Upload
abel-moody
View
214
Download
0
Tags:
Embed Size (px)
Citation preview
WP 6.3 Integration of Adriatic port with hinterland and improved services
WP 6.3.2 test of new ICT solutions and pilot interventions in ports by adopting light infrastructures
FB3,6,7,8,9,15,17,19 will implement internet, public information checking system, ticketing and ICT activities.
FB10 will improve connections between ports and railway/bus hubs.
FB 10REGIONE ABRUZZO
PHYSICAL INFRASTRUCTURES: PORTS
REGION ABRUZZO
2 main ports: - PESCARA Passengers (Pescara – Split) 17.000 Passengers from 20.07.2014 to 30.09.2014
- ORTONA Goods (almost 900.000 tons per year)
Other ports: - Giulianova - Vasto
Giulianova
PESCARA
ORTONA
Vasto
PHYSICAL INFRASTRUCTURES: CONNECTIONS BETWEEN PORTS AND RAILWAY/BUS HUBS
PESCARA ORTONA
Distances: From port to Railway station/bus hub 2,4 km From port to airport 5,2 km
Distances: From port to Railway station/bus hub 0,2 km From port to airport 26,00 km
PORTPORT
BUS/RAILWAY BUS/RAILWAY
EA SEA WAY – WP 6.3.2 ICT SOLUTION FOR IMPROVING connections between ports and railway/bus hubs
APPLICATION “APP” EASY PASSENGERS TOTEM TOUCH-SCREEN
GIVES INFORMATION ON:
• urban mobility system (bus);• how to reach main destinations by train and bus• touristic itineraries (hinterland)
GIVES INFORMATION ON:
• urban mobility system (bus);• how to reach main destinations by train and bus• touristic itineraries (hinterland)
GIVES INFORMATION TO: “connected passengers” GIVES INFORMATION TO: “non-connected passengers”
Acts as first contact with passengers and guides them through the city and the hinterland
Will be also useful for the spread of the “app”
APP – STRUCTURE AND FEATURES
Main features :
Replicable. The structure of the software should be implemented on different integrated transport system (main Adriatic hubs) without significative changes
Modulear. A Modulear structure allows fast/easy travel information updating (i.e. new routes, timetable changing etc.) Sustainability:
Economic sustainability: maintenance costs
Environmental sustainability: it is possible to estimate emissions (environmental impact) through specific algorithms
User Friendly The interface must be essential and recognisable in the three versions available for the passengers: Phone Application, Website, TOTEM Touch screen. Although this sw aims to guide the passengers through the Adriatic Basin, we think that aspects such as updating and maintainability are crucial. For this reason a specific interface will be carried out in order to simplify the implementation of new routes and/or changes process so technical staff will be non necessary for ordinary updating operations.
Module A Option 2 Database
Module B «Software»
Module C Interface
Strategic points
Infrastructures: stops
App
Totem Touch Screen
Module AA Ordinary Updating
Non-technical staff (authorities, travel companies etc.)
USERS – CUSTOMERS
Module A Option 1 Itineraries
Next steps
1. Main Idea – Software Structure
2. Software developer identification
3. Economic and professional consultants identification
4. Data collection DB Creation
5. Software compilation programming
6. Software validation
7. Totem installation
APP DEVELOPING PHASES
“Involved regions test new ICT solutions for infomobility&integrated ticketing, real time
check-in and tracking for passengers and their vehicles: realisation of a shared IT
platform to allow a more efficient and easier mobility among Adriatic area.”
COOPERATION PROPOSAL
Mentioning the description of the activities included in the EA Sea-WAY project - WP 6.3.2:
FB 10 APP’S STRUCTURE IDEA DB compilation
One single ICT solution for everybody??????Sharing different ICT solutions???????
SPLIT
ROME
PESCARAORTONA
COOPERATION PROPOSAL
One Route actually active from Pescara to Split
FB10’s APP + TOTEM
ORTONA
NAPLES