Wrap-Up Meeting of thepilot project on SIGMET Coordination in
South East Asia(MetMalaysia, MSS & BMKG)
Singapore27-29 March 2017
Agenda Item 4 (NMHS experiences and recommendations)
Hamray Bin Muhammad YazitMetMalaysia
1
OUTLINES
INTRODUCTION
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
▪ Staff awareness and training
▪ Review of local procedures
▪ Installation of technical resources
LOCAL ACTIVITIES DURING TO OPERATIONAL PHASE
▪ Ongoing staff awareness and training
▪ Update of local procedures
▪ Completion of logbooks
▪ Resolution of technical difficulties
POSITIVE EXPERIENCES
AREAS FOR IMPROVEMENT
RECOMMENDATIONS
TRANSITION
OTHER ISSUES2
INTRODUCTION
Two FIR involved:
o Kuala Lumpur (KL); and
o Kota Kinabalu (KK)
Meteorological Watch Office (MWO):
o Kuala Lumpur FIR – National Aviation Meteorological Centre(NAMC) at KLIA.
o Kota Kinabalu FIR – Sabah Meteorological Office (SMO) at KKIA.
Number of Meteorological Officer involved:
o NAMC – 10 (5 senior MO’s and 5 junior MO’s/ Shift/ 24 x 7)
o SMO - 10 (5 senior MO’s and 5 junior MO’s/ Shift/ 24 x 7)
3
4
NAMC
Sabah Meteorological Office
5
Forecaster’s Workstation Meteorological Data Processing System (MDPS)
SATAID and JMA web tool STAID, MDPS and ABT (Aviation Briefing Terminal)
NAMC
6
DISPLAY SYSTEM AT NAMC
7
SABAH METEOROLOGICAL OFFICE
HKO Web Tools and Meteorological Processing System
Forecaster’s Workstation
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Staff awareness
Responsibility of MWO to prepare the SIGMET based on;
▪ International Standards and Recommended Practices (SARPs), Annex 3.
▪ Technical Regulations (WMO-No. 49), Volume II: Meteorological Service for International Air Navigation.
▪ ASIA/PACIFIC Regional SIGMET Guide.
The issues on SIGMET;
▪ Phenomena involve more than one FIR.
▪ No specific tools especially to locate the coordinate of phenomena.
▪ The accuracy of SIGMET (Movements, Intensity and Position of phenomena).
8
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
The qualifications and competencies required of personnel involved in the provision of aeronautical meteorological services.
▪ Qualifications - Aeronautical Meteorological Forecaster (AMF) has successfully completed the Basic Instruction Package for Meteorologists;
▪ Competencies for AMF is implemented.
Familiarization on the use of Web Tool
▪ Refer to the manual of Web Tools.
▪ Using the Web Tools in daily SIGMET operation.
▪ Refer to JMA/HKO for any problems on Web Tools.
9
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
Adoption the new SIGMET coordination procedures into actual operation.
▪ Use of web applications
▪ The completion of Log Book
▪ Coordinates the web applications and existing Meteorological Processing System in the dissemination of SIGMET.
Harmonization of SIGMET procedures;
▪ SIGMET coordination procedures
▪ Latest ASIA/PACIFIC Regional SIGMET Guide (5th Edition)
▪ Local Procedures
10
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
Attended “Asia Pacific SIGMET WORKSHOP TOKYO 2016”
▪ Training conducted to other forecaster; and
▪ Materials used from workshop.
Study on Himawari Satellite products continuously.
▪ JMA Website
▪ MetMalaysia Himawari Satellite Processing System Manual
11
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Review of Local Procedures
The new processes to be included in the local procedures;
▪ use of Web Tools for the weather monitoring;
▪ coordination with other MWO for phenomena involving more than one FIR;
▪ Use of Web Tools to generate the coordinate (latitude/longitude) of the SIGMET phenomenon;
▪ transfer the SIGMET which is generated from Web Tools to the existing processing system for the dissemination of SIGMET;
▪ monitoring of the SIGMET (ABT, SkyVector, AWC, JMA Web Tools); and
▪ record the coordination in Log Book; and
▪ Document references
12
Previous SOP New SOP 13
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Review of Local Procedures
Updates the references documents (manual/guidelines):
▪ Local Procedures;
▪ SIGMET coordination procedures; and
▪ ASIA/PACIFIC Regional SIGMET Guide.
Updates the use of the system/tools:
▪ Web Tools (Monitoring and Generating); and
▪ Meteorological Data Processing System (Monitoring,
Analysis/Forecasting and Dissemination)
14
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Installation of technical or other sources
Installation of Web Tools:
▪ Refer to manual (JMA and HKO);
▪ Used existing workstation; and
▪ No upgrading on the network.
Satellite data (Himawari 8) and Composite Radar Network:
▪ Enhanced Infrared Satellite Image data updates every 10 Minutes into
SATAID and Meteorological Processing System; and
▪ Composite CAPPI (2 km) data updates every 10 minutes into
Meteorological Processing System.15
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Ongoing staff awareness
Frequent discussion on the procedures:
▪ SIGMET coordination procedures;
▪ ASIA/PACIFIC Regional SIGMET Guide; and
▪ Local Procedures.
