172
Document of The World Bank FOR OFmFCIAL USE ONLY --- ' •At 27y3y-JzrEf Report No. 5346a-IND STAFF APPRAISAL REPORT INDONESIA KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT April 24, 1985 Agriculture 4 Division East Asia and Pacific Regional Office This document has a restricted distribution and mav be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Document of

The World Bank

FOR OFmFCIAL USE ONLY

--- ' •At 27y3y-JzrEf

Report No. 5346a-IND

STAFF APPRAISAL REPORT

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

April 24, 1985

Agriculture 4 DivisionEast Asia and Pacific Regional Office

This document has a restricted distribution and mav be used by recipients only in the performance oftheir official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

CURRENCY EQUIVALENTS

Currency Unit Indonesian Rupiah (Rp)

US$1.00 = Rupiahs (Rp) 1,100Rp 100 = US$0.909

Rp 1 million = US$909.09

WEIGHTS AND MEASURES - METRIC SYSTEM

1 millimeter (mm) - = 0.039 inches1 meter (m) = 39.37 inches1 kilometer (km) = 0.62 miLes1 square kilometer (sq km) 0.386 square miles1 hectare (ha) = 2.47 acres1 cubic meter per second (cu m/sec) = 35.31 cubic feet per second1 million cubic meters (MCM) = 811 acre feet1 liter (1) = 0.264 gallons (US)1 liter/second (Wfs) 0.035 cubic feet per second1 kilogram (kg) = 2.2 pounds1 metric ton (ton) = 2,205 pounds1 Megawatt (MW) = 1,000 kilowatts1 Megavolt-ampere (MVA) = 1,000 kilovolt amperes1 kilovolt (kV) = 1,000 volt1 Gigawatt hour (GWh) = 1 million kilowatt hours

INDONESIAN FISCAL YEAR

April 1 - March 31

GLOSSARY

Agraria - Department of Mapping and Land SurveysKabupaten - Administrative districtKanwil - Kantor Wilaya - regional officesKecamatan - Administrative subdistrictKecil - Small-scale irrigation systemKhusus - Large-scale irrigation systemPalawija - Secondary foodcrops (maize, soybeans, cassava, groundnut,

sweet potatoes, etc.) grown mainly in dry season.Repelita - Five-Year National Development PlanSawah - Lowland rice fields with bunds to collect irrigation or

rain water and maintain controlled inundationSedang - Medium-scale irrigation systemSeksi - Irrigation section (20,000-60,000 ha)Wilayah - Regional irrigation office which oversees several seksis

Page 3: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

FOR OMCAL USE ONLY

ABBREVIATIONS

ADB - Asian Development BankBPKP - Financial and Development Supervisory BoardDGLRR - Direccorate General of Land Rehabilitation and

ReforestationDGWRD - Directorate General of Water Resources DevelopmentDOI - Directorate of IrrigationDOR - Directorate of RiversGOI - Government of IndonesiaHlYV - High Yield Varieties of RiceICB - international Competitive BiddingIHE - Institute of Hydraulic EngineeringINPRES - Revenue sharing grant programs from GOI to district and

village authorities.IPEDA - turan Pembangunan Daerah (land tax)MPW - Ministry of Public WorksMSL - Mean Sea LevelNWSL - Normal Maximum Water Surface LevelO&M - Operation and Maintenance,LNTE - Perusanaan Umum Listrik Negara (GOI's power authority)RSI - Resident Staff, Indonesia (Bank)SIAP - Budget CarryoversSMEC - Snowy Mountains Engineering Corporation

IThis docume has a resticted distbutkn and may be used by recpients only in theprfonanceoftheir ofricil dutieL Its contents may nDt otherwise be dsdosed without Wold Bank authorizati

Page 4: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

STAFF APPRAISAL REPORT

Table of Contents

Page No.

LOAN AND PROJECT SUMMARY ... iv

I. BACKGROUND ............ 1General ........... ...... .............O................................. IThe Agricultural and Rural Sector ............................ 1The Irrigation Subsector .. 2The Role of the Bank ............ 6

II. THE PROJECT AREA . ... 7Background and Location .... 7Climate and Soils .... 9Existing Irrigation Systems ................ ... .... . 9Power .......................................... ............ . 10Town .nd Village Water Supplies ............................ . 11AgEriculture .......................... .... .......................... 11Farm Size and Land Tenure . ............ e*............. 13Population ..................................................... .......... 14Eployment .............................................................. 15Health . .. ... ... ................................... 15

III. THE PROJECT .......................... 15Objectives, Rationale for Bank Involvement and Scope ......... 15Project Details ............................................. . 17Consulting Services....... ........ ...................... 25Status of Project Preparation ........ .... ........ 26Dam Safety .......................................................... 26Implementation Schedule. ... .e .... o ..... ........... ...... 27Cost Estimates ........................................................ 27Financing ....................................... ... ....... .... 29Procurement ....................... *....a............................. 29Review of Procurement ........... ............ .............. ... 31Disbursementse.e....................................................... 31Accounts, Audits and Reporting ............................... 32Environmental Impact ...... ............................... 32

This report is based on the findings of an appraisal mission to Indonesiaconsisting of Messrs. Gunaratnam and LeMoigne (Bank) and Ms. Thompson andMr. Matheson (consultants) who visited Indonesia in May 1984.

Page 5: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Page No.

IV. ORGANIZATION AND MANAGEMENT ...... ..... 34National Level Organization and Management . . 34Field Level Organization and Management ...................... 35Project Coordination .. 37Operation and Maintenance .. 37

V. AGRICULTURAL SERVICES AND PRODUCTION . . 40Agricultural Services .. 40Changes in Crop Production under the Project . . 41

VI. MARKZT PROSPECTS, PRICES, FARM INCOMES AND PROJECT CHARGES... 44

Market Prospects ............... 44Prices ....................................................... 45Farm Incomes ................................................. 45Project Charges .. 47

VII. BENEFITS, ECONOMIC JUSTIFICATION AMD RISKS . . ................. 49General ...................................................... 49Benefits ..................................................... 49Main Assumptions Used in the Economic Analysis . . . 50Risks and Sensitivicy Analysis . . . 51

ViIII. AGREEMENTS REACHED AND RECOMMENDATION . ... 53

LIST OF TABLES IN MAIN REPORT

1.1 Indicative Investment Program for Irrigation, 1984/85-1988/89 52.1 Previous Investments in the Project Area by GOI and Bank ..... 82.2 Land Use Suimmary ............ . 122.3 Summary of Farm Size Distribution, 1983 . . 132.4 Land Values and Rental Values-------....---......-------- 142.5 Project Area, Population, Density and Households, 1983 ...... 143.1 Features of Kedung Ombo Dam and Appurtenances . . 183.2 Annual Water Requirements and Supply by Source .. 203.3 Project Irrigation Works ..... 223.4 Project Cost Suimiary ....... . .................... . 283.5 Financing Plan . ....... .............................. . 293.6 Procuremento ..................... .0............................ 303.7 Proposed Resettlement Plan and Compensation Payments .......4 4 334.1 Project Office Staff Numbers .... o..... . .......... 365.1 Cropping Intensity ..... ......................... 4...44444 41

5.2 Crop Areas .. ... ...... . 42

5.3 Yield Estimates . .. - ... ......... . .. . 43

5.4 Incremental Production ... as& . ... 446.1 Net Farm Incomes Per Capita ....... ........................... 467.1 Sensitivity AnaLysis .... .........-......... ..... 52

