Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan :- Feb 17, 2014 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: May 31, 2014 to May 30, 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Table A3.3 of PAD. Expenditure Category Contract Value (Threshold) Procurement Method Contracts/Processes Subject to Prior Review >= US$7.500,000 ICB All contracts over US$ 10 m equivalent <US$7,500,000 NCB All contracts subject to post review Works <=US$50,000 Shopping All contracts subject to post review >=US$600, 000 ICB All contracts over US$ 1 m equivalent <US$600,000 NCB All contracts subject to post review. <=US$50,000 Shopping All contracts subject to post review Goods DC All contracts costing more than US$ 100,000 equivalent 2. Prequalification. : Not Applicable 3. Proposed Procedures for CDD Components: According to the PAD: A limited number of small works may be procured following and Community Based Procurement with clearance from World Bank in accordance with the Procurement Administration Manual of the Project. 4. Reference to (if any) Project Operational/Procurement Manual: Project Procurement Administration Manual – January 2014 5. Any Other Special Procurement Arrangements: Not Applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Procurement Plan

I. General

2. Bank’s approval Date of the procurement Plan :- Feb 17, 20143. Date of General Procurement Notice: -4. Period covered by this procurement plan: May 31, 2014 to May 30, 2019

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Table A3.3 of PAD.

Expenditure Category

Contract Value (Threshold)

Procurement Method

Contracts/Processes Subject to Prior Review

>= US$7.500,000 ICB All contracts over US$ 10 m equivalent

<US$7,500,000

NCB

All contracts subject to post review

Works

<=US$50,000 Shopping All contracts subject to post review

>=US$600, 000 ICB All contracts over US$ 1 m equivalent

<US$600,000 NCB

All contracts subject to post review.

<=US$50,000 Shopping All contracts subject to post review

Goods

DC All contracts costing more than US$ 100,000 equivalent

2. Prequalification. : Not Applicable

3. Proposed Procedures for CDD Components: According to the PAD: A limited number of small works may be procured following and Community Based Procurement with clearance from World Bank in accordance with the Procurement Administration Manual of the Project.

4. Reference to (if any) Project Operational/Procurement Manual: Project Procurement Administration Manual – January 2014

5. Any Other Special Procurement Arrangements: Not Applicable

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement)

Reference No. Description Estimated Cost

US$ Million PackagesDomestic Preference (Yes/No)

Review by Bank (Prior / Post)

Comments

Summary of ICB (Works) - - - - -

Summary of ICB (Goods)

384 1 Post

Summary of NCB (Works) 65.071 230 Post

Irrigation

Department 26.726 172 Post

Mahaweli Authority of Sri

Lanka 9.743 30 Post

Road Development

Authority 21.453 10 Post

National Building Research

Organization 6.349 15 Post

PMU 0.9 3 Post

Summary of NCB (Goods) 6.281 28 Post

Summary of ICB (Non - Consultancy Works)

- - - - -

Page 3: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

III. Selection of Consultants

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Table A3.3 of PAD.

Expenditure Category

Contract Value (Threshold)

Procurement Method

Contracts/Processes Subject to Prior Review

>=US$300,000 All competitive methods; advertise internationally

All contracts over US$1 m equivalent

<US$300,000 All competitive methods; advertise locally

<US$300,000 CQS

All contracts subject to post review.

Consultant Services (firms)

SSS All contracts costing more than US$ 100,000 equivalent

IC ( (Section V of Consultant Guidelines)

All contracts over US$300,000 equivalent

Individual Consultants

IC- Sole source All contracts costing more than US$ 50,000 equivalent

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: Not Applicable

4. Consultancy Assignments with Selection Methods and Time Schedule (during the first 18 months after project effectiveness)

Reference No. Description of Assignment

Estimated Cost US$ Million

PackagesReview by Bank (Prior / Post)

Comments

Summary of number of contracts that will be let under QCBS 8.5 2 Post

Summary of number of contracts that will be let other methods 3.17 7 Post SSS

Page 4: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 1

PROCUREMENT

PLANSri Lanka : Climate Resilience Improvement Project (CRIP)

General Information

Country: Sri Lanka Bank’s Approval Date of the Original Procurement Plan: 2016-08-24

Revised Plan Date(s): (comma delineated, leave blank if none)2019-09-08

Project ID: P146314 GPN Date:

Project Name: Climate Resilience Improvement Project (CRIP)

Loan / Credit No: IDA / 54170, IDA / 57680

Executing Agency(ies):Ministry of Irrigation and Water Resource Management

WORKS

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LK-MOIWRM-3486-CW-

RFB / Rectification of

unstable slopes at Haggala

along Peradeniya-Badulla-

Chenkaladi Road (A05)

(CRIP/WORKS/RDA/ICB/308

)

IDA / 54170Increasing climate

resilience of infrastructurePrior

Request for

Bids

Open -

International

Single Stage -

One Envelope2,950,000.00 0.00

Under

Implement

ation

2016-11-

17

2016-11-

22

2017-01-

03

2017-02-

02

2017-03-

09

2018-03-

08

LK-MOIWRM-3479-CW-

RFB / Construction and

rehabilitation of flood

control structures and

flood protection structures

of Kalawewa Right Bank

Main Canal and left bank

canal.

CRIP/WORKS/MASL/NCB/

227

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope284,615.38 0.00

Under

Implement

ation

2017-01-

02

2017-01-

09

2017-01-

30

2017-02-

13

2017-03-

13

2018-03-

12

LK-MOIWRM-3478-CW-

RFB / Rectification of

unstable slopes in the

premises of

Maha/Sirimalwatta Maha

Vidyalaya Gunnapana

(CRIP/WORKS/NBRO/NCB/

355)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope310,000.00 0.00

Pending

Implement

ation

2016-12-

01

2016-12-

08

2016-12-

10

2016-12-

24

2017-01-

21

2017-03-

07

LK-MOIWRM-4970-CW-

RFB / Flood damage

repairs and Improvements

to L.B. Main canal from

stn 0+000 km to 10+000

km, Construction of

Nethravil Anicut & Flood

damage repairs and

Improvements to LB 1A &

LB 1 canals in Ampara

Unit

CRIPAF/WORKS/ID-

AMP/NCB/01

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 155,575.28 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-05-

10

2018-05-

05

LK-MOIWRM-4972-CW-

RFB / Rehabilitation Of

UB 12 D-Canal with Field

canal &Rehabilitation of

D-Canal with Field canal

IN Uhana Unit

CRIPAF/WORKS/ID-

AMP/NCB/02

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 0.00

Under

Implement

ation

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-4971-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

50-1

Rectification of unstable

slopes in the premises of

Molagoda Sri Piyadassi

Vidyalaya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 145,233.49 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-4974-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

53

Rectification of unstable

slopes in the premises of

Maha/Kasawaththa Muslim

Kanishta Vidyalaya &

Maha/Rambuke-Ela Muslim

Maha Vidyalaya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope346,153.85 167,449.84 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-4975-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 101 Protection of

Canal Bunds of LB Main

Canal of Ulhitiya Reservoir

& Miscellaneous

rehabilitation works in

Girandurukotte,

Sandunpura and

Madagama Blocks.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope253,846.20 161,097.66 Signed

2017-01-

16

2017-01-

23

2017-02-

13

2017-02-

27

2017-03-

27

2018-03-

27

LK-MOIWRM-4977-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/03

Flood damage repairs and

Improvements to LB 23,

G4, G21.1,G22,G22.1 &

LB22 canal in Gonagolla

Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope216,000.00 393,951.09 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-4981-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/04

Flood damage repairs and

Improvements to M 31, M

31.5, M 31.5.1, M 31.5.2,

M22 & M23 canal in

Annamalai Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope124,000.00 169,424.05 Signed

2017-03-

07

2017-03-

14

2017-04-

04

2017-04-

18

2017-05-

16

2018-05-

16

LK-MOIWRM-4980-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

59

Rectification of unstable

slopes in the premises of

Gampola St. Joseph Girls'

College

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope461,538.47 107,913.51 Signed

2017-01-

30

2017-02-

06

2017-02-

27

2017-03-

13

2017-04-

10

2017-10-

07

LK-MOIWRM-4982-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/05

Flood damage repairs and

Improvements to RB-04,

RB-15, RB-19 & RB-17

channel in Damana Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope161,000.00 0.00

Under

Implement

ation

2017-02-

22

2017-03-

01

2017-03-

22

2017-04-

05

2017-05-

03

2018-05-

03

LK-MOIWRM-4979-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 102

Construction of Tough

Structure at 206/D6/TC 47

as Ulhitiya Unit and at

2014/D4/FC28 at

Hobiriyawa Unit in

Girandurukotte Block

IDA / 54170Increasing climate

resilience of infrastructurePrior

Request for

BidsOpen - National

Single Stage -

One Envelope121,286.50 0.00

Under

Implement

ation

2017-01-

19

2017-01-

26

2017-02-

16

2017-03-

02

2017-03-

30

2018-03-

30

LK-MOIWRM-4983-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/06

Flood damage repairs and

Improvements to RB-07,

RB-11, RB-12, RB-05 &

RB-18 channels in Damana

Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope173,076.92 209,993.82 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-4984-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/07

Flood damage repairs and

Improvements to M-5.5.3,

M-5.6, M-5.2.1 & M-1.3

canals in Weeragoda Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope238,461.54 196,310.85 Signed

2017-03-

22

2017-03-

29

2017-04-

19

2017-05-

03

2017-05-

31

2018-05-

31

LK-MOIWRM-4986-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

60

Rectification of unstable

slopes in the premises of

Vidyartha Vidyalaya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope538,461.54 120,395.60 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2017-10-

14

LK-MOIWRM-4985-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 103 Construction of

Concrete Retaining Walls

for the Rathkinnda Right

Bank Branch Canal No.02

& Construction of Tough

Structures 402/D5/FC50 at

Webadagama in

Sadamadulla Unit in

Sadunpura Block

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope247,328.60 280,893.92 Signed

2017-02-

01

2017-02-

08

2017-03-

01

2017-03-

15

2017-04-

12

2018-04-

12

LK-MOIWRM-4987-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 104 Construction of

700 m long reinforced

concrete retaining wall at

27+610 km to 27+310 km

of side canal bank of

Right bank main canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 0.00 Canceled

2017-02-

10

2017-02-

17

2017-03-

10

2017-03-

24

2017-04-

21

2018-04-

21

LK-MOIWRM-4989-CW-

RFB /

CRIPAF/WORKS/MASL/S/10

5 Construction of flood

protection bund at Kuda

oya (940m d/s of 503

anicut) and flood protection

bund to spill drainage of

Bamunakotuwa tand (Near

FC08, 09/D01) of Track 04

of Aralaganwila unit, of

Wijayabapura block

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope30,769.20 0.00 Canceled

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-4992-CW-

RFB / Construction of

Gabion wall U/S and D/S

of 503 Anicut

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 0.00

Pending

Implement

ation

2017-02-

15

2017-02-

22

2017-03-

15

2017-03-

29

2017-04-

26

2018-04-

26

LK-MOIWRM-4993-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 108 Construction of

flood protection bund near

the FC 03 and

rehabilitation &

improvement of

FC03/D1/302 (0+00km to

0+450 km and 0+739 km)

in Sooriyawewa Unit in

Singhapura Block

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope45,384.62 89,795.58 Signed

2017-01-

19

2017-01-

26

2017-02-

16

2017-03-

02

2017-03-

30

2018-03-

30

Page 5: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 2

LK-MOIWRM-4994-CW-

RFB /

CRIPAF/WORKS/MASL/S/

109 Construction of Gabion

Wall for D/S eroded

section of Bowatenna

Spillway Tail Canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope46,161.20 0.00 Canceled

2017-01-

23

2017-01-

30

2017-02-

20

2017-03-

06

2017-04-

03

2018-04-

03

LK-MOIWRM-4995-CW-

RFB /

CRIPAF/WORKS/MASL/S/

110 Construction of Gabion

Wall for structures at

6+250 km and 7+500 km

of Huruluwewa Feeder

Canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope49,901.80 36,741.64 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5013-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 111 Removing of

Existing Concrete lining

and Reconstruction at

Tunnel out-let Bowatenna

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 116,349.73 Signed

2017-03-

01

2017-03-

08

2017-03-

29

2017-04-

12

2017-05-

10

2018-05-

10

LK-MOIWRM-5014-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 112 Improvement of

Kandalama RB Canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope100,000.00 0.00 Canceled

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5015-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 113 Rehabilitation and

improvement works of

irrigation structures at

Dematawewa Block

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope38,461.54 26,877.59 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5016-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/08

Improvements to tank and

LB & RB drainage canal

& Flood damage repairs

andReconstruction of 10.0m

span 4.88 m width bridge

in neethai tank spill tail

chl At stn.0+600 km in

Illukuchenai unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope106,153.85 83,346.00 Signed

2017-03-

15

2017-03-

22

2017-04-

12

2017-04-

26

2017-05-

24

2018-05-

24

LK-MOIWRM-5017-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 114 Rehabilitation and

Improvement works of

irrgation works of

Kalawewa RB main canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 208,756.63 Signed

2017-03-

09

2017-03-

16

2017-04-

06

2017-04-

20

2017-05-

18

2018-05-

18

LK-MOIWRM-5018-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/09

Improvements to

Karadikkulam and

Padarakkal Kulam in

Deegawapi Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope100,000.00 59,125.24 Signed

2017-02-

14

2017-02-

21

2017-03-

14

2017-03-

28

2017-04-

25

2018-04-

25

LK-MOIWRM-5019-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/10

Flood damage repairs

andImprovements to

Pallakkadu Anicut,

Malayadi Anicut &

Kaliodai anicut with

addional spillway in

Veerayadi unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope130,769.23 69,810.15 Signed

2017-02-

22

2017-03-

01

2017-03-

22

2017-04-

05

2017-05-

03

2018-05-

03

LK-MOIWRM-5020-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 116 Rehabilitation and

improvement of right bank

main canal from chainage

33+420 km to 34+640 km

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope308,461.54 269,806.94 Signed

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-5021-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/11

Construction of box

culverts and Providing

steel gates to Muthalaikkal

anicut and D/S flood

damage repairs in

Akkarapathu Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope69,230.77 30,060.69 Signed

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-5023-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/12

Flood damage repairs and

Improvements to D'chls of

VRBC, KLBC, KL-20A &

exiting causeway at 234

road including necessary

structures in Deegawapi

Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope84,615.38 52,743.40 Signed

2017-02-

15

2017-02-

22

2017-03-

15

2017-03-

29

2017-04-

26

2018-04-

26

LK-MOIWRM-5022-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 117 Construction of

gabion protection work

along the left bank

RawanOya - D/S of the

bridge near the Open

University.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope140,769.23 110,086.33 Signed

2017-03-

23

2017-03-

30

2017-04-

20

2017-05-

04

2017-06-

01

2018-06-

01

LK-MOIWRM-5024-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 118 Construction of

gabion retaining walls at

dam maintenance premises

for protection embankment

in reservoir to control

siltation

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope159,230.77 92,524.85 Signed

2017-03-

14

2017-03-

21

2017-04-

11

2017-04-

25

2017-05-

23

2018-05-

23

LK-MOIWRM-5025-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/13

Improvements to

Veddukadu Anicut, visarai

vaikal drainage, Thiraiodai

drainage, Narrakkanodai

drainage and desilting and

widening of Udanga river

including bund strengthing

from 0+000 to 7+000 km

in Moravil, Paddampitty

Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope296,153.85 226,487.53 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5026-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 119 Rehabilitation of

Ahetugaswewa

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope461,538.46 344,790.42 Signed

2017-03-

22

2017-03-

29

2017-04-

19

2017-05-

03

2017-05-

31

2018-05-

31

LK-MOIWRM-5027-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/14

Improvements to

Kollaveliodai drainage

channel including

Reconstruction of drainage

out let to weerayadi river

in Moravil Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,538.46 0.00 Canceled

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5028-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 120 Rehabilitation of

Kiriibbanwewa

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope769,230.77 503,822.49 Signed

2017-03-

17

2017-03-

24

2017-04-

14

2017-04-

28

2017-05-

26

2018-05-

26

LK-MOIWRM-5030-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/15

Widening of Aarapaththai

bridge across Nellikadu

river in Block J Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope53,846.15 43,013.63 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5029-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 121 Construction of

new bridge across the

Mora-Oya at Singhapura

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,538,461.54 1,179,540.09 Signed

2017-03-

27

2017-04-

03

2017-04-

24

2017-05-

08

2017-06-

05

2018-06-

05

LK-MOIWRM-5031-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/16

Improvement to LB

channal of Kaliodai anicut

to cater additional flood,

Straightning of Kaliodai

anicut LB flank bund to

cater addition flood &

Flood damage repairs and

Strengthening of U/S bund

of Kothayanmadu anicut in

Sengap

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope123,076.92 27,403.07 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5032-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/17

Improvement to

Chettiyawattai main chl.at

stn from 5 + 000 to 9+000

km to cater additional

flood, Koduvapini Branch

chl. to cater additional

flood, Manamvaddai br.

