4938
Current Posting Information Type ### 205013 $59.51 ### 205013 $39.67 Post Date W.O. #/ S.O. # Speed Type Current Charge Current Credit Work Order # PF-163127 Credit - Labor Work Order # PF-98839 Credit - Labor

€¦ · XLS file · Web view · 2014-09-03Work Order # PF-146428 GRC GRC-CIRC-BFP-2 Backflow Preventer No. 2 ... ~ARE-GR Work Order # PF-159062 ... FY 14/15 COPY OF PF-136145 TO

Embed Size (px)

Citation preview

Posted ChargesCurrent Posting InformationWork Order SummaryPost DateW.O. #/S.O. #SpeedTypeCurrentChargeCurrentCreditTypeAction RequestedBuildingLocationDescriptionLaborParts/OtherWO Total08/31/14Work Order # PF-163127205013$59.51Credit - LaborPRESIDENTS OFFICE IS TOO HOT (SATURDAY)BHBH-116Office08/31/14Work Order # PF-98839205013$39.67Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus08/31/14Work Order # PF-98839205013$39.67Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus08/31/14Work Order # PF-98839205013$39.67Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus08/31/14Work Order # PF-98839205013$59.51Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus08/31/14Work Order # PF-98839205013$39.67Credit - LaborASSIST CAPITAL PLANNING AT WOLF LEDGES ENGINEERING BUILDING DURING CONSTRUCTION.HVAC, ELECTRICAL, AND PLUMBING.KEEP OPEN FOR PROJECT DURATION - MAY, 2012. NO CHARGE.CONTACT JASON WEISMAN @ EXTENSION 6298 WITH QUESTIONS2/4/13 DETERMINE THE ELECTRICAL INFORMATION (VOLTAGE/PHASING/ETC.) ON THE LIGHT POLE AT THE TOP OF THE STAIRS BETWEEN AERC AND BCCEAkronAkronAkron Campus08/31/14Work Order # PF-130739205013$109.09Credit - LaborPM Annual - BoilerICSICS-57-BLR-6Boiler No. 6 (SID: 803631)08/31/14Work Order # PF-130740205013$148.76Credit - LaborPM Annual - BoilerICSICS-76-BLR-7Boiler No. 7 (SID: 803632)08/31/14Work Order # PF-137462205013$39.67Credit - LaborPM Annual - Gas Furnace~ARE~ARE-ICS-RF-RTU-2Roof Top Unit No. 2 (TEAM SHOP)08/31/14Work Order # PF-139708205013$79.34Credit - LaborREPLACE 8 WINDOWS IN ATRIUM, WINDOW UNITS ARE BADCBACBA-CIRCCirculation08/31/14Work Order # PF-139728205040$169.57Credit - LaborHIGH TEMP LEAK ON BL # KJ VAULTCARP. TO ADD WOOD SHORING TO THE CEILINGCARP. TO COVER VAULTGROUNDS-MOVE GRANITE,FOUNTAIN WAS DISMANTLEDREPAIR IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-139728205040$27.75Credit - LaborHIGH TEMP LEAK ON BL # KJ VAULTCARP. TO ADD WOOD SHORING TO THE CEILINGCARP. TO COVER VAULTGROUNDS-MOVE GRANITE,FOUNTAIN WAS DISMANTLEDREPAIR IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-140192205013$39.67Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$257.86Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$128.93Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$24.99Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$99.97Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$148.76Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$148.76Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$178.52Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$128.93Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$39.67Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$89.26Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$128.93Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$109.09Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$19.84Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$19.84Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$297.53Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$49.98Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$89.26Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$39.67Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$69.42Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$89.26Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$168.60Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-140192205013$128.93Credit - Labor*NPIC/MESOCOAT LAB PROJECT TIME/MATL FOR PFOC HVAC/PLUMBING/ELECMESOCOAT LAB-PROJECT#130020 GRANT 535064PFOC HVAC-$2,000.00PFOC PLUMBING-$4,000.00PFOC ELEC-$4,000.00PFOC CONTINGENCY - $1,000.00THERMAL ENERGY STORAGE TANK (PER EMAIL)-$650.00P-2 FROM NORTHRICH (PER EMAIL)-$1,000.00TOTAL COST-$12,650.00CHARGE ACCOUNT-535064DELIVER TO PFOC PLUMBING SHOP ATTENTION BILL RINEHARTCONTACT RALPH MORRONE@330-972-8116 FOR ANY QUESTIONS.THANK YOU.NEED CARP. TO CUT STEEL TO COVER HOLESNPICNPICNational Polymer Innovation Center08/31/14Work Order # PF-142484205013$19.84Credit - LaborOUTSIDE STAIRS ATTACHED TO SW CORNER OF BUILDING ARE RUSTY AND DECAYED, NEEDS REINFORCEDWHITWHITWhitby Hall08/31/14Work Order # PF-142484205013$19.84Credit - LaborOUTSIDE STAIRS ATTACHED TO SW CORNER OF BUILDING ARE RUSTY AND DECAYED, NEEDS REINFORCEDWHITWHITWhitby Hall08/31/14Work Order # PF-142725205013$19.84Credit - LaborPM Annual - Domestic Water HeaterHOWHOW-56C-DWH-1Domestic Water Heater No. 108/31/14Work Order # PF-143222205013$39.67Credit - LaborPM Semi-Annual: Air CompressorPAHPAH-7-COMPR-2Air Compressor No. 2 (Fire Suppression)08/31/14Work Order # PF-143223205013$39.67Credit - LaborPM Semi-Annual: Air CompressorPAHPAH-CIRC-COMPR-3Air Compressor No. 3 (Fire Suppression)08/31/14Work Order # PF-144385205013$89.26Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144385205013$148.76Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144385205013$79.34Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144385205013$297.53Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144385205013$29.75Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144385205013$79.34Credit - LaborNOT WORKING (MIGHT BE UNDER WARRENTY?)~ARE~ARE-KO-RF-ACCU-1Air Cooled Condensing Unit No. 108/31/14Work Order # PF-144919205013$39.67Credit - LaborPM Annual - Domestic Water HeaterQSIQSI-S108A-DWH-10Domestic Water Heater No. 10 (Quaker Station)08/31/14Work Order # PF-145225205013$19.84Credit - LaborPM Semi-Annual - Fan Coil UnitICSICS-513-FCU-12Fan Coil Unit No. 1208/31/14Work Order # PF-145619205013$79.34Credit - LaborCONTRACTOR TO REPLACE HTHW VALVESCALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-2Heat Exchanger No. 208/31/14Work Order # PF-145619205013$297.53Credit - LaborCONTRACTOR TO REPLACE HTHW VALVESCALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-2Heat Exchanger No. 208/31/14Work Order # PF-145619205013$148.76Credit - LaborCONTRACTOR TO REPLACE HTHW VALVESCALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-2Heat Exchanger No. 208/31/14Work Order # PF-145619205013$19.84Credit - LaborCONTRACTOR TO REPLACE HTHW VALVESCALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-2Heat Exchanger No. 208/31/14Work Order # PF-145816205013$59.51Credit - LaborPROJECT - ZOOK HALL RENOVATIONS - PROJECT # UAK120015 (CENTRAL HOWER SWING SPACE)ASSIST CAPITAL PLANNING IN ELEVATOR TESTING FOR FIRE SERVICE ON 12/02/13 AT 10:00 AM.GENERAL ASSIST - NO CHARGEPLEASE CONTACT JAMES C. HASKELL AT 330-972-6943 FOR ANY QUESTIONS.CHCSCHCSCentral Hower Community School08/31/14Work Order # PF-145816205013$69.42Credit - LaborPROJECT - ZOOK HALL RENOVATIONS - PROJECT # UAK120015 (CENTRAL HOWER SWING SPACE)ASSIST CAPITAL PLANNING IN ELEVATOR TESTING FOR FIRE SERVICE ON 12/02/13 AT 10:00 AM.GENERAL ASSIST - NO CHARGEPLEASE CONTACT JAMES C. HASKELL AT 330-972-6943 FOR ANY QUESTIONS.CHCSCHCSCentral Hower Community School08/31/14Work Order # PF-145816205013$59.51Credit - LaborPROJECT - ZOOK HALL RENOVATIONS - PROJECT # UAK120015 (CENTRAL HOWER SWING SPACE)ASSIST CAPITAL PLANNING IN ELEVATOR TESTING FOR FIRE SERVICE ON 12/02/13 AT 10:00 AM.GENERAL ASSIST - NO CHARGEPLEASE CONTACT JAMES C. HASKELL AT 330-972-6943 FOR ANY QUESTIONS.CHCSCHCSCentral Hower Community School08/31/14Work Order # PF-145936205013$277.69Credit - LaborREPLACE FAILING HEAT X VALVES*CALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-1Heat Exchanger No. 1 (AHU)08/31/14Work Order # PF-145936205013$69.42Credit - LaborREPLACE FAILING HEAT X VALVES*CALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-1Heat Exchanger No. 1 (AHU)08/31/14Work Order # PF-145936205013$148.76Credit - LaborREPLACE FAILING HEAT X VALVES*CALIBRATE CONTROL VALVESGDYRGDYR-152-HEX-1Heat Exchanger No. 1 (AHU)08/31/14Work Order # PF-146268205013$99.97Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$59.51Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$29.75Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$59.51Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$59.51Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$69.42Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146268205013$79.34Credit - LaborBETWEEN SRWC & ONAT HIGH TEMP LEAK UNDERGROUND. HTHW LEAK ON RETURN LINE BETWEEN VAULTS NJ AND OJ AND HTHW RETURN PIPE BETWEEN VAULT ON AND ONAT MECHANICAL ROOM.ELEC.SHOP TO WIRE IN TEMP.HEATSPEC. SVCS TO MOVE BOILER~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146301205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-1Backflow Preventer No. 1 (4" Domestic)08/31/14Work Order # PF-146302205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-2Backflow Preventer No. 2 (8" Fire)08/31/14Work Order # PF-146303205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-3Backflow Preventer No. 3 (3/4" Unconfirmed)08/31/14Work Order # PF-146304205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-4Backflow Preventer No. 4 (3/4" Unconfirmed)08/31/14Work Order # PF-146305205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-5Backflow Preventer No. 5 (3/4" Unconfirmed)08/31/14Work Order # PF-146306205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-6Backflow Preventer No. 6 (3/4" Make-up)08/31/14Work Order # PF-146307205013$49.59Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-7Backflow Preventer No. 7 (3/4" Make-up)08/31/14Work Order # PF-146339205013$49.59Credit - LaborPM Annual - Backflow PreventerFOLKFOLK-163-BFP-3Backflow Preventer No. 3 (1" Heating Water)08/31/14Work Order # PF-146355205013$49.59Credit - LaborPM Annual - Backflow PreventerKNCLKNCL-130-BFP-2Backflow Preventer No. 2 (3/4" Heating Water)08/31/14Work Order # PF-146356205013$49.59Credit - LaborPM Annual - Backflow PreventerKNCLKNCL-230-BFP-3Backflow Preventer No. 3 (1" Chilled Water)08/31/14Work Order # PF-146369205013$49.59Credit - LaborPM Annual - Backflow PreventerMGHMGH-108-BFP-1Backflow Preventer No. 1 (6" Domestic)08/31/14Work Order # PF-146415205013$39.67Credit - LaborPM Annual - Backflow PreventerHMSTHMST-101-BFP-1Backflow Preventer No. 1 (1" Domestic)08/31/14Work Order # PF-146417205013$49.59Credit - LaborPM Annual - Backflow PreventerBRHBRH-3-BFP-1Backflow Preventer No. 1 (6" Domestic)08/31/14Work Order # PF-146418205013$49.59Credit - LaborPM Annual - Backflow PreventerBRHBRH-3-BFP-2Backflow Preventer No. 2 (6" Fire)08/31/14Work Order # PF-146420205013$49.59Credit - LaborPM Annual - Backflow PreventerEXCEXC-49-BFP-1Backflow Preventer No. 1 (6" Domestic)08/31/14Work Order # PF-146421205013$49.59Credit - LaborPM Annual - Backflow PreventerEXCEXC-49-BFP-2Backflow Preventer No. 2 (8" Fire)08/31/14Work Order # PF-146422205013$39.67Credit - LaborPM Annual - Backflow PreventerEXCEXC-49-BFP-3Backflow Preventer No. 3 (3/4" Detector)08/31/14Work Order # PF-146422205013$39.67Credit - LaborPM Annual - Backflow PreventerEXCEXC-49-BFP-3Backflow Preventer No. 3 (3/4" Detector)08/31/14Work Order # PF-146423205013$49.59Credit - LaborPM Annual - Backflow PreventerEXCEXC-51A-BFP-4Backflow Preventer No. 4 (2" Heating Water)08/31/14Work Order # PF-146424205013$49.59Credit - LaborPM Annual - Backflow PreventerEXCEXC-CIRC-BFP-5Backflow Preventer No. 5 (11/2" Business Area)08/31/14Work Order # PF-146425205013$49.59Credit - LaborPM Annual - Backflow PreventerGALLGALL-525-BFP-1Backflow Preventer No. 1 (4" Domestic)08/31/14Work Order # PF-146426205013$49.59Credit - LaborPM Annual - Backflow PreventerGALLGALL-525-BFP-2Backflow Preventer No. 2 (3/4" Heating Water)08/31/14Work Order # PF-146427205013$49.59Credit - LaborPM Annual - Backflow PreventerGALLGALL-668-BFP-3Backflow Preventer No. 3 (3/4" Boiler)08/31/14Work Order # PF-146428205013$49.59Credit - LaborPM Annual - Backflow PreventerGRCGRC-CIRC-BFP-2Backflow Preventer No. 2 (2" Irrigation)08/31/14Work Order # PF-146451205013$49.59Credit - LaborPM Annual - Backflow PreventerGRCGRC-704-BFP-1Backflow Preventer No. 1 (Make Up)08/31/14Work Order # PF-146453205013$39.67Credit - LaborPM Annual - Backflow PreventerQSIQSI-1-BFP-1Backflow Preventer No. 1 (4" Domestic) (^ (SILOS))08/31/14Work Order # PF-146454205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-1-BFP-2Backflow Preventer No. 2 (8" Fire) (^ (SILOS))08/31/14Work Order # PF-146455205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-1-BFP-3Backflow Preventer No. 3 (1" Irrigation) (^ (QSI))08/31/14Work Order # PF-146456205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-5Backflow Preventer No. 5 (4" Fire) (^ (RETAIL))08/31/14Work Order # PF-146457205013$39.67Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-6Backflow Preventer No. 6 (4" Fire) (^ (RETAIL))08/31/14Work Order # PF-146458205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R123-BFP-7Backflow Preventer No. 7 (1" Irrigation) (^ (RETAIL))08/31/14Work Order # PF-146459205013$39.67Credit - LaborPM