17
January 10, 2018 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: November 2015]: Revision 1 of Updated Procurement Plan, August 2016] 2. Date of General Procurement Notice: January, 2016 3. Period covered by this procurement plan: The procurement period of project covered from December 2017 to December 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of procurement Substantial risk Works (including turnkey, supply & installation of plant and equipment, and PPP) 10.000.000USD Goods, information technology and non-consulting services 2.000.000USD 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines Not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P147674 issued by PRAPS-BF 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. No. Description Estimated Cost US$ million Packages Domesti c Preferen ce (yes/no) Review by Bank (Prior / Post) Comments Summary of the NCB (Works) 7.6 7 No Post Summary of the NCB (Goods) 1.6 6 No Post Summary of the RfQ (Works) 0.2 2 No Post Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

January 10, 2018

Procurement Plan

I. General

1. Bank’s approval Date of the procurement Plan [Original: November 2015]: Revision 1 of Updated Procurement Plan, August 2016]

2. Date of General Procurement Notice: January, 20163. Period covered by this procurement plan: The procurement period of project covered

from December 2017 to December 2019

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Type of procurement Substantial risk Works (including turnkey, supply & installation of plant and equipment, and PPP) 10.000.000USD

Goods, information technology and non-consulting services 2.000.000USD

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines Not applicable

4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P147674 issued by PRAPS-BF

5. Any Other Special Procurement Arrangements: Not applicable

6. Summary of the Procurement Packages planned during the first 18 months after project

effectiveness (including those that are subject to retroactive financing and advanced procurement)

1 2 3 4 5 6 7

Ref. No.

Description EstimatedCostUS$

million

Packages Domestic

Preference

(yes/no)

Reviewby Bank(Prior / Post)

Comments

Summary of the NCB (Works)

7.6 7 No Post

Summary of the NCB (Goods)

1.6 6 No Post

Summary of the RfQ (Works)

0.2 2 No Post

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

January 10, 2018

Summary of the RfQ (Goods)

0.5 9 No Post

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Type of procurement Substantial risk Consultants: firms 1.000.000USD Consultants: individuals 300.000USD

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: Not applicable

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Assignment

Estimated CostUS$ million

Packages Reviewby Bank(Prior / Post)

Comments

Summary of number of contracts that will be let under QCBS, FBBS, LCBS

0.8 8 post

Summary of number of contracts that will be let under other methods

3 39 Post CQS, Individual consultant

Page 3: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 1

PROCUREMENTPLAN Western Africa : Regional Sahel Pastoralism Support ProjectGeneral InformationCountry: Western Africa Bank�s Approval Date of the Original Procurement Plan: 2018-01-12

Revised Plan Date(s): (comma delineated, leave blank if none) 2018-01-12Project ID: P147674 GPN Date: Project Name: Regional Sahel Pastoralism Support ProjectLoan / Credit No: IDA / 56510, IDA / 56520, IDA / D0650, IDA / D0640, IDA / 56500Executing Agency(ies): Regional Sahel Pastoralism Support Project - Niger, Regional Sahel Pastoralism Support Project - Chad, Regional Sahel Pastoralism Support Project - Senegal, Inter-State Committee against Drought in the Sahel, Regional Sahel Pastoralism Support Project - Mali

WORKSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7788-CW-RFB /Travaux de constructionsbureaux DGSV & rehabilitationbatiment UCP