7.2 Summary of Impact of O&M Changes ....................... oo.... 52

Page 6: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

~~~~~~~~~- i -

ANNMEES

1. Summary Cost Estimates, Allocation of Loan Proceeds, and Schedule ofDisbursements.

2. Agricultural Production under the Project and Project Economic andFinancial Analyses.

3. Main Features of Project Civil Works.

4. Dam and Irrigacion Works - Construction Program.

5. Detailed Costs of Equipment and Buildings.

6. Consulting Services.

7. Flood Forecasting and Water Monitoring System.

8. Proposed Organization for Resettlement.

9. Operation and Maintenance - Organization and Funding.

10. Statements of Expenditure.

11. Selected Documents and Data Available in Project File.

CHARTS

26628 - Directorate General of Water Resources Development Organization26629 - Structure of Organization - Jratunseluna River Basin Development

Project26630 - Organization for Dam Construction26631 - Organizacion Scheme for Irrigation Subproject26681 - Schematic Used for Operations Study26718 - Project Organization for Implementation

MAPS

18568R - Project Area18555 - GeneraL Layout18544 - Kedung Ombo Multipurpose Dam Project18529 - Layout of Irrigation Scheme under the Project18530 - Water User Associations - Upper and Lower Sedadi18531 - Present and Future Administration Boundaries

Page 7: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

'NDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Loan and Project Summary

Borrower: Republic of Indonesia

Amount: US$156 million equivalent

Terms: Repayable in 20 years, including 5 years of grace, at thestandard variabLe rate.

ProjectDescripcion: The main obiectives of the project are to increase food

production an some 59.340 ha, stimulate employment in theproject area. control damaging floods in rural and urbanareas, supplement water supplies for some 300 villages andtowns, generate 74 GWh of power which would be fed into thenational grid and improve water management in the projectarea. The project includes: (a) construction of the KedungOmbo Dam, appurtenant structures, diversion works, a hydro-power plant (28.5 MVA) and associated transmission line (30km, 150 kV) and three micro-hydropower plants (about 1.8 MVAeach) and associated transmission lines (20 kV); (b)improving existing irrigation (34,240 ha) and constructingtwo new irrigation systems (25,100 ha); (c) establishing aflood warning and water monitoring system for the dam andirrigation operations; and (d) provision of technical assis-tance for: Mi) training in dam construction and safetyinspection and in reservoir operations; (ii) design ofirrigation works serving 121,300 ha from the Jatigede Dam(West Java); (iii) surveys for updating classification ofland for tax purposes to improve cost recovery; (iv) surveysfor monitoring resettlement and compensation payments; and(v) studies for soil and water conservation. AlthoughIndonesia is now largely self-sufficient in rice, steadyincreases in national rice consumption and the very limitedscope for expanding the irrigated area on Java make it vitalfor the country to intensify food production by augmentingdry season water supplies through the construction ofmultipurpose dams. The increase in cropping intensity thuspermitted would also have a substantial impact on raising theincomes of smallholders and landless laborers in an areawhere more than 60Z of the population has incomes below theabsolute poverty line, about a third of farm households arelandless, and unemployment is high. The main project risksare delayed land acquisition and inadequate operation andmaintenance (O&M) of the irrigation systems. However, landacquisition has already begun and Government has agreed to aschedule and has given assurances on adequate funding for

Page 8: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

this purpose. Shortfalls in O&M budgets are not expected inview of assurances obtained for adequate funding andGovernment's willingness to fund O&M costs for irrigationprojects from its development budget, and from increasedallocation of land tax revenues collected at the local Level.

EstimatedCost: /a Local Foreign Total

= --(USs million)ConstructionKedung Ombo Dam 13.3 25.3 38.6Power stations & transmission lines 2.8 12.9 15.7Irrigation 52.4 35.7 88.1

Equipment 4.7 9.6 14.3

Consultant services & training 7.8 7.3 15.1Administration 13.4 - 13.4Land acquisition 25.5 - 25.5

Base Cost 119.9 90.8 210.7

Physical contingencies 15.1 12.3 27.4Price contingencies 25.4 19.6 45.0

Total Project Cost 160.4 122.7 283.1

FinancingPlan: Bank 51.9 104.1 156.0

Government of Indonesia 104.5 1.3 105.8Export Credits 4.0 17.3 21.3

Total 160.4 122.7 283.1

EstimatedDisbursements: Bank FY 1986 1987 1988 1989 1990 1991

~~--- (US$ million) --

Annual 6 18 34 41 38 19Cumulative 6 24 58 99 137 156

Rate of Return: 17.41 overall, 16.7Z for the irrigation component and 25X forthe power component.

Maps: IBRD Nos. 18529, 18531, 18534, 1854, 18555 and 18568R.

/a Costs exclude taxes of US$17.2 million on civil works, equipment andservices.

Page 9: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

I. BACKGROUND

General

1.01 The Government of Indonesia (GOI) has requested assistance for theconstruction of the Kedung Ombo multipurpose dam, one the major waterresource developments in the Jratunseluna River Basin in Central Java. Thedam will provide irrigation water for (a) 25,100 ha of new 2 rrigation systemsin the Klambu Kanan (Juana) and Sidorejo (South Crobogan) - areas and 2b)34,240 ha in the Sedadi (Upper Sedadi) and Klambu Kiri (Lower Sedadi) Iirrigation systems which at present have only wet season irrigation. Theproject will also control flood waters in che upper and lower Serang area,improve drainage and augment domestic and municipal water supplies in cheservice areas, and generate hydropower.

1.02 The Bank has been deepLy involved in planning and implementing proj-ects in the Jratunseluna Basin since the Irrigation I Project (Cr. 127-IND) in1968, under which the then largely inoperative Sedadi irrigation syscems wererepaired. Extensive tertiary development in the Upper and Lower Sedadi areaswas supported under Irrigation Projects VII and IX (Lns. 1268 and 1435-IND).Master plans for the whole Jratunseluna Basin and designs for additionaldrainage and flood procection works were also prepared under the IrrigationVII Project together with feasibility studies and designs for a dam at KedungOmbo on the Serang River and related irrigation development. The floodprotection works and drainage are being implemented under the Irrigation XIVProject (Ln. 1811-IND), while construction of the dam and related irrigationfacilities will be carried out under the proposed project. The proposedproject was prepared by PROSIDA (the special project agency responsible formost Bank-assisted projects) which has now been incorporated into theDirectorate of Irrigation II in the Directorate General of Water ResourcesDevelopment (DGWRD), assisted by consultants (Snowy Mountains EngineeringCorporation of Australia).

The Agricultural and Rural Sector

1.03 GOI's major objectives for the agricultural and rural sector areto: (a) create productive employment to raise incomes of the rural poor; (b)increase domestic food supply, especially rice, to keep pace with risingdemand; (c) expand agricultural exports, particularly of smallholder treecrops; and (d) ensure productive, sustainable use of Indonesia's land, water,and natural resources.

1/ An area on the north coast including the Jragung, Tuntang, Serang andLusi Rivers which feed the coastal plain east of Semarang, the capital ofCentral Java (Map 18555).

2/ GOI has renamed the irrigation areas.- based on the sources of water. Thenames in parentheses refer to the names of administrative areas where theirrigation systems are located.

Page 10: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

1.04 Food crop production forms 60% of agriculturaL GDP and 18% of total(DP. Rice is the most importanc food crop. Between 1968 and 1982, rice pro-duction grew substantially in response co government interventions, includingexpansion of the irrigation network, major changes in rice growing technology,and price incentives. Production gains of other major food crops, while notso impressive as those for rice, have exceeded population growth, althoughsome crops, for exampLe corn, are encountering market constraincs.

1.05 GOI's policies in food crop production, combined with the expansionof the COI infrastructure investment program (e.g. INPRES, etc.) and thestrong linkages and multiplier effects between agriculcural incomes and otherrural industries, have had a substantial impacc on increasing incomes andlevels of living in a large portion of the rural areas. They have alsoresulted in some reduction in the incidence of rural poverty, even though thisstill remains a major probLem facing GOI. Increases in income have not beenuniformly spread, especiaLly to dryland rood crop farmers. in many cases,inadequate infrastructure is also a contributory factor to slow growth in foodcrop output, and needs to be addressed through further investments in ruralroads, etc.

1.06 The Bank, in cooperation with GOI, has undertaken a series of sectorstudies related to food crop production, the most recent of which are PolicyOptions and Strategies for Major Food Croos (October 1982, Report 3686-IND)and the Irrigation Sector Review: An Issues Paper (October 1982 and updatedin May 1984) which reviewed the irrigation work program and budget included inthe GOI Fourth Five-Year Development Plan (Repelita IV) for the period1984-88.

The Irrigation Subsector

1.07 Irrigation and Rice Production. During 1970-83 rice production grewfrom 13.1 million tons to 23.3 million tons. Production increased at about4.9% per year during 1970-81, but slowed to 2.2% per year from 1981 to 1983mainly due to droughts. Rice production increases between 1970 and 1981resulted from increases in the harvested area (25%) and yield increases(75Z). About 16% of the production growth can be attributed solely to expan-sion and improvement in irrigation, about 9Z is due to improved rice varietiesand fertil ,er use, and about 75% is due to the joint interaction of thesevariables.-

1.08 Rice consumption steadily increased at 4.5% per year between 1970and 1981, of which 2.3% p.a. was due to population increases and 2.2% p.a. toincome, price and other effects. In 1980 and 1981, Indonesia became largelyself-sufficient in rice, and rice imports plunged from 2.0 million tons in1980 to 0.3 million tons in 1982. GOI buffer stocks increased to 2.3 millionin 1981. Successive droughts reduced production in 1982 and 1983, forcingGovernment to import some 1.3 million tons of rice in 1983 and 0.3 million

3/ Source: Indonesia - Policy Options and Strategies for Major Food Crops,Report No. 3686b-IND, April 1984.

Page 11: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 3 -

tons in 1984. The 1984 crop is tentatively estimated at 25.5 million tons,and buffer stocks have increased once more to some 3 million tons. It isexpected that for most "average rainfall" years rice production will meetdemand, provided the present rate of irrigation development is maintained.

1.09 In the future, improved rice variecies and fertilizer use are likelyto play a lesser roLe in increasing Indonesia's rice production. The use ofhigh yielding varieties (HYVs) is already high (about 80% of the irrigated andwetland crop) and is unlikely to expand beyond 90X in 1990. Several tradi-tional varieties are preferred for taste and ceremonial reasons, and arebetter adapced to difficult growing conditions such as saline. flooded orwater-short areas. Fertilizer use is also high. particularLi on 'ava whereabout i35 kg of nitrogen and 50 kg of phosohate per hectare are now applied.There is evidence chat nitrogen applications above this would be -wasted andcause crop iosses due to lodging and greater insect damage. With such alreadyhigh fertilizer and HYV use, future yield increases will depend primarily onimproving the quality of irrigation and water management, and expandingirrigation to exiscing dryland areas.

1.10 Strategy for Water Resource Development. GOI's irrigation sectorinvestments include irrigation works to sustain self-sufficiency in rice;swamp reclamation for transmigration; and river control works to developmultipurpose use of water resources for irrigation, municipal water supply,flood mitigation, and hydropower. The Bank sector work assisted by GOIcovering the Repelita IV plan period (1984-88) concluded that the followinginvestment program would be justified:

(a) Construction of 0.5 million ha of ongoing rehabilitation, and 0.2million ha of new irrigation works including medium (sedang) andlarge-scale (khusus) systems. New rehabilitation projects andtertiary network construction of 0.6 million ha would be pursued,together with 0.27 million ha of new small (kecil), medium (sedang)and large-scale (khusus) irrigation works. Construction of at leasttwo major dams on Java to supply water for irrigation intensifica-tion will be included as part of the program. These irrigationworks would enable GOI to maintain self-sufficiency in rice produc-tion, which requires an annual growth rate of 3.5% (harvested areagrowth of 1.4% and yield growth of 2.1%);

(b) Construction of 0.1 million ha of tidal swamp reclamation (grossarea), and a further 0.3 million ha of new reclamation works toaccomodate 20,000 to 25,000 transmigrant families per year. Anadditional 0.1 million ha of already settled inland swamp area needrehabilitation and improved water control; and

(c) Construction of river control and improvement works (levees, dams,etc.), and volcanic debris control in about 20 river basinsthroughout the country for more efficient multipurpose use of water.

1.11 Multipurpose Use of Water and Dam Construction Program. Java hasthree million ha under irrigation (60X of all irrigated areas in Indonesia),and very little scope (about 16,O000 ha) for new irrigation schemes. Basic

Page 12: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-4-

rehabilication of che Javanese schemes is almost completed. Crop productivitycould, however, be further increased through intensive system upgrading coimprove operations and facilitate maintenance; construction of better tertiarynetworks; and augmentation of dry season w.ater supplies from multipurposestorage dams. The increase in cropping intensity thus permitted would have asignificant impact on raising the incomes of very small farms (0.1 to 0.3 ha)and the employment of surplus landless labor.

1.12 Water resources must also be developed for meeting municipalsupplies, hydropower and flood control. Excensive floods in the i980i'81 and1982/83 wet seasons caused widespread disruption of road transportation anddamage to both agricultural and urban areas (e.z., Semarang in CertralJava). Limited municipal and industriaL water suDpLies for key cities(Jakarta, Semarang, Surabaya. etc.) have sLowed down their development. Sincegroundwater in these sites is not promising, water storage through dams is theonly rationai alternacive to increase water supplies.

1.14 GOI started construction of two dams in late 1982, and has detaileddesigns for nine others, the construction of which is phased to meet actualrequirements. At present, COI places highest priority on the Kedung OmboMultipurpose Dam Project on Java in view of its major irrigation benefits inan area now largely without dry season water but subject to flooding in thewet season. The proposed dam wouLd also generate power and develop municipalwater supplies for major towns in the commuand area (Demak, Grobogan, Pati)once flows are controlled in the Serang River.

1.13 Investment Needs. The indicative irrigation program and relatedinvestments in water resources developr*nt are estimated to cost about Rp 4.5trillion (US$4.1 billion) at current costs (see Table 1.1). About one-thirdof this amount, equivalent to the foreign exchange cost of foreign-assistedprojects, is expected to be financed from external loans. This is somewhathigher than the share (about one-quarter) financed from external loans duringRepelita III, due to the assumption that completion of ongoing foreign-assisted projects will be given priority over the next few years. As in thepast, the balance of funding will come from the Government's domesticbudget. The indicative program is 30% smaller than the planned allocationsfor irrigation and water management. This is partly due to cutbacks inphysical programs, due to the overall resource constraint and the changingrice situation. It also reflects some substantially lower unit costs, basedon recent experience with international bids for civil works contracts.During 1984/85 and 1985/86, actual budget allocations were only about 75% ofthe level required for the indicative program, and .ctual expenditures may beeven lower. Therefore, to meet the physical program some further rephasing ofinvestments will probably be necessary. This rephasing might also help smooththe projected bunching of investment costs in 1986/87.

1.15 There are a number of features worth noting in the composition ofthe indicative investment program: (a) Close to 85Z of the costs are relatedto ongoing projects, of which 77% are foreign-assisted. New foreign-assistedprojects are projected to cost Rp 384 billion while new GOI projects arelimited to Rp 293 billion; (b) The major components of the program are forlarge-scale irrigation expansion (38Z), irrigation rehabilitation (14Z), river

Page 13: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

improvement (12%), irrigation O&M (7U), 0ood control (7%) and medium-scaleirrigation (6Z). However. aew investments show a significant reorientation ofpriorities, away from large-scale irrigation (11%) and towards flood controL(23%) and swamp programs (15%). '-i These changing priorities also reflect ashift in the regional distribution of investments. Java still accounts formore than one-half of total investment costs. However. among new projects,over 90% are located on the Outer Islands, mainly on Sumacra and on Sulawesi.

Table 1.1: 'NDICATIVE rNVESTMENT PROGRAM FOR IRRIGATION. 1984/85-1988/89(in Rp billion at current prices) /a

Program 84/85 85/86 86/87 87/88 88/89 Total Z

Irrigation 522.4 564.5 784.0 712.5 719.2 3,302.5 73Small 24.0 29.6 32.3 33.5 45.6 165.0Medium 34.9 49.8 72.8 54.1 62.1 273.7Large 261.7 282.8 439.3 369.7 344.2 1,697.6 /bGroundwater 19.0 27.2 28.2 29.5 30.8 134.7Tertiary 37.7 11.4 12.9 14.2 16.3 92.4Rehabilitation 102.5 115.5 133.2 139.4 140.2 630.7O&M 42.6 48.3 65.4 72.2 79.9 308.3

Rivers 114.8 118.4 238,7 209.4 252.3 933.6 21River improvement 101.1 91.8 115.3 127.8 117.9 554.0Flood control 4.6 7.6 107.7 64.5 115.5 299.8Other 9.1 19.0 15.8 17.1 18.9 79.8

Swamps 21.0 28.0 32.7 38.8 44.4 164.9 4Tidal new 8.2 12.1 15.2 18.0 19.6 73.0Tidal rehab. 3.8 5.8 4.2 4.8 5.7 24.3Inland 9.1 10.1 13.3 16.0 19.1 67.6

Planning 11.5 12.7 13.9 15.2 16.5 69.8 2

Total 669.7 723.6 1,069.3 975.9 1,032.3 4,470.8 100of which:Ongoing 603.6 659.6 896.4 818.8 815.5 3,793.8 85New 66.1 64.1 172.9 157.1 216.8 677.0 15

Financed by:GOI budget 394.6 436.9 722.4 731.0 798.8 3,083.6 69External loans 275.1 286.8 346.9 244.9 233.6 1,387.2 31

/a Exchange rate of US$1.00 = Rp 1,100.

lb Dams account for about Rp 400 billion.

Source: Bank Sector Work, 1985

Page 14: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

1.16 Major Constraints in irrigation development relate to improvingirrigation system operation and maintenance (O&M) and ensuring adequate costrecovery. Current standards of 0&1M of the main systems are frequently inade-quate, though GOI has consistentLy raised the level of funds allocated forsuch purposes, and has decided in FY84/85 to slow the rate of new irrigationconstruction and divert development funds to improve O&M standards. BanKassistance in O&M is designed to improve the organization and training of theprovincial services which are responsible for all O&M activities and to deve-lop and demonstrate new techniques (Irrigation XVII, La. 2119-IND and SecondProvincial Irrigation Development Project, Ln. 2375-2ND). Cost recoverythrough the IPEDA (land tax) s an efficient mechod of colLection, and linkslevies to the productive capacitv o- -arm Lands. WhiLe capital cost recoveryis less than 10%, this is an equitabie position consisEent with che povertyand small farm sizes of most beneficiaries. However. reclassification ofnewly irrigated lands and raising of ..ew Land taxes have often been slowbecause of the lack of coordination within the various agencies. Assuranceswere therefore obtained from Governmenc that reclassification of Landbenefitting from the proposed project and collection of increased IPEDA taxeswill be carried ouE in a timeiy manner (para. 6.07). Bank assiscance willalso seek to introduce a more direct linkage of IPEDA levies to O&Mallocations and to ensure that O&M funds are spent effectively.

The Role of the Bank

1.17 Since 1968, the Bank has provided US$1,018 million for irrigationprojects in Indonesia. The earliest projects were designed to repair majorsystems to quickly increase rice output. Later projects provided additionalrehabilitation of existing systems, drainage, flood protection, and tertiarynetworks. The most recent projects include measures to strengthen planning,programming, and budgeting capacity and management information systems(Irrigation XV - Cr. 995 and XVI - Ln. 2118), and to build up the capacity ofprovincial irrigation services in East Java Province (Irrigation XVII - Ln.2119), and in eight other provinces (Second Provincial Irrigation Development- Ln. 2375).

1.18 During Repelita IV, the Bank's involvement in the sector willemphasize institution-building and address persistent sectorwide problems suchas operation and maintenance standards. Lending will focus on:

(a) strengthening of national, and especially provincial, irrigationservices, and improving their operation and maintenance performance;and

(b) a small number of technically complex projects or projects whichpresent difficult economic choices, or in which Bank participationcan mobiLize significant cofinancing. Besides the proposed project,these include the West Tarum Canal for irrigation and the Jakartawater supply, and the Jatigede Multipurpose Dam project.

1.19 Project Performance Audits. The .-first six Bank-assisted irrigationprojects have been compLeted. Project Performance Audits have been issued for

Page 15: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-7-

four of them 4 and a follow-up .mpact Evlluation Reporr on .he first project(Cr. 127-IND) was released in July 1983.-;

1.20 The most serious implementation problems were construction delaysand cost overruns. The delays arose because of GOI's then cumbersome localbidding, contracting and fund reLease procedures, and shortages of localfunds. Cost overruns were due to additional quantities of work required afterdetailed design, and increased unic costs due to rapid inflation and construc-tion delays. However, cost increases were more than offset by higher ricefprices, and economic rates of return are expected to exceed 40X. Other prob-lem areas include the need to improve operation and maintenance services (O&M)at provincial leveLs; to provide cechnical and administrative support to wateruser associations; and to promote efficient water use. These Droblems arerecognized in the strategy adopted for Bank assistance (para. 1.18) and havebeen used in the planning and design of this project.

1.21 Disbursement Performance. Disbursements currentlv run at about 73%of appraisal escimates. Performance has improved (disbursements -vere below61% in FY82) through more intensive supervision by Residenc Bank staff, accel-erating start-up activities and disbursing against statements of expendituresfor small civil works contracts. In addition, consulting service needs areusually agreed with the Bank prior to loan negotiations, and civil works forthe first year's construction are usually tendered and contracts negotiatedprior to loan effectiveness. Together with other continuing Bank assistanceto accelerate contracting procedures and improve the domestic constructionindustry, these measures appear to be progressively reducing implementationdelays.

II. THE PROJECT AREA

Background and Location

2.01 The proposed Kedung Ombo Multipurpose Dam and Irrigation Project ispart of the Jratunseluna basin development and is located in the flood plainsof the Serang River and its tributaries, about 75 km east of Semarang on thenorth coast of Java. In 1971, DGWRD assisted by consultants (NEDECO) prepareda master plan for the development of the water resources of the rivers of theJratunseluna basin, which, together with later studies, identified thefollowing priority schemes: (a) flood mitigation works (levees, etc.) alongthe Jragung, Tuntang and Dolok Rivers; (b) rehabilitation of irrigationschemes served by the Jragung, Dolok, and Tuntang; (c) tertiary irrigationnetwork construction in the Tuntang, Jragung, and Sedadi areas; (d) floodprotection and drainage in the Lower Serang and the river systems that feedthe Serang from Mount Muria, and drainage of the swamp areas in the Juana

4/ Credit 127-END, PPAR Report No. 2047, May 1978. Credits 195, 220 and289-IND, PPAR Report No. 3269, December 1980.

5/ Report No. 4775.

Page 16: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

'Valley; and (e) construction of the Kedung Ombo Dam on the Serang River andthe Glapan Barrage on the Tuntang River to improve water supplies forirrigation and for flood mitigation.

2.02 The Bank has been involved in the Jratunseluna basin developmentthrough the following projects: Irrigation I (Cr. 127-IND), Irrigation VII(tLn. 1268-IND), Irrigation IX (Ln. 1435-IND), Irrigation XI (Ln. 1579-IND) andIrrigation XIV (Ln. 1811-DID). The irrigation I Project rehabilitated themain irrigation system in tr:e Serang area. Extensive tertiary development inthe Sedadi (Upper Sedadi) and Klambu Kiri (Lower Sedadi) areas took placeunder Irrigation VII and rX, and main and some secondary drainage in the LowerSerang and Juana Valley areas is being improved under Zrrigation :IV. 'fncontrast to the Bank's eariier activities which concentrated on improving theirrigation syscem and flood control, ,he prouosed Kedung Ombo projec. isintended to enhance water availability through construction of a dam on theSerang River in order to ex?and irrigation to the currentLy rainfed areas ofSidorejo (South Grobogan) and Klambu Kanan (Juana Valley) and to the alreadyirrigated Sedadi and Klambu Kiri areas, where the system will be improved (seeTable 2.1). This will greatly increase the cropping intensity of thepreviously rehabilitated irrigation systems and reduce floods.

Table 2.1: PREVIOUS INVESTMENTS IN THE PROJECT AREA BY GOI AND BANK

Area coverage as Z of total areas To beGOI Bank-assistance /a com-

System investment I VII IX XIV/b Total pleted

Sedadi (13,900)Main system 50Z 50% - - - 100%Tertiary system 30% - 47% 232 - 100%Main drains 50% - - - 50% 100% -Secondary drains 83% - - 83% 17%

Klambu Kiri (20,300 ha)Main system 602 - - - - 60X 40%Tertiary system 20% - 13% 17% - 50% 50%Main drains 24% 23% - - 53% 100% -Secondary drains 40% - - - - 40Z 60%

/a Irrigation Project Numbers.75 Included in this loan was also flood mitigation works for the Lower

Serang and main drainage for Klambu Kanan (Juana Valley).

2.03 The net area for development (59,340 ha) comprises Sidorejo(6,100 ha) on the right bank of the Serang River near Purwodadi, Klambu Kanan(19,000 ha) further downstream on the right.-bank, and the Sedadi and KlambuKiri irrigation area (34,240 ha) situated on the left bank, running fromPerawangan down to the coast (see Map 18555). The project area is comprised

Page 17: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

of parts of four kabupatens (discricts) - Demak, Kudus, Pati and Grobogan -and 22 kecamatans (subdistricts) with 308 villages. The area is well servedby air, rail and road transport, and port faciLities in Semarang.

Climate and Soils

2.04 The climate is tropical and monsoonal. Mean annual rainfall isabout 2,000 mm, with 85% occurring in the wet season (October-November toApril-Hay). Mean monthly evapotranspiration exceeds rainfall in the June-October dry season. Most rainfall is localized, short duration, and of highintensity. This underlies the need for flood protection. drainage andsupplementary irrigation co achieve satisfactory Leveis oi oroduction in theflood plains of the Serang aiver system.

2.05 The four project ayeas (Sidorejo, Klambu Kanan, Sedadi and KlambuKiri) have different soi s ° buC are ai. suited zo intensive rice croppingand several secondary crops. The Sidorejo irrigation area is a relativelywell drained flat river plain ac about 20 m above mean sea level (MSL). Dueto the flat grades and Lack of drains, shallow inundation occurs in somelocations for up to 24 hours following heavy rain. About 5,000 ha of lower-Lying land is subject Eo inundation by the Serang River flood (every fiveyears), but total crop Loss occurs only on about 250 ha. The soils arepredominantly grumosols which are suited for intensive rice growing and fordry season secondary crops. The Klambu Kanan area is located on the very flatalluvial flood plains of the Babalan-Juana River at an elevation of 2-14 mabove KSL. These plains were built up rapidly by sediment deposition, due tothe construction of the Wilalung diversion structure in 1918 and subsequentdiversion of Serang River flows to the Juana Valley. The bulk of the area issubject to regular flooding and poor drainage and is classified as permanentswamp (see Map 18555). Works in progress under che Irrigation XIV project(Loa'n 1811-IND) will have a significant effect in improving and extending thecropping area in Klambu Kanan. The Sedadi and Klambu Kiri areas have alluvialdeposits of volcanic origin, well suited to intensive rice cultivation.

Existing Irrigation Systems

2.06 A large portion of the lower Serang basin, including Sedadi andKlambu Kiri, is covered by irrigation systems. In the Klambu Kanan area,minor streams are diverted to irrigate small areas scattered along the foot-hills in the wet season. The Sidorejo project area has no irrigation.

2.07 The Sedadi irrigation system (previously known as the Glapan-Sedadi)is the largest in the area. Most of the area receives irrigation water fromthe Serang River through an intake structure (the Sedadi Weir) constructed in1886, and remodelled in 1922 and 1976. There are four distinct irrigationservice areas. Two form the Sedadi area: (a) Serang (about 6,880 ha), servedby the secondary canal from the Sedadi River and a canal from the TuntangRiver at Glapan which provides an unreliable supply of excess water from the

6/ Detailed soil surveys have been carried out for all project areas.

Page 18: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Tuntang. M4ost of :'.e area receives a fairlv reliable wec season water suppLy,but dry season flows are adequace only for abouc 25Z of the area, and (b)Tuntang-Serang (about 7,030 ha). supplied mainiy from the Sedadi WeirsuppLemented with excess water .rom tnie runtang River when avaiiable. Anadditional pump intake for che main canal was constructed around 1970 atPondok on the Serang River. slightly upstream of the Wilalung diversionstructure, 29.4 km downstream from the Sedadi Weir. The Pondok intake wasbadly silted up in 1973 and has not been used since. About 70% of theTuntang-Serang area has a reliable water supply for wet season rice but only25Z receives water in che dry season.

2.08 The other cwo areas fail in Klambu Kiri: (a) Pelayaran (about10,560 ha) which recei7es water at the downstream end of the Si canal but isLargely dependent on drainage water from the Tuntang-Serang area, fed into thePeLayaran canal, about 10 km downstream from its junction with Si. SuppLiesare generally inadequate, particularly in the drv season, and ase of thedrainage return flow from Tuntang-Serang causes poor drainage conditions inpart of that area; and (b) Wedung (abouc 9,770 ha), which is supplied from theiower section of the Serang or WuLan Rivers by means of a oumping station con-structed at Karanganyar in 1968. Serious siltation problems and pump operat-ing difficulties hamper a regular water supply. About 75Z of the Klambu Kiriarea has wet season irrigation buc only 25% has dry season water.

2.09 The structures of the Sedadi and Klambu Kiri system are, in general,sound but several gates need replacing to receive water released from thedam. Tertiary networks have been designed for the entire area, but have beenconstructed only in Serang and Tuntang-Serang. ConstructiGn in the lowerparts of the Pelayaran and Wedung areas has been postponed until regularflooding is prevented there, following completion of flood protection anddrainage works under the Irrigation XIV Project (Ln. 1811-IND).

Power

2.10 Two power systems operate in Central Java under the PerusahaanListrik Negara (PLN, GOI's power authority): the Ketanger system to the westand .the larger Tuntang system in the east. In addition, there are manyisolated diesel and a few micro-hydro units. The total installed generatingcapacity in Central Java in 1984 was about 483 MW, comprising 80 MW (16.6Z) ofhydro, 300 MW (62%) oil-fired steam, 84 MW (17.5%) gas turbines and 19 MW(3.9%) of diesel capacity. The total installed capacity has almost doubledsince 1979. The total firm capacity is about 250 MW (50%).

2.11 Demand for power in Central Java during 1978-83 increased by 26% ayear in peak, and 20% a year in energy, sales. With such dramatic increases,it is expected that gas turbines and steam station capacity will be fullyutilized by the late 1980s. Any hydro station with even secondary power wouldprove to be very economical in saving fuel costs from thermal stations. Thepower component of the proposed project would help meet some of these require-ments.

Page 19: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- LI -

Town and Village Water Supplies

2.12 Protected water supplies are available only in the towns of Kudus,Purwodadi, Demak and Pati, but only about 152 of the urban population isserved by these supplies. In ruraL areas, the onlv source of water is fromsprings, wells, rivers and canals, and less than 10% of the rural populationhas access to a protected water supply. Toward the coast, aLmost the entiredomestic water supply is untreated canal or river wacer. which is in shortsupply and becomes heavily polluted as che dry season progresses. Under theproject, domestic, municipal and industrial water wouLd be augmented from thedam to benefit people in the towns of Demak, Grobogan and Pati. Municipalwater will be treated at various points along the canais. GOI, assisted bythe Asian Development Bank (ADB), is currently identifying Ehe necessary watersupply investments, and their construction will be coordinated with thisproject.

Agriculture

2.13 Some 69% of the gross project area of 82,600 ha is under rice orsecondary crops and 31X (25,310) is secttlements, dry fields, swamp lands, etc.(Table 2.2). About 48% (27,350 ha) of the rice fields are irrigated and 52%are rainfed wetlands (sawahs). About 50% of the rainfed ricelands are subjectto floods from the Serang River, but chey will largely be protected by drain-age and flood mitigation works now being constructed under the Irrigation XIVProject (Ln. 1811-IND). The same project will drain the 2,100 ha of permanentswamps in Klambu Kanan, after which they will be reclaimed.

Page 20: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 12 -

Table 2.2: LAND USE SUMMARY

PresentSedadi-

Klambu Klambu WithLand classification Sidorejo Kanan Kiri rotal (X) drainage (%)/a

1. Rice fieldsIrrigated - 2,550 24,800 27,350 (33) 27.350 (33)Rainfed 5,200 5,300 4,440 14.940 (18) 32,340 t39)Rainfed (floodprone) - 10,000 5,000 15,000 (18) -

Subtotal 5,200 17,850 34,240 57,290 (69) 59,690 (72)

2. Permanent swamps - 2,100 100 2,200 (3) 400 (1)3. Wet season flooded - 600 - 600 (') (1)4. Dry fields 1,500 750 4,800 7,050 (9) 7,050 (9)5. Settlements and

houseyards 2,000 1,800 4,860 8,660 (10) 8,660 (10)6. Other 500 1,300 5,000 6,800 (8) 6,800 (8)

Subtotal 4,000 6,550 14,760 25,310 (31) 22,910 (28)

Total 9,200 24,400 49,000 82,600 (100) 82,600 (100)

/a Under Bank-assisted Irrigation XIV Project (Loan 1811-IND) to be completedby the end of 1986.

2.14 The four project areas have varied levels of agricultural develop-ment depending on the availability of water, drainage and flood protection.In Sidorejo, production is entirely rainfed. Cropping intensity is high(265%), mostly in maize and soybeans, but rice yields are low due to rainfedconditions and the lack of irrigation. Klambu Kanan has wet season irrigatedrice on some 2,550 ha, and rainfed rice on about 15,300 ha, of which 10,000 haare affected by floods. The rainfed area will increase to about 17,600 ha asa result of drainage improvements under the Irrigation XIV Project. In thedry season, irrigated rice is planted on about 1,000 ha, and maize and soybeanare planted over about half of the wet season cropped area. Klambu Kiri hassome 20,400 ha of wet season rice, of which 12,100 ha are irrigated and8,300 ha are rainfed. Poor drainage on about 60% of the rainfed area is beingcorrected by the Irrigation XIV Project. At present, dry season rice croppingis possible on only about 500 ha due to the severe shortage of irrigationwater. In low drainage areas, half the fields are intercropped with maize andsoybean/mungbean, and in the dry season, chili, cucumber and watermelon aregrown. The Sedadi area has about 13,9G0 ha of wet season rice, 90% of whichis irrigated. Dry season rice is grown on about 6,300 ha, and triple croppingis possible near the Sedadi weir on about 1,400 ha. Maize and soybean areplanted on about a third of the area which does not have a second rice crop.

Page 21: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 13 -

Farm Size and Land Tenure

2.15 The Agricultural Census in 1983 indicated that farm land was distri-buted among some 87,400 farms in the project area (Table 2.3). Almost 55% offarms are less than 0.5 ha, which in conjunction with the high population den-sity refleccs the pressure on land resources. Farm sizes cend to be smallerin Sidorejo, particularly near the urban center of Purwodadi, -where 63% offarms are below 0.5 ha. Almost 60% of farms are owner-overated. 31% areoperated by tenants and only 10% by sharecroppers. In most sharecroppingarrangements, the landlord and tenant share total oroduction, inpuc and hiredlabor costs. The tenant and his family provide their Labor. and the Landlordpays the land tax. Land values and rentals vary considerably according coproductivity and demand, and are higher in Sidorejo and Kiambu Kanan (Table2.4). The low averages for land values recorded for the Sedadi areas reflectthe poor water control and limited crop production in Klambu Kiri.

rable 2.3: SUMMARY OF FARM SIZE DISTRIBUTION, 1983(Z)

SubprojectSidorejo Sedadi- Klambu Kanan Total

KlambuKiri (X)

Less than 0.05 3.0 5.9 4.5 5.00.05 - 0.09 5.6 2.9 3.8 3.60.10 - 0.24 20.4 14.3 18.1 16.40.25 - 0.49 34.2 29.5 27.3 29.80.50 - 0.74 19.8 19.5 17.6 19.00.75 - 0.99 8.2 8.9 8.6 8.71.00 - 1.99 7.8 13.5 14.9 12.92.00 - 2.99 0.8 3.4 3.5 3.03.00 and greater 0.2 2.1 1.7 1.6

Total Z 100.0 100.0 100.0 100.0No. 15,485 48,926 22,967 87,378

Source: Derived from (Agricultural Census); 1983 - Preliminary.

Page 22: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 14 -

Table 2.4: LAND AND RENTAL VALUES

Estimated Land values Estimated rentalsRp million/ha Rp '000/ha/year

Average Range Average Range

SidorejoRainfed 3.0 100 100

Sedadi-Klambu KiriIrrigated 1.3 0.75-2.5 130 40-200Rainfed 0.75 0.35-1.5 75 25-125

Klambu KananIrrigated 3.8 1.0-6.0 240 75-380Rainfed 2.8 0.6-6.0 125 30-250

Source: Kecamatan Statistics, 1982.

Population

2.16 In 1983, the project area had a predominantly rural population of570,600 (about 125,000 households), distributed as shown in Table 2.5. Therelatively small household size (4.6 persons) and low population growth (1.64Zper annum) are indicative of the impact of the family planning program. Theworking age group (15-59 years) represents about 54Z of the local population,although 42% of the project area population is under 14 years.

Table 2.5: PROJECT AREA, POPULATION, DENSITY AND HOUSEHOLDS - 1983

Population Area Density Households Households(no.) (sq km) (no./sq km) (no.) size (no.)

Sidorejo 89,961 91.0 989 21,086 4.3Sedadi-Klambu Kiri 338,394 490.0 691 72,661 4.7Klambu Kanan 142,245 240.9 591 30,868 4.6

Total 570,600 821.9 694 124,615 4.6

Central Java (1980) - - 742 - 4.8

Source: Central Java, Statistical Yearbook of Indonesia - 1984.

Page 23: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 15 -

Employment

2.17 The workforce in the project area represents about 46Z of the totalpopulacion, reflecting a considerable degree of unemployment in addition tonon-pyeicipation for reasons such as schooling or household activities.Data f Eor 1982 indicate that agriculture provided employment for about 64Z(209.000) of the total employed workforce of 261,000, or some 37Z of the totalpopulation. Of the 87,000 farm households in the project area, some 33,000consist of landless agricultural laborers. The opportunity for urban employ-ment in the four major towns of Demak, Kudus, Pati and Purwodadi is limited,although the seasonal tobacco industry in Kudus employs some 35,000 people.

Health

2.18 Most health problems, as elsewhere in Java, are related to diseasescommonly associated with poor nutritional standards and environmentaL sanita-tion. The most common diseases are gastro-enteric and parasitic infections(e.g., hookworm). Of primary concern under the proposed project are thepossible effects of project construction of a reservoir and new irrigationsystems the incidence of water-borne and zoonetic diseases such as cholera,malaria - and filariasis. The high incidence of malaria in irrigation areascan be reduced by closure and draining of secondary and tertiary canals afterthe establishment of dry season crops, which breaks the continuous vectorbreeding cycle. This and other measures will therefore be taken under theproject to increase the effectiveness of malaria control programs in theservice areas (see para. 3.42(e)).

III. THE PROJECT

Objectives, Rationale for Bank Involvement and Scope

3.01 The major objectives of the project are to: (a) increase foodproduction on some 59,340 ha through irrigation, and provide additionalemployment opportunities, (b) control flooding in the upper and lower reachesof the Serang River through construction of a dam which, together with worksunder the Irrigation XIV Project (Ln. 1811-IND), will protect about 10,000 haof productive land in Klambu Kanan and 5,000 ha in urban areas; (c) supplementmunicipal water supplies for about 300 villages and towns in the irrigationarea; (d) generate hydropower, mostly secondary power, which will result infuel savings at existing thermal stations; and (e) improve water management inthe project area.

7/ Kantor Statistics, Central Java Provincial Government.

8/ About 0.11-0.5Z of the population in most of the project areas isinfected with the dominant form of malaria (plasmodium vivaz), thepreferred breeding habitat for the vector being paddy lands. In multi-cropped irrigation areas the infection rate probably exceeds 10X.

Page 24: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 16 -

3.02 The recommended Bank participation is justified since (a) the 3ankis supporting che overall develooment rf the Jratunseluna Basin (para. 1.02)through a series of Loans, and the Kedung Ombo Dam is a key component of thisdevelopment, (b) the Bank has oiayed a key role in the technical studies anddesign of the project, and will be needed during implementation to assist GOIto supervise the project, and (c) the oroject supports the sector strategiesagreLd with GOI for Bank irrigation assistance.

3.03 The main project components are as follows:

(a) Dam and Irrigation Development

(i) construction of the Kedung Ombo Dam on the Serang River andappurtenant structures;

(ii) construction of a new diversion structure at Sidorejo tosupply water for the Sidorejo svstem. and a new diversionbarrage at Klambu. with associated suppiy canals for theKlambu Kiri and Klambu Kanan irrigation systems;

(iii) construction of two new irrigation systems: (a) the Sidorejosystem serving 6,100 ha; and (b) the Klambu Kanan systemserving 19,000 ha;

(iv) improvements to two existing systems: (a) the Sedadi systemof 13,910 ha; and (b) the Klambu Kiri system of 20,330 ha; and

(v) provision of supplemental municipal water suppLy for 300villages and small towns through expansion of the irrigationcanal system.

(b) Power Development

gi) construction of a powerhouse and installation of electricaland mechanical equipment, for a generating capacity of 28.5MVA;

(ii) construction of a 30 km single-circuit transmission line(150 kV) and the substations to connect with the grid atPurwodadi and Tanggung; and

(iii) construction of micro-hydro power pLants at the Klambu barrageand the Sidorejo ana Sedadi weirs, including 30 km of 20 kVtransmission line.

(c) Establishment of a Flood Warning and Water Monitoring Center atKudus for overall operation of the dam and irrigation systems.

(d) Technical Assistance for (i) training in dam constructionsupervision, dam safety inspection, reservoir operation and waterquality management and monitoring; (ii) design of the Jatigede

Page 25: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 17 -

irrigation systems; (iii) stucv oi upland soil and -water conserva-tion in the cacchment area of the Jatigede Dam; (iv) surveys forresettlement monitoring and compensation payments; and (v) surveysand assistance for updating maps for reclassixicaEion ror land tax(IPEDA) purposes.

Project Details

3.04 The Kedung Ombo Dam site is located on the Serang River near thevillage of Kedung Ombo and is accessible by a 30 km all-weather road from thetown of Purwodadi. The drainage basin is 614 sq km. The selection of thesite was decided based on the availabilitv of construction materials andhydrological considerations as the most suitable to regulate che maximumquantity of water (85: of the annual flows) at the lowest cost per cu m ofwater stored. The Dam wilL be a rockfiiLirandomfill embankment with a centralimpervious core bounded by filter and gravel transition zones. rhe founda-tions consist of interbedded claystones and sandstones and are consideredsuitable for a fill type dam. The dam will be of 61 m maximum height and1,600 m crest length. The total embankment volume will be 6.3 million cubicmeters (MCM). The design crest level is Elevation (EL) 96. with a full supplylevel of EL 90. Minimum operating level is EL 64.5 below which the deadstorage is 88 MCM and above which the active storage is 635 MCM. Thereservoir surface area at maximum flood level EL 94.2 will be 60.4 sq km.

3.05 The appurtenant structures include: (a) a concrete lined diversiontunnel, 4 m in diameter and 325 m long through the right abutment of the dam,which will discharge 180 cu m/sec during the design diversion flood of a 200-year return period; (b) an ungated service spillway incorporating a 40 m longogee crest with a discharge capacity of 1,000 cu misec during a 15-day prob-able maximum flood; (c) a 250 m wide emergency spillway incorporating a2-element fuse plug embankment to prevent overtopping of the dam in the eventof an extreme flood (the estimated peak discharge during a 15-day probablemaximum flood is 4,540 cu m/sec); (d) a 51.7 m high reinforced concrete intakestructure and a 270 m long, 3.8 m diameter pressure conduit; and (e) an irri-gation outlet, branching from the pressure conduit, controlled by a fixeddispersion cone valve with a butterfly guard valve. These and other featuresare indicated in Table 3.1 (see Annex 3, Table 1 and Figure 1).

3.06 Materials sources for the dam will be as follows: (a) the rockfillfor the main cofferdam and upstream shell of the embankment will consist ofcalcarenite from a source near the town of Juwangi, situated 15 km by a newhaul road from the damsite; (b) the downstream shell of the dam will consistof randomfill of fresh claystone with interbedded sandstone, the main sourcebeing a borrow area, about 1-1/2 km from the damsite, with the balance fromrequired excavation in the emergency spillway area; (c) the impervious corewill be weathered claystone, obtained from the dam abutments, and materialremoved to expose the foundations; and (d) a 2.5 m thick filter drain con-structed against the downstream boundary of the core, as well as filterblankets and finger drains over the foundations downstream of the core, willconsist of processed andesite, brought from rock sources close to the site.

Page 26: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 18 -

Table 3.1: FEATURES OF KEDUNC OMBO DAM AND APPURTENANCES

1. DamType rock/earthfill with impervious

coreCrest length 1,600 mHeight 61 m (96 m above MSL)Volume of fill 6.3 million cu mRiverbed leveL Elevation 35 m

2. Appurtenanc StructuresService spillway crest Elevation 90 m (MSL)Service spillway maximumdischarge 1,000 cu misec (10,000 yr flood)

Service tunnel 3.8 m (ID) x 270 mEmergencv spillway crestlength 250 m

Emergency spillway capacity 4,540 cu m/secDiversion tunnel 4.0 m (ID) x 325 mDiversion cunnel capacity 180 cu m/sec

3. Reservoir and Catchment

(a) CatchmentCatchment area 614 sq kmAverage annual rainfall 2,700 mmAverage annual runoff 796 million cu mProbable maximum flood 5,540 cu m/sec

(b) ReservoirNo4rmal Maximum WaterSurface Level(NWSL) Elevation 90 m MSL

Maximum surcharge Elevation 96 m MSLReservoir capacityat NWSL 723 million cu m

Dead storage(64.5 m MSL) 88 million cu m

Active storage 635 million cu mSurcharge volume 263 million cu mReservoir area at NWSL 46 sq km

4. Power ComponentTurbine type KaplanDesign power 22.5 MWGenerator type vertical shaft 3 phase typeTransformer three phase oil cooled

