14
1 Maria Santos-L leo XMM- Newton Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)

XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

1Maria Santos-Lleo

XMM-Newton

Science Operations Status

EPIC Ops-Cal Meeting

November 6, 2007, Mallorca

María Santos-Lleó

(XMM-Newton Science Support Manager)

XMM-Newton

2

Maria Santos-Lleo

Contents Science program: AO6 & AO7

Mission planning issues

Instrument operations

SAS: release 7.1

XSA: release 4.0 and 2XMM, next release

Users feedback: UG recommendations

Scientific highlights

Mission extension: AWG and SSAC recommendation

Symposium: The X-ray Universe 2008

XMM-Newton

3

Maria Santos-Lleo

… and the Science Support Team Community Support and Mission Planning Team

Matthias Ehle

Instrument Dedicated Teams:● EPIC: Marcus Kirsch● RGS: Andy Polloc● OM: Antonio Talavera

SAS Carlos Gabriel

XMM-Newton

4

Maria Santos-Lleo

Science Program AO6, May 2007 - April 2008: status as of 29

October:● A+B performed: 7500 ks: 58% ● C: 93ks: 1% (27-31% in last two AOs)

AO7, May 2008 – April 2009● New: Very Large Programs (>1000 ks)

• 10 submitted with mean requested time 1980 ks• Oversubscription 7.8 & 586 proposals

● OTAC currently underway: • 13 panels, 66 scientists, rotate every 2 years• chairperson 29-30 Nov at ESAC• Results by Christmas (if approval from D/Sci)

● Second phase in January-February

XMM-Newton

5

Maria Santos-Lleo

Mission Planning Perth maintenance in October 2007:

Dongara used as replacement rev 1431-1445

Several problems (didn’t work as expected)

Heavy re-scheduling & several gaps

~ 110h lost near apogee

Cal. RXJ1856.6-3754  42 ks lost in REV 1432

XMM-Newton

6

Maria Santos-Lleo

Instrument Operations RGS2 single node readout, since rev. 1408: 16 Aug 2007

● Pile-up: if strong emission lines: higher than expected● Radiation monitoring not possible with RGS2 (under

investigation)

OM: review of slew constraints● Possibility to reduce by 2 (current: Earth 10°, Moon 7°)

Slow Slew Survey● Slowest slows 5°/h using close loop slews (20s+2-4° slews)● Overhead (time between slews and RWB) under

investigation

EPIC: action from UG: 2007-06-07/14: On the EPIC team to report on the impact of reducing the overhead for EPIC-pn thin, medium and thick filter exposures in modified mosaicing mode, by using a fixed offset table

XMM-Newton

7

Maria Santos-Lleo

SAS & XSA SAS 7.1 released in July 2007

● Patch: eexpmap● Patch to be released this week

• rgsframes (for single node)• arfgen / backscale - support for masks - asked by users• epreject upgrade• some very minor fixes (test lines printouts suppression  + inclusion of

forgotten parameter change in rgsproc) ● Next release : ~ end spring 2008, with:

epic_lccorr, rgs analysis using wavelength grid, and will be (most probably) based on gcc4 and include version for 64 bit machines.

XSA 4.0 released in August 2007● Full, uniform, reprocessing ● Science products● 2XMM catalogue: 360□ :247000 det., ~192000 unique

• ~ 6x10-15 cgs in soft 0.2-2 keV (typical sensitivity)• ~1.5x10-14 cgs in hard 0.2-2 keV

● Slew Survey catalogue 1.1: 20% of sky, ~4300 sources● Next release in ~ March 2008: dedicated to OM

XMM-Newton

9

Maria Santos-Lleo

Users FeedbacK: UG recommendations

Recommendation 2007-06-08/39: The priority for timing modes of EPIC-pn needs to be focused on solving the current problems of the timing and burst calibration. Only after they are fixed, the UG would be glad to revise its recommendation about the modified timing. For the time being, the modified timing mode should only be made available on a case by case basis(Policies and Procedures updated for AO7)

Recommendation 2007-06-08/45: The UG recommends that the Background Working Group makes a study of the needs for closed filter data

XMM-Newton

10

Maria Santos-Lleo

Scientific Highlights `The Next Decade’ workshop

● Presentations on-line● Papers received, review process started

Press releases:● 19 so far in 2007● Good for PR and mission extension discussion

Let us know about your results to make press releases !

Publications and citations keep on as expected● About 300 papers per year

XMM-Newton

11

Maria Santos-Lleo

Scientific Highlights: Public Outreach I

XMM-Newton

12

Maria Santos-Lleo

Scientific Highlights: Public Outreach II

in 2007 so far 19 ESA science and technology news releases

XMM-Newton

13

Maria Santos-Lleo

Mission Extension

Both AWG and SSAC recommended XMM-Newton extension up to end 2012. Decision on the 13th of November, SPC

ASTRO(2007)16 Paris, 11th October 2007

EUROPEAN SPACE AGENCY

ASTRONOMY WORKING GROUP

Recommendation on the extension of Operation

of the INTEGRAL and XMM-Newton missions

At its 129th meeting held on 9-10 October 2007 at ESA Headquarters, Paris (France), the Astronomy Working Group (AWG) was briefed on the scientific returns and status of the Integral and XMM-Newton missions as well as the Executive’s plan to combine and simplify aspects of their operations, resulting in the financial savings compatible with the recommendations from the SPRT. The AWG was asked to express a view of the scientific performance of the missions and to recommend on the proposed mission extensions until the end of 2012. This is a further 2 years beyond the current approved interval for Integral and 2.75 years for XMM-Newton. The AWG expressed its satisfaction with the current status and science return of the Integral and XMM-Newton missions. The AWG noted that the concept of combined operations provides strongly reduced costs, compared to previous extensions, with an acceptable small initial reduction in the high scientific performance of both missions. Integral continues to provide a powerful capability to explore extreme phenomena in the Universe and XMM-Newton is expected to maintain its world-class scientific profile over the time period under consideration. Therefore, the AWG highly recommends approval of the 2-year and 2.75-year rolling extensions and expects to review the science case for the 2011-2012 time frame as part of any further extension requests.

XMM-Newton

14

Maria Santos-Lleo

Next XMM-Newton Conference The X-ray Universe 2008

Date and venue TBD by mid November

● Sevilla or Granada● 26-31 May or 9-14 June

(UG: 7-8 May, 2008)

XMM-Newton

15

Maria Santos-Lleo

…Thanks !