IDA / 56510 Animal Health Improvement Post Request for Bids Open - National

Single Stage - OneEnvelope 400,000.00 0.00 Pending

Implementation 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03

NE-PRAPS-NE-7808-CW-RFQ /Réhabilitation bureau antenneDosso

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-07-19

NE-PRAPS-NE-7962-CW-RFQ /Rehabilitation bureau antenneTillaberi

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-15 2017-06-10 2017-08-09

NE-PRAPS-NE-7963-CW-RFQ /Réhabilitation bureau antenneAgadez

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-15 2017-06-10 2017-08-09

NE-PRAPS-NE-7964-CW-RFQ /Réhabilitation bureau d'Agadez

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-08-16

NE-PRAPS-NE-7966-CW-RFQ /Réhabilitation bureau antenneMaradi

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-08-16

NE-PRAPS-NE-7968-CW-RFQ /Réhabilitation bureau antenneZinder

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-17 2017-06-12 2017-08-11

NE-PRAPS-NE-7969-CW-RFQ /Réhabilitation bureau antenneDiffa

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-25 2017-06-20 2017-08-19

NE-PRAPS-NE-7970-CW-RFQ /Construction de 15 postesdépartementaux vétérinaires

IDA / 56510 Animal Health Improvement Post Request forQuotations Open - National

Single Stage - OneEnvelope 377,500.00 0.00 Pending

Implementation 2017-05-27 2017-07-22 2018-01-18

PRAPS-SN-01-TX / Recrutementd'une entreprise pour les travauxde construction de 15 parcs devaccination

IDA / 56520 Animal Health Improvement Post Request for Bids Open - National

Single Stage - TwoEnvelope 250,000.00 0.00 Pending

Implementation 2017-05-03 2017-05-08 2017-06-19 2017-07-04 2017-08-18 2017-11-16

PRAPS-SN-05-TX / Recrutementd'une entreprise pour laconstruction et la réhabilitationdes forages pastoraux équipésde château d'eau, d'abreuvoirs etde moyens d'exhaure en zone 2(KF et TC)

IDA / 56520 Natural Resource ManagementEnhancement Post Request for Bids Open - National

Single Stage - TwoEnvelope 1,000,000.00 0.00 Pending

Implementation 2017-10-02 2017-10-07 2017-11-18 2017-12-18 2018-01-22 2018-07-21

TD-PRAPS-TD-9579-CW-RFQ /Réhabilitation des tronçons debalises

IDA / D0650 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 87,272.00 0.00 Pending

Implementation 2017-03-15 2017-05-10 2017-11-06

TD-PRAPS-TD-9637-CW-RFB /Construction de 4 marchés àbétail et de 2 postes de sortiefrontaliers

IDA / D0650 Market Access Facilitation Post Request for Bids Open - National

Single Stage - OneEnvelope 2,425,100.00 0.00 Pending

Implementation 2017-07-17 2017-07-22 2017-09-02 2017-10-02 2017-11-06 2018-05-05

TD-PRAPS-TD-9638-CW-RFB /Aménagement de 20 mares

IDA / D0650 Natural Resource ManagementEnhancement Post Request for Bids Open - National

Single Stage - OneEnvelope 1,184,100.00 0.00 Pending

Implementation 2017-07-20 2017-07-25 2017-09-05 2017-10-05 2017-11-09 2018-05-08

TD-PRAPS-TD-9641-CW-RFB /Aménagement de 150 kilomètresde tronçons balisés

IDA / D0650 Natural Resource ManagementEnhancement Post Request for Bids Open - National

Single Stage - OneEnvelope 300,000.00 0.00 Pending

Implementation 2017-07-20 2017-07-25 2017-09-05 2017-10-05 2017-11-09 2018-05-08

TD-PRAPS-TD-9644-CW-RFQ /Forage des postes de sortie

IDA / D0650 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 150,200.00 0.00 Pending

Implementation 2017-10-07 2017-12-02 2018-05-31

TD-PRAPS-TD-9645-CW-RFB /Construction et réhabilitation despostes de vaccination

IDA / D0650 Animal Health Improvement Post Request for Bids Open - National

Single Stage - OneEnvelope 2,003,600.00 0.00 Pending

Implementation 2017-05-31 2017-06-05 2017-07-17 2017-08-16 2017-09-20 2018-03-19

TD-PRAPS-TD-9648-CW-RFB /Construction réhabilitation etéquipement de 12 forages

IDA / D0650 Market Access Facilitation Post Request for Bids Open - National

Single Stage - OneEnvelope 3,600,100.00 0.00 Pending

Implementation 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03

REF 8 / Construction dans lazone agro-écologique du MaliNord Est

IDA / 56500 Market Access Facilitation Post Request forQuotations Open - National

Single Stage - OneEnvelope 120,000.00 0.00 Pending

Implementation 2017-06-06 2017-08-01 2018-01-28

NE-PRAPS-NE-23108-CW-RFB/ Construction des locaux

IDA / 56510 Project Management andInstitutional Support Post Request for Bids Open - National

