1 WWF Workshop on Solar Heat in Agri-Processing Dr Stefan Hess 17 November 2016, STIAS, Stellenbosch Large-scale Solar Thermal Systems in South Africa and SOLTRAIN III

WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

1

WWF Workshop on Solar Heat in

Agri-Processing

Dr Stefan Hess

17 November 2016, STIAS, Stellenbosch

Large-scale Solar Thermal Systems

in South Africa and SOLTRAIN III

Page 2: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

2

1. Large-scale Systems Database

2. Analysis of CBC Tender

3. SOLTRAIN III Project

4. Barriers and Recommendations

Page 3: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

3

Xtrata Elands Platinum Mine: DHW and SPH for change house

• 500 m2 evacuated tubes,

60 m3 storage

• Installed 2011

• Caters 1500 workers daily

• 90 % of demand for

heating of 100 m3 shower

water up to 60 ºC

• 10 % of produced heat

used for laundrySource: Blackdotenergy.co.za

Page 4: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

4

Solar process heating and cooling

BMW Manufacturing, Pretoria, SA:

Heating of paint with 200 m2 evacuated

tubes and 24.2 m2 of storageSource: Blackdotenergy.co.za

MTN, Johannesburg, SA: Solar cooling

with 484 m2 Fresnel coll., 180 °C, 16 bar

© Dinter

Page 5: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

5

Database:

• Stationary systems > 10 m2

• Whole SA, installed between 2007 and 2015

• Sources: Blackdot Energy, Soltrain 1&2, installers, etc.

Currently:

• 89 systems > 10 m2

• Total gross area 13 894 m2

• Confidence level: high > 50 m2, low < 50 m2

Page 6: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

6

Large-scale SWH systems in SA per type of application (gross collector area > 10 m2).

Domestic hot water 66 systems, staff ablutions 14 systems, process heat 7 systems,

solar cooling 2 systems. Legend units are m2.

69%

20%

7% 4%0

2 000

4 000

6 000

8 000

10 000

12 000

Co

llect

or

gro

ss a

rea

[m2]

Application

> 500

250 - 500

125 -250

50 - 125

10 - 50

Page 7: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

7

Large-scale systems in SA per beneficiary industry. Legend units are m2.

Page 8: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

8

Large-scale SWH systems in SA per province (gross collector area > 10 m2).

Number of systems and percentage contribution above bars. Legend in m2.

52.3%

17.8%13.2%

8.4%4.5%

2.2% 1.1% 0.3% 0.2%

42

303

46

1 2 1 1

0

1 000

2 000

3 000

4 000

5 000

6 000

7 000

8 000

Co

llect

or

gro

ss a

rea

[m2]

Province

> 500

250 - 500

125 -250

50 - 125

10 - 50

Page 9: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

9

y = -0.41x + 770.34

0

200

400

600

800

1 000

1 200

1 400

0 100 200 300 400 500 600 700 800 900

Spec

ific

sys

tem

co

st [

EUR

/m2]

Collector gross area [m2]

Costs relative to collector area (data from Blackdot Energy, AEE Intec and personal

communication with installers during 2014 - 2015). Exchange rate at date of

installation was used (9.66 < ZAR/EUR < 15.3 from 2007 to 2015).

Average = 603 EUR/m2

Page 10: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

10

1. Large-scale Systems Database

2. Analysis of CBC Tender

3. SOLTRAIN III Project

4. Barriers and Recommendations

Page 11: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

11

www.soltrain.co.za/

120 m2 flat-plates, 10 m3 storage tank, SF = 60 %

https://www.youtube.com/watch?v=JXANpox482k

Pre-heating storage unit

with stratified charging

Page 12: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

12

Tender evaluation

0

200

400

600

800

1 000

1 200

1 400

1 600

1 2 3 4 5 6 7 8 9 10

Co

st [

EUR

/m2]

Proposal

Storage

Roof strengthening

Maintenance

Installation

Piping material

HE, pump andcontrol

Proposal comparisons and component breakdown from the CBC tender (using

September 2015 exchange rate of ZAR/EUR = 15.3)

Page 13: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

13

Average costs and variance per cost category between all ten proposals of the CBC

tender. Not all offers included costs for future maintenance and storage.

0

100

200

300

400

500

600

Co

st [

EUR

/m2]

Component

Average Proposals Best price

Theoretical best price = 503 EUR/m2

Page 14: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

14

1. Large-scale Systems Database

2. Analysis of CBC Tender

3. SOLTRAIN III Project

4. Barriers and Recommendations

Page 15: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

15

Soltrain I and II (2008 – 2016)

Partners: Botswana, Lesotho, Mozambique,

Namibia, South Africa, Zimbabwe

Soltrain III targets:

• 500 persons trained in 22 courses on ST systems

• 12 policy workshops with 250 participants carried out

• 6 national ST Roadmaps implemented

• 6 ST market statistics available

• 70 ST demonstration systems installed, operating and checked

Page 16: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

16

Results:

www.soltrain.co.za

Support for demonstraion systems:

• System must be in „flagship district“, beneficiary SME

• Budget spent ca. 33 % on „roll-out“ and 66 % on „new applications“

• Installing company applies, up to 50 % of invest is funded

• Soltrain contact person Western Cape: [email protected]

[email protected]

Page 17: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

17

1. Large-scale Systems Database

2. Analysis of CBC Tender

3. SOLTRAIN III Project

4. Barriers and Recommendations

Page 18: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

18

Required specific ST system costs to break even after 5 years in SA

SA: 603 EUR/m2

Page 19: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

19

Solve long payback problem:

• Reduce investment: Standardized planning

• Contracting: Dedicated support?

Increase competence and and build trust:

• Training seminars: Soltrain

• Publish best practice: Independent monitoring

Push market diffusion:

• Identify low-hanging fruits

• Sector specific research projects (STEP-Bio for SA sugar industry)

Page 20: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

20

Thank you!

Acknowledgements:

Eugéne JoubertBlackdotenergy

Dr Stefan Hess

Stellenbosch University

[email protected]

+27 (0)21 808 4016

Page 21: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

21

5 % Hydro + RE

6 % Fuel + others

4 % Nuclear

85 % Coal

Blackdot Energy n.d., Documenting Commercial Solar Thermal in South Africa. Available

from: http://www.blackdotenergy.co.za/. [15 August 2015].

Joubert, EC, Hess, S & van Niekerk, JL 2016. Large-scale solar water heating in South

Africa: Status, barriers and recommendations. Renewable Energy 97: 809-822.

Page 22: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

22

48 6

8

25

1413

65

0

500

1 000

1 500

2 000

2 500

3 000

3 500

Co

llect

or

gro

ss a

rea

[m2]

Year

> 500

250 - 500

125 -250

50 - 125

10 - 50

ST collector gross area (> 10 m2) newly installed in SA in recent years. Total number

of installations per year indicated above bars. Legend units are m2.

Page 23: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

23

System Hydraulics

Demand: 7 m3/d @ 85 °C

Page 24: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

24

Average component shares

Page 25: WWF Workshop on Solar Heat in Agri-Processing Large-scale ... › assets › Uploads › Presentation-3.pdf · Xtrata Elands Platinum Mine: DHW and SPH for change house • 500 m2

25

CBC

Current and future heat generation costs from conventional fuels in SA. LCOH values over

20 years with and price increase 0%, 6 % and 12 % respectively. Values in EUR/kWh.