28.5 NVA X 50 HzTransmission lines 150 kV x 30 kmSubstations 150. kV x 2Micro-hydro plants 1.8 MVA x 3 with 30 km x 20 kV

lines

Page 27: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 19 -

3.07 Durinz conscruction, the Serang River flow will be diverted throughthe diversion tunnel by a coffer dam approximately 30 m high. The coffer damwill be constructed in the first Piacement season and will form part of themain body of the dam. A water controi plant will be installed in the intakeof the diversion tunnel to allow for irrigation releases to existing areasduring dam construction.

3.08 An instrumentation network of piezometers. settlement gauges,extensometers and horizontal movement indicators will be inscalled to monitorthe behavior of che dam during and after the construction. The dam .sdesigned and sized to maximize irrigation, although ic has multipurpose bene-fits. The optimum dam height was decided after nvdroLogicai, geologicai, andsoil investigations and simulation studies on reservoir operations.

3.09 Water Requirements were estimated for two rice crops over the entirearea and for secondary crops for 302 of the area. The wacer requirements wereestimated using the Penman formula and crop factors developed for Java byDGWRD's Directorate of Irrigation II (DOI-II) and the International RiceResearch Institute (Philippines). Water requirements needed for the designeddry year (one year in five years) vary from 1,880 mm co 2,023 mm per year forthe various areas. The maximum water duties for which canals were designedvary from 1.35 to 1.5 liters per sec per ha (see Table 3.2).

3.10 Reservoir Characteristics and Operation. The reservoir will have anormal maximum operating water surface level (NWSL) of 90 m MSL, and minimumoperating level of 64.5 m MSL. When full (at NWSL) the reservoir willinundate 46 sq km (4,600 ha) upstream of the dam. Its normal maximum operat-ing capacity will be 635 million cubic meters (MCM). The dead storage volumeis 88 MCM. On the basis of simulation studies covering a 31-year hydrologicalcycle, the average annual inflow to the reservoir is 796 MCM of which 647 MCMwill be released for irrigation, 108 MCM released for dump power to preventspilling, and 11 MCM for urban water supply, while 10 MCM will spill over thedam (see Chart 26681). The dam thus will regulate 85Z of the upper SerangRiver flows. The reservoir will be operated to guarantee that sufficientwater is available to meet the full water requirement for a cropping intensityof 230Z with a 1% risk during the second rice crop season (50% rice crop lossfor one year in 31 years) and a 10Z risk during the secondary crop season(three crops of secondary crops lost in 31 years) (see Chart 26681).

3.11 Releases from the dam will form 34% of total cropwater requirements,with 66Z from rainfall and downstream uncontrolled riverflows (Table 3.2).Riverflows must be forecast and rainfall monitored over the service areasdaily to provide flow data for reservoir operations and scheduling of damwater. A telemetered hydro-meteorological network will be installed, linkedwith a minicomputer operation at a Water Control Center to be established forthe project at Kudus.

Page 28: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 20 -

Table 3.2: ANNUAL WATER REQUIREMENTS AND -SUPPLY BY SOURCE /a

Water Releases from Mam.require- Effective Uncontrolled dam for Net waterments rainfall riverflow irrigation/b balance duties

- m (Z) m (X) () mm (Z) lJsec/ha

Sidorejo 2,023 1,113 (55) 0 (0) 890 (44) 21 (+1) 1.50Sedadi 1,918 1,021 (53) 0 (0) 857 (45) 40 (.2) 1.40KIambu Kiri 1,919 959 (50) 310 (16) 640 (33) 10 (+1) 1.35Klambu Kanan 1,880 960 (51) 442 (24) 458 (24) 20 (*1) 1.35

Average 1,933 999 (52) 251 (13) 664 (34) 19 (+1)

/a One dry year in five years.7T Water supplied at farm level.

3.12 The power generated is essentially due to irrigation releases, andis incidencal. A totaL of 74 CWh of energy will be generated, of which peakpower of 14.6 GWh is about 10 MW for 4 hours daily for 952 of the year.

3.13 The Sidorejo irrigation system will provide irrigation and drainageto a net area of 6,100 ha within a gross area of 9,230 ha. Water will besupplied from the Kedung Ombo Dam, approximately 9 river km downstream througha gated intake in a new diversion weir on the Serang River. In addition tothe diversion weir, the project works (see Table 3.3) include 87.3 km ofprimary and secondary irrigatior canals, 46 km of inspection roads for opera-tion and maintenance of the canaLs, 18 km of secondary drains, and appurtenantstructures. The Sidorejo system will be equipped with automatedhydrotechnical gates in the main and some secondary canals and flow modulesfor all other secondary/tertiary canals over 6,100 ha on a pilot basis forimproved water management. The irrigation area will be divided into 109tertiary umits, with an average size of 56 ha net irrigable area. Thetertiary facilities will comprise tertiary and quaternary canals and drainsand minor structures for up to 8-10 ha lots. Additional access roads of 31 kmwill be constructed for better farmer access.

3.14 The Klambu Kanan system will supply water to a net irrigable area of19,000 ha in a gross area of 24,000 ha. Works include the construction of anew barrage at Klambu; 192 km of primary and econdary irrigation canals;111 km of new and improved secondary drains,9 including some "river training'works; and 107 km of inspection roads for operation and maintenance along theirrigation and drainage canals. The irrigation area will be divided into 321tertiary units with an average size of 59 ha net irrigable area. Additionalservice roads (90 km) will also be constructed.

91 88 km of primary drains will be consLc.^ted under Irrigation XIV(Ln. 1811-IND).

Page 29: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 21 -

3.15 improvements to Existing Irrigation Systems. For the Sedadiirrigation area (13,910 ha), water will be supplied from the Sedadi weir whichwill be upgraded. Capacity of the main Si canal (41 km) (see Map le529) willbe increased at the upstream end from 12 to 21 cms to supply the 13,910 ha.The supply from the Tuntang River via the Tl canal will be diverted to supplythe Tuntang irrigation systems. One secondary canaL will be expanded. cheS2/S16 (10 km) canaL, and most secondary canals (58 km) will have minoradjustments (Table 3.3). Tertiary systems have been completed, but minoradjustments in the structures will be made to accommodate changes in thesecondary canal. Main (58 km) and secondary (66 km) drains will berehabilitation. Additional inspection roads (20.5 km iong) will beconstructed (see Annex 3 for details).

3.16 Klambu Kiri will have its main and tertiary canal system upgradedwith new tertiaries in 50Z of the Lower area (Wedung). A new (twin) maincanal (16 km) parailel to the Si canaL will be constructed from the Klambubarrage (see Map 18529) to provide water for the entire 20,330 ha. The onlyother supply will be the Sedadi-Pelayaran (7.9 km) secondary canal connectingthe main canal to che Pelayaran canal. Adjustments will be made to a further24 km of main canal to increase its capacity. Major adjustments will be madeon the secondary canals (128 km) in the Wedung area and modevate adjustmentswill be made on canals (41 km) in the Pelayaran area. The main systemstructures in Wedung and the Pelayaran area require major adjustments orreplacement (see Table 3.3). Main drains (97 km) are being upgraded underLn. 1811-IND while secondary drains (164.5 km) will be constructed under thisproject.

Page 30: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

_ 22 -

Table 3.3: PROJECT IRRIGATION WORKSMAIN CONSTRUCTION FEATURES /a

Rlambu KlambuItems Unit Sidorejo Kanan Sedadi Kiri

Area ha 6,100 19,000 13.910 20,330

CanalsMain km 13.7 38.1 41.2 47.1/cSecondary km 73.6 154.0 10.0ib 169.2Tertiary/Quaternary km 366.0 1,140.0 250.0 1,220.O/d

DrainsPrimary km 7.1 88.0/e 58.0/e 97.0/eSecondary km 18.0 111.0 66.07? 164.37'f

RoadsService km 31.0 90.0 - 21.2Inspection km 46.0 107.0 20.5 196.5

Structures (Main System)Turnouts no. 64.0 52.0 21.0/b 145.0Water control no. 126.0 185.0 9.07T 19.0Other no. 145.0 1,785.0 302.07T 1,170.0

Tertiary block no. 109.0 321.0 169.0 250.0

Size of tertiaryblock (average) ha 56.0 59.0 82.0 92.0

/a Does not include all figures for adjustments (See Annex 3 for details).b Construction of 3 km of new canals, major adjustments of 7 km of existing

canals and minor adjustments of 58 km of existing canals (Annex 3, Table2).

/c Desilting and increasing the present capacity of 24 km of canal andconstruction of 23 km of new canal.

/d New tertiary system for 9,800 ha in the Wedung area and adjustments to10,500 ha of existing tertiaries.

/e Included in the drainage works under Irrigation XIV.7T Additional drainage over that undertaken in Irrigation XIV.

3.17 Municipal and domestic water supply will be provided by expandingthe capacities of specific canals by an average 0.009 liters per sec per ha inthe Sidorejo and Klambu Kanan areas, and by 0.006 liters per sec per ha in theSedadi and Klambu Kiri areas. Treatment of the incremental water supply willbe undertaken by GOI through an ADB-assisted project (see para. 2.12).

Page 31: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 23 -

3.18 New Diversion Structures will consist of the Sidorejo and Klambibarrage/weirs (see Annex 3. TabLe 3 for details). The Sidorejo weir is a aewweir located on the Serang River 9 km from the dam which will divert water forthe Sidorejo scheme. The weir is a concrete overflow structure 10 m high and80 m crest length with a primary canal intake on the left side of the weir.The diversion barrage will be on the Serang River near Klambu. The barrageconsists of a crested concrete weir 8 m high and 93 m wide. The left andright irrigation intakes pass through desilting basins; the left intake feedsthe new twin main canal to the Klambu Kiri scheme and the right feeds the newmain canal to the Klambu Kanan system.

3.19 Hydropower Stations and Transmission Line. The main power stationwill be located on the left bank at che toe of the dam; this affords the mosteconomical aligwnent and provides no interference with the spillway. Mheplant wiLl consist of one Kaplan-type turbine with 22.5 MW design power. and athree phase vertical shaft generator, with a power rating of 28.5 MVA. Thecapacity and unit size of the plant were determined as optimum taking intoaccount the economies of secondary power generation utilizing the high irriga-tion releases and spilLs from the reservoir. The generated power will bestepped up to 150 kV through a switchyard at the powerhouse for transmissionto Purwodadi and Tanggung substations, 30 km away via a single circuit trans-mission Line. Also included will be the construction and installation of 3micro-hydro power stations, 1.8 MVA each, at the Sidorejo and Sedadi weirs andthe Klambu barrage, with associated substations and a transmission line 30 kmlong at 20 kV to Purwodadi. The construction of the micro-hydro will besubject to a detailed feasibility study.

3.20 A Flood Warning and Water Monitoring Center will serve to (a) warnthe entire river basin of possible floods in the Serang and Lusi basins; and(b) schedule water to the various irrigation systems in the basin based on theavailability of water in the river systems and the inflow to the Kedung Omboreservoir, and on the rainfall over the irrigation service areas. Theconstruction of the center includes: (a) a master control center at Kuduswith a building (1,000 sq n) and facilities including auxiliary power supply;(b) a network of telemetered rainfall and water level stations (100) in thecatchment area of the Lusi, Serang and Muria basins; (c) operationalcommunication and computer systems with software for rainfall and river flowanalysis, flood forecasting and water scheduling; and (d) a radar computerfacility to interface with existing radar at the Bureau of Meteorology andGeophysics in Semarang (for advance warning of rainfall). There will be onesupply contractor for che equipment, computers and software, who will install,maintain and operate the system and train the staff for a period of two yearsafter installation. Details of the system are given in Annex 7.

3.21 Technical Assistance for Training will focus on dam construction,dam safety inspection, reservoir operation studies and water qualitymanagement and monitoring:

(a) Dam Safety Inspection and Construction Training will focus on: (i)the role of the engineer in contract administration and constructionsupervision, quality control and preparation of constructiondrawings; (ii) accounting and cost control for contracts;

Page 32: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 24 -

(iii) familiarization with a computer-based supervisory controlsystem for construction management; (iv) dam safety inspectiontechniques: and (v) O&M procedures for the dam. The services offour dam constructionisafety inspection experts (total of 15 man-months) intermittencly over a period of 18 months will be needed toprovide; (i) three short courses (3 weeks each) on damcontructioniinspection techniques for 21 staff af the Directoratesof Irrigation I, II, and Rivers, and the IHE; (ii) assistance to chetHE to establish and coordinate a dam inspection oreanizationcomposed of experienced staff from the Directorate of Rivers andDirectorates of Irrigation I and II; and (iii) assistance to .HE indrafting a seismic zoning and seismic loading code for majorhydraulic structures. Fellowships will be provided for 15 DGWRD andIHE staff to train in dam safety inspection techniques ac inter-national institutions such as the U.S. Bureau of Reciamation or theU.S. Army Corps of Engineers. Some special equipment for inspectionpurposes will be procured (Annex 5).

(b) Computer-based Reservoir Operation and Water Resources AnalysisTraining will be for DGWRD and IHE staff who are heavily involved inphysical and mathematical model analysis on use of severalgeneralized operational hydrologic and hydraulic computersoftware. The type of computer software covers hydrologic watercontrol and reservoir system analysis and water resources planninganalysis. Three experts from institutions like the HydrologicEngineering Center (HEC) of the U.S. Corps of Engineers will trainIHE staff to set up some 35 HEC operational software in the IHEcomputer systems and train the staff to apply the use of thesesoftware to their reservoir operating rules, hydrologic andhydraulic problems. The training will be composed of six 3-weekintermittent sessions interspersed over 18 months in order to ensurethat IHE can apply the HEC software on actual problems faced intheir day-to-day operation.

Cc) Water Quality Management and Monitoring training will consist of:Ci) on-the-job training of staff with foreign expert inputs of 24man-months in IHE's Division of Environmental Water Quality (DEWQ)to develop a water quality management plan and monitoring network,to set up a data bank, and to evaluate data; and (ii) formaltraining for three trainees, 6 man-months each, in telemetry andcomputer data processing in suitable overseas institutions. Somefield and laboratory equipment will be procured.

3.22 Technical Assistance for:

(a) Design of Jatigede Irrigation Systems. Detailed designs and biddingdocuments for the proposed Jatigede Dam in West Java are being prepared withBank assistance under the Irrigation XVI Project (Ln. 2118-IND). Consultantswill be provided under the proposed project to design adjustments to the121,300 ha of irrigation systems to be served by.-the dam, i.e., the Rentang(89,000 ha), Cilutung (7,600 ha), West Cirebon (6,400 ha), and other (6,000ha) systems. Designs for new pumped irrigation systems over 12,300 ha in thedownstream areas will also be prepared.

Page 33: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 25 -

(b) Upland Soil and Water Conservacion in Jatigede Dam Catchment.SpeciaL studies wiLl be undertaken to identify criticai soil erosion areaswhere gully and sheet erosion Dredominate. Engineering and agroforestrvmeasures will be designed to ameiiorate erosion and loss of catchment waterstorage.

(c) Resettlement Monitoring. Surveys will be performed biannualiv overthe entire dam reservoir area to determine the status of compensation Pavmentsand to monitor sites where peopie are being resettled. Some sampLe survevswill also be undertaken in transmigration and resetclement areas to determinethe welfare of the peopLe aiter resetclement.

Cd) IPEDA HaoDing and Land Reclassification. Technical assistance wiilbe provided for: (L) remapping iOO,000 ha by aerial photographv to a scale of1:10,000 for demarcation of village boundaries and individuaL Land holdingsand for production of Line maps at a scale of 1:2,500, for each land holdingand for the production of registers and coordinate indices for each holding;(b) reclassification of each holding under the current IPEDA reclassificationtables to assess new taxes; and (c) upgrading of IPEDA inspection offices,including technical assistance for computerized processing and recording ofIPEDA collections.

Consulting Services

3.23 Consultants (265 man-months foreign and 385 man-months local) willbe recruited by DCWRD's Directorate of Irrigation II (DOI-II) to superviseconstruction of the dam (see Annex 6). They will prepare working drawings andwill be responsible for supervision of dam and powerhouse construction (para.4.04). GOI wishes to appoint the foreign consultant Snowy MountainsEngineering Corporation (SMEC) which designed the dam and powerhouse asconsultants for construction supervision and equipment installation. Theproposed contract for SMEC was reviewed during negotiations and appointment ofthe consultants will be a condition of loan effectiveness.

3.24 An expatriate consultant will be recruited to supervise establish-ment of the Flood Warning and Water Monitoring System (18 man-months) andadditional consultants for water quality training (24 man-months). Local andforeign consultants (469 and 165 man-months, respectively) will be recruitedto bupervise irrigation system construction to assist the Irrigation ProjectOffice (para. 4.04). Consultants for detailed design of irrigation works,construction supervision of the diversion tunnel and bid evaluation of the damhave been recruited under Loan 1811-IND and have been in place since September1984 (see Annex 6).

3.25 Consultants (510 man-months; 450 man-months local and 60 man-monthsforeign) will also be recruited for the Jatigede irrigation designs(para. 3.22) Terms of reference for the designs have been reviewed and agreedby the Bank. The consultants will be recruited in September 1985.

Page 34: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 26 -

Status of Project Preparation

3.26 The designs and all major investigations for the main dam and power-house have been completed. Bidding documents have been reviewed by the Bankand found satisfactory. The schedule for tendering the main dam andpowerhouse for international comperitive bidding CICB) is: invitations wereissued on August 6, 1984 for 19 Drequalified contractors; bids were opened onDecember 6, 1984; DGWRD' s recommendation for cender award -was on February 28,1985 and the award will be in .av 1985. A condition of loan effectivenesswill be the signing oi the concract -sr dam and powerhouse construction.Designs for che diversion tunnel. base camp and hauL road have been reviewedby the Bank. Their construction is under way by local contractors and will becompleted prior zo the contract award for the main dam. These initial workshave been fully funded by GOI, and demonstrate GOI's incenc to oroceed withthe project.

3.27 Geotecnnical investigation and detailed surveys and designs for theKlambu barrage and all other major irrigation structures and canals have beencompleted. Detailed designs for secondary and tertiary systems will becompleted in stages by the end of 1986. The existing designs andinvestigations for these systems are to a sufficient standard for computingfirm cost estimates. Detailed tender documents and specifications would beavailable in mid-1986 for calling of tenders for the irrigation works (seeAnnex 4). Detailed specification and designs for the Flood Monitoring Systemhave been completed, are being reviewed by the Bank, and will be tendered inJuly 1985.

3.28 Land acquisition for the area (340 ha) around the dam site has beencompleted and about 300 families have transmigrated. The GOI has firm plansto acquire most of the settled land in the proposed reservoir area by1987/88. The Governor of Central Java has set up coordinating committees for(a) land acquisition and (b) resettlement.

Dam Safety

3.29 A panel of three international dam experts have been recruited, havereviewed design and tender documents for the dam, and have found the designsand investigations satisfactory. This panel will continue to review anydesign modifications and safety arrangements needed during construction uptill 1990. GOI will keep the Bank continually informed of the panel'sfindings (para. 4.02). Dam safety inspections will be performed by ;HEinspection teams on a routine basis (twice a year or more frequently) afterthe dam is completed. An assurance was obtained during negotiations that byDecember 31, 1989 IHE wilL submit for the Bank's review a plan for theproposed dam inspection arrangements, and will carry out such plan asacceptable to the Bank.

Page 35: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 27 -

Implementation Schedule

3.30 The implementation schedule for the project is presented inAnnex 4. The dam will be compLeted in four years (by early 1989) while theirrigation system construction will be completed in six years (by mid-1991). The implementation targecs are modest in terms of what has beenachieved in dam and irrigation construction in Indonesia.

Cost Estimates

3.31 Total project costs are estimated at US$283.1 million (excludingtaxes of US$17.2 million) of which US$122.7 million (or 44%) will be foreignexchange. Project costs are expressed in January 1985 prices and at anexchange rate conversion of Rp 1,100 = US$1.00. Unit rates for the irrigationsystem are based on similar irrigation works in the project area, and for thedam on the lowest bid prices of the ICB tenders which were submitted inDecember 1984. A 19 i allowance for physical contingencies has beenincluded for the dam, 15Z for the irrigation works, and 5% on consultantservices and special equipment. Expected price increases total about 21Z ofthe base cost and were estimated on the basis of the following inflationrates: for local costs 8% in 1985-90, 5% thereafter; and on foreign costs, 5%in 1985, 7.5Z in 1986, 8% in 1987-90, 5Z thereafter. Details of project costsare given in Annex 1, Table 1 and are sumnarized in Table 3.4.

10/ 20Z for the dam embankment, 15Z for appurtenant structures and and 10%for the power plant.

Page 36: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 28 -

Table 3.4: PROJECT COST SUMMARY

2 of Z ofItem Local Foreign Total Local Foreign Total foreign total

- ltXp billion) - - ( illion)- exchange base cost

Civil WorksDan and appartenances 14.6 27.8 40.4 13.3 25.3 38.6 66 -

Power stations & transmission 3.1 14.2 17.3 2.8 12.9 15.7 82 -

Subtotal 17.7 42.0 59.7 16.1 38.2 54.3 70 26

Irrigation /aSidorejo 7.7 5.3 13.0 7.0 4.8 11.8 41 -Sedadi 3.3 2.2 5.5 3.1 2.0 5.1 40 -Klambu Kiri 15.4 9.n 24.4 14.0 8.2 22.2 39 -Xlambu Kanan 24.7 15.0 39.7 22.5 13.5 36.0 37 -Xl.ambu Barrage 6.4 7.8 14.2 5.8 7.2 13.0 55 -

Subtotal 57.5 39.3 96.8 52.4 35.7 88.1 40 43

Subtotal Civil Works 75.2 81.3 156.5 68.5 73.9 142.4 52 67

EquiwmentOffice, OM, hydro & training 1.0 4.1 5.1 0.9 3.7 4.6 83 -Telemetry &Water quality 4.2 6.5 10.7 3.8 5.9 9.7 61 -

Consultants 8.4 7.0 15.4 7.6 6.4 14.0 46 -Training /b 0.2 1.0 1.2 0.2 0.9 1.1 82 -Administration 14.7 - 14.7 13.4 - 13.4 -

Land Acquisition 28.1 - 28.1 25.5 - 25.5 - -

SubtotalEquipment & Servicea 56.6 18.6 75.2 51.4 17.9 68.3 26 32

Base Cost 131.8 99.9 231.7 119.9 90.8 210.7 43 100

Physical contingencies/c 16.6 13.5 30.1 15.1 12.3 27.4 45 13Fxpected price increases/c 28.0 21.6 49.6 25.4 19.6 45.0 44 21

Total Prolect Cost /d 176.4 136.0 311.4 160.4 122.7 283.1 43 134

/a Costs for roads (3Z) and enlarging canals for municipal water supply (0.5Z) are Included in these costs.7i* Inclades costs of training, consultants and specialized equipment.7-c See Annex 1, Table 1 footnotes (b) and (c) for contingency assumptions.7d- Excluding taxes of US$17.2 million on civil works, equipment and services.

Page 37: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 29 -

Financing

3.32 The proposed loan of US$156 million (see Annex 1, Table 6) willfinance about 60Z of total project costs excluding taxes (US$17.2 million),reserve procurement of vehicles (US$2.1 million) and equipment for the powercomponent (US$21.3 million) wnich will be financed by export credits. Theloan will finance the remaining Eoreign exchange costs (US$104.1 million) ofthe project and US$51.9 million of local costs. GOt wiLl finance the balanceof the costs of US$105.8 million (Table 3.5) and is arranging for financing ofthe power component by export credits to be available by December 1985. Theproposed cost sharing arrangements are justified since (a) the projectbenefits almost entireiy low-income farmers or iandless agricultural laborers(paras. 6.05-6.06), and (b) without external assistance COI would have to slowdown implementation to che detriment of economic viabilicy.

Table 3.5: FINANCING PLAN

Local Foreign TotalSource -…------ US$ million ------------

Bank 51.9 104.1 156.0GOI 104.5 1.3/a 105.8Export Credit 4.0 17.3 21.3

Total 160.4 122.7 283.1

/a Foreign cost of reserve procurement of vehicles; the remaining US$0.8million represents local costs.

Procurement

3.33 Civil Works. The dam and associated works (US$43.7 million) will beconstructed through a single contract procured using international competitivebidding (ICB) procedures. The Klambu barrage, Klambu Kanan main canal andSidorejo weir (US$35.0 million) will be contracted through ICB. A series ofabout 56 smaller contracts (US$77.0 million) will construct a series ofsmaller and widely dispersed irrigation works which are unlikely to attractforeign contractors. For these, local competitive bidding (LCB) proceduresopen to foreign contractors and acceptable to the Bank will be used. Table3.6 summarizes procurement arrangements under the project.

Page 38: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 30 -

Table 3.6: PROCUREMENTTU-S$ million)

Bank ExportCategory ICB LCB Other N.A. Total Loan credit/a

Civil WorksDam 43.7 - - - 43.7 32.3Irrigation 35.0 77.0 - - 112.0 82.9Buildings - 0.4 - - 0.4 0.4

Power PlantTurbines and generator (28.5 MVA) - - - 12.4/a 12.4 - L2.4Transmission line (150 kVx30 km) - - 3.37a 3.3 - 3.3Micro-hydro (3x1.80 MVA) 3.1 3.1 - 3.1Transmission line (20 kVx3O km) 0.6 0.6 - 0.6

EquipmentSpecial equipment - 0.9 0.4/b - 1.3 1.0 -

Vehicles - - 2.0 - 2.0 -O&M 1.8 - - - 1.8 1.7Telemetry & facilities/c 9.4 1.3 - 10.7 9.6 -

IPEDA computers - 0.1 - - 0.1 0.1 -

ConsultantsDam construction

and water management - - 5.5 - 5.5 5.5 -

Irrigation supervision - - 3.8 - 3.8 3.8 -Jatigede designs - - 4.9 - 4.9 4.9 -

Telemetry & training/d - - 1.3 - 1.3 1.3 -

Soil conservation - - 0.5 - 0.5 0.5 -IPEDA (mapping) - - 1.0 - 1.0 1.0 -

Training - - 0.7 - 0.7 0.7 -

Administration - - - 13.4 13.4 -

Land Acquisition - - - 27.3 27.3 -

Subtotal 89.9 79.7 20.1 60.1 249.8

Physical contingencies 14.7 11.8 1.0 5.8 33.3 - 1.9Unallocated - - - - - 10.3 -

Total 104.6 91.5 21.1 65.9 283.1 156.0 21.3Financing t75.0) (62.9)(18.1) (- (156.0)

/a GOI will use ICB procedures to tender for export credit.7i Equipment for training under limited international bidding.7i Computers, telemetry, software and installation.7r Includes all the consultants for training.

Page 39: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 31

3.34 Equipment. Procurement of major equipment for operation and maince-nance (US$1.8 million). and for specialized telemetry and computers for floodwarning and water monitoring (US$9.4 milLion) will be procured through ICB.Other small Laboratory, office, hydrometeorologic and minor O&M equipment(US$0.9 million) will be procured locally in small Lots through GOIprocurement procedures acceptabLe to the Bank.

Review of Procurement

3.35 All civil works contracts are reviewed by the Procurement ControlUnit (DCWRD) and for contracts Larger than US$500,000. clearance must aLso beobtained from the Ministry of Public Works procurement unit and the SEKNEG -the State Secretariat. The Bank reviews contract evaluation and award throughits RSI (Resident Staff. Indonesia) which works closeLy with these agencies onprocurement matters. The 3ank has reviewed the contract cocuments for the dam(US$43.7 million) and found them sacis.actory. The Bank will review prior totendering and award about 24 additional contracts (USS79.0 million) eachvalued at over USS1.5 miLlion. About 32 other contracts (US$33 million), eachvalued at less than USS1.5 million, will be reviewed by the ProcurementControl Unit, and subsequently by the Bank, on a sample basis after award.The two ICB contracts for equipment (totaLling US$11.2 million) will bereviewed by the Bank prior to tendering. Equipment procured in smalL lots notexceeding US$0.2 million in value will be reviewed after award on a samplebasis.

Disbursements

3.36 Loan funds will be disbursed against:

Category Disbursement

(a) Civil works for the dam 74%

(b) Civil works for irrigation contracts .4Z

(c) Imported equipment and materials 100% of foreigncost

(d) Equipment and materials procured locally 65%

(e) Locally manufactured goods 95% of ex-factorycosts

(f) Local and expatriate consultant services,and training costs 100%

Page 40: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 32 -

Disbursements will be made against contracts, except for training costs andcivil works costs for contracts Less than USS1.5 million -hich wiLl bedisbursed against statements of expenditure (Annex 10)._1I rhe proposedallocation of loan proceeds is presented in Annex 1, Table o. rhe disburse-ment profile (Annex 1, Table 7) is projected over a six-year period fromSeptember 1985 to June 1991. The profile follows fairly closelv tneIndonesian and Bankwide disbursement profiles for similar works. Loan Closingis expected by December 31, 1991.

Accounts, Audits and ReDorting

3.37 Detailed separate accounts and records are kept by DGWRD and PLN foreach budget item by project and budget year. Carrv-overs of unspent funds(SIAP) are permitted for two vears. 3ecause SIAPs are permitted, cash booksand accounts are not closed until the budeet for the Line item has been fullyspent. Project accounts are subiecc-to two audits: (a) by the InspectorGeneral of the Ministry of PubLic Works (MPW), and (b) by the Financial andDevelopment Supervisory Board (BPKP). The work of both auditors has beenfound to be generally satisfactory on Bank-assisted irrigation projects.Assurances were obtained at negotiations that adequate and separate accountswill be maintained: all contracts, orders and receipts will be kept for atluast one year after loan closing; and independent audits by BPKP of eachyear's accounts will be submitted to the Bank within nine months of the cLoseof each GOI fiscal year. Assurances were also obtained that DGWRD wouldprepare a Project Completion Report which will be submitted no later than sixmonths after loan closing.

Environmental Impact

3.38 Resettlement. Senior environmental specialists and managers fromthe Institute of Ecology, Padjadjaran University, supervised by internationalconsultants, have been involved since 1981 in identifyir7 the detailed reset-tlement needs of the project, and preparing an environmental impactassessment.

3.39 In 1982, the Government of Central Java set up a coordinationcommittee at the provincial and district levels to coord:nate the transmigra-tion and resettlement of the popuLation to be inundated by the reservoir. Thecoordination committee is responsible to: (a) carry out ̀ .tailed surveys ofthe area through the provincial Agraria for purposes of compensation of landand facilities; (b) supervise land transactions; and (c) establish resettle-ment and transmigration implementation teams to coordinate with the peopLeaffected.

11/ A revolving fund wilL not be used in the proposed project because ofexisting prefinancing arrangements with GOI for the irrigation sector.The introduction of such a fund for future projects is being discussedwith GOI.

Page 41: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 33 -

3.40 Some 5,390 families (23.380 oeopie) in 2C vilLages wiil be relo-cated. About 12,200 of these people are in che iabor force and 50 are far-mers, 27% are Laborers, 18Z are unempioyed, and 5% have other employmenc.Sample surveys of villages show chat 55% of the people nave incomes below theminimum poverty level. Popuiacion densities vary from 860 to 1,060 people/sakm. In the most recent survey in 1983, 75Z of the famiLies wanted to trans-migrate. Resettlement within the catcnmenc is discouraged because of _ne veryhigh population density and the low productivity of the upland areas. ReDre-sentacives of the affected villages have visited the proposed transmigracionsites in Irian iaya and Bengkulu in Sumatra, and were sacisfied wich Ehesites. Some 300 families have already cransmigraced. The Proiect Office. incooperation with the Central Java Provincial Coordinating Committee. has ore-pared a resettlement plan, compensation payments and schedules acceDcable tothe Bank (see Table 3.7). Assurances were obtained during negotiations thatGOI will provide adequate and timely budgecary resources for compensation pav-ments and will provide the Bank with annual reports on the resectlement,compensation, and welfare of people affected by the reservoir constructioncommencing December 31, 1985.

Table 3.7: PROPOSED RESETTLEMENT PLAN AND COMPENSATION PAYMENTS

Land acquisition No. of families Compensation bud-Year (ha) to be resettled gets (Rp billion)

1983/84/a 340 300 1.81984/85/a 380 1,170 2.51985/86 1,308 1,560 8.51986/87 1,500 1,190 6.31987/88 1,179 1,170 4.71988/89 /b 1,500 /c - 2.1

Total 6,207 5,390 25.9

/a Payment has been completed.7i Filling of dam starts in April 1989.77 This land is mainly forestry land above the maximum operating water

surface Level.

3.41 Judging from the experience gained on similar dam sites in CentralJava, the present number (25%) of all families who preferred relocation inJava will probably decrease to 1OZ as transmigration accelerates. The remain-ing 10% have land outside the catchment, or may choose to live with rela-tives. For these people, the Kabupatan Coordinating Development Comitteewill give them preference for vocational training, work in local rural worksprograms, and in the project's civil works construction program (see Annex 8).

Page 42: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 34 -

3.42 Other environmental aspects of the project include:

(a) The dam will substantially reduce flooding in the upper Serang Riverat the junction of the Serang and Lusi. The upper Serang with themodified flows will peak in the dry season. The present floodingdownstream of the basin will also be substantially reduced;

(b) The Serang and Lusi watersheds are the subject of a recentlyapproved Upland Agriculture and Conservation Project (Ln. 2474-IND)supported by the USAID and the Bank. During negotiations assuranceswere obtained that the measures taken for catchment procection underthis loan will focus on soil and water conservation. in addition,studies will be undertaken by the Directorate General of LandRehabilitation and Reforestation (DGLRR) for improved soil and waterconservation for the proposed Jatigede Dam catchment on che Ci.anukRiver;

(c) Public health will be improved due to the increased quantity andquality of water available year-round for drinking. Assurances -wereobtained during negotiations that a plan for a continuous canalwater quality monitoring system will be established by the IHE inconsultation with the Provincial Health Services by December 31,1988 and the system will be in place by June 30, 1991;

Cd) There are no archaeological sites or artifacts of any significancein the area to be submerged. Construction of the project is alsonot expected to adversely affect fauna in the valley; and

Ce) Public health authorities, with the cooperation of the ProjectOffice, will intensify malaria control efforts as the irrigation andcropping patterns intensify, since some of the vectors are presentand there is some incidence of malaria in the project area.Assurances were obtained at negotiations on appropriate measures formalaria control in the project area.

IV. ORGANIZATION AND MANAGEMENT

National Level Organization and Management

4.01 DGWRD in the Ministry of PubLic Works will be the principalexecuting agency for the project responsible for all design and supervisoryconsulting services and all civil works for the dam, substructure of thepowerhouse, major diversion, irrigation and drainage works. PLN, under theMinistry of Mines and Energy, will be responsible for the construction of thesuperstructure of the powerhouse, electrical and mechanical facilities,equipment installation for the powerhouse, and construction of thetransmission line.

4.02 DGWRD will carry out its responsibilities through its Directorate ofIrrigation II (DOI-II) (see Chart 26628). A panel of dam experts, established

Page 43: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 35 -

to review designs, will continue to review design modifications, safety andeconomy throughout conscruc:ion. and report to DOI-II (para. 3.29).Assurances were obtained ac aegotiations that the dam panel's comments priorto and during construction regarding safety and economy in construction shailbe properLy taken into accounc and that their periodic reports shall be madeavailable to che Bank not :.acer than one month afrer each visit. IHE willorganize the inspection teams on a routine basis (three times a year) for aperiod of five years to perform dam safety inspections. IHE in consultationwith the Directorate oi Rizers (DOR), DOI-I and DOI-II will implement thetraining component of the project. IHE with DOI-II's Project Office willestablish the Flood Warning and Water Monitoring Center.

4.03 PLN will implement the power component (see Chart 26718) through itsDirectorate of Construction, which will manage the consultancs for the powerstation, and the procurement and instalLation of the electrical and mechanicaL-equipment according to the schedule shown in Annex 4. An assurance to thiseffect was obtained during negotiations.

Field Level Organization and Management

4.04 At the field level. DOI-II's Jratunseluna General Project Officewhich was established in 1976 in Semarang, will be responsible for theproject. To manage day-to-day supervision of construction this office has twoProject Offices for the Kedung Ombo Dam and Irrigation (Chart 26629). TheKedung Ombo Dam Project Office is located in the town of Purwodadi, with asite office at the dam location. The Government wishes to continue theservices of consultants, SMEC, who will be responsible for supervisingconstruction of the dam at the site (Chart 26630). The Irrigation ProjectOffice has been established at the town of Godong, and will be responsible forsupervision of construction of all irrigation works, assisted by local andsome foreign consultants (Chart 26631). The present and future staff needsare shown in Table 4.1. An assurance was obtained during negotiations thatall staffing requirements will be met by September 30, 1985 for the DamProject Office and by January 31, 1986 for the Irrigation Project Office, andthat vehicles required for implementation will be provided on a timely basis.

Page 44: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 36 -

Table 4.1: PROJECT OFFICE STAFF NUMBERS

Dam /a Irrigation /bPresent Future Present Future

Type of Prof. Non-prof. Non- Non- Non-work Ic ,c Prof. prof. Prof. prof. Prof. prof.

ProjecEManager I - 1 - 1 - 1 -

Working Draw-ings 2 a 3 8 5 10 6 15

Constructionsupervision -

main svstem 15 36 20 56 8 50 10 50Construction

supervision -tertiary system - - - - 10 30 15 70

Total 18 44 24 64 24 90 32 135

/a The shortfalls in future staff requirements will be met by reassignmentsof staff from other projects which will be completed by DOI-II by August1985.

/b Shortfalls in future staff will be met by reassignments within theJratunseluna Of'ice.

/c Professional staff are mainly engineers while nonprofessionals aretechnicians, draftsmans, surveyors, etc.

4.05 For the power component, the Central Java Hydropower and Transmis-sion Project Offices of PLN in Semarang will be responsible for day-to-daysupervision of the project. The Hydropower Project Office will set up aProject Office at the dam site to supervise construction of the powerhouse andthe installation of the generator sets. The transmission line contractor willbe supervised by the Transmission Office of Central Java in Semarang.

4.06 IHE's Division of Hydrology will establish by June 1986 a SubprojectOffice within the Jratunseluna General Project Office to implement the FloodWarning and Water Monitoring System. This Subproject Office will supervisethe contractors responsible for the installation of telemetry, the water leveLmonitoring stations, computers, and software in the Kudus Water ControlCenter, and will work closely with the Provincial Public Works Office inSemarang, the new Regional (wilayah) office of Pati, and with the ProjectOffices for the Dam and Irrigation. The Jratunseluna General Project Officewill also be responsible to ensure that the Water Control Center at Kudus willbe adequately staffed and sufficiently trained by the contractor to manage thewater allocation and flood warning operations (para. 4.09).

Page 45: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 37 -

4.07 IHE through its Training Divison will be responsible for all train-ing components in the project. IHE will coordinate with the relevant dir-ectorates in DGWRD to organize training, including the recruitment of expertsto teach the dam construction, dam inspection and reservoir operationscourses. The dam construction, dam safety and reservoir operations courseswill be scheduled for 1986 and 1987. Participants in these courses will be asfollows: three each from the iratunseluna Office and the three ProjectOffices; two each from DOI-I, DOI-II and DOR; and three from tHE. Coursematerial will follow that used by the U.S. Bureau of Reclamation.

Project Coordination

4.08 Since agencies from three Ministries at the national, provincial andkabupaten levels are involved in the project, effective coordination of proj-ect activities will be needed at all stages and levels. The followingarrangements have been established and are shown on Chart 26718. DGWRD as theprincipal executing agency wilL coordinate with PLN's central office and theDirectorate General of Civil Government and Autonomy (DGCGA) under theMinistry of Home Affairs at the national level. At the field level theJratunseluna General Project Office will coordinate with the newly establishedKedung Ombo Development Coordinating Team under the Office of the Governor ofCentral Java. The Project Offices for the dam and irrigation will coordinatewith the subteams of the Development Coordinating Teams at the kabupaten levelfor all land and water control and agricultural aspects of the project. TheJratunseluna General Project Office will also coordinate with the Central JavaHydropower and Transmission Project Units of PLN for all aspects of the powercomponent.

Operation and Maintenance (O&M)

4.09 Organization for O&M. At present the four project irrigation areasfall in three irrigation regional (wilayah) offices (i.e., Wilayah Pati,Semarang and Surakarta) and four irrigation sectional (seksi) offices. Duringnegotiations assurances were obtained that the Provincial Irrigation Servicein Central Java will reorganize its irrigation offices and operations by April1, 1989 (two years before project completion) as follows:

(a) reconfigure the wilayah boundaries so as to follow watershedboundaries of catchments, and, for the project irrigation, all areaswill fall under one wilayah office (called the Pati Wilayah) withits headquarters at Kudus (Map 18531);

(b) establish a new seksi office for the operation of the dam;

(c) establish the four project irrigation areas under three seksi(Serang Bawah, Serang Atas and Pati). The Serang Bawah Seksi willbe responsible for the maintenance of all waterways in the lowerSerang;

Page 46: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 38 -

(d) for the operation of the project, a Water Allocation Committee willbe set up composed of the four seksi representatives (Serang Bawah,Serang Atas, Pati and Kedung Ombo). The Committee will meet atleast once a week. or more frequently as needed, at Kudus todetermine the weekly operating rules for water releases from thedam, and proposed allocations for the various systems; and

(e) the Water Control Center at Kudus with all the necessary telemetric,hydrologic and hydraulic information will advise the WaterAllocation Committee (WAC) on the possible options for waterallocation for the various systems and the releases from the dam.Water allocation will be decided by the WAC. The Water ControlCenter will have adequately trained staff, who will be in place byApril 1, 1989, two years prior to project completion.

4.10 initial Operations and Maintenance (O&M). During construction, theIrrigation Project Office will be responsible for O&M of the new irrigationsystems (Klambu Kanan and Sidorejo). O&M of the existing Sedadi and KlambuKiri systems will remain the responsibiLity of the Central Java ProvincialIrrigation Services under the existing Serang Atas and Serang Bawah irrigationsection offices. O&M of the tertiaries and quaternaries will be theresponsibility of existing water user organizations (see Map 18534) and newones to be organized in newLy developed areas. After completion of construc-tion, the Project Offices, together with the new Water Control Center atKudus, will be responsible for O&M of the dam, the Klambu barrage, the newtwin canal leading to Klambu Kiri, and the Klambu Kanan and Sidorejo systemsfor a period of not less than two years. On completion of the power station,PLN will set up its own site office close to the dam site which will beresponsible for O&M of the power station. This office will be under PLN'sRegion XIII Office located at Semarang. PLN's site office will coordinatewith the Project Office during the initial period of operation.

4.11 PLN will enter into an agreement with DGWRD and the ProvincialCovernment by July 31, 1989, prior to the commissioning of the power station,providing, among other things, operational rules and criteria for utilizationof reservoir water for irrigation and power purposes. In the event that anysubstantial changes in the cropping pattern and/or irrigation releases fromthe dam are proposed which could affect power generation, DGWRD will consultPLN before such changes are adopted. The Government will inform the Bank ofany such proposed changes in sufficient time to give an opportunity tocomment. A share (50Z) of the cost of operation and maintenance of the intakeof the dam and irrigation/power tunnel will be borne by PLN. PLN will bearthe cost of O&M of the powerhouse. Assurances on the above were obtained atnegotiations.

4.12 Sustained O&M. Two years after completion of construction,responsibility for O&M of the dam, Klambu barrage, main linking canals, andmain system irrigation and drainage for the Klambu Kanan and Sidorejo sub-systems will be turned over to the Provincial Irrigation Services of CentralJava (Kedung Ombo, Serang Atas and Pati irrigation section offices, respect-ively). PLN's regional office (Region XIII) will continue to undertake O&M ofthe power station. Day-to-day operation of the entire irrigation system and

Page 47: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 39 -

dam will be controLled by the newLy established Water Control Center's WaterAllocation Committee at Kudus. PLN's new office at the dam site will be res-ponsible for the operation of the power station. In addition, the threeirrigation seksi will be responsible for day-to-day operations of the threeirrigation subsystems up to the tertiary level in the service area. The waterusers associations will continue to be responsible for OL& of the tertiary andquaternary canals (see Map 18534). New associations will be formed in thenewly irrigated areas. Within each irrigation seksi the overall waterallocation will be determined by the existing irrigation advisory committees(Panitia Pengairan) at the village levels.

4.13 O&M of the canal inspection roads is carried out in conjunction withthe O&U for irrigation. The O&M of the kecamatan and village roads will beperformed by the local kabupaten public works offices.

4.14 O&M staffing needs for the various irrigation section offices areindicated in Annex 9, Table 1. O&M cost allocations which should adequatelycater for the dam, irrigation and downriver works are US$0.50 million, US$0.89million, and US$0.34 million, respectiveLy, and are based on existing irriga-tion O&M costs for the Serang Bawah and Atas Section offices for irrigation(see Annex 9, Tables 2 and 3) and on future needs. The average costs per hafor dam, irrigation and downriver works are US$8.40/hatyr, US$15.00/ha/y-r andUS$5.8O0haIyr, respectively (see Annex 9. Table 4). An assurance was obtainedduring negotiations that adequate (as indicated in Annex 9, Table 4) andtimely funding and staffing will be provided for 0& (para. 6.09).