Chl. to cater additional

flood & Panneerkattu

anicut and Panne

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope261,538.46 362,070.78 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5033-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/18

Scoure filling &

construction of gabion wall

proction Kurunal kanji

river bund road, RB site

and Pooran puri bund

road, Flood damage repairs

and Improvement to D/S

basic gabian wall to palla

vkl regulator in Upper

Kurunal kanji

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope307,692.31 245,539.22 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

Page 6: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 3

LK-MOIWRM-5035-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/19

Improvements to D 04 LB

02 canal & D 04 (from

1 +500km to 4+600 Km)

in L.M.C. Padaviya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope385,714.23 214,374.58 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5042-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/20

Improvements to D 5

canal , D 6 canal , D

11 FC 04 canal in

L.M.C.& D 11 of RB 02

from 1+060Km to 1+130

Km in L.M.C. Padaviya .

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope422,932.60 235,274.12 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5041-CW-

RFB /

CRIP/WORKS/RDA/NCB/31

0

Rectification of 02 unstable

slopes along Kegalle-

Bulathkohupitiya-

Karawanella Road (A21)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope326,923.08 187,803.90 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5043-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/21

Improvements to RB 12 in

D 15 canal from 0+000Km

to 0+600Km, . RB 14 in

D 15 canal from 0+000Km

0+432Km ,D 15 canal from

3+500km to 4+625Km &

Reconstruction of D15

Canal from 1+000Km to

1+105Km in L.M.C. IN

Padaviya.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope382,153.85 244,159.48 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5044-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/22

Construction to D 16 canal

from 0+000Km to 0+149km

& Improvements to LB

03 in D 18 , RB 03 in D

18 ,RB 05 in D 18 , D

26 canal from 0+700m to

1+050m and Cascade

Drop 01 at 25.5 Km ,

Cascade Drop 03 at 26

Km & Cascade

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope250,846.15 198,709.12 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5045-CW-

RFB /

CRIP/WORKS/RDA/NCB/31

2

Rectification of unstable

slope at Bridge no. 48/2

on Avvissawella - Hatton

Road (A07)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope115,384.62 739,047.51 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5046-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/23

Improvements to D 02

0+000Km - 2+462 km

canal , D 04 canal D 05

FC 02 0+000Km 0+128Km

canal in U.M.C. Padaviya.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope285,000.00 163,900.63 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5047-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/24

Improvements to D 07

canal ,LB 08 / D 07 canal

, RB 02 / D 08 canal &

RB 01 / D 09 canal in

U.M.C. Padaviya.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope342,307.69 303,901.60 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5050-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/26

Construction of Bridge at

1+500 LB 01 of D 13 &

Improvements to LB 08 of

D 13 canal , D 14 canal ,

RB 03 of D 21 canal , D

21 LB 01 canal & D 21

LB 02 canal in U.M.C

.Padaviya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope515,923.08 0.00 Canceled

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5048-CW-

RFB /

CRIP/WORKS/RDA/NCB/31

6

Reconstruction of Bridge

No. 23/3 on Ella-Kanthale

Road (B010)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope769,230.77 770,735.54 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

08

2018-05-

08

LK-MOIWRM-5051-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/27

Flood damage Repairs

Hurulu wewa Right bank

main canal D5 1+200

DROP, B2 1+850 culvert,

D5 FC 39 Truff, D4

FC28 Road, D5 FC 34

0+000 Drop, D5 FC 40

0+500

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 137,945.01 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5053-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/28

Flood damage Repairs

Hurulu wewa Right bank

main canal FC31 road,

DC6 FC45 ROAD,

B2/FC3/0+035 km

DROP,D7 DROP,

B2/FC6/0+100 km DROP,

D7 DROP, B2/FC16/0+250

km DROP

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 96,947.79 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5052-CW-

RFB /

CRIP/WORKS/RDA/NCB/31

7

Rehabilitation of Bridge

No. 3/3 on Makandura-

Badalgama Road (B503)

Across Maha Oya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope961,538.46 1,347,609.57 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5054-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/29

Construction of drop

structure 0+200m & 0+300

RB D2,1+410Km RB

D12,D8 FC18 in RB MC(

02 drop structures),D8

FC9,(2 no. of Drops),RB

D8 FC22,RB D6

0+250Km,RB D6 FC48,RB

D3 FC24 0+150Km,

Construction of Retaining

wall at 1+650Km

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5055-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/30

Demolishing and re-

construction of 02 Nio. Of

drops and trough structure

in RB D6

canal,Improvements to FC3

agriculture road in LB

D9,Re-construction of inlet

structure and drop

structure at 0+00m in

FC13,Construction of drop

s

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 71,283.87 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5056-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/31

Flood damage Repairs

Illuk wewa anicut

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope269,230.77 0.00 Canceled

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5058-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/33

Provinding lifting Gates to

Manankattiya Scheme

spill

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 40,446.44 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5059-CW-

RFB / CRIPAF/WORKS/ID-

BAT/NCB/34

Construction of

Mookarayankattu anicut

and Widening,

Straightening the Tributary

of Mundenai aru, Thevu

aru and Karachchaveli aru

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 289,195.19 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5060-CW-

RFB / CRIPAF/WORKS/ID-

BAT/NCB/35

Improvements to

Pallathuvelli Road and

construction of

Pammathurai &

Koddadikattu anicuts,

Improvements to Uppodai

Road, Road from Uppodai

road to Kidawadipallam

Anicut and Thevu Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 0.00 Canceled

2017-03-

27

2017-04-

03

2017-04-

24

2017-05-

08

2017-06-

05

2018-06-

05

LK-MOIWRM-5061-CW-

RFB / CRIPAF/WORKS/ID-

BAT/NCB/36

Widening, Straightening

Mundenai aru, Kaliyamadu

anicut and providing

bridge at anicut,

Improvements to

Thoduvilcholai road, road

from Thalaiyadi to

Kidavadipallam,

Vavichchenai channel and

road from

Sinnalamvelikkaddu to

Kuru

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope269,230.77 0.00 Canceled

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

Page 7: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 4

LK-MOIWRM-5062-CW-

RFB / CRIPAF/WORKS/ID-

BAT/NCB/37

Construction of

Murukanthivu Regulator,

Reconstruction of

Erukalampathu Bridge and

Widening, Straightening

the Odduvelli River and

Wahulawalai Drainage and

Widening, Straightening

the Paddiyadiveli Drainage

and Maduru Oya upstr

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope507,692.31 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5063-CW-

RFB /

CRIP/WORKS/RDA/NCB/31

8

Reconstruction Bridge No.

23/1 on Warakapola-

Ruwanwella Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope2,222,222.22 1,424,475.24 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5064-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/38

Drought Mitigation of D1 ,

D2 , D3/D4 canals Tract I

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope215,384.62 304,357.41 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5065-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/39

Drought Mitigation of D1

canal Tract II

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope269,230.77 0.00 Canceled

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5066-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/40

Drought Mitigation of FC-

1, FC-2, FC-4, FC-5 ,FC-

12, FC-13, FC-14 ,FC-15,

FC-17 of D1 Tract II,

Drought Mitigation of FC-

22, FC-25, of D2 Tract II,

Drought Mitigation of FC-

64, FC-65 of D5 Tract II

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope196,153.85 258,739.92 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5067-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/41

Drought Mitigation of FC-

66 ,FC-70 ,FC-74 of D6

Tract II, Drought

Mitigation of FC-87, FC-

88, FC-92 of D7 Tract II,

Drought Mitigation of FC-

115, FC-116 of D8 Tract

II

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope176,923.08 149,303.21 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5068-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/42

Drought Mitigation of

FC-125, FC-128, FC-142 of

D9 Tract II, Drought

Mitigation of FC-1, FC-4,

FC-5, FC-6, FC-9, FC-10,

FC-12 of D1 Tract III,

Drought Mitigation of FC-

17, FC-28, FC-29, FC-32

of D2 Tract III

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope215,384.62 244,231.47 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5069-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/43

Drought Mitigation of FC-

52, FC-53, FC-57, FC 143

of D3 Tract III, Drought

Mitigation of FC-63,FC-64

of D4, FC-68, FC-70 of D5

Tract III, Drought

Mitigation of FC-148, FC-

149 of D6, Supply channel

from Mahaweli pickup

regul

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope257,692.31 221,140.40 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5070-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/44

Drought Mitigation of FC-

78, FC-85, FC-86, FC-90,

FC 95, FC 97 of D7 Tract

III, Drought Mitigation of

FC-102, FC-103, FC-105,

FC-107 of D8 Tract III,

Drought Mitigation of FC-

121, FC-131 of D9, D9

Track III

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope207,692.31 214,576.61 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5071-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/45

Widening of WLB Main

canal 6.95 km - 11.00 km

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope161,538.46 293,151.32 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5072-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/46

Reconstruction existing of

box culvert at 8.170 km

WLB Main canal,

Widening of existing

Modarapiliwela anicut at

10.500 km WLB Main

canal,& Proposed new

escape structure at 11.00

km WLB Main canal &

Improvements to existing

box

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope100,000.00 0.00 Canceled

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5073-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/47

Widening of box culvert

Nugelanga yaya Koggalla

ara Drainage canal,

Widening of box culvert

Koggalla ara Drainage

canal and avoid bend

along Koggalla ara &

Bank protection along

Koggalla ara Drainage

canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope123,076.92 238,369.91 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5074-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/48

Improvements to Kadawara

wewa

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 0.00 Canceled

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5075-CW-

RFB / CRIPAF/WORKS/ID-

HAM/NCB/49

Introduce new spill tail

canal and land acquition

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope46,153.85 0.00

Under

Implement

ation

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

24

2018-04-

24

LK-MOIWRM-5076-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/50

FDR Tekkam Anicut to

GT Head Sluice(0+000 to

4+000) in Gaints tank

Inlet canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope423,076.92 0.00 Canceled

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5077-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/51

FDR GT Head Sluice to

Canal Spill No-02 ( 3+000

to 4+000) in Gaints

tank Inlet canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 116,348.38 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5078-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/52

FDR Canal Spill No-02 to

Kaddaiyadampan Bridge

(4+000 to 11+000) in

Gaints tank Inlet canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope346,153.85 442,576.96 Signed

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5080-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/53

Improvements Giants Tank

Spill Tail Canal to cater

future floods

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope115,384.62 104,876.71 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5081-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/54

Flood damge repairs in

Neelamadu Feeder Tank in

14th mile canal of Gaints

tank, Flood damge repairs

in Chalampan Feeder

Tank and Vellalakaddu

Feeder Tank 13th mile

canal of Gaints tank

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope115,384.62 84,183.94 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5082-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/55

FDR Akathymurippu Inlet

Canal from Tekkam Anicut

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 560,852.00 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5083-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/56

Viyadikulam Spill Tail

Canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 0.00 Canceled

2017-03-

06

2017-03-

13

2017-04-

03

2017-04-

17

2017-05-

15

2018-05-

15

LK-MOIWRM-5085-CW-

RFB / CRIPAF/WORKS/ID-

TRI/NCB/57

Flood damage repairs and

Impts. to D9 chl. & chl.

bund road from 1000m to

5500m , D5 chl. bund

road from 3500m to

4500m and FC

2,3,4,6,8,11,13 canal bund

road in Peraru Tract,

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope100,000.00 192,967.42 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

Page 8: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 5

LK-MOIWRM-5086-CW-

RFB / CRIPAF/WORKS/ID-

TRI/NCB/58

Flood damage repairs and

Impts. to D7 canal in RB

M/chl. Kantale ,Flood

damage repairs at 3850m

in Potankadu chl. off RB

M/chl. in Kanatle ,Flood

damage repairs

Kusumankadawela canal

bund road (0m to 3650m)

,Flood damage repair

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope69,230.77 220,876.96 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5088-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/71

Rehabilitation of D1A,

D1B, D3B, D6B,D8A, D8B,

& D10A canals in D1 FO

Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 182,436.84 Signed

2017-01-

23

2017-01-

30

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5090-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/60

Rehabilitation of Main

canal and 12 Nos of FCC

in Saddatissa Scheme

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 356,625.94 Signed

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-5091-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/61

Construction of canal

lining for Horabokka main

canl at 3+800km to

4+000km

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,538.46 49,793.00 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5092-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/62

Construction of canal

lining for Halmillapillawa

main canal at 0+000kmto

0+500km and 0+700km to

0+800km and construction

of feeder canal from end

of Halmillapillawa main

canal to Nikawewa

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope69,230.77 38,738.49 Signed

2017-03-

27

2017-04-

03

2017-04-

24

2017-05-

08

2017-06-

05

2018-06-

05

LK-MOIWRM-5094-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/63

Rehabilitation of

Balaharuwa D3, D5, D6

canals

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,538.46 55,035.01 Signed

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5093-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/72

