8
WSN Summer Project WSN Summer Project Skövde 2008 Skövde 2008

WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Embed Size (px)

DESCRIPTION

Presentations University and the Campus 450 employees, 15 professors 450 employees, 15 professors 4100 full time student equiv. (8300 individuals) 4100 full time student equiv. (8300 individuals) 48 study programs, 12 master programs 48 study programs, 12 master programs The area History History Manufacturing and Agriculture Manufacturing and Agriculture Round the table presentations

Citation preview

Page 1: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

WSN Summer ProjectWSN Summer ProjectSkövde 2008Skövde 2008

Page 2: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Welcome !Welcome !

Presentations Presentations Project overview and aimProject overview and aimObjectives, tasks and constraintsObjectives, tasks and constraintsSetting the time plan Setting the time plan Remaining admin issues Remaining admin issues

Page 3: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

PresentationsPresentations

University and the CampusUniversity and the Campus 450 employees, 15 professors450 employees, 15 professors 4100 full time student equiv. (8300 individuals)4100 full time student equiv. (8300 individuals) 48 study programs, 12 master programs48 study programs, 12 master programs

The areaThe area HistoryHistory Manufacturing and AgricultureManufacturing and Agriculture

Round the table presentationsRound the table presentations

Page 4: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Project OverviewProject Overview

The Information Fusion Program in SkövdeThe Information Fusion Program in SkövdeProject presentationProject presentationEquipmentEquipment

DB

DB

DB

DBSTATICCLIENT

MOVINGCLIENT

SENSOR NODE

CLIENT NODE

DATABASE NODE

Page 5: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Project AimProject Aim

””Using a distributed database as platform”Using a distributed database as platform” Develop the parts missing for the WSN testbedDevelop the parts missing for the WSN testbed An demonstrator: Infrastructure/Platform /PrototypeAn demonstrator: Infrastructure/Platform /Prototype Show advantages of distributed fusionShow advantages of distributed fusion Distributed information fusion of real data Distributed information fusion of real data Multisensor fusion (simple)Multisensor fusion (simple) Teaching platform for distributed real-time systemsTeaching platform for distributed real-time systemsPaper?Paper? After SeptemberAfter September Target?Target? Joint paper (Sanny involved too)Joint paper (Sanny involved too)

Page 6: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Project Description Objectives Project Description Objectives Objective 1Objective 1:: Connecting the gateway sensor nodeConnecting the gateway sensor node to to the N810 (both in hardware and software)the N810 (both in hardware and software)Objectives 2Objectives 2: :

Objective 2a:Objective 2a: Implement a databaseImplement a database on N810, and store on N810, and store incoming sensor updates in the distributed database. incoming sensor updates in the distributed database.

Objective 2b:Objective 2b: Visualize sensor dataVisualize sensor data at the N810 unit, first as at the N810 unit, first as raw data collected, later cohesive presentation of related data raw data collected, later cohesive presentation of related data sensed.sensed.

Objective 2c:Objective 2c: Distribute data objects. Distribute data objects. Allocate for usage at Allocate for usage at any other database node, rather than at the database node any other database node, rather than at the database node where the sensor is connected via its gateway node.where the sensor is connected via its gateway node.

Objective 2d:Objective 2d: Visualize the contentVisualize the content of sensor data at other of sensor data at other database nodes, as a cohesive view of the “mission” where database nodes, as a cohesive view of the “mission” where sensors are used. Simple fusion of related data is done at sensors are used. Simple fusion of related data is done at database nodes. database nodes.

Page 7: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Setting the Time PlanSetting the Time PlanTENTATIVETENTATIVE ””Database”Database” ””Connection”Connection” PeoplePeople

7 July7 July DB/development DB/development PlatformPlatform

Existing Existing Maemo/Linux?Maemo/Linux?

WK,LS,GM,MBWK,LS,GM,MB

14 July14 July ReplicationReplication Interface from Interface from MaemoMaemo

WK,LS,GMWK,LS,GM

21 July21 July ReplicationReplication WK,GM,MBWK,GM,MB

28 July28 July FusionFusion WK,(GM,MB)WK,(GM,MB)

4 Aug4 Aug VisualizationVisualization WK,(GM,MB)WK,(GM,MB)

Post Post SkövdeSkövde

Visualization/ Visualization/ demo setupdemo setup

Page 8: WSN Summer Project Skövde 2008. Welcome ! Presentations Project overview and aim Objectives, tasks and constraints Setting the time plan Remaining admin

Remaining admin issuesRemaining admin issuesOfficesOfficesLunch placesLunch placesEquipmentEquipmentAvailability/Access to peopleAvailability/Access to peopleTax MattersTax MattersLeisure ActivitiesLeisure ActivitiesLocal informationLocal informationThings to see and doThings to see and doCar rentalCar rental……

www.his.se/research/drts/wsnsummer08