4.15 Monitoring and Evaluation (MXE). M&E of the project during andafter implementation are important to ensure that project objectives aremet. The N&E information on water management will be obtained from telemetricdata on every 1,000 ha, available through the water control center at Kudus,and from information gathered by irrigation section and subsection offices andby village water masters. The M&E information on agricultural production,input supply, etc. will be gathered by agricultural extension workers (PPLs,PPMs. etc.) and by village contract farmers and village chiefs. The evalua-tion of the general performance of the irrigation systems would be performedat three levels (the village, kabupaten, and regional (wilayah)) throughgovernment-established committees known as "Penitia Pengairan" using theabove information. The committees have representatives from local governmentirrigation, agriculture and district sectional offices. The village, districtand regional level committees meet at bimonthly and monthly frequencies. Inthe existing irrigation areas in Sedadi and Klambu Kiri, these committees areoperational and functioning satisfactorily. For the new irrigation areas, GOIlegislation requires that committees will be set up prior to the completion ofthe project.

Page 48: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 40 -

V. AGRICULTURAL SERVICES AND PRODUCTION

Agricultural Services

5.01 Agricultural support services in the project area are being streng-thened by several Bank-assisted projects and government programs. Ongoingprojects include the Second National Agricultural Extension Project (NAEP II,Cr. 996-IND) and the Seeds II Project (Ln. 2066-IND). The main source ofinputs for rice production in the four project area districts is the Govern-ment's INMAS program. The INMAS program provides Earmers with subsidized HYVseed, fertilizer and agrochemicals and technical advisory services by fieldextension staff. Under the program, farmers pay cash for the productioninputs which are supplied through the local outlets. Since 1979 a groupapproach called the INSUS program has also been expanding in the projectarea. The objective of the INSUS program is to encourage farmer groups in anarea of not less than 10 ha, to organize land preparation and planting withinspecific time limits, to organize water management, to use HYVs andfertilizer, etc. In 1984/85, the INSUS program covered almost 80% of thetotal planted area in the project districts.

5.02 Crop production intensification methods with use of HYVs andfertilizer inputs are well established in the project area, and during each ofthe past five years data on fertilizer use and farm surveys indicate thatimproved technology has been adopted on more than 90% of the area planted withrice. Seeds, fertilizer and pesticides are readily available in the projectarea, and no supply constraint is expected under the project. Extensionservices under the Directorate General of Food Crops Agriculture are alsoadequate.

5.03 Crop Marketing. About 90% of the marketable surplus of rice in theproject area is sold by farmers as padi to private traders or millers. Thenumerous private traders operating in villages in the area provide competitionand offer services such as farm collection and drying of produce. About 370private rice mills and 26 government mills serve the project area subdis-tricts, and almost 200 rice mills are located within the project area bounda-ries. Milling capacity is expected to be adequate for incremental productionunder the project. Marketing of palawija crops is handled almost entirely byprivate traders, and well-established marketing channels exist, especially forsoybean and mungbean. In order to cater for increased marketing needs as aresult of the project, market and village access roads will be constructedunder Government's INPRES program. Village Class V roads will be upgraded toClass IV roads in ledadi/Klambu Kiri (57 km); Klambu Kanan (10 km); andSidorejo (11 km). 1 New farm-to-market roads will be constructed inSedadi/Klambu Kiri (42.5 km); Klambu Kanan (73 km); and Sidorejo (335 km).Assurances on the access road construction program were obtained atnegotiations.

12/ Class V and IV roads are, respectively, 3.0 and 3.5 meter wide, sealedall-weather roads.

Page 49: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 41 -

Changes in Crop Production under the Project

5.04 The project will increase agricultural production on about 59,340 hain the Serang River Basin. The major crops grown are rice, maize, soybeans,mungbeans and sorghum. Minor crops such as groundnuts, sugar and cassava havebeen ex.cluded from the analysis. The main benefits will result from theprovision of a reliable and timeLy supply of adequate irrigation water and themitigation of flood damage, allowing production of two crops of irrigated ricein the project area followed by secondary (palawija) crop production on aboutone third of the area.

5.05 Cropped Areas and YieLds. Overall cropping intensity for rice willincrease from a current (weighted) average of about 105% in the four areas to200Z at full deveLopment. Cropping intensities for the total cropped area(rice plus palawija) will increase from a present weighted average of about175% to 230% with the project at full development (Table 5.1).

Table 5.1: CROPPING INTENSITY (Z)

Present Preproject /a Future without Future withPaddy & Paddy & Paddy & Paddy &

Area Paddy palawija Paddy palawija Paddy palawija Paddy palawija

Sidorejo 85 266 85 266 85 266 200 230Sedadi 145 179 145 179 145 179 200 230Klambu Kiri 102 153 102 153 102 153 200 230Klambu Kanan 86 166 119 206 119 206 200 230

Average /b 105 175 115 188 115 188 200 230/c

/a After drainage is completed.Tb Weighted.0c High cropping intensities of 240% have been achieved in the Jatiluhur Project

over 200,000 ha (Irrigation V, Cr. 512).

5.06 Based on water availability and the existing technology available tofarmers, a cropping intensity of 230% with the project is reasonable. Thnischange results in an incremental area of 83,430 ha growing rice (wet and dryseason), an 236% increase over the present. The area planted with palawijacrops will decline by 20,200 ha or 52% (Table 5.2). The only net increase incommandable area is in Klambu Kanan where a 15% increase occurs due to theimpact of drainage activities under the Irrigation XIV Project (Ln. 1811-IND).

Page 50: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 42 -

Table 5.2: CROP AREAS(ha)

Futurewithout Future with

Crop Present project/a project

Wet seasonIrrigated paddy 27,350 27,350 59,340Rainfed paddy 29,930 32,230Maize 495 495

Dry season IIrrigaced paddy 7,900 7,900 59,340Maize 18,200 22,090Soybean 5,165 5,165Maize/soybean 2,880 3,280 -

Dry season II

Maize/soybean 5,060 5,060 6,000Maize/mungbean 5,830 6,540 11,820Sorghum 890 1,120 -

/a After drainage works under Irrigation XIV (Ln. 1811-IND) are completed.

Source: Annex 2, Table 5.

Page 51: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 43 -

Table 5.3: YIELD ESTIMATES(tons/ha)

Sidorejo Sedadi Klambu Kiri Klambu KananFuture Future Future Future Future Future Future Futurewithout with without with without with without with

Crop project project project project project project project project

Wet season paddyIrrigated rice - 4.7 3.5 4.7 2.9 4.6 3.0 4.0Rainfed paddy 3.2 - 3.0 - 2.7 - 2.7 -Maize i.6 - - - - - - -

Dry Season IIrrigated paddy - 5.0 4.0 5.0 3.5 4.8 3.0 4.2Maize 1.6 - 1.4 - 1.0 - 1.0 -Soybean 0.7 - 0.6 - 0.6 - - -

Maize/Soybean - - 0.8/0.4 - - 0.6/0.4 -

Dry Season IIMaize/Soybean 1.0/0.5 1.3/0.6 - 1.3/0.5 - - - -

Maize/Mungbean - - - - 0.6/0.4 0.9/0.5 0.6/0.4 1.3/0.5Sorghum - - - - - 1.0 -

5.07 Paddy yields are expected to improve by about 25% to 55% over thefour areas and palawija yields by about 8-35% with the project (Table 5.3).The expected future yield estimates are shown in Annex 2, Table 3. Theprojected yield estimates take into account both the impact of the IrrigaticnXIV Project (due to be completed at end-1986) and the negative impact of anycontinuing flood problems in the area.

5.08 Production. Paddy production in the area will rise substantiallyfrom about 0.20 million tons per year in 1984 to about 0.54 million tons peryear with both the proposed project and Irrigation XIV. Incremental annualrice production at full development (1993) will be about 0.34 million tons,but secondary crop production will decline by about 12,780 tons from thecurrent level of output. Eliminating the impact of the Irrigation XIVProject, incremental rice production due solely to the proposed project willbe about 0.29 million tons per year at full development, but palawija produc-tion may decline by 35,480 tons per year (Table 5.4). These increases inagricultural production will generate about US$41 million in annualincremental agricultural benefits (Annex 2, Table 11).

Page 52: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

TabLe 5.4: INCREMENTAL PRODUCTION !a(Tons '000)

Total Incremental rncrementaLincremental production due to production due to

production (1993) drainage project project alone

RiceSidorejo 42.53 0.52 42.01Sedadi 61.68 12.40 49.28Klambu Kiri 132.04 14.87 117.17Klambu Kanan 103.54 19.33 84.21

Total 339.79 47.12 292.67

PalawijaSidorejo (11.68) /b 3.46 (15.14)Sedadi 2.05 1.31 0.74Klambu Kiri (0.81) 4.08 (4.89)Klambu Kanan (2.34) 13.85 (16.19)

Total (12.78) (22.70) (35.48)

/a Future production with project less future production without project./b Figures in parentheses mean production decreases.

Source: Annex 2, Tables 6 and 7.

5.09 Build-up of Production. In accordance with the implementation sche-dule (Annex 4), the phasing of agricultural build-up is presented in Annex 2,Tables 12 and 13. Full agricultural benefits are assumed to be achieved afterone year in Sedadi and over three years (50Z in year one, and 75X in year two)in the remaining areas after each part of the irrigation system iscompleted. Full agricultural deveLopment of the total project area is reachedin 1993, four years after the completion of the dam.

VI. MARKET PROSPECTS, PRICES, FARM INCOMES AND PROJECT CHARGES

Market Prospects

6.01 Central Java is only now approaching self-sufficiency in rice.Although the world price of rice has fallen sharply (para. 6.02) almosteliminating the subsidy received by farmers, production will be encouraged toguarantee the stability of Central Java's rice self-sufficiency and providesurplus rice for other regions. Thus marketing prospects for paddy shouldremain favorable, and in the event of lower prices, farmers are expected toincrease palawija crop production.

Page 53: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-45-

Prices

6.02 Economic and financial prices for major agricultural inputs andoutputs are presented in Annex 2. Table 1. Estimated farm inputs and outputsare valued in constant January 1985 prices in farm budgets and economicanalyses. Economic prices for rice, maize, soybean, mungbean, sorghum andfertilizers are based on the world market price forecasts produced by theBank's Commodities and Export Projections Division adjusted fortransportation, processing and handling costs to che farmgate. Financialprices for all commodities and economic prices for inputs not tradedinternationally have been updated from actual farmgate orices. In the past,COI maintained low consumer food prices by subsidizing the sale of importedrice and holding domestic floor prices Low. To offset an adverse impact onproducers, GOI subsidized fertilizer and pesticide prices. in recent years inorder to encourage production, paddy floor prices have been raised consider-ably. In addition, recent declines in the world rice prices have contributedto almost eliminating the rice subsidy. For project analysis, financialprices of rice have been assumed to converge with economic prices. To dis-courage the excessive use of fertilizers and reduce subsidy elements, COI, inearly 1983, raised the price of urea and triple superphosphate (TSP) from Rp70/kg (unchanged since 1977) to Rp 90/kg. However, the domestic price isstill below the border price and is expected to remain low in the 1990s.

Farm Incomes

6.03 Three typical farm sizes (0.2 ha, 0.4 ha, 0.6 ha) have been selectedfor farm income analysis in Sidorejo and Klambu Kanan and three (0.1 ha, 0.4ha and 0.6 ha) in Sedadi and Klambu Kiri. In the analysis it is assumed thatthe farm family, consisting of 4.6 persons, provides 1.7 man-days of labor for22.5 days per month. In the months of peak labor requirement such as plantingor harvesting, when most of the month's activity must be completed in aboutten days, it is assumed that labor is hired. This amounts to about 20% of thetotal labor requirements at full development. It is aLso assumed that allanimal labor will be hired. In addition, there are a few off-farm employmentopportunities, the majority being seasonal tobacco or factory work in centerssuch as Semarang, Demak or Kudus. These employ predominantly women or youngadults at an average wage of about Rp 600/day. These representative farmmodels, shown in Annex 2, Tables 15a-d and 16 a-d are summarized in Table 6.1.

Page 54: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 46 -

Table 6.1: NET FARM INCOMES PER CAPITA /a(1985 US$)

Z of Increment atFarm total Future full develop.

Area Size farms Present w/o proj. w/ proJ. S v

Sidorejo 0.2 ha 20 82.5 4 9.i 72.1 23.0 470.4 ha 35 62.3 79.0 140.9 61.9 780.6 ha 20 92.5 116.9 213.3 96.4 82

Sedadi 0.1 ha 14 15.9 21.9 35.0 13.1 600.4 ha 30 63.5 87.7 140.0 52.3 600.6 ha 19 96.4 132.1 208.4 76.3 58

Klambu Kiri 0.1 ha 14 9.4 14.0 33.5 19.5 1400.4 ha 30 37.4 56.0 134.1 78.1 1380.6 ha 19 53.9 81.8 200.0 118.2 145

Klambu Kanan 0.2 ha 18 20.5 34.4 62.1 27.7 800.4 ha 30 36.0 61.1 119.8 58.7 960.6 ha 19 52.7 91.0 178.7 87.7 96

Weighted average lb - - - - - 98

ia Incomes for owner-operators (65% farmers in project area) with 4.6 persons per family.7ib Weights calculated according to area.

6.04 About 60% of the farm area is operated by owner-operators and about30% by tenants. The remaining 102 of the farm area is farmed by sharecroppersunder the 'bawon' system, whose income is usually 1/7 or 1/10 of the harvestvalue.

6.05 The moat recent Bank estimate of the absolute poverty leveL (in end-1983 terms) for rural areas in Central Java is about US$103.5 per capita per

Page 55: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 67 -

year, similar to the level for all tndonesia of about US$103.1.131 However,consumption estimates indicate chat since i980, the position of Central Javacompared to the ryX5 of Indonesia has worsened. Bank estimates of the inci-dence of povercy _ reveal that rural areas in Central Java have a greaterconcentration of poverty (62%) than all Indonesia (43% of the national popula-tion are estimated to have incomes below the absolute poverty Line). It isexpected that the majority of notentiaL beneficiaries would remain at incomesbelow the absolute poverty level without the project. On the smallest farms(0.1 in the Sedadi and Klambu Kiri and 0.2 ha in Sidorejo and Klambu Kanan),incomes will remain below the absolute poverty level with the project.Nevertheless. farmers wilL stii be substantially better off, and incrementalincomes are espected to rise between about 47% and 145%, with a weightedaverage increase of 98Z over the whole project area.

6.06 Encome Distribucion. The project area inciudes: about 87,000 farmoperator households; about 11,000 farm laborer househoLds which are separatefrom owner-operators and about 22,000 living within owner-operator households;and about 23,000 nonfarm households. An area of about 2,000 ha of drainedswamp land in the Klambu Kanan area will be redistributed to landless agricul-tural labor in the project area. Comparing tenant income with owner-operatorincome, the income of former cenants will increase by about 20-25% in KlambuKanan, 15-20X in Sidorejo and about 15% in Sedadi and Klambu Kiri. The incomeof landless laborers (only 101 in project areas) is estimated to increase by5-10% due to increased farm employment.

Project Charges

6.07 Indonesian farmers pay land taxes (IPEDA) and make contributions tovillage watermasters who are responsible for tertiary network operation andmaintenance. Land is classified according to a number of physical criteriaand IPEDA is charged at a fixed tariff which varies by land class and totalland holding. The revenue is collected by village heads and turned over tothe local (Kabupaten) and provincial administration for financing local devel-opment. Projected increases in land classes due to irrigation and otherimprovements and consequent IPEDA increases in each area are detailed in Annex2, Table 17a. Assurances were obtained during negotiations that GOI will(a) reclassify for IPEDA purposes all land benefitting from project works,section by section within one year of completion of works, and (b) reassessand collect IPEDA taxes from all project beneficiaries in accordance with anagreed implementation schedule. At full development, IPEDA in the projectarea will range from about US$13/ha/year to about US$22/ha/year. In-kindcontributions for water in the project area are 25 kg of paddy per crop. Atfull development, water contributions are expected to be about US$8/ha.

13/ These estimates are drawn from the 1980 Indonesia Household ExpenditureSurvey, released in 1983. The 1980 rupiah estimate is inflated by aprice index for nine basic items of 56% from 1980 to end 1983 andconverted to US$ at the prevailing exchange rate of.Rp 1,000 = US$1.

14/ Also from the 1980 Household Expenditure Survey.

Page 56: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 48 -

Farmers will also contribute about 20 man-days of their labor, equivalent toabout Rp 26,GOO/farmIyear. to operate and maintain the village level irriga-tion system.

6.08 Cost and Rent Recovers. Present and estimated future levels ofIPEDA, water service concriDuEions and O&M labor contributions are summarizedin Annex 2, Table 18a. At -ull development, incremental IPEDA and othercharges wiLl more than offset incremental O&M outlays for main and secondarynetworks. It is oer-haps miore meaningful to observe the cost and rent recoveryindices jhich estimate cost and rent recovery due to the stream of chargesover the project's .ife. The cost recovery index. ranging becween about 6%and 26% (averaging i6Z), is the ratio of the present vaLue of incrementaldirect revenue (IPEDA and other contributions) to the presmgg value ofincremental financial project costs in January i°85 terms.-' The rentrecovery index, ranging from about 6% to almost 23%. is che racio of thepresent vaiue of incremental direct revenue (IPEDA and other contributions) tothe present zalue of incremental net financial project rent. These rates arein line with those in similar recent projects in 7ndonesia. The recoveryrates are considered reasonable due to the low incomes of Droject bene-ficiaries (para. 6.05). O&M cost recovery ranges *rom about 86Z in Sedadi(0.6 ha farms) to about 355% in Sidorejo for 0.2 ha (Annex 2, Table 18c).Incremental streams of O&M contributions over the oroject's life and theresultant cost and rent recoverv index are shown in Annex 2, Table 18c.

6.09 O&M Funding. Support for O&M on the main irrigation system from thecentral government has been increasing steadily over the past few years. Inaddition, for Bank-assisted projects, part of the capital development budget(the DIP) has recently (in the 1983/84 budget) been directed to support O&Mactivity which has reduced the shortfalls in O&M budgets from 40% to 20%.Shortfalls in 0&M can have consequences on the agricultural benefits achievedover the project's life (para. 7.12). Additional funding sources for OE& havebeen agreed in principal with GOI by use of revenues collected from IPEDA.Assurances were obtained at negotiations that sufficient (see Annex 9, Table4) and timely funds will be allocated to O&M, and that GOI will increase 1PEDArates for reclassified land (para. 6.07), and furnish to the Bank by December31, 1988 a plan to allocate the incremental IPEDA thus collected to O&M ofproject works following construction.

15/ Discounted at the opportunity cost of capital of 10% ovc-r the projectlife of 30 years.

Page 57: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 49 -

VII. 3ENEFITS, ECONOMIC JUSTIFICATION AND RISKS

General

7.01 The project complements the previous Bank,gupport in water resourcedevelopment in the project area. EarLier projects concentrated onrehabilitating the existing irrigation system, mitigating flood problemsthrough constructing main and some secondary drainage, and undertakingextensive tertiary development in the Sedadi and Klambu Kiri areas. Theproposed Kedung Ombo Multipurpose Dam and irrigation Project will enhancewater avaiLability through water storage in a dam, expansion of the irrigationarea to the Klambu Kanan and Sidorejo areas. and substantial improvement ofexisting irrigation svstems in the Sedadi and KLambu Kiri areas. The projectwill also assist ongoing flood control activities through reservoir operationand the continuation of drainage works. Yainly secondary power (a total of 74GWh per vear) will be generated resulting from the operation of thereservoir. Municipal and industrial water will also be supplied through theirrigation canals throughout the year. The proposed proiect is high on COI'sdevelopment priorities in view of its large agricultural and flood controlbenefits, in an area mostly without dry season water, yet subject to floodingin the wet season.

Benefits

7.02 Agricultural Benefits. Approximately 87,000 farm families willdirectly benefit from the project and their incomes will increase (para. 6.05)due to increased agricultural production valued at US$41 million (See Annex 2,Table 11). An additional 33,000 farm laborer households, 20,000 cf which arecontained within farm operator households, will also benefit. There will alsobe indirect beneficiaries due to the improved access and communications in thearea from the new feeder roads and access tracks to be constructed or upgraded(para. 5.03). The full costs of these roads have been charged to the project,although no road user benefits have been quantified.

7.03 Power Benefits. Power generation will be incidental to theoperation of the reservoir and will be secondary to the main objective ofproviding irrigation. On average, 74 GWh of electrical energy will begenerated per year. The main benefit from the energy generated will be thesaving of cost of fuel from oil, diesel or coal stations. PLN's simulationsindicate that for the proposed future network of generating stations startingfrom 1989 onward, the Kedung Ombo power station will initially accrue savingon fuel from oil fired steam stations (1989 to 1994), while in the latteryears (1995-2020), it will save fuel from the coal fired plants (see Annex 2,Table 22b). Fuel savings range from US$2.7 million to over US$4.0 million peryear (till 1994) and subsequently average US$4.3 million per year in financial

16/ Irrigation projects I, VII, IX, and XIV (Loan numbers 127-IND, 1268-IND,1465-IND and 1811-IND) all in the Jratunseluna River Basin, Central Java.See Chapter 1.

Page 58: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 50 -

terms. The economic benefic of this power is equated to the tariff revenuecollected. From the commencement of power generation in 1989, this is aboutUS$6.16 million per year.-

7.04 Employment. As a direct resuir of increased agriculturalproduction, theLe will be a substantial increase in agricultural employment inthe project area. Three distinct peaks in Labor demand will occur due to theincreased cropping intensity. At full development, the incremental agricul-tural labor demand is about 8.7 million man-days (40.000 man-years), anincrease of abouc 65%. This represents an increase of 10.3 million man-days(47,000 man-years) or 89% over the present (see Annex 2, Table i9).

7.05 Flood control benefits have been taken into account in formulatingyield estimates. The Klambu Kanan and Klambu Kiri areas will predominantlybenefit from flood control. Improved municipal and industrial water supply isLikely to reduce the incidence of water-borne diseases in village and muni-cipal areas. Health benefits and possible fishing and recreational benefitsfrom the use of the Kedung Ombo Dam reservoir area have not been quantified inthe analysis.

Main Assumptions Used in the Economic Analysis

7.06 Financial costs have been converted to economic costs using thefactors in Annex 2, Table 14. Expected price increases and taxes have beenexcluded from economic costs. No shadow price has been applied to the cost ofanimal labor due to the shortage of animals in the project area. However, thelabor component of a team day (two mpn) has been shadow priced at 50% of themarket wage. The consequent conversion factor for an animal team-day is thus0.7.

7.07 Foreign Exchange. The exchange rate of US$1.00 = Rp 1,100 isconsidered to reflect the value to the economy of the foreign exchange used inthe project.

7.08 Operation and Maintenance. Based on updated estimates of O&M costsfor other multipurpose dams, O&M for the irrigation system alone is estimatedat US$15/ha/year. The system is expected to operate at about 502 efficiency.Annual O&M for the dam and reservoir is estimated at US$0.5 million andUS$0.13 million for the power plant (see Annex 9 for detailed costs).Equipment for O&M on the irrigation systems (US$1.72 million) and downriverworks (US$0.87 million) is replaced in its fifteenth year. Wal O&M for allirrigation and dam facilities per ha is about US$29/ha/year._

17/ After allowing 15Z transmission losses, negligible incrementaldistribution costs and an average tariff of Rp 98/Kwh in 1985 constantterms.

18/ Excluding O&M on the power component.

Page 59: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

7.09 Economic Rate of Return (ERR). Based on the assumptions above and aproject financial and eccenomic life of 30 years, the ERR is estimated at about17.4% (17.6Z for a 50-vear scream) which is satisfactory. The flow ofeconomic costs and benerics over the project life is presented in Annex 2,Table 20. The ERRs for che irrigation and power components taken individuallyare 16.7% (Annex 2, Table 21) and 25% (Annex 2, Table 22a) respectively. Theequalizing discount rate for che power component taking only fuel saving is14.1Z (Annex 2, Table 22b).

Risks and Sensitivicy Analysis

7.10 The main risks associated with the project concern delays in landdevelopment due to delayed Land acquisition and inadequate operation andmaintenance.

7.11 If, due to deLayed land acquisition for the dam, construction costsare lagged two years and benefits are lagged more than two years, the ERRfalls to just under 13.4%. A future reduction in rice yields of about 12% inall areas except Sidorejo would result in a reduction of rice benefits ofalmost 20%. However, the project ERR will be 14.2%. If total benefits fell50%, costs should decrease to just over 20% for the project to remain viableat 10%, the opportunity cost of capital. Similarly, an increase in costs of50z could still maintain the project's viability at 11.8%. The project isless sensitive to cost overruns than to reductions in benefits, and theproject can withstand a reasonable degree of cost overruns and reduced bene-fits. Cross-over values for a number of critical variables are summarized inTable 7.1.

7.12 Varying Levels of O&M. The standard level of O&M assumed for theproject (para. 7.08) aims to produce an irrigation system efficiency of 50%. Theestimated impact of different levels of O&M on project beneg'ts was investigatedand summarized in Table 7.2. A cut in O&M budgets of 50% _t (very poor O&K)produ87d over time a system efficiency of 30%; poor O&M due to a cut in O&M of30Z ' resulted in system efficiency of 40%. In these cases, it is assumed thatO&M for the dam, reservoir, and the power component continues. In addition, itis assumed that the impact of the O&M changes occurs over 20 years. Due to thediscounting process, the ERR is little affected by the impacts of changes in O&Mexpenditures. Comparing the change in O&M costs to agricultural benefits overthe project life, however, shows a considerable trade-off. In the case of verypoor O&M, "savings" of US$1.99 million (NPV) in O&M costs result in losses ofUS$30.25 million in incremental agricultural benefits over the life of theproject. Similarly in the case of poor O&M, "savings" of US$1.31 million in O&Mcosts result in losses of US$8.58 million in agricultural benefits over the lifeof the project.

L9/ Complete neglect of maintenance and operational staff is also reduced.

20/ Costs of maintenance reduced by 60% but operational staff is not reduced.

Page 60: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

52

Table 7.1: SENSITIVITY ANALYSIS AT A 10Z OPPORTUNITY COST OF CAPITAL-

Appraisal value /a Switching value PercentageKey factor (WS$m) (USSm) change

(X)

Present Value IncrementalAgricultural benefits 239.5 121.0 -49.0Rice benefits 256.3 156.0 -39.0

Paddy yield at full 4.0 tons/ha 3.2 tons/hadevelopment /b to 5.0 tons/ha to 3.9 tons/ha -21.0

Dam and Structures:Construction costs 33.1 151.7 +358.0

Irrigation System:Construction costs 56.7 175.3 +209.0

Total Benefits 278.1 159.5 -42.7

Total Costs 159.5 278.05 +74.4

/a Discounted at 10%.

lb Average over the project area.

Table 7.2: SUMMARY OF IMPACT OF O&M CHANGES

Change in Change inAgricultural O&M CostBenefit NPV NPVUS$m Z US$m E ERR Z change

Very poor O&M -30.23 -12.0 -1.99 -17.4 15.9 -1.5Poor O&M - 8.58 - 3.4 -1.31 -12.0 17.0 -0.4

Page 61: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 53 -

VIII. AGREEMENTS REACHED AND RECOMMENDATION

8.01 During negotiations, the Bank obtained assurances from GOI that:

(a) IRE will submit for the Bank's review by December 31, 1989 a planfor dam inspection arrangemenrs and will carry out such arrangementsas acceptable to the Bank (para. 3.29);

(b) Adequate and separate accounts for the project will be maintained;all contracts, orders and receipts will be kept for at least oneyear after loan closing; independent audits by BPKP of each year'saccounts will be submitted to che Bank within nine months of theclose of each GOI fiscaL year; and a Project Completion Report willbe submitted no Later than six months after loan closing (para.3.37);

(c) GOI will provide adequate and timely budgets for compensation pay-ments to families relocating from the reservoir area, and willprovide the Bank with annual reports on the resettlement, compensa-tion and welfare of people affected by reservoir construction(para. 3.40);

(d) Catchment protection measures under the Bank-assisted Upland-Agriculture and Conservation Project and gill focus on soil andwater conservation (para. 3.42b);

(e) A plan for a continuous water quality monitoring system will beestablished by the IHE in consultation with the Provincial HealthServices by December 31, 1988 and the system will be in place byJune 30, 1991 (para. 3.42c);

(f) Appropriate measures for malaria control will be taken in theproject area (para. 3.42e);

(g) Comments of the panel of dam experts given prior to and during con-struction shall be properly taken into account and their periodicreports made available to the Bank not later than one month aftereach visit (para. 4.02);

(h) PLN will carry out the implementation of the power component inaccordance with the schedule shown in Annex 4 (para. 4.03);

(i) All staff requirements will be met by September 30, 1985 for the DamProject Office and by January 31, 1986 for the Irrigation ProjectOffice, and all vehicles required for implementation will beprovided on a timely basis (para. 4.04);

(j) The Provincial Irrigation Service in Central Java will reorganizeics irrigation offices and operations by April 1, 1989 as follows:

Page 62: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 54 -

(i) All wilayah boundaries will be reconfigured to follow watershedboundaries of catchments so that all project irrigation areaswill fall under the Pati Wilayah;

(ii) a new seksi office also under the Pati Wilayah will beestablished for operation of the dam;

(iii) The Serang Bawah Seksi will be responsible for the maintenanceof all waterways in the lower Serang;

(iv) Day-to-day operational issues of flood forecasting, water allo-cation for the various irrigation systems and for the reLeasesfrom the dam will be undertaken by the proposed Water Alloca-tion Committee in the new Pati Wilayah to be located atKudus. The Committee will meet at least once a week, or morefrequently as needed. The Water Control Center with all thenecessary telemetric. hydrologic and hydraulic information willalso be located at Kudus and will act as the technical arm ofthe Water Allocation Committee. The Water Control Center willhave adequately trained staff, who will be in place by April 1,1989, two years prior to project completion (para. 4.09);

(k) PLN will enter into an agreement with DGWRD and the ProvincialGovernment by July 31, 1989, prior to the comnissioning of theKendung Oinbo Power Station, providing among other things, operatingrules and criteria for utilization of reservoir water for irrigationand power. In the event that any substantial changes in thecropping pattern and/or irrigation releases from the dam areproposed which could affect power generation, DGWRD will consultwith PLN before such changes are adopted and Government will informthe Bank concerning the proposed changes in sufficient time to givean opportunity to comment. A 50% share of the cost of O&M of thedam intake and irrigation/power tunnel and all O&M costs of thepowerhouse will be borne by PLN (para. 4.11);

(1) In order to cater for increased marketing needs, market and villageroads will be constructed under the INPRES program. Village Class Vroads will be upgraded to Class IV roads in: Sedadi/Klambu Kiri(57 km); Klambu Kanan (10 km); and Sidorejo (11 km). New farm-to-market roads will be constructed in Sedadi/Klambu Kiri (42.5 km),Klambu Kanan (73 km), and Sidorejo (335 km) (para. 5.03).

(m) GOI will (i) reclassify for IPEDA purposes all land benefitting fromproject works within one year of completion of works, and(ii) reassess and collect IPEDA taxes from all projectbeneficiaries, in accordance with an implementation schedule agreedwith the Bank. GOI will furnish to the Bank by December 31, 1988 aplan assigning incrementaL IPEDA tax revenues thus collected to O&Mof the project works following construction (paras. 6.07 and 6.09);and

Page 63: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 55 -

(n) Sufficient and timely funds will be provided for operation andmaintenance of all project works (para. 6.09).

8.02 Signing of the contract for dam and powerhouse construction (para.3.26) and appointment of consuLtants for construction supervision (para. 3.23)will be conditions of loan effectiveness.

8.03 With the above assurances and conditions, the project will besuitable for a Bank loan of US$156 million with a 20-year maturity, includinga grace period of 5 years. The Borrower will be the Republic of Indonesia.

Page 64: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-56 - ANNEX 1Table 1Page 1

INDONESIA

KEDUNG 01430 MULTIPURPOSE DAM A1ND IRRIGATION PROECT

Sumnmary Cost Estimate (1984)(million S1

Local Foreign cost Total baseItern cost Direct Indirect costs FX% cost

CIVIL WORKSDam & Appurtenances

Base camp :.10) - (1.10)/a -Raul road tz.70) - - (2.70)7Ia -Diversion tunnel (1.90) - - (i.90)73? -Dan embankment 10.00 15.20 4.60 29.80 66Spillway & inlet work 1.90 1.10 1.50 4.50 58Pressure conduit and steel works 0.40 0.80 0.40 1.60 75Buildings, instrumentation, etc. 0.90 1.70 - 2.60 69E & equipment (25 ?VA) 1.60 8.40 - 10.00 84Transmission & substation (150 kV) 0.70 2.00 - 2.7n 74Micro Hydro & transmission

substation (20 KV) n.50 2.50 6.50 3.00

Subtotal 16.00 31.70 13.00 54.20 70 26

Irrigation ComponentService Area WorksSiloreio 7.0n 1.20 3.60 11.80 41

S6.100 ha net)Sedadi 3.10 - 2.00 5.10 4n

(13,410 ha net)KLambu Kiri 14.00 - 8.20 22.20 3Q

(20,330 ha net)Klambu Kanan 22.50 1.80 11.80 36.00 88

(19,000 ha net)'lambu weir and connecting s.sn 1.80 5.4n 13.no 54

canal

Subtotal 52.40 4.80 30.90 88.10 40 43

Total Civil Works 68.40 36.50 37.40 142.30 52 67

EQUIPMENT & SERVICESoffice & Special XquipmentHydrometeorology & meteorological 0.01 0.04 - 0.05 90Laboratory n.02 0.15 - 0.17 90Office 0.04 0.31 - 0.35 90Vehicle 0.46 - 0.85 1.31 65O&M 0.17 1.25 0.30 1.72 90Communications n.01 0.13 - 0.14 90Spares 0.19 0.47 0.18 n.R4 77Water quality & dam safety 0.23 0.25 - 0.48 52Telemetry 3.60 4.32 1.25 9.17 61IPP.DA - 0.10 - 0.10 -

Subtotal 4.73 7.02 2.58 14.33 67 7

Page 65: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 1- 57 Table 1

Page 2

z

Local Foreign cost Total baseItem cost Direct Indirect costs vx% cost

Consultant ServicesConstruction supervision 2.80 4.30 0.92 8.02 65water management

Water quality 0.05 0.25 - 0.30 83Telemetric system - 0.18 - 0.18 100Resettlement monitoring 0.15 - - 0.15 0Upland agriculture planning 0.40 - - 0.40 0Jatigede design 3.43 0.74 - 4.17 18IPEDA survey 0.80 - - 0.80 n

Subtotal 7.63 5.47 0.92 14.02 46 7

TrainingDam construction/safety insp./b 0.42 0.61 - 0.73 75Reservoir operation 0.08 0.12 - 0.20 60'Water quality monitoring - 0.18 - 0.18 100

Subtotal 0.20 0.91 - 1.11 100 1

Administration & Land AcquisitionAdministration 13.40 - - 13.40 0Land acquisition 25.50 - - 25.50 0

Subtotal 38.90 - - 38.90 0 19

Total Equipment & Services 51.46 13.40 3.50 68.36 25 33

Base Total 119.86 49.90 40.90 210.66 57 100

Physical Contingencies /c 15.14 8.16 4.10 27.40 56 13

Price Contingencies /d 25.42 9.10 10.48 45.00 43 21

GRAND TOTAL 160.42 67.16 55.48 283.06 43 134

(-) -Reing presently implemented and not included in cost.

/a Being presently implemented by GOI under its own resources.b7W Includes consultants for training $0.46 million.

T_ Taken at 20% for dam embankment, 10% for appurtenant structures and power house, 15%for irrigation works, and 5% for equipment and services.

/d Foreign price increases adopted are 5% in 1985, 7.5% in 1986 and 8% in 1987 till1990 and 5% thereafter. Local price increases adopted are 8% in 1985 till 1990, and5% thereafter.

Page 66: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KEDUNG OHBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Dlstribution of Civil Works Cost for Dan and Appurtenant Structures(1984 - $ mllion)

1985 1986 1987 1988 TotalItem FC LC TC PC LC TC PC LC TC FC LC TC FC LC TC

Dam embankment 7.13 3.10 10.23 5.74 3.20 8.94 5.35 2.80 8.15 1.58 0.90 2.48 19.80 10.00 29.80Spillway and concreting 0.29 0.22 0.51 1.35 0.99 2.34 0.95 0.70 1.65 2.59 1.91 4.50 W

Intake structure and 0.42 0.14 0.56 0.78 0.26 1.04 1.20 0.40 1.60conduit and steel

Road construction, etc. 0.31 0.17 0.48 0.83 0.44 1.27 0.55 0.80 0.85 1.69 0.91 2.60Bamse cost 7.13 3.10 10.23 6.34 3.59 9.93 7.95 4.37 12.32 3.86 2.16 6.02 25.28 13.22 38.50Phyaleal contingencies /a 1.43 0.62 2.05 1.24 0.70 1.94 1.46 0.80 2.26 0.66 0.37 1.03 4.79 2.48 7.27

Total ConstructLon 8.56 3.72 12.28 7.58 4.29 11.87 9.41 5.17 14.58 4.52 2.53 7.05 30.07 15.71 45.78(Base and physLcal)

Priee contingencies Lb 0.21 0.15 0.36 0.68 0.54 1.22 1.66 1.12 2.78 1.23 0.80 2.03 3.78 2.60 6.39

Total Cost /c 8.77 3.87 12.64 8.26 4.83 13.09 11.07 6.29 17.36 5.75 3.33 9.08 33.85 18.31 52.17

/a 20Z for daa embankment, 151 for other works.7-b For price contingencies see footnote c, Table 1.Ze: Cost for land acquisition vi Included as a separate item. n .

Page 67: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

1EDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Distribution of Power Plant and Transmission Line Costs(19A4 - million $F

1986 1987 1988 1989 TotalItem FC LC TC FC LC TC FC LC TC PC LC TC FC Lr TC

Power plant (E&M) 1,50 - 1.50 5.00 0.90 5.90 1.nn n.70 1.70 0,9n - 0.90 R.4n 1.60 10.00

Transmission line & subst. - - - 1.30 0.10 1.40 0.70 0.60 1.30 - - - 2.00 n.7n 2.70VI

Micro-hydro & transmission& subst. - - - - - - - 2.50 n.5 3.00 2.5n 0.50 3.00

Base cost 1.50 - 1.50 6.30 1.00 1.30 1.70 1.30 3.00 0.90 - n.90 12.9n 2.80 15.7n

Physical contingencies /a 0.15 - 0.15 0.63 0.10 0.73 n.17 n.13 0.30 0.09 - 0.09 1.29 0.28 1.57

Total Construction /b 1.65 - 1.65 6.93 1.10 R.03 1.87 1.43 3.3n 3.49 0.5 3.99 14.19 3.08 17.27

Price contingencies /c 0.15 - 0.15 1.22 0.24 1.46 0.51 0.45 0.96 1.29 0.20 1.49 3.17 0.89 4.06

Total Cost /d 1.80 - I.RO 8.15 1.34 9.49 2.38 1.88 4.26 4.78 n.70 5.48 17.36 3.97 21.33

/a Taken at 10%.7b Rase and physical.

TC For price contingencies see footnote /c of Table 1. 7T Consultant and administration costs are included in overall administration.

Page 68: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KFDLZG OMBO MHULTIt'RPOSE DAH AND IRRIGATION PROJECT

Distribution of Irriaution Systems Civil Works Costs(1984 - million $)

1985 1986 1987 1988 1989 1990 TotalLC FX TC LC FX TC LC FX TC LC FX TC LC FX TC LC FX TC LC FX TC

Irrization IzateniSidorejo /a - - - 1.15 0.78 1.93 3.13 2.13 5.26 2.03 1.39 3.42 0.66 0.46 1.12 - - - 6.97 4.76 11.73Sedadi - - - 0.32 0.21 0.53 1.43 0.94 2.37 0.98 0.65 1.63 0.33 0.21 0.54 - - - 3.06 2.01 5.07Klambu Kiri - - - 0.65 0.38 1.03 4.78 2.80 7.58 5.73 3.36 9.09 2.17 1.27 3.44 0.66 0.39 1.05 13.99 8.20 22.19 o

Klambu Yanan - - - 0.29 0.18 0.47 5.92 3.56 9.48 9.68 5.81 15.49 5.71 3.43 9.14 0.93 0.56 1.49 22.53 13.54 36.07

Subtotal - - - 2.41 2.55 3.96 15.26 9.43 24.69 18.42 11.21 29.63 8.87 5.37 14.24 1.59 0.95 2.54 44.85 28.51 75.06

MaorSructu!recK la,m Fu Tbatrragae - - - 0.58 0.72 1.30 2.34 2.86 5.20 2.32 2.83 5.15 0.58 0.72 1.30 - - - 5.82 7.13 12.95

Subtotal - _ - 0.58 0.72 1.30 2.34 2.86 5.20 2.32 2.83 5.15 0.58 0.72 1.30 - - - 5.82 7.13 12.95

Bass Total - - - 2.99 2.27 5.26 17.60 12.29 29.89 20.74 14.04 34.78 9.54 6.09 15.54 1.59 0.95 2.54 52.87 35.64 88.01

Physical contingencies - - - 0.45 0.34 0.79 2.64 1.84 4.48 3.11 2.11 5.22 1.42 0.91 2.33 0.24 0.14 0.38 7.86 5.35 13.20Price contingencies - - - 0.43 0.24 0.67 4.39 2.49 6.88 7.54 4.39 11.93 4.60 2.63 7.23 0.99 0.53 1.52 17.94 10.28 28.22

Total - - - 3.87 2.85 6.72 24.63 16.62 41.25 31.39 20.54 51.93 15.47 9.64 25.10 2.81 1.63 4.44 78.16 51.27 129.43

/a Includes the South Grobogan Weir.

Page 69: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

KIEDUN OM1 IULItUIJUOI DMl MM1 2IUIRATIOH POWICT

Distribution of Coat,s fo '$aI'etM a ait(3584 - millio 92 E ILE

tnt ins i~~~~~~~~~~~~~~~ae ~~~~1987 982991990 TotalItem LC PC IC LC P C I.C PC IC LC FC IC- IL IC IC C tO P C oro -I TC LC Fe T

111roaterc 4g geophyatea -l 2 22 24 2 22 24 - 41l 4SOiL And Mteiorat 10 90 300 7 40 47 - - - - - - - 1 11 10 141Of f Ic,1 ,l ad drfting - -- 34 309 343 - -- - - - 34 309 343

Yetit±tan - - - ill~~~~~~~~~~~~~~11 329 500 37 321 100 20? 200 307 AS - - - - 4? 810 1,101

VC,all4nlinttoni - - - 1 61 10 I 60 67 1 4 121 337Wais 9 quality - - - - - 9 230 223 73 - 3 14 - 4 - - - 29 230 419

aix - - - - - - - - - 84~~~~~~~~~~~~~~~~~~~~~~~~~~~21 716 A6 84 715 "Ii - - - - - - I 1,151 1,172I-- - ~~~~194' 500 694' 323 i,006 1,329 24 914 ,24 10 111 931 944 3,216 4,200

Spares 201 39 100 129 41 201 246 Ss1343 248 32 III to? - - - 8 451 I'D-- - ~~~~233 400 833 388 1,201 1,593 319 1,171 1,490 192 920 1,122 - - 1,1313 3,907 51,040

Taeumnetttc nyntee I'm-1,1 1,41 4,130 1,171 1,561 2,140 924 963 1,711 21$ 101 220 - - 3,601 1,144 9,141

Onshtata ul O maIpst 3. I608 3.1155 16,243 3.63 2.172 4.331 1.135 2.112 1.24? 407 1.035 1.442 - - - - .134 9431.0

Conotr.,tton auperetalontDatr ufn%Joefnt - 4 IS? 241 121 13,39 2,044 949 3,718 2,127 844 1,420 2,496 26?l 3*4 691 - - 2,193 1,228 8,021

ILnter qu lity - - - 83 200 it 83 10') 14 8 0 0 210 100aTutmiaetrte systnl - - 9 6-0 I- 60 60 * 60 40 - - - - - - - ISO ISOnma.tctlaent e"Iaritot - 1 - 21 10 10 50 - 10 21 21 ISO - ISOUpland Agfic.itt.ird ptanntn*n - - - 10 0 too 0 10 - 10 - 300 - 300J*ttpgdo dm645 - - 46? 100 141 12,234 244 1,100 1,210 270 1,31200 41,19 t04 193 - - - - - 3,430 140 ,217017104 airwasy - - - - - 450 - '¶0 450 - 450 - - - - - - - - 900 - 900

Su%tntal Conoult.inta - - 114 317- 893 j2-fLj-4 1748 4.344 243 2a.191 l1.007 2484 1.goo3 1294 16? 314 481L I 1.43 4.398 26.023

Refurvoir operation - - - 75 122 197 - 1 1222 I'97Dan safety inopection/cooatruction /a - - - 24 237 243 24 1229 15-4 24 124 i1s; - - - - 78 4A 17Wat.c quality mon%ntintl - -- 0 40 60 Go 60 6 0 0 - -o- 8 I40

S.Ibti)tat - - - Ol 21-9 440 24 s- lB 24- 24- 148 214 - 60. 60 - j - - - il 1915 111Owerlieadn and Admntnatratton

DMsadrsror- - 2 2 1 8 10 ,500 - 2,50 1,100 - 1,100 810 - 930 301 - 301 5,321 - ,121rt artta Soo-10 - S00 808 809 2,000 - 2,000 2,000 - 2,000 2,000 * 2,000 746 - 144 4,074 - ,076

LubtatAt - - 20- - 20- 3.618 -J 2.48 3.100 z 3.100 3.100 3.100 2.830 - 2810 1.047 4J.& 3.911339

Djiii ..iiOtr" (4,145) -(4,141) 8,100 - ,300 6,220) - 6,310 6,140 - 4,740 2,100 2,200 - - - - - 22,450 - 2,160irrlgatlun - -600 - 00 1,940 - 2,940 1,34 - 2,342 - 2,900 3,902

SUbUt4tl (4.1413 (4.5413 9.200 9.100 8.210 8.210 6.102 6.102 2.200 2.00 - - - 21.112 2.5

Aaa. Total CAMS41 (4.14 L 4,11 11.0 .1t3.436 14.01 4,12 18.803 23.19 4.49 24.09 .49 2.903 20.196 3.02 326 1 3.331 1.04? 1.067 14134j.4467 48.104

ltiycicuI onatIngency Lb - - 198 219 424 1,409 234 1,841 1,460 224 1,684 111 365 902 293 24 309 10? IN20 4,312 839 1,312

Price contIngoecy /t- 98 224 122 919 441 1,364 1,763 810 2,193 2,231 429 2,944 74 124 199 - - 3,988 2,341 6,221 e

TotAl cost CAMS41 (4,141) 12.101 4.343 26.97 4.403 5.41 2 012I 24.82 1.14 2234 19.3-81 IN,UJ L 13.22 .84 414 3.824 2.214 2.274 5991 19.81 M940

Hotel Amnber. tn liareothule are not Included tn total,

1wlotdan 0 nokneInr equipmen.31 5 for alil~u aup an end cmieul teat..re Ues Table 1.Ann1, footnote (c).

Page 70: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-62- ANNEX 1Table 6

INDONESIA

KEDUNG OMBO M4ULTIPURPOSE DAM PROJECT

Proposed Allocation of Loan Proceeds(US$ million)

Base cost Disburse-and expected ment

price increases Loan z

Civil 'WorksDam and appurtenances 43.7 32.3 74Irrigation works 112.0 82.9 74Buildings 0.4 0.4 100

Power PlantTurbines and generators (28 MVA) 12.4 - -

Transmission & substations (150 KV x 30 km) 3.3 -

Micro-hydro (3 x 1.8 MVA) 3.1 -

Transmission & subst. (20 KV x 30 km) 0.6 -

EquipmentHydrometeorology, laboratory, office 1.3 1.0 770&M 1.8 1.8 95Telemetry and computers /a 10.7 9.6 88Vehicle 2.0 - -Computers (IPEDA) 0.1 0.1 -

ConsultantsConstruction supervision of dam lb 5.5 5.5 100Construction superivion of irrigation 3.8 3.8 100Jatigede designs 4.9 4.9 100Training & telemetry 1.3 1.3 -IPEDA survey 1.0 1.0 100Soil conservation 0.5 0.5 100

Training 0.7 0.7 100Administration and land acquisition 40.7 - -Physical contingencies 31.8 - -

Unallocated - 10.3 -

Front-end fee -

Total 283.1/c 156.0 -

/a Includes installation and services.

/b Includes water management.

/c These exclude $17.2 million in taxes.

Page 71: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-63- ANNEX 1-63 - Table 7

INDONESIA

KEDMUG ABO M0MLTIP-JMPOSE DA! AND IRRIGATI3N PROJECT

Estimated Schedule of Disbursements(US$ million)

Bank fiscal Indonesiayear and Disbursements project Banksemester Semester Cumulative Project profile profile

-US$ ln - Z

1986First 3.0 3.0 2 2 0.8Second 3.0 6.0 4 4 4.6

1987First 8.0 14.0 9 11 11.0Second 10.0 24.0 15 17 19.8

1988First 15.0 39.0 25 25 30.6Second 19.0 58.0 37 35 42.5

1989First 20.0 78.0 50 45 50.4Second 21.0 99.0 63 54 65.5

1990First 19.0 118.0 75 62 75.1Second 19.0 137.0 87 70 83.1

1991First 14.0 151.0 96 76 89.4Second 5.0 156.0 100 81 94.1

Page 72: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2-64 - Table 1

Page 1 of 4

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Price Structure for Agricultural Outputs(Estimated Constant 1985 US$)

Operation 1984 1986 1990 1995

RiceExport price, Thai 5% broken,FOB Bangkok, US$/ton /a 255 272 351 338

Quality adjustment /b 90% 230 245 316 304Freight and insurance /c +30 260 275 346 334CIF Semarang 260 275 346 334Port handling, storage, losses /d +12 272 287 358 346Transport, port to wholesaler fe +5 277 292 363 351Transport, mill to wholesaler We -4 273 288 359 347Ex-mill price - 273 288 359 347Conversion to paddy 65% 177 187 233 226milling cost /f -6 171 181 227 220Paddy transport and marketing,farm to mill I& -10 161 171 217 210

Economic farmgate price, US$/ton 161 171 217 210Economic farmgate price, Rp/kg /h 177 188 239 231Financial farmgate price, Rp/kg i 165 180 200 210

/a All world prices are based on Bank EPD projections (Sept 1984) withadjustment to 1984 constant dollars by an MUV index of 103.5 for 1984.The EPD 1985 MEV index for 1983 to 1985 adjustment is 1.02 which is only1.5% different from value adopted. Hence the figures were left unchangedin order to ensure consistency1 and for all practical purposes thesefigures could be assumed as 1985 constant dollars.

lb Ninety percent of world price based on spot checks and regressions. Seepaper IBRD/AEPIA 1979.

/c Freight and insurance rates based on end-1982 rates of $15/ton freight and$15/ton insurance and other costs.

/d Includes port costs, transport to warehouse, spraying and fumigation,unloading, warehouse rents. Losses are 0.5% at unloading and 1.nZ at thewarehouse.

/e Based on rates provided by DOLOG, Semarang, 1q84, assuming an averagedistance of 75 km from port to wholesaler at Rp 71/ton/km.

/f Net of value of byproducts and includes milling/storage losses incurred byand handling charges. Obtained from Farmer Survey 1984.

/g Includes cleaning and drying before milling. Estimate from Farmer Survey1984.

/h Exchange rate of Rp 1,100 = US$1./i Based on official KUD procurement (floor) price of Rp 165/kg, adjusted for

moisture and impurity content.

Page 73: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2-65 - Table i

Page 2 of 4

Operation 1984 1986 1990 1995

MaizeExport price FOR US Gulf Port,US$/ton /a 138 122 117 117

nua ity discount 25Z 104 92 88 88Freight and insurance +35 139 127 123 123CIF Semarang 139 127 123 123Port handling and storage /b +7 146 134 130 130Transport, port to wholesaler /c +12 158 146 142 142Transport and marketing, farm towholesaler -15 143 131 127 127

Economic farmgate price, $/ton 143 131 127 127Economic farmgate price, Rp/kg /d 157 144 139 139Financial farmgate price, Rp/kg 90 90 90 90

SoybeanExport price, FOB IrS Gulf PortS/ton /e 300 280 267 265

Freight and insurance, rulf port toJTr/Semarang +35 335 315 302 3n0