Rehabilitation of D 12

canal in D12 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope100,000.00 72,731.22

Under

Implement

ation

2017-01-

23

2017-01-

30

2017-02-

20

2017-03-

06

2017-04-

03

2018-04-

03

LK-MOIWRM-5096-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/64

Rehabilitation of

Dambewewa RBMC up to

2km and LBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope46,153.85 0.00 Canceled

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5095-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/73

Rehabilitation of D16, D17,

canals D16 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope138,461.54 428,240.94 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5097-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/65

Rehabilitation of Debarara

LBMC & RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,538.46 58,927.15 Signed

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5099-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/66

Rehabilitation of

Kandiyapita scheme &

Hambegamuwa scheme

including IFF

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5100-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/67

Rehabilitation of

Dehiaththawela Schme

including IFF

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope184,615.38 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5101-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/68

Rehabilitation of Baduluoya

Schme including IFF

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope138,461.54 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5104-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/69

Rehabilitation of

Monarawana Schme

including IFF

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope138,461.54 122,545.05 Signed

2017-03-

13

2017-03-

20

2017-04-

10

2017-04-

24

2017-05-

22

2018-05-

22

LK-MOIWRM-5106-CW-

RFB / CRIPAF/WORKS/ID-

MON/NCB/70

Rehabilitation of

Magandanaoya Schme

including IFF

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope200,000.00 0.00 Canceled

2017-01-

09

2017-01-

16

2017-02-

06

2017-02-

20

2017-03-

20

2018-03-

20

LK-MOIWRM-5105-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/74

Rehabilitation of D20 canal

in D19 FO Area &

Rehabilitation of D21 canal

in D21 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 0.00 Canceled

2017-01-

09

2017-01-

16

2017-02-

06

2017-02-

20

2017-03-

20

2018-03-

20

LK-MOIWRM-5115-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/75

Rehabilitation of D25 canal

in D25 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope176,923.08 0.00 Canceled

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5117-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/76

Rehabilitation of D26,D27A

canal in D26 FO Area &

Rehabilitation of D31 canal

in D31 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope207,692.31 337,063.26 Signed

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

24

2018-04-

24

LK-MOIWRM-5119-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/77

Rehabilitation of D35,D38

canal in D35 FO Area

,Rehabilitation of D33A

canal in D32 FO Area

&Rehabilitation of D34

canal in D34 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 0.00 Canceled

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

17

2018-04-

17

LK-MOIWRM-5123-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/78

Rehabilitation of D39 canal

in D39 FO Area &

Rehabilitation of D41 canal

in D41 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope215,384.62 0.00

Under

Implement

ation

2017-02-

06

2017-02-

13

2017-03-

06

2017-03-

20

2017-04-

24

2018-04-

24

LK-MOIWRM-5124-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/79

Rehabilitation of D43,D44

canal in D43 FO Area &

D45 canal in D45 FO area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope269,230.77 0.00 Canceled

2017-02-

20

2017-02-

27

2017-03-

20

2017-04-

03

2017-05-

01

2018-05-

01

LK-MOIWRM-5125-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/80

Rehabilitation of D47 canal

in D47FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 0.00 Canceled

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-5126-CW-

RFB / CRIPAF/WORKS/ID-

KAN/NCB/81

Rehabilitation of D48,D49

canal in D49 FO Area

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 0.00 Canceled

2017-02-

13

2017-02-

20

2017-03-

13

2017-03-

27

2017-04-

24

2018-04-

24

LK-MOIWRM-7307-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 104

Construction of 700 m

long reinforced concrete

retaining wall at 27+610

km to 27+310 km of side

canal bank of Right bank

main canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 328,878.62 Signed

2017-03-

01

2017-03-

08

2017-03-

29

2017-04-

12

2017-05-

10

2018-05-

10

LK-MOIWRM-8983-CW-

RFB / Rehabilitation of

D1,D4, D9,D11,D17,D18,

D24, D26,D27A &D30

canals

CRIPAF/WORKS/ID-

KAN/NCB/82

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope761,538.46 354,928.85 Signed

2017-03-

03

2017-03-

10

2017-03-

31

2017-04-

14

2017-05-

19

2018-05-

19

LK-MOIWRM-8985-CW-

RFB / Rehabilitation of

D43, D47,D48,D51,D57

canals

CRIPAF/WORKS/ID-

KAN/NCB/83

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope707,692.31 428,240.94 Signed

2017-03-

03

2017-03-

10

2017-03-

31

2017-04-

14

2017-05-

12

2018-05-

12

LK-MOIWRM-8987-CW-

RFB / Rehabilitation of D2

canal

CRIPAF/WORKS/ID-

KAN/NCB/84

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope692,307.69 0.00

Pending

Implement

ation

2017-03-

03

2017-03-

10

2017-03-

31

2017-04-

14

2017-05-

12

2018-05-

12

LK-MOIWRM-8997-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 107

Construction of Gabion

wall U/S and D/S of 503

Anicut

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope154,000.00 87,521.80 Signed

2017-03-

03

2017-03-

10

2017-03-

31

2017-04-

14

2017-05-

12

2018-05-

12

Page 9: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 6

LK-MOIWRM-9117-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 115

Construction of Retaining

Wall for RBMC Left Bank

from 15+650 km to

16+150 km at

Kachchigala.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope387,000.00 0.00 Canceled

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-9142-CW-

RFQ /

CRIPAF/WORKS/UVA/NCB/

419

Office Partitions

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope15,384.61 0.00

Pending

Implement

ation

2017-04-

03

2017-05-

22

2017-07-

21

LK-MOIWRM-9121-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

409

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 15+800),

(15+900)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,092,307.69 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-4991-CW-

RFB /

CRIPAF/WORKS/MASL/NS/

106 Improvement

Kandakaduwa tail Canal

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope38,461.54 30,650.09 Signed

2017-04-

20

2017-06-

08

2017-07-

08

LK-MOIWRM-9412-CW-

RFP /

CRIP/WORKS/RDA/NCB/32

0

Construction of New

Bridge Across Thalawila

Estuary on Nainamadama

- Iranawila- Chilaw road.

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope2,222,222.22 0.00 Canceled

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9111-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

402

Kottagoda Podumilla

Adiyarawattha Yalagamuwa

Road (Culvert15/5-15/4)

Kottagoda Podumilla

Adiyarawattha Yalagamuwa

Road (Culvert 16/3-16/4)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope369,230.77 776,425.84 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9112-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

403

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 4+500)

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 5+500)

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 8+700)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope115,384.61 442,770.00 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9113-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

404

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 13+700), (Ch

15+700), (Ch 17+800)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 364,154.31 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9114-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

405

Karametiya -Kandaketiya-

GalaUda Road (Ch

17+460), (Ch 17+720), (Ch

17+950)

Drainage Improvement and

Removal of Earth cribs

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope330,769.23 950,262.22 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9115-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

406

Karametiya -Kandaketiya-

GalaUda Road (Ch

19+260), (Ch 19+555-

19+640), (Ch 19+875), (Ch

19+980)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope161,538.46 841,758.71 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9116-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

407

Bridge at Ridimaliyadda-

Ekiritankumbura Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope269,230.77 312,139.12 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9118-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

408

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (Ch 3+050), (Ch

6+400)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope861,538.46 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9122-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

410

Haggala Ambagasdowa

Road (Ch 3+500)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope315,384.61 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9123-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

411

Badulla-Kuttiyagolla-

Kahataruppa-

Ilupathuthenna-

Kolongaspitiya Road

(7+700)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope215,384.62 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9124-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

412

Attampitiya-Ketawela-

Keenakele Road

(Ch+10+500)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope415,384.62 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9126-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

414

Kottagoda-Podumilla-

Adiyarawatta-Yalagamuwa

Road (Ch1+140),

(Ch4+200), (Ch4+500),

(Ch5+400), (Ch5+700),

(Ch9+150)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,307,692.31 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9127-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

415

Kottagoda-Podumilla-

Adiyarawatta-Yalagamuwa

Road (Ch11+000),

(Ch14+700), (Ch14+850),

(Ch 20+400), (Ch 20+700)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope684,615.38 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9128-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

416

Medithale -Pathanawatta-

Thennpanguwa-Kiriwehara

Road (16+700)

Drainage Improvement and

Removal of Earth cribs

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9129-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

417

Karametiya -Kandaketiya-

GalaUda Road (Ch

9+240)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,846.15 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9132-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

418

Bambarapana-Dalukella-

Pudumilla bypass Road

(C1+538), (C1+607),

(C1+711), (C1+811),

(C1+950), (C2+047),

(C2+100), (C2+147),

(C2+200). (C2+236),

(C2+336), (C2+450),

(C2+586)

Drainage Improvement and

Removal of Earth cribs -

By Pas

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,653,846.15 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-8991-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

401

Kottagoda Podumilla

Adiyarawattha Yalagamuwa

Road (Ch0+650),

(Ch4+400), (Ch9+100),

(Ch9+200), (Ch9+900)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope192,307.69 371,357.14 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9125-CW-

RFP /

CRIPAF/WORKS/UVA/NCB/

413

Pooja Nagaraya-

Pangaragammana-Loggaloya

Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope3,100,000.00 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

LK-MOIWRM-9411-CW-

RFP /

CRIP/WORKS/RDA/NCB/31

9

Construction of New

Bridge near Udappuwa

Town on Batthulu Oya-

Udappuwa - Andimuni

Road (B614)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope2,444,444.44 2,322,167.75 Signed

2017-04-

06

2017-04-

13

2017-05-

04

2017-05-

18

2017-06-

15

2018-06-

15

Page 10: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 7

LK-MOIWRM-5037-CW-

RFB /

CRIP/WORKS/RDA/NCB/30

9

Rectification of 02 unstable

slopes at 194 km Post in

Beragala -along Colombo-

Rathnapura- Wellawaya

Road (A004)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope5,014,615.38 302,397.33 Signed

2017-02-

27

2017-03-

06

2017-03-

27

2017-04-

10

2017-05-

08

2018-05-

08

LK-MOIWRM-5049-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/25

Improvements to RB 06 D

10 from 0 to 1+125 km in

U.M.C. in Padaviya, RB

11 D10 from 0 to 1+200

km in L.M.C. in Padaviya

Division, Anuradhapura

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope284,615.38 105,320.51 Signed

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-5089-CW-

RFB / CRIPAF/WORKS/ID-

TRI/NCB/59

Improvements to LB/2 D6

off LB Main Channel in

Allai Extension Scheme in

Muthur Division,

Trincomalee Region

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope92,307.69 220,270.42 Signed

2017-03-

13

2017-03-

20

2017-04-

10

2017-04-

24

2017-05-

22

2018-05-

22

LK-MOIWRM-4976-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

58

Rectification of unstable

slopes in the premises of

Gampola Buddhist College

and Jinaraja Girls'

Collage

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope230,769.23 0.00 Canceled

2017-01-

30

2017-02-

06

2017-02-

27

2017-03-

13

2017-04-

10

2018-04-

10

LK-MOIWRM-39179-CW-

RFB /

CRIP/WORKS/NBRO/NCB/3

50-1

Rectification of unstable

slopes in the premises of

Maha/Molagoda Sri

Piyadassi Vidyalaya

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope177,756.18 0.00 Canceled

2017-12-

04

2017-12-

09

2017-12-

30

2018-01-

13

2018-02-

10

2018-08-

09

LK-MOIWRM-45206-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/502

Repairing & Developing of

selected roads with taring,

Developing pebble roads

with J.C.B & Motar

Grader, Construction of

Ihala Kudaligama Bridge

& Concreting of Selected

roads in Bulathsinhala

P.S. in Kaluthara District.

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,578.95 0.00 Canceled

2018-01-

23

2018-01-

31

2018-02-

28

2018-03-

28

2018-04-

25

2018-09-

22

LK-MOIWRM-45215-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/503

Developing and Concreting

of selected roads in

Palindanuwara Pradeshiya

Saba in Kaluthara District

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope105,131.58 0.00 Canceled

2018-01-

23

2018-01-

30

2018-02-

27

2018-03-

27

2018-04-

24

2018-09-

21

LK-MOIWRM-45275-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/508

Repairing & Developing of

selected roads, Repairing of

Kottambagas Handiya to

Pinwela road with taring

and Concreting of selected

lanes and roads in

Bandaragama PS

(Millaniya) in Kaluthara

District

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope70,723.68 0.00 Canceled

2018-01-

23

2018-01-

30

2018-02-

27

2018-03-

27

2018-04-

24

2018-09-

21

LK-MOIWRM-5057-CW-

RFB / CRIPAF/WORKS/ID-

ANU/NCB/32

Flood damage RepairsIlluk

Wewa LB main canal

D6/FC13 Drop, D5/FC4

Canal, L B main canal

Bund road, D1/FC1 Canal

Bund road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00 Canceled

2017-03-

20

2017-03-

27

2017-04-

17

2017-05-

01

2017-05-

29

2018-05-

29

LK-MOIWRM-4976-CW-

RFB-2 /

CRIP/WORKS/NBRO/NCB/3

58

Rectification of unstable

slopes in the premises of

Gampola Buddhist College

and Jinaraja Girls' Collage

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope174,000.00 192,010.26 Signed

2018-03-

09

2018-03-

14

2018-04-

04

2018-05-

02

2018-06-

06

2018-12-

03

LK-MOIWRM-60642-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/601

LOT 1,5-Improvement

bridge of Koshingala Rd,

Haldolahena Rd

LOT 2,3-Concreting of

Elamodara Rd, Pinlida

Mawath

LOT 4-Improvement &

construction of RW & Box

Culvert at Peragaswaththa

Rd

LOT 6-Interlocking

Illukmandiyawaththa rd

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope101,265.82 94,629.76 Signed

2018-04-

25

2018-05-

02

2018-05-

23

2018-06-

20

2018-07-

18

2018-12-

30

LK-MOIWRM-60646-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/602

Concreting the road near

the Kotagoga Kanda at

Kotagoda Karawwa road &

retaining wall

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope51,644.97 71,990.17 Signed

2018-04-

25

2018-05-

02

2018-05-

23

2018-06-

20

2018-07-

18

2018-12-

30

LK-MOIWRM-45478-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/605

LOT 1-Taring the road

from Nagoda bridge to

Gammeddegoda sri

Sunandarama viharaya

LOT 2-Concreting road of

Udaweliviti Thalawa

Ashokaramaya rd

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope94,937.00 49,333.87 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45509-CW-

RFB / CRIP-

CERC/Works/Rat/NCB/704

Construction of retaining

wall on 29/3

Thiriwanakatiya

Agalawatta Road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope96,645.57 55,732.57 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