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14

119 / Construction de 15 postesdépartementaux vétérinaires

IDA / 56510 Animal Health Improvement Post Request for Bids Open - National

Single Stage - OneEnvelope 377,500.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18

120 / Contruction de 10 postescommunaux frontaliers

IDA / 56510 Animal Health Improvement Post Request for Bids Limited

Single Stage - OneEnvelope 251,200.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18

121 / Finalisation de 4 puitspastoraux à Dosso(PAAPSSP/CTB)

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

122 / Fonçage de 4puitspastoaraux Tahoua (PAAPSSP)

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 176,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

123 / Réhabilitation de 3 puitsDosso (PAAPSSP)

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 88,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

124 / Rehabilitation batimentDGPIA

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

125 / Constructiondes 2 centresde collecte de lait

IDA / 56510 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

Page 4: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 2

126 / Construction/réhabilitationdes marchés à bétail

IDA / 56510 Animal Health Improvement Post Request for Bids Open - National

Single Stage - OneEnvelope 2,100,000.00 0.00 Pending

Implementation 2018-02-13 2018-02-18 2018-04-01 2018-05-01 2018-06-05 2018-12-02

127 / Réalisation d'une stationde pompage dans la communede N'Guimi dans la région deDiffa dans le cadre deprogramme d'urgrncr Diffa 2017

IDA / 56510 Natural Resource ManagementEnhancement Post Request for Bids Open - National

Single Stage - OneEnvelope 170,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18

128 / Réhabilitation des puitspastoraux dans la commune deTchinta

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

129 / Réhabilitation des puitspastoraux dans la commune deTassara

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

130 / Réhabilitation des puitspastoraux dans la commune deBermo

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 72,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

131 / Réhabilitation des puitspastoraux dans la commune deKorgom

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

132 / Réhabilitation des puitspastoraux dans la commune deOllélewa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

133 / Réhabilitation des puitspastoraux dans la commune deTenhiya

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 48,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

134 / Réhabilitation des puitspastoraux dans la commune deTanout

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

135 / Réhabilitation des puitspastoraux dans la commune deMagaria

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 84,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

136 / Réhabilitation des puitspastoraux dans la commune deBandé

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

137 / Réhabilitation des puitspastoraux dans la commune deBouné

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

138 / Réhabilitation des puitspastoraux dans la commune deAlakos

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

139 / Réhabilitation des puitspastoraux dans la commune deGamou

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

140 / Réhabilitation des puitspastoraux dans la commune deGouré

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

141 / Réhabilitation des puitspastoraux dans la commune deGuidiguir

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

142 / Réhabilitation des puitspastoraux dans la commune deKéllé

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

143 / Réhabilitation des puitspastoraux dans la commune deTakaya

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

144 / Réhabilitation des puitspastoraux dans la commune deGudimouni

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

145 / Réhabilitation des puitspastoraux dans la commune deMoa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

146 / Réhabilitation des puitspastoraux dans la commune deKanya Wamé

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

147 / Réhabilitation des puitspastoraux dans la communedeTesker

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

148 / Réhabilitation des puitspastoraux dans la commune deGueskérou

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

149 / Réhabilitation des puitspastoraux dans la commune deChétimari

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

150 / Réhabilitation des puitspastoraux dans la commune deN'Guigmi

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

151 / Réhabilitation des puitspastoraux dans la commune deKablewa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 72,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

152 / Réhabilitation des puitspastoraux dans la commune deFoulatari

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

153 / Réhabilitation des puitspastoraux dans la commune deN'Guel Beyli

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

154 / Réhabilitation des puitspastoraux dans la commune deN'Gourti

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

155 / Réhabilitation des puitspastoraux dans la commune deDjeladjo

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

156 / Réhabilitation des puitspastoraux dans la commune deFillingué

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

Page 5: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 3

157 / Réhabilitation des puitspastoraux dans la communedeTchintaborak

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

158 / Réhabilitation des puitspastoraux dans la commune deIngall

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

159 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune de Ingall

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

160 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune de Bermo

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

161 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune de Tchinta

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

162 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune de Abala

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

163 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune deTenhiya

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

164 / Réhabilitation des stationsde pompage/forages pastorauxdans la commune deTesker (sitede Tesker et Aborak)

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 56,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

REF 1 / Réhabilitation de 19batiments

IDA / 56500 Natural Resource ManagementEnhancement Post Request for Bids Open - National

