10
The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) REPORT NO.: RES31013 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 TO SAVE THE CHILDREN INTERNATIONAL EDUCATION EAST ASIA AND PACIFIC Regional Vice President: Victoria Kwakwa Country Director: Ellen A. Goldstein Senior Global Practice Director: Jaime Saavedra Chanduvi Practice Manager/Manager: Harry Anthony Patrinos Task Team Leader: Tsuyoshi Fukao Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

REPORT NO.: RES31013

RESTRUCTURING PAPER

ON A

PROPOSED PROJECT RESTRUCTURING

OF

EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT

APPROVED ON JUNE 10, 2016

TO

SAVE THE CHILDREN INTERNATIONAL

EDUCATION

EAST ASIA AND PACIFIC

Regional Vice President: Victoria Kwakwa Country Director: Ellen A. Goldstein

Senior Global Practice Director: Jaime Saavedra ChanduviPractice Manager/Manager: Harry Anthony Patrinos

Task Team Leader: Tsuyoshi Fukao

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

ABBREVIATIONS AND ACRONYMS

CB Community-basedECCD Early Childhood Care and DevelopmentHB Home-basedISR Implementation Status ReportPDO Project Development ObjectiveSCI Save the Children International

Page 3: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

BASIC DATA

Product Information

Project ID Financing Instrument

P146085 Investment Project Financing

Original EA Category Current EA Category

Partial Assessment (B) Partial Assessment (B)

Approval Date Current Closing Date

10-Jun-2016 10-Jun-2019

Organizations

Borrower Responsible Agency

Save the Children International

Project Development Objective (PDO)

Original PDOThe PDO is to improve access to quality Early Childhood Care and Development (ECCD) services through community and home-basedprograms for 0 to 5-year-olds, particularly for those from disadvantaged background, in the targeted areas.OPS_TABLE_PDO_CURRENTPDOSummary Status of Financing

TF Approval Signing Effectiveness ClosingNet

Commitment Disbursed Undisbursed

TF-A2429 30-May-2016 10-Jun-2016 10-Jun-2016 10-Jun-2019 2.79 1.38 1.41

Policy Waiver(s)

Does this restructuring trigger the need for any policy waiver(s)?No

Page 4: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

4

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING

A. Summary of Project Status

1. The Early Childhood Care and Development (ECCD) for Floating Villages Project (hereinafter referred to as the Project) supports the Government of Cambodia, through Save the Children International (SCI) as an implementing agency, to improve access to quality ECCD services through community-based (CB) and home-based (HB) ECCD programs. To this end, the Project supports: (i) the construction of onshore and floating CB ECCD centers; (ii) establishment of HB ECCD programs; (iii) building capacity of CB ECCD center facilitators as well as government officials for improving CB ECCD services; (iv) training to core mothers and parent group leaders for conducting HB ECCD programs; and (v) maternal literacy program for promoting ECCD activities. The baseline and endline studies are included to assess the output and outcome results and indicators agreed in the project results framework. 2. The Project is half way through its short three-year implementation period. Its design is ambitious and innovative and reasonable progress has been made to-date. The project is now entering a crucial stage, with a range of important activities to be implemented within tight time constraints. Initial delays of approximately one year were due to the pilot nature of the construction (onshore and floating centers). More time was required for SCI to get qualified staff on board, especially in the areas of center designs, and construction of both onshore and floating centers. The design of the onshore center was approved by the Bank in February 2017. The design of the floating center was submitted to and approved by the Bank in December 2017 and the technical specifications finalized in March 2018. Thus far, one onshore ECCD center has been completed in March 2018. Three other onshore centers are being constructed and scheduled to finish in June 2018. For construction of floating ECCD centers, the bid announcement has taken place in mid April 2018. The bid opening will be carried out in mid May 2018.

3. Despite the construction delays of the CB centers, SCI is to be complimented on implementing a series of training activities relating to the soft components. All project personnel are now on board and have received appropriate training, including training on safeguards to SCI engineers, staff and contractors, training on procurement and contract management as well as training on financial management. Training sessions for CB-ECCD volunteer teachers has been completed. While waiting for the construction to complete, trained facilitators use existing infrastructure or available spaces in the villages to organize CB ECCD classes such as community centers, primary schools and pagodas. These volunteer teachers will also be able to support the HB ECCD activities. For HB ECCD, parenting sessions are ongoing, with increasing numbers of participating parents. Parental literacy program has been successfully completed for 198 parents (the project has achieved the target of 150 parents). As of April 30, 2018, project cumulative disbursement stands at 45.55 per cent of the total grant amount.

