 Distance from plant 2.9km 2.7km

Page 10: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

PRIMARY BATTERY EXPENSE COMES FROM LEAD PLATES AND ACID RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

REDUCTION IN DISTANCE TRAVELLED CAN OFFSET COST INCREASE

Lead Plates: 28kg

Acid: 11.5kg

Plastic: 3.1kg

Terminal: 1kg

Avani or Dolphin Power Limited

Galaxy or Haley

Average Battery: 43.6kg

Page 11: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

XTRA POWER HAS THE PRODUCT BUT NEEDS THE SUPPORT High Quality

Product Low Reconditioned Sales

Retailer Recommendations

Short Production Time

High Reconditioned

Margins

Retailers only customer touch

point

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

A NEW PARTNER IS NEEDED TO SUCCEED

The product is able to address

market need

Necessary to fix closed loop

system

Retail relations are essential to brand strength

High Product Demand

Page 12: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

FINANCIALS

Page 13: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

Y/Y SALES GROWTH PER CATEGORY RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

EXCEPT FOR OPEN SHIELD BATTERIES, NOT MEETING MARKET GROWTH

-10% -5% 0% 5%

10% 15% 20% 25% 30%

2012-2013 Growth

Market Growth

Page 14: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

SAVINGS IN PACKAGING COUNTERED LOSSES IN LOGISTICS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

LEAD DOES NOT SEEM TO BE A SIGNIFICANT CONCERN

-200%

-100%

0%

100%

200%

300%

Raw Materials Packaging Logistics

y/y changes in direct costs

Page 15: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

WHAT IF ANALYSIS – EXCLUDING PACKAGING SAVINGS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

PROFITABILITY DROPPED BY 70% IN ONE YEAR

  2012   2013  Total Sales   328   360        Raw Materials   84   90  Packaging   74   74  Logistics   26   95  Total Direct Costs   183   258        Other Costs   71   80        Total Profits   74   22  

0

20

40

60

80

2012 2013

Total Profits (M INR)

Page 16: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

ESTIMATION OF QUANTITY SOLD AND RECYCLED RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

WITH LOSSES, ASSUME 4000 BATTERIES REPURCHASED

Sales (M INR)   Low   High     Heat Shield   89.9       Open Shield   126.2       Reconditionned   17.8            Unit price         Heat Shield Battery   9200   20000     Open Shield   9200   25000     Reconditionned   4700   10500          Qty Sold   High   Low  

  Heat Shield Barrety   9,772   4,495  

  Open Shield   13,717   5,048  

  Reconditionned   3,787   1,695  

Page 17: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

ASSUMPTIONS ON TRANSPORTATION TO/FROM RETAILERS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

WEIGHED AVERAGE DISTANCE PER TRIP - INBOUND

Delhi  Northern Region  

% Trips Breakdown   59%   41%  Average Distance Travelled (km)   35   100  

Page 18: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

INBOUND TRANSPORTATION COSTS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

DIFFERENCE OF 6M INRS BETWEEN PROVIDERS

Cretto   DLSP  # repurchased Recycled batteries  

4,000  

Average weight (in kg, dry)   32  

Average Distance   62  

Cost/(kg.km)   1.6  

2.4  

Total Cost to Pickup   12,737,280  

18,707,880  

Page 19: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

OUTBOUND TRANSPORTATION COSTS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

ADDITIONAL 36M INRS; FOR A TOTAL OF 41M INRS

Cretto   DLSP  

# batteries shipped   18000  

Average distance / trip   62  

Average weight / battery (kg, wet)   43.6  

Cost/(kg.km)   1.6  

2.4  

Total Costs of Delivery   77,852,160  

114,345,360  

Page 20: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

ALTERNATIVES

Page 21: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

ALTERNATIVES – COSTS PER COMPONENTS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Avani / Galaxy  

Avani / Haley  

DLSP / Galaxy  

DLSP / Haley  

Terminals/lead   7150   7150   8172   8172  

Acid/Plated   1000   1050   1000   1050  

Page 22: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

COSTS OVERALL RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Avani / Galaxy  

Avani / Haley  

DLSP / Galaxy  

DLSP / Haley  

Terminals/lead   0   0   18   18  

Acid/Plated   0   1   0   1  

Transportrtation   0   0   41   41  

Total   0   1   59   60  

Page 23: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Avani / Galaxy   Avani / Haley  

