10
Title: DCM Update WWN Procedure - Seagate Originator : KP Lim Owner: Seagate Prepared by Name (in block letter) Signature Date Originator Approved by Name (in block letter) Signature Date Owner Owner’s Department Head Reviewed by Name (in block letter) Signature Date Quality Seagate Business Unit Manager 1 Title: Procedur e P08-SE-006 DCM Update for WWN Procedure - Seagate Revisio n A Page 1 of 8

WWN_Procedure in DCM

  • Upload
    khuong

  • View
    223

  • Download
    1

Embed Size (px)

DESCRIPTION

hhhhhgggfdsaaa

Citation preview

HDA Daily Start-up Check For CSC

Title:ProcedureP08-SE-006

DCM Update for WWN Procedure - Seagate

RevisionA

Page2 of 8

Title:DCM Update WWN Procedure - Seagate

Originator:KP Lim

Owner:Seagate

Prepared byName (in block letter)SignatureDate

Originator

Approved byName (in block letter)SignatureDate

Owner

Owners Department Head

Reviewed byName (in block letter)SignatureDate

Quality

Seagate Business Unit Manager

Revision History

RevDescriptionChange ByDate

ReleaseRef. No

AInitial ReleaseKC Chong18 March 2011-

1. Scope

This procedure is applicable to all Seagate products of Teleplan Penang.

2. Purpose

To establish Seagate DCM update WWN process in Teleplan Penang from Seagate to Teleplan production release.

3. Terms and definations

3.1 BE - Back End

3.2 ECR Enterprise Change Request

3.3 FCN Field Change Notice

3.4 DCM - Drive Configuration Manager

3.5 DCC Drive Customer Configuration

3.6 BOM Bill of Material

3.7 SBR Sub Build Group

3.8 S/N Serial Number

3.9 FC Fiber Channel

3.10 SAS Serial Attach SCSI

3.11 WWN World Wide Number4. Reference Documents

-5. Responsibilities

5.1 Product Engineer

5.1.1 Upon received WWN block from Seagate through email the WWN block will be immediately implement into DCM.

5.1.2 Update to tables: ID, BLOCK, PRODUCT, FACLITY, FILLED & CONTACT.5.2 BE Process Engineer

5.2.1 To ensure all WWN details and changes are matching according to customer specification.5.2.2 Process Engineer informs Product Engineer immediately if any discrepancy found during verification.5.3 Quality Engineer

5.3.1 To ensure the sample label details is matching with the change in WWN related document.

5.3.2 To make sure printing quality is good and all the information on the label has meet overall requirement per qualification plan.

5.3.3 To inform Product Engineer and BE Process Engineer immediately whenever there is any reject found during sample label verification and new label released.

6. Procedure

6.1 Upon received new WWN block from Seagate. 6.2 Login to http://www.sgtacr.com.my/dcmweb/dcm_manager_menu.asp,

6.3 Current DCM Manager Version is V3.16.0 (refer graphic 1) and DCMHUB is v3 (refer graphic 2).6.4 Then select the block received, SATA, SAS or FC block.

Graphic 1

Graphic 26.5 For SATA block received using DCM Manager V3.16.0 refer Graphic 3 and for DCMHUB v3 refer graphic 4 to key in NAA, ORG ID, BLOCK, PRODUCT, FACILITY, FILLED & CONTACT fields acoording to SATA block received. Next Serial field by default setting by system is 0.

Graphic 3

Graphic 46.6 For SAS block received using DCM Manager V3.16.0 refer Graphic 5 and for DCMHUB v3 refer graphic 6 to key in NAA, ORG ID, BLOCK, PRODUCT, FACILITY, FILLED & CONTACT fields acoording to SAS block received. Next Serial field by default setting by system is 0.

Graphic 5

Graphic 66.7 For FC block received using DCM Manager V3.16.0 refer Graphic 7 and for DCMHUB v3 refer graphic 8 to key in ORG ID, BLOCK, PRODUCT, FACILITY, FILLED & CONTACT fields acoording to FC block received. Next Serial field by default setting by system is 1.

Graphic 7

Graphic 86.8 BE Process Engineer to verify the WWN details.6.9 Inform Product Engineer immediately if any discrepancy found and correction taken by Product Engineer.7. Records

N/A

8. Attachment

N/A

2