CIF JKT/Semarang 335 315 302 300Port handling and storage /b +7 342 322 309 307Bagging +10 352 332 319 317Transport, port to wholesalers /c +12 364 344 331 329Transport, marketing, farm towholesalers -15

Economic farmgate price, S/ton 349 329 316 314Economic farmgate price, Rp/kg /d 384 361 348 345Financial farmgate price, iRp/kg If 430 420 450 450

SorghumExport price, US No. 2 Milo yellow, FOBGulf ports, 11S$/ton 128 120 113 112

Freight and insurance, UJS to Semarang +35 163 155 148 147CIF Semarang 163 155 148 147Port handling, storage and transport towholesalers lb +19 182 174 167 166

Handling, transport, farm to wholesaler -15 167 159 152 151Economic farmgate price, $/ton 167 159 152 151Economic faragate price, Rp/kg /d 167 159 152 151Financial farmgate price Rp/kg 7W 100 95 105 105

Mungbean /gEconomic farmgate price, $/ton 415 415 415 415Economic farmgate price, Rp/kg 457 457 457 457Financial farmgate price Rp/kg 415 415 415 415

/a Assuming Indonesia is a net Importer of maize.7TW Eased on estimates, DOLOG, Semarang, 1984.72c Based on rates provided by DOLOG, Semarang, 1984, assuming an average dis-

tance of 200 km from port to wholesaler at Rp 60/ton/km./d Fxchange rate of Rp 1,100 - US$1.72e Equal to standard price projections, CIF Rotterdam less $20/ton freight

and insurance from Oulf to Rotterdam. Assumes Indonesia net importer ofsoybeans.

If 1984 price from 1984 Farm Survey and other prices projected to grow atsame rate as economic prices.

/g Prices estimated from Farmer Survey, May 1984.

Page 74: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANMEX 2Table 1

-56- Page 3 of 4

Operation 1984 1986 1990 1995

UreaWorld export price, FOB Europe,US$/ton 170 196 259 269

Ex-factory price, Palembang /a +15 185 211 274 284Bagging, shipping to Central Java +15 200 226 281 299Handling and distribution to retail

level /b +25 225 251 314 324Storage and transfer to farms /c +4 229 255 318 328Economic farmgate price, US$/Iton 229 255 318 328Economic farmgate price, Rp/kg /d 252 281 350 361Financial farmgate price, Rp/kg 77e 90 110 130 180

TSPWorld export price, FOB US Gulf port,US$/ton 145 153 176 176

Freight and insurance to Semarang +60 205 213 236 236Port handling and distribution tofarm /b +26 231 239 262 262

Economic farmgate price, $/ton 231 239 262 262Economic farmgate price, Rp/kg /d 254 263 288 288Financial farmgate price, Rpkg/7e 90 110 130 180

xClExport price FOB N. Africa 82 89 104 104Freight and insurance +50 132 139 154 154Port handling, distribution, transportto farm /b +26 158 165 180 180

Economic farmgate price, $/ton 158 165 180 180Economic farmgate price, Rp/ton 174 182 198 198Financial farmgate price, Rp/kg 90 110 130 180

/a Urea is valued ex-PUSRI plant, Palembang. 'ank price projections forbagged urea, FOB Europe, are adjusted to Asian markets by adding a trans-port premium of US$15/ton.

/b Based on rates provided by PT PUSRI, Semarang, 1984.7Tc Bank estimates.Td Exchange rate of Rp 1,100 - US$1.7Te Financial price Urea/TSP, as of 1984 is subsidized. Future financial

price estimates reflect anticipated subsidy reduction. Includes (+$4)transport to farm.

Page 75: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2-67- Table I

Page 4 of 4

1984 1986 1990 1995

InsecticideEconomic faragate price, ITSS/liter 10.0 10.0 1o.n 10.0Fconomic faragate price, Rp/liter 11,000 11,000 11,000 11,000Financial farngate price, Rplliter /a 1,5nO 1,5no 2,000 2,5no

RodenticideEconomic farugate price, USS/kg 5.0 5.0 5.0 5.0Pconomic farmgate price, Rp/kg 5.500 5,500 5,500 5,5noFinancial faragate price, Rp/kg /b 2,100 2,100 2,500 2,5n0

Seed /cRiceEconomic farogate, price, US$/ton 161 171 217 210Fconomic far4gate price, Rp/kg 177 188 239 231Financial farmgate price, Rp/kg 165 180 200 210

MaizeEconomic farngate, price, US$/kg 143 131 127 127Economic farmgate price, Rp/kg 157 144 139 139Financial farmgate price, Rp/kg 90 90 90 90

SoybeanEconomic farcgate, price, ITS$/ton 349 329 316 314Economic farugate price, Rp/kg 384 361 348 345rinancial farmgate price, Rp/kg 430 420 450 45s

Itungbean /dEconomic faragate, price, US$/tea 415 415 415 415Economic farugate price, Rp/kg 457 457 457 457Financial farmgate price, Rp/kg 415 415 415 415

-orghumEconomic farmgate, price, TISS/ton 167 159 152 151Fconomic farugate price, Rp/kg 184 175 167 166Financial farmgate price, Rp/kg 1nn 95 105 105

LaborAnimal /e financial price, RP/teaw-day 4,200 4,200 4,200 4,200Animal economic price, Pp/teanr-day 2,900 2,900 2,9n0 2,90nMan-day, financial price, Rp/man-day 1,30n 1,300 1,300 1,300Nan-day, economic price, Up/mar-day 650 650 650 650Woman-day, financial price, Rp/woman-day 1,000 1,000 1,000 1,0noWoman-day, economic price, Rp/woman-day 5n0 500 500 5nn

Sprayer RentalPer day, financial (Rp) 300 300 300 300Economic price (Rp) 330 330 330 330

/a Subsidized price informatlon obtained from RIMUAS, Semarang. Assume sub-sidy decreases over time.

/b Average of subsidized prices on six rodenticides obtained from RMITtS,Semrang.

/c Economic price of seed equated to economic price of the outputs, assumingthat with the project, Increased production of seed will be at either thecost of imports or exports of the relevant products. Note that farmersreplace seed every fourth season.

/d No projectionas yet developed for mungbean. Rave assumed no differencebetween financial and economic prices.

Ie Two anlals, driver and two meals. Shadow price only applied to thedriver's labor.

Page 76: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDnNESIA

KEDUNG OMBO MItLTIPIHRPOSE DAM AND IRRIGATION PROJECT

Land Use Summarv(ha)

Klambu Kiri & SedadiSidorejo (South Grobogan) Klambu Kanan (Juana) (11 & L Redadi)

Future without Future Future without Future Future without FuturePresent (with drainage) with Present (with drainage) with Present (with drainage) with

Irrigated rice - - 6,100 2,550 2,550 19,000 24,8nn k4,Rnn 34,240Rainfed rice 5,200 5,200 - 15,300 17,600/b - 9,44) 94,440 -

Subtotal 5200 5.200 6,100 17,850 20,150 19,n00 34,240 34.240 34.240

Permanent swamp - - - 2,100 400 400 100 - -Wet-season flooded - - - 60o - - -

Dry fields 1,500 1,500 100 750 750 250 4,8o0 4,9n0 1,95nSettlements-homeyards 2,0no 2,000 2,000 1,RO0 1,ROO 1,800 4,860 4,860 4,860

Otner 500 5n0 1,000 1,300/a 1,30n/a 2,950/a 5,000 5,000 7,95n

Total 9.200 9.200 9,200 24,400 24,400 24,400 49.nnn 49,000 49,000

/a Includes 400 ha sugar.

/b Represents increased area due to drainage project (Irrigation XIV). Net benefit from drainage - 2,300 ha. h3I.3.

Page 77: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

&UZ 2

-69 -

KE¢W3C MSE PULTIPUOESE DAN MID 1330608TeO FUOJECY

Crop Areas snd Yeltd Estimates

Praant Praproht future wichout prolect Toer sith pro tactYteld Ae YtId ikren Yield Ar Yild Ar

(toetha) (ha) (ton/ha) (ba) (to/ha) (ha) (tom/ha) (ha)

StdorroI(South Crobeaan)

Y t semadeirr-gated rtce - - - - - - 6*7 6,100Rhinfed rice 1.2 5,2DO 3.3 5,200 3.3 5.200 -MatXE 1.0 495/a 1.4 495/a 2.n 495/ -

Dry seasonIrrigated rice - - - 5.0 6,100itire 1.6 3.280 1.6 1.280 2.0 3.280Soybean 0.7 2.185 0.7 2.1S5 0.9 2,185 -

Dry te on1 beayn I.0/0.5 5.060 I.0/0.5 5,060 *.2/0.6 5,060 1.3/0.6 1,S30

Cropp3!tng fsity (Z)Itre ony 85 aS 85 2oo

Uce and palaw1ja 266 266 266 210

Sedadit rir aSdie

Wet meaonIrrigated rice 3.5 12.700 3.8 12.700 6.2 12,700 4.7 13,910hilnted rier 3.0 1.2001 3.2 1.200 3.3 1,200 -

Iry aease on Lrrigated riee 6.0 6.300 4.2 6.100 4.5 6,300 5.0 13,910_i#e 1.4 ,.le0/c l.5 3,880 1.7 I,8O -

Soybean 0.6 9407; 0.6 940 0. 940 _=tre/soybean 0.8/0.4 1.88o7; 0.910.4 1,880 1.0/0.5 1,S0

ODrr esson 11Ta-nyba - - - 3 1/0.5 4,170

Cropping intensity (2)RIce only 145 14S 145 200Rice and palsaija 179 179 179 230

(Latr Sedadi)

Wit seasonIrrigated rite 2.9 12.1110 3.2 12,100 3.7 12,100 4.6 20,330OLaned rice 2.7 8.230 3.0 8,230 3.3 8.230 -

Dry woeaon IIrrigated rice 3.5 Soo 3.7 so0 .0 500 4.8 20.330-otie 1.0 4,080/d 1.2 4.080 1.5 4.080 -

Soybean 0.6 2.047uT 0.6 2.0"0 0.6 2,040-

.Ory *eneon .11M. I.T ngbesn n.6/0.4 4.0S0/d 0.7/0.4 4,080 n.9/0.5 4.080 0.9/0.5 6,320

Croppinz intensity (Z)Rice only 303 103 301 2noRain and palsui3 153 153 153 230

IU_bo Ieann(d4ana Valley)

Wet meamenlrrlrsted rice 1.0 Z,550 3.5 2,5S0 3.7 2.550 4.0 19.000Rlalnfed rice 2.7 35,300 31.0 17,600/e 3.3 17.60D -

Dry seseon rIrrigation rier 31.0 l,tW 3.5 1,100 j.7 3.300 4.2 19.000tilre IlC R Y

90/g 1.2 12850/f 1 5 12.850 -

linlce/s.ybqnn n.h6n.4 i.oF 0.1/0.4 3,4007 0.9/05 3400 -

Dry se.ne 11mize/gbeo" an 0.6/0. 13,750 0.7/0.4 2.460/f 0.9/0.5 2.460 1.1/0.5 5,700sorgl..s 3.0 890 1.2 1.i207?T 1.5 1.,20 -

Cropping Intensity (Z)tic- only 99 112 112 200Rice and pslniIja 16I 206 204 230

/A ReprepentS 551 of dry rields (9uO ha) comnmndable .. ith Irterittion.7ii Int-rcrop yields: Sie about 60z nod soybean or nmngaben about 652 of sole crop yteld.7c An.s.vlng 402 mize, 20! soybean as sole crop and 40! tinercropped of the dry season area of 4,700 ha.77- Asa_ing 6nz air., 2n sonybean en sole crops and 40Z as intercropped of the dry sason area of 10.200

be./e Net henefit fre dranIage project 2.30W ba see Land Use Summary, Table 1.7Tf 732 tainfed riee ares grew_ mire. S! gr ore mieloybean, 7.2S graie aorghml snd 3142 xrae

mawir/mungbean71 2n0 r.ctlnn *roe If due to peer draLonge.

Page 78: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INnONRSIA

KxEntiN( nno MILTIPiIRPnsB DMI ANn IRRI(ATION PROJFCT

C.ropina Tntensities

Rice only Rice & PalawiaSidorejo Sedadi Klambu Kiri Klambu Kanan Sidorejo Sedadi Klambu Kalmbu

Irrg rice Irrg rice Irrg rice Kirl Rananonly All rice only All rice only All rice

Present R5/a 137 145 62 103 1q 99 266 179 153 166

Preproject R5/a 137 145 62 103 19 112/c 266 179 153 206/c

Future without 85/a 137 145 62 103 19 112 266 179 153 2n6

Future with /b 200 200 200 20n 230 230 23n 23n

La All ralnfed rice. b

/b All irrigated rice.

/c Reflects impact of Serang River and nrainage Project (Loan IRl-IN ).

Page 79: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2- 71 - Table 5

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Crop Areas: Total Project Area(ha)

IncrementCrop Present Preproject FWOP FWP FWnP-FWP Present-FWP

Wet SeasonIrrigated rice 27,350 27,350 27,350 59,340 31,990 31,990Rainfed rice 29,930 32,230 32,230 - (32,230) (29,930)Maize 495 495 495 - (495) (495)

Dry Season IIrrigated rice 7,900 7,900 7,900 59,340 51,440 51,440Maize 18,200 22,090 22,090 - (22,090) (8,200)Soybean 5,165 5,165 5,165 - (5,165) (5,165)Maize/soybean 2,880 3,280 3,280 - (3,280) (2,880)

Dry Season IIMaize/soybean 5,060 6,060 5,060 6,000 940 940Maize/mungbean 5,830 6,540 6,540 11,820 5,280 5,990Sorghum 890 1,120 1,120 - (1,120) (890)

Page 80: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2- 72 - Table 6

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Agricultural Production('000 ton)

Rice Maize Soybean Mungbean Sorghum All palawija

SidorejoPresent 16.64 11.10 4.06 - -Preproject 17.16 11.10 4.06 - -Future without project 17.16 13.62 5.00 - -Future with project 59.17 2.38 1.10 - -

SedadiPresent 73.25 4.14 1.32 - -Preproject 78.56 4.51 1.32 - -Future without project 85.65 5.08 1.69 - -Future with project 134.93 5.42 2.09 - -

Klambu Kir.Present 59.06 6.53 1.22 1.63 -Preproject 65.26 7.75 1.22 1.63 -Future without project 73.93 9.79 1.63 2.04 -Future with project 191.10 5.51 - 3.06 -

Klambu KananPresent 52.26 10.61 0.40 0.70 0.89Preproject 65.58 18.12 0.56 0.98 1.34Future without project 71.59 22.75 0.790 1.23 1.68Future with project 155.80 7.41 - 2.85 -

TotalsPresent 201.21 32.38 7.00 2.33 0.89 42.60Preproject 226.56 41.48 7.16 2.61 1.34 52.59Future without project 248.33 51.24 9.02 3.27 1.68 65.21Future with project 541.00 20.72 3.19 5.91 - 29.82

Incremental ProductionOver PresentPresent -Preproject 25.35 9.1 0.16 0.28 0.45 +9.99Future without project +47.12 18.86 2.02 0.94 0.79 +22.61Future with project +339.79 (11.66) (3.81) 3.58 (0.89) -12.78

Incremental Productionat Full Development

Future without project 248.33 51.24 9.02 3.27 1.68 65.21Future with project 541.00 20.72 3.19 5.91 - 2.9.82

Increase/Decrease +292.67 -30.52 -5.83 +2.64 -1.68 -35.39

Page 81: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KsDUNG OmBO muLTIPuRPosr DAI AK) IRRICATION PROJECT

Production Cha oLee( W 0 tons)

S1dorejo Sedadi K.labu Kinr Klambu Kanan Total Total In-(SouRth Crobgan) (Upper SedsdI) (Lower Sedadi) (Juana Valley) production crmsental

Crop VlOP FW Iner. WOr FWP Iner. WO?P 1W Incr. FW10 FWP Incr. IWOP 1W production

Due to ProjectRICO 17.16 59.17 42.01 85.65 134.93 54.28 73.93 191.10 117.17 71.59 155.80 84.21 248.33 541.00 292.67Hkize 13.62 2.38 (11.24) 5.08 5.42 0.34 7.79 5.51 (4.28) 22.75 7.41 (15.34) 51.24 20.72 (30.52)Soybean 5.00 1.10 (3.90) 1.69 2.09 0.40 1.63 - (1.63) 0.70 - (0.70) 9.02 3.19 (5.83)lungbean - - - - - 2.04 3.06 1.02 1.23 2.85 1.62 3.27 5.91 2.64Sorghio - _ _ _ _ _ 1.68 - (1.68) 1.68 - (1.68)

Due to araineProject /aRice 16.64 17.16 73.25 78.56 59.06 65.26 52.26 65.58 201.21 226.56 25.35Halle 11.10 11.10 4.136 4.51 6.53 7.75 10.61 18.12 32.38 41.48 9.10Soybean 4.06 4.06 1.32 1.32 1.22 1.22 0.40 0.56 7.00 7.16 0.16NMangbean - - - - - - 1.63 1.63 0.70 0.984 2.33 2.61 0.28Sorghum - - - - - - - - - 0.89 1.34 0.89 1.34 0.45

/a Due to be completed in 1986 (Irrigation XIV - Loan 1811-IND).

J!E

Page 82: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

UIUzm tWSO ILTLtiWPr OS M BAl itzIGuIO5 PrWJc?

sI.inv of lwt!a - Sce

ruture itotit project future .ttihut preoetFrosest PraprJeket /a (KlauS. Isaac) (11*0d. sidrobel) rotare Witb preAect

Or *oeoon Dry aea" Dry Bease. Dry .em4 rrtigattd Br ses Dry "Irrigated 3t.lufl Irrigated Ittrlated MAIted Irrigated Irrigated hitefd irrgaIted 1rrledt M11d it rrlaattd rice irriasted rice irrioted rice trripted rice

Unit rice fte. rite rlce rlee rice rice rice ric rice rice rice (i.s.o valley) (beda,1. 3. Cr nbogas) (Seadi. S. Oresbs")(_3Jiax valley)

"d 4 2S 25 Z 25 as 3 2 is 3D is 3D 3D as 3 a. 25rertt l8.of

UrOe 4 12S 12S liSD 1 2S 125 ISO 150 350 200 IS0 200 200 200 200 ISOTop 2s o 50 50 So So S0 Do so 50 100 Do 100 100 a2S I00 50mrleideml

letettdte 1 2 I I I I 1 2 2 3 2 3 3 3 3 2"F.eticIge I I I I I I I I I I 1.5 I 3.) 1 I 3. 3.5 I

1pratrer fe44 d&a 4 1 3 A 3 3 12 * * 12 * it 12 12 12 f

lAbef 1?.Lenpt e#er4ttla1 TO 12 to I 32 to 1 3s to 10 Is 10 Is 15 is 15 10

m 34 2S 21 34 26 23 34 23 2i 34 25 34 34 34 34 28 '

Ptinttos MD 11 1i 13 3 13 )1 13 13 13 13 Is 13 11 13 13 13 z40 30 24 24 30 24 24 S0 26 30 30 23 30 so 30 30 30

Crope "ngeeait MS iS 20 IS 1S 2S It 3D 32 iS 3S Zs iS 35 31 40 40SD so 3D Is 40 is 35 40 35 40 40 3D 40 45 45 40 40

1MrotIng NIo D 23 a) is 23 23 30 3D 3O 30 23 30 20 30 30 3040 aD II 3I 2D 21 2I 25 21 25 2D 21 25 aD 23 25 25

Total tiburtTO it 10 A 32 t1 S 15 I0 10 I5 10 IS IS IS 35 10MD3 l1 34 39 301 5t 39 III t9 10* 112 59 I1I 112 112 III 30450 95 62 52 95 A2 a2 95 32 9% 90 52 g0 IW IW00 is i5

-VMtf o4ntig draIlnge preject to .n*tat*4 in 10,81

lb * TO e T v 93 a -N nds, VD * Wibm day.

Page 83: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

KEDUNCG OMBO MULTIPURPOSE DAM ANIf IRRIGATION PROJECT

Swa..ary of Inputs/ha /a - PAlglJa

Present PtrpruIect /b Future without prolect Future ttth proJectffilze/7oybean Mize/ aoyb.n

Malin Soybean 'haLue/mungbeln 0r4ghux Wae Soybean aat:/'wnBbeoan SorRhun 44ale Soybean Malze/soybean Muatr/.ungbean Sorghum '4aize Mae/soybean lauze/mnhban

Seed 20 4I) 10/20 4 20 40 I0/20 5 20 40 10/20 10/20 S 20 10/20 10/20Fbrtlllzeru

Urea SO - SO - SO - s0 - 70 - 70 50 50 120 100 100TSP 10 20 20 - in 20 20 - 30 40 40 25 25 60 50 50SCI - - - - - - - - - 10 10 10

PesticideesInsecticide - I I - - I I - 0.5 I 1. 0.S - 2.0 2,0 2.0Rndentctldo - - - - - - - - 0.5 - 0.5 0.5 - I,t I ISprayer runiit - 3 3 - - 3 3 - 2 3 * 2 - h 6 6

LaborLcland preparation TO 4 4 _ 4 4 A 4 - 4 4 A 4 - 4 4 4

MD 20 2n 20 20 20 20 20 20 20 20 20 20 30 20 20 20 'APlanting MD 4 6 6 2 4 6 6 2 4 6 6 6 9 6 8 8

Wu 6 If 10 4 6 10 Ir 4 6 10 10 10 8 10 14 14Crop man gefsent MD 10 is IS 1 n0 i IS Is 10 10 is is 15 12 is 20 20

WD 10 IS 15 10 Ia) Is 15 10 t0 I` IS 1i I2 15 20 20Itarvstcina 41 15 20 2n IS is 20 20 is is 20

WD IS 20 20 IS 15 20 20 15 15 20 20 20 IS 20 25 25

tocal laborITO 4 4 - 4 4 - 4 4 4 4 - 4 4 4HD 49 61 61 47 49 61 61 47 49 61 61 61 66 61 73 73WD 31 45 45 29 31 45 45 29 31 45 45 4A 35 45 49 49

reonqon InpLaap fur all areAn.7 Foloiunp .:ompl.tton of ongoing drainage project under Ln. 1811 In 1986. i

T T'l * T*aodYay, HOD A anday, WO * Womanday. gJ

Page 84: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

n0oIIuTA

KENN 00 9HLOS:IITPOS DM1 AND IRRICATION PRO9C1

Crop ludlet. - Prrec. 198. /e(R 0)W nt 1984 /a(Fin. in lp'ODO - bon. In UBSO

Wet season_ Dry me..n I Ory aammon 11Irrigated rice Rainled rice Hlal. iirriatd rce MHate Soy Maite/soay mallasoy he/ une Soraluu

Tin. Ccon. Fin. [con. Fin. *con. Fin. lean. Fin. Ucon. Fin. kcon. Fin. con. Fin. Econ. 1in. lcon. Ftn. icon.

Seed 4.13 4.02 4.13 4.02 1.80 2.86 4.13 4.02 1.80 2.86 17.20 11.96 9.50 8.41 9.90 8.41 9.20 9.73 0.40 0.67Ferttiuner

Ure" 11.25 28.62 11.25 28.62 4.50 11.4s 11.25 28.62 4.5 11.45 - - 4.50 11.45 4.50 11.45 4.50 11.45 - -TSP 4.50 11.SS 4.50 11.55 0.90 2.31 4.50 11.55 0.9 2.31 1.80 4.62 1.80 4.. 1.70 4.62 1.70 4,62 - -olI - - - _ - _ . _ _ . . . . . . . . . .

PemiteldeInseoticide 3.00 20.00 1.50 10.00 - - 1.50 10.00 - - 11.50 10.00 1.50 10.00 1.S0 10.0 1.50 10.00 - -Rodenticlde 2.10 9.00 2.10 S.00 - - 2.10 5.00 -- - -Spraysr rental 1.80 1.80 0.90 0.S0 - - 0.90 0.90 - - .0 0.90 0.90 0.90 0.90 0.90 0.90 0.90

Subtotal 26.80 70.99 24.18 60.09 7.20 16.62 24.38 60.09 7.20 16,62 21,40 29.48 18 20 35.38 18.20 35.38 11.80 36.70 0.40 0 67

LaborLand preparmIlon

TD - 34.'0 - 29.00 - 11.60 - 23.20 - 11.6 - 11.60 - 11.60 - 11.60 - 11.6 - -MD - 22.10 - 18.20 - 13.00 - 11.20 - 13.0 - 13.00 - 13.00 * 13.00 - 13.0 - 13.00

Plant ingND - 8.45 - 8.45 - 2.t0 - 5.45 - 2.60 - 1.90 - 3.90 - 3.90 - 3.90 - 1.30WD - I.00 - 13.00 - 3.00 - 13.00 - 3.00 - 5.00 - .00 - S.00 - 5.00 - 2.00

Crop .an4aae.ntMD - 12.75 - 13.00 - 6.50 - 16.29 - 6.90 - 9.75 - 9.1 - 9.75 - 9.79 - 6.50 ;VD - 20.00 - 17.50 - 5.00 - 17.50 - S.00 - 7.50 - 7.50 - 7.50 - 7.50 - .00

hervestingXD - 16.25 - 14.95 - 9.75 - 14.99 - 9.79 - 1.00 . 11.00 . 13.00 . 1300 . 9.75WD - 12.50 - 10.50 - 7.50 I0 - 79 - 1O.W - 10.00 - 10.00 - 10.00 - 7.I0

Nlred labor LbTD 50.40 - 42.00 - 16.80 - 33.60 - 16.80 - 16.80 - 16.80 - 16.80 - 16.80 - - -MD 6.90 - 9.80 - 3.00 - 5.80 - 3.00 - 4.00 - 4.00 - 4.00 - 4.00 - 3.00 -VD - - - - - - - -- - - - -- -

Total Labor 57.30 151.85 47.80 124.60 19.80 58.9S 19.40 122.05 1980 98.95 20.80 73.75 20.80 jJ 39.73 75 20.80 73.75 3.00 49.05

economicfield(t0,0/he2 O 2.9 , 3.0 3.S 2.? 3.0 3.2 1.6 3.0 , 3.5 4.0 1.0, 1.4, 1. 0.6. 0.7 0.8/0.40 0.6/0.4 1.0/0.5 0.6/0.4 1.0

Prca (0/too 161.00 161.00 143.00 161.00 143.0 349.W - - _ 167.00cro revenue

($/lh) 466.90, 483.00, 563.90 434.70, 483.00 515.20 228.80 483.00. 563.50, 644.00 143.00, 200.20, 228.80 209.40, 244.30 294.00, 229.40 317.5 251.8 167.00not econec revenue

(W/ha) 244.06, 260.16, 140.16 250.01, 298.31, 330.51 153.23 300.86, 381.36, 461.86 67.43, 124.63, 152.21 106.117 141.07 144., 116.21 208.37 141.35 121.28

Yield (tona/ha) . 2.9, 3.0. 3.5 2.7. 3.00. 3.2 1.6 3.0. 3.5, 4.0 1.0. 1.4, 1.6 0.6, 0.7 0.8/0.4. 0.6/0.4 1.0/0.S 0.6/0.4 1.0Price (Rp.0 j 165.00 165.00 90.00 165.00 90.00 430.00 - - 100,00Oross revfnu ht(8p 0OO/he) 48.50, 495.01, 571.50 445.50, 495.00, 928.00 144.00 49S.00, 7.50, 660.00 90.00. 126.00. 144.00 258.00, 301.00 244.00, 226.00 30500 220.00 100.00

Net finatcall revenueC8p 000ha) 394.40. 411.00, 493.40 373.32, 422.82, 45*.82 117.00 431.22, 513.72, 596.22 63.00, 99.00, 117.00 215.80, 258.80 205.00, 187.00 266.00 181.40 96.60

/a Ceman inputs fur ALL areas

Lb Aassue In0 not hired aen."I tabor 4t premsnt, 200 with and without project In future. in addition to all eAimal labor hired.

e Dlfferenc yields shiotn for each area.

Page 85: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

£102M O60 WLM IPOfh_I 6SZ DA AM IRfIGATIW PROJECT

Crop *udist - SdoTUlo)I PTro (Fin. in P.'roo, reqn. In us$).~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Fn .B .r0 -.a,,1. _84

Preprolect (1986) Future without Project_ ___ Futur with stoitvet 1seson Dry moason I Or lam - e aon O1 season I ert Melon D11

Ltrinted rtis bams1 Hats* Sobean S4a kgt Painted rice Halosa taie Sorbean Hatslioyban oIirrisatad rieo Iuce iAIuiuLois nLuFin. Econ. Fin. Icon. Fin. Ccon. Fin. Ieon. Fin. Icon. n len. V1 ion. 7in. Icon. Fin, aCon. Fin. Icon. FIn. econ. tin. Keoo. Fin. aeon.

Saud 4.50 4.24 1.80 2.62 1.0 2.62 16.6 11.16 9.10 7.89 5.25 5.25 1.80 2.54 1.80 2.54 18.00 12.S6 10.27 7.55 5.25 5.25 5.25 3.25 10.27 7.55

UIrea 22.73 31.88 5.30 12.75 5.50 12.13 - - 5.50 12.75 31.00 49.20 12.60 22.96 12.60 22.96 - 12.60 22.96 36.00 65.60 36.00 65.60 12.00 32.80TsP 5.50 11.95 0.90 2.39 0.90 2.39 1.80 4.78 1.10 4.76 9.00 11.10 5.40 7.86 5.40 1.36 1.20 I0.4S 7.20 10.48 22.50 32.15 1S.00 26.20 9.00 13.10K01 1- - - - - - - - - - - - - 1.80 2.80

PesticideInsecticide .1S0 10.00 - - - - I.S0 10.00 2.50 20.00 1.00 20.00 2.2S 5.00 1.25 5.00 2.50 10.00 3.13 15.00 7.50 30.00 7.50 10.00 5.00 20.00Rodenuicide 2.50 5.00 - - - - - 2.50 5.00 1.2S 2.50 1.25 2.50 - _ 1.25 2.50 3.75 1.50 3.75 5.00 2.50 5.00Sprayer rental 0.90 0.90 - - - . 0.90 0.90 0.90 0,90 1 .0 1.60 0,60 0.60 0.60 0.60 0.90 0.90 1.20 1.20 3.60 3.60 2.60 3.60 1.80 2.80

Subtotal 21.65 64.02 L.20 t1.76 9.20 !7,76 21.00 28.84 19.00 36.12 l 50.3 94.35 22.90 42.46 22,90 41.46 28.60 33.94 36.27 59.69 7U60 144 70 74.10 135.65 AL3i 62.05

Laburtind prepar4tion

TD - 17W - 22.60 - 11.60 - 11.60 - 11.60 - 29.00 - 11.60 - 11.60 - I 1.60 - 11.60 - 43.50 - 413S0 - 11.60MD _ 1.a.20 - 11.00 - 21.00 - 13.00 - 13.00 - 18.20 - 11.00 - 11.00 - 13.00 - 13.00 - 22.10 - 22.10 - 23.00

Flant ing YD - USS - 2.60 - 2.60 - 3.90 - 3.90 - .645 - 2.60 - 2.60 - 3.90 - 3.90 - 8.45 - 8,45 - 5.2060 - 11.00 - 1.00 - 1.00 - 5.0 - 5.00 - 13.00 - 3.00 - 1.00 - 5.0 - 5.00 - 25.00 - 25.00 - 7.00 a

Crop an,ageuantYD _ 16.25 W 5 l1 _ 6.SU 9.75 - 9.75 - 16. 25 - 6.50 - 9.75 _ 9.5 227- 25 :6.00 11.0060 - 17.50 - 5S00 - M.D0 - 7.50 - 1.50 - 17.50 - 5.00 - 5.00 - 7,30 - 7.50 - 22.50 - i0O00 - 10.00

Karvest1ig2D - 14.95 - 9.75 - 9.71 - 13.00 - 13.00 - 14.95 - 9.7S - 9.75 - 13.00 - 13.00 - 19 50 -19S0 16.25vo - 20.10 - 7.50 - 7.30 - 20.00 - 20.00 - 10.50 - 7.50 - 7.50 - 10.00 - I0.00 - 120 - 12,50 - 12.50

Urofd laborTD 42.00 - 16.40 - 16.80 - 16.80 - 16.50 - 42.00 - 16.80 - 16.80 - 16.80 - 16.80 - 63.00 - 63.00 - 16.80 -Ms 11.70 - 6.50 - 6.o0 - 7.80 - 7.80 - 21.40 - 13.00 - 13.00 - 15.60 - 15.60 - 25.00 - 23.00 - 18.20 -ItD - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _

Tratal Labor 51.70 121.85 23.30 53.95 23.30 S5.95 34.60 71.75 34.60 71,75 6S.40 227.85 29.80 58.95 29.80 55.95 32.40 737.5 32.40 3.75 86.00 66.30 U8.00 167.05 U00 U.ASS

Icononlcyield (totrsl%) O.1 1.6 2.6 0.7 I.0/0.1 3.1 2.0 2.0 0.9 1.2/0.6 4.7 5.0 1.3/0.6Price (S/ton) 171.00 212.00 23.00 329.00 - 210.00 127.00 122.00 324.00 - 210.00 210.00 r.roes rsvenue ($/ha) W64.30 209.60 209.60 230.30 295.50 693.00 254.00 254.00 282.60 340.60 987.00 2,050,00 353250

ete revenue (/ha) 212.44 132.69 112.49 127.71 185.43 470.80 153159 153.59 174.97 207136 676.00 747.10 162.90

FinancialYied t)nm/hA) 3.10 2.6 1.6 0.7 1.0/0.5 3,3 2.0 2.0 0.9 1.2/0.6 6.7 S.0 1.3/0.6Price (IpW00/ton) 180.00 90.00 90.00 420.00 - 210.00 90.00 90.00 450.00 - 210.00 210,00 -12noon renenue t(tp'OO

16) 59S4.00 144.00 244.00 294.00 300.00 693.00 280.00 280.00 405.00 422.40 981.00 1a

050.00

387.00Net retenue Ap000/hs) 512.65 112.50 112.50 238.60 246.40 577.05 127.30 127.30 344.00 372.93 820.40 87.90 303.63

|bI|

Page 86: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Crop Mw00_M 2.d2d0U(M, In hail 22420400Win usC)

___________ ~ ~~~rfer 121 90fi Future WIthu rjc Future with oroject

FLA. Etu.. Fl... tw. Fi. ron Fn (o. Flu. Ic.Ve. td.6 74. 14 C**. FIu. Icon. Flu,R Icao. Fin, loF 7ilsp iek1 Jii 14. Fit. Nosi.

lees ~~~~~~~~4.10 4.2, 4.10 01.28 0.10 4.21 2.02 2.02 10.0 13.20 9.1 1.11 1.21 1.21 1.21 1.21 1.21 1.21 2.30 2.5 81.00 22.50 10.2? 7.11 5,21 5.21 1.21 1.25120.27 7.11

Urea 11.41 31.18 11.11 22.08 I1.1 21.81 1.0 22.11 - - 1.c10 2.11 26.00 11.60 21.00 49.20 10.00 01.60 22.60 22.96 - - 2.60 32.90 160.0 02.00 34.00 01.60 23.00 312.801SF 1~~~~~~~.50 11.91 1.10 22.91 1.1 11.91 0.00 2.19 2,80 4.18 2.80 4.18 18.00 24.20 9.00 22.20 23.00 00.20 1.40 1.86 P.20 10.48 1.20 10.40 22.10 322.7 25.00 20.20 9.00 51.10

Act - - -- - - - - - - - - - - - - - - - - - 2.80 1.80~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.8 14PestletIde

floacllrlcde 1.00 20MM .3 2.1 1. 10 20.00 - 2.10 0.00 1.5 O .50 10.010 7.10 10.00 1.00 20.00 7.10 10.00 2.21 1.00 2.10 20.00 1.71 21.00 1.10 10.00 1.10 20.00 1.00 20.00Iodeutlcide 1.1 1.00 2.10 IdIt 1.20 1.00 - - - - 2.11 P.1 2.10 5.00 2.11 7.10 1.21 2.10 - - 2.2 12.10 2.11 7.10 2.01 1.00 2.10 1.00Oprayer moitst 1.80 2.80 0.90 0.90 0.90 0.90 - 0.90 0.90 0.90 0.90 2.00 2.60 2.10 2.50 2.00 3.00 0.00 0.00 0.40 090 2. .00 I.20 2.40 160 2.00 2.00 2.80 2.80

S.bmil J059). Y0.01 3,aj ALl) 21.01 M.*L 8.2 17.10 L- jj LI 4 14 AJJ0 fLjj 70.20 124.215 10.11 94.2%174.10 138.15 22.90 42.40 28.00 21.94 ALL?, lii! 1.014240.70 74.20 235.11s 08.27 32.05

Taor40 - 0.o 2. - 22 200 - 22,00'Q - 22.:00 421.1100 - :2900 - 01.10 200 - 22.40 0 -1100 21.300 * 42.500 - 2.12:0 - 22.00oo

Pleotiftl-o - .1 - 84 .41 2.40 - .90 - .10 * .41 - .05 - 041 - 240 - .90) 3 .90 - 8.45 - .41 - 1.0WI'- 21.0 - 21.0 2.0 .0 00 0 -00 0o - 100 - 3.00 - 2.0 -00 0 .0 0 00.0 0 00 21.00 - 2.00 - 7.00

rop eUsqmotL leD - 22.11 - 20.21 - 14.21 - 0.10 - 9.21 - 9.11 - 22.71 - 10.21 - 22.13 * 0.10 - 9.71 - 1.71 * 22.11 - 20.00 - 22.0022.15 6.00 13:1'OD* 20.00 - 21.1 - 2.10 - .00 - 7.10 - 7.10 - 20.00 - 21.10 - 20.00 .. .00 - 1.10 - 7.20 - 22.20 - 20.00 2. 00

KArveeStiuoNeo - 102 is 14.91 - 2.1 9.11 - 1.00 13.00 * 19.10 - 24.91 - 1910 9.71 1 2.00 - 12.00 - 9.50 - 9.10 * 2.21it I122.0 - 0.20 - 10.10 - 1.10 - 0.00 - 0.00 - 22.10 - 20.10 * 2.10 - 7.10 * 10.00 - 0.00 - 22.10 - 22.10 - 22.10

eired laborT0 10.40 - 02.00 - 11.5 11.10 - 120Als 10.00 - 03.00 - 2.00 - 0.00 1 6.80 - 2.00 - 10.50 - 4.00 - 01.00 10.600

10 20.90 - 21.10 - 11.70 - 0.10 - 7.50 1.10 - 21.00 - 22.40 - 21.00 - 12.00 - 25.00 - 21.00 - 28.0013.21.00 -021.200

Total LAbor 11±12 MlISS 1jlj1.01 41.10 222.0 1 2.30 j8-j 10.00 11.71 14.00 12.7 1 fl,f 102.40 01.40 127.13 Ital 103.0 29.80 10.91 22.00 72.71 22.00 13.11 88.00 210.10 £1.0 107.01 21.00 Is8.1

£tff!"0ttaumo) 2.8 3.2 0.2 2.1 0.0 0.9/0.4 4.3 2.3 4.1 2.1 0.0 1.0/0.1 4.7 1.0 1.3,0.5iPrice (S/te) 212.00 272.00 212.00 152.00 229.00 210.00 220.00 210.00 127.00 524.00 220.00 210.00Orat ne mea. (I/ha) 049.80 101.20 728.20 290.10 291.oO 049.10 882.00 495.00 001.00 221.90 212.20 150,00 957.00 2,O.01,0 222.20Pet reyptme (9hal 025.06, 211.20 512.24 129.19 9.0.1 239.01 180.02 470.00 043.01 121.9 241.512 250.10 074.00 107.20 212.10

flivid (t.41116 3.0 2. 4.2 1.1 0.0 0.910.0 4.2 .1. 4.1 1.7 0.8 2.0/0.1 4.7 2.0 1,2/0.1Prim. (8p'00O/teo1) 1810.00 200.00 240.00 90.00 420.00 220.00 210.00 320,00 90.00 410.00 220.00 210.00Orcee co-mte (4000O/ha) 034.00 110.00 181.20 213.00 212.00 249.10 832.00 491.00 941.00 112.0 300.00 211.00 981.00 1,010.0 342.00

Bet rename (8p000/he) 150.02 ~490.02 103.21 101.10 219.00 291.40 12.90 171.01 182.90 200.10 299.00 240.22 020.40 88.9 21.01MOL ra"Ofte UPTOOMA) $56.43 I Vo~~~~~~~~~~~~~~~~~M

Page 87: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

awmin amO tUmm100 PM8 AIM IDICAIIU1)0010?

lucre mi (1083 lectrn olde.: crGeemeFai.ametilla ',JooL

Via. Leon. Fit. teen. Vim, Leon. Fin. Sean. Pin. koc. fln, kern. F a. tee..al.Fit. Seen. via. leon. Fit.. eon. VIl.. ILesn.Viig, gearn. Flie, Lees.Flo. wi%.tFla. lest.

0404 t.14 4.28 1.A0 4.28 0.50 4.24 3.80 2.02 30.80 11314 0.20 5.01 5.21 .2 5.2 1 a 1.2 1.21 1.2 13.80 2.14 taco0 32.30 9.20 9.5 5.21 1.21 1.21 3.21 9.20 4.11

UPn 31.i1 .13.5 3311.7 1 13.8331 33.88 1.10 32.21 - 1.10 32.31 30.00 01,00 21.00 49.20 20.00 82.80 30,00 22.00 - 9.001 10.00 24.00 41.60 14.00 11.60 30.00 11.80ts t.io 11.11 4.10 33.05 o 1 10 3.91 0.90 1.39 3.80 0.18 3.80 0.18 (8.00 20.20 9.00 33.30 38.00 20.20 1.40 1.80 1.20 39.58 4.50 0.11 22.10 32.11 30.00 20.20 9.00 131.0

ioeaatleide 2~~~.')0 30.00 1.SQ13 0.00 3.543 300 .0 1.0 35 00 .0 0.0 50 00 .0 3.0 32 .020.00 .0 32 100 1.50 20.00 1.10 10.00 1.00 20.00=Metleldei 3.50 3.00 3.50 1.00 1.10 3.00 IM -31 1.50 2,50 5.00 1.11 1.10 (.21 2.10 - - 3.21 2.10 3.11 1.10 3.11 1.30 0.00 0.00

Opcqer, -intl 3.80 [.8o 0.00 0.90 0.90 0.90 - :1.9 0.90 0.90 0-.90 3.30 2.60 3.80 3.40 1.00 3,00 0.00 0.603 0.90 0.90 0.00 0.40 1.00 2.30 1.00 1.0 3.001.0 1.80

50tnela1.0 30 .91i S 23.0S 00.01 21.01 8L0.08 a.20 31.1 2.0 26.88s 38.90o s 18.04 114 jfl 1241 98.23 14.30 1jj,jj, 33490 3J4j 28.Go 12.98 228 00.82 180_0 (44.10 1141 i111. EaI 1147.

It prtp,tratitaTo t1.4 " 90 - 2.0 30 - 3.00 - 33.00 - 43.10 - 29.00 * 42.10 - 33.00 - 1i.o0 * it.60 - AL.SO - 41.10 - 33.001

80 - 3~~~~~~~~2.3101 * 38.200 - 8210" 1 .00 1 3,00 1 3.00 - 22.30 * 33.20 - 22.30 - 33.00 - 131.00 - 33.0o - 22.10 - 22.30 - (1.00Planting

eN -I,1 .5 .5 .0 - 3.9 - 3.90 * .81 * 8.41 - 8.01 - 2.00 * ,9 - 31.0 - 8.45 * 8.41 - 5.00VD 1.0 -O 311.010 .13.00 - 200 - 1.0 - .00 1 3.00 - 132.00 - 3.00 - 3.00 - 3.00 - 1.00 * 31.00 - 31.00 - 1.00

1.0 - 22.31 - (.21 L61.29 - .50 - 9.?) - .11 22.21, - 10.11 - 2.11 -. .50 - 9.12 - 9.11 - 22.13 - 24.00 - 11.00 W, 20.00 - 1.30 - (3.30 - .00 - .50 - 1.10 - 0.00 - (1.10 * 20,00 - .00 - 1.10 - 1.10 - 22.10 * 20.00 - (0.00

,WD - 3.25 (0.9 - 14.85 - 9.13 - 3.00 - 13 00 - 9.10 * 34.91 - 9.30 - 9.71 - 11.00 - 13.00 - 39.10 - 09.00 - 10.0544i 32.5 5010 - (3.50 - 3,.S .50 - (.00 - 30.00 * 2.10 * 30.10 - 1.00 1.10 - 30.80 - (0.00 - 2.10 * 32.10 - 32.10

gar m laborTO 10.40 - 42.00 - 33.00 - .300 - 38.00 30.60 - 0.00 - 2.00 - 0.00 - (0.80 t61.80 - 30,0 - 03.00 * 02.00 - 46.80 -MD 30.90 - 3.10 113.10 - .50 - .80 3.80 - 2.00 - 2.40 - 21.00 31.00 - 31.00 - 0500O 20.00,- 21.00 - 3.20 -

Itelj Labor 81.10 333.95353.10 321.81 45.20 1JL0l 22.10 18.9 l49,0 12.11 ALE6 13.11 fljfl 163480 5.349 121.81 84.00 202 002.00 10.01 32.0 73.3,7 32.40 12.3 91.00 (0.0 L. 1.7.I00tl

LYTtue s/ tl.) 1.2 0. 3.7 3.2 0.0 0.110.4 1.1 3.3 4.0 3.1 0.8 0.9/0.1 4.8 4.0 0.9/0.1Pri:e (8/in,) 313.00 313.00 Il(.02) 333.00 129.00 330,00 210,00 2(0.00 111.00 313.00 210.00 230.00One ,ot ewnai (IthaI 403.20 5(1.00 032.7 (51.20 (91.80 211.10 731.00 093.00 131.00) 190.10 213.20 223.00 904.00 3,000.00 223.80Me. iOflhIO (9/41*3 120.00 123 .30 840.04 60.09 90.81 341.93 435.01 010.90 330,30 90.09 130.13 201.43 013.00 101.00 (49.30

inane avITiuTTT js/ ) 2.2 3.0 1.1 3.2 0.4 M0.104 3.1 2.1 4.0 1.1 0.8 0.9/0.3 0.0 4.8 0.9/0.1Price (3,000/seo3 380.00 380.00 (00.00 90.00 420.00 230.00 230.00 230.00 90.00 010.00 230.00 2(0.00Grase icdaon (Ee0i300/iea 170.00 140.00 000.00 308.00 252.00 229.00 1711.00 092.00 040.00 101.00 04.00 118,A0 000.00 1,005.00 2a".10Not r-onoan (ip'000/0.3 438.05 459.4 101.05 10.50 000.00 113.30 038.90 117.0 118.01 332.30 299.00 233030 130.40 841.90 200.20

Page 88: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

C.. Imicci - UI-. Ia..s.tN ke 9 S

aP4 . ..... r. IseM. .. It Lm9 in9*'IITjIiiiIjlIIi8jj~~~~~~~~~~~hI4i2j4Ij1jj. 1 IS cc cil10W hr kin It cci rue £ vies irrigated lice hi N.Fla U -2. ig. scv. am. agll.rip "o. liw"0Fc Ic9. cc.7 c. e. c.". e. lace".0 F C. "em. vs. VAC Ti. WIN. Flo. * a... i. a. Vic. laiII. 135.

W.0 0.IS -.. ' L.29 6.V1! 6.29 UP. 2.42 9.M. 1.89 9.20 9.8 0.44 0.00 1.31 9.31 91 1.2 1 W 1.21 141 1.80 3.14 99421 1.11 .2 9.1 1 .1 9. 28QJ 1 1.11 1.21 S.21 1.21 9.20 9.1199.20 32.88 11.1$ 11.94 11.1$ 11.04 8.W 2.2$ 1.Io 11.11~~~~ S.1 2.20 228'202.8 4.3 20 4.03.0 22.961 9260 22.0 9.2I0 91.40 9.0 6.40 34.20 40.60 22.00 49.31 98.00 32.80981 1.1.' 11.9$ ~~~~~~~.0*I 39.99~% 9.' 9.9 "., 299 3.90 '.a 9.0 6.28 9.00 1.0 9.'O 20 'I91. 10 920 9.2 1.840 2.34i 1.3 90.48 840 i 011 8i 6. s 8.0 2.0 98 3.0 90 39

.…9~~~~~~~~~~~~~~~~.80 l.a6&Wscct ltl 9.l.W I..) .3 9,.b391 .. I 3..2-I.9..9 .0I. 90.W0 .00 10.0 1.80 20.8 1.80 26.80 9.0 1.2 . 1.21 91.0 9.21 .0 2.11A.0 10.09 1.20 208 .00 S." ,003pr.r .c9. 9.8 1 .4'1 1 .9" :3,99 P,9. '. I 0.9' 0."3 0.90 0.92 2.80 3.80 3.80 3.80 3.80 9.00 0.80 0.60 3.29 9.20 0.80 0.80 - .80 3.80 9.80 3.80 3.80 3.80

T3 - .. q. -I.eA. - 29.1 I 99.801 . 9.80 - I96 -J - - 420 9.89 - 9,o4 - 9.64 - 01.69 - 2.40 - - 30 9.00 - 99.8000 ,.I.I' II.;" I.2 )9.,Y3 31.101 - 1.010 - 1.00 - 2.9 119.20 - 9.20 * 1.04 * 1.00 - 3.00 - 1.10 - 2.iI0 10.30 Is9.m

* . 93,.c9.39~~~~~~~~~.H.99,.*, . 2.930~~~~~~~~x . 1.) . 000 - .0 - 100 * 3.0 - 12.20 - 3.00 2,0 1020 - 0.100 -1al 332 12 .0092 22.29 90.21 !c.28 0.149 ~~~~~ ~~ ~~~~~~ ~~~~~~~~~~9.99 - .21 - .0 2.2 3 8.20IS 1 3.21 - .1 9.22 - .22 - .80 - 22.23 28.00 - 32.08413 '. I0~. 99 .h 2,9'I PM.0 1.00 - 2.20 * 3.10 - 9.10 - 1.20 - 2.0 * 2.10 - .00 IS2.1 - 0.20 - 0.00

t:.9 . ,2 I.3.303) I 31.0 9.91 - 3.10 1 4.91 - 3.91 9.20 - 9.801 - M1.0* 9.22 - to.10 * 9.1 - 9.21- 92,8" . I'.$'I.I'~~~~~1 .V'. 2.1'9.9' .0'2 30.20 9.29 92,80 932.0 - 9.10 - .10 - 0.00 - 0.80 - .10 - 2.10 - 32.10 - 9.10TO 39 2u 9 £8.9' - 364.0 1 9.80 - - - 63.0 £3.20 - 82.20 - 98.90 * 38.00 98.90 - 3.00 * 2.09 * 3.20 00 98~~~~~~~1.0' )? 9t .3 - 29 .1 80 10 31.40 - 20.83 - 91.00 ISM.6 IS9.8 - .10 - 2.0 - 23.20 98.18

LLffto I~2. .' .932 921, OJ.11.2.8 .2 3,2 2.1 1.1 3.1 0.9/0.1 0.910.1 3.1 0.0 8.3 1.210.3price Ci/erlID.91 39.0 91111.93 39.) 119090 1340.0 330.00 230.80 922.20 919.80 298.20 230.00ret.. rcvc,r (0140 1 0.3 9 .u 04 .l' I 9*.333 221.1i 212).lo 380.80 222.00 493 fl.00 12.0990.68 *19.0 223.80 I28.10 40.00 903.80 32.40Tel "S~ (1$4, 92.2I:%.2;926 9"-.69 130.21 319.93 982.20 0.02.9 820.80 192.80 80.8 932.04 202.43 98.10 11.8 810.S 9.981LLMAtH. c I0II 2' .2 '9TII. 0,713.9 .2 2.2 2.2 2W 3.0 0.9(0.9 0.9(0.1 . . . .34.2(.FVI. .liiti .4 99!.3 14.1 19.` .` 180 23.0 908 22.0208 30.20 29.20 39.00

01.99 re.c*wa 98p~~.I10~/8j9 891.91 36'3.'.l 001.09 909.30 229.'30 229,039,10334.20 222.200493.00 222.801931.80 200.80M200.1050 932.10 080.00 802.000128.101.5 re.ea.e 9l~~~~'50I~8a3 992,50 .19.01 92Ii.-II 246.0') 922.80 320.13) 302,0 44,91$ 140.21 422.2 82.10 212.13 2130,20 904.92 829.90 742.81 24.20

Page 89: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2

- 8j _ Table 10

INDONESIA

KEDUNG O13O MLTIPURPOSE DAM AND IRRIGATION PROJECT PROJECT

Summry of Economic Benefits at Full Agricultural Developnaet

IWO? FWJ? IncremgentalBen/ha Area fttal Ben. Ben/ha Area Total Ben. benefittS) (ha) (S ai) (5) (ha) (S ml) ( nil)

SidorejoWt Season

Irrigated rice - - - 676.00 6,100 4,123.60 4,123.60RaLafed rice 470.80 5,200 2,448.16 - - - (2,445.16)Maize /a 153.59 495 76.03 - - - (76.03)

Dry Season IIrrigated rice - - - 747.30 6,100 4.558.53 4,558.53Maize 153.59 3,280/b 503.78 - - - (503.78)Soybean 174.97 2,1857w 382.11 - - - (382.31)

Dry Season 11Msize7sybiean 207.36 5,060 1,049.24 182.90 1,830 334.70 (714.54)

Total (Rp m) 6,459.52 9,016.83 4,557.31

Sedadiwet Season

Irrigated rLce 580.05 12,700 7,366.64 676.00 13,910 9,403.16 2,036.52Rainfed rice 470.80 1,200 564.96 - - - (564.96)

Dry Season IIrrigated rice 643.ns 6,300 4,051.22 747.30 13,910 10,394.94 6,343.72Maize 115.49 1,880 217.12 - - - (217.12)Soybean 143.51 940 134.89 - - - (134.89)Vatze/soybeRn 150.56 1,880 283.05 - - - (283.05)

Dry_SeasnI

Matizsoybean - - - 151.50 4,170 631.76 631.76

Total (Rp a) 12,617.88 20,429.86 7,811.98

ama mbu KrirMWt SeasonIrrigated rice 475.05 12,100 5,748.10 655.00 20,330 13,316.15 7,568.n5ainfed rtce 470.80 8,230 3,874.68 - - - (3,874.68)

Dry Season IIrrigated rtce 310.80 500 155.40 705.30 20,330 14,338.75 14,183.35Maize 90.09 4,080 367.57 - - - (367.57)Soybean 143.51 2,040 292.76 - - - (292.76)

Dry SeasnI

a ungbean 2n7.43 4,080 846.31 149.18 6,120 912.75 66.67

Total (Rpm) 11,284.82 28,567.88 17,283.06

Klambu Xananwet Season

Irrigated rice 507.05 2,550 1,292.98 537.05 19,000 10,203.95 8,910.97Rainfed rice 470.80 17,600 8,286.08 - - - (8,286.08)

Dry Season IIrrigated rice 552.80 1,100 608.08 639.00 19.000 12,141.00 11,532.92Rainfed rice 90.09 12,850 1,157.66 - - - (1,157.66)Maizetsoybean 137.86 1,400 193.00 - - - (193.00)

Dr SS

Haize7iMhgbean 207.43 2,460 51n.28 199.9R 5.700 1,139.89 629.61Sorght-i 142.39 1,120 159.47 - - - (159.47)

Total (Rpm) 12,207.55 23,484.84 11,277.29

/a 900 ha dry flelds (maize) are commandable. 495 ha ts 60Z of the dry Elelds as given in SMEC Agricul-tural Report, 1984 (Table 5.6).

/b According to SMEC, 5.465 ha is pltanted with pal&uija crops; 602 is planted vitt maize, 402 with soybean.

Page 90: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2

-82 - Table 11

INDONESIA

KEDUNG OMB0 MULTIPURPOSE DAM AND IRRIGATION PROJECT

Incremental Annual Agricultural Benefits at Full Development

Rice Palawija Total$'000 X $'000 Z $'000 x

Sidorejo 6,233.97 14 (1,676.66) (53) 4,557.31 11

Sedadi 7,815.28 18 (3.30) (-) 7,811.98 19

Klambu Kiri 17,876.72 40 (593.66) (19) 17,283.06 42

Klambu Kanan 12,157.81 28 (880.52) (28) 11,277.29 28

Total 44,083.78 100 (3,154.14) (100) 40,929.64 100

Page 91: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2- 83 - Table 12

INDONESIA

KEDUNG ONBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Phasing of Benefits /a($ million)

Area on XBeginning stream Benefits Phasing of benefitsof years (ha) added 1988 1989 1990 1991 1992 1993

Sidorejo

1989 4,000 65.6 - 1.50 2.24 2.99 2.99 2.991990 2,100 34.4 - - 0.79 1.18 1.57 1.57

6,100

Sedadi(Phased over 1 year)

1988 8,000 58.0 4.53 4.53 4.53 4.53 4.53 4.531989 5,910 42.0 - 3.28 3.28 3.28 3.28 3.28

13,910

Klambu Kiri

1988 7,500 36.9 3.19 4.79 6.38 6.38 6.38 6.381989 7,500 36.9 - 3.19 4.79 6.38 6.38 6.381990 5,330 26.2 - - 2.26 3.39 4.52 4.52

20,330

Klambu Kanan

1989 5,500 28.95 - 1.63 2.45 3.27 3.27 3.271990 11,450 60.26 - - 3.40 5.10 6.80 6.801991 2,050 10.79 - - - 0.61 0.91 1.2i

19,000

/a Development of agricultural benefits in all areas except Upper Sedadi phased over 3years- 'ith 50t year 1, 75% year 2 and 100% year 3.

Page 92: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Phasing of Incremental Agricultural Benefits by Subproject Area($ million)

SidoreJo Sedadi Klambu Kiri Klambu Kanan(6,100 ha) (Z) (13,910 ha) (X) (20,330 ha) (7) (19,000 ha) (X) Total (%)

1984 - - - --

1985 - - - - - - - - -

1986 - - - - - - -

1987 - - -1988 - - 4.53 58.0 3.19 18.5 - - 7.72 18.91989 1.5 32.9 7.81 100.0 7.98 46.2 1.63 14.5 18.92 46.21990 3.03 66.4 7.E. 100.0 13.43 77.7 5.85 51.9 30.12 73.61991 4.17 91.4 7.81 100.0 16.15 93.5 8.98 79.6 37.11 90.71992 4.56 100.0 7.81 100.0 17.28 100.0 10.98 97.3 40.63 99.31993 on 4.56 100.0 7.81 100.0 17.28 100.0 11.28 100.0 40.93 100.0

Full agricultural development is reached in 1993.

Page 93: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 285 - Table 14

INDONESIA

KEDUNG OMBO MF1LTIPURPOSE DAM ANY IRRIGATION PROJECT

Economic Conversion Factors

Conversion factorfor financial to

Cost item economic prices

ConstructionDam and structures 0.9Power and equipment and maintenance plant 0.9Irrigation system 0.8

Operation and MaintenanceDam 0.9Down riverworks 0.9Power plant 0-95Irrigation system 0.75

Land AcquisitionDam and reservoir 1.0Irrigation system 1.0

Equipment and services 1.0Administration and overheads 1.0

LaborAgricultural labor 0.5Animal labor 1.0Animal team/a 0.7

/a The agricultural labor required for one animal team is shadow pricedalthough animal labor itself is not.

Note: The differences between coefficients reflects the differences in thetransfer payments and unskilled labor components of financial values.

Page 94: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

MUU 2-86- Table 23.

Wmam8sIA

tEDINO OHIkO mO.tIPURFOSK DAN AND TIRICATIOIE FIOJICT

Fa.rm 11Npet - Sidoralo - DuNer-Oplaberatr (IFINhture With and Future Without Projeti

0. 2 ha (202 fas 01.4 ha (332 tona 0.6 he (202 tarniSuture vichout Future wIth ~~~~~~future without Fuuewl'Ftr ihumtFurewt

Area Per he Total AWnus Per ha TotAl Area Far ha TtlArea Per ha Total Area Per ha Total' krern Per ha T-otalr(l's -- RCp'0n0) - (ha) --- Cftp'OOCI) -- (he) -- (tp'0OO) -- (ha) - (.Rp0On) - (ha) - (Rtp'000)- (ha) - CUp'000) -

RIre- (Ir-Lg.ut.d) W - - - 0.20 9816.10 197.40 - - - 0.40 987.00 3"4.0 -s-o 0.6.0 967.010 592.20IIIre CrA.ln.'d), W '1.17 691.00 117.81 - - - 0.34 691.00 235.62 - - - 0.5 611.00 351.43 - - -

11.-c (I-r[bnte.) to - - - 0.70 2,050.0 210.00 - - - 0.60 l.C5O.00) 420.00 - - - 0.60 l.050.00 610.00-h.I-.e IA W 01.1`12f 31111.011 2.811B - - - 0.01 1110.00 5.40 - - - 0.05 1380.00 9.00 - - -

IhI_ 1~i MIz 2810.00 101.80 - - - 01.22 280.00 39.60 - - - 0.12 380.00 51.60 - - -S.. it .... I i1.07 405.900 83 - 0.1£ 405.00 36.70 - - - 0.21 405.00 85.05 - - -~ls2a./....y6..u.1 O/L l'.3I7 422.60 73.82 C0.f. 3187.00 21.22 0.33 422.40 119.19 0.17 387.00 46i.44 0.50 422.40 213.20 0.38 3117.00 69.68

Torti 11.51'. 2~~~~~~~~~~40.1.5 f11.4t 410.4i2 1.06 £76.71 0.92 861.2£ 1.59 716.s28 13.1 2.291.86.

Cr.rpPl.,u Iut:511 .6I' 2.3n 2.45 2.10 2.65 2.10

RIr... IlNhct.I W2 - - .20 78.6u)1 15.7 2 - - - 0.60 78.610 33.44 - - - 0.60 78.60 47.160.!r,, rAln-r1I 1 11.17 %0.13% 25.59 - - 0. 36 50. 55 27.19 - - - 0.52 50.55 25.78 - - -KI,.' (LNrrL,gaI-'I, II- - 0.211 74.201 14.82 - - - 0.40 74.10 29.64 - - - 0.60 74.20 44.46

Maine I. 11.1116 ~~~~~~~2Z.11( 0.117 - - .8. 0.01 212.90 0.o9 - - - 0.05 22.80 2.15 - - -

tt.Ir.. I)~~~~~1 0.23 22.Q11 2.52 - - tn~ 0.22 22.90 5.06 - - - 0.12 22.90 7.31 - - -

A lb~2 11.Iv :a. 1,1 2.02 - - - .4 28.66 6.01 - - - 0.21 28.66 6.02 - - -

t*I. r...VI-,,..ll1' SI/l IN. I' 26.27 h11.7 0.06 481.17 2.90 0.11l 16.27 22.97 0.22 48.17 5.80A 0.50 16.27 181.1£ M.2 68.17 8.73

To,t.L 39.-61 '11.44 189 6,885.42 3010.311

Ill .. *(.2,ru%QTI' W' 0.37 4-.04' 7.24 01.20 61.01 127.1.0 0.34 62.00 34.289 0.40 6312 25.20 0.52 62.00 21.42 0.60 e3.010 17.80MI' W I. II 217.4(1 1.48 01.201 25OI .01 0.34 21.40 7.91. 0.40 25.12 10.00 0.53 21.40 31.93 0.60 25.0 15.00

hi rrcld) TI' II - 0.20 63.00 32.160 - - - .40 1.1.00 215.20 - - - 0.60 63.00 37.80(13' II - - - 2~~~~~~~~1).20,I 25.110 5.210 n .80 25N.00 20.00 -1- 11.60 21.00 Mion

ITIN.71 - 1h.1 3M.N1 11.217 - - - 0.031 16.510 1.50 OA-- S.0 26.80 0.8 - -

'47 4 111 27.01! 11.22 - - - 01.03 13.00 '1.1 - - 11%0 21.00u 0.65 - - -t.. 7 12 (1.2 tt1.1811 2.85 - - - 01.22 M6.U 3.721 - 0.12 36.80 9.18I - - -

M : 0 IN.1 2 I1.83q 3.32 - - - 0.22 11.10 2.86 - 0.32 23.030 4.36 - - -7T1 2 011 l'.8 2.8 - .1 I4 2.5n0 2.15 - - 0.23 36.80 3.513 91' 1' n.117 236"1.00If9 - - (.124 11S.60 2.38IR 0.22 15.60 1.28 - -

'6. I.-f...,ln-... " II.D. I. 17 16h.81) 2.86 (.06 26l.80 3.n1 0.33 16i.51mo 5 0.12 36.80t 2 .02i 0.50 26.810 8.40 0.318 1L.11,1 1.0122r. 7 I5.1..0 2.1.5 0.06i 11.0 .79 0.11 11ti.' .2 0.12 21.20 3.58I 0.5"n 15.60 7.80 01.18 21.20 2.381

T..2 721 Ii. (1216.21 26.17 521.42 10.57 78.62M!) 111~~1.- 2.79 218.34 21.18 27.812 32.38

1.. .1 7~~~~~~~~~~~~?S 17.110~~~~~~~~'o 43.93 746.10 67.19 102.0171

11 LI A IJ1.0 5,1 .?fl 0.211 21.70 4.74 01.40 8.50 3.40 0.40 21.70 9.48 n2.10 8.50 5.20 0.60 2-1.70 14.22

4.A,r',...'.~~~~ rIh..12.n. '.2'* - -~~~ 1220 8.95 1.79 01.4(2 - - 0l.40 8,95 3.5 0.612t - - 0.60n 8.95 5.37

_________ 196.14 311~~~ ~ ~~~~~~~~~~.4% 118,.30 707.06 W85.37 1.1170.904

2.. .... .. 6I) 2 ."". 12 NIl 6.110n 32 '10 6.28 fi I1M1 3.50 1. No1 3.00 20 fib 1.0(

U!, I li . 'n 5.1", I wS. 164.45 1. 19!1 5W .50 723.04 5001.17 1.075 n9

'I,I.- .5.16.5390,50 711.06 591.3? 1.0751.94

Inn.- '.*r ,a;.!' .I 34.12 7~~~~ ~ ~~~~~~~~~~~q.77 86.115 I35.1 128.56 214A.55

~ t% .1 ~ I rId" ((oLd 100 lua) .hlch lure .l atI.' Inche Fn,ture - reprNN.,sev:t R2 cropped area planted Late in wst s-asonII. S.*.-. 'u-...TP.iI -:I1. IiucI(c uetcdu pra,,ers.

c A. -,-.:ng t.. u.l . 1-0"2.Idr. 211? ,.I nuu lbor end (all aNlNal. Lalbor) Ia hJro-d in the, fi.t'urr.d ,I.-

1l 7.(.rr1lIaino 21E1A enNd 'eater cnrtolu

7P -lr,'..2t. -'..rl.. Inn asi.(hor ot Rp '.00/day.

Page 95: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANN=X 2- 87 - Table 15b

INDONESIA

IKEDUNG ON6O MULTIPUIPOSZ DAM AND IRRIGATION PROJECT

Farm Budget - Sadadi - Oaner-Cperator (Future Wtth and Future Without Project)

0.4 ha (30Z far",) O.E ha (19.52 frm)Future without Future wit- Future without Future wtth

Area Per ha Total Area Per ha Total Area Per ha Total Area Per ha Total(ha) -- (Rp'OOO) - (ha) -- (Rp'000) - (ha) - (Ftp'OOO) - (ha) - (Rp'000) -

Cr.as RevenuesIrrtiated rice W 0.36 882.00 317.52 0.40 987.00 394.80 0.55 882.00 485.10 n.60 987.00 592.20RaLnfed rice U 0.03 693.00 20.79 - - - 0.05 693.00 34.65 - -Irrigated rtce D 0.18 945.00 170.10 0.40 1.050.00 420.00 0.27 945.00 255.15 0.60 1,050.00 630.00

Ritze D 0.05 153.00 7.65 - - - 0.08 153.00 12.24 - -Soybean D 0.03 360.00 10.80 - - - 0.04 360.00 14.40 -Maize/soybean D/L 0.05 315.00 15.75 - - - 0.08 315.00 25.20 - -Msize/soybann L - 0.12 342.00 41.04 - - - 0.18 342.00 61.56

Total 0.07 542.61 855.84 1.07 826.74 1,283.76

Cropplng tntenaity 1.75 1.78

Expendtture on Agricultural.Inputs

Irrigated rtce W 0.36 74.10 26.68 0.40 7a.60 31.44 0.55 74.10 40.76 0.60 78.60 47.16RaLnfed rice W 0.03 50.55 1.52 - - 0.05 50.55 2.53 - -Irrigated rice 0 0.18 74.10 13.34 0.40 74.10 29.64 0.27 74.10 20.05 0.60 74.10 44.46Maize D 0.05 22.90 1.14 - - 0.08 22.90 1.83 - 65.25Soybean D 0.03 28.60 0.86 - - 0.04 28.60 1.14 - 65.25Maize/soybean D 0.05 36.27 1.81 - - 0.08 36.27 2.90 - 65.25Maize/soybean D/L - - - 0.12 40.37 5.80 - - - 0.18 48.37 8.71

Total 45.35 66.88 69.21 100. 3

Htred Labor InputsIrrigated -tce W TO 0.361 63-.0 22.68 0.40) 63.00 25.20 0.55) 63.00 34.65 0.6n0 63.00 37.80

W MD 25.00 9.00 28.00 11.20 25.00 13.75 28.00 16.80Ra-infed rtce W TD 0.03) 42.00 1.26 - C.0s} 42.00 2.10 -

V MD 23.40 n.70 - 23.40 I.:: -Irrtgate~d rice D TD 0.18) 63.00 11.34 0.40) 61.00 25.20 0.27) 63.00 17.J1 0.60) 63.00 37.RO

D M* 25.00 4.50 25.00 10.00 25.09 6.75 25.00 15.00Maize D TD 0.05) 16.80 0.84 0.08) 16380 1.15 -

D MD 13.00 0.65 13.00 1.04 -Soybean D TD 0.03) 16.80 0.50 0.04) 16.80 U.62 -

D MD 15.60 0.47 15.60 o U -Kmaie/soy:.aan D/L To 005) 16.80 0.84 16.80 1.34 -

D/L MD 15.60 0.78 0.08 15.60 1.24 -Katze/soybean L TD - - - 0.12) 16.80 2.01 - 0.18) 16.80 3.02

L MD - - - 18.20 2.18 - 18.20 3.28

Total TD 37.46 52.41 57.12 78.62MD 16.10 23.38 24.57 35.08

TotIal 53.56 75.79 81.69 113.70

IPCDA /a 0.40 12.10 4.84 0.40 20.30 8.12 0.60 12.10 8.52 0.60 23.70 14.22Watar contributtons 0.40 6.13 2.45 0.40 8.95 3.5R 0.60 6.13 3.68 0.60 8.95 5.37

Net Agric. Income 436.41 701.47 663.64 1.050.14

Off-farm income /b 7 10 3.50 7 MD 3.50 5 MD 2.50 5 MD 2.508 WD 4.00 b WD 4.00 4 WD 2.00 4 WD 2.00

Total Net Income 443.91 708.97 668.14 1.LJ.6 4

Per Earm family 443.91 708.97 668.14 1,054.64Incom per capita /c 96.50 154.12 145.25 229.27

/a See Tahlee 17a and 17b for calculation of IPEDA and water contrtbat tons.b MAsin sufficient employmant extits to take up 5T of the surplus labor at Rp 500/day.

I Assume 4.6 persons per fitLy.

Page 96: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2- Ss - Table lSc

IDONIESIA

KIUDUNO OIM MWLTIPUF0OE DAN AND IRRIGATION PROJECT

FPr. *uGget - Klambu Kirt - 0en.r-Op.rator (Future With and Future WYthout Project)

0.4 he (302 rm) 0.6 ha (19.5X farm*)Future without uture swith Feuture without Future with

Area Par ha Total Area Per ha Total Area Per ha Total Area For ha Total(ha) - (Rp'OOO) - (ha) -- (Rp'000) - (ha) - (Rp'nO) - (ha) -- (Rp'000) -

Cross RdvenuemIrrigated rtce W 0.24 777.00 186.48 0.40 966.00 386.40 0.36 777.00 279.72 0.60 966.00 579.60RatnEed rice W 0.16 693.00 110.88 - 0.24 693.00 166.32 - -Irrigated rtce D - - - 0.40 1,008.00 403.20 - - 0.60 1,008.00 604.80Mwtze D 0.08 135.00 10.80 - 0.12 135.00 16.20 - -Soybean D 0.04 360.00 14.40 - 0.06 360.00 21.60 - -MUtze/mungbean L 0.08 288.50 23.08 0.12 288.50 34.62 0.12 288.50 34.62 0.18 288.50 51.93

Total 0.60 345.64 824.22 0.9 518.46 1,236.33

Cropping intenitLy 1.50 1.50

Expenditure on Agrtcultural InputIrrigated rice 0.24 74.10 17.78 0.40 78.60 31.44 0.36 74.1n 26.68 0.6 7R.60 47.16Rainfed rice 0.16 50.55 8.09 - 0.24 50.55 12.13 -Irrigated rice - - 0.40 74.10 29.64 - - - 0.6 74.10 44.46Mize 0.08 22.90 1.83 - 0.12 22.90 2.75 -Soybenn 0.04 28.60 1.14 - 0.06 28.60 1.72 -"itze/mungbean 0.08 2S.80 2.06 0.12 47.30 5.68 0.12 25.80 3.09 0.18 47.30 8.51

Total 30.90 66.76 46.37 100.13

Htred Labor InputsIrrtgated rtce TD 0.24 r 63.00 15.12 0.40 { 63.00 25.20 0.36 1 63.00 22.6R 0.60 { 63.00 37.R0

MD 4 25.00 6.00 ( 28.O0 11.20 4 25.00 9.00 4 2k.00 16.80Ralnfed rice TD 0.16 { 42.00 6.72 - 0.24 42.00 10.08 _

MD | 23.40 3.74 - 1 23.40 5.62 -Irrigated rice TD - - - 0.40 63.00 25.20 - - - 0.60 4 63.016 37.80

MD - - - 28.00 10.00 - - - * 25.00 15.00Maize TD 0.0A { 16.80 1.34 - 0.12 16.80 2.02 -

MD 4 13.00 1.04 - 4 13.00 1.56 -Soybean TD 0.n40 16.80 0.67 - 0.06 16.-0 1.01 -

MD 15.60 0.62 - 4 15.60 0.94 -MaLze/nungbean TO n.0R 4 16.80 1.34 n.12 1 16.80 2.02 0.12 1 Ih.80 2.02 0.18 { 16.80 3.02

mD ' 15.60 1.25 ' 18.20 2.18 ' 15.60 1.87 * 18.20 3.28

Totail TD 25.19 52.42 37.81 78.62MD 12.65 23.38 18.99 35.08

Total 37.84 75.80 56.80 113.70

IPEDA /a 0.40 8.50 3.40 0.40 18.10 7.24 0.60 8.50 5.10 0.60 21.20 12.72Water contributiono n.40 2.78 1.;& n.40 R.95 3.58 0.60 2.78 1.67 0.60 8.95 5.37

Met Agric. Income 272.39 670.84 4n8.52 1.on4.41

OF-farm incore/b MD 12 MD 6.00 7 MD 3.50 6 MD 3.00 in MD 5.00UD 1it WD 5.00 8 UD 4.00 5 WD :.50 6 UD 3.00

Total Net Incnue 281.39 678.34 414.n2 1(112.41

Per Farm Family 283.39 67a.34 414.02 1,012.41Income par capita /c 61.61 147.47 9n.nn 220.09

/a See Tj.bles 17a and 17b for caktalatton of IPEDA and wjatxr c ntrthutions.Ab- Asuue sufficient employment extuts to take up 5S of the surplus lahor at Rp Sn0/dev.

T__ Assume 4.6 persnna per ftmily.

Page 97: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

JUSIX 2

cmin tue MLTfSutU6 DIW AD un C:macoa mtCCr

ar. t amb. iteas, - ear-teeator (Pter. Mit, sad Pz. WiLeet P_. ecU

0_ F_ (382I f_, 0.0 N. (3: fr.) 0.0 b ( fare.)Fete. without Pate. with1 ihene wstht tr wIth tr. witet ee with

Arms Pr ha Tta Are Pr be At ra Per be Tbtat ra er ha total ACe rer h TeeL -Ae. Par a Ta(ha) - Cp000) - (ha) - (teO0o) - (a), - (

6P0w0) - (ba) - (BCPo) - (ha) - (Woo) - (a) - (pooo) -

Irrlpted rt. U 0.027 777W00 20.96 0.2e 660.00 36o.00 0.0o 777.o0 26.65 0.40 640-.0o 336I00 0oa 777.00 Z.16 0.60 640.00 504.00Whnfed rice . 0.165 691.00 326.21 - - - 0.37 693.00 250.61 - 050 093.00 366.30 - -IrrIgted ris a 0.012 7m.0w 9.32 0.2D 8J2.00 170.40 0.02 777.40 IS.S0 0.0 662.00 352.40 0.03 777.00 23.31 0.60 862.00 52.20klwi. B4 - - _ - - - - _ _ _ _ _ _ - - _ _