DLSP / Galaxy   DLSP / Haley  

% Market   0.25   0.32   0.53   0.6  

# Batteries   18000   23040   38160   43200  

Sales (M INRs)   359   459.52   761.08   861.6  

Costs   87   111.36   184.44   208.8  

Additional Costs   60.0   76.8   99.4   67.9  

Profits   212.0   271.4   477.3   584.9  

Page 24: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

SITUATIONAL SYNOPSIS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

SUPPLY CHAIN IMPROVEMENTS REQUIRED TO MEET DEMAND

Market

Demand > Supply Highly Competitive Price & Seasonally Sensitive

Core Competency

Short-Lead Time Refurbishment

Strategy Distribution Through

Retailers Premium Quality Closed Loop

Page 25: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

OPTIONS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Status Quo

25%

At Risk

Haley Alone

32%

At Risk

DLSP

53%

Improve

Full Change

60%

Improve

Ability to Meet Demand

Revenue

Profit

Relationships with Retailer

Decision Criteria

Page 26: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

SITUATIONAL SYNOPSIS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Impact of retailer

relationships

Improved experience Faster lead

times

Over change management compensation

Staffing of manufacturing

plant Comprehensive

HR Plan Leverage

supplier network

Risks Mitigations Contingencies

Page 27: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RECONFIGURE CLOSED-LOOP SUPPLY CHAIN

•  Partner with DLSP •  Integrate Dolphin Power materials •  Partner with Harley in Y3

Address logistics issues

RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

•  Leverage ERP for orders/pickups •  IT platform for on-going feedback •  Retailer program for recycling

Improve retailer

relationships

•  Increase plant staffing •  Integrate ERP (leverage partners) •  Government relations

Prepare for increased

production capacity

Page 28: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

IMPLEMENTATION

Page 29: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

3 YEAR TIMELINE RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Year 1 Year 2 Year 3 June 2013

DLSP Logistics issues

Retailer relationships

Prepare for production capacity

DLSP logistics

Components from Dolphin Power

From Galaxy to Harley Power

Page 30: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

CLOSED-LOOP SUPPLY CHAIN RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Cretto Logistics

Xtra Manufacturing

Plant (assembly)

Cretto Logistics Retailer

Galaxy

Avani International

Cretto Logistics

Customers

Plastic Casting Lead Terminal

Lead Plate Battery Acid

Cretto Logistics

Page 31: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

CLOSED-LOOP SUPPLY CHAIN RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

START BY ADDRESSING THE LOGISTICS ISSUES

DLSP Logistics

Xtra Manufacturing

Plant (assembly)

DLSP Logistics Retailer

Galaxy

Dolphin Power

Cretto Logistics

Customers

Plastic Casting Lead Terminal

Lead Plate Battery Acid

DLPS Logistics

Page 32: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

CLOSED-LOOP SUPPLY CHAIN RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

MOVE FROM GALAXY TO HARLEY POWER IN YEAR 3

DLSP Logistics

Xtra Manufacturing

Plant (assembly)

DLSP Logistics Retailer

Harley Power

Dolphin Power

Cretto Logistics

Customers

Plastic Casting Lead Terminal

Lead Plate Battery Acid

DLPS Logistics

Page 33: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

3 YEAR TIMELINE RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Year 1 Year 2 Year 3 June 2013

DLSP

platform for order / pick-up

Logistics issues

Retailer relationships

Prepare for production capacity

DLSP logistics

Components from Dolphin Power

Increase reps visits

From Galaxy to Harley Power

Reconditioned battery campaign

Page 34: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RECONDITIONED BATTERY CAMPAIGN FOR RETAILERS RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

PROMOTING RECYCLING SHEDS YOU FROM FLUCTUATING LEAD PRICES

Proprietor Mr. Dutta

Marketing Manager

(Mr. Nanda) Sales Manager

Reps in contact with retailers

Operations Managers (Mr. Sheik)

Develop “Savings for you and the planet” sales kit Provide retailers with sales

kits (flyers, posters, displays)

Page 35: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RETAILER RELATIONSHIPS CAN BE IMPROVED WITH DLSP RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

XTRA POWER CAN LEVERAGE THE ERP EXPERTISE OF DLSP

DLSP Platform

Retailers Consumers

Place orders

Feedback training

Schedule pickup

Client feedback

More frequent representative visits

Page 36: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

3 YEAR TIMELINE RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

Year 1 Year 2 Year 3 June 2013

DLSP

Launch platform for order / pick-up

Double plant staff size

Logistics issues

Retailer relationships

Prepare for production capacity

DLSP logistics

Components from Dolphin Power

Increase reps visits

Approach government for subsidy (recycling)

Leverage DLSP IT expertise

From Galaxy to Harley Power

Page 37: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

PLANT STAFF MUST BE ADJUSTED RECOMMENDATION ANALYSIS FINANCIALS ALTERNATIVES IMPLEMENTATION

LEVERAGE SUPPLIER NETWORK TO STAFF PLANT

Proprietor Mr. Dutta

Marketing Manager

(Mr. Nanda) Sales Manager

Operations Managers (Mr. Sheik)

DOUBLE plant staff size over 2 years Use ERP system to manage CLSC

Page 38: XTRA POWER ENERGY SYSTEMS · 2015-10-19 · xtra power energy systems jmsb consulting elliott altilia matthew beck simon foucher lysiane proulx . how can xtra power reconfigure its

RECONFIGURING XTRA POWER SUPPLY CHAIN WILL

NOT ONLY INCREASE ITS BOTTOM LINE BUT ADDRESS AN ESSENTIAL NEED OF THE

MARKET