22

LK-MOIWRM-45500-CW-

RFB / CRIP-

CERC/Works/Rat/NCB/701

Renovation of Karawita -

Hangamuwa Road

Repairs to Kotamulla -

Amuwala road ( from 0.00

- 2.5km)

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope143,165.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

22

LK-MOIWRM-45507-CW-

RFB / CRIP-

CERC/Works/Rat/NCB/703

Construction of bridge no

63/9 at Panadura

Nambapana Rathnapura

road

Construction of bridge

no 2/5 at Ayagama

Kukulegama road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope287,342.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45483-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/608

Develop Ela uduwila road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope75,950.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45480-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/606

LOT No.1 -

Usbimjanapadaya Edanda

Ela Road

LOT No.2 -Bangamukanda

Main Road Constriction Of

Side Wall

LOT No.3 -Godamuna

Junction Road

LOT No.4 -Gurawala

Junction To

Jambugahahena Road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope69,620.25 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45320-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/603

LOT No.1- Develop the

road from Eppala to

Oruhena

LOT No.2 - Develop

theWeerapana west

janapada road

(Buddagayawa,

Suduwelipatha,Budumedura

road)

LOT No.3 - Kudugalpala

Hallakanda Road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope94,937.00 65,953.15 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45218-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/504

Construction of the Bridge

of Dikgoda Peellawalakada

Construction of the culvert

(Box culvert R.C.C.) for

Kelinkanda (near

Community Hall)

Designing of a bridge for

Addaragoda

Construction of Retaining

wall near Athale School

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope201,075.95 12,916.17 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

22

LK-MOIWRM-45146-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/501

Development Thennahena-

Arambahena rd with

culvert

Construction Udugalakanda

1st stage culvert

Construction of

Samagipura rd's

Kudagangawaththa Culvert

Renovation Paragoda-

Welgamuwa Bridge

Construction of

Kirimatiwalakada Culver

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope134,056.96 0.00

Pending

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

22

Page 11: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 8

LK-MOIWRM-60649-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/604

LOT No.1 -Develop

Happitiya wadimulla

Baraniwala road Road

LOT No.2 -Developing

Jambugaswila road from

Dewalegama across

Panagoda

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope94,937.00 49,320.04 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-60650-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/607

LOT No.1 -Concreting

Kekillawaththa

Narangahawita road

LOT No.2 -Concreting

Dahagalla Wadiyawaththe

road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope71,836.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45313-CW-

RFB / CRIP-

CERC/Works/Gal/NCB/609

LOT No.1 -Concreting

Miggahagoda Badahalagoda

road with retaining wall

LOT No.2 -Concreting

Rathambalapath

Galpoththa road from

Raththaldeniya to

Rathmbalapatha

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope68,355.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45502-CW-

RFB / CRIP-

CERC/Works/Rat/NCB/702

Construction of retaining

wall and repairs to

Gonakumbura road ( near

2.00 km)

Construction of gabion wall

for Ratmalathenna bridge

and repairing the approach

road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope101,519.00 0.00

Under

Implement

ation

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2019-01-

06

LK-MOIWRM-45511-CW-

RFB / CRIP-

CERC/Works/Ham/NCB/901

Improvement of Beligalla-

Witharandeniya-Netolpitiya

Road (11,12,13Km)

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope300,402.42 169,546.60 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

30

LK-MOIWRM-45514-CW-

RFB / CRIP-

CERC/Works/Ham/NCB/902

Improvement of Radawela-

Dewalegama Road (2.2Km)

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope201,322.45 127,647.03 Signed

2018-04-

25

2018-05-

02

2018-05-

30

2018-06-

27

2018-07-

25

2018-12-

30

LK-MOIWRM-60657-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/509

Construction of the bridge

for Dombagoda

Seelarathana Road,

retaining wall for

downstream side &

Raddagoda Boralugama

Road & Reinforced Cement

Concrete box culvert for

Veniwelpitiya Petigamuwa

Road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope68,038.00 42,912.79 Signed

2018-04-

25

2018-05-

02

2018-05-

23

2018-06-

20

2018-07-

18

2018-12-

30

LK-MOIWRM-60659-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/502

Construction of the bridge

of Mahakalupahana

Lilinawaththa

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope18,988.00 0.00

Pending

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-60660-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/503

Construction of the culvert

for Janadipathi Mawatha

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope13,292.00 0.00

Under

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-60661-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/505

Construction of the Bridge

for Amundara Owita Ela -

807/A Ihala Neboda G.N.

Division

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope7,563.71 0.00

Pending

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-60662-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/506

Construction of the Bridge

of Malwathukanda

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope22,151.90 6,908.30

Under

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-60663-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/507

Developing Meegahatenna

Indigasgodella Road

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope9,907.00 0.00

Pending

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-60665-CW-

RFQ / CRIP-

CERC/Works/Kal/NS/508

Construction of the culvert

for Nahalla Dewananda

Lane

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope6,829.00 0.00

Pending

Implement

ation

2018-04-

30

2018-07-

16

2018-12-

13

LK-MOIWRM-11894-CW-

RFB /

CRIP/WORKS/RDA/ICB/321

Design, Build and

Maintenance Contract for

Stabilizing Rock Fall

Locations on Kandy -

Mahiyanganaya Road

(A026)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

Bids

Open -

International

Single Stage -

One Envelope1,481,481.48 0.00

Pending

Implement

ation

2017-04-

06

2017-04-

11

2017-05-

23

2017-07-

22

2017-08-

26

2018-02-

22

LK-MOIWRM-115821-CW-

RFQ /

CRIP/WORKS/PMU/S/371 -

Improvements to office

premises, PMU - CRIP

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope40,000.00 0.00

Pending

Implement

ation

2019-06-

10

2019-08-

05

2020-02-

01

LK-MOIWRM-116882-CW-

RFB /

CRIP/WORKS/RDA/NCB/32

5-Reconstruction of Bridge

No.60/5 on Thiruwanketiya-

Agalawatta (B421) Road

under CRIP

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope900,000.00 0.00

Pending

Implement

ation

2019-05-

31

2019-06-

05

2019-07-

17

2019-08-

16

2019-09-

20

2020-03-

18

LK-MOIWRM-121105-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/89-

Construction of Mattayaya

Anicut , Construction of

anicut across UB/ 12/13/14

drainage canal and Bridge

& Construction of 2 Nos

Bridge at UB 01 channel

and UB 15 drainage canal

in Uhana Unit

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope481,750.17 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121115-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/90A-

Rehabilitation of M-13

canal, Construction of box

culvert at stn. 0+010 km

in M -1-3-2 canal,

Improvements to UB 17

canal, Construction of

Anicut structure in

Dungala Anicutin

Weeragoda Unit

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope296,867.77 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121122-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/91-

Construction of

Arwattayaya 3 Bay

regulator ,Construction of

Nethaliyankarni Anicut in

Improvements to M 18.15

canal in Annamalai Unit.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope390,202.61 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121125-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/94-

Improvements to Nellikadu

First & Second Anicut in

Nellikadu drainage channel

& C- 6 channel in Block J

unit.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope217,932.44 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121134-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/95-Upstream

& dowm stream

Improvements of Vettakdu

anicut & Construction of

Weerayadi U/S River Bund

including Boulder packing

Rip Rap in Padampatty

Unit

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope155,957.84 0.00

Pending

Implement

ation

2019-07-

10

2019-07-

15

2019-08-

26

2019-09-

25

2019-10-

30

2020-04-

27

LK-MOIWRM-121138-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/96-

Improvements to SKBC

branch canal and D

channels RB -36 drainage

chanel in Akkaraipattu

Unit Akkarapattu Division

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope218,663.52 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121146-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/98-

Improvemrnts toRB -23,

RB-26, RB-27 &

Anaivilunthan channel in

Illukuchenai Unit.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope228,406.25 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121161-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/99-

Kallarichchical anicut RB

canal in Upper Kurunal

Kanji Unit Kakmunai

Division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope392,253.84 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-121262-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/100-

Construction of Bridge

across Sengapai river at

Kaihati River Sengapadi

LB Unit Kalmunai

division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope439,826.42 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121264-CW-

RFB / CRIPAF/WORKS/

ID-ANU/NCB/26-

Construction,RB 03 of D21

Canal, D 21 LB 01 canal

01 & D 21 LB 02 canal

in U. M. C Padaviya

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope184,230.47 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

Page 12: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 9

LK-MOIWRM-121265-CW-

RFB / CRIPAF/WORKS/

ID-BAT/NCB/35-

Rehabilitation of

Erukkalampaththu Bridge

in Vahanery Scheme in

Rugam Division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope174,804.42 0.00

Pending

Implement

ation

2019-07-

10

2019-07-

15

2019-08-

26

2019-09-

25

2019-10-

30

2020-04-

27

LK-MOIWRM-121266-CW-

RFB / CRIPAF/WORKS/

ID-MON/NCB/101-

Rehabilitation of

Dambawewa RBMC up to

2 Km and LBMC

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope62,655.71 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121267-CW-

RFB / CRIPAF/WORKS/

ID-MON/NCB/102-

Improvements to Badulu

oya Main Canal

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope523,544.34 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121268-CW-

RFB / CRIPAF/WORKS/ID-

PUT/NCB/87-Construction

of Pump House U/S of the

Sengal Oya Anicut &

0+575 km of the feeder

canal from Sengal Oya

Anicut to Sengaweliya

Anicut

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope215,467.60 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121269-CW-

RFB / CRIPAF/WORKS/ID-

PUT/NCB/88-Construction

of Pump House at Kala

Oya for Dangaswewa Field

in Puttalm Region

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope82,217.90 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121271-CW-

RFB / CRIPAF/WORKS/ID-

MAN/NCB/50-Flood

Damage repaires in FDR

Tekkam Anicut to Gianst

Tank Head Sluice(0+000

to3+025) in Gaints tank

Inlet canal

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope361,383.64 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121324-CW-

RFB / CRIP/WORKS/ID-

ANU/FA/14-Improvements

to RBMC canal from

0+000 m and 8+500m and

improvements to LBMC

from 0+000m to 1+575 m

of Nuwara Wewa

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope180,134.52 0.00

Pending

Implement

ation

2019-06-

27

2019-07-

02

2019-08-

13

2019-09-

12

2019-10-

17

2020-04-

14

LK-MOIWRM-121426-CW-

RFB / CRIP/WORKS/ID-

HAM/FA/232-Flood

Mitigation of D-1 Tract III

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope446,194.60 0.00

Pending

Implement

ation

2019-06-

28

2019-07-

03

2019-08-

14

2019-09-

13

2019-10-

18

2020-04-

15

LK-MOIWRM-121427-CW-

RFB / CRIP/WORKS/ID-

HAM/FA/271-Flood

Mitigation of D-8 & D9,

FC 118 of D-8 Tract II

and FC124, 126, 134 of D-

9 Tract II

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope440,233.60 0.00

Pending

Implement

ation

2019-06-

28

2019-07-

03

2019-08-

14

2019-09-

13

2019-10-

18

2020-04-

15

LK-MOIWRM-121107-GO-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/90-

Improvements to G 6

canal and Field canals,

Improvemets to Gonagolla

Branch canal from stn

4+00 km to 5+000 k ,

Construction of anicut &

Bridge in G 10 drainage

canal, Improvements to

Dambe Ela Anicut

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope808,873.02 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

10

2019-10-

22

2019-11-

21

2019-12-

26

2020-06-

23

LK-MOIWRM-132820-CW-

RFQ / CRIP/WORKS/ID-

BAT/S/24-C-Rehabilitation

of Kulaththuwettai in

Rugam Scheme

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope10,244.96 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132818-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/210-1-Improvements

to D1 canal ( tr -01 ) at

0+000km to 1+030 km ,

D2 canal ( tr -02 ) from

+.000 km to 0+020 km ,

D3 canal (tr - 03 ) 0+000

km & D3A canal ( tr -03

) in RBE

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope21,945.72 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-121432-CW-

RFB / CRIP/WORKS/ID-

TRI/S/225-B-Construction of

Channel lining in Muthr

Channel

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope24,912.58 0.00

Pending

Implement

ation

2019-08-

05

2019-09-

30

2020-03-

28

LK-MOIWRM-132817-CW-

RFQ / CRIP/WORKS/ID-

TRI/S/225-C-Construction of

retaining wall at the

Aruththalai juction in D6 /

LBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope28,309.75 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132826-CW-

RFQ / CRIP/WORKS/ID-

BAT/S/24-D- Improvements

to Takeoff chennel in

Sinnaweli Kandam in

Rugam Scheme

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope32,172.85 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132824-CW-

RFQ / CRIP/WORKS/ID-

TRI/S/225-2A-Construction

of retainig wall at 14+000

km in RBMC Allai Scheme

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope22,647.80 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132821-CW-

RFQ / CRIP/WORKS/ID-

BAT/S/24-B-Rehabilitation

of Sadawakkai High

Level channel in Rugam

Scheme

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope15,520.34 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132819-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/209-7-Improvements

to D! & D2 canal of

Galkissa Anicut in

Radavibeda Ela

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope28,291.63 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132825-CW-

RFQ / CRIP/WORKS/ID-

TRI/S/226-2B-Construction

of Pachchnkulam road and

cahnnel from 660 m to

1610m

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope27,347.22 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132827-CW-

RFQ / CRIP/WORKS/ID-

TRI/S/225-A-Construction of

Box Culvert repaires to

Sinnapoomalaivettai and

construction of retaining

wall at yhe D/S of

Thangaturai bridge in D

06 chl LBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope28,026.65 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132822-CW-

RFQ / CRIP/WORKS/ID-

BAT/S/24-A-Improvements

to Mahilaiyadi Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope31,595.77 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-132823-CW-

RFQ / CRIP/WORKS/ID-

TRI/S/226-2A-Construction

of Pachchnkulam road and

cahnnel from 0 m to

660m

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope27,460.46 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-121139-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/97-

Constructuio of U/S & D/S

proction of Kallaiodi

adddtional spill way in

Weerayadi Unit

Akkaraipattu Division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope414,866.24 0.00

Pending

Implement

ation

2019-06-

26

2019-07-

01

2019-08-

12

2019-09-

11

2019-10-

16

2020-04-

13

LK-MOIWRM-125860-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/92-

Improvements to LB 8, LB

8.1 & LB 7D canal and

construction of Segura

Anicut , Madapallama

Anicut & Selverdore

Regulator in Ampara

Division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope519,568.49 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125864-CW-

RFB / CRIPAF/WORKS/

ID-AMP/NCB/93-

Construction of Parakadi

Anicut in Damana Unit

Ampara Division.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope296,550.21 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125874-CW-

RFB / CRIPAF/WORKS/

ID-ANU/NCB/105-

Improvements to pump

house and construction of

of new canal lining of

existing lift irrigation

system in Parakrama FO

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope278,583.17 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125877-CW-

RFB / CRIPAF/WORKS/

ID-ANU/NCB/106-

Construction of new canal

lining of existing Lift

Irrigation System in Gami

Isura FO

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,318.22 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125879-CW-

RFB / CRIPAF/WORKS/

ID-ANU/NCB/107-

Improvements to Pump

house and Construction of

new canal lining of

existing Lift Irrigation

System in Arunalu FO

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope273,850.95 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125883-CW-

RFB / CRIPAF/WORKS/

ID-MON/NCB/103-

Improvements to LBMC of

Monarawana Scheme,

Stage II

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope97,077.83 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125884-CW-

RFB / CRIPAF/WORKS/

ID-MON/NCB/104-Providing

of IFS for Saddathissa

LBMC

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope258,616.89 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

Page 13: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 10

LK-MOIWRM-125897-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 123-Construction of

Bridge at 5+ 890 Km

along Nelumwewa –

Sinhapura Road in System

L, Welioya.