Single Stage - OneEnvelope 300,000.00 0.00 Pending

Implementation 2017-11-22 2017-11-27 2018-01-08 2018-02-07 2018-03-14 2018-09-10

ML-PRAPS-ML-33832-CW-RFQ/ Travaux d'aménagement et degestion des pistes et des gîtesd'étapes dans les cercles deKoutiala et Yorosso (région deSikasso)

IDA / 56500 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 79,000.00 0.00 Pending

Implementation 2017-10-30 2017-12-25 2018-06-23

ML-PRAPS-ML-33835-CW-RFQ/ Travaux d'aménagement de 3périmètres pastoraux

IDA / 56500 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 105,000.00 0.00 Pending

Implementation 2017-11-14 2018-01-09 2018-07-08

ML-PRAPS-ML-34689-CW-RFB/ Réhabilitation dans la zoneDelta central

IDA / 56500 Market Access Facilitation Post Request for Bids Open - National

Single Stage - OneEnvelope 1,500,000.00 0.00 Pending

Implementation 2018-03-31 2018-04-05 2018-05-17 2018-06-16 2018-07-21 2019-01-17

ML-PRAPS-ML-34760-CW-RFQ/ Construction dans la zone agro-écologique du Delta central de 7magasins

IDA / 56500 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 140,000.00 0.00 Pending

Implementation 2017-11-13 2018-01-08 2018-07-07

GOODSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7631-GO-RFB /Acquisition matériel informatique

IDA / 56510 Project Management andInstitutional Support Post Request for Bids Open - National

Single Stage - OneEnvelope 193,400.00 0.00 Pending

Implementation 2017-02-23 2017-02-28 2017-04-11 2017-05-11 2017-06-15 2017-12-12

NE-PRAPS-NE-7652-GO-RFQ /Production de certificatinternational de transhumance dela CEDEAO

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-03-05 2017-04-30 2017-05-10

NE-PRAPS-NE-7653-GO-RFQ /Fourniture et installation dePanneau Solaire pour la DGPIA

IDA / 56510 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 15,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-07-04

NE-PRAPS-NE-7654-GO-RFQ /Confection des Panneaux ettotems lumineux à Niamey

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-07-19

NE-PRAPS-NE-7655-GO-RFQ /Productions des outils decollecte de données sur lesstatistiques d'élevage (commercialisation de bétailetc ....)

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-06-04

NE-PRAPS-NE-7658-GO-RFQ /Realisation, conception d'uncompendium sur deux ans demise en RN en Suvre du PRAPS

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-07-03

NE-PRAPS-NE-7659-GO-RFQ /impression d'un compendium surdeux ans de mise en RN enSuvre du PRAPS

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-07-07

NE-PRAPS-NE-7660-GO-RFQ /Edition et diffusion des outils etmanuels de sensibilisation surles maladies prioritaires et lesmaladies emergentes du betail

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-07-27

NE-PRAPS-NE-7662-GO-RFQ /Telephone et flotte PRAPS

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2018-04-16

NE-PRAPS-NE-7663-GO-RFQ /Fonctionnement véhicules etmotos (carburant,entretien,...)

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 584,700.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2017-10-18

NE-PRAPS-NE-7664-GO-RFQ /Fourniture et produit d'entretien

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2018-04-16

NE-PRAPS-NE-7667-GO-RFQ /Consommable bureau, journaux

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 13,300.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2018-04-16

NE-PRAPS-NE-7670-GO-RFQ /Edition journal du PRAPS

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 18,000.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2017-06-20

TD-PRAPS-TD-8494-GO-RFB /Acquisition d'un groupeélectrogène pour l'UCP

IDA / D0650 Project Management andInstitutional Support Prior Request for Bids Limited