Annual - Backflow PreventerQSIQSI-R137-BFP-8Backflow Preventer No. 8 (2" Domestic)08/31/14Work Order # PF-146460205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R54-BFP-9Backflow Preventer No. 9 (6" Fire) (^ (RETAIL))08/31/14Work Order # PF-146461205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R54-BFP-10Backflow Preventer No. 10 (3/4" Detector)08/31/14Work Order # PF-146462205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-S108A-BFP-11Backflow Preventer No. 11 (3" Domestic)08/31/14Work Order # PF-146463205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-S108A-BFP-12Backflow Preventer No. 12 (4" Fire)08/31/14Work Order # PF-146464205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-S108A-BFP-13Backflow Preventer No. 13 (3/4" Detector)08/31/14Work Order # PF-146659205013$29.66Credit - LaborPM Water Treatment - NitratesKNCLKNCLKnight Chemical Laboratory08/31/14Work Order # PF-146659205013$69.20Credit - LaborPM Water Treatment - NitratesKNCLKNCLKnight Chemical Laboratory08/31/14Work Order # PF-146666205013$39.54Credit - LaborPM Water Treatment - NitratesPEACPEACPolymer Engineering Academic Center08/31/14Work Order # PF-146673205013$69.20Credit - LaborPM Water Treatment - NitratesPFOCPFOCPhysical Facilities Op Center08/31/14Work Order # PF-146673205013$108.74Credit - LaborPM Water Treatment - NitratesPFOCPFOCPhysical Facilities Op Center08/31/14Work Order # PF-146722205013$39.54Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field08/31/14Work Order # PF-146722205013$29.66Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field08/31/14Work Order # PF-146722205013$59.31Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field08/31/14Work Order # PF-146722205013$29.66Credit - LaborPM Annual Water Treatment Glycol SystemICSICSInfoCision Stadium / Summa Field08/31/14Work Order # PF-146723205013$29.66Credit - LaborPM Annual Water Treatment Glycol SystemORHORHOrr Resident Hall08/31/14Work Order # PF-146723205013$39.54Credit - LaborPM Annual Water Treatment Glycol SystemORHORHOrr Resident Hall08/31/14Work Order # PF-146726205013$49.43Credit - LaborPM Annual Water Treatment Glycol SystemSMRHSMRHSisler-McFawn Residence Hall08/31/14Work Order # PF-146726205013$19.77Credit - LaborPM Annual Water Treatment Glycol SystemSMRHSMRHSisler-McFawn Residence Hall08/31/14Work Order # PF-146726205013$29.66Credit - LaborPM Annual Water Treatment Glycol SystemSMRHSMRHSisler-McFawn Residence Hall08/31/14Work Order # PF-146728205013$59.31Credit - LaborPM Annual Water Treatment Glycol SystemGDYRGDYRGoodyear Polymer Center08/31/14Work Order # PF-146729205013$39.54Credit - LaborPM Annual Water Treatment Glycol SystemLHLHLeigh Hall08/31/14Work Order # PF-146730205013$19.77Credit - LaborPM Annual Water Treatment Glycol SystemOLRCOLRCOlson Research Center08/31/14Work Order # PF-146749205013$29.66Credit - LaborPM Water Treatment - Nitrates~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-146785205013$39.54Credit - LaborPM Water Treatment - Water SoftenerPFOCPFOC-51-WTRC-1Water Softener/Conditioner No.108/31/14Work Order # PF-146817205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-FOLK-GN-BFP-1Backflow Preventer No. 1 (8" Domestic)08/31/14Work Order # PF-146817205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-FOLK-GN-BFP-1Backflow Preventer No. 1 (8" Domestic)08/31/14Work Order # PF-146824205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-SRH-GS-BFP-1Backflow Preventer No. 1 (8" Fire)08/31/14Work Order # PF-146824205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-SRH-GS-BFP-1Backflow Preventer No. 1 (8" Fire)08/31/14Work Order # PF-146825205013$79.34Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-8Backflow Preventer No. 8 (8" Fire)08/31/14Work Order # PF-146825205013$39.67Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-8Backflow Preventer No. 8 (8" Fire)08/31/14Work Order # PF-146825205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-8Backflow Preventer No. 8 (8" Fire)08/31/14Work Order # PF-146825205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-8Backflow Preventer No. 8 (8" Fire)08/31/14Work Order # PF-146826205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-9Backflow Preventer No. 9 (3/4" Detector)08/31/14Work Order # PF-146826205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-ICS-GS-BFP-9Backflow Preventer No. 9 (3/4" Detector)08/31/14Work Order # PF-146827205013$79.34Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-GS-BFP-2Backflow Preventer No. 1 (8" Fire Containment)08/31/14Work Order # PF-146827205013$79.34Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-GS-BFP-2Backflow Preventer No. 1 (8" Fire Containment)08/31/14Work Order # PF-146828205013$69.42Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-GS-BFP-3Backflow Preventer No. 2 (3/4" Fire Detector)08/31/14Work Order # PF-146828205013$69.42Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-KO-GS-BFP-3Backflow Preventer No. 2 (3/4" Fire Detector)08/31/14Work Order # PF-146835205013$39.67Credit - LaborPM Annual - Backflow PreventerASECASEC-31-BFP-11Backflow Preventer No. 1108/31/14Work Order # PF-146870205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-3Back Flow Preventer No. 3 (6" Fire)08/31/14Work Order # PF-146870205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-3Back Flow Preventer No. 3 (6" Fire)08/31/14Work Order # PF-146871205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-4Backflow Preventer No. 4 (3/4" Fire)08/31/14Work Order # PF-146871205013$49.59Credit - LaborPM Annual - Backflow Preventer~ARE~ARE-WBB-GS-BFP-4Backflow Preventer No. 4 (3/4" Fire)08/31/14Work Order # PF-146874205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-103-BFP-1Backflow Preventer No. 1 (Fire Supression 8")08/31/14Work Order # PF-146875205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-103-BFP-2Backflow Preventer No. 2 (Fire Supression Bypass 3/4")08/31/14Work Order # PF-146876205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-103-BFP-3Backflow Preventer No. 3 (Domestic 4")08/31/14Work Order # PF-146877205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-103-BFP-4Backflow Preventer No. 4 (Domestic 4")08/31/14Work Order # PF-146878205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-105-BFP-5Backflow Preventer No. 5 (Make Up Heating System 1")08/31/14Work Order # PF-146879205013$49.59Credit - LaborPM Annual - Backflow PreventerSHSH-105-BFP-6Backflow Preventer No. 6 (Make Up Chilled Water 1")08/31/14Work Order # PF-146987205071$51.05Credit - LaborPICK UP SURPLUS PROPERTYOLRCOLRC-107Research/Nonclass Laboratory08/31/14Work Order # PF-147093205013$59.