2007 Water Resources Report

Rob Montgomery

River Flow & Lake LevelsTMDL Study

Floodplain mapping revisionsDredging 101

Page 2: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Rock River FlowJuly 2005 – July 2007

Page 3: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Rock River Flow1990 – 2007

Page 4: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Lake Koshkonong StageJuly 2005 – July 2007

Page 5: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Lake Koshkonong Stage1990 - 2007

100-yr 864

Page 6: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Rock River TMDL Study• TMDL = Total Maximum

Daily Load

• Load allocations for sediment and phosphorus for impaired streams and waterbodies

• Analyzing target phosphorus loads– 0.08 mg/L for wadeable streams– 0.125 mg/L for non-wadeable

• Allocations to point and non-point sources

Page 7: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Rock River TMDL Study• DNR to submit

TMDL to USEPA, funded by USEPA

• Technical analysis ongoing, technical advisory committee meeting upcoming

• Lake Koshkonong will benefit, but changes will be slow in coming

Page 8: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Floodplain Mapping Revisions

• Generally based on new topography, but old hydraulic analysis

• Dane County, Rock County: new maps, 90 day appeal period over

• Jefferson County: Appeal period not yet announced

Page 9: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Dredging 101

• Dredging can increase water depths and supply fill

• Expensive

• Usually conducted in critical navigation areas only

• Substantial permit requirements

Page 10: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Types of Dredging

Mechanical (excavated)– Usually used for smaller areas– Slower production than hydraulic– Smaller disposal area

Hydraulic (suction – pumping)– Most cost-effective, especially for large

areas– Usually requires large disposal area

Page 11: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Mechanical Dredging

JF Brennan

Page 12: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Hydraulic Dredging

Dredge

Dredge Disposal

Area

Dredge discharge pipeline

Return Flow

Page 13: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Hydraulic Dredge

JF Brennan Company

Cutterhead

Pump

Discharge pipeline

Page 14: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Hydraulic Dredge Disposal Areas

• Often 1.5 x Dredge volume

• Sediment dewatering return flow

• Land acquisition

State of North Carolina

Page 15: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Final use of dredge spoil area

• Spoil properties important

• Open Space, Agricultural, Wildlife area

Applied Marine Sciences

Page 16: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

In-Lake dredge spoil placement to create habitat

• Dredge spoil placed behind confinement berms

• Would involve substantial permitting process on Lake Koshkonong

Corps of Engineers

Project at Pointe Mouillee, MI Lake Erie

Page 17: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Factors Affecting Hydraulic Dredging Project Costs

• Dredge spoil site acquisition, preparation

• Access and mobilization

• Dredge material properties

• Pumping system

• Restoration

• Permit Conditions

• Costs could range from <$10/cy to >$20/cy

Page 18: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Hypothetical Hydraulic Dredging Project

• 1000 ft x 300 ft (~7 Ac) x 2 ft depth = 22,000 cy

• Disposal – 3 ft depth – 8 acres• Dredge & place: 22,000cy x $20/cy =

$440,000• Property acquisition: 8 acres x

$20,000 = $160,000• Total: ~ $400,000 to $600,000• Actual project costs could vary

WIDELY

Page 19: Www.ma-rs.org 2007 Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101

www.ma-rs.org

Implementing a Dredging Project on Lake Koshkonong

PLANNING • Prioritizing navigation improvement areas• Identify habitat improvement opportunities• Effects on wind driven waves and ice push• Funding• Permit strategy• Planning level engineering, costing

DESIGN• Sediment characterization• Permitting• Acquisition of land and access• Specialist contractor