Single Stage - OneEnvelope 45,155.00 0.00 Pending

Implementation 2017-07-01 2017-07-06 2017-08-17 2017-09-16 2017-10-21 2018-04-19

TD-PRAPS-TD-8497-GO-RFB /Acquisition de 4 000 000 dedoses de vaccin PPR

IDA / D0650 Animal Health Improvement Post Request for Bids Open - National

Single Stage - OneEnvelope 472,727.00 0.00 Pending

Implementation 2017-07-01 2017-07-06 2017-08-17 2017-09-16 2017-10-21 2018-04-19

Page 6: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 4

PRAPS-SN-01-F / Acquisitionde Vaccins PPCB, PPR et FVR

IDA / 56520 Animal Health Improvement Post Request for Bids Open - National

Single Stage - TwoEnvelope 162,000.00 0.00 Pending

Implementation 2017-03-13 2017-03-18 2017-04-29 2017-05-14 2017-06-13 2017-07-13

BF-CILSS-8938-GO-RFQ /Impression de divers documents(notes des ETP-2, fichestechniques, notes de plaidoyer,guide routier, plaquettes)

IDA / D0640 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-06-20 2017-08-15 2017-09-14

PRAPS-SN-02-F / Acquisitionde kit de diagnostic delaboratoire (PPR et FVR) et dematériel d'intervention

IDA / 56520 Animal Health Improvement Post Request for Bids Open - National

Single Stage - TwoEnvelope 150,000.00 0.00 Pending

Implementation 2017-03-06 2017-03-11 2017-04-15 2017-05-15 2017-06-19 2017-08-03

PRAPS-SN-03-F / Recrutementd'un prestataire pour laconfection de supportspromotionnels (agendas, polos,pagnes, etc.) et Support deCommunication (JML, JNE, autrecom)

IDA / 56520Animal Health ImprovementProject Management andInstitutional Support

Post Request forQuotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-11 2017-04-28 2017-05-28

PRAPS-SN-04-F / Acquisitionde 8 motos pour l'animation desUP

IDA / 56520 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-07 2017-06-21

PRAPS-SN-05-F / Acquisitionde matériel de lutte contre lesfeux de brousse en vue del'équipement de 30 comités delutte contre les feux de brousse

IDA / 56520 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 90,000.00 0.00 Pending

Implementation 2017-07-29 2017-09-17 2017-11-01

PRAPS-SN-06-F / Acquisitionde motofaucheuses

IDA / 56520 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-06-17 2017-08-12 2017-11-10

PRAPS-SN-07-F / Acquisitionde fournitures de bureau, deconsommables informatiques etde Produits d'entretien de locauxadministratifs et de petitsmatériels et outillages

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-03-11 2017-04-30 2018-04-30

PRAPS-SN-09-F / Services deconfection d'habillement pour lepersonnel de service

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-14 2017-06-14

PRAPS-SN-11-F / Acquisitiond'équipements deCommunication

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2017-03-11 2017-04-30 2017-06-15

BF-CILSS-9090-GO-RFQ /Produire des éditions de find'année (calendriers,plannings...)

IDA / D0640 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-12-01 2017-12-30 2018-01-13

BF-CILSS-9091-GO-RFQ /Acquisition de deuxrétroprojecteurs

IDA / D0640 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2018-03-05 2018-04-09 2018-04-19

BF-CILSS-9092-GO-DIR /Acquisition de matériel de bureaucomplémentaire

IDA / D0640 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,500.00 0.00 Pending

Implementation 2018-03-09 2018-04-09 2018-04-19

BF-CILSS-9093-GO-RFQ /Acquisition de fournitures debureau

IDA / D0640 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2018-04-07 2018-05-12 2018-05-22

PRAPS-SN-12-F / Achat deMobilier (archivage et salon pourbureau coordonnateur et bureauassistant sauvegardeenvironnemental et social)

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2017-04-08 2017-05-28 2017-06-27

PRAPS-SN-13-F / Acquisitionde Groupes Electrogènes UCP etantennes

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-07 2017-08-05

PRAPS-SN-14-F / Acquisitionde céréales en cas de crisepastorale

IDA / 56520 Pastoral Crisis Management Prior Request for Bids Open - National

Single Stage - OneEnvelope 648,000.00 0.00 Pending

Implementation 2017-11-06 2017-11-11 2017-12-23 2018-01-22 2018-02-26 2018-03-28

TD-PRAPS-TD-9182-GO-RFQ /Equipement de la salle desréunions du Ministère del'Elevage et des ProductionsAnimales

IDA / D0650 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,360.00 0.00 Pending

Implementation 2017-04-19 2017-06-14 2017-12-11

TD-PRAPS-TD-9999-GO-RFB /Acquistion de 17 véhicules ToutTerrain et de 176 motocyclettes