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147093205013$39.54Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147093205013$19.77Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147093205013$29.66Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147093205013$29.66Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147093205013$59.31Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-2BOILER No. 208/31/14Work Order # PF-147094205013$19.77Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$19.77Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$39.54Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$29.66Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$39.54Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$19.77Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$29.66Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147094205013$19.77Credit - LaborTEST BOILER WATER, ADD CHEMICALS AS NEEDED FOR STEAM HEATING SYSTEMCHCSCHCS-405-BLR-3BOILER No. 308/31/14Work Order # PF-147107205013$79.34Credit - LaborAIR HANDLING UNIT NUMBER 16 HAS NO POWERASECASEC-54-AHU-16Air Handling Unit No. 1608/31/14Work Order # PF-147175205013$19.84Credit - LaborCRACKED WINDOW ACROSS FROM 217ICSICS-CIRCCirculation08/31/14Work Order # PF-147175205013$128.93Credit - LaborCRACKED WINDOW ACROSS FROM 217ICSICS-CIRCCirculation08/31/14Work Order # PF-147175205013$128.93Credit - LaborCRACKED WINDOW ACROSS FROM 217ICSICS-CIRCCirculation08/31/14Work Order # PF-147562205013$297.53Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$59.51Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$59.51Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$99.97Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$99.97Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$79.34Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$99.97Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$79.34Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$297.53Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147562205013$109.09Credit - LaborINSTALL NEW AIR COMPRESSOR AND DRYER FOR CONTROL AIRELEC. SHOP:WIRE IN NEW AIR COMPRESSORGDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-147569205013$19.84Credit - LaborREPLACE GAS VALVEEXCEXC-51-BLR-1Boiler No. 1 (SID: 802466)08/31/14Work Order # PF-147570205013$69.42Credit - LaborREPLACE GAS VALVEEXCEXC-51-BLR-2Boiler No. 2 (SID: 802467)08/31/14Work Order # PF-147665205013$19.84Credit - LaborTROUBLESHOOT BOILER AND REPLACE GAS VALVEEXCEXC-51-BLR-5Boiler No. 5 (SID: 802470)08/31/14Work Order # PF-147665205013$148.76Credit - LaborTROUBLESHOOT BOILER AND REPLACE GAS VALVEEXCEXC-51-BLR-5Boiler No. 5 (SID: 802470)08/31/14Work Order # PF-147752205013$0.00Credit - LaborESTIMATE TO INSTALL QUAD OUTLET (110V)ON WALL BETWEEN SAFETY SHOWER AND COUNTERNPICNPIC-215Research/Nonclass Laboratory08/31/14Work Order # PF-147855205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R137-BFP-14Backflow Preventer No. 1408/31/14Work Order # PF-147856205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-15Backflow Preventer No. 15 (3/4" Detector) (^ (RETAIL))08/31/14Work Order # PF-147857205013$39.67Credit - LaborPM Annual - Backflow PreventerQSIQSI-R120-BFP-16Backflow Preventer No. 16 (3/4" Detector) (^ (RETAIL))08/31/14Work Order # PF-147858205013$49.59Credit - LaborPM Annual - Backflow PreventerQSIQSI-R137-BFP-17Backflow Preventer No. 17 (3/4" Detector) (^(RETAIL))08/31/14Work Order # PF-147911205013$19.84Credit - LaborSCHRANK NORTH GROUND LEVEL MECHANICAL ROOM TROUBLE SMOKE DETECTOR NO ANSWER-DISPATCHEDSHNSHN-20Mechanical08/31/14Work Order # PF-148062205013$9.92Credit - LaborLEAK#2340QSIQSI-S108Meeting Room08/31/14Work Order # PF-148263205013$109.09Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$148.76Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$148.76Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$148.76Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$89.26Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$69.42Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148263205013$89.26Credit - LaborIN ALARMCOIL BUSTED IN SEVERAL PLACES-CALLED IN BY THE ENERGY CENTERELECTRIC SHOP TO ADD ELECTRIC FOR POWER TO NEW GLYCOL TANKONATONAT-225-AHU-1Air Handling Unit No. 1 (Pool)08/31/14Work Order # PF-148898205013$337.20Credit - LaborPM Annual - Emergency Exit Lighting InspectionRDWYRDWYRoadway Building08/31/14Work Order # PF-148903205013$337.20Credit - LaborPM Annual - Emergency Exit Lighting InspectionTRETRE122 South College Street08/31/14Work Order # PF-148981205071$14.59Credit - LaborDELIVER TABLE FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014 SEMESTERPOLPOL-213Class Laboratory08/31/14Work Order # PF-148983205071$14.59Credit - LaborDELIVER TABLE FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014 SEMESTERPOLPOL-499Classroom08/31/14Work Order # PF-148984205071$14.59Credit - LaborDELIVER PADDED CHAIR NO ARMS & TABLE FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014 SEMESTERSHSSHS-145Classroom08/31/14Work Order # PF-148996205071$14.59Credit - LaborDELIVER TABLE & ADJUSTABLE HEIGHT PADDED CHAIR FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-434Classroom08/31/14Work Order # PF-149003205071$14.59Credit - LaborDELIVER TABLE & ADJUSTABLE HEIGHT PADDED CHAIR FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-152Classroom08/31/14Work Order # PF-149006205071$14.59Credit - LaborDELIVER TABLE & ADJUSTABLE HEIGHT PADDED CHAIR FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-464Classroom08/31/14Work Order # PF-149007205071$14.59Credit - LaborDELIVER TABLE & ADJUSTABLE HEIGHT PADDED CHAIR FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-488Classroom08/31/14Work Order # PF-149013205071$7.29Credit - LaborDELIVER TABLET DESK FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-110Classroom08/31/14Work Order # PF-149031205071$14.59Credit - LaborDELIVER PADDED CHAIR WITH NO ARMS FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014SHSSHS-222Classroom08/31/14Work Order # PF-149032205071$14.59Credit - LaborDELIVER TABLE & ADJUSTABLE HEIGHT PADDED CHAIR FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014POLPOL-296Classroom08/31/14Work Order # PF-149127205013$168.60Credit - LaborSINK LEAKINGGDYRGDYR-524Research/Nonclass Laboratory08/31/14Work Order # PF-149127205013$9.92Credit - LaborSINK LEAKINGGDYRGDYR-524Research/Nonclass Laboratory08/31/14Work Order # PF-149241205050$138.39Credit - LaborREPLACE RELIEF VALVEPFOCPFOC-201-STNK-5Storage Tank