h1w D .l1s 135.0 3L22 - _ - 027 131.O 36.05 - - - 0.40 135.00 0.C0 - - -eawfan n 0 0.015 200.00 4.59 - - - 0.03 300.00 9.16 - - - 0.04 300.00 .2.20 - - -

43A3/esoea L 0.026 28.50 7.50 0.00 324.50 19.47 0.05 26.50 10.62 0.12 320.5 33.90 0.06 26.so 23.80 0.36 320.50 56.0Surja.s L 0.0e2 2s7.50 LBS - - - 0.02 357.50 1.1S - - 0.03 157.50 4.72 - - -

i.t.t 0.012 390.73 0.40 320.67 0.61 370.00 0.92 727.70 1.22 507.59 3. 1.091.61

topping tccgeliy 2.00 2.30 2.01 2.30 2.03 2.20

EUptite, n er t

Irrlgated rice 0.027 56.S5 3.48 8.20 72.65 16.57 0.05 54.65 2.74 0.40 72.85 29.1 0.06 54.65 4.19 0.40 72.5s 03.17Ialted rice 0.165 SO.S5 9.35 - - - 0.37 50.55 38.70 - - - 0.56 50.55 23.30 - - -IrrIgaed rice 0.012 50.55 0.607 0.20 50.55 30.33 0.02 50.55 1.011 0.40 50.55 20.22 0.03 50.55 1.52 0.60 50.55 30.33361.. 0.135 22.99 3.3o - - - 0.27 22.90 0.16 - - - 0.40 22.90 9.30 - -bloaseybns, 0.02S 236.27 0.5s - - - 0.03 30.27 t.09 - - - 0.00 30.2? 3.05 - - -iskize.agban, 0.026 25.50 0.07 0.06 47.30 2.0 o.os 25.60 1.29 0.12 07.30 5.66 0.0 2S.60 2.00 0.36 07.30 6.51SorenL 0.0l2 36.03 0.37 - - - 0.02 14.03 0.23 - - - 0.03 34.03 0.42 - - -

mteal 35.92 27.52 33.29 55.04 07.20 62.55

Aired Ltbar lepesIrrigated rime TD 0.0271 3.00 1.70 0.20 1 63.00 126O0 0.05 3 .0o 3.15 0.0 63.00 25.20 0.06 03.0o 5.00 0.60 1 63.00 37.60

40 25.00 0.6715 25.00 5.00 25.00 3.25 25.00 10.00 25.00 2.00 25.0 35.00Related ric TO 0.1t6) 62.00 7.77 - - - 0..37 102.00 15.54 - - - 0.50) 62.00 23.52 - - -

EU 23.40 0.33 - - - 23.40 6.64 - - - 23.60 13.10 - - -

Irrigated rtce TD 0.0121 62.00 0.50 0 20; 4200 3.40 0.02 402.00 0.64 * 0240 16,80 0°03 I1G 00 0.30 0.60 42.00 25.20"O 23.00 0.28 mo2o0 4.40 23.6 0.07 22.00 68.0 13.00 0.39 - 22.00 11.20

Wa w TD 0.235 10.80 27 - - - O. 36.610 0.54 _ _ _ 30.0 6.72 - - -3 * 13.00 1.75 - - - 33.00 3.51 - - - 15.60 0.24 - - -

lbiwfe.oybean T 0.0253 16.60 0.252 - - - 0.03) 116.60 0.50 - - - 0.0 0 0.67 - - -- 15.60 0.23_ - - -1O 0.07 15.60 0.62 - - -.lkwIsmiOaa TD 024 t0.60 O." 0.06) t1.80 tOt 0.05) It6ao ° 0.12 1 t.8 2.02 0.00) 10.60 1.14 0.16 1.0 31.2

EU 25.40 18.620 1.09 15.00 0.76 28.20 2.181 15.60 1.21 16.20 3.23s_hw TD 0.012) s. e 0.02) - - - - -

.30 6.50 0.102 - - - 0.2 6.50 0.37 -- - - 6.3 .50 0.26 b

Total TO 12.93 22.01 25.58 40.02 37.7 00.02-ID .77 10.09 15.31 20.96 - 23.86 31.4

Total 20.71 32.50 40o.9 0S.00 01.65 97.50

16M0 1. 0.20 6.30 t.70 0.20 33.90 2.76 0.00 6.50 3.40 .4O 13.90 5.56 0.60 6.50 3.16 0.60 13.30 9.76Mater cZ-etbecia. 0.20 O.S 0.17 0.20 6.9s 1.79 0.40 0.65 0.30 o0'o 6.95 3.56 0.40 0.65 0.51 0.60 6.9 5.37

mot ane. baes 1S2.21 2".26 296.06 539.506 05.95 890.03

o0f-far. Ioe. lb 2 MD 12.00 14 MD 7.00 32 3D 0.00 7 M 1.50 oIs .0oo 1o PM 5.0020 MD 30.00 16 M 8.00 10 VD s.00 a 33 0.00 5 MD 2.50 6 VD 3.00

Total e Inote 174.21 314.3 309.06 4600.06 *60.45 900.01

Per fae fartly 170.23 314.2 209.011 606.06 000.45 904.41Inome per capita Ic 37.67 68.32 67.19 131.75 100.10 196.61

Is See Table 17. am? 17b for calcol,eto, of 1PE3 and *water couurtibca.7i a s teice an mch labor t- avaIlable as os 0.4 ha fer *d that Emc emplooyent e lertea1tlee eulat.7;.6 Person per fatly.

Page 98: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

f ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~hr 2'

- v~~~~~~~~~~~~~-.

-e OHM t" Tr_tWI DnS PM TWCAnT r

0.2 ha (20Z tfer) 0.4 wae f35 tern) _.6 ha (- ter)Pruet Urouruiect _remt t roe1et _ enet Preeroalec

Arm per be Total Ara Perks Total Arm fPr b TbOt Area Per l Totl Ares Per h Tbol Area -er to Tota(he) - (npe0o)- g) -h. Ofi ) - CM) - (pnU)- bs) - ) - h (Rp ) - (ha) - (Rno1 0 ) -

tainted rice V n.170 S23t.0 3.76 0.170 19.n )0048 0.34 52.0D 179.52 0.34 "4.0 20."9 0e.51 ¶2.0 244.21 0.11 I 94.0 302.94ats V 0.0n6 144.0 2.30 0.03 144.0 2.3n 0.0 144.0 4.12 0.m 0 44.0 4.12 0.05 144.0 7.20 0.05 144.0 7.20

ralm, n n.10 1444.0 15.34 0.11 34. 114 0.22 244.0 31.s3 0.22 144.0 33.43 0.33 14.0 47.52 0.33 144.0 47.52s.basn nI n.o70 301.0 21.07 0.070 294.0 2n.53 n.15 101.0 42.14 0.14 24.0n 43.14 0.2 301.0 41.21 0.21 294.0 n1.74NI/r n 1. n.170 10.s0 S.05 n.170 30n,n s51n 0.34 305.0 01.70 0.14 3m.o 12.o n0.5 3105.0 S55.35 0.51 300.0 153.00

Total O.54 13nJ02 0.536 190.7 1.07 143.3 1.07 31J.12 1.61 W42.74 1.3 372.4n

cropptng intmeo i (2) 2.430 2ARB 2.64 2.3 2.34 2.43

_uveedItc on aerl,,lturo T"estsRalnted rVc I n.170 24.38 4.145 0.170 27.s1 4.70 0.34 24.3 8.29 0.34 27.15 *.0 0.5 24.3R 12.43 0.51 2745 14.10_les v n.034 7.20 0.115 0.01o 8.20 0.3 0D03 7.2n 0.22 0 3 .20 0z.25 0.45 7.20 0.36 0,05 3.20 0.41M1stee l 0.130 7.20 0.79 0.110 3.20 n0n 0.22 7.20 1.3 0.22 A.20 1.30 0.33 7.20 2.3 0.33 3.20 2.70Way?..n, n n.070 21.40 1.49 0,0m zl0o IA?7 0.14 21.40 2.99 0.14 21.00 2.94 02 21.40 4.49 0.21 21.00 4.41Faiiss/n-yh , . 0n.170 13.20 30 .l70 3.w0 3.23 n.34 3.20 S1.9 0.34 19J00 6.46 0,31 t1.2n 9.23 0.51 19.0 94

TOal 9.13 10.43 t9.27 2n.35 23.44 31.31

aired tluber luvtftlefed rice ID 0.170 42.00 7.14 0.170 42.0n 7.14 0.34 42.40 14.23 0.34 e2.no 14.23 0.51 42.o 21.42 0.51 42.00 21.42

Pe n.170 5.88 0.9 0.170 13.70 1.9 0.34 1.33 1.47 0.34 11.70 3.33 0.51 s5on 2.9 0.51 11.70 5.97MatDe 0.016 162tD 0.27 0.016 14.D 0.27 n.0n 14.0 0.50 0.03 14.30 0.0 D.S 11.n 0." O.C5 11.30 0.34

D 0n.m1 3.00 0.05 0.014 4.Sn 0.10 .0n 10n o.09 n3 6.50 n.19 0.0s 3.0 0.15 0 .0 1.50 02ain Tn 0.110 14.8o 1.35 3.110 t140 185 n.22 16.51 3.69 0.22 16J10 3.19 0.33 14.30 5.54 0.31 16.80 5.54

1 n0.1o 3.0 n.33 n.110 1S0n 0.72 .22 3.m o.34 n.22 6.50 1.41 o.3 14010 O." 0.33 6.50 2.14.obean Tn 0.070 11.30 1.13 0.070 11l8 1.13 0.14 161.30 2.35 0.1 16.30 2.35 02 1340 3.53 0.21 16.30 3.53

PS nDm 4.0 0.2n 0.070 7.30 n0.5 n.14 4.00 0.56 n.14 7.3M 1.04 021 4.00 0.34 0.21 7.30 1.64steeoaan To n.17 16.W 2.3 0.1 1.o0 2.36 0.34 14.3 5.71 0.34 16.30 5.71 0.51 16.30 3.57 0.51 1S.3 3.57

m 0.170 4n 0 0.7n 0.17n 7.r0 1.33 0.34 4.0n 1.36 0.14 7.30 2.45 0.51 4.00 2.04 0.51 7.30 1.9

Total m0 13.30 33.3n 24.53 24.S3 39.90 5.9n- 2.34 4*9 464 9.34 6.93 14.05

TOal 35."4 Men9 31.17 35.37 44.3 53.95

1730 ia n.sn 1.70 3.50 1.70 3.50 3.40 3.50 3.4O 3.n 5.10 3.50 5.10Voter contributtor - - - - - - - -

Net Aeriemltural.mne 133.5 160.53 307.52 321.00 441.34 02.04

0ff-trm teens lb M 12 4.0 12 4 l0 10 5.0n 10 3.0o 3 4.00 a 4.00MD 10 5.00 to 5.00 5 2.50 3 2.50 5 2.50 3 2.50

Total Net Tor_so "4sJ15 171.5 3S.n2 321.S 443.34 483.54

per Prs owsIly 164.3S 171.53 315.02 2.10 468.34 438.54Per Capita Ic 35.34 37.30 6343 71.41 101.01 106.20

la Soe Tables 37 and 17b for calculation of 2PCDA mg or coetribofnlos.Db Asne suficient employment exists to take up S of Co erpnL lAbor at

Tp 50014g..

7T Aenea 4.5 person per faity.

Page 99: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANN=X 2- gl - Table 16b

KEMUNC ONDO MULTIPMRPOSE DAN AND IRRICATTOI PROJECT

Farm Rudget Sedadi - Owner-nOerator

0.4 ha (301 farm.) 0.6 ha (19.5Z farmst)Present Preprolect Present Preprolect

Area Per ha Total Area Per ha Total Area Per ha Total Area Per ha Total(ha) - (ltpOO0) - (ha) - (l!p000) - (bie) - (tp'OOO) - (ha) - (Utp'000) -

Crosa RevenuesIrrigated rice U 0.36 577.50 207.90 0.36 684.00 246.24s 0.55 577.50 317.62 0.55 68R4.00 376.20Itainfed rice V 0.03 495.00 14.85 0.03 576.00 17.28 0.05 495.O0 24.7¶ 0.05 576.00 2R.80Irrigated rice n1 0.18 660.00 118.80 0.18 78r.20 140.62 0.27 660.00 178.20 0.27 781.20 210.90Malze 0 0.05 126.00 6.30 0.05 135.00 6.75 P.08 126.00 10.08 0.08 135.00 10.80So-ybea 0 0.03 258.00 7.74 0.03 2-52.00 7.56 0.04 258.00 10.32 0.04 252.00 10.0814alze/soybean ntL 0.05 244.00 12.20 0.05 249.50 12.4R 0.08 244.00 19.52 0.08 249.50 19.96

Total 0.70 367.79 0.70 430.93 1.07 56.91.n7 667

Cropping intensity (Z) 1.75 1.75 1.7R 1.78

Fxpendl ure on Axrf-cultural InputsIrrigated rice v 0.36 26.80 9.65 0.36 30.05 10.82 n.55 26.80 14.74 0.55 30.05 16.53Painfed rice U 0.03 24.3R 0.73 0.03 27.65 0.83 0.05 24.38 1.22 n.05 27.65 1.38Irrigated rice P 0.18 24.3R 4.3q 0.18 27.65 4.98 0.27 24.38 6.58 0.27 27.65 7.47Maize n 0.05 7.2n 0.36 0.05 8.20 0.41 0.08 7.2n 0.5R c.08 R.20 0.66Soybean n 0.03 21.40 0.64 n.03 21.00 0.63 0.04 21.40 0.86 n.04 21.n0 0.84Maize/soybean n 0.05 18.20 0.91 0.05 19.00 0.95 0.08 18.20 1.46 0.08 19.00 1.52

Total 16.68 IR.62 25.44 28.40

fired Labor InputsIrrlgated rice TD 0.36 50.40 18.14 0.36 50.40 1R.14 0.55 50.40 27.72 0 50.40 27.72

n- 6.9n 2.48 16.90 6.08 6.90 3.79 16.90 9.29Painfed rice TD 0.03 42.00 1.26 0.03 42.00 1.26 0.03 42 n.0 126 O.n3 42.00 1.26

no 5.80 0.17 11.70 0.35 5.80n 0.17 11.70 0.35Irrigated rice Tn 0.1A 33.60 6.05 0.18 33.6n 6.05 O.IR 33 .6n 6 05 0.8 33.60 6.n5

TI 5.80 1.04 11.70 2.11 5.80 1.04 11.70 2.11maize To 0.05 16.80 0.84 0.05 16.80 0.84 0.05 16.80 0,R4 0.05 16.R0 0.84

MD 3.00 0.15 6.50 0.32 3.00 0.15 6.50 0.32Soybean Tr 0.03 16.80 0.50 0.03 16.80 0.5(j 0.03 16.R0 0.50 0.03 16.R0 0.50

no 4.00 0.12 7.80 n.23 4.00 n.12 7.80 0.23Maizelsoybean TO 0.05 16.80 0.84 6 .05 16.80 O.84 0.n5 16.Rn 0.84 0.n5 16M80 0.84

Mn 4.00 0.20 7.Ro 0 30 4.00 0.20 7.8n n.39

Total TD 27.63 27.63 37.21 37.21mn 4.16 9.48 5.47 12.69

Toral 31.79 37.11 42.68 49.90

IPEDA Ia 12.10 4.84 12.10 4.84 14.2C- 8.52 14.20 8.52Water contributions 4.80 1.92 5.24 2.10 4.RO 2.R8 5.24 3.14

Net AgriculturalIncome 312.56 36R.29 480.97 566.78

Off-farm Income tb MD 10 5.00 10 5.00 8 4.00 R 4.00VD 8 4.00 8 4.00 5 2.50 5 2.50

Total Met Income 321.56 377.26 487.47 573.28

Per Farm Faully 321.56 377.26 4R7.47 573.28Income per capita Ic 69.90 82.n0 105.07 124.63

/a See Tables 17a and 17b for calculation of TEPlDA and water contributions.r Aseome mufficient eiplov ent exists to take up 52 of surplus labor at 2p 500/day.Tc Assume 4.6 persons per family.

Page 100: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

AYNEX 292 Table 16c

DONFSIA

KEDUNG 011 MNLTIPTTRPOSE DAK AND TRRIGATInN PP1OJPCT

Farm Budget Xlambu Kri - Ouner-Operator

0.4 ha (302 farms) 0.6 ha (19.5Z farms)Present Preproject Present Preprolect

Area Pe- ha Total Area Per ha Total Area Per ha Total Area Per ha Total(ha) - (Rp'000) - (ha) - (tp'000) - (ha) - (Up'OOO) - (ha) - (Rp'0OO) -

Cross RevenuesIrrigated rice U 0.24 478.50 114.84 0.24 576.00 138.24 0.36 478.50 172.26 0.36 576.00 207.36Rainfed rice w 0.16 445.00 71.20 0.16 540.00 86.4n 0.24 445.50 106.92 0.24 540.00 129.60Irrigated rice D - - - - - - - - - - - -

Iafize D 0.08 90.00 7.20 0.08 108.00 8.64 0.12 90.00 10.80 0.12 108.00 12.96Soybean D 0.04 258.00 10.32 0.04 252.00 10.08 0.06 258.00 15.48 0.06 252.00 15.12naize/mungbean L 0.08 220.00 17.60 0.0 229.00 18.32 0.12 220.00 26.40 0.12 229.00 27.4R

Total 0.60 221.16 0.60 261.68 0.90 331.86 0.90 392.52

Cropping Intensity (X) 1.50 1.50 1.50 1.50

Expenditure on Agri-cultural Inputs

Irrigated rice U 0.24 26.80 6.43 0.24 3n.05 7.21 0.36 26.80 9.65 0.36 30.05 10.82Rainfed rice v n.16 24.38 3.90 0.16 27.65 4.42 0.24 24.38 S.85 0.24 27.65 6.64Irrigated rice n - - - - - - - - - - -

Naize D 0.0R 7.20 0.5R 0.08 8.20 0.66 0.12 7.20 0.86 0.12 R.20 n.98Soybean n 0.04 21.40 0.86 0.04 21.00 0.84 0.06 21.40 1.28 0.06 21.00 1.26Maize/mungbean L 0.08 17.80 1.42 0.08 18.90 1.51 0.12 17.80 2.14 0.12 18.90 2.27

Total 13.19 14.64 19.78 21.97

'lred Labor InputsIrrigated rice TD 0.24 50.40 12.10 0.24 50.40 12.09 0.36 50.40 18.14 0.36 50.40 18.14

-.a 6.90 1.66 16.90 4.06 6.90 2.48 16.9O 6.08Rainfed rice T) 0.16 42.00 6.72 0.16 42.00 6.72 0.24 42.00 10.08 0.24 42.00 10.08

, 5.80 0.93 11.70 1.87 5.80 1.39 11.7 2.81Irrigated rice TD - - - - - - - - - - -

MD - _ - _ _ _ _ _

Maize TN 0.08 16.80 1.34 0.08 16.80 1.34 0.12 16.80 2.02 0.12 16.80 2.02

14) 3.00 0.24 6.50 0.52 3.00 0.36 6.50 n.78Soybean TDn 16.80 0.67 0.04 16.80 0.67 0.06 16.80 1.01 0.06 16.80 1.01

14 4.00 0.16i 7.80 0.31 4.00 0.24 7.80 0.474aizeIuun8bean TD) 0.08 116.80 1.34 0.08 16.80 1.34 0.12 16.0n 2.02 0.12 16.80 2.02

14 4.00 0.32 7.80 0.62 4.00 0.48 7.80 0.94

Total TD 22.17 22.16 33.27 33.27140 3.31 7.3R 4.95 11.08

Total 25.48 29.54 38.22 44.35

IPEDA (a 8.50 3.40 8.50 3,4n R.50 5.10 8.50 5.10water contributions 2.17 n.87 2.37 0.95 2.17 1.30 2.37 1.42

Net Agricultural

Income 17R.22 213.15 267.46 319.68

off-farm income lb Mn 12 6.on 12 6.0n 6 3.00 6 3.00WD 10 5.00 10 5.00 5 2.5n 5 2.50

Total Net Inco e 189.22 224.15 272.96 325.18

Per Parm Family 189.22 224.15 272.96 325.18Inecome per capita /c 41.13 4R.73 59.34 70.69

/a See Table 17a and 17b for calculation of IPEnA and water contributions.T7 Assume sufficient employment exists to take up 5Z of the surplus labor at Rp 500/day.

7T Assoue 4.6 persons per family.

Page 101: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

AUn 2-0- Table 14d

KmiWW: #WU W.LTTPURP_SK DA" ANeD 2.t0.flIW PfircT

ar. Un_et inbIm lanes - ibmarO-pwator

0.2 he (Il Verse) 0.4 be (32 rerms) 0.6 ha (14.5? fers)'reset preprelt r t Prprolct rt Presroect

Are Per be Toal Area Per be Tota Arn Per he TotAA re Pr ha Total Ares Ver he -otaL Aret Per be Total(ha) - (spinon) - (ha) - (Dtpnn) - (he) - (Upwi-oe) - (ha) - (Rp-O) - Cho) - (nrnn) - (ha) - (sDnnn) -

Irrigated rte v 0.027 495.n0 11.37 0.027 630.00 17.01 0.05 495.n 24.75 0n.05 a0.00 33150 0.0_ 445.5 39.60n O.00 £33.nn 0 n.40alinfed rice v 0.16g 445.sn 71.23 0.1n5 S40.0n 09.90 0.32 44s.s0 142.60 0.17 5c0.00 104.30 0.6 *45.50 213.34 0.5s6n 540.0n 32M.4

tTrigeted rice n3 n.n12 495.00 5.94 0.012 6£3.00 7.SA 0.02 4Qs.n0 .90 0n.02 630.00 32.60 n.n3i 495.0 17.32 Q0.36 63o.nn n.60t6i nb n.1n0 00n.nn 3.10 0.135 103.00 14.53 0.10 90s.n 17.10 0.27 10l.le 29.16 0.27 40.00 24.30 0.60 1,n .nn 41.20NeiTeeseaybes n 0M.0 226.00 2.49 n.05 231.0o 1.47 0.63 22n.n 6.73 n.3 231.00 6.`3 0.03 226.00 7.46 0.065 231.0 10.39-ateas/lmrghAn t 0.013 22n0n. 3.96 0.2 229.00 5.95 0D0 220.0n 3.n n.0s 22.0n 13.65 0.nns 20n.n0 11.3 0.11n0 229.no 13.32sor$ns L n.nnp 0n0.n0 0.9n 0.012 I31.0 3.57 0.012 1nO.00 2.00 0o.2 134.00 2t.2 0.027 100.0O 2.7D o0ms 114.00 3.90

Tnte! 0.127 104.04 0.412 144.36 n.67 211.93 0.31 201.72 0.Q 317.30 3.26n 451.3R

Cropping itentntt (.) 1.4n 2.n00 1.67 2.02 3.63 2.n6n

tuenditure o AIri-en.irert Tin-ot

lrrianted rice V n0.27 26.60 n0.72 .n27 30.05 n03l 0.ns 26.30 1.31 0.05 30.os 3.50 n.mt 26.J0 2.16 n.mmO W0.05 2.4nPAinfed rice 3 0.13i0 26.33 3.90 1.185 27.65 5.12 0.32 26.33 7.30 0.37 27.65 In.23 n0.4u 24.3R 11.70 0.56n 27.65 15.43Trriated rin n0 .2 26.33 0.24 0.12n 27.65 3.32 0.02 26.33 n0.9 n0n2 27.61 0.55 0.036 24.33 0.33 0.036 27n7.6s5 0_tce a 0.090 7.20 0.65 0.13S 3.20 3.31 0.19 7.2n 1.37 n.27 3.2n 2.21 0.270 7.20 1.94 0.60n 3.2n 1.23mtizasoybsa n 0.011I 2.2n 0.20 0.035 19.00 0.29 0.03 3.20 n0.55 0.06 39.00 0.57 0.n33 1t.20 n.60. n0n4s t.nn 0.6atr.velrcangen 1. 0.13 37.30 0.32 0.026 13.0n 0.40 G.M 17.30 n.73 nns I3.9 0.93 0.054 17.30 n.36 n.040 13.9n 1.51

Soroom L n.nn0 0.40 0.006 0.012 0.43 0.006 0.02 0.40 n.01 0.02 0.41 0.03 n0.27 0.40 n.0 n.n35 0.64 n.02

Total 4.0 L1.15 12.27 16.02 24.54

Ntred Labor lnvrat

IrriAnel rtce T n.n027 50.4 1.16 2 .40 f13 n0.05 50.4 2.52 n s0 40 2.52 n on 50.4n 4.03 o.nno '0. n 4.03MD i.90n n0:3 16.90 0.46 o.0n n0305 3400 0.35 6.00 0ns55 19Qn 1.35

t;tafed rice TD n0.14 42.00 6.72 0.135 42 7nn .777 0.12 42 OM 133.46 n.17 42.00 15.56 0 o.u 2.0n 20n .6 o.s6 42.00n 23.5236 5.30 0.91 11.70 2.3 5.30 1.36 31.70 4.33 5 .30 7.73 13.70 6i.55

Trrtiatd ric 0 11.012 13.60 .40 0.012 133.4n 0.40 0.2 13640 0.a7 n.02 13.60 0.67 0.n36 33.60 1.21 0 n4 33 .4n 1.2110) 5.60 0.07 53.70 034 5.30an 0.12 1.7 0.23 5.53n n21 1l.70 0.47

aSw nl n.m 26.306 1.5 0.17 35 16.30 sn I n 6n 2.27 03 1.30 4 31 0.01 045 9 16. 4.n a56 0.400 16. 6n.2MD 1.00 0.27 6.50 0.30 1.00 0:.57 7.30n 0.23 1.0 n:1 06.50 2.60n

mairsloybean To n0.l0 16.30 0N.3 0n.05 16.30 025 0.03 36.30 5n0, n. m 34.3 0 031 16.30 05 0.065 16nn 0.76303 6.00 0nn 6 7.30 0'~ 6.00 0.122 A7.n4 0.23 4.M 013 7.3M 0.55

'Aixee/ssabf 01 2. 0.0I26 36:30 04 2. 3 n4 10 0o67 o.os 16.30 0. o.nsa 1i6.3 0I03 16 .3 136

rr*"A~~~~M 70> n: nown no n.l o. 22 2 2 ~ nm 0.20n6.0 0.6 7.30 0..949' .27.0 06

m 0.00 - 0.012 0.02 - - 0.012 - - 0.027 - - 0.035 - -- 1.00 0.en n3 4.S0 0.n0 3.00 n0n64 6.50 0.11 1. n n.0m 6.5n n.23

rotel 3Tl 10.47 I 32.40 20.09 20.63 11.40 37.5S103 1.60 4.64 1.24 6.23 6.73 32.12

Total 12.n7 36.53 24.21 26.R6 36.13 49.70

PEIIA /a 5.3n 2.n0 31n 1.70 1.30 2.12 3.5n 1.6n 5.30 .1. 3 .so 5.10Mater congrib..ticnn 0.66 0.33 n.73 0.145 n0.6 n,7 n.71 0.20 0.66 n.4n n.73 0.44

met AgrticlruralIncoes 3.70 120.12 173.n4 247.15 250.61 371.4n

Off-femr tone lb 2n m In,nn 10.002n 10.00 I3n s.03 5. 31 s.00 a 0 6.0n 3 pn 4.n0I- m 3.00 16 um 3.0 33UP 4.0 R u 4.0n 6 vn 10nn 6 3.0n

Thtal Net brone 3067 1I1.12 337.N0 256.13 26.63l 373.6

Per tern rautly 106.7 313.12 IR3.06 65A.3 2466.41 173.6Inea- per cotrs Ie 22.76 1n0nS77 56 57.46 Q2.3n

/a Sev TAble 17e snd 17b for c-ncnlatton of TPrWZ and dAter cntrwstione.7ii Anssa efftcient enployse"t elints to rAke op 5? of the mrplis lehor at Pp 500/dAe. Assue that is en .c _h lAbor is ewailahs on .n2 ha far an on

n.4 ha aras end that such seploiowet pportanttsn exit./c Ass_e 4.6 person per f-Ihp.

Page 102: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

AIR 2-94 S Table 17a

Page 1

INDONESIA

KEDUIIG ONBO MLTIPURPOSE DAN AND IRRIGATION PROJECT

IPEDA - Sidorelo

ScoresFuture with- Future

Criteria Present Preproject out project with project

Harvest pattern 12 12 12 31Irrigation 12 12 12 25Landslope 19 19 19 19Aluviu 15 15 15 1SSoil texture 5 5 5 5Soil color 4 4 4 4Height above sea level 5 5 5 5Flood damage to crop 4 4 4 4Soil cultivation 3 3 3 4

Total 79 79 79 112

Land class 9 9 9 3

Tariff 20,300/ai*7ii 8,500 8,500 8,500 23,7007W

Tariff per average farm (Rp):0.2 ha 1.700 1,700 1,700 4,0600.4 ha 3.400 3,400 3,400 8,120/a0.6 ha 5,100 5,100 5,100 14,2207iW

IPEDA - flambu Kanan

ScoresPreproject, Future

Criteria Present Future without project with project

Harvest Pattern 12 18 25Irrigation 18 18 25Landslope 15 15 15Aluvium 7 11 11Soil texture 4 4 4Soil color 2 2 2Height above sea level 5 5 5Flood damage to crop 1 3 3Soil cultivation 1 3 3

Total 65 79 93

Land Class /a 11 9 6

TariffRplha 5,300 8,500 13,900/b

16,3007T

Tariff per avrrage farm (Rp):0.2 ha 1,060 1,700 2,7800.4 ha 2,120 3,400 5,5600.6 ha 3,180 5,100 9,780

/a See Project File.

/b For total land holding of less than 0.5 ha.

/c For total land holding of greater than 0.5 ha.

Page 103: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

MANEX 2Table 17a

95 ~~~~~~~Page 2

IPEDA - Sedadi

ScoresPresent, preproject,

Criteria Future without project Future with project

Harvest pattern 25 31Irrigation 18 31Landslope 17 19Aluvium 11 11Soil texture 4 4Soil color 2 2Height above sea level 5 5Flood damage to crop 2 4Soil cultivation 3 3

Total 89 110

Land class 7 3

TariffRp/ha 12.100/a 20,300/a

14,2007b 23,7007Wb

Tariff per average farm (Rp):0.4 ha 4.840 8,1200.6 ha 8.520 14.220

irFDA - Klambu Kiri

ScoresPreproject, Future

Criteria Present Future without project with project

Harvest pattern 12 12 31Irrigation 18 18 25Landslope 19 19 19Aluviu 11 1i1 11Soil texture 4 4 4Soil color 2 2 2Height above sea level 5 5 5Flood damage to crop 2 4 4Soil cultivatton 3 3 3

Total 76 78 104

Land class 9 9 4

TartffRp/ha 8,500 8,500 1 18,1O0/a

21,2007W

Tariff per average farm (Rp):0.4 ha 3,400 3,400 7,2400.6 ha 5,100 5,100 12,720

/a Total land ow_nership less than 0.5 ha.

lb Total land ownership greater than 0.5 ha.

Page 104: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2-96- Table 17b

INDONESIA

KEDUNG 0MBO MULTIPUPPOSE DAM AND IRRIGATION PROJECT

Water Contribution Calculation /a

Future FuturePresent Preproject without project with project

Paddy price 140 153 179 179

Sidorejo per ha - - - 8,9500.2 ha farm - - - 1,7900.4 ha farm - - - 3,5800.6 ha farm - - - 5,370

Sedadi per ha 4,795 5,240 6,130 8,9500.4 ha farm 1,918 2,096 2,452 3,5800.6 ha farm 2,877 3,144 3,678 5,370

Klambu Kiri per ha 2,170 2,371 2,775 8,9500.4 ha farm 868 948 1,110 3,5800.6 ha farm 1,302 1,423 1,665 5,370

Klambu Kanan per ha 665 727 850 8,9500.2 ha farm 133 145 170 1,7900.4 ha farm 266 291 340 3,5800.6 ha farm 399 436 510 5,370

/a Water contributions/ha/year calculated as follows: irrigated ricecropping intensity multiplied by the value of 25 kg paddy/ha (usingfinancial price less 15% to account for moisture and impurity content).

Page 105: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INnONESIA

KEDIUN OMD) MIILTIPHIRPOSE DAM AND IRRIGATION PROJECT

Summary of Project Charges(Rp'noo)

Sidorejo Sedadi Klambu Kiri Klambu Kanan0.2 ha 0.4 ha 0.6 ha n.4 ha 0.6 ha n.4 ha 0.6 ha 0.2 ha 0.4 ha 0.6 ha

IPEDAPresent 1.70 3,40 5.10 4.84 8.52 3.40 5.10 1.06 2.12 3.18Future with project 4.06 8,12 14.22 R.12 14.22 7.24 12.72 2.7R 5.56 q.78Increment 2.36 4.72 9.12 3.28 5.70 3.84 7.62 1.72 3.44 6.60

Water ContributionsPresent - - - 1.92 2.88 n.87 1.30 0.13 0.27 0.40Future with project 1.79 3.58 5.37 3.58 5.37 3.58 5.37 1.79 3.58 5.37 wIncrement 1.79 3.58 5.37 1.66 2.49 2.71 4.07 1.66 3.31 4.97

O&M Labor /aPresent - - - 13.0 13.0 - - - - -Future with project 28.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0Increment 26.0 f26.0 26.0 13.0 13.0 26.0 26.0 26.0 26.0 26.0

TotalsPresent 1.7 3.4 5.1 19.8 24.4 4.3 6.4 1.2 2.4 3.6Future with project 31.9 37.7 45.6 37.7 45.6 36.8 44.1 30.6 35.1 41.2Increment 30.2 34.3 40.5 17.9 21.2 32,5 37.7 29.4 32.7 37.6

/a Farmers contribute 20 1D/year, valued at Rp 26,000/farm to O&M. In llpper Redadi, they contribute an additional10 MD/year/farm.

co

Page 106: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KEJDUNG OHRO M4 LTIPIlRPOSE DAM AND IRRIGATION PROJECT

Incremental Revenues (IPE)A. O&H C-ontributions, Wat:er Contributions)

Sidorejo Sedadi Klambu Xiri Klambu Xanan0.2 ha 0.4 ha 0.6 ha 0.4 ha 0.6 ha 0.4 ha 0.6 ha 0.2 ha 0.4 ha 0.6 ha

IPEDA 3.04 6,08 9.12 3.28 5.70 3.84 7.62 1.72 3,44 6.60NPV /a 11,15 22.30 33.45 12.03 20.91 14.08 27.95 6.54 13.07 24.89

Water Contributions 1.79 3.58 5.37 1.66 2.50 2.71 4.07 1.66 3.32 4.97 CINPV /a 6.57 13.13 19,70 6,15 9,27 9,97 14.97 6,10 14.60 18.24

n&M Contributions 26.00 26.00 26.00 13,00 13,00 26,00 26.00 26.00 26.00 26,00NPV /a 144.00 144.00 144.00 86.50 86.50 151.50 151.50 125.40 125.40 125.40

Total Stream ofContributions /b 161.72 179.43 197.15 104.68 116.68 175.55 194.42 138.04 153.07 168.33

/a Discounted at 1O% over project life of 30 years.

/b Sum of the Net Present Values of contributions.

Page 107: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIA

KFDUNG OHRO MI1LTIP1JRPOSE DAM AND IRRIGATION PROJFWFC

Cost and Rent Recovery Ik

Incremental Valueg per Farm(Rp '000)

Area: Sidorejo sedadi Klanbu Kiri Klambu KananFarm siset 0.2 ha 0.4 ha 0.6 ha 0.4 ha 0.6 ha 0.4 ha 0.6 ha 0.2 ha 0.4 ha 0.6 ha

At Full Airicultural DevelopentValue of farm production 189.97 384.53 575.58 313.23 457.02 478.58 717.87 173.16 353.74 524.02Less cash production costi/a 28,03 57.07 75.52 43.76 63.13 73.82 1l0.6 23.39 47.86 71.10

Net caah income 161.94 327.46 500,06 269.47 393.89 404.76 607.21 149.77 305.88 452.92

Lose imputed value of family labor/b 3.30 6.58 9.R7 8.42 12.72 46.55 40.n3 13.35 26,68 4n.04Less imputed value of manager/c 8.10 16.37 25.00 13.47 19.69 20.24 30.36 7.49 15.29 22.65Lesa allowance for risk/d 16.19 32.75 40.00 26.95 39.39 40.48 6n.72 14,98 3M.59 45.29Less general taxes/e 9.50 19.23 28.78 15.66 22.85 23.93 35.89 R.66 17.69 26.20

ProJect Rent 124.85 252.53 386.51 204.97 2Q9.24 273.56 440.21 In5.29 215.63 31t,74

IPEDA 3.04 6.08 9.12 3.28 5.70 3.4 7.62 1.08 2.16 6.60nWater contributions 1.79 3.58 5.37 1.13 1.69 2.47 3.70 1.62 3.24 4.Rfil06M contributions /f 26.00 26.00 26.00 13.no 26.00 26.00 26.no 26.no 26.00 26.00

Discounted flows over Prolect Life ILProject rent 699.92 1,415.90 2,165.65 1,363.64 1,990.83 1,683.45 2,695.21 562,94 1,159.61 2,739.77Project costs (includingphysical contingenciea) 623.00 1,246.00 1,869.00 1,246.00 1,869.00 1,246.00 1,869.00 623.00 1,246.00 1,869.00

Operation and maintenance costs 45,50 91.00 136.50 91.00 136.50 91.00 136.50 45.50 91.00 136.50IPLDA/water contributions 17.72 35.43 53.15 18.18 30.18 24.n5 42.92 12.64 27.67 43.13o&M contributlons 144.00 144.00 144.0n 86.50 86.50 i51.5n 151.50 125.40 125.40 125.40Direct cost recovery (Z) /h 26.00 14.40 10.60 8.40 6.2n 14.10 10.40 22.20 12.30 9.00Rent recovery (1) /A 23.00 13.00 9.00 8.00 6.00 I1O0 7.0n 25.00 13.00 6.00o&H recovery (%) LF 355.40 197.10 144.45 115.03 85.50 192.91 142.09 303.00 168.00 123.0n

/ Includes cost of hired labor.Calculated from famfily labor requirements distributed monthly.

75 S2 net cash income.7T1 102 net cash income.We 52 grosa farm output.z An incremental 20 man-days labor per year per farm are supplied by the farmer for O0H activity. Value at PP 1,300/day. In Upper Sedadi the present 10

man-days supplied are increased to 20 man-days per farm per year.IR Net prevent value, discounted at Inz over the project life (30 years).4h Cost recovery index - discounted stream of charges divided by discounted stream of cost as I7? Rent recovery index * discounted atream of charges divided by diacounted stream of projectred rent as X II

0 041 recovery index * discounted stream of charges divided by discounted cost of 0414 as 2.

Page 108: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

IRM$MqFTA

YP.nfl1 fWIn PIILTIPIIRPnOs nA7 A8n TP.QTCATTON PPWJT

Summtry of Tntal hgricultural tsbor ljpuiremnt; e Project Dhame Per CroppingS Year('Innn labor days)

n 'I n J v w4 A ' J J A C 'otal

Prapent Tn 244.65 128.41 448.95 - - 47.40 11.60 26.25 7A.74 -- - I,nn0.n01) 989.79 1,m34.79 1,252.86 528.A1 282.,7 1,010.2s 870.89 194.43 507.86 V02.0* 320.56 422.30 7,717.19wn 129.5 98?.00 642.74 1,237.87 602.11 647.36 829.30 197.3n 284.23 450.Rx 233.93 255.74 6,504.27

(Amount I VD * 0.6 PM) Equivalent M 3,n67.54 1,621.99 1,638.53 1,271.23 64.17 1,398.67 1,36d.15 312.93 813.49 576.21 £60.92 .75.74 11,619.75

Praouraect Tm 246.65 M3A.N8 481.45 - - 47.4') 11.60 30.54 9..60 - - - I ,061.12 114) 1,276.83 1,062.74 1,311.21 569.49 346.08 1,042.45 898.49 215.88 583.1* 338.55 354.88 483.45 125,20un' 521.60 904.64 649.63 1,290.77 64.113 670.36 864.40 197.50 310.68 521.23 255.3s M92.63

rqulvdlent "0 I.5I9.79 1,659.55 1,721.11 3,163.95 735.0t7 1,44.67 1,411.13 334.38 771.59 651.29 508.11 659.02 12,849.62 I

Future Without Project TO 219.29 241.28 481.45 - - 47.4n 11.60 Inf.4 91.60 - - - 1,145.165MD 1,276.83 3,062.74 1,331.21 549.49 346.08 1,042.45 3,081.43 227.73 597.03 338.55 354.88 647.55 8,895.93up 521.60 994.64 649,83 1,290.77 648.31 67n.36 A54.4n 237.0n 310.68 521.2 3 25.38 292.63 7,246.86

Equtvalmnt ' 1,589.79 1,659.55 1,721.11 1,361.95 735,n7 1,444.67 1,59.405 169.0*40 1,097.79 1,720.86 1,305.48 415.16 593.40',o76.90 1,780.2,l 186.60 807.24 1,157.40 89.10 12,5S6.95

Equivalent M' 13,97,7n 2,735.57 1,655.59 1,147.02 427,25 1,958.22 4,569.18 3,809.87 1,186.80 2,042.69 1,988.16 498.6 21,916.65

II

Page 109: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Kr7W11n WAn WILTIPITYP0R3 "AN AIM TRUTOATTIW V4nJVcr

r.conointc Costa *nd TeneFt ts (S milion - Jan 1985 value.

Construction Land acquisition Adainti- W4e /a Tnere- Tcere- Iera- locre-Dan and TrJns. & Irrigation Total rquip. a Dam and Irrigation tration A flavn Irrig- mental mental ental mental

atructures PAM plant/b system /c onstrue- servtces/d reservoir ayatm overheads/o river Power tion total agrie. pover /Ih total Nat(rr * 0.9) (cr - n.9 (Cr * o.1T tion cot (CT * I.Y (Cy * 2.0) (Cv - 1.0) r CP * Mms vorks/f alant areas costs eenefitx benefits bonefits benefits

1935 22.05 - - 11.05 5.73 8.50 n.60 n,sn - - - - 26.73 - - _ -26.7.1996 10.68 1.44 4.84 17.n fi.An .. 11 .. °4 2.32 - - - - 33.33 - - - -33.U1937 13.12 7.23 27.5n A7.35 6.35 4.7n 1.36 .s - 0 - 0.31 - 4.42 - - - -64.4219U3 6.15 2.47 32.00 41.32 4.13 2.1n L.s5 n.45 n.31 - 0.27 52.33 7.72 - 7.72 -44.2l19A9 0.3q 14.30 15.19 0.50 2.54 0.45 0.31 0.12 0.43 19.54 18.92 6.16 25.03R +.541990 2.34 2.34 0.50 0.45 0.31 0.12 M.A4 4.36 30.12 6.16 36.23 +31.921991 0.45 0.32 0.2 n.67 1.55 37.11 6.16 43.27 441.721992 n.45 n0.3 0.12 0.67 1.55 40.63 6.16 46.79 +45.241993 0.45 M.31 0.12 0.67 2.55 40.93 6.16 47.09 445.541994 0.45 M.32 n.12 0.67 1.55 40.93 6.16 47.09 445.541995 n.45 n.11 0.12 n.67 1.55 40.93 6.16 47.0q 445.54lq6 0.45 M.31 0.22 0.67 1.55 40.93 6.16 47.0W +45.54

1997 0.4s n.32 0.12 0.67 1.55 40.93 6.16 47.09 445.541998 0.45 n.31 0.12 0.67 1.55 40.93 6.16 47.09 +45.542999 nO4s 0.31 N012 n,67 1.55 40.93 6.16 47.09 445.542noo 0.45 n.31 0.12 0.67 1.55 40.93 6.16 47.09 445.542n01 0.45 1.16 0.12 n.67 2.42 40.93 6.16 47.09 +44.672no2 0.45 .32 n0.2 2.39 3.27 40.93 6.16 47.09 443.322003 0.45 0.31 0.12 0.67 1.55 40.93 6.16 47.09 +45.S42nn0 N045 031 0.2 0.67 1.55 40.93 6.16 47.09 445.542005 n.45 n.31 0.12 0.67 2.55 40.93 6.16 47.09 445.542006 0.45 0.31 0.12 0.67 1.55 4n.93 6.16 47.09 +45.542MO7 0.45 0,31 0.12 0.67 1.55 40.93 6.16 47.09 445.542nn0 0.45 0.31 0.12 0.67 2.55 40.93 6.16 47.09 445.542nw 0.45 0.31 n.12 0.67 1.55 40.93 6.16 47.09 445.542010 0.45 0.31 0.22 0.67 1.55 40.93 6.16 47.09 445.542022 0.45 0.31 0.12 0.67 1.55 40.93 6.16 47.09 445.542012 n.45 n.31 0.12 0.67 1.55 40.93 6.16 47.09 +45.542011 0.45 n.31 0.12 0.67 1.55 40.93 6.16 47.09 445,542024 A.45 0.31 0.12 0.67 1.55 40.93 6.16 47.09 445.54

Total 412n 122.53 60.91 134.76 23.51 21.65 3.90 13.46 12.15 9.5S 3.12 19.04 241.10 1.034.96 160.16 1.195.12 954.02

NPVLI 33.07 9.25 56.7n 99.02 12.71 17.94 3.17 9.70 3.12 2.56 0.75 4.45 159.42 239.51 33.54 273.05 113.62

e- 17.42/i

r aeonoie coats based on base 4 physlcal financial costs adjueted for conversion factors. bysicatl contingencies, lO2 d_ embanlnt. 102 otber volt Ineluding poimr component.tneludee transmission and witechyard, does not include the slcro-hydroe.Average physical contingency ti 122. Ineludes aajor structures In Irrigation areas.

E Rquipwnt, consultants. Includes equiptwnt for n4i of S2.6 million (only for Irrigation mnd down river vorks) and physi a ntin en y of 52.Pased on administration coats of S13.4 million.CAN1 for 3erang Drainage and Flood Proteetion Works.

7 t Irrigation 04A equipment (82.72 million) and dowuriver 0n equiment (90.37 million) replaced in 15th year. CT - 0.75 for trrigation CAN, 0.9 for d nd downriver 06N2, and 0.95 forpower 0n^4

/h Pover benefits equated to tatiff revenme after deducting 152 for trenmission losses. See projeet flle background note.j Projeet life - 30 years. If project life to extended to 5n years., ER Inereases frm 17.42 to 17.61.3 Diseounted at Int.

Page 110: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANfEX 2

-102 - Table 21

INDONFSIA

IKEDUNG O0I MLTIP RPOSR DA1I AND IRRICATION PROJECT

Economic Analvsis of Irrigation Component as a Single-Purpose Project(US$ million, Jan 1955 values

Net benefitsNet benefits Net benefits from single-multipurpose due to fuel purpose irriga-

'roject /a savings tion project /b

1985 -20.56 - -20.561986 -42.11 -2.79 -39.321987 -82.43 -10.99 -71.441988 -66.09 -5.28 -60.811989 +4.53 +5.n6 -n.531990 +28.23 46.04 +22.191991 +41.72 +6.04 35.681992 +45.24 +6.n4 39.201993 +45.54 +6.04 39.501994 +45.54 46.04 39.501995 +45.54 +6.04 39.501996 +45.54 +6.04 39.501997 +45.54 +6.04 39.501998 +45.54 +6.04 39.501999 +45.54 +6.04 39.5n2000 +45.54 +6.04 39.502001 +45.54 +6.04 38.632002 +45.54 +6.04 37.782003 +45.54 +6.04 39.502004 +45.54 +6.04 39.502005 +45.54 +6.04 39.502006 +45.54 +6.04 39.502007 +45.54 +6.04 39.502008 +45.54 +6.04 39.502009 +45.54 +6.04 39.5n2010 +45.54 +6.04 39.502011 +45.54 +6.04 39.502012 +45.54 +6.04 39.502013 +45.54 +6.04 39.502014 445.54 +6.04 39.50

Total 954.02 137.00 817.02

NPV 11! .62 23.02 95.60

ERR - 17.42 25.n0 16.70 /c

/a See Table 20, Annex 2 last column.

/b ERR assuming foregone power benefits.

/c See Annex 2 Table 23.

Page 111: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

It4DNFSTA

KRDTING OMBO MITLTIP1IRPOS8 DAM ANn IRRIPATION PROJOMT

Economlc Analysis of Power Comoonent as a Aingle-Puroose Prolect(US$ million, JAN 1985 values)

ConstructionPower station F&64 and trans- Total con- Consultants, Total benefit. Net benefits Benefits due Not benefits& outlet works mission llne struction admin. and Total due to fuel due to fuel to tariff due to tariff(CF * 0.9) (O * 0.9) costs overhead /a 04 costs savings /b savings revenue /c revenue

1985 -1986 1.05 1.49 2.54 N.25 - 2.79 - -2,79 - -2.791987 2.76 7,23 4.99 1.0n - lo199 - -10,99 -10.991988 1,83 2,97 4,80 0.48 - 5,28 - -'.28 - -1,281989 - 0.89 0.89 0n09 0.12 1,10 2,92 +1.81 6.16 +5,061990 - - - - n,12 0.12 4.31 +4,19 6.16 +6.041991 - - - 0.12 0.12 2.75 +2.63 6.16 46,041992 - - - - 0.12 0.12 2,63 +2.51 6.16 +6,041993 - - - - 0,12 0.12 3.43 +3.31 6.16 +6,041994 - - - - 0.12 0.12 5.15 +5.n3 6.16 +fin41995 - - - - 0.12 0.12 2.64 +2952 6.16 +6,041996 - - - - 0,12 0.12 2.95 +2,83 6.16 +6.041997 - - - - 0.12 n0.z 4.42 +4430 6.16 +6,04 d

1998 - - - - 0.12 0.12 4.42 +4.30 6.16 +6.041999 - - - 0.12 0,12 4,42 44,30 h ,lh +6,042000 - - - - 0.12 0,12 4.42 +4.30 6.16 +6.042001 - - - - 0,12 0,12 4.42 +4,30 6.16 +6.042002 - - - - 0.12 n.12 4.42 +4.30 6.16 +6,042003 - - - - n,12 0,12 4.42 44,30 6.16 +6.042004 - - - - 0,12 0,12 4.42 +4.30 6.16 +6i042005 - - - - 0,12 0.12 4.42 +4,3n 6,16 +6.042006 - - - - 0.12 0,12 4.42 +6.30 6.16 +6.042007 - - - - 0.12 0.12 4.42 +4.30 6,16 +6.042008 - - - - 0,12 0.L2 4.42 +4.30 6.16 +6.042009 - - - - 0,12 0,12 4,42 +4430 6.16 +6.042nlo - - - - 0,12 0,12 4,42 +4,30 6,16 +6.042011 - - - - 0.12 0.12 4.42 +4,30 6.16 +6,042012 - - - - 0,12 0,12 4.42 +4.3n 6,16 +6.042n0. - - - - 0,12 0.12 4,42 44.30 6.16 +6.042n04 - - - - 0.12 0.12 4.42 +443n 6.16 +6904

Total 5.64 12.58 18.22 1,82 3.12 13.16 106.34 R3.17 160,16 137.00

NPV e 10% 15.53 23.74 8.21 3R.54 21.02ERR - - 15.40 - 24.90

/a Ten percent total construction costs.7b Based on Bank estimates.7i Taken from Annex 2, Table 20.

Page 112: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 2

- 134 _ Table 22b

INDONESIA

KEDUNG ONBO h14[TIPURPOSE DAM AND IRRIGATION PROJECT

Summary of Energy SubstitutionEnergy Benefits /a

Energy substitution in GWhHighspeed Energy

Year Oil fired /b diesel /c Coal /d Other /e benefit(US$'000)

1989 66 2 - - 2,9201990 61 2 - 1 4,3081991 63 1 4 - 2,7481992 54 1 12 - 2,6251993 19 2 46 1 3,4331994 63 4 - 1 5,1521995 32 6 30 - 2,6361996 - 6 71 1 2,9481997 20 9 38 1 4,4201998 23 11 33 1 4,4201999 16 16 35 1 4,4202000 24 19 24 1 4,420

l l l l I l2014 10 24 33 1 4,420

/a Based on simulations performed by PLN with a loss of lOX.

/b Substitution for plants of 25 to 200 MW capacity. Fuel cost varying from$39 to $54/MWh.

/c Substitution for gas turbines of 20 to 300 MW capacity. Fuel costs varyfrom $80 to $87/MWh

/d Substitution for plants of 400 NW capacity. Fuel costs vary from $18.0 to$19.50/MWh.

/e Costs of energy not served $1.5/kWh - voltage reduction, etc.

Page 113: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

AMNE 2- O0z - Table 23

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Financial Analysis

Financial costs DifferenceCon- Cons. + Fuel between

struction admin. O&M Total costs /a cost streams

1983 - - - - - -1984 2.82 0.25 - 3.070 - -3.0701985 11.10 1.00 - 12.100 - -12.1001986 5.33 0.48 - 5.810 - -5.8101987 0.99 0.09 0.126 1.206 2.92 +1.7141988 - - 0.126 0.126 4.31 +4.1841989 - - 0.126 0.126 2.75 +2.6241990 - - 0.126 0.126 2.63 +2.5041991 - - 0.126 0.126 3.43 +3.3041992 - - 0.126 0.126 5.15 +5.0241993 - - 0.126 0.126 2.64 +2.5141994 - - 0.126 0.126 2.95 +2.8241995 - - 0.126 0.126 4.42 +4.2941996 - - 0.126 0.126 4.42 +4.2941997 - - 0.126 0.126 4.42 +4.2941998 - - 0.126 0.126 4.42 +4.2941999 - - 0.126 0.126 4.42 +4.2942000 - - 0.126 0.126 4.42 +4.2942001 - - 0.126 0.126 4.42 +4.2942002 - - 0.126 0.126 4.42 +4.2942003 - - 0.126 0.126 4.42 +4.2942004 - - 0.126 0.126 4.42 +4.2942005 - - 0.126 0.126 4.42 +4.2942006 - - 0.126 0.126 4.42 +4.2942007 - - 0.126 0.126 4.42 t4.2942008 - - 0.126 0.126 4.42 +4.2942009 - - 0.126 0.126 4.42 t4.2942010 - - 0.126 0.126 4.42 +4.2942011 - - 0.126 0.126 4.42 +4.2942012 - - 0.126 0.126 4.42 +4.2942013 - - 0.126 0.126 4.42 +4.2942014 - - 0.126 0.126 4.42 +4.294

Total 25.56 106.34 80.78

NPV 17.21 23.74 6.58

Equalizing discount rate 14.1%

/a In economic analysis, fuel costs are regarded as savings; i.e., benefits.

Page 114: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 1AM 3

Table 1Page 1

INDONESIA

KEDUNG OMBO MULTIPUEPOSE DAlI ANM IRPIGATION PROJECT

Main Features of Dam, Reservoir and Appurtenant Structures

DamType of dam Rockfill type with impervious

core located on Serang RiverDam height 61 m (96 m above SPB)Crest length 1,600 mElevation- Normal water surface 90 m SPB- Dam crest 96 m SPB- Dowstream level of river bed 37.5 m SPB- Upstream level of river bed 38.7 m SPB

Peak discharge of inflow design flood(service and emergency) PMF 5,540 cu m/S

Volume inflow of design flood (PMF) 1,400 MC!Peak inflow for 200 year frequency flood 2,000 cu m/SVolume of 200 year frequency flood (3 day) 100 MCMVolume of embankment 6.26 MCM

ResevoirCatch-ent area 614 sq kmMaximum reservoir flood elevation 95 m SPBMaximum operating reservoir elevation(full supply level) 90.0 m SPB

Reservoir area EL 95.0 m 60.40 sq kmReservoir area EL 90.0 m 46.03 sq kmReservoir capacity at fullsupply level 90.0 m 723.00 ECQ

Reservoir capacity at Maximum flood level 986.06 MCMDead storage to level 64.5 m (excludingestimated sedimentation) 88.40 MCM

Active reservoir capacityelevation 64.5 to EL 90.0 634.6 MCM (without silt deposition)

Service SpillwayLocation Right abutment of damType Ungated crest with open chute

and flip bucketSpillway crest length (clear) 40 mSpillway crest elevation 90.0 mDesign discharge (at reservoir 500 cu m/s (10,000 yearelevation 93.3) flood)

Overall length 167 mWidth of chute at flip bucket 14.5 mElevation of flip bucket invert 60.0 m SPE

Page 115: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 1D7 -ANNEX 3Table 1Page 2

Diversion TunnelLocation Right Abutment of damType Circular concrete lined

tunnel with gated upstreamportal

Diameter 4.0 mIntake sill elevation 38.0 m SPBOverall length 325 mDischarge at reservoir elevation 65.0 m 180 cu m/s

Intake Structure and Pressure ConduitLocation Left Abutment of damNormal maximum discharge 55 cu misIntake sill elevation 55.6 m SPBIntake gate (fixed wheel) 4.0 m x 3.0 mIntake shaft radius 4.7 m to trashrack slotsPressure conduit diameterllength 3.8 m x 270 in

Power HousePower house type Conventional indoorPower house dimension- Maximum height above foundations 37.4 m- Overall length 47.8 m- Overall width 31.0 m

TurbineElevation of centreline of unit 32.0 mTurbine type Kaplan turbineNumber of units 1Design and rated head 40.5 mMaximum head 58.0 mMinimum head 25.5 mDesign power 22.5 MW at normal speedGovernor type Electro-hydraulic cabinet-

actuator typeTurbine guard value butterfly

GeneratorType Three phase vertical shaftSpeed 250 rpmRating 28.5 MYAFrequency 50 HzTransformer type Three phase oil cooled, 25

MVA 50 Hz rating

Page 116: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 3- lOB - Table 1

Page 3

Inlet WorksConduit diameter beloc bifurcation 2.7 aGuard value type butterflyControl valve type Cone valveMaximum discharge 55 cu m/sec

Switch GearLocation line landing structureSize 500 MVA/150 KVTransmission line 150 KV single circuit to

Purwodadi

SubstationsType Step-up 150 kV to 500 kVLocation Purwodadi and Tanggung

Page 117: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ZONE IEAIDULC

k = ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C Cerm rFIler

COFF GMMso POLNtO USZ0 ULAKET4ELXLPiTa E corrotouE tOUND^EXTENT t° 5 C S EEPAGE DRAIN XL 4.00 EPAUX DRI WIT 0

FOPQTIR EGDAT50 CNTE Kedung Ombo DamSECTION OF DAM AT D-Chl280.00 General Plan and Profile

Page 118: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- no - AMEU 3Ta'b e

INDONESIA

XEDUNG OMNDO MULTIPURPOSE DAM AND IRRiGATION PROJECT

Main Feature of Proposed Irrilation DeveloPment

Adus ent PerUnchanged Minor MaJor New Total ha

Sldoreio (6,100 ha)Caaskm (a/ha)=Tr-,hary_ - - 13.7 13.7 2.30

Secondary --- 73.6 73.6 12.10Tertiary - - - 366.0 366.0 60.00

StructuresMain system - - - 215.0 215.0 0.004Secondary system - - - 608.0 608.0 0.100Tertiary system - - - 610.0 610.0 O.tO0

DrainsMaMn system - 7.10 - - 7.1 1.16Secondary system - 11.45 - 6.5 18.1 3.00Tertiary system - - - 244.0 244.0 40.00

Klambu Kanan (19,000 ha)snals-km(a ha)li5r-1ary - - - 38.1 38.1 2.00Secondary - - - 153.8 153.8 8.70Tertiary - - - 1,140.0 1,140.0 60.00

Structures-ain syste - - - 602.0 602.0 0.030Secondary system - - - 1,420.0 1,420.0 0.080Tertiary system - - - 1,900.0 1,900.0 0.10

Draimn,20/ Main yste 12.0a - 51.0/a 25.2/a R8.2/a 4 .60/aSecondary system - - 48.6- 62.7 111.2 5.90r-Tertiary system - - - 760.0 760.0 40.00

:edadl (13,910 ha)canals km (m/ha)

FrlSsary 11.7 19.8 9.9 - 41.4 2.98Sect%ndary 18.4 58.0 7.0 3.0 86.4 6.30Tertiary 314.0 520.0 - - 834.0 60.00

StructuresaInisystem 26.0 188.0 - 98.0 312.0 0.02Secondary system 112.0 - - 46.0 158.0 0.01Tertiary system 974.0 417.0 - - 1,391.0 0.10

DrainsMain system - 57.9 - - 57.9 4.20Secondary system 21.9 65.3 - - 87.2 6.30Tertiary system 389.0 167.0 - - 556.0 40.00

Klaubu Kirn (20.330 ha)Canals km (m?Wa)Prl ary - - 22.9 24.1 47.1 2.30Secondary - 4.9 164.3 - 169.2 8.30Tertiary 40.0 2.9 303.0 585.0 930.9 45.80

Main systes - - 35.0 435.0 470.0 0.02Secondary system - - 158.0 706.0 864.0 0.04Tertiary system 67 464.0 565.0 977.0 2,033.0 0.10

Main system - - 97.5/a -97.5/a 4.7 0/a

Secorndary system - - 164.5 - 164.5 8.10Tertiary system 27 193.0 202.0 390.0 812.0 40.00

/a Under Irrigation XIV Loan.

Page 119: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-111 -

Pagle 1

DIDOURSIA

KID 03 RULTIPURPSE DAM AND TRRICATION PROJC

Scope of Irrigation Works and Proposed Contract Packages

Contract valueType of (Base cost)

Contract description Scope of works contract ( Wis sin)

Sidorejo (flew) Construction of 7 a hlgh, A0 u long, stone masonry weir on ICA 3,41Constructton of Serang River near Sldorejo village including ierigation lntakeSldorejo Ueir and 15 km long levee.

Nain canal and Constructlon of 13.7 km of maln canal in the "wnth Crobogan area LCB 3.00structures from Sidorejo weir to structure BSG 10 including construction of

twin cell reinforced concrete syphon under Serang River nearTruwnli village with an overall length of 200 a, and thefollowing nubers of structures:

I mesuring device6 diversion

10 offtake17 check0 dropo check-drop27 vlllage bridge1i foot bridgeI road culvert

20 drain culvert35 buffalo wallow73 washing step1 flame3 sphon5 escapewastaay

Total 215 Structures

-econdery canals and Construction of 21.0 ku of secondary canals in the Candisari LC 0.79structures - Candinari area of South Crobogan including the construction of thearea following structures:

6 diversion2 offtake

10 check9 drop5 check-drop

21 villge bridge16 footbridge0 road culverts2 drain culverts5 buffalov wallow

62 washing stepO floe0 syphon7 escape/vasteay-

rotal 141 structures

Page 120: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 112 -

AUNFI 3Table Iwage 7

Contraet valueTyre of (Rage cost)

Contract descriptton Scope of works contract (IT." mlin)

recondary canals and Constrt:tton of 2R.09 km of secondary canals in the Purwodadi LCR 1.50structures - Purwodadi area of South Crobogan including the construction of thearea following structures:

O measuring device5 diversion7 offtake9 checkV drop5 check-drop

23 village bridge19 foot bridge2 road culvertR drain culvert6 buffalo wallow

75 washing step0 flume1 syphone7 escape/wasteway

motal 176 Structures

Secondary canals and Construction of 25.6 km of secondary canals in the Iendangan LCAB 0.6structures - Xandangan area of South Grobogan Including construction of the followingarea structures:

7 diversion21 offtake29 check5 drop0 check-drop25 village bridge33 foot bridgeo road culvert7 drain culvert10 huffalo wallow144 washing step

o flumec syphon9 escape/wasteway

Total 291 structures

Tertiary Unit Develop- Development of tertiarv units, including the construction of all TAP 0.2Rsent - Candisart area irrigation canals and small drainage channels, for approximately

2,200 ha in the randisari area of South Crobogan.

Tertiary Unit Develop- Developnent of tertiary units, including the construction of all LnN 0.27ment - Purwodadi area irrigation canals and small drainage channels, for approximatelv

2,2n0 ha In the 'urwodadi area of South Crobogan.

Tertiarv flnit Develop- Development of Tertiary units, including the construction of all TXF 0.21ment - Itaidangan area irrigation canals and small drainage channels, for approximately

1,700 ha in the Vandangan area of qoutl Crobogan.

construction of roads, Surfacing of approximately 40 Im of road to class 5 (3.5 m TCR 1.24drains and mis- sealed Pavement), 46 km of inspectton road and 46 km ofcellaneous works in motorcycle tracks, 8.35 km drains, and other miscellaneousthe South Crobogan works. (Inspection road of sealed asuhalt paving (.0n n wide)area, and 6.5 km by new senled macadam and 9.7 Im of existtng road for

sealed macadam.

Page 121: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANMP* I'able iPage 1

rontract valueType of (Bae coat)

Contract description Scope of works contract (isp sin)

liabu LAnan (New)lUlabu Barrage and Construction of a reinforced concrete gated weir at Klambu on 7Cll 12.95intakes the Serang River Including supply and Inutallation of gater,

construction of levees and construction of Intakes and sedimentejectors on the left and right bank for lower Sedadl area andJuana Valley area respectively.

Main canal And ronstrection of the main canal. from irlmbu wsir to structure LCR 11.11structures Ula 19. a distance of 36.0 kin, and the following structurea

wtill be constructed2

I uasuring device13 diversion

5 offtakeI checkf drop

10 check-dropB kabupsten brIdges

30 village bridge32 foot bridge

0 road culvert59 drain culvert44 buffalo wallow

3q6 washing stepI flume- syphon7 escape/wasteuay

Total 602 structures

Secondary canals and The construction of econdary canals and structures In the LCA 6.67structures in the ndnadso Ilndaan urea of Juana Valley. The length of canal isarea approximately 75.9 kmn and the following atructures will be

rquired to be constructed:

I measuring device14 diversion20 offtake3q check0 drop2 check-drop2 kabupaten bridges3 village bridge4 foot bridge

11 road culvert17 drain culvert52 buffalo allow

310 usahing step1 flue5 syphon

11 eacape/wasteway

Total 512 structures

Secondarv canals and The construction or secondary canals and structures in the TCB 1.0Ostructures in the Sukolilo area of Juana Valley. The length of canal ts approzi-Sukolilo area. sately 46.2 km and the following structures will he required:

I measuring deviceR diversion

14 offtake34 check

I drop1 kabuoaten hrIdge0 check-dropA village bridge4 foot bridge6 road culvert

11 drain culver,24 buffalo wallow

237 washing step0 flumeO siphonR escape/wastewav

Total 353 structures

Page 122: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 114 -

TUbl 3

fontract valueTyp of (PlA comt)

Contract descrtption Scope of works contract CUSS mln)

Secondary canals and The construction of secondary canals and structures in the Xyen LCD 2.33structures in the area of Juana Valley. The longth of the canal 1s approximatelyRayon area. 34 km *and the following structures will be required:

6 diversion13 offtake29 check

S drop3 check-drop1 kabupaten brldge

11 vtlla e bridge3 foot bridge5 road culvert

12 drain culvert41 buffalo wmllow

417 washing atopn flueO syphonI eacape/wamteewy

Total 555 structures

Tertiary Unit Develop- [he development of tertiary uiits In the llndean area of Juana LC 0.8nsent - Undaan urea. Valley including the construction of Tertiary and Ouaternary

irrigatlon canals and msal drainage channels for a netirrlgable ara of avproximately 6,400 ha.

Tertiary Unit Develop- The devlopment of tertlary units iln the Sukolilo area of Juan LCh 0.30sent - Sukolilo area. Valley including the construction of tertiary and quaternary

lrritgatlon canls and mull dralnae channels for a netirrigable area of approximately 6,400 ba.

Tertiary Unit The deelopment of tertiary units In the Rayon area of Juana Les 0.76Development Valley including th construction of tertiary and quaternmry- Kayen area, irrigation canals and moll drainage cbannels for a net

irrigable area of approximately 6,230 it.

Main dratna To he constructed under separate project.

Secondary dralns The construction of or liprovement to 101 km of secondary drains LCH 6.64in the Juan- Valley area Including levees structures.

tndaan Sukolilo K5"m se otal(km)

New secondary drains 34.7 1.7 9.3 62.7Improvement to exleting 6.5 8.0 34.1 43.6

trENS

41.2 26.7 43.4 111.3

Roads and miscel- The construction of 197.8 km of Inspection road n 525 km of LCD 2.30laneous. access road in the Juana Valley area.

Page 123: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANMC 3Table 3Pageo 5

Contract valueType of (Dame coat)

Contract description Scope of works contract (11WS aln)

Ad1ustoent to the SedadiareaRehabilitatton of Rehabtlitation and raising crest levc; by 0.5 a of existing LCR 0.53Sedadi wsir. Sedadi wetr.

Adjustments to sin constrection of adjustments to the SI canal from Sedadi wetr to LCt 1.62canal and structures. Wilalung and to USd24 a total length of 30.5 km. Work. include

adjustments to the following structures:

I assuring devtceI diversion9 offtaks0 checko drop6 check-drop

10 village bridge25 foot bridgeO road culvert1 draln culvert

14 buffalo wallow119 washing step0 flume0 syphon2 escape/wasteway

Total IRS structures

Main canal and Construction of adjustments to main canal and structures LCD 1.00srYuetures - Pengkol from BSd 2 up te DPgk7 ton Pengkol area. Length of canalssrea (Upper Serang). is approximately 9.89 km with the following nu her of

structures:

I essuring deviceI diversionA offtakeI check-drop

11 village bridge11 foot bridge7 buffalo wallow

57 washing step3 syphoneI escape/wsstewav

Total 08 structures

Secondary canals and Construction of minor adjustments to secondary canals and LrC 0.11structures - Lower structures in the Lower serang ares. Length of canals isSerang area. approximately 1.0 km with the following number oF structures:

I tlverslon3 offtakesI vitlage brdge6 foot bridge3 buffalow wallow

30 washing stopI fiUeI escape/wasteway

Tutal 46 structures

Page 124: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 116 -ANNEX 3Table A'Page 1

contract valunType of (Rane cost)