IDA / D0650 Project Management andInstitutional Support Prior Request for Bids Open - International

Single Stage - OneEnvelope 1,644,600.00 0.00 Pending

Implementation 2016-07-04 2016-07-09 2016-08-20 2016-09-19 2016-10-24 2017-04-22

TD-PRAPS-TD-9998-GO-RFB /Acqusitions des matérielsinformatiques

IDA / D0650 Project Management andInstitutional Support Post Request for Bids Open - National

Single Stage - OneEnvelope 362,100.00 0.00 Pending

Implementation 2016-07-21 2016-07-26 2016-09-06 2016-10-06 2016-11-10 2017-05-09

TD-PRAPS-TD-9990-GO-RFB /Acquistion de 3 000 000 dedoses de vaccins PPCB

IDA / D0650 Animal Health Improvement Post Request for Bids Limited

Single Stage - OneEnvelope 500,000.00 0.00 Pending

Implementation 2016-07-21 2016-07-26 2016-09-06 2016-10-06 2016-11-10 2017-05-09

REF 11 / Equipements etmobiliers de bureau pour lesantennes régionales du Projet

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 90,000.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

REF 12 / Achat d'un véhiculespécialement équipé pour lesinterventions d'urgence

IDA / 56500 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-02-28 2017-04-25 2017-10-22

REF 13 / Moquettes, rideaux etaccessoires pour l'Unité deCoordination du Projet

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2017-05-21 2017-07-16 2018-01-12

REF 14 / Matérielsinformatiques pour les antennesrégionales

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

REF 16 / Acquisition de 80smartphones

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-22 2017-05-17 2017-11-13

REF 17 / Equipements de travailpour les enquêteurs et lescontrôleurs

IDA / 56500 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-03-14 2017-05-09 2017-11-05

REF 19 / kit de semencesfourragères et petits équipements

IDA / 56500 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

REF 22 / Trousses vétérinaires

IDA / 56500 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-03-30 2017-05-25 2017-11-21

Page 7: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 5

REF 23 / 40 ordinateursportables et disques externes

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-04-14 2017-06-09 2017-12-06

REF 25 / Ordinateur portable etaccessoires, imprimantemultifonction, photocopieuse etonduleur du PADEL-M

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-05-16 2017-07-11 2018-01-07

NE-PRAPS-NE-23097-GO-RFQ/ Acquisition des kits devaccination

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 27,000.00 0.00 Pending

Implementation 2017-09-01 2017-10-27 2018-04-25

NE-PRAPS-NE-23100-GO-RFQ/ Equipements des 2 centres decollecte de lait

IDA / 56510 Market Access Facilitation Post Request forQuotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-10-20 2017-12-15 2018-06-13

NE-PRAPS-NE-23249-GO-RFQ/ Son de blé (1100 tonnes) régionde Tahoua avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 616,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-7610-GO-RFB /Acquisition matériel roulant ( 26véhicules et 42 Moto)

IDA / 56510 Project Management andInstitutional Support Post Request for Bids Open - International

Single Stage - OneEnvelope 1,280,000.00 0.00 Pending

Implementation 2017-02-27 2017-03-04 2017-04-15 2017-05-15 2017-06-19 2017-09-02

NE-PRAPS-NE-7640-GO-RFQ /Equipement Vétérinaire(matériels froid)

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-02-28 2017-04-25 2017-06-24

NE-PRAPS-NE-7641-GO-RFQ /Equipements Vétérinaires(Matériels de Prélèvement et Kitsde diagnostic )

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 83,000.00 0.00 Pending

Implementation 2017-03-05 2017-04-30 2017-06-29

NE-PRAPS-NE-23326-GO-RFQ/ Tourteaux de graine (300tonnes) région de Tahoua (tonnes)de coton avec depot sursite

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 168,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23347-GO-RFQ/ Fourniture des produitsvétérinaires et complexesminéraux pour la DGPIA