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope97,095.79 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125898-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 125-Construction of 02

Nos. Bridges on

Parakramapura -

Mulathive road across the

Ehatugaswewa spill tail

canal and Parakramapura

- Nedunkeni road across

Monarawewa spill tail

canal in System L,

Welioya

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope153,407.42 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125900-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 124-Rehabilitation of

Ihalathalawa Tank in

System “H”

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope220,971.16 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125901-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 126-Rehabilitation Work

in Waladowa Tank at

Miriswatta in

Padiyathalawa Block in

Rambakenoya Mahaweli

System

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope123,743.69 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125903-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 127-Rehabilitation and

Improvement of D1

Distributary Canal from

0+900km to 3+710km in

Track 04 of Aralaganwila

Unit of Wijayabapura

Block – System B

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope170,019.83 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125916-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 128-Rehabilitation and

Improvement of Field

Canal Nos. FC01/D01,

FC02/D01, FC03/D01,

FC05/D01 and FC06/D01

in Track 04 of

Aralaganwila Unit of

Wijayabapura Block –

System B

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope58,373.48 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125917-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 129-Rehabilitation and

Improvement of Field

Canal Nos. FC07/D01,

FC09/D01, FC14/D01 and

FC15/Tank 02 in Track 04

of Aralaganwila Unit of

Wijayabapura Block –

System B

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope62,907.34 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-125918-CW-

RFB /

CRIPAF/WORKS/MASL/NC

B/ 130-Rehabilitation and

Improvement of Field

Canal Nos. FC16/D01,

FC17/D01, FC24/D01,

FC27/Tank 03, FC28/Tank

03 and FC29/Tank 03 in

Track 04 of Aralaganwila

Unit of Wijayabapura

Block – System B

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope50,439.22 0.00

Pending

Implement

ation

2019-08-

01

2019-08-

06

2019-09-

17

2019-10-

17

2019-11-

21

2020-05-

19

LK-MOIWRM-126360-CW-

RFB /

CRIP/WORKS/RDA/NCB/32

4-Fabricating&Erecting

Arched railings to Bridge

No.1/1 Batticaloa -

Thirikkondiadimadu-

Trincomalee(A015)Road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope109,914.46 0.00

Pending

Implement

ation

2019-08-

07

2019-08-

12

2019-09-

23

2019-10-

23

2019-11-

27

2020-05-

25

LK-MOIWRM-119669-CW-

RFB /

CRIP/WORKS/RDA/NCB/32

6-Re-construction of Bridge

No.98/4 on Colombo -

Ratnapura - Wellawaya -

Batticaloa (CRWB) (A 004)

Road & Re-construction

of Bridge at 0+480km on

Eheliyagoda Bypass Road-

CRIP/WORKS/RDA/NCB/32

6

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,113,120.11 0.00

Pending

Implement

ation

2019-06-

19

2019-06-

24

2019-08-

05

2019-09-

04

2019-10-

09

2020-04-

06

LK-MOIWRM-127284-CW-

RFB /

CRIP/WORKS/RDA/NCB/32

7-Reconstruction of

Causeway No 1/2 on

Baratheendra Mawatha (B-

397h)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope1,409,062.50 0.00

Pending

Implement

ation

2019-08-

15

2019-08-

20

2019-10-

01

2019-10-

31

2019-12-

05

2020-06-

02

LK-MOIWRM-127468-CW-

RFB / CRIPAF/WORKS/ID-

AMP/NCB/12-2

Construction of additional

spillway and D/S

protection of Kaliodai

anicut in Veerayadi Unit

Akkaraipattu Unit

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope294,000.00 0.00

Pending

Implement

ation

2019-08-

16

2019-08-

23

2019-09-

13

2019-09-

27

2019-10-

25

2020-05-

12

LK-MOIWRM-127477-CW-

RFB /

CRIP/WORKS/RDA/NCB/32

3 Supply and Installation

of Instruments in land

slide Mitigation Areas in

A026, A004, A005 and A

007 Roads

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope670,000.00 0.00

Pending

Implement

ation

2019-08-

16

2019-08-

23

2019-09-

13

2019-09-

27

2019-10-

25

2020-05-

12

LK-MOIWRM-127487-CW-

RFB / CRIP-

CERC/WORKS/RAT/NCB/70

6 Improvement of road

near Sumana Balika

Vidyalaya via Gorokgoda

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope142,000.00 0.00

Pending

Implement

ation

2019-08-

16

2019-08-

23

2019-09-

20

2019-10-

18

2019-11-

15

2020-04-

21

LK-MOIWRM-127491-CW-

RFB / CRIP-

CERC/WORKS/RAT/NCB/70

7 Reconstruction of 5/9

bridge on Ayagama

Kukulegama road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope261,000.00 0.00

Pending

Implement

ation

2019-08-

16

2019-08-

23

2019-09-

20

2019-10-

18

2019-11-

15

2020-04-

28

LK-MOIWRM-127494-CW-

RFQ /

CRIP/WORKS/PMU/S/369-6

Renovation of the office of

Climate Resilience

Improvement Project

(CRIP)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope39,170.00 0.00

Pending

Implement

ation

2019-08-

30

2019-10-

18

2019-12-

17

LK-MOIWRM-130171-CW-

RFB /

CRIP/WORKS/ID/FA/79-

Construction of Gabion

Walls(RB side) from stn

6+900 to stn 11+050 in

LB main canal in

Mineriya Schemes in

Meneriya Division in

Polonnaruwa Range

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope333,993.01 0.00

Pending

Implement

ation

2019-09-

03

2019-09-

08

2019-10-

20

2019-11-

19

2019-12-

24

2020-06-

21

LK-MOIWRM-130346-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/211- A

Improvements to RB

main canal & D1, D2,

D3,D4 , D5 Madayaya

canals (Tr-01) at 1+

000km to 4+000 km in

Inginimitiya RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope22,670.45 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

04

2020-05-

02

LK-MOIWRM-130347-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/211- B

Improvements RB main

canal & D1, D2, D3,D4,

D5 Madayaya canals (Tr-

01) at 4+ 000km to 7+000

km in Inginimitiya RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope22,670.45 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130348-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/211- C

Improvements to causeway

structure in RB main

canal & D1, D2, D3,D4,

D5 Madayaya canals (Tr-

01) at 0+000km to 7+000

km in Inginimitiya RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope11,465.34 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130349-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/212-A Improvements

to RB main canal (Tr-

02) at 7 .000km to 10.000

00km in Inginimitiya

RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope24,125.00 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130350-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/212-B Improvements

to RB main canal D1 &

D4, (Tr-02) at 10 .000km

to 13.0 00km in

Inginimitiya RBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope27,502.84 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130351-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/215-A Improvements

to LB main canal & D1

canals (Tr-01) at 0.000km

to 3+000 km in

Inginimitiya LBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope21,840.90 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130352-CW-

RFQ / CRIP/WORKS/ID-

PUT/S/215-B Improvements

to LB main canal & D2,

canals (Tr-01) at 3.000km

to 5+075 km in

Inginimitiya LBMC

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope20,767.04 0.00

Pending

Implement

ation

2019-09-

09

2019-11-

11

2020-05-

09

LK-MOIWRM-130356-CW-

FCA /

CRIPAF/WORKS/MASL/FA/

119 Ehetugaswewa Bund

Rehabilitation,Welioya

IDA / 54170Increasing climate

resilience of infrastructurePost Force Account Direct

337,901.54 0.00

Pending

Implement

ation

2019-09-

04

2019-09-

09

2019-10-

21

2020-04-

18

Page 14: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 11

LK-MOIWRM-130543-CW-

RFB / CRIP -

CERC/Works/Gal/NCB/610-

Improvement of Benthota -

Elpitiya Ranthotuwila road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope138,728.75 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

10

2019-10-

22

2019-11-

21

2019-12-

26

2020-06-

23

LK-MOIWRM-130544-CW-

RFB / CRIP -

CERC/Works/Gal/NCB/603-1-

Additonal work of

Mapalagama Panangala

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope27,745.75 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130547-CW-

RFQ / CRIP -

CERC/Works/Gal/NCB/606-1-

Additonal work of

Bangamukanda main road

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope21,641.69 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130550-CW-

RFB / CRIP-

CERC/WORKS/Rat/NCB/708

Concreating of Weragama

Dambuluwana road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope110,620.00 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

12

2019-10-

06

2019-10-

30

2019-11-

27

2020-05-

10

LK-MOIWRM-130555-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/505 -

Developing Indigasgodella

Kapugoda Road

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope12,571.12 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130556-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/506 -

Construction of box culvert

for Malgahagoda Junction

at Ihalagoda

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope11,905.57 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130573-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/507-1

- Construction of

Dombagoda Seelarathana

Road small bridge &

retaining wall, culvert at

Veniwelpitiya Road and

retaining wall & Culvert

for the Raddagoda Road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,637.20 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

12

2019-10-

10

2019-11-

07

2019-12-

05

2020-05-

03

LK-MOIWRM-130576-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/510 -

Construction of Diggoda

Peellawalakada small

Bridge and Kelinkanda

small bridge

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope78,497.60 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

12

2019-10-

10

2019-11-

07

2019-12-

05

2020-05-

03

LK-MOIWRM-130577-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/503-1

- Construction of retaining

wall and road concreting

work at Amundara Owita

Bridge Neboda

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope16,584.00 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130588-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/511-1

- Construction of gabion

retaining wall extension at

Athale School

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope17,136.80 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130589-CW-

RFB / CRIP-

CERC/Works/Kal/NCB/512 -

Construction of 4 nos of

culverts retaining wall and

concreting work at

Wedawatta Pelawatta road

IDA / 54170Contingent emergency

responsePost

Request for

BidsOpen - National

Single Stage -

One Envelope93,976.00 0.00

Pending

Implement

ation

2019-09-

05

2019-09-

12

2019-10-

10

2019-11-

07

2019-12-

05

2020-05-

03

LK-MOIWRM-130590-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/513 -

Construction of Delpe

Halowita small bridge

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope37,590.40 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-130591-CW-

RFQ / CRIP-

CERC/Works/Kal/NCB/514 -

Construction of

Halawalkele road small

bridge and approached

road at 790 Utumgama

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope29,298.40 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

GOODS

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LK-MOIWRM-1420-GO-

RFQ / Procurement of

Proffessional Digital

Camera for PMU

CRIP/GOODS/S/47

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope6,153.85 0.00

Pending

Implement

ation

2017-01-

03

2017-02-

21

2017-03-

23

LK-MOIWRM-1422-GO-

RFQ / Procurement of

Multimedia Projectors

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope15,692.31 0.00

Pending

Implement

ation

2017-01-

09

2017-02-

27

2017-03-

29

LK-MOIWRM-1421-GO-

RFB / Office Furniture for

the Project Implementation

Unit of NBRO

(CRIP/GOODS/S/03)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope19,230.77 0.00

Pending

Implement

ation

2017-03-

17

2017-05-

19

2017-07-

18

LK-MOIWRM-1436-GO-

RFQ / Office Furniture for

all component

CRIP/GOODS/S/42-2

IDA / 54170 Project implementation PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope58,615.38 0.00

Pending

Implement

ation

2017-05-

15

2017-07-

31

2017-08-

30

LK-MOIWRM-1538-GO-

RFQ / GPS Equipment

CRIP/GOODS/S/32

(GPS high ended with

Photo facilities Tabs to

update & monitoring

maps)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope28,846.15 0.00

Pending

Implement

ation

2016-09-

27

2016-11-

15

2016-12-

15

LK-MOIWRM-1545-GO-

RFB / Office Equipment

for RDA -

CRIP/GOODS/S/09

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope15,384.62 0.00

Pending

Implement

ation

2017-05-

10

2017-06-

28

2017-07-

28

LK-MOIWRM-1544-GO-

RFQ / Office Equipment

(Package 1) - Photocopy

Machines

CRIP/GOODS/S/29 (i)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope37,692.31 0.00

Pending

Implement

ation

2016-10-

31

2016-12-

19

2017-01-

18

LK-MOIWRM-1548-GO-

RFQ / Office Equipment

(Package 1) -

(Photocopy machines

(Color)

Photocopy Machines (Black

& White)

A4 Scanner

Fax Machine

Multimedia Projector

Network A3 lasser printer

A4 Lasser printer (black &

white)

A4 Lasser printer (color) )

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope37,692.31 0.00

Pending

Implement

ation

2016-10-

31

2016-12-

19

2017-02-

17

LK-MOIWRM-1553-GO-

RFQ / GPS Instruments

and Other machines for

Component 01 - A0 Plotter

- CRIP/GOOD/S/27-2 (a)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope3,400.00 0.00

Pending

Implement

ation

2016-12-

19

2017-02-

06

2017-03-

08

LK-MOIWRM-1555-GO-

RFQ / Communication

system for monitoring

floods for ID-

CRIP/GOODS/S/20

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope6,153.85 0.00

Pending

Implement

ation

2016-12-

19

2017-02-

06

2017-03-

08

LK-MOIWRM-1419-GO-

RFB / Field equipments

required for monitoring the

ground movements during

and post construction stage

for NBRO

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2017-02-

23

2017-03-

09

2017-03-

23

2017-04-

06

2017-04-

27

2017-05-

27

LK-MOIWRM-3498-GO-

RFB / Office Equipment

(Package 2)