Contract description Scope of works contract (liss ain)

Adjustmente to Construction of adjustments to tertiary units in Upper serang LeRw n,34Tertiary units - Upper area with a net irrigable area of approximately 8,780 ha.Serang area.

Adjustments to Ter- Construction of adjustments to tertiary units in the Lower LCR 0.22tiary units - Lower Serang area with a net irrigable area of approximately 6,420 ha.Serang area.

Construction of dralns Conetruction of road works on a total of 20.5 km of existing TAR 1.24and roads in the Upper roaed and liprovement to 7 km of main drain and approximtelvSedadi area. 120 km of secondary drain.

Vlsbu Riri AreaConstruction of main The construction of a new main canal from Xlamhu weir to Vil_- 5 91canal and structures, lung. a distance of 15.9 km, and from Wtlalung to Pelaysran. a

distance of approximately R.2 km. The existing S1 canal betweenWilalung and Raranganyar will also requSre adjustments on ttslength of fi 5 km. Pelayaran canal a dietance of 14.6 km. Thenumber of structures requiring new construction or adjustmentare:

New AdJusted2 measuring device 0 meesurlg device4 diversion R diversion6 offtake 12 offtake3 drop 2 check

14 village bridge 5 drain culvert36 foot brldge I syphon3 drain culvert 4 esCape/wastewavy

16 buffalo wallow351 washing step

3 syphon

438 structures 32 structures

Secondary canals and Construction of major adjustments to secondary canals in the LCR 4.80structures - Pelayaran Pelayaran area over a total length of 75.0 km. Structuresarea, requiring adjustments are:

New Adjusted

2 village bridRe 2 diversion6 kabupaten bridge 47 check

19 buffalo wallow 16 village bridge231 washing step 22 foot bridgeI flume 7 drain culvert

I flume

259 structures 95 structures

Page 125: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 11.7 -

ANNEX 3Table 3Bage 7

Contract valueType of (Base cost)

Contract description Scope of works contract (USS aln)

Secondary canals and Construction of major adjust ents to secondary canals in the LCB 1.00structures - Vedung Wedung area over a total length of 81.7 km; structures requiringarea. construction or replacement are:

Neev Adjusted1 diversion 4 diversion

12 kabupaten bridge 54 checkI0 village bridge 11 drain culvert26 foot bridge I syphon

I road culvert 1 escape/wasteway2 drain culvert

25 huffalow wallow252 washing step

1 syphon

330 structures 8fi structures

Tertiary nnit Development of tertiary units for the Pelayaran area, including LCR 0.82nevelopment - construction of tertiary and quaternary irrigation canals andPelayaran area, snall drainage channels, over a net irrigable area of

approximate:y 8,1M ha.

Tertlary Tnit Develop- nevelopnent of tertiary units In the wedung area, Including TJB 1.22ment - Vedung area, construction of tertiary and quaternary Irrigation canals and

small drainaRe channels, over a net irrigable area ofaoproximately 10,500 ha.

Tertiary unit develop- !kvelopment of tertiary units for the Ttndaan area, including LCB 0.24ment Undaan area. construction of tertiary and quarternary irrigation channels and

small drainage channels, over a net area of approximately3,224 ha.

ronstruction of Construction or improvements to approximately 165 km of existing LCR 3.24secondary drains, secondary drains and 10.9 km of existing roads, and 0.30 km of

new connecting roads and other miscellaneous work.

Page 126: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-118- ANR 3

Table 4

INDONESIA

XEDUNG YiBiJ -ULTIPURPOSE DAN AND IRRIGATION PROJECT

Buildings for Irrigation Operation and Maintenance

Unit prige TotalItem Area (sq m) Number US$ x 10 US$ s 103

SidorejoOffice Purwodadi 200 1 0.2 40.0Maintenance shop 150 1 0.1 15.0Material storage 150 1 0.05 7.5Property 2,500 0.01 25.0

House:Section Head 60 1 0.2 12.0Supervisor 50 3 0.2 30.0Asst. Supervisor 36 8 0.1 28.8Mechanic 21 1 0.09 1.89Gate keeper 21 25 0.08 42.0Property 6,000 0.002 12.0

Subtotal 1.032 214.2

Sedadi/klambu Kiri System(Additional)

Houses:Supervisor 50 1 0.2 10.0Mechanic 21 3 0.1 6.3

Subtotal 16.3

KLabu KananKudus:Office 300 1 0.2 60.0Maintenance shop 300 1 0.1 30.0Material storage 300 1 0.1 30.0Property 3,000 0.01 30

Gabus:Office 150 1 0.08 12.0Property 1,000 0.002 2.0

Sukolilo:Office 150 1 0.08 12.0Property 1,000 0.002 2.0

Houses:Supervisor 50 3 0.2 30.0Asst. Supervisor 36 10 0.1 36.0Mechanic 21 1 0.01 0.21Gate keeper 21 50 0.08 84.0Property 12,000 0.002 24.0

Subtotal 352.2

Total 582.7

Page 127: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

PCONESAKEOtW OUO MULTwUNOG OUm PROJICT

INOA1TIVE CONSTRUCTIN PHOORAM

lDAMS * AMURTENAT3 a :_iCw

"".0_."st;~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~M 34 ' 3. S , MA -MAIN lAW AM11 53

A#s¢*Wz S 1.318346.2 | t f&4 _ 1WB nnwwft"Z ^"ll"z, col q I '_r_

y,eW , _ a* ZnI,-.Ia" _3i *I __ _M _ we am

~ ~...I~4 ii...A..Lam u La' w~ mrw"m Amw

INMRUATIOI WOAKCS 111 #a A,. hEWI S I no

noun usn asM I mVAN SMUM C" AUit?AMIL S MeIIIMISS

"#W%NIMP *s*E . t I l _ * _ ,.,,,1 WY. 144A _ I Yu - _m * .. 4,1LS aAW * -1 _ _.

Uema iam" * MWIItu La6efYW II

A MAW IT I III W l 1S TtU

MMIIA LIII'bAm,wuLo-Ma|| I_^sl Sso gWMa 1465 AWSY . , istQ

141? ML 4 fifiWU IIMIW?Utt _ _ _a 4IIZ

._e_ stt~ _M" a 8"9fs LGIW

mm M I, WEuLA 144nz SIWOAAl m it. §

urnw IUAAI 6 SYnIM$ 1416WYMY U

1915141 Wm NIMA..UM LIMIS46l£

F. Ttot K *i ui 1 _ 1

Z 112111.12. 0111-21 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~14461

L" lXTtt" maI "Ft", cIfk I_I rqtm~ t Z 4 tSt gs t "a _ tm r_IN-

= Fw;;Xgf!|EL;@!wt|l,lt.! W;,,|,.z,. |fXsw*s||>[*|| *;: 4 r fX1%1@|l@|<t | i ! *§§& Inil nz tt *a t

Page 128: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 5

- 123 - Table I

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAN AND IRRIGATION PROJECT

Summary of Equipment Costs(US$'000)

Item Local Foreign Total FXZ

Dam and Irrigation (DOI-I1)Office and drafting 34.0 309.0 343.0 90Communications 14.0 123.0 137.0 90Vehicles 457.0 850.0 1,307.0 65Soil and material 17.0 150.0 167.0 90laboratory

Hydrometeorology and 5.0 43.0 48.0 90meteorological

Operations and maintenance 172.0 1,551.0 1,723.0 90

* Subtotal 699.0 3.026.0 3.725.0 81

Spares 20X 190.0 650.0 840.0 81

Ease Total 889.0 3.676.0 4,565.0 81

Flood and Water Monitoring (IRE)Telemetered event gauge - 1,040.0 1,040.0 100CAmmunications 200.0 350.0 550.0 64Computer systems 85.0 800.0 885.0 90Spares - 295.0 295.0 100Auxiliary power supply - 652.0 652.0 100Facilities, installation, 0&M, 3,316.0 2,429.0 5,745.0 44etc./b

Subtotal 3.601.0 5,566.0 9,167.0 61

Training (IRE) /aDam inspection 10.0 90.0 100.n 90Water quality laboratory 20.0 200.0 220.0 90Water quality field equipment 3.0 32.0 35.0 90Spares and supplies 15.0 110.0 125.0 87

Subtotal 48.0 432.0 480.0 90

IPEDA Mapping (DG. IPEDA)Computer 10.0 90.0 100.0 90

Base Total 4,548.0 9.754.0 14.312.0 68

/a Vehicles ($500,000.0) and minor equipment ($150,000) are included.

/b Includes costs of facilities, services for installation and OEM.

Page 129: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-121- ANE Tabte 2Page 1

INDONESIA

YEDLTNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Dam and Irrigatlon

Office aud S§ecial Eqhipment

No. of Unitunits price Total

Kedung Ombo Dam Project Office0Ottlce EquipmentElectric typewriter 4 1,500 6,000Manual typewriter 10 800 8,000Blue-print machine 1 5,000 5,000Photocopy machine 2 7,000 14,000Drafting tables & machines 15 1,500 22,500Calculators 28 150 3,000Projectors (overhead and slide) 2 800 1,600Air conditioners 30 1,000 30,000Safe 1 2,000 2,000Filing cabinets 30 200 6,000Plan cabinets 5 300 1,500Stationery cupboards 10 200 2,000Voltage stabilizers 10 500 5,000word processor 1 20,000 20,000Stereoscopes 2 1,000 2,000Miscellaneous 1 10,000 10,000Microcomputer 1 10,000 10,000

Subtotal 148,000

CommunicationsTelephone P-MIM switchboard 1 5,000 5,000Telephone handsets 30 200 6,000Telephone transmission lines 30 1,500 45,000Radio telephone (VHF) 2 10,000 20,000Telex 1 20,000 20,000Intercom for offices 1 5,000 5,000

Subtotal 101,000

Vehicles (For GOI staff only)Sedan 2 15,000 30,000Pickups 6 9,000 54,000Toyota SWB Jeeps 40 15,000 600,000Minibus (25 ps) 2 13,000 26,000Trucks (Toyota DA Dyna) 2 16,000 32,000Motorcycles 80 2,000 160,000

Subtotal 902,000

Page 130: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-122-- ANNE 5Table 2Page 2

No. of Unitunits price Total

Laboratory EquipmentStove sets 4 2,500 10,000Sieve shaker 1 4,000 4,000Compaction molds and hammers 2 500 1,000Precise balances 1 10,000 10,000Beam balances 3 2,000 6,000Field density sampler with 24 sample tubes 2 1,600 3,200Laboratory ovens 2 4,000 8,000Concrete compression tester 1 13,000 13,000Cylinder moulds 50 400 20,000Cylinder capper 1 1,000 1,000Triaxial cell 1 30,000 30,000Misc: pans, brushes, spatules, straightedges, glassware, moisture boxes, shrinkageapparatus, liquid limit apparatus, cappingcompound, trowels, etc. 1 lot 15,000 15,000

CDnsolidation apparatus 1 5,000 5,000

Subtotal 126,200

Hydrological/Meteorological EquipmentPortable cable way 2 2,000 4,000Single drum winch 3 1,500 4,500Cable for single drum winch 4 1,000 4,000Cable for steven sounding well 3 500 15,000Cable for cableway 3 1,000 3,000Automatic float recorders 3 2,000 6,000Columbus weight 25 kg 2 500 1,000Staff gauges (meters) 100 10 1,000Spare parts 1 lot 10,'n0

Subtotal 48,000

Total 1,325,200

Irrigation Project Office(for detailed design of irrigation)Equipment to be provided by the client for the detailed design of irrigationworks will include:

Air conditioner for new office 50 1,000 50,000Plan printer 6 5,000 30,000Photocopy machine 6 5,000 30,000Maps, aerial photos, etc. I lot 5,000 5,000

Subtotal 115,000

Page 131: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-123- ~~~~~ANNME 5-123 -a ableZPage -

No. of Unitunits price Total

Irrigation Project Office (forconstruction supervision of irrigation)Office EjuipmentEectric typewriter 2 1,500 3,000Manual typewriter 5 800 4,000Blue print machine 1 5,000 5,000Photocopy machine 1 5,000 5,000Drafting table & machines 10 1,500 15,000Alr conditioners 20 1,000 20,000Safe 1 2,000 2,000Filing cabinets 15 200 3,000Plan cabinets 5 300 1,500Stationery cupboards 5 200 1,000Voltage stabilizers 2 500 1,000Stereoscopes 3 1,000 3,000Microcomputer 1 10,000 10,000Miscellaneous 1 lot 5,000 5,000

Subtotal 80,000

ComuunicationsTelephone switchboard 1 3,000 3,000Telephone handsets 20 200 4,000Radio base 1 5,000 5,000Mobile radios 6 2,000 12,000Site office radios 4 3,000 12,000

Subtotal 36,000

VehiclesToyota SWB jeeps 20 15,000 300,000Minibus 1 13,000 13,000Trucks 2 16,000 32,000,Motorcycles 30 2,000 60,000

Subtotal 405,000

Laboratory EquipmentAssume equipment transferred from SerangRiver Project additional equipment will be

Concrete compress tester 1 13,000 13,000Cylinder moulds 50 400 20,000Cylinder capper 1 1,000 1,000Miscellaneous 1 lot 5,000 5,000Spare parts 1 lot 2,000 2,000

Subtotal 41,000

Total 562,000

GRAND TOTAL 2,002,000

Page 132: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 5- 124 - Table 3

Page 1

IND0NESIA

KEDUNG OMBO MULTIPURPOSE DAM A1ND IRRIGATION PROJECT

Operation and Maintenance Equipment List and Costs

Number Unit price TotalItem of units (US$'000) (US$'000)

SidorejoFront-end loader (0.8 cu m) 1 116.03 116.03Dump truck 2 24.16 48.32Flat bed truck 1 20.10 20.10Jeep 1 15.64 15.64Pickup truck 1 7.72 7.72Motorcycle 10 1.19 11.90Bicycle 25 0.10 2.50Concrete mixer (35 liters) 1 1.29 1.29Welding set (250 amp) 1 2.48 2.48Hand tools LS 2.28Hand compactor 2 1.49 2.98sump pump 1 1.68 1.68Office equipment LS 1.68 1.68Maintenance shop equipment LS 4.65Comuminication equipment (radio) LS 11.58

Subtotal 253.01

Sedadi/Klambu Kiri System (Additional)Grader 1 116.03 116.03Dragline (3/4 cu m) 1 201.07 201.07Front-end loader (0.8 cu m) 1 116.03 116.03Dump truck 3 24.16 72.48Jeep 3 15.64 46.92Pickup truck 3 7.72 23.16Motorcycle 64 1.19 76.16Bicycle 74 0.10 7.40Concrete mixer (350 liters) 3 1.29 3.87Welding set (250 amp) 2 2.48 4.95Sump pump 3 1.68 5.04Head compactor 3 1.49 4.47Maintenance shop equipment LS (3x) 46.43Speed boat (aluminum) and Engine 60 HP 1 8.51Communication equipment (radio) LS 46.43

Subtotal 778.96

This is split between Sedadi (Upper Sedadi) and Klambu Kiri (Lower Sedadi) inproportion to their net irrigable areas.

Page 133: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 5-125- Table 3

_ Page 2

Number Unit price TotalItem of units (US$'000) (US$'000)

Klambu KananGrader 1 116.03 116.03Dragline (3/4 cu m) 1 210.07 201.07Front-end load (0.8 cu m) 1 116.03 116.03Dump truck 3 24.16 72.48Tractor and trailer 1 35.24 35.24Flat bed truck 1 20.10 20.10Jeep 2 15.64 31.28Pickup truck 3 7.72 23.16Motorcycle 12 1.19 14.28Bicycle 50 0.10 5.00Concrete mixer (350 liters) 1 1.29 1.29Welding set (25 amp) 1 2.48 2.48Hand tools LS 3.86Hand compactor 3 1.48 4.47Sump pump 2 1.68 5.04Maintenance shop equipment LS 15.44Engineering equipment LS 4.65Office equipment LS 11.58Communication equipment (radio) LS 7.72

Subtotal 691.21

Total 1,723.18

Page 134: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 5-126 - Table 4

Page 1

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Telemetry and Other Costs for Flood Forecasting andWater Monitoring Center

($'000)

Unit Cost EstimateItem Nos. price FX LC TC

Event Recording Rain GaugesRiver BasinsKedung Ombo 5 6,000 30.0 - 30.0Serang 5 6,000 30.0 - 30.0Lusi 10 6,000 60.0 - 60.0Juana 5 6,000 30.0 - 30.0Muria 5 6,000 30.0 - 30.01hmtang 5 6,000 30.0 - 30.0Jragung 5 6,000 30.0 - 30.0

Subtotal 240.0 - 240.0

Irrigation Service AreasSedadi/Xlambu Riri 34 7,000 238.0 - 238.0Klambu Kanan 20 7,000 140.0 - 140.0Tuntang/Jragung 30 7,000 210.0 - 210.0Sidorejo 6 7,000 42.0 - 42.0

Subtotal 630.0 - 630.0

Total 870.0 870.0

Event Recording River GaugesSerang 4 7,000 28.0 - 28.0Lusi 2 7,000 14.0 - 14.0Tuntang 2 7,000 14.0 - 14.0Jragung 1 7,000 7.0 - 7.0Juana 1 7,000 7.0 - 7.0Additional (new) 5 20,000 100.0 - 100.0

Total 170.0 - 170.0

Page 135: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-127- _ANN 5Table 4Page 2

Unit Cost EstimateItem Nos. price FX LC TC

Operational Communication EquipmentFor Semarang (duplex), (microwave link)

and Kedung Ombo - - 350.0 200.0 550.0

Total 350.0 200.0 550.0

TrainingOverseas 68 mm 10,000 56.7 - 56.7Local training incl.

books, etc. 30 ma - 30.0 30.0

Total 56.7 30.0 86.7

Maintenauce and OperationFour years:-B"G - - 190.0 390.0 580.0Puslitbang Air (DPHA) - - 230.0 470.0 700.0

Total 420.0 860.0 1,280.0

Computer SystemsFor Semarang Radar Station

(radar computerized supportsystem incl. software) - - 430.0 45.0 475.0

For Kudus (central computersystem) - 370 40.0 410.0

Total 800.0 85.0 885.0

ExpertsSupport personnel 132 mm 12.5 1,650.0 - 1,650.0Miscellaneous - - - 250.0 250.0

Total 1,650.0 250.0 1,900.0

Local CostsVehicles, travelcosts, etc. - - 1,500.0 1,500.0

GRAND TOTAL 4,316.7 2,925.0 7,241.7

Page 136: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-128 - ANNEX 5Table 5Page 1 of 2

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Water Control Center Building and Installation Costs Estimate

Item Unit Unit cost Foreign Local Total

BuildingSemarang Land 1,200 sq m 25.0 - 30.0 30.0

Construction 800 sq n 200.0 60.0 100.0 160.0Kudus Land 2 ha 200.0 - 400.0 400.0

Construction 400 sq a 200.0 20.0 60.0 80.0Purwodadi Land 300 sq m 20.0 - 6.0 6.0

Construction 200 sq a 200.0 10.0 30.0 40.0

Subtotal 90.0 626.0 716.0

Furniture & Office EquipmentSemarang LS - 30.0 30.0 60.0Kudus LS - 15.0 15.0 30.0Purwodadi LS - 5.0 5.0 10.0

Subtotal 50.0 50.0 100.0

Auxiliary PowerSupply: 100 KVASemarang PLN - - - - -

Connection 1 60.0 60.0 - 6u.0AC 1.5 60.0 90.0 - 90.0Gen. set 2.0 30.0 60.0 - 60.0UPS 1.0 225.0 225.0 - 225.0

Subtotal 435.0 - 435.0

Kudus PLN 0.6 40.0 24.0 - 24.0Gen. set 0.7 57.0 40.0 - 40.0UPS 0.3 400.0 120.0 - 120.0

Subtotal 184.0 - 184.0

Purwodadi Gen. set 0.30 50.0 15.0 - 15.0PLN 0.15 20.0 3.0 - 3.0UPS 0.05 300.0 15.0 - 15.0

Subtotal 33.0 - 33.0

Page 137: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-129- ANNEX 5Table 5Page 2 of 2

Item Unit Unit cost Foreign Local Total

Spare PartsSemarang Radar LS - 115.0 - 115.0

Computer LS 86.0 - 86.0

Kudus Computer LS 74.0 - 74.0

Purwodadi Repeaters LS - 20.0 - 20.0

Subtotal 295.0 - 295.0

Raised Floor MaterialsSemarang 200 sq m 250.0 50.0 - 50.0Kudus 50 sq m 250.0 12.5 - 12.5

Subtotal 62.5 62.5

Fire ProtectionSemarang LS 35.0 - 35.0Kudus LS 20.0 - 20.0Purwodadi LS 20.0 - 20.0

Subtotal 75.0 - 75.0

Lightning ArrestersSemarang LS - 10.0 - 10.0Kudus LS 10.0 - 10.0Purwodadi LS 5.0 - 5.0

Subtotal 25.0 - 25.0

Supervision ConsultantTelemetry and River

Forecast Advisor 18 mm 10,000.0 180.0 - 180.0

Total 1,429.5 676.0 2,105.5

GRAND TOTAL 5,746.2 3,601.0 9,347.0

Page 138: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 5- 133 al

INDONESIA

KEDUNG OBO MULTIPURPOSE DAN AND IRRIGATION PROJECT

Equiipment for TraininR

No. of Unitunits price Total

Dam InspectionPiezometer System - 32,500Inclinometer System - 34,000Settlement System 33,500

Subtotal 100,000

Water Quality Monitoring

Field EquipmentWater quality kit 5 sets )Automatic sampler 5 sets ) LS 35,000Bacteriological kit 5 sets )

Laboratory EquipmentInductively Coupled Plasma

Quartometer (ICPQ) 1 set )Spectrophotow-er, U-vis, ) LS 220,000double bea I set )

Particle size analyzer 2 sets )

Subtotal 255.000

Spares and Supplies 125,000

Total 480.000

Page 139: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6- 131 - Page 1

INDONESIA

KEDUNG OBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Consulting Services for Dan and Irrigation

1. It is anticipated that Consulting Services will be performed underthree areas of Management and DGWRD. These are:

2. Kedung Ombo Dam and Appurtenant Works. This will include:

(a) Detailed design and preparation of construction drawings for dam,power station and appurtenant works.

(b) Construction supervision of diversion tunnel.

(c) Construction supervision of dam, power station, appurtenant worksand transmission line.

*d) Water management for reservoir operation.

3. Detailed Design of Irrigation Works. This will include: detaileddesign of weirs, irrigation canals and structures, drainage works, andtertiary developments, including preparation of Tender Documents.

4. Construction Supervision of Irrigation Works. This will include:

(a) Preparation of Construction Drawings for the weirs and majorstructures.

(b) Supervision of Weirs and Structures.

Cc) Supervision of Canals and Tertiary Development.

It is expected that Part A will be managed from Project Offices at KedungOmbo, Part B managed from Project Offices in Semarang, and Part C from ProjectOffices at Puxwodadi. A summary of all the consultant services and man-monthsis shown in Table 1.

Page 140: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6- 132 - Page 2

Table 1: SUMMARY OF CONSULTANT SERVICES

Proj- For-ject Local eign Subpro-

Design staff /a cons. cons. fessional

Kedung Ombo Dam, Power Station and Appur-tenant WorksManagement 46 2 54 -Detailed design & preparation of con-

struction drawings 126 102 18 -Construction supervision of diversion

tunnel 45 - 21/a -Construction supervision of dam, powerstation and appurtenant works 1,064 281 193 -

Water management for reservoir operation 132 39 60 -Subprofessional staff for all above works - - - 1,792

Subtotal 1,413 385 346 1.792

Detailed Design of Irrigation WorksDetailed design of irrigation works 150 348 103 -Subprofessional staff for above works 300

Subtotal 150 348 103 300

Construction Supervision of IrrigationWorks

Management 87 87 51/c -

Detailed design and construction drawing 12 48 18c -

Construction supervision of weirs andmajor structures 360 102 96/c -

Constructior supervision of canals andtertiary developments 1,460 232 - -

Subprofessional staff for above works - - - 2,322

Subtotal 2,709 469 165 2.322

Total 4.272 1,202 614 4.414

/a Financed under GOI budget, and Irrigation XIV./b Financed under Irrigation XIV Loan.7T7 15% is for Rydrotechnical devices in Sidorejo.

Page 141: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6133 Page 3

IKedung Ombo Dam, Power Station and Appurtenant Works

5. Project Management will be based at Kedung Ombo Damr site.Engineering consulting services will be by "task concept" and will include thefollowing works:

(a) Detailed design and preparation of construction drawings for dam,power station and appurtenant works. This will include all workrequired for the upgrading of the tender drawings and designs to alevel which will allow construction of the various structures.Final designs and drawings will include all modifications necessaryfor interfacing civil works with equipment supplied under variouscontracts (such as water control plant, dam instrumentation, andpower station electromechanical equipment).

(b) Construction Supervision of Diversion Tunnel will in additioninclude the review of contractors'-designs and construction methods,and contract administration.

(c) Construction supervision of dam, power station, appurtenant works,will consist mainly of quality control, supervision, and contractadministration.

(d) Special emphasis will be made in this project to ensure technologytransfer on dam construction supervision. The consultant willprepare specific proposals for on-the-job transfer of skills.

(e) Water management for reservoir and irrigation operation. Fordetails, for reservoir, main and tertiary system irrigation prior tothe installation of hydro meteorological and communication equipmentfor forecasting demands and inflow to the reservoir preparationoperational and management rules.

The anticipated number of man-months is shown below for each of the above sec-tions of work.

Page 142: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6-134- Page 4

Table 2: DAM CONSTRUCTION CONSULTANT SERVICES FOR CONSTRUCTION SUPERVISION

Project Local ForeignDesignation staff /a constr. constr.

NanagementProject sponsor - - -Project director 8 2 2Resident dam engineer/team leader 44 - 44Head office support - - 8

Subtotal 52 2 54

Detailed Designs for Dam, etc.Structural design engineers

Chief of design 24 - 18Intake structure and spillways 36 36 -Dam engineer I 36 36 -

Dam engineer II 30 30 -

Subtotal 126 102 18

Construction Supervision - TunnelTunnel engineer 12 - 12Concrete engineer 12 - -Gates engineer 3 - 3Geologist 6 - 6Misc. works 12 - -Specialist

Subtotal 45/a 21/b

Construction Supervision - Dam etc.Contract engineer 42 42 30Senior engineers - Dam 56 42 34Grouting engineer 52 31 17Structure engineers 59 -42 35Materials engineer 20 - 20Material testing engineer 50 40 -Geologist 52 30 17

Page 143: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNIEX 6-~~~~~~- -

- 135 - Page 5

Project Local ForeignDesignation staff /a constr. constr.

Construction Supervision - Dam etc. (cont'd)Instrumentation engineer 28 28 2Mechanical - - -Electrical engineers 42 19 24Specialist - 7 14

Subtotal 399 281 193

Subprofessional StaffLaboratory staff (12) 432 - -

Survey assistant (9) 270 - -

Draftsmen (8) 300 - -

TechniciansTunnel (3) 60 - -

Grouting (3) 110 - -

Excavation (6) 220 - -

Power station (3) 90 - -

Concrete (3) 120 - -

Intake struct. (2) 50 - -

Spillways (2) 50 - -

Embankment (3) 90 - -

Subtotal 1,792 - -

Water MInagementHydro meteorologist 24 - 12Irrigation management 24 12 12Hydrologist/computer systems 24 12 12Instrumentation/communications 24 - 12Agronomist/social scientists 12 12 -Pcwer system engineer 18 - 6Specialists 6 3 6

Subtotal 132 39 60

Total Professional Staff 754 424 346

/a Financed under GOI budget.79E Financed under Irrigation XIV.

Page 144: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6136 Page 6

Detailed Design of Irrigation Works

6. Project management will be based in Semarang with coordination fromJakarta and assistance and direction from the consultants. Engineeringconsulting services will be performed under a task concept contract for thelocal consultant except for some major works which will be under the taskconcept of the foreign consultant. Contract duration will be 18 months formain system and 12 months for tertiary system, and consists of about 10 man-months for foreign consultants and 348 man-months for local consultant.Consultants have been in place since early October 1984.

Construction Supervision of Irrigation Works

7. Supervision of the construction of the irrigation works is expectedto be based at Purwodadi, which coordination from Semarang and Jakarta andassistance direction from the consultants head offices in Bandung and Cooma.Engineering consulting services would be on a task concept for the preparationof detailed construction drawings and on assistance concept for constructionsupervision.

8. The work would include the following:

(a) Preparation of detailed designs and construction drawings for theweirs and major structure. These designs would be based on the tender drawings and would be of sufficient detail to permit cor-struction to proceed.

(b) Construction supervision of Sidorejo Weir, Klambu Barrage and othermajor structures.

(c) Construction supervision of main and secondary canals, associatedstructures, and tertiary developments.

The estimated number of man-months are as shown in Table 3.

Page 145: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

137- ~~~~~~ANNEX 6- 137 - Page 7

Table 3: CONSULTANT SERVICES FOR IRRIGATION DESIGN AND CONSTRUCTION(man-months)

Project Local ForeignDesignation staff constr. constr.

ManagementProject director 3 3 3Project managaer/team leader 72 72 36Read office support 12 12 12

Subtotal 87 87 51

Detail Design of Weirs and Major StructuresStructural engineers 6 24 12Electrical/Mechanical engineers 6 12 6Supervising Draftsmen - 12 -

Subtotal 12 48 18/a

Construction Supervision-WeirsStructural engineer 192 60 60Gouting & geotechnical 48 12 12Mechanical 54 12 12Materials specialists 48 12 6Electrical 18 6 6

Subtotal 360 102 96/a

Construciton Supervisionr-Canals etc.Civil engineers - canals 250 160Civil engineers - structures 250 72Surveyors 250 - -

Geotechnical engineers 120 - -

Mechanical engineers 60 - -

Materials engineers 160 - -

Equipment engineers 120 - -

Contracts engineers 250 - -

Subtotal 2,250 72 -

Project Local Foreign Subpro-staff con. con. fessional

Total 2.709 469 165 2.250

/a 15% of the mm is for hydrotechnical devices.

Page 146: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNMEX 6-133- Page 8

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJRCT

Consulting Services for IRE

1. Flood Forecasting and Water Monitoring. A consultant will berecruited to assist IEE to supervise and advise the HEE over a period of5 years on: (a) evaluation of tenders; (b) verify the equipment and softwaresupplied by contractors. The software and equipment will be tested on severalbench mark operational computer runs; (c) verify the final installation of theequipment and its software and sign-off on the final coumissioning of theentire installation; and (d) review and advise on the training and O&H programproposed by the contractor and evaluate its initial effectiveness.

2. Dam Safety Inspection and Construction. Consultants will berecruited at least four experts, 15 mm internittant to: (a) organize coursefor at least 21 DGWRD engineer on dam safety inspection and on dam construc-tion supervision techniques. Three courses lasting about 4 weeks, each overan 18 month period will be conducted including site visits to several damsunder construction; (b) advise on O&M requirement and manual for dams;Cc) advise on procedures for establishment of a dam inspection team, i.e.,institutional, technical qualifications of team, training needs and financialrequirements; and td) develop a seismic zoning and loading code for majorhydraulic structures and for dams.

3. Water Quality Monitoring. Consultants will be hired to assist IKEto (a) set up a water quality monitoring system for the Kedung Ombo irrigationproject areas, (b) develop a plan for water quality management for the projectarea, Cc) assist in setting up of a data bank for water quality data,Cd) assist in on-the-job training of THE staff for water quality monitoring,data handling, telemetry, field checking and analysis of data, computermodelling of water quality profiles, health Impact of water quality, etc.; andCe) assist in setting up an institution for continuous water qualitymonitoring in the provinces in coordination with the Ministry of Health.

Page 147: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 6-139 - Page 9

INDONESIA

KEDUNG OHBO 4ULTIPURPOSE DAN AND IRRIGATION PROJECT

Consulting Services for IRE(man-months)

Description Local Foreign

Flood forecasting and water monitoring - 18

Training

Dam safety inspection and constructionDam engineer - 4Structural engineer - 4Engineering geologist - 4Instrument engineer - 3

Subtotal 15

Water QualitySenior water quality specialist 24

Total 57

Page 148: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-140 Page I

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Flood Forecasting and Water Monitoring System

Introduction

1. The flood and water supply monitoring system will consist of a net-work of sensors and telemetry to report meteorologic and hydrologic data inreal time to a central operations center equipped with computer systems andsystems softcware to fully automate the reception and archiving of data andtheir subsequent use. Computer models and applications software will be usedfor the purpose of forecasting floods, flood warnings, flow routing, andscheduling the delivery of irrigation water to diversion points. The contrac-tor who will be awarded the job will oversee the operations and maintenance ofthe data colLection, communications, computer system, and water control appli-cations for a period of four years after installation. During installationand the subsequent four-year period the contractor will provide training tothe Indonesian staff in all facets of operational activities.

Description of the System

2. The geographical area to be covered with the precipitation and waterlevel gauge network includes the upper catchment of the Juana River, as wellas the Serang-Lusi-Wulan catchment (see Map 18555). The Kedung Ombo Dam willcompletely regulate the flows of the upper Serang and will provide all of thesupplemental water to the Upper Sedadi (Sedadi) (13,900 ha) and the SouthCrobogan (Sidorejo) (6,100 ha) irrigation schemes. This is about 40Z of thetotal required. The supplemental water routed from Kedung Ombo to the JuanaValley (Klambu Kanan) (19,100 ha) and Lower Sedadi (Klambu Kiri) (20,400 ha)is augmented by the unregulated Lusi River (2,057 sq km) and the interveningcatchments.

3 Historically the Serang-Wulan and the adjacent coastal areas havebeen subjected to frequent and serious flooding from the Upper Serang and LusiRivers, and streams draining the southern slope of Mt. Muria. A comprehensiveprogram of channel dredging and levee improvements under Irrigation XIV (Ln.1811-IND) is under way to increase drainage and provide greater protectionfrom floods. However, the threat of flooding of Godong from the Lusi Riverhas not been reduced.

organizacion for Project Operation

4. Administration. The operation of a data collection network system,river flow forecasting, flood forecasting and warning, and scheduling ofsupplemental irrigation water will be managed from one water control center.This center will be located in Kudus.

Page 149: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 141 - ANNEX 7Page 2

5. The Water ControL Center will be the technical arm of the irrigationcounictee which allocates water to the irrigation areas. During projectconstruction the Institute of Hydraulic Engineering (IHE) will establish aSubproject Office in the Jratunseluna Project Office and will be the agencyresponsible for implementing the data collection system, flow forecasting, andother water management activities. IHE, with project staff, will continue onand operate and maintain the Water Control Center for two years after theproject is completed. The Wilayah (regional irrigation) staff will be phasedinto the Center with the IHE staff during this period and ultimateLy willasvume management responsibilities.

6. Project Elements. The project proposal is to provide the ProvincialPublic Works Department (PU) with a computer-based real-time system for dataacquisition, communications, and hydrologic modeling tailored to the projectarea. Data acquisition includes point rainfall measurements, radar rainfalldata, and water levels in streams and canals, and at water control devices.There are nine basic program elements required to provide this complete waterresources management system: (i) network of data stations; (ii) MasterControl Center at Kudus; (iii) operations communications system; (iv) computersystem with software for data management, analysis and water control opera-tions; (v) training; (vi) four-year program of operations and maintenance forthe system; (vii) radar computer facility - Semarang; (viii) computer systemwith systems and applications software for process and analysis of radarrainfall data; and (ix) local support.

7. The entire program is designed for a minimum 20-year life. Thiswill be reflected in both the design and the level of training and support.All electronics will be estimated at a 10-year life.

Data Collection Network

8. A number of radio-linked precipitation and water level gauges willbe required to satisfy the data requirements for flood warning, flood controloperations, reservoir operation, forecasting and determination of watersupply, flow routing, forecasting irrigation water requirements, andscheduling and managing irrigation water delivery. Approximately 100 radio-linked precipitation event recording rain gauges will be required. About 60gauges will be installed in the irrigation areas. The spacing of the gaugesin the irrigation areas will be such that areas of approximately 1,000 ha canbe represented. These gauges will provide a measure of the irrigation waterderived directly from rainfall. About 40 gauges will be required in the UpperSerang (7), Lusi (22), Mt. Muria (5) catchments, and the reservoir (1) anddiversion structures tl).

9. About 86 radio-linked event recording water level and controlsensors will be required. At Kedung Ombo Dam, the reservoir level will bemonitored by a water level recorder installed in the intake tower. Inaddition, output will be monitored from two ultrasonic flow meters installedin the conduit supplying water to the power turbine and irrigation outlet.

Page 150: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-142- ANNE- 7Page 3

10. Radio-linked water level sensors and rain gauges will be used toestablish 12 stream gauging stations in the Upper Serang above Kedung Ombo Dam(2), the Lusi (3), the Juana (2) and the Mt. Muria catchments (4). Inaddition, a water level monitoring station will be established on the BumDrain and the Serang Lama River (see map 18555).

11. In the irrigation areas, water level sensors will be coupled withthe 60 radio-linked event recording rain gauges. The water Level sensors willbe used on the primary, secondary, and tertiary canals. This group of waterlevel sensors will provide a measure or the distribution and utilization ofthe diverted water volume in the irrigated areas. This information will beused in the assessment of irrigation water needs.

Central Control Center - Kudus

12. The master control center will be located in Kudus and will beequipped with communications facilities to receive and decode data transmittedfrom a network of about 120 field transmitters and one or more repeaters. Acomplete computer system and systems operations software to be linked to thecommunication system will serve the following functions: (i) receive data fromthe communications system; (ii) store received data in short- and long-termdata bases; (iii) provide alarm notification for floods and other significantevents; (iv) provide a maintenance logging function to aid in system diagnosisand repair; (v) interface with real-time radar rainfall data; (vi) provide agraphic display of telemetered data; (vii) provide real-time computer modelscapable of forecasting river flow, potential flooding, reservoir and diversioncontrol management, and irrigation water accounting; (viii) provide necessarycommunications to link WSR-74 WMS system with the computer in the KudusCentral Control; (ix) transmit operational instructions to reservoir anddiversion control stations; and (s) in addition the tenderer will furnish,install and operate a weather monitoring systetm in the Bureau of MeteorologyRadar in Semarang.

Radar Computer System - Semarang

13. The Radar Computer Facility will be located at the Bureau ofMeteorology in Semarang. The Facility consists of an EEC WSR-74-S bandmeteorology radar equipped with a digital video integrator and processor(DVIP) already in place and operational. A computer system, compLete withsystems and applications software, will be furnished and installed by thetenderer to provide real-time distributed rainfall amounts over the projectarea and also to provide a variety of rainfall and storm movement informa-tion. Models will be used to forecast firm and probable (as appropriate)short-term unregulated flow and reservoir storage in the system that isavailable for irrigation supply. The output will be used periodically by theirrigation committee to aLlocate and schedule water delivery to the irrigationareas. Given the irrigation water schedules, models will be used to determinereservoir releases, if needed, and to modify reservoir releases and flows inthe system during the delivery period in order to account for direct rainfallto the irrigated areas and for differences in projected and actual unregulatedflow supply.

Page 151: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-143 - ANNEX 7Page 4

14. Communications System. The network of rainfall, water level, andflow measuring sensors will be linked to che Water Control Center in Kudus bya line-of-sight radio communicacions system. The system will consist ofdemand- and event-actuated VHF radio transmitters at sensor sites,strategically located repeaters. and a central radio receiver in Kudus toprovide the interface between remote data stations and the central computerfacility.

15. Flood Forecasting and Flow Routing. The network of gauges providingreal time data for rainfall and water levels together with the computersystems and applications software will provide the following capabilitiesduring flood : (i) reservoir management for flood control and hydro poweroperation; (ii) rainfall-runoff simulations in the upper catchment areas,including Mt. Muria; (iii) flood forecasting and flood routing for reaches ofthe Upper Serang, Lusi, and Wulan Rivers; (iv) flood warnings for Purwodadi,Godong and at selected points in the lower reaches for levee monitoring andemergency spillway operations.

Water Accounting and Management

16. The data network provides continuous real time data related to thedelivezy of water to each irrigation area. Within each area the network ofrainfall gauges provides a measure of water supplied directly to the area.The water level gauges provide an index to the distribution of water withinthe system. Water level gauges will usually be located on secondary andtertiary canals. Whenever possible gauges will be located at existingparshall flumes or structures with fized control characteristics. Recordsfrom these gauges, used individually and collectively, will provide accuratereal time information of flows and water supply delivered to selected subareaswithin each irrigation area.

Cost Estimates

17. Annex 5, Table 4 gives the sumary of quantities and cost estimatesof equipment and services.

Implementation Program

18. The whole system will be implemented in four phases (see Figure1): (i) The first phase will involve the setting up of a flood warning systemin the Serang River during the construction of the coffer dam. This systemwill forecast floods upstream of the coffer dam and will give advance warningdownstream of possible dam break conditions. This system will have to becompleted by the 1986/87 wet season (September 1986). (ii) The second phaseof the system should be installed to perform the entire flood forecastingoperation for the Lusi-Serang Rivers through the center at Kudus in September1987. (iii) The third phase of the system should be installed to perform both(i) and (ii) and to do water allocation for the South Crobogan (Sidorejo) andUpper Sedadi (Sedadi) systems in June 1989. (iv) The fourth phase of thesystem should be installed to perform the entire flood forecasting operationin June 1990.

Page 152: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESI AKEDUNG OMKO MULTIPURPOSE DAM PROJECT

FLOOD WARNING AND WATER MONITORING SYSTEM

1 985 19 s6 1 987 1988 1989 1990

I APPOINTMENTOF CONSULTANT v C - t - 1 1

2 TENDERING ANDAWARD

1 -- _ . _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ __ _ _ _ _ _ _ _ . - __

__ __ __

S I FLOOD FORECASTINGSYSTEM FOR COFFERDAM

4 FLOOD FORCCASTINGSYSTEM FOR SERANG C-

5 MONITORINO WATERFOR U SEDADIS. GROSOGAN C

6 VATER MONITORINGSYSTEM FOR L.85EDADI AND JUANAVALLEY

71 COMMISSIONING OFdTOTAL SYSTEM

E2 COMPLETION TIMES

Page 153: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-145 - ANNE 8

INDONESIAKEDUNG OMBO MULTIPURPOSE DAM PROJECT

PROPOSED ORGANIZATION FOR RESETTLEMENT

OTHER input MINISTERS OF

MINISTERIES HOME AFFAIRS

input

GOVERNOR .9- resettlement plan D

LFNERNOR | 4 ainput BAPPEDA|

resettlement/policy input

feedback

consultation _ ic n

FISHERIES ANIMAL TOURJSM INDUSTRIAL RECRUITMENTTRANSMIGRA- DEVELOP- HUSBANDRY DEVELOP DEVELOP- FORTION MENT DEVELOP- MENT MENT CONSTRUCTION

. | ~~~~~~RESETTLEMENT|,_

| PEOPLE

Page 154: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-146- ANNME 9Tasble 1

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Operation and Maintenance Staffing Requirements

Section Offices

Kedung DownSerang Serang Ombo River /aAtas Banah Pati dam works-

Section StaffChief oSection 1 1 1 1 1Chief of Technical 1 1 1 1 1Chief of Administration 1 1 1 1 1Chief of Operation 1 I 1 1 ITechnical staff 6 8 8 4 2Administration staff 12 15 15 5 8Operation staff 7 7 7 3 4WorkshopTechnicians 1 1 1 3 4Carpenters 1 1 1 1 -Mason 1 1 1 1 -Machine operator 1 1 1 1 3Workshop labor 1 1 1 2 3

Operators 2 2 2 4 2Storage clerk 1 1 1 1 2Supervisor 2 3 3 1 -Telephone operator & others 5 6 6 5 2

Subtotal 46 51 51 35 34

Field StaffIrrigation supervisors 5 5 5 - 4/b'Water masters 12 26 26 - -Technicians 5 10 10 - -Water master staff 10 12 12 - 11/cGate keepers 45 157 155 - 38Permanent labor 11 24 25 40 25Seasonal labor 50 90 90 30 50

Subtotal 140 324 323 70 128

Total 186 375 374 185 162

/a Port of Serang Bavah.

/b Supervisors.

/c Foreman.

Page 155: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 9- 147 - Table 2

INDONESIA

KEDUN 3NBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Existing Operation and Maintenance Staffing forSerang Atas Section (10,000 ha)

Position Number Salary/month YearlyRp

Chief of Section 1 135,000.00 1,620,000.00Chief of Technical 1 100,000.00 1,200,000.00Chief of Administration 1 100,000.00 1,200,000.00Chief of Operation 1 100,000.00 1,200,000.00Technical staff 6 70,000.00 5,040,000.00Administration staff 12 70,000.00 10,080,000.00Operation staff 7 70,000.00 5,880,000.00Workshop 1 80,000.00 960,000.00

Special technicians 1 45,000.00 540,000.00Carpenters 1 45,000.00 540,000.00Mason 1 45,000.00 540,000.00Machine operator 1 45,000.00 540,000.00Workshop laborer 1 30,000.00 360,000.00

Operators 2 70,000.00 1,680,000.00Storage operator 1 45,000.00 540,000.00Supervisor 2 50,000.00 1,200,000.00Apprentice 1 30,000.00 360,000.00Telephone operator 1 30,000.00 360,000.00Guard 2 30,000.00 720,000.00Messenger 1 30,000.00 360,000.00Gardener 1 30,000.00 360,000.00

Subtotal 46 35,280,000.00

Operation StaffIrrigation supervisors 7 90,000.00 7,560,000.00Water masters 12 80,000.00 11,520,000.00Technicians 5 80,000.00 4,800,000.00Water master staff 10 50,000.00 6,000,000.00Gate keapers 45 45,000.00 24,300,000.00Permanent labor 11 30,000.00 3,960,000.00Seasonal labor 50 25,000.00 15,000,000.00

Subtotal 140 73,140,00.00

Total 186 108,420,000.00

Page 156: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 9i-: - 148 - Table 3

INDONESIA

KEDUNG OXBO -:UL.TIPURPOSE DAM AND IRRIGATION PROJECT

Existing Operation and Maintenance Staffing forSerang Bawah (20,000 ha)

Position Number Salary/month YearlyChief oRp

Chief of Section 1 130,000.00 1,560,000.00Chief of Technical 1 95,000.00 1,140,000.00Chief of Atministration 1 95,000.00 1,140,000.00Chief of Operation 1 95,000.00 1,140,000.00Technical staff 8 65,000.00 6,240,000.00Administration staff 15 65,000.00 11,700,000.00Operation staff 7 65,000.00 5,460,000.00Workshop 1 70,000.00 840,000.00

Special technicians 1 40,000.00 480,000.00Carpenters 1 40,000.00 480,000.00Mason 1 40,000.00 480,000.00Machine operator 1 40,000.00 480,000.00Workshop laborer 1 25,000.00 300,000.00

Operators 2 65,000.00 1,560,000.00Storage operator 1 40,000.00 480,000.00Supervisor 3 45,000.00 1,620,000.00Apprentice 1 25,000.00 300,000.00Telephone operator 1 25,000.00 300,000.00Guard 1 25,000.00 300,000.00Messenger 1 25,000.00 300,000.00Gardener 1 25,000.00 300,000.00

Subtotal 51 36,600,000.00

Operation StaffIrrigation supervisors 5 80,000.00 4,800,000.00Water masters 26 75,000.00 23,400,000.00Technicians 10 75,000.00 9,000,000.00Water masters staff 12 45,000.00 6,480,000.00Gate keepers 157 40,000.00 75,360,000.00Permanent laborer 24 25,000.00 7,200,000.00Seasonal laborer 90 20,000.00 21,600,000.00

Subtotal 324 147,840,000.00

Total 375 184,440,000.00

Page 157: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNME 9- 149 - Table 4

INDONESIA

KEDUNG OMBO NULTIPURPOSE DAM AND IRRIGATION PROJECT

Cost of Operation and Maintenance

Costs in $/ha/yrDown river

Dam Irrigation works

Section staff 1.8 3.0 1.5

Field staff 0.5 7.0 1.0

Administration /a 1.0 1.5 0.7

Material costs /b 1.0 1.5 0.6

Equipment cost /c 0.5 2.0 2.0

Special equipment 2.0/d

Other costs 1.6/e - -

Total Costs/ha/yr 8.4 15.0 5.8

Total Costs $500,000 $890,000 $344,000

/a Include consumables, telephone, electricity, travel, social costs, etc.

/b Replacement of gates, chemical, laboratory supplies, etc.

/c O&M and minor replacement costs for equipment.

/d Includes O&M for telemetric, dam instrumentation, etc.

/e Includes costs for dam safety inspection and other costs.

Page 158: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

-153 - ANNEX 10

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAM AND IRRIGATION PROJECT

Statement of Expenditures

1. Statement of expenditures will be used for disbursements against thefollowing:

Item Loan amount($ million)

Civil works contracts costing less than 33.00$1.5 million equivalent for irrigation tertiaryworks, rehabilitation of some secondary canals andconstruction of inspection roads under 32 contracts

Dam safety inspection and construction training 0.15courses and fellowships

Water quality monitoring training 0.52

2. Civil works contracts, 32 in total, will involve: (a) three con-tracts for new secondary canals, three tertiary contracts, and two for drainsand roads contracts in the Sidorejo system; (b) three tertiary and sevensecondary drains and roads contracts for Klambu Kanan; (c) rehabilitation offour secondary, and two tertiary canals and two drainage systems and roadscontracts for Sedadi; and (d) rehabilitation of three drainage and roadscontracts for Klambu Kiri system.

Page 159: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

ANNEX 11-151-.-

INDONESIA

KEDUNG OMBO MULTIPURPOSE DAN AND IRRIGATION PROJECT

Selected Documents and Data Availablein Project File

1. Kedung Ombo Dam Bank Mission Report, Oct. 28, 1984.

2. Kedung Ombo Dam Bank Mission Report, May 20, 1984.

3. Kedung Ombo Dam Bank Mission Report, Feb. 14, 1984.

4. Kedung Ombo Dam Design and Irrigation Project Interim Reports -Main Report (Vol. 1); Agriculture (Vol. 2); Hydrology (Vol. 3); Irrigation(Vol. 4); Dam and Power (Vol. 5) - by SMEC, May 1984.

5. Kedung Ombo Dam Tender Documents Contract No. SKD-5, Volumes 1 and 2, byDirector-General of Water Resources, August 1984.

6. Kedung Ombo Dam Tender Documents Contract No. SKD-5, Volumes 3 and 4(Technical Specifications), by SMEC, August 1984.

7. The Improvement of Development of the Serang River and Irrigation Project- Definite Scheme Report - Dam and Power Station (Vol. 2), Dec. 1979;Downriver Works (Vol. 3), Sept. 1978; Water Investigations (Vol. 4), March1978 - by SMEC.

8. Review of Dam Design and Preliminary Design of Irrigation Works - MainReport (Vol. 1), June 1984; Agriculture (Vol. 2); Hydrology (Vol. 3);Irrigation (Vol. 4); Dam and Power (Vol. 5), May 1984 - by SMEC.

Page 160: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIAKEDUNG OMBO MULTIPFURPOSE DAM PROJECT

Director General Water Resources Orgnizatlon

..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

I IlltcRnttwiv. -i D| Llatt | ,

I Ve ICU C, f,.** I I &WMV to UCID COX" . ~ ~ Wut L'gIREC~~~~~~~~~~~~~~m h?9 GEN At:lIWt I A k. vi. a. Ass ~t*Ct HIFRct RBeitancNtF

I iv-4aw, ,,WI.

t' t2 ct atWtI g e n. t. *

A, bralv ra _ __ _ _

_______ I .__,__..___

1m1~~~~~secsmveW m9FOV1CAntEL 0ahs* 1 1 114M" st JKlI. 0ua 11 1 .11]0^t 10 1st

CVamd m26

Page 161: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Structure od OrganizotionJratunseluna Rher Basin Development Project

(DGWRD Decree Leffees No. 282/KPTS/A/1983 Doted July 25,1983)

g DlNeclor G~ d walett l

|~~~~~~~~~~~~~~~~~~~~~~~xeur Soora of |areMRa Eu ee*

. 1-

PmrI.| ctlt A tFo

Amvi'Ic AaIt~ toAW'Ir s1I, &itg A"willMfaori ffWUVQ AdTVfA4ftrtal

Chef DvfttC chw I t h >

[2Fobttf,fobbXd~~~~~~~~~~~~~~~~~~~~dtpw or- X I -- I. 4t19<tll .~~h"'

. . t ,. sW 1~~~~~~~~~~~~~~~~ t d F tcrAt C d ~ ~ ~ ~ ~~~~rUin-262

Page 162: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

Organization for Dam Construction

G.anuoI PIgc M._o;g l *ctunklm*"Sam oftqiw

*Ks" On= DwC M

taf fo AMP b Dan Om EN#peer fuGen lor Ho ft kw *X l

