WP7 Evaluation of ZERO BRINE systems sustainability performance Steve Harris IVL Swedish Environmental Research Institute 23 September 2019 1 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

WP7 Evaluation of ZERO BRINE systems sustainability

performance Steve Harris

IVL Swedish Environmental Research Institute

23 September 2019 1 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

Page 2: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

1. Where are we in WP7

2. D7.3 Results of preliminary analysis

3. Next steps

Introduction

23 September 2019 2 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

Page 3: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

• Task 7.1 - Evaluation LCA, LCC and Social • Design workshops

• Data collection

• Draft D7.3 Preliminary Analysis - delivered 1st June 2019

• Task 7.2 Feasibility study

• Task 7.3 Environmental Technology Verification • Workshop today

1. Where are we with WP7?

23 September 2019 3 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

Page 4: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

2. Draft sustainability evaluation

3. Final sustainability evaluation

Evaluation of sustainability performance (WP7)

Zero

Bri

ne

Sys

tem

Finalise evaluation. Includes: • Updated data collection for optimised

process • Update and finalise LCA/LCSA/LCC

evaluation Input to commercialisation and further

development

Industry Water (WP2) Evides, Botlek, NL

Coal Mine Drainage (WP3) Tauron, Poland

Textile Industry (WP3) Zorlu, Turkey

Precipitated silica (WP4) IQW, Spain

1. Define sustainability evaluation

1. Bench scale 2. Pilot 3. Validation & verification

Optimisation of process design & parameters

Final analysis start: Mar 2020 Data collection end: Sep 2020?

Task 7.1 Stages in ”Unified Approach for Sustainability Evaluations”

Page 5: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

• ZB plant has higher impact

• However - impacts of current discharge is not yet included

• Largest impact: chemical use at the TOC removal process • Sulphuric acid and sodium hydroxide

• Due to electricity in production

• Benefits of recovery - of water, NaCl and magnesium do not counteract the impact of the chemicals

23 September 2019 5 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

1.664

130 18 20

3.439

262 53 69

0

500

1000

1500

2000

2500

3000

3500

4000

Abiotic depletion (MJ) Global warming (kg CO2eq)

Human toxicity (kg 1,4-DBeq)

Fresh water aquaticecotoxicity (kg 1,4-DB eq)

DWP (without ZB plant)

DWP (with ZB plant)

D7.3 Preliminary LCA and LCC – Overview of results Demineralised Water Plant – Netherlands Life cycle assessment

Page 6: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

23 September 2019 6 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

77%

23%

OPEX (personnel)

OPEX (materials)

Antiscalant (Vitec 3000)

1%

NaOH 3%

H2SO4 0%

Magnesium Oxide -55%

Calcium hydroxide -13%

NaHCO3 (soda ash) -23%

HCl 1%

Contributions of consumables and recovered materials

OPEX estimations of DWP with ZB system

D7.3 Preliminary LCA and LCC – Overview of results Demineralised Water Plant – Netherlands Life cycle costing

Page 7: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

Industrial Wastewater Resource Recovery Circular Economy 7

Case study 2: Coal mine, Poland Μain findings

Conf. 1: Two stage NF, electrodialysis diluate recycled to NF Conf. 2: Single-stage NF, ED diluate recycled to NF

Best environmental performance with similar LCA results

Page 8: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

Industrial Wastewater Resource Recovery Circular Economy

• Main environmental impact: (i) energy consumption, (ii) use of dolime suspension at the magnesium recovery process.

• Minor: Use of the auxiliary materials for cleaning and regeneration purposes

• Positive benefit: Recovered materials - especially magnesium hydroxide (dependent on quality)

• LCC performance: Positive LCC results – up to 1.022,75 €/ m3 wastewater

• From the 4th configuration (single stage NF, 75% NF retentate recycling, ED diluent recycling before RO) is the most cost-effective one (no externalities included)

8

Coal mine – Poland Preliminary results

Page 9: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

9

Case study 3: Textile Industry, Turkey Preliminary results

• Main environmental impact: Reverse Osmosis from energy consumption. RO contributes most to all impact categories, with a factor of higher than 80%, except ozone layer depletion. • Minor: Use of auxiliary materials (mainly cleaning and operational

chemicals) • Positive benefit: Recovery of materials and especially brine solution

(quality and market dependent) • LCC performance: LCC result is positive at 403,62 €/m3 wastewater input,

(externalities not included)

Page 10: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

• RO main cause of environmental impact (80%)

• Physico-chemical treatment 10%; UF 5% (from operation, and energy use)

• Regenerated membranes only 5-10% impact v new membranes

LCC

• OPEX 80% / CAPEX 20%

• Staff account for 60% of OPEX (>50% of total)

D7.3 Preliminary LCA and LCC – Overview of results Silica Plant - Spain

23 September 2019 10 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

Page 11: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

3. Task 7.2 Feasibility study

23 September 2019 11 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

• Feasibility Study - Economic evaluation of case studies examined - Ecodesign for full-scale development

• DLR will use the simulation platform developed in Task 5.3 to obtain concrete figures about energy and mass balances, as well as critical cost figures regarding the operating costs (OPEX).

• Example Evides I (flowsheet & RCE implementation)

• Main results provided till 06/2020

Page 12: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

• Task 7.1 • LCA/LCC data refinement and collection from pilot plants

• Unified Approach nearing completion

• Refine analysis

• Task 7.2: Feasibility • Completed by June 2020

• Task 7.3 Environmental Technology Verification • Agree plan forward

• Data format and collection

3. Next steps

23 September 2019 12 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

Page 13: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

23 September 2019 13 The ZERO BRINE project (www.zerobrine.eu) has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 730390.

[email protected]

Page 14: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

Can LCA be used for design?

• Absolutely !!

• It can help with many questions

• Materials and energy impacts from mining

• Performance during the use phase

• What is the best option at the end of life?

• Life cycle costing • Can give a new perspective

• Help to show benefits

23 September 2019 14

Page 15: WP7 Evaluation of ZERO BRINE systems sustainability ... · •Task 7.1 - Evaluation LCA, LCC and Social •Design workshops •Data collection •Draft D7.3 Preliminary Analysis -

Industrial Wastewater Resource Recovery Circular Economy 15

-0,015

-0,01

-0,005

0

0,005

0,01

0,015

0,02

0,025

0,03

No

rmal

isat

ion

un

its

Normalisation ILCD, Configuration 1

Magnesium recovery Nanofiltration Reverse Osmosis

Electricity, high voltage {PL} Gypsum Magnesium hydroxide

Deionised water Sodium chloride