No. 5 (Expansion Tank)08/31/14Work Order # PF-149241205050$138.39Credit - LaborREPLACE RELIEF VALVEPFOCPFOC-201-STNK-5Storage Tank No. 5 (Expansion Tank)08/31/14Work Order # PF-149359205071$7.29Credit - LaborDELIVER TABLE & PADDED CHAIR WITH NO ARMS FOR DIFFERENTLY-ABLED STUDENT FOR SPRING 2014SHSSHS-145Classroom08/31/14Work Order # PF-149396205013$29.75Credit - LaborREPAIR PERFORATED HOOD EXHAUST DUCTGDYRGDYR-524Research/Nonclass Laboratory08/31/14Work Order # PF-149477205013$39.67Credit - LaborMULTIPLE SHOWERS NOT WORKING IN FOOTBALL SHOWER AREA, TALK TO ALLAN OR KELCI FOR DETAILSAFLDAFLD-186Athletic or Phys. Ed. Service08/31/14Work Order # PF-149477205013$39.67Credit - LaborMULTIPLE SHOWERS NOT WORKING IN FOOTBALL SHOWER AREA, TALK TO ALLAN OR KELCI FOR DETAILSAFLDAFLD-186Athletic or Phys. Ed. Service08/31/14Work Order # PF-149477205013$19.84Credit - LaborMULTIPLE SHOWERS NOT WORKING IN FOOTBALL SHOWER AREA, TALK TO ALLAN OR KELCI FOR DETAILSAFLDAFLD-186Athletic or Phys. Ed. Service08/31/14Work Order # PF-149481205013$0.00Credit - LaborESTIMATE TO INSTALL 110V DUPLEX OUTLET INSIDE DOOR NEXT TO CABINET FOR CENTRIFUGE, SEE MARK HOLTMAN FOR SPECIFIC LOCATIONOLRCOLRC-218Research/Nonclass Laboratory08/31/14Work Order # PF-149552205013$9.92Credit - LaborREPAIR/REPLACE LIGHT TIMER-NOT WORKINGASECASEC-V217Animal Quarters08/31/14Work Order # PF-149665205013$19.84Credit - LaborMETAL IS STICKING OUT OF AN OUTLETCALLED TO 23.50CASCAS-136Classroom08/31/14Work Order # PF-149753205013$39.67Credit - LaborROOM 53, DRESSING ROOM 1, TOILET LEAKINGPAHPAH-53Assembly Service08/31/14Work Order # PF-150133205013$297.53Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$297.53Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$24.99Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$297.53Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$297.53Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$12.50Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$74.98Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$37.49Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$148.76Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$24.99Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$297.53Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150133205013$79.34Credit - LaborASSIST CAPITAL PLANNING/CONTRACTORS WITH UPGRADES DUE TO ENERGY AUDIT FINDINGS(RALPH MORRONES PROJECT)AkronAkronAkron Campus08/31/14Work Order # PF-150698205013$19.84Credit - LaborSUMP PUMP NOT WORKINGPAHPAH-7-SMP-1Sump Pump No. 108/31/14Work Order # PF-150973205040$92.49Credit - LaborREPAIR/REPLACE HORN, PARKING BREAK, LEFT REAR TIRE, AND LEFT REAR BRAKE LIGHT.UA129193UA129193Toro Workman 3230 (2002)08/31/14Work Order # PF-151141205013$69.42Credit - LaborPROJECT - CBA BUSINESS ANALITICS LAB ROOM 106 - PROJECT # 140004FABRICATE AND INSTALL TABLES AND DESKS IN CBA ROOM 106 PER DRAWINGS BY BRAUN & STEIDL.(7) 4'4 X 6'0 TABLES AT $1,885.00.(4) 4'4 X 6'6 TABLES AT $1,885.00(1) 3'0 X 6'0 INSTRUCTOR DESK AT $3,600.TOTAL: $24,335.00CHARGE ACCOUNT: 6-36586;CONTACT STEPHEN MYERS AT 330-972-6631 FOR ANY QUESTIONSCBACBA-106Class Laboratory08/31/14Work Order # PF-151210205013$39.67Credit - LaborINSTALL NEW SOAP DISPENSER IN WEST TOWER,ROOMS 374&371ASECASEC-W374Class Laboratory08/31/14Work Order # PF-151397205013$148.76Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205013$148.76Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205013$59.51Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$177.93Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$79.08Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$200.40Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$79.08Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$148.28Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$69.20Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$124.55Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205050$296.55Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$92.49Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$22.20Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$24.97Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$200.40Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$138.74Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$30.83Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$146.44Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$146.44Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$92.49Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$146.44Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$107.91Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$107.91Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205013$148.76Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$146.44Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$115.61Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$138.74Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$92.49Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151397205040$146.44Credit - Labor*STEAM/WATER COMING FROM PIPE IN MECHANICAL ROOM/BASEMENT OF LIB. (BEBAN AND LIPSCOMB) CAUSE IS HTHW RETURN LINE LEAK OUTSIDE OF BUILDINGCARP. TO BUILD PLATFORMREPAIR LANDSCAPE AND IRRIGATION~UTI~UTI-HTHigh Temperature System08/31/14Work Order # PF-151542205040$61.66Credit - LaborJOHNDEERE SKIDLOADER NEEDS CUTTING EDGE. GM WILL DO.UA131152UA131152John Deere 317 Skid Steere Loader08/31/14Work Order # PF-151699205040$23.12Credit - LaborREPAIR MUFFLER IT IS LOUD AND LEAKING INTO THE VEHICLEPLEASE HAVE THEM CONTACT ME AT LEAST 3 DAYS BEFORE REPAIR DATE.UA131116UA131116Kubota RTV 900 (2006)08/31/14Work Order # PF-152077205013$39.67Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GE-ACCU-1Air Cooled Condensing Unit No.108/31/14Work Order # PF-152089205013$59.51Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-10Air Cooled Condensing Unit No.1008/31/14Work Order # PF-152090205013$69.42Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-15Air Cooled Condensing Unit No.1508/31/14Work Order # PF-152091205013$19.84Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-16Air Cooled Condensing Unit No.1608/31/14Work Order # PF-152091205013$39.67Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-16Air Cooled Condensing Unit No.1608/31/14Work Order # PF-152093205013$49.59Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-7Air Cooled Condensing Unit No.708/31/14Work Order # PF-152094205013$29.75Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-8Air Cooled Condensing Unit No.808/31/14Work Order # PF-152095205013$39.67Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-9Air Cooled Condensing Unit No.908/31/14Work Order # PF-152096205013$39.67Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-24Air Cooled Condensing Unit No.24 (For AHU-7)08/31/14Work Order # PF-152098205013$59.51Credit - LaborPM Annual - Air Cooled Condensing Unit~ARE~ARE-EXC-GW-ACCU-23Air Cooled Condensing Unit No.23 (For AHU-6)08/31/14Work Order # PF-152189205013$39.67Credit - LaborPM Quarterly - BoilerSMRHSMRH-12D-BLR-1Boiler No. 1 (SID: 240329)08/31/14Work Order # PF-152206205013$29.