CRIP/GOODS/NCB/30

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope84,615.38 0.00

Pending

Implement

ation

2017-01-

01

2017-01-

08

2017-01-

29

2017-02-

12

2017-03-

12

2018-03-

11

LK-MOIWRM-1437-GO-

RFB / Office Furniture for

all component

CRIP/GOODS/NCB/42

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2016-11-

07

2016-11-

14

2016-12-

05

2016-12-

19

2017-01-

16

2017-03-

17

LK-MOIWRM-1438-GO-

RFB / Office and IT

equipment with necessary

software I-1

CRIP/GOODS/NCB/41-1

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2017-05-

09

2017-05-

16

2017-06-

06

2017-06-

20

2017-07-

18

2017-09-

16

LK-MOIWRM-1441-GO-

RFB / Office and IT

equipment with necessary

software II

CRIP/GOODS/NCB/41

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2018-05-

07

2018-05-

14

2018-06-

04

2018-06-

18

2018-07-

16

2018-08-

15

LK-MOIWRM-1442-GO-

RFB / Office and IT

equipment with necessary

software I

CRIP/GOODS/NCB/40

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope122,307.69 0.00

Pending

Implement

ation

2017-12-

07

2017-12-

14

2018-01-

04

2018-01-

18

2018-02-

15

2018-03-

17

LK-MOIWRM-1443-GO-

RFB / Modelling Software

for Component 1

CRIP/GOODS/NCB/39

IDA / 54170Development of basin

investment plansPost

Request for

BidsOpen - National

Single Stage -

One Envelope461,538.46 0.00

Pending

Implement

ation

2017-03-

07

2017-03-

14

2017-04-

04

2017-04-

18

2017-05-

16

2017-06-

15

LK-MOIWRM-1547-GO-

RFB / Procurement of

Field Laboratory

Equipment for RDA and

NBRO-

CRIP/GOODS/NCB/15

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope300,000.00 0.00

Pending

Implement

ation

2017-04-

23

2017-04-

30

2017-05-

21

2017-06-

04

2017-07-

02

2017-08-

01

LK-MOIWRM-1549-GO-

RFP / Flood Monitoring &

Early warning equipment

for ID & current meter for

MASL-

CRIP/GOODS/NCB/19

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope515,384.62 0.00

Pending

Implement

ation

2017-04-

30

2017-05-

07

2017-05-

28

2017-06-

11

2017-07-

09

2017-09-

07

LK-MOIWRM-1536-GO-

RFB / Equipments for

National Water Resources

Planning Cell-2

CRIP/GOODS/NCB/38-1

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2017-07-

16

2017-07-

23

2017-08-

13

2017-08-

27

2017-09-

24

2017-11-

23

Page 15: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 12

LK-MOIWRM-1537-GO-

RFB / Equipments for

National Water Resources

Planning Cell-1

CRIP/GOODS/NCB/38

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope138,461.54 0.00

Pending

Implement

ation

2016-11-

07

2016-11-

14

2016-12-

05

2016-12-

19

2017-01-

16

2017-03-

17

LK-MOIWRM-1540-GO-

RFB / Office Equipment

(Package 2)

CRIP/GOODS/NCB/30

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope76,923.08 0.00

Pending

Implement

ation

2016-11-

06

2016-11-

13

2016-12-

04

2016-12-

18

2017-01-

15

2017-02-

14

LK-MOIWRM-1546-GO-

RFB / Procurement of

Geotechnical Drilling

Equipment for NBRO -

CRIP/GOODS/NCB/07

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope246,153.85 0.00

Pending

Implement

ation

2016-11-

23

2016-11-

30

2016-12-

21

2017-01-

04

2017-02-

01

2017-03-

03

LK-MOIWRM-1551-GO-

RFB / Computers &

Accessories ( Package 3)

CRIP/GOODS/NCB/28

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope53,846.15 0.00

Pending

Implement

ation

2017-07-

24

2017-07-

31

2017-08-

21

2017-09-

04

2017-10-

02

2017-12-

01

LK-MOIWRM-1550-GO-

RFB / Field equipment

required for application for

mitigation measures for

RDA -

CRIP/GOODS/NCB/16

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope307,692.31 0.00

Pending

Implement

ation

2017-02-

22

2017-03-

01

2017-03-

22

2017-04-

05

2017-05-

03

2017-06-

02

LK-MOIWRM-1554-GO-

RFB / Procurement of

Field Vehicles II -(Double

Cabs - 1No. Mini bus-

01)(Package 2) -

CRIP/GOODS/NCB/25

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope142,307.69 0.00

Pending

Implement

ation

2016-12-

14

2016-12-

21

2017-01-

11

2017-01-

25

2017-02-

22

2017-03-

24

LK-MOIWRM-1557-GO-

RFB / Computers &

Accessories ( Package 2)

CRIP/GOODS/NCB/27

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope53,461.54 0.00

Pending

Implement

ation

2017-01-

15

2017-01-

22

2017-02-

12

2017-02-

26

2017-03-

26

2017-05-

25

LK-MOIWRM-9119-GO-

RFQ /

CRIPAF/GOODS/UVA/S/225

Procurement of Office

Furniture,Fiittings

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope4,616.00 0.00

Pending

Implement

ation

2017-03-

20

2017-05-

08

2017-06-

07

LK-MOIWRM-9135-GO-

RFQ /

CRIPAF/GOODS/UVA/S/228

Telephone Lines, Intercom

Sstem & Internet

equipment's

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope3,077.00 0.00

Pending

Implement

ation

2017-03-

23

2017-05-

11

2017-07-

10

LK-MOIWRM-9138-GO-

RFQ /

CRIPAF/GOODS/UVA/S/229

Personnel Safety

Equipment

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope1,539.00 0.00

Pending

Implement

ation

2017-11-

07

2017-12-

26

2018-01-

25

LK-MOIWRM-9143-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

230

Four Weel Double Cabs

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope184,616.00 0.00

Pending

Implement

ation

2017-08-

28

2017-09-

18

2017-10-

09

2017-10-

23

2017-11-

20

2018-03-

20

LK-MOIWRM-9144-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

231

Bailey bridge

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope384,616.00 0.00

Pending

Implement

ation

2017-03-

22

2017-03-

29

2017-04-

19

2017-05-

03

2017-05-

31

2017-11-

27

LK-MOIWRM-9147-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

232

01 Cube Lorry Trucks

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope173,077.00 0.00 Canceled

2017-08-

28

2017-09-

04

2017-09-

25

2017-10-

09

2017-11-

06

2018-05-

05

LK-MOIWRM-9148-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

233

Skid steer Loaders

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope115,385.00 139,974.20

Under

Implement

ation

2017-05-

15

2017-05-

22

2017-06-

12

2017-06-

26

2017-07-

24

2017-11-

21

LK-MOIWRM-9149-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

234

Drilling Machine

,Jackhammer and

Compressor Machine

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope61,539.00 0.00

Pending

Implement

ation

2017-03-

13

2017-03-

20

2017-04-

10

2017-04-

24

2017-05-

22

2017-08-

20

LK-MOIWRM-9154-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

236

Disaster Mangement

Equipments

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope57,693.00 0.00

Pending

Implement

ation

2017-03-

13

2017-03-

20

2017-04-

10

2017-04-

24

2017-05-

22

2017-08-

20

LK-MOIWRM-10588-GO-

RFQ / CRIP/GOODS/S/48

Purchase two data servers

for DoM

IDA / 54170Development of basin

investment plansPost

Request for

QuotationsLimited

Single Stage -

One Envelope15,000.00 0.00

Pending

Implement

ation

2017-04-

07

2017-05-

26

2017-07-

25

LK-MOIWRM-9133-GO-

RFB /

CRIPAF/GOODS/UVA/NS/22

7

Installation of Server

System for Road Data

Management and Software

Development

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope20,000.00 0.00

Pending

Implement

ation

2017-04-

20

2017-06-

08

2017-08-

07

LK-MOIWRM-9152-GO-

RFB /

CRIPAF/GOODS/UVA/NS/23

5

GIS Software and

Acessories

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope11,539.00 0.00

Pending

Implement

ation

2017-04-

20

2017-06-

08

2017-08-

07

LK-MOIWRM-15964-GO-

DIR / CRIP/GOODS/DP/39-

i

Additional Aerial data for

DBIP

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

33,850.00 0.00

Pending

Implement

ation

2017-05-

23

2017-05-

28

2017-07-

02

2017-12-

29

LK-MOIWRM-16397-GO-

DIR / CRIP/GOODS/DP/39

- (ii)

Procurement of License for

ArcGIS Desktop

IDA / 54170Development of basin

investment plansPost Direct Selection Direct

18,462.00 0.00 Canceled2017-05-

29

2017-06-

03

2017-07-

08

2018-01-

04

LK-MOIWRM-24977-GO-

DIR / CRIP-

DOM/GOODS/DP/48

Accessing ECMWF digital

NWP products - License

for 2 years

IDA / 54170Development of basin

investment plansPost Direct Selection Direct

98,725.00 0.00

Pending

Implement

ation

2017-08-

15

2017-08-

20

2017-09-

24

2017-11-

08

LK-MOIWRM-39200-GO-

RFB /

CRIP/GOODS/NCB/25

Procurement of Field

Vehicles II -(Double Cabs -

1No. Mini bus-01)(Package

2)

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope107,767.18 256,758.05 Signed

2017-12-

04

2017-12-

18

2018-01-

08

2018-02-

07

2018-03-

14

2018-09-

10

LK-MOIWRM-39211-GO-

RFB /

CRIPAF/GOODS/UVA/NCB/

230

Procurement of 03 Nos. of

Double Cabs for CRIP

UVA-PRDD

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope176,344.39 0.00

Under

Implement

ation

2017-12-

04

2017-12-

18

2018-01-

08

2018-02-

07

2018-03-

14

2018-09-

10

LK-MOIWRM-53002-GO-

RFQ / CRIP/GOODS/S/47

Procurement of

Proffessional Digital

Camera for PMU

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope4,460.00 0.00

Pending

Implement

ation

2018-03-

14

2018-05-

16

2018-07-

15

LK-MOIWRM-67333-GO-

DIR / CRIP/GOODS/DP/39

- (iii)

Procurement of the Plaxis

Software for NBRO

Plavis 2D suite, Plaxis 3D

2017 suite - Flexible

license & In-house training

program for Plaxis 2D and

3D suites

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

51,522.00 44,515.00 Signed2018-06-

20

2018-06-

25

2018-07-

30

2018-08-

20

LK-MOIWRM-67372-GO-

RFQ / CRIP/GOODS/S/49

Procurement of Office

Equipments for the CRIP-

PMU (Computers &

Printers)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope6,200.00 0.00

Under

Implement

ation

2018-07-

04

2018-09-

19

2018-12-

18

LK-MOIWRM-108304-GO-

RFB /

CRIP/GOODS/NCB/63 -

Procurement of

Engineering Material

Equipment for ID (EM

Division)

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope323,530.00 0.00

Pending

Implement

ation

2019-04-

15

2019-04-

29

2019-05-

20

2019-06-

19

2019-07-

24

2020-01-

20

LK-MOIWRM-108309-GO-

RFB /

CRIP/GOODS/NCB/64 -

Procurement of Machinery

for ID

IDA / 54170 Project implementation PostRequest for

BidsOpen - National

Single Stage -

One Envelope741,176.00 0.00

Pending

Implement

ation

2019-04-

30

2019-05-

14

2019-06-

04

2019-07-

04

2019-08-

08

2020-02-

04

LK-MOIWRM-115801-GO-

DIR / CRIP/GOODS/DP/66-

Procurement of Plaxis 3D

Software for EM Division,

Irrigation Department 

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

50,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-06-

30

2019-12-

27

LK-MOIWRM-115803-GO-

DIR / CRIP/GOODS/DP/67-

Procurement of Geo Studio

Universal Software for EM

Division, Irrigation

Department

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

57,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-06-

30

2019-12-

27

LK-MOIWRM-115804-GO-

DIR / CRIP/GOODS/DP/68-

Procurement of the

MODFLOW Software for

Geology Division, Irrigation

Department

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

4,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-06-

30

2019-12-

27

LK-MOIWRM-115810-GO-

DIR / CRIP-

DOM/GOODS/DP/48-1 -

Procurement of ECMWF

products for DoM

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

90,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-06-

30

2019-12-

27

Page 16: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 13

LK-MOIWRM-115811-GO-

RFB /

CRIP/GOODS/NCB/69 -

Procurement of Diamond

Core-bits and Accessories

for Geology Division of

Irrigation Department

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope510,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-07-

07

2019-08-

06

2019-09-

10

2020-03-

08

LK-MOIWRM-115818-GO-

RFB /

CRIP/GOODS/NCB/71 -

Procurement of Crawler

Mounted Cleaning Device

for NBRO

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope220,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-05-

26

2019-07-

07

2019-08-

06

2019-09-

10

2020-03-

08

LK-MOIWRM-115086-GO-

RFQ / CRIP-

CERC/GOODS/S/65 -

Procurement of Office

Equipments for Site

officers/ CRIP

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope10,000.00 0.00

Pending

Implement

ation

2019-05-

21

2019-07-

16

2020-01-

12

LK-MOIWRM-108303-GO-

RFB / CRIP/GOODS/ICB/62

- Procurement of Drilling

Machines and Equipment

for Geology Division of

Irrigation Department

IDA / 54170 Project implementation PostRequest for

Bids

Open -

International

Single Stage -

One Envelope1,360,000.00 0.00

Under

Implement

ation

2019-05-

24

2019-05-

29

2019-07-

10

2019-08-

09

2019-09-

13

2020-03-

11

LK-MOIWRM-115807-GO-

RFB / CRIP/GOODS/ICB/72

- Procurement of

Amphibious Weed Cutting

Machines and Weed

Harvesters for ID

IDA / 54170 Project implementation PostRequest for

Bids

Open -

International

Single Stage -

One Envelope1,080,000.00 0.00

Under

Implement

ation

2019-05-

24

2019-05-

29

2019-07-

10

2019-08-

09

2019-09-

13

2020-03-

11

LK-MOIWRM-116212-GO-

DIR / CRIP/GOODS/DP/70

- Procurement of ArcGIS

Software for MASL

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

300,000.00 0.00 Canceled2019-05-

23

2019-05-

28

2019-07-

02

2019-12-

29

LK-MOIWRM-126156-GO-

RFB /

CRIPAF/GOODS/NCB/73-

Procurement of Medium

depth Drilling Machines

for geology division of

Irrigation Department

IDA / 57680Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope647,058.82 0.00

Pending

Implement

ation

2019-08-

05

2019-08-

10

2019-09-

21

2019-10-

21

2019-11-

25

2020-05-

23

LK-MOIWRM-126157-GO-

RFQ / CRIP/GOODS/S/74-

Procurement of office

equipment for ID and DS

offices,Lower kelani river

Basin

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope39,657.80 0.00

Pending

Implement

ation

2019-09-

01

2019-10-

20

2019-12-

19

LK-MOIWRM-127281-GO-

RFQ /

CRIP/GOODS/PMU/S/61-

Procuremnet of Air

Conditioners for CRIP/PMU

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope7,552.57 0.00

Pending

Implement

ation

2019-08-

27

2019-10-

22

2020-04-

19

LK-MOIWRM-127462-GO-

RFQ / CRIP/GOODS/S/49-1

Procurement of Office

Equipment – Computers

and Accessories for Project

Management Unit (CRIP)