~~~~~~~~~~~~~~~~~~~qd soto W &

II I

Chiel Dtv Chid Div.hIv.

Ia a A F cw Omr CITI NfgW Roo & Iajw UM WO O Lftvrt~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Cnst rr r A r r rar

YW 6"-266M0

Page 163: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIAKEDUNG OMKO MULliPURPOSE DAM PROJECT

Organizatoon Scheme br IngotIon Prowect

* I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I,

I Ckfd0k MM M D I

1I11 p i Ijii [X E

CIWIiv@ O tdf l l d5 hbe 1 CI Wd O| g1o I1 aha |~~~ CWi~ OS~ d-=

I Gcd II 1 1 P }1 }1 9 u e 0lalR ko ht Ao llS §dgouI & IAreaJAMC AJoo Aa A.,uo PvgO M Fed C

V*M W*2663'

Page 164: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

INDONESIAKEDUNG OMBO MULTIPURPOSE DAM PROJECT

Schemaik Used tor Operations Study SR1QDPL0) |L6(21) QCRLM796)

AE1rAE FOR UD.WI t I0 (Is) D NK

,ICIAL PR*GA1)N AP.iA KEAS'I (4ID)

BENDUJNG S -

SE~~~~~P

CDOV 25 MID__ __ __ __ __ _ *26I

w / < (13MOWO 2 I~~~FLO-LP (23 \\ "fxPWES

\\L & RE0FOWS

(1046) 164M5L~~~~~~~~(161

g ~~~~~~~~~~~~~~~~~~~JVAUE _IIA030^

A~W MJ*F#I1 MRL

R^,fQ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~~~~~~~~~~~~~~IRmI AREAWNw

TO ~AL WATER SLFPLV- ^LWAE

FItPY AND RElUZ

- ----- IVVW IV Wde"a-26mi0 dt 0 h t ) h MOA ~~~~~~~~~~~~~~~~~~~JAVA 5EA

Page 165: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

- 157 -

INDONESKAKEDUNG OMBO MULTIPURPOSE DAM PROJECT

Paect CooIdlabn for ImpsntAon

bV d *_~~& .'g MJbIy

me Po"

Di.o PSuhoon Okoctau9sGwmml d unwm 6mnu" of

Rk-ourc v 1 gon_ -_ - - - - ----- - chGOfw

OdOPIIiSft ) (PLN) Autonanw

DkuctDo'tot Dllctargoo Dll"JRdmtO

NAfONALO.,-.-----.000 ...............- - -- ................................... ..........

POW Go I

Office

M I

-- Ientmo -

"a Ovmo

- LhuCICOiTtnd %

Gmbogan Muck

- - LkwdCowdndIm

Bdw* - 26718

Page 166: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

o*_- 4HAILAND * li> w - .l0UIR l

¢- ) 7<-Ju ,. ;:. x PHttiPPa~~~~~~~~~~~~~~~~~~~~EDNEs'. OMPO MULTIPURPOS PROJET

>\ ~~>>< % \ 0 r f S e t | ~~ } B>RUNEI ,p,vA2e_-AW0VAWd DM

C.1 ^ MALAYSIA ZX ISAAKPON-.d MAMWWA ROA ............................. NX_

< ~ ~ ~ ~~OPR pm , .z m s o . I

.L;o~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

Page 167: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

., ~.

I ND ONE SI A- ,2 A L-2 KEDUNG OMBO MULTIPURPOSE DAM PROJECT

.... '.. ~~~~~~~~~~~FLOOD PRONE AND SWAMP AREAS r

IE GAUCH AMAS OF TM PIOKa

'I 551~~~~~~~~MSOG I1GAUON AlIS O 10 IE 9OWOuIEI NGAUO4 MA GUI OF UTE FOF f

... _ _ _ _ ' EMNT4t SWMES

- SI@ M ISia FLOOD MOM M

G. -- '''.';'' K NEW MOM CM4^LS

*~~~~~~~~~~~~~~~~~~~~U N 02M TO OE EO I AM M S __XMr

- - s_ d, -- \ r _o -ai r*EW bM TO BE CONSnWf 0WQlN wi

- ll te ,---,dzfra -s ~~~~~~~~NEw %VM

, J tS / / @ SIA1 ~~~~~~~~won

\~~~~~~~~~~~~~~~~~~~~~~~POOE DAh v %f >_-_

....... J VA. E

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~LLvv

, . . .~~~~~~~~~~~~~~~~~~~~~~~~~~~~av^lw4

;~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

, ... .~ ~

.. ... .. . ..... ...... .~~~~xa m cm

Page 168: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

T; W t g 'S ''t f;t ,.020 f X . // MURIA VOLCANO

. .~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~A 3N

.000 J.A V A S E A

,.,, DUNI AlDlNO ARIA

- P~~~~~~ILAY RAN ARIAA

10,560 ha~~~IN ON SI

/SKEDUNG OMBO/ \ 7,030 ha . /MULTIPURPOSE DAM PROJECT

II\ \ RONTAKE New Irrigotion Areas

|_\_._t Irrigoted Land

Major Rivers

\- AR-- Minor RiversNew Irrigation Canals

IIt!** Canal ExpansionfluMhhme_avi'. is.4dbi~ *9 *9** is_b UPPER SERANO Irrigation Canals

d flW ~US'* bV i*AS REAwtw.is| wshuisuis9WV ,s, t -jio ha Drains Under Irrigation XIV

___________________________________________________________ I.UAAUA Levees Under Under IIrrigatonn XII

N<> ,-, _ s 4_ |_ New Barrage or Weir/& rA AY V Wr ir

.i- . 't0^ " S * #8sM ,* .#g! .' . @,* '. 1.' \ X4', Z 9 Irrigation Pumping Plant To So Removed

* ~ ~~ EDB ERA Irrigolion Intake

f / . . Project Boundary

I {', Isl.oiAN f' '-1 , , J'. -* . / Internationol BoundaryMAN*' '.SCHEMATIC DRAWING -

________________________________________________________ __ .;To k.d -w, NO T TO SCALEf | . b , , , . , | rO KAunR ~~~~~~~~~~~~Ombo Doma Ot1

Page 169: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

:.- :'l Ag l: 1m 1

KEDUNG OMBO MULTIPURPOSE DAM PROJECTLAYOUT OF IRRIGATION AREAS UNDER THE PROJECT

-;~~~~~~~~~~~~~~~~~~~~~~~~~~M . - -;s -X

- '-- d .I

----- -: Gokws; as m.xt -F-

-.J A V A -S E A

W~~~~~~~~~~~~~~~EU

_ _ _ _ _ _ _ ~ ~~ ~~~~~~~~~- 1-

i w~~~~~~~~O

C4SS

mpomm swmm).

Page 170: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

IBRD 18530

110*45

JAV SE-;- --. :D A INDONESIA

: .- N--WEDUNG KEDUNG OMBO--: -:- ,=% -- s /9°,<t MULTIPURPOSE DAM PROJECT

0: -, 9., \ i (s ~WATER USER ASSOCIATION-A - X x> txUPPER AND LOWER SEDADI

L~ N, \% w K_ -i_

, , ~~~~,\ -_

-N E ~\~Xo 4~ )A" P~EIAVA!DAM / ' .oKudus

!' 0 .4ertAc e .5KABANGANYAR

| CROPPIN PATTEPUMP STATION

DDemak Ac

~~~~~ ABoiPoiPlwio, ' AI - /

WATER USER ASSOCLATIONS - --...- * -

kEIR Very Active I /UNTANG j-

- -oiPd-oowj z S b

El Moderately Active SEAN' N'WLLUGSTLCTR

CROPPING PATTERN NC

AA Podi-Podi-Poldi

A Podi-Padi-Polowijo / A

B Podi-Podi-Palawijo K C Padi-Podi-Plalwijoi

D Podi-Padi-Polowiio orPadi-Palawiia-Polowija\\'* K70

E Podi-Palowijo-Polowija 7O>-

F Padi-Polowijo-Polowijaor 'o r-Godo o - (' -

Podi-Polowiji-Follow

- Main Canals - - A %u

Other Irrigation Canals w, \'

Major Rivers

RiverslMojor Drains

-- Inrmotional Boundories

KILOMETERS0 5 10

MILES 0 5

;, , - A L A r s I ^ t - - S O^CI^C C'-! SFDZI WEIRW L

: J uD;b~...- - '_-- flw,c_ C_ bcewus11,rw,3IU of*** 1*i 101

,~~~~~~~~~~~~~~~~~~~~~~M . -I to or 70 ,t x .; -t I R- Cwgm O -..v __ n bvv

NOVEMBER 1984

Page 171: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240

IBRD 18531

INDONESIA U A L a r I A

KEDUNG OMBOMULTIPURPOSE DAM PROJECT

PRESENT AND FUTUREADMINISTRATIVE BOUNDARIES

Existing Wiloyah Boundaries Proec A : ,

Proposed Wiloych Boundaries .__

- - - Seksi Boundaries

..... Kobupoten Boundaries

:Z'^ New Irrigation Wilayay ch '- P '

Irrigation under the Project .

-- - International Boundaries OSpo ' . ORunbvg

! a v a Se a

KendelO a OSEMAJANG

IRIATO IRIA IO SETO OFFICES'AW '-'I

3. rUNAN 3--- TUNTANG

3 %al \ j . (-

\ ) r 14"''''"'"''"---""'IC. -'*

2.~~~\ PAT 6. OUU .S13N ATAS

7.~~~ ~ ~ .'ER 5'"" SEAGAA1 0 B L O R _ _ _ _ _ _ _ _ _ _

1E \

IRRIEGIATINON IRRIGATION SECTION OFFICES PRESENT FUTURE

1. SEMERANG l. BODARI 1 WODGRI12. RAWAPENING 2 RAWAPENING3. TUNTANG 3 TUNTANG4. SERANG ATA 3S. SERANG BAWAH .:.2.. .. __-,.-

2. PATI 6. 'BLDUS 4 SERANG ATAS7. JEPARA 5 SERANG E AWAH8. PATI 6 KUDUS9. REMBANG 7 JEPARA

1 O. BLORA 8 PATI9 REM0ANG KILOMETERS o,255

1 O BLORA....

3. SURAKARTA 11. WONOGIRI 11 WONOGIRI12. KLATEN 12 KLATEN13. KARANG ANTAR 13 KARANG ANTAR14. BOTOLALI 14 00TOLAULI_ __t w _s ~ _

15. BRAGEN 1S 0RAGEN _d _ w _= _ _ _

NOvEMBER 1984

Page 172: World Bank Document€¦ · km, 150 kV) and three micro-hydropower plants (about 1.8 MVA each) and associated transmission lines (20 kV); (b) improving existing irrigation (34,240