Attending the coordination monthly meeting:
▪ updates on new issues;
▪ new instructions/amendments of procedures; and
▪ Opportunities to share the knowledge.16
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Ongoing staff training
All forecasters are involved in the discussion of any issues :
▪ during coordination (monitoring and analysis of weather); and
▪ actively involved in the case study (preparation).
Training on the system
▪ hands on training on the updated features available via Web Tools;
and
▪ other MetMalaysia Meteorological Systems (radar, satellite and WAFS
products) which is available for the purposes of monitoring and
analysis.17
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Update of local procedures
Update accordingly from the monthly meeting highlights:
▪ Processes (Methodologies);
▪ Web Tools new features (JMA and HKO);
▪ local meteorological system (overlay radar data and satellite); and
▪ Add new document references (WMO, ICAO, etc)
18
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Number of SIGMET
19
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Number of SIGMET Coordination
20
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
SIGMET Coordination Logbook
21
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Significant elements to be recorded in the logbook includes:
▪ Date of consultation;
▪ Consultation start and end time;
▪ Local MWO;
▪ Consulted by or consultation with neighbouring MWO;
▪ SIGMET sequence number;
▪ Phenomenon;
▪ Observed or forecast;
▪ Geographic area affected;
▪ Brief description of the consultation (reach consensus and/or nonconsensus);
▪ Full SIGMET message issued by the originating MWO; and
▪ Suggestions for improvement.
22
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Criteria for logbook completion:
▪ For any coordinated SIGMETs; and
▪ Recorded after the issuance of coordinated SIGMET.
Review logbook to identify any issues for further discussion (monthly
meeting as a case study).
Retain logbook (softcopy)
23
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Resolution of the technical difficulties
Web Tools
▪ Call the front line maintenance team (24 x 7) for any problem
encountered on workstation and network;
▪ Report to WEB TOOL ADMINISTRATOR (JMA via BBS chatroom/email
and HKO (via HKO chatroom); and
▪ Call the Satellite Division for any problem on the SATAID Satellite
Images.
Other Meteorological Systems as a back-up for the SIGMET coordination.
▪ Corrective and preventive maintenance which is support by
maintenance team (office/Headquarters)24
POSITIVE EXPERIENCES
Increase the knowledge and confident among forecasters through:
▪ Discussion with other MWO;
▪ Discussion on any issues encountered (case studies) in the monthly
meeting;
▪ Improve local SOP
▪ Cooperation at international level for development of SIGMET
Coordination Procedures and Guidelines; and
▪ Technologies (web tools) used for monitoring and generating of
phenomenon coordinate and SIGMET messages.25
AREA FOR IMPROVEMENT
Methodologies used for the movement of phenomenon;
26
AREA FOR IMPROVEMENT
Need to have a proper procedure to be included in the SIG-CoordGuidelines on determining the SIGMET consistency (to reachconsensus) {E.g: cloud top reference, movement & intensity}
27
AREA FOR IMPROVEMENT
Usage of other satellite images. Eg. Cloud Type, etc.;
To include cloud type or other types of satellite images in web tools
Himawari 8 – Cloud Type 28
AREA FOR IMPROVEMENT
Use of WAFC (graphic) for the monitoring of SIGMET
29
Graphic SIGMET
AREA FOR IMPROVEMENT
Use of actual upper wind chart (0000UTC and 1200UTC);
30
Upper Wind Chart(1,000ft, 3,000ft, 5,000ft, 7,000ft, 10,000ft, 14,000ft, 19,000ft, 25,000ft, 32,000ft, 36,000ft and 41,000ft)
AREA FOR IMPROVEMENT
31
FY2E ASEAN IR, 0000UTC, 23/02/17 HIMAWARI 8 ASEAN IR, 0020 UTC, 23/02/17
Verification on Infra-Red Satellite (position of phenomenon).
AREA FOR IMPROVEMENT
32
Overlay IR Himawari satellite images with Radar CAPPI
(2km) Composite images, 0000UTC
IR satellite images, JMA Web Tools, 0100UTC, 23/2/2017
Verification on Infra-Red Satellite (position of phenomenon).
RECOMMENDATIONS
WMO or JMA expert provide training on the application of satellite
images.
Involves other adjacent FIR
▪ Other adjacent FIR to Kuala Lumpur FIR : Bangkok, Yangon and
Chennai
▪ Other adjacent FIR to Kota Kinabalu FIR : Manila
33
34
Kuala Lumpur , Kota Kinabalu and adjacent FIR
TRANSITION TO FULL OPERATIONAL SIG-Coord
Commencement on 1st May 2017 at 0000UTC.
Support required
▪ JMA and HKO for web tools
▪ Training
35
OTHER ITEMS/ISSUES
WMO and ICAO future plan
To disseminate Graphical SIGMET locally
To practice the usage of NWP products to forecast phenomena in the
issuance of SIGMET
36
37