4. In terms of achieving the PDO, the most recent ISR rating is Moderately Unsatisfactory (MU). CB ECCD program enrollment and classroom environment have made little progress, as most of the CB ECCD centers are under construction, resulting in the slow progress of these two PDO indicators. On the other hand, HB ECCD program has been implemented on schedule and the PDO indicator on HB ECCD program enrollment is on track. Regarding the intermediate results, one intermediate indicator regarding the community-based ECCD center construction shows little progress, while a second indicator regarding parent’s literacy class has been achieved and a third indicator related to parent’s participation in the home-based ECCD program is on track. The fourth and last intermediate indicator – the number of communes that address ECCD services in their official annual plans – is expected to be met during the final year of implementation.

Page 5: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

5

B. Rationale for Restructuring

5. The project mid-term review was conducted during November 20 – December 1, 2017. Its key findings highlighted that the project is at a critical stage of implementing activities within the tight remaining timeframe due to the accumulated delays from the civil works component. Although the other components have been progressing relatively well, adjustment and alignment of targets and indicators as well as reallocation of funds were suggested to ensure that the PDO will be met during the remaining implementation period. The main adjustment will be the number of children enrolled in the CB ECCD programs as well as HB ECCD programs, the project’s PDO level indicators, which will be reduced due to the following reasons.

6.First, findings from the project baseline study indicates that the number of children in the target areas who would participate in the ECCD programs has reduced due to the two main reasons: (i) children from floating communities migrate with their families to find jobs on the main land or in the neighboring country; and (ii) behaviors in reproductive health have changed, resulting in low new birth rate for the target age children of the project. The study shows that there is a decline of about 7 per cent per year in the population of age 0-6 children in target villages. Migration also causes the total number of parents who would participate in the project’s HB ECCD program to reduce.

7.Second, the number of children enrolled in CB ECCD programs will be reduced due to the decreased number of CB ECCD centers to be constructed (from originally 18 to 11 centers) caused by the construction cost escalation. Two main reasons have contributed to such cost escalation: (i) the design has been significantly improved to ensure stability, safety and provision of quality learning environment; and (ii) the cost of materials has increased significantly due to inflation and limited availability in the domestic market.

8.In light of the above, SCI has requested that the project be restructured within the following parameters of PDO indicators as well as an intermediate indicator: (i) reduce the number of children enrolled in CB ECCD program from the original target of 1,200 children to 770 children (PDO Indicator); (ii) reduce the number of children enrolled in HB ECCD program from 12,183 children to 10,070 children (PDO Indicator); (iii) reduce the number of CB ECCD centers to be constructed using the project funds from 18 to 11 centers (Intermediate Indicator), (iv) reduce the number of parents participating in HB ECCD program from 10,153 to 8,483 persons, and (iv) reallocate the funds to cover the increased construction cost of the CB ECCD centers. The restructuring, which is in response to the local context changes, will allow the project to achieve its PDO and related indicators. Concerted efforts both by SCI and WB task teams will be made to ensure that the project implementation will be closely monitored and accelerated within the remaining project timeframe.

II. DESCRIPTION OF PROPOSED CHANGES

C. Results Framework and Monitoring9.PDO Level Results Indicators

(a) Indicator One: Number of children enrolled in CB ECCD grogram financed by the project

The proposed change for this indicator is to reduce the end target to 770 children due to (i) the reduction of beneficiary children in the target areas, and (ii) the reduction of the number of CB ECCD centers to be constructed.

Page 6: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

6

(b) Indicator Two: Number of children enrolled in HB ECCD program financed by the project

The proposed change for this indicator is to reduce the end target to 10,070 children due to the reduction of beneficiary children in the target areas.

10. Intermediate Results Indicator(c) Intermediate Result Indicator One: Number of ECCD centers with health corners constructed

The number of CB ECCD centers to be constructed is scaled down from 18 centers (9 onshore and 9 floating) to 11 centers (4 onshore and 7 floating) due to the cost escalation.

(d) Intermediate Result Indicator Two: Number of parents participating in HB ECCD program

The proposed change for this indicator is to reduce the end target to 8,483 parents due to the lower number of new parent groups participating in the project in Year 3. The reason for the lower number of parent groups is due to migration.