IDA / 54170 Project implementation PostRequest for

QuotationsLimited

Single Stage -

One Envelope49,623.52 0.00

Pending

Implement

ation

2019-08-

30

2019-11-

15

2020-02-

13

LK-MOIWRM-130167-GO-

RFB /

CRIP/GOODS/NCB/51

Procurement of

Instruments, Equipment

and Machineries for

Landslide Mitigation Works

for NBRO

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope82,352.94 0.00

Pending

Implement

ation

2019-09-

03

2019-09-

08

2019-09-

29

2019-10-

13

2019-11-

10

2020-05-

08

LK-MOIWRM-130172-GO-

RFB /

CRIP/GOODS/NCB/52

Procurement of Landslide

Mitigation Equipment for

RDA

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

BidsOpen - National

Single Stage -

One Envelope352,941.17 0.00

Pending

Implement

ation

2019-09-

03

2019-09-

08

2019-09-

29

2019-10-

13

2019-11-

10

2020-03-

01

LK-MOIWRM-130174-GO-

RFQ / CRIP/GOODS/S/53

Procurement of Bill Boards

for CRIP

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope44,117.64 0.00

Pending

Implement

ation

2019-09-

08

2019-10-

27

2020-04-

24

LK-MOIWRM-130180-GO-

DIR / CRIP/GOODS/DP/75

Procurement of Arc-GIS

Software for MASL

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

94,117.64 0.00

Pending

Implement

ation

2019-09-

03

2019-09-

10

2019-10-

22

2019-12-

21

NON CONSULTING SERVICES

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LK-MOIWRM-14623-NC-

DIR / Overseas Training

Programme - Flood

Modelling and Design of

Drainage Systems at AIT-

Thailand

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

36,500.00 0.00

Pending

Implement

ation

2017-05-

09

2017-05-

14

2017-06-

18

2017-12-

15

LK-MOIWRM-34060-NC-

DIR /

CRIP/NCS/PMU/DC/380

Training Programme on

"Environmental and Social

Safeguard Management"

for CRIP Staff at

Postgraduate Institute of

Agriculture in University

of Peradeniya

IDA / 54170Increasing climate

resilience of infrastructurePost Direct Selection Direct

8,775.00 0.00

Pending

Implement

ation

2017-10-

26

2017-10-

31

2017-12-

05

2018-06-

03

LK-MOIWRM-60674-NC-

RFQ / CRIP-

CERC/NCS/Gal/NS/611

Hiring a vehicle to use for

senior engineer

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope12,659.00 0.00

Pending

Implement

ation

2018-04-

30

2018-06-

25

2019-05-

06

LK-MOIWRM-60676-NC-

RFQ / CRIP-

CERC/NCS/Kal/NS/511

Hiring a vehicle to use for

senior engineer

IDA / 54170Contingent emergency

responsePost

Request for

QuotationsLimited

Single Stage -

One Envelope12,659.00 0.00

Pending

Implement

ation

2018-04-

30

2018-06-

25

2019-05-

06

LK-MOIWRM-117485-NC-

DIR /

CRIP/NCS/PMU/S/384 -

Documentary Video Clip

Production for Project

Communication and

Dissemination

IDA / 54170 Project implementation Post Direct Selection Direct

36,000.00 0.00

Pending

Implement

ation

2019-06-

03

2019-06-

08

2019-07-

13

2020-01-

09

LK-MOIWRM-127515-NC-

RFQ /

CRIP/NCS/PMU/S/382 A

Production and

Broadcasting of Interactive

Radio Programs on Project

Achievements and Kelani

Flood Mitigation Works

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsOpen - National

Single Stage -

One Envelope10,500.00 0.00

Pending

Implement

ation

2019-09-

10

2019-11-

05

2020-05-

03

LK-MOIWRM-127516-NC-

RFQ /

CRIP/NCS/PMU/S/382 B

Production and

Broadcasting of Interactive

Radio Programs on Project

Achievements and Kelani

Flood Mitigation Works

IDA / 54170Increasing climate

resilience of infrastructurePost

Request for

QuotationsLimited

Single Stage -

One Envelope10,500.00 0.00

Pending

Implement

ation

2019-09-

12

2019-11-

07

2020-01-

06

CONSULTING FIRMSActivity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Contract TypeEstimated

Amount

(US$)

Actual

Amount

(US$)

Process

StatusTerms of Reference

Expression of

Interest Notice

Short List and

Draft Request for

Proposals

Request for

Proposals as

Issued

Opening of

Technical Proposals

/ Minutes

Evaluation of

Technical Proposal

Combined

Evaluation Report

and Draft

Negotiated

Contract

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CRIP/CS/QCBS/01 /

Consultancy Service for the

Carrying out Flood and

Drought Risk Assessment

and Development of Risk

Mitigation Investment

Plans

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open -

International

5,000,000.00 3,038,177.37 Canceled

LK-MOIWRM-4111-CS-

QCBS / Consultancy

Service for Strategic

Environmental Assessment

of Development of River

Basin Level-Flood and

Drought Mitigation

Investment Plans (DBIP)

CRIP/CS/QCBS/01

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

233,333.33 0.00Pending

Implementation2016-12-02

2016-12-

21

2017-02-

10

2017-03-

10

2017-03-

31

2017-04-

21

2017-05-

05

2017-10-

02

LK-MOIWRM-7354-CS-

CQS / CRIP/CS/CQS/09-4

Consultancy on Hydrology

study for Udappuwa Town

on Batthulu oya -

Udappuwa - Andinuni

Road (B614)

IDA / 54170Increasing climate

resilience of infrastructurePost

Consultant

Qualification

Selection

Open - National

3,846.15 0.00Pending

Implementation2017-02-15

2017-03-

08

2017-03-

22

2017-03-

29

2017-04-

26

2017-10-

23

LK-MOIWRM-7364-CS-

CQS / CRIP/CS/CQS/09-5

Hydrology study for

proposed Bridge at

Thalwila Estuary on

Nainamadama - Iranawila

- Chilaw Road (B640)

IDA / 54170Increasing climate

resilience of infrastructurePost

Consultant

Qualification

Selection

Open - National

7,692.31 0.00Pending

Implementation2017-02-15

2017-03-

08

2017-03-

22

2017-03-

29

2017-04-

26

2017-10-

23

LK-MOIWRM-9354-CS-

QCBS / CRIP/CS/QCBS/01-

01

Consultancy Service for

Strategic Environmental

Assessment of Development

of River Basin Level-Flood

and Drought Mitigation

Investment Plans (DBIP)

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

369,231.00 259,999.96 Signed 2017-03-082017-03-

08

2017-03-

08

2017-04-

05

2017-05-

05

2017-06-

09

2017-07-

14

2018-07-

14

LK-MOIWRM-10505-CS-

QCBS / CRIP/CS/QCBS/16

Hiring of Systems

Integrator Consultant for

Hydromet Observation and

Information Systems

Modernization

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open - National

400,000.00 0.00 Canceled 2017-03-242017-04-

14

2017-06-

04

2017-07-

02

2017-08-

01

2017-08-

15

2017-09-

12

2018-09-

12

LK-MOIWRM-10581-CS-

CQS / CRIP/CS/CQS/13

Hiaring of international

expert to expedite the

development of the

CONOPS of the integrated

forecasting and early

warning system - Senior

International Advisor on

Hydromet Modernization

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

250,000.00 0.00 Canceled 2017-03-242017-04-

14

2017-04-

28

2017-05-

05

2017-06-

02

2017-11-

29

Page 17: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 14

LK-MOIWRM-10583-CS-

CQS / CRIP/CS/CQS/14

Hiaring of international

expert to expedite the

development of the

CONOPS of the integrated

forecasting and early

warning system -

International Hydrological

Advisor

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

200,000.00 0.00 Canceled 2017-03-242017-04-

14

2017-04-

28

2017-05-

05

2017-06-

02

2017-11-

29

LK-MOIWRM-14668-CS-

QCBS / CRIP/CS/QCBS/18

Consultancy Service for

feasibility studies and

detailed engineering

designs for flood risk

mitigation in Mundeni Aru

river basin and Batticoloa

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open -

International

2,000,000.00 0.00 Canceled 2017-05-122017-06-

02

2017-07-

23

2017-08-

20

2017-09-

19

2017-10-

03

2017-10-

31

2019-10-

31

LK-MOIWRM-14983-CS-

CQS / CRIP/CS/CQS/11

International Consultant

for Design of Urgent River

Bank Restoration and

protection works of Kelani

River

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open -

International

720,000.00 0.00 Canceled 2017-05-122017-06-

02

2017-06-

16

2017-06-

23

2017-07-

21

2019-07-

21

LK-MOIWRM-10584-CS-

CQS / CRIP/CS/CQS/15

Hiaring of international

expert to expedite the

development of the

CONOPS of the integrated

forecasting and early

warning system -

International Disaster

Management Advisor

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

150,000.00 0.00 Canceled 2017-03-242017-04-

14

2017-04-

28

2017-05-

05

2017-06-

02

2017-11-

29

LK-MOIWRM-17197-CS-

QCBS / CRIP/CS/QCBS/01

Consultancy Service for

Development of Basin

Investment Plan for

Selected Basins.(ICB)

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open -

International

6,000,000.00 0.00Under

Implementation2017-06-07

2017-06-

07

2017-06-

07

2017-06-

07

2017-06-

07

2017-06-

07

2017-06-

07

2017-06-

07

LK-MOIWRM-14660-CS-

QCBS / CRIP/CS/QCBS/19

Consultancy service for

detail engineering designs,

preparation of bidding

documents, and

construction supervision for

proposed flood risk

mitigation works in Kelani

River Basin

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open -

International

2,000,000.00 0.00Under

Implementation2017-05-09

2017-05-

30

2017-07-

20

2017-08-

17

2017-09-

16

2017-09-

30

2017-10-

28

2018-10-

28

LK-MOIWRM-17198-CS-

CQS / CRIP/CS/CQS/20

Hiring of International

consultants to lead the

resettlement planning

process in Kelani

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open -

International

100,000.00 0.00Under

Implementation2017-06-07

2017-06-

07

2017-06-

21

2017-06-

28

2017-07-

26

2018-01-

22

LK-MOIWRM-21549-CS-

CQS / CRIP/CS/CQS/15

Hiaring of national expert

to expedite the

development of the

CONOPS of the integrated

forecasting and early

warning system - National

Disaster Management

Advisor

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

90,000.00 0.00Pending

Implementation2017-07-24

2017-08-

14

2017-08-

28

2017-09-

04

2017-10-

09

2018-10-

04

LK-MOIWRM-26051-CS-

QCBS / CRIP/CS/CQS/22

Strategic Social Assessment

for Kalani River Basin

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

100,000.00 0.00 Canceled 2017-08-242017-09-

14

2017-10-

28

2017-11-

27

2018-01-

01

2018-06-

30

LK-MOIWRM-33237-CS-

QCBS / CRIP/CS/QCBS/22

Strategic Social Assessment

(SSA) for Disaster Risk

Management (DRM)

Investment Planning in

Mahaweli, Attanagalu oya,

Kelani and Mundeni Aru

River Basins

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

100,000.00 136,616.22 Signed 2017-10-232017-11-

13

2017-12-

27

2018-01-

26

2018-02-

25

2018-04-

01

2018-05-

06

2018-11-

02

LK-MOIWRM-49995-CS-

QCBS / CRIP/CS/QCBS/18

Consultancy Service for

feasibility studies and

detailed engineering

designs for flood risk

mitigation in Mundeni Aru

river basin and Batticoloa

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open -

International

1,000,000.00 0.00Under

Implementation2018-02-21

2018-03-

14

2018-05-

04

2018-06-

01

2018-07-

01

2018-07-

15

2018-08-

19

2020-08-

18

LK-MOIWRM-60666-CS-

CQS / CRIP-

CERC/CS/Gal/CQS/610

Hiring a senior Engineer

to facilitate Director

Planning to coordinate and

supervise all civil works

contracts

IDA / 54170Contingent emergency

responsePost

Consultant

Qualification

Selection

Open - National

12,659.00 0.00Pending

Implementation2018-04-25

2018-05-

16

2018-06-

29

2018-07-

29

2018-09-

02

2019-07-

14

LK-MOIWRM-60670-CS-

CQS / CRIP-

CERC/CS/Kal/CQS/510

Hiring a senior Engineer

to facilitate Director

Planning to coordinate and

supervise all civil works

contracts

IDA / 54170Contingent emergency

responsePost

Consultant

Qualification

Selection

Open - National

12,659.00 0.00Pending

Implementation2018-04-25

2018-05-

16

2018-06-

29

2018-07-

29

2018-09-

02

2019-07-

14

LK-MOIWRM-60671-CS-

CQS / CRIP-

CERC/CS/Rat/CQS/705

Hiring a service of

hydrologist for designing 4

bridges in Rathanapura

IDA / 54170Contingent emergency

responsePost

Consultant

Qualification

Selection

Open - National

25,316.46 0.00 Canceled 2018-04-252018-05-

16

2018-06-

29

2018-07-

29

2018-09-

02

2019-07-

14

LK-MOIWRM-60673-CS-

CQS / CRIP-

CERC/CS/Kal/CQS/705

Hiring a service of

hydrologist for designing a

bridge in Bulathsinhala

IDA / 54170Contingent emergency

responsePost

Consultant

Qualification

Selection

Open - National

25,317.00 0.00Pending

Implementation2018-04-25

2018-05-

16

2018-06-

29

2018-07-

29

2018-09-

02

2019-07-

14

LK-MOIWRM-77575-CS-

CQS / Recruitment of an

Environmental and Social

Consultant to the Project

Implementation unit of

Road Development

Authority of CRIP

(CRIP/CS/CQS/30)

IDA / 54170Increasing climate

resilience of infrastructurePost

Consultant

Qualification

Selection

Open - National

1,851.85 0.00Under

Implementation2018-09-11

2018-09-

11

2018-09-

11

2018-09-

11

2018-09-

20

2019-03-

19

LK-MOIWRM-77901-CS-

CQS / Recruitment of

Consultant for Component

1 Contract Management

and Procurement Works of

CRIP-PMU.

(CRIP/CS/CQS/40)

IDA / 54170Increasing climate

resilience of infrastructurePost

Consultant

Qualification

Selection

Open - National

6,481.48 0.00Pending

Implementation2018-09-17

2018-09-

17

2018-09-

17

2018-09-

17

2018-10-

01

2019-03-

30

LK-MOIWRM-83282-CS-

CQS / CRIP/CS/CQS/31

Environmental Assessment

for Proposed Kelani Flood

Mitigation Interventions

and Alterations to Salinity

Barrier in Ambatale under

the Climate Resilience

Multi-Phased Approach

(CRes MPA).