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemORHORHOrr Resident Hall08/31/14Work Order # PF-152206205013$29.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemORHORHOrr Resident Hall08/31/14Work Order # PF-152207205013$29.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemSMRHSMRHSisler-McFawn Residence Hall08/31/14Work Order # PF-152208205013$39.54Credit - LaborPM Annual Water Treatment - Condenser Water SystemPOLPOLPolsky Building08/31/14Work Order # PF-152208205013$69.20Credit - LaborPM Annual Water Treatment - Condenser Water SystemPOLPOLPolsky Building08/31/14Work Order # PF-152209205013$29.66Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center08/31/14Work Order # PF-152209205013$19.77Credit - LaborPM Annual Water Treatment - Condenser Water SystemOLRCOLRCOlson Research Center08/31/14Work Order # PF-152378205013$19.77Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-1Cooling Tower No. 108/31/14Work Order # PF-152379205013$19.77Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-2Cooling Tower No. 208/31/14Work Order # PF-152379205013$19.77Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-2Cooling Tower No. 208/31/14Work Order # PF-152380205013$19.77Credit - LaborPM Annual Water Treatment - Condenser Water System~ARE~ARE-PFOC-RF-CT-3Cooling Tower No. 308/31/14Work Order # PF-152824205013$79.34Credit - LaborIN ALARM,15-13 RESPONDINGEXCEXC-51-BLR-7Boiler No. 7 (SID: 802472)08/31/14Work Order # PF-152846205040$30.83Credit - LaborREPLACE T-HOSE FOR HYDRAULICSUA132204UA132204New Holland T1520 (2011)08/31/14Work Order # PF-152979205013$39.67Credit - LaborMAKING LOUD NOISE. REPLACE COMPRESSOR.GDYRGDYR-152-COMPR-1Air Compressor No. 108/31/14Work Order # PF-153025205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15~ARE~ARE-STUN-GS-INT-2Interceptor No. 208/31/14Work Order # PF-153027205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15GALUGALU-170-INT-1Interceptor No. 108/31/14Work Order # PF-153027205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15GALUGALU-170-INT-1Interceptor No. 108/31/14Work Order # PF-153027205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15GALUGALU-170-INT-1Interceptor No. 108/31/14Work Order # PF-153028205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-104-INT-1Interceptor No. 108/31/14Work Order # PF-153028205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-104-INT-1Interceptor No. 108/31/14Work Order # PF-153028205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-104-INT-1Interceptor No. 108/31/14Work Order # PF-153029205013$49.98Credit - LaborCLEAN INTRECEPTOR WEEKLY

FY 14/15ICSICS-111-INT-2Interceptor No. 208/31/14Work Order # PF-153029205013$49.98Credit - LaborCLEAN INTRECEPTOR WEEKLY

FY 14/15ICSICS-111-INT-2Interceptor No. 208/31/14Work Order # PF-153029205013$24.99Credit - LaborCLEAN INTRECEPTOR WEEKLY

FY 14/15ICSICS-111-INT-2Interceptor No. 208/31/14Work Order # PF-153029205013$49.98Credit - LaborCLEAN INTRECEPTOR WEEKLY

FY 14/15ICSICS-111-INT-2Interceptor No. 208/31/14Work Order # PF-153030205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-115-INT-3Interceptor No. 308/31/14Work Order # PF-153030205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-115-INT-3Interceptor No. 308/31/14Work Order # PF-153030205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-115-INT-3Interceptor No. 308/31/14Work Order # PF-153030205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-115-INT-3Interceptor No. 308/31/14Work Order # PF-153031205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-133-INT-4Interceptor No. 408/31/14Work Order # PF-153031205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-133-INT-4Interceptor No. 408/31/14Work Order # PF-153031205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-133-INT-4Interceptor No. 408/31/14Work Order # PF-153031205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-133-INT-4Interceptor No. 408/31/14Work Order # PF-153033205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-134-INT-6Interceptor No. 608/31/14Work Order # PF-153033205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-134-INT-6Interceptor No. 608/31/14Work Order # PF-153033205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-134-INT-6Interceptor No. 608/31/14Work Order # PF-153033205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-134-INT-6Interceptor No. 608/31/14Work Order # PF-153034205013$24.99Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-153-INT-7Interceptor No. 708/31/14Work Order # PF-153034205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-153-INT-7Interceptor No. 708/31/14Work Order # PF-153034205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-153-INT-7Interceptor No. 708/31/14Work Order # PF-153034205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-153-INT-7Interceptor No. 708/31/14Work Order # PF-153034205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-153-INT-7Interceptor No. 708/31/14Work Order # PF-153035205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-159-INT-8Interceptor No. 808/31/14Work Order # PF-153035205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-159-INT-8Interceptor No. 808/31/14Work Order # PF-153035205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-159-INT-8Interceptor No. 808/31/14Work Order # PF-153035205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-159-INT-8Interceptor No. 808/31/14Work Order # PF-153036205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-173-INT-9Interceptor No. 908/31/14Work Order # PF-153036205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-173-INT-9Interceptor No. 908/31/14Work Order # PF-153036205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-173-INT-9Interceptor No. 908/31/14Work Order # PF-153036205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-173-INT-9Interceptor No. 908/31/14Work Order # PF-153037205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-174-INT-10Interceptor No. 1008/31/14Work Order # PF-153037205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-174-INT-10Interceptor