Xiao-ying ZhuangXiao-ying Zhuang
Tongji University
2006. Oct. 212006. Oct. 21
A study on Permeable Design A study on Permeable Design of Parallel Seepage Tunnel of Parallel Seepage Tunnel
GroupGroup
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Hydropower Station Construction Hydropower Station Construction Status quo in ChinaStatus quo in China
Increase in Total
Augmentation Capacity
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Jingping Hydro Power Station under CoJingping Hydro Power Station under Constructionnstruction
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Jingping Hydro Power Station under CoJingping Hydro Power Station under Constructionnstruction
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Jingping Hydro Power Station under CoJingping Hydro Power Station under Constructionnstruction
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Traditional Design CriteriaTraditional Design Criteria• Impervious design ideaImpervious design idea Load-structure method
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
• Impervious design ideaImpervious design ideaCrack width verificationωmax≤0.3mm
Traditional Design CriteriaTraditional Design Criteria
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Background InformationBackground Information
The Pubugou hydropower station, about 200 km away from The Pubugou hydropower station, about 200 km away from the the urban area of Chenurban area of Cheng-g-dudu in Sichuan Province in Sichuan Province, has a total , has a total augmentation capacity over 3000kW and a reservoir capacity augmentation capacity over 3000kW and a reservoir capacity over 5,390 million cubic meters. over 5,390 million cubic meters.
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Background InformationBackground Information
The initial design stage gave a dual-layer 18Ф32 The initial design stage gave a dual-layer 18Ф32 reinforcement reinforcement rations rations for tunnel lining of lower part in rock for tunnel lining of lower part in rock Grade IV, which is unreasonable for substantial construction Grade IV, which is unreasonable for substantial construction due to the load-structure method and crack limit requirement due to the load-structure method and crack limit requirement of 0.25mm it employs.of 0.25mm it employs.
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Problems to be solved by Problems to be solved by impervious modelimpervious model
How to prove steel ratios is over estimated by impervious design?
Impractical dense reinforcement ratio !
An reasonable reinforcement ratio based on permeable design should be given.
We are not sure if hydraulic splitting could be avoided by Norway Method which is gained from empirical acknowledgement.
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Calculation ModelCalculation Model
Upper Part
Inclined Part
Lower Part
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Porous Media Material Porous Media Material PropertyPropertyRock, as permeable material, its permeability is mainly controlled by joints and structure surfaces.
Concrete has a constant permeability coefficient under steady seepage field.
F2
(m)
850
(
高程m
)
左 岸 右 岸
强
弱
微
微
地下水位
风 化
岩体 化 风
体岩
化 风
体岩
鲜新
体岩
200 400 600 800 1000 1200 1400
600
700
800
900
1000
1100
500
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Lining ElementLining Element
Beam element or truss element is usually adopted for the concrete lining in FEM analysis of tunnel. As the lining is assumed porous media material, 4 edge 8 node solid element is selected.
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Unfavorable Load combinationsUnfavorable Load combinations
Tectonic stress is unfavorable when the tunnel is empty for maintenances. The tunnel inner force is mostly under compressive stress.If tectonic stress field is counted for operation stage the results might be more on the unsafe side
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Stress Field – Inner ForceStress Field – Inner Force
M (kN·m) N (kN) Q (kN)
Construction Stage Construction Stage ((imperviousimpervious))
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Operation Stage Operation Stage (impervious)(impervious)
Stress Field – Inner ForceStress Field – Inner Force
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Operation Stage Operation Stage (impervious)(impervious)
Stress Field – Inner ForceStress Field – Inner Force
M (kN·m) N (kN) Q (kN)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Stress Field – Inner ForceStress Field – Inner Force
Operation Stage Operation Stage (Permeable)(Permeable)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Stress Field – Inner ForceStress Field – Inner Force
Operation Stage Operation Stage (Permeable)(Permeable)
M (kN·m) N (kN) Q (kN)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Comparisons of Analysis ResultsComparisons of Analysis Results
(Permeable)(Permeable)(Impervious)(Impervious)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Comparisons of Analysis ResultsComparisons of Analysis Results
(Permeable)(Permeable)(Impervious)(Impervious)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Comparisons of Analysis ResultsComparisons of Analysis Results
(Permeable)(Permeable)(Impervious)(Impervious)
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Seepage Field – Operation StageSeepage Field – Operation Stage
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Seepage Field – Maintenances Seepage Field – Maintenances StageStage
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Seepage Field – Maintenances Seepage Field – Maintenances StageStage
Tongji UniversityTongji University Tunnelling & Underground SpaceTunnelling & Underground Space
Thanks for your Thanks for your attention!attention!