D. Reallocation between Disbursement Categories

11. Due to the construction cost escalation, funds are proposed to be reallocated across disbursement categories to reflect the additional construction costs as follows:

Original Proposed ReallocationCategory Amount ($) % Amount ($) %

Consultants’ Services 557,990 20.0 551,990 19.8Incremental Operating Costs 418,494 15.0 418,494 15.0Goods 159,945 5.7 149,091 5.3Works 600,768 21.5 654,658 23.5Training and Workshops 1,052,803 37.7 1,015,767 36.4

2,790,000 100.0 2,790,000 100.0

III. SUMMARY OF CHANGES

Changed Not Changed

Change in Results Framework ✔

Reallocation between Disbursement Categories ✔

Change in Disbursement Estimates ✔

Change in Implementing Agency ✔

Change in Project's Development Objectives ✔

Page 7: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

7

Change in Components and Cost ✔

Change in Loan Closing Date(s) ✔

Cancellations Proposed ✔

Additional Financing Proposed ✔

Change in Disbursements Arrangements ✔

Change in Overall Risk Rating ✔

Change in Safeguard Policies Triggered ✔

Change of EA category ✔

Change in Legal Covenants ✔

Change in Institutional Arrangements ✔

Change in Financial Management ✔

Change in Procurement ✔

Change in Implementation Schedule ✔

Other Change(s) ✔

IV. DETAILED CHANGE(S)

OPS_DETAILEDCHANGES_RESULTS_TABLE

RESULTS FRAMEWORK

Project Development Objective Indicators PDO_IND_TABLE

Number of children enrolled in Community-based ECCD program financed by the projectUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 300.00 770.00 Revised

Date 10-Jun-2016 23-Jan-2018 31-May-2019

Number of children enrolled in Home-based ECCD program financed by the projectUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 5394.00 10070.00 Revised

Page 8: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

8

Date 11-Jul-2016 23-Jan-2018 31-May-2019

Percentage of Community Based ECCD program rated as level 5 overall on the adjusted Early Childhood Environmental Rating Scale throuhg classroom observationUnit of Measure: PercentageIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 0.00 50.00 No Change

Date 11-Jul-2016 23-Jan-2018 31-May-2019

Intermediate IndicatorsIO_IND_TABLE

Number of ECCD centers with health corners constructedUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 0.00 11.00 Revised

Date 10-Jun-2016 23-Jan-2018 31-May-2018

Number of parents participating in HB ECCD programUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 4339.00 8483.00 Revised

Date 11-Jul-2016 23-Jan-2018 31-May-2019

Number of parents/mothers who participated and completed maternal literacy programsUnit of Measure: NumberIndicator Type: Custom

Baseline Actual (Current) End Target Action

Value 0.00 198.00 150.00 No Change

Date 11-Jul-2016 23-Jan-2018 31-May-2019

Number of communes that address ECCD services in their official annual plans of commune councilUnit of Measure: NumberIndicator Type: Custom

Page 9: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

9

Baseline Actual (Current) End Target Action

Value 0.00 0.00 24.00 No Change

Date 11-Jul-2016 06-Sep-2017 31-May-2019

OPS_DETAILEDCHANGES_REALLOCATION _TABLE

REALLOCATION BETWEEN DISBURSEMENT CATEGORIES

Current Allocation Actuals + Committed Proposed Allocation Financing %(Type Total)

Current Proposed

TF-A2429-001 | Currency: USD

iLap Category Sequence No: 1 Current Expenditure Category: TFA2429 - CONS SERV

557,990.00 256,038.22 551,990.00 100.00 100.00

iLap Category Sequence No: 2 Current Expenditure Category: TFA2429 - GOODS

159,945.00 94,340.92 149,091.00 100.00 100.00

iLap Category Sequence No: 3 Current Expenditure Category: TFA2429 - WORKS

600,768.00 45,448.57 654,658.00 100.00 100.00

iLap Category Sequence No: 4 Current Expenditure Category: TFA2429 - TRAINING & WS

1,052,803.00 616,613.84 1,015,767.00 100.00 100.00

iLap Category Sequence No: 5 Current Expenditure Category: TFA2429 - OPERATING COSTS

418,494.00 166,198.97 418,494.00 100.00 100.00

Total 2,790,000.00 1,178,640.52 2,790,000.00

OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE

DISBURSEMENT ESTIMATES

Change in Disbursement EstimatesYes

Page 10: World Bank Documentdocuments.worldbank.org/curated/en/158361527570454842/...The World Bank Early Childhood Care and Development for Floating Villages Project (P146085) 6 (b) Indicator

The World BankEarly Childhood Care and Development for Floating Villages Project (P146085)

10

Year Current Proposed

2016 500,000.00 0.00

2017 1,000,000.00 560,000.00

2018 1,000,000.00 800,000.00

2019 290,000.00 1,430,000.00

2020 0.00 0.00