No. 1008/31/14Work Order # PF-153037205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-174-INT-10Interceptor No. 1008/31/14Work Order # PF-153037205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15ICSICS-174-INT-10Interceptor No. 1008/31/14Work Order # PF-153038205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15POLPOL-358-INT-1Interceptor No. 108/31/14Work Order # PF-153038205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15POLPOL-358-INT-1Interceptor No. 108/31/14Work Order # PF-153038205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15POLPOL-358-INT-1Interceptor No. 108/31/14Work Order # PF-153039205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLYQSIQSI-145B-INT-2Interceptor No. 208/31/14Work Order # PF-153039205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLYQSIQSI-145B-INT-2Interceptor No. 208/31/14Work Order # PF-153039205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLYQSIQSI-145B-INT-2Interceptor No. 208/31/14Work Order # PF-153041205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-156-INT-1Interceptor No. 108/31/14Work Order # PF-153041205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-156-INT-1Interceptor No. 108/31/14Work Order # PF-153041205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-156-INT-1Interceptor No. 108/31/14Work Order # PF-153042205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-R220-INT-4Interceptor No. 408/31/14Work Order # PF-153042205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-R220-INT-4Interceptor No. 408/31/14Work Order # PF-153042205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15QSIQSI-R220-INT-4Interceptor No. 408/31/14Work Order # PF-153044205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15RDRD-117-INT-1Interceptor No. 108/31/14Work Order # PF-153044205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15RDRD-117-INT-1Interceptor No. 108/31/14Work Order # PF-153044205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15RDRD-117-INT-1Interceptor No. 108/31/14Work Order # PF-153045205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15STUNSTUN-220-INT-1Interceptor No. 108/31/14Work Order # PF-153045205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15STUNSTUN-220-INT-1Interceptor No. 108/31/14Work Order # PF-153045205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15STUNSTUN-220-INT-1Interceptor No. 108/31/14Work Order # PF-153045205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15STUNSTUN-220-INT-1Interceptor No. 108/31/14Work Order # PF-153087205013$228.10Credit - LaborREPAIR CLASSROOM DESKS LOCATED IN VARIOUS LOCATIONS THROUGHOUT THE BUILDINGPOLPOLPolsky Building08/31/14Work Order # PF-153087205013$228.10Credit - LaborREPAIR CLASSROOM DESKS LOCATED IN VARIOUS LOCATIONS THROUGHOUT THE BUILDINGPOLPOLPolsky Building08/31/14Work Order # PF-153087205013$89.26Credit - LaborREPAIR CLASSROOM DESKS LOCATED IN VARIOUS LOCATIONS THROUGHOUT THE BUILDINGPOLPOLPolsky Building08/31/14Work Order # PF-153087205013$208.27Credit - LaborREPAIR CLASSROOM DESKS LOCATED IN VARIOUS LOCATIONS THROUGHOUT THE BUILDINGPOLPOLPolsky Building08/31/14Work Order # PF-153166205013$178.52Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$218.19Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$29.75Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$99.18Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$69.42Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$69.42Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$29.75Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153166205013$29.75Credit - LaborREPAIR CLASSROOM CHAIRS AS NEEDED THROUGHOUT BUILDINGCBACBABusiness Administration Building08/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$29.66Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$39.54Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$29.66Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153173205013$19.77Credit - LaborPM CHILLED WATER FILTERCBACBA-53-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$29.66Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$9.89Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153174205013$19.77Credit - LaborPM CHILLED WATER FILTERLIBLIB-2-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$29.66Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153175205013$19.77Credit - LaborPM CHILLED WATER FILTERONATONAT-103-CHWF-1Chilled Water Filter No. 108/31/14Work Order # PF-153346205013$39.67Credit - LaborHOT,AHU 2 OKKNCLKNCL-119Research/Nonclass Lab Service08/31/14Work Order # PF-153477205013$297.53Credit - LaborPATCH AND PAINT GENERAL CLASSROOMS AND COMMON AREASAYERAYERAyer Hall08/31/14Work Order # PF-153503205040$84.78Credit - Labor#19 TORO NEEDS TWO FRONT TIRES FROM THE STOCKROOMREPAIR OVERHEATING RADIATORUA129193UA129193Toro Workman 3230 (2002)08/31/14Work Order # PF-153503205040$61.66Credit - Labor#19 TORO NEEDS TWO FRONT TIRES FROM THE STOCKROOMREPAIR OVERHEATING RADIATORUA129193UA129193Toro Workman 3230 (2002)08/31/14Work Order # PF-153746205013$148.76Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-2Boiler No. 2 (SID: 135197) (^ (RD))08/31/14Work Order # PF-153747205013$29.75Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-3Boiler No. 3 (SID: 135196) (^ (RD))08/31/14Work Order # PF-153747205013$19.84Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-3Boiler No. 3 (SID: 135196) (^ (RD))08/31/14Work Order # PF-153747205013$19.84Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-3Boiler No. 3 (SID: 135196) (^ (RD))08/31/14Work Order # PF-153748205013$148.76Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-4Boiler No. 4 (SID: 276622) (^ (RD))08/31/14Work Order # PF-153748205013$39.67Credit - LaborPM Quarterly - BoilerRDRD-11-BLR-4Boiler No. 4 (SID: 276622) (^ (RD))08/31/14Work Order # PF-153965205013$69.42Credit - LaborPM Annual - BoilerSHSH-105-BLR-3Boiler No. 3 (SID:288085)08/31/14Work Order # PF-154074205013$89.26Credit - LaborPUMP LEAKING. HAVE ELECTRIC REWIRE THE DOMESTIC WATER PUMP PER RICK SAMPLESLAWLAW-60C-DHWRP-2Domestic Hot Water Recirculating Pump No. 208/31/14Work Order # PF-154074205013$109.09Credit - LaborPUMP LEAKING. HAVE ELECTRIC REWIRE THE DOMESTIC WATER PUMP PER RICK SAMPLESLAWLAW-60C-DHWRP-2Domestic Hot Water Recirculating Pump No. 208/31/14Work Order # PF-154074205013$109.09Credit - LaborPUMP LEAKING. HAVE ELECTRIC REWIRE THE DOMESTIC WATER PUMP PER RICK SAMPLESLAWLAW-60C-DHWRP-2Domestic Hot Water Recirculating Pump No. 208/31/14Work Order # PF-154331205040$61.66Credit - LaborNEED BATTERY FROM STOCKROOMGROU11GROU11Smithco Rake (1998)08/31/14Work Order # PF-154359205040$61.66Credit - Labor#26 TORO NEEDS BRAKE LINES REPLACED-GROUNDS WILL DOUA128559UA128559Toro Workman 3230 (2002)08/31/14Work Order # PF-154367205013$19.84Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-1Boiler No. 1 (SID: 802466)08/31/14Work Order # PF-154367205013$9.92Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-1Boiler No. 1 (SID: 802466)08/31/14Work Order # PF-154368205013$19.84Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-2Boiler No. 2 (SID: 802467)08/31/14Work Order # PF-154368205013$9.92Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-2Boiler No. 2 (SID: 802467)08/31/14Work Order # PF-154369205013$39.67Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-3Boiler No. 3 (SID: 802468)08/31/14Work Order # PF-154370205013$39.67Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154370205013$39.67Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154370205013$148.76Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154370205013$19.84Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154370205013$79.34Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154370205013$148.76Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-4Boiler No. 4 (SID: 802469)08/31/14Work Order # PF-154371205013$29.75Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-5Boiler No. 5 (SID: 802470)08/31/14Work Order # PF-154372205013$148.76Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-6Boiler No. 6 (SID: 802471)08/31/14Work Order # PF-154372205013$109.09Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-6Boiler No. 6 (SID: 802471)08/31/14Work Order # PF-154373205013$69.42Credit - LaborPM Annual - BoilerEXCEXC-51-BLR-7Boiler No. 7 (SID: 802472)08/31/14Work Order # PF-154394205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-1Boiler No. 1 (SID: 803635)08/31/14Work Order # PF-154394205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-1Boiler No. 1 (SID: 803635)08/31/14Work Order # PF-154395205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-2Boiler No. 2 (SID: 803634)08/31/14Work Order # PF-154395205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-2Boiler No. 2 (SID: 803634)08/31/14Work Order # PF-154395205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-2Boiler No. 2 (SID: 803634)08/31/14Work Order # PF-154396205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-3Boiler No. 3 (SID: 803633)08/31/14Work Order # PF-154396205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-3Boiler No. 3 (SID: 803633)08/31/14Work Order # PF-154397205013$297.53Credit - LaborPM Annual - BoilerICSICS-823-BLR-4Boiler No. 4 (SID: 278582)(Heating)08/31/14Work Order # PF-154397205013$79.34Credit - LaborPM Annual - BoilerICSICS-823-BLR-4Boiler No. 4 (SID: 278582)(Heating)08/31/14Work Order # PF-154397205013$148.76Credit - LaborPM Annual - BoilerICSICS-823-BLR-4Boiler No. 4 (SID: 278582)(Heating)08/31/14Work Order # PF-154587205040$61.66Credit - Labor2005 BEARCAT NEEDS REPLACEMENT PARTS. (GM WILL DO)UA130943UA130943Bearcat Leaf Vacuum (2005)08/31/14Work Order # PF-154822205013$59.51Credit - LaborLEAK ON THIRD AND SECOND FLOOR NEAR FREIGHT ELEVATORGHGH-CIRCCirculation08/31/14Work Order # PF-155062205013$59.51Credit - LaborCHECK AND REPLACE/REPAIR ALL OUTSIDE GFCIS ON CAMPUS. START ON COLEMAN COMMONS AREA 1ST~ARE~ARE-SWSidewalks/Walkways/Commons08/31/14Work Order # PF-155062205013$59.51Credit - LaborCHECK AND REPLACE/REPAIR ALL OUTSIDE GFCIS ON CAMPUS. START ON COLEMAN COMMONS AREA 1ST~ARE~ARE-SWSidewalks/Walkways/Commons08/31/14Work Order # PF-155118205013$39.67Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$99.97Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$257.86Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$148.76Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$257.86Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$257.86Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$59.51Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$69.42Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$148.76Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$148.76Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$39.67Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$109.09Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155118205013$19.84Credit - LaborCOLEMAN COMMONS BY NEW FOUNTAIN PIPE FROZE AND BROKE FLOODING PIT AND SHORTING OUT PUMPS~ARE~ARE-CCFColeman Commons Fountain08/31/14Work Order # PF-155146205013$29.75Credit - LaborWATER LEAK IN STAIRWELL NEAR 243,CALLED TO 23.10GHGH-CIRCCirculation08/31/14Work Order # PF-155158205013$69.42Credit - LaborREPAIR/REPLACE BROKEN WINDOWQSIQSI-R310Office Service08/31/14Work Order # PF-155173205013$148.76Credit - LaborSTEAM LEAK, BAY AREAWBBWBB178 South Forge Street08/31/14Work Order # PF-155173205013$59.51Credit - LaborSTEAM LEAK, BAY AREAWBBWBB178 South Forge Street08/31/14Work Order # PF-155173205013$39.67Credit - LaborSTEAM LEAK, BAY AREAWBBWBB178 South Forge Street08/31/14Work Order # PF-155183205013$0.00Credit - LaborEST. TO REPAIR LEG ON CHAIR (CHAIR IS CURRENTLY ON TOP OF THE FILE CABINET)CBACBA-222Office08/31/14Work Order # PF-155209205013$49.59Credit - LaborCEILING LEAK#2310GHGH-318Office08/31/14Work Order # PF-155229205013$9.92Credit - LaborWOMENS RESTROOM INSTALL GRAB BAR-SEE SHAWN STEVENS FOR LOCATIONGHGH-203Toilet and Restroom08/31/14Work Order # PF-155256205013$19.84Credit - LaborCEILING LEAK, EMERGENCY LIGHT HAS SHORTED OUT. #2340ASBASB-165MOffice08/31/14Work Order # PF-155422205013$19.84Credit - LaborCEILING LEAK AND TILE REPAIRPOLPOL-133AOffice08/31/14Work Order # PF-155423205013$39.67Credit - LaborCEILING LEAK AND TILE REPAIRPOLPOL-134Conference Room08/31/14Work Order # PF-155464205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15FESTFEST-CIRC-INT-1Interceptor No. 108/31/14Work Order # PF-155464205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15FESTFEST-CIRC-INT-1Interceptor No. 108/31/14Work Order # PF-155464205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15FESTFEST-CIRC-INT-1Interceptor No. 108/31/14Work Order # PF-155464205013$49.98Credit - LaborCLEAN INTERCEPTOR WEEKLY

FY 14/15FESTFEST-CIRC-INT-1Interceptor No. 108/31/14Work Order # PF-155472205013$39.67Credit - LaborINSTALL THE FOLLOWING IN NPIC ROOM 216:1) 208 VAC, SINGLE PHASE, 30 AMP OUTLET2) 208 VAC, SINGLE PHASE, 6.3 AMP. POWER IS TO SUPPORT NEW EQUIPMENT WAITING INSTALLATION.EQUIPMENT IS LOCATED IN 105C,WOULD LIKE WORK DONE ASAPNPICNPIC-208Office Service08/31/14Work Orde