IDA / 54170Increasing climate

resilience of infrastructurePost

Consultant

Qualification

Selection

Open - National

27,777.78 0.00Pending

Implementation2018-10-22

2018-10-

22

2018-10-

22

2018-10-

22

2018-11-

05

2019-05-

04

LK-MOIWRM-97264-CS-

CQS / CRIP/CS/CQS/41

Consultancy service for

Conceptual Engineering

Design of the Ambatale

Salinity Barrier

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open -

International

300,000.00 0.00Under

Implementation2019-02-20

2019-03-

13

2019-04-

26

2019-05-

26

2019-06-

30

2019-12-

27

LK-MOIWRM-10586-CS-

CQS / CRIP/CS/CQS/17

Consultancy Service to

Develop the Architectural

and Engineering Design

for the Forecasting and

Warning Center Buildings

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open - National

200,000.00 0.00Pending

Implementation2019-02-28

2019-03-

21

2019-04-

04

2019-04-

11

2019-05-

09

2019-11-

05

LK-MOIWRM-108298-CS-

QCBS / CRIP/CS/QCBS/42

- Preparation of Detailed

Engineering Designs and

Bidding Documents for

Construction of Flood

Protection Works in Lower

Kelani River Basin of Sri

Lanka

IDA / 54170Development of basin

investment plansPrior

Quality And

Cost-Based

Selection

Open -

International

4,000,000.00 0.00Under

Implementation2019-03-29

2019-04-

19

2019-06-

09

2019-07-

07

2019-08-

06

2019-08-

20

2019-09-

17

2020-09-

16

LK-MOIWRM-115847-CS-

QCBS / CRIP/CS/QCBS/43

- Carryout Feasibility

Study and Detailed

Engineering Designs for

Proposed Wee-Oya

Multipurpose Reservoir

Project in Kelani River

Basin, Sri Lanka

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open -

International

650,000.00 0.00Pending

Implementation2019-05-24

2019-05-

29

2019-08-

10

2019-09-

07

2019-10-

07

2019-10-

21

2019-11-

18

2020-11-

17

LK-MOIWRM-116866-CS-

QCBS / CRIP/CS/QCBS/43

- Carryout Feasibility

Study and Detailed

Engineering Designs for

Proposed Wee-Oya

Multipurpose Reservoir

project in the Kelani River

Basin

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

370,000.00 0.00Pending

Implementation2019-05-28

2019-06-

02

2019-08-

14

2019-09-

11

2019-10-

11

2019-10-

25

2019-11-

22

2020-11-

21

LK-MOIWRM-116935-CS-

QCBS / CRIP/CS/QCBS/44

- Carryout Feasibility

Study and Detailed

Engineering Designs for

"Anuradhapura City Flood

Protection Project"

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

370,000.00 0.00Pending

Implementation2019-05-28

2019-06-

02

2019-08-

14

2019-09-

11

2019-10-

11

2019-10-

25

2019-11-

22

2020-11-

21

LK-MOIWRM-117152-CS-

QCBS / CRIP/CS/QCBS/45

- Carryout Feasibility

Studies for Gampaha and

Ja-Ela Cities Flood

Protection Projects

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

280,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-08-

15

2019-09-

12

2019-10-

12

2019-10-

26

2019-11-

23

2020-11-

22

LK-MOIWRM-117155-CS-

QCBS / CRIP/CS/QCBS/46

- Carry out Feasibility

Study for Proposed Upper

Deraniyagala Reservoir

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

310,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-08-

15

2019-09-

12

2019-10-

12

2019-10-

26

2019-11-

23

2020-11-

22

Page 18: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 15

LK-MOIWRM-117158-CS-

QCBS / CRIP/CS/QCBS/47

- Carryout Feasibility

Study and Detailed

Engineering Designs for

Kandakadu Diversion

Structure

IDA / 54170Development of basin

investment plansPost

Quality And

Cost-Based

Selection

Open - National

430,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-08-

15

2019-09-

12

2019-10-

12

2019-10-

26

2019-11-

23

2020-11-

22

LK-MOIWRM-130358-CS-

CQS / CRIP/CS/CQS/13

Hiring of International

Expert - Meteorology

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open -

International

100,000.00 0.00Pending

Implementation2019-09-04

2019-09-

25

2019-11-

08

2019-12-

08

2020-01-

12

2020-06-

30

LK-MOIWRM-130360-CS-

CQS / CRIP/CS/CQS/14

Hiring of International

Expert - Hydrology

IDA / 54170Development of basin

investment plansPost

Consultant

Qualification

Selection

Open -

International

100,000.00 0.00Pending

Implementation2019-09-04

2019-09-

25

2019-11-

08

2019-12-

08

2020-01-

12

2020-06-

30

INDIVIDUAL CONSULTANTSActivity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Contract TypeEstimated

Amount

(US$)

Actual

Amount

(US$)

Process

StatusTerms of Reference

Invitation to

Identified/Selected

Consultant

Draft Negotiated

ContractSigned Contract

Contract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CRIP/CS/SSS/10 / Short

Term Local Technical

Consultancy for LiDAR

Survey in Implementation

of Development of Basin

Investment Plans under

Climate Resilience

Improvement Project

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

0.00 6,903.69 Signed

LK-MOIWRM-9212-CS-

INDV /

CRIPAF/CS/UVA/SSS/251

Consultancy Service for

design, Development,

updating and maintenance

of Software on Disaster

Information Flat form

IDA / 54170Increasing climate

resilience of infrastructurePost

Individual

Consultant

Selection

Direct

23,076.92 0.00Pending

Implementation2017-03-20

2017-04-

06

2017-04-

20

2017-05-

18

2017-11-

14

LK-MOIWRM-9213-CS-

INDV / CRIP/CS/SSS/05-1

Consultancy Services for

providing training on

Environmental and Social

safeguard management

IDA / 54170Increasing climate

resilience of infrastructurePost

Individual

Consultant

Selection

Direct

23,076.92 0.00Pending

Implementation2017-03-20

2017-04-

06

2017-04-

20

2017-05-

18

2017-11-

14

LK-MOIWRM-10617-CS-

INDV / CRIP/CS/SSS/12

Strengthening the

Forecasting System for

Accelerating Improvements

in Quantitative

Precipitation Estimates for

Flood and Landslide early

warning in Sri Lanka

IDA / 54170Development of basin

investment plansPrior

Individual

Consultant

Selection

Direct

180,000.00 0.00Under

Implementation2017-03-24

2017-04-

10

2017-04-

24

2017-05-

22

2017-11-

18

LK-MOIWRM-25846-CS-

CDS / CRIP/CS/SSS/23

Consultancy service for

Detailed Engineering

Designs, preparation of

Bidding Documents,

Supervision of Geo-

technical Investigations for

proposed flood risk

mitigation works in Kelani

River Basin from Hanwella

to River mouth (both

sides) in

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

2,000,000.00 0.00 Canceled 2017-08-242017-09-

03

2017-11-

07

2020-11-

06

LK-MOIWRM-38414-CS-

INDV / CRIP/CS/IC/25

Development of

Communication Strategy

together with Campaign

and Coordination of

Implementation of

Communication Campaign

for the project

IDA / 54170Increasing climate

resilience of infrastructurePost

Individual

Consultant

Selection

Direct

6,510.00 0.00Pending

Implementation2017-11-27

2017-12-

07

2017-12-

28

2018-02-

01

2018-11-

28

LK-MOIWRM-38424-CS-

CDS /

CRIPAF/CS/UVA/SSS/250

Providing consultancy

service on investigation,

Design, preparation of

BOQs, costing and

Construction Supervision

for Civil Works

IDA / 54170Increasing climate

resilience of infrastructurePrior Direct Selection Direct

423,076.92 417,788.48 Signed 2017-11-272017-12-

14

2018-01-

25

2018-07-

24

LK-MOIWRM-9211-CS-

INDV /

CRIPAF/CS/UVA/SSS/250

Providing consultancy

service on investigation,

Design, preparation of

BOQs, costing and

Construction Supervision

for Civil Works

IDA / 54170Increasing climate

resilience of infrastructurePost

Individual

Consultant

Selection

Direct

423,076.92 0.00 Canceled 2017-03-202017-04-

06

2017-04-

20

2017-05-

18

2017-11-

14

LK-MOIWRM-40102-CS-

CDS / CRIP/CS/SSS/21 (A)

Hiring of Consultant Team

for carrying out Socio-

economic surveys,

Inventory of Losses,

Census Survey, and

Community Consultations

for Resettlement Planning

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

200,000.00 187,772.59 Under Review 2017-12-182017-12-

28

2018-03-

03

2018-08-

30

LK-MOIWRM-24942-CS-

CDS / CRIP/CS/SSS/21

Hiring of Consultant Team

for carrying out Socio-

economic surveys,

Inventory of Losses,

Census Survey, and

Community Consultations

for Resettlement Planning

IDA / 54170Development of basin

investment plansPost Direct Selection Direct

100,000.00 0.00 Canceled 2017-08-152017-08-

25

2017-10-

29

2018-04-

27

LK-MOIWRM-77577-CS-

CDS / Carrying out

Feasibility Studies of

Kelani Ganga- Phase 2

Package 1

(CRIP/CS/SSS/31)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

793,442.81 0.00Under

Implementation2018-09-11

2018-09-

11

2018-09-

11

2018-10-

09

LK-MOIWRM-77889-CS-

CDS / Single Source

Contract for Preparation of

EIA/EA Report for Lower

Kelani Ganga Basin under

the Climate Resilience

Improvement Project.

(CRIP/CS/SSS/39)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

27,777.78 0.00 Under Review 2018-09-132018-09-

18

2018-11-

05

2019-05-

04

LK-MOIWRM-77893-CS-

CDS / Carrying out

Feasibility studies of Gin

Ganga- Phase 2 Package 3

(CRIP/CS/SSS/33)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00Under

Implementation2018-09-13

2018-09-

13

2018-12-

26

2019-01-

23

LK-MOIWRM-77894-CS-

CDS / Carrying out

Feasibility studies of

Nilwala Ganga- Phase 2

Package 4

(CRIP/CS/SSS/34)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00Under

Implementation2018-09-13

2018-09-

13

2018-12-

26

2019-01-

23

LK-MOIWRM-77895-CS-

CDS / Carrying out

Feasibility studies of

Mahaweli Ganga- Phase 2

Package 5

(CRIP/CS/SSS/35)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00 Under Review 2018-09-132018-09-

13

2019-01-

25

2019-02-

22

LK-MOIWRM-77896-CS-

CDS / Carrying out

Feasibility studies of

Malwathu Oya- Phase 2

Package 6

(CRIP/CS/SSS/36)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00Under

Implementation2018-09-13

2018-09-

13

2019-02-

24

2019-03-

24

LK-MOIWRM-77898-CS-

CDS / Supervision and

training of counterpart

staff to carry out Pre-

feasibility and Feasibility

studies of the balance four

basins (Ma Oya, Deduru

Oya Kala Oya and Gal

Oya).- Phase 2 Package 7

(CRIP/CS/SSS/37)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00 Under Review 2018-09-132018-09-

13

2019-03-

26

2019-04-

23

LK-MOIWRM-77900-CS-

CDS / Development of

macro-level risk reduction

investment strategy and

development of guidelines

for water resources

operations (country level

and basin level).- Phase 2

Package 8

(CRIP/CS/SSS/38)

IDA / 54170Development of basin

investment plansPrior Direct Selection Direct

625,000.00 0.00Under

Implementation2018-09-13

2018-09-

13

2019-05-

25

2019-06-

22

LK-MOIWRM-77890-CS-

CDS / Carrying out

Feasibility studies of

Attanagalu Oya-Phase 2

Package 2

(CRIP/CS/SSS/32)

IDA / 54170Development of basin

investment plansPost Direct Selection Direct

625,000.00 0.00Pending

Implementation2018-09-13

2018-09-

13

2018-10-

27

2018-11-

24

LK-MOIWRM-77899-CS-

CDS / Kelani Gaga and

Attanagalu Oya Basins

Feasibility Studies- Phase

2 Package 8

(CRIP/CS/SSS/31)

IDA / 54170Development of basin

investment plansPost Direct Selection Direct

625,000.00 0.00Pending

Implementation2018-09-13

2018-09-

13

2019-04-

25

2019-05-

23

LK-MOIWRM-117187-CS-

INDV / CRIP/CS/IC/49 -

Selection of an Individual

Consultant for Supervision,

Guiding and Monitoring

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

140,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-06-

24

2019-07-

29

2020-01-

25

LK-MOIWRM-117206-CS-

INDV / CRIP/CS/IC/50 -

Selection of an Individual

Consultant - Hydraulic

Modeling Expert

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

140,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-06-

24

2019-07-

29

2020-01-

25

LK-MOIWRM-117207-CS-

INDV / CRIP/CS/IC/51 -

Selection of an Individual

Consultant for Risk

Assessment and Reporting

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

130,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-06-

24

2019-07-

29

2020-01-

25

LK-MOIWRM-117209-CS-

INDV / CRIP/CS/IC/52 -

Selection of an Individual

Consultant - Hydrologist

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

130,000.00 0.00Pending

Implementation2019-05-29

2019-06-

03

2019-06-

24

2019-07-

29

2020-01-

25

Page 19: World Bank Document€¦ · Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit IDA / 54170 Increasing climate resilience of infrastructure Post Request for Bids

Page 16

LK-MOIWRM-130181-CS-

INDV / CRIP/CS/IC/53

Hiring of Individual

Consultant - Drought

Modelling

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

14,705.88 0.00Pending

Implementation2019-09-03

2019-09-

08

2019-09-

15

2019-10-

04

2020-06-

30

LK-MOIWRM-130341-CS-

INDV / CRIP/CS/IC/54

Hiring of Individual

Consultant - Spatial

Planner

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

14,705.88 0.00Pending

Implementation2019-09-04

2019-09-

09

2019-09-

30

2019-11-

04

2020-02-

02

LK-MOIWRM-130342-CS-

INDV / CRIP/CS/IC/55

Hiring of Individual

Consultant - Economist

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

8,823.52 0.00Pending

Implementation2019-09-04

2019-09-

09

2019-09-

10

2019-10-

15

2019-12-

29

LK-MOIWRM-130343-CS-

INDV / CRIP/CS/IC/56

Hiring of Individual

Consultant -Climate

Change Expert

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

14,705.88 0.00Pending

Implementation2019-09-04

2019-09-

09

2019-09-

16

2019-10-

21

2019-12-

20

LK-MOIWRM-130344-CS-

INDV / CRIP/CS/IC/58

Individual Consultant -

Hydrogeologist

IDA / 54170Development of basin

investment plansPost

Individual

Consultant

Selection

Limited

5,882.35 0.00Pending

Implementation2019-09-04

2019-09-

09

2019-09-

16

2019-10-

21

2019-12-

20

LK-MOIWRM-130345-CS-

CDS / CRIP/CS/SSS/57

Hiring of Consultant for

Completion of urgent

procurement tasks for

CRIP

IDA / 54170 Project implementation Post Direct Selection Direct

3,529.41 0.00Pending

Implementation2019-09-04

2019-09-

14

2019-10-

05

2019-12-

17