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 658,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23327-GO-RFQ/ Son de blé région (1100 t) deZinder avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 616,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23328-GO-RFQ/ Tourteaux de graine de coton(300t) région de Zinder avecdepot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 168,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23330-GO-RFQ/ Son de blé région deDiffa (600)avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 336,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23333-GO-RFQ/ Tourteaux de graine région deDiffa ( 200 tonnes)de coton avecdepot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 112,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23335-GO-RFQ/ Son de blé région de Maradi(1000 tonnes) avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 560,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23336-GO-RFQ/ Tourteaux de graine régiondeMaradi ( 200 tonnes)de cotonavec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 140,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23337-GO-RFQ/ Son de blé région de Tillaberi(1000 tonnes) avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 560,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23338-GO-RFQ/ Tourteaux de graine région deTillaberi ( 250 tonnes)de cotonavec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 140,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23339-GO-RFQ/ Son de blé région de Dosso(800 tonnes) avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 448,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23340-GO-RFQ/ Tourteaux de graine région deDosso ( 150 tonnes)de cotonavec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 84,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23341-GO-RFQ/ Son de blé région de Niamey(400 tonnes) avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 224,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23343-GO-RFQ/ Tourteaux de graine région deNiamey ( 250 tonnes)de cotonavec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 140,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23344-GO-RFQ/ Son de blé région de Agadez (1000 tonnes)de coton avec depotsur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 560,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23345-GO-RFQ/ Tourteau de graine de cotonrégion d'Agadez (300 tonnes)avec depot sur site

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 168,000.00 0.00 Pending

Implementation 2017-08-06 2017-10-01 2018-03-30

NE-PRAPS-NE-23045-GO-RFB/ Aquisition materiel informatiqueet de communication

IDA / 56510 Project Management andInstitutional Support Post Request for Bids Open - National

Single Stage - OneEnvelope 193,400.00 0.00 Pending

Implementation 2017-07-31 2017-08-05 2017-09-16 2017-10-16 2017-11-20 2018-05-19

1 / Acquisition materiel roulant(26véhicules et 50 Motos)

IDA / 56510 Project Management andInstitutional Support Prior Request for Bids Open - International

Single Stage - OneEnvelope 1,280,000.00 0.00 Pending

Implementation 2016-12-02 2016-12-07 2017-01-18 2017-02-17 2017-03-24 2017-09-20

5 / Acquisition de vaccins etdiluants PPCB et diluants (6000000 doses)

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 655,000.00 0.00 Pending

Implementation 2017-11-06 2018-01-01 2018-06-30

6 / Edition guide ingénieriesociale

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

7 / Acquisition matériel aratoirepour les sites de Tanout

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

Page 8: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 6

8 / Acquisition matériel aratoirepour les sites de BelbedjiGangara

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

9 / Acquisition matériel aratoirepour les sites de Kantche

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

10 / Acquisition matériel aratoirepour les sites de Takaya

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,400.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

11 / Acquisition matériel aratoirepour les sites de MagariaDoungas

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

12 / Acquisition matériel aratoirepour les sites de Gouré

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

13 / Acquisition matériel aratoirepour les sites de Boune

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

14 / Acquisition matériel aratoirepour les sites de Tesker

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

15 / Acquisition matériel aratoirepour les sites de AgadezAderbissanet

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

16 / Acquisition matériel aratoirepour les sites de INGAL

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

17 / Acquisition matériel aratoirepour les sites de Tchiro-Arlit

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

18 / Acquisition matériel aratoirepour les sites de Iférouane

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

19 / Acquisition matériel aratoirepour les sites de INATES

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,600.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

20 / Acquisition matériel aratoirepour les sites de say

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

21 / Acquisition matériel aratoirepour les sites de Téra

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

22 / Acquisition matériel aratoirepour les sites de Tondikiwindi

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

23 / Acquisition matériel aratoirepour les sites de Filingué

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,200.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

24 / Acquisition matériel aratoirepour les sites de Bankilare

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

25 / Acquisition matériel aratoirepour les sites de GuidanRoumdji Madaroumfa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

26 / Acquisition matériel aratoirepour les sites de Mayayi

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

27 / Acquisition matériel aratoirepour les sites de Dakoro Bermo

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

28 / Acquisition matériel aratoirepour les sites de Tchinta-Konni

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

29 / Acquisition matériel aratoirepour les sites de Abalak

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

30 / Acquisition matériel aratoirepour les sites de Bagaroua

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

31 / Acquisition matériel aratoirepour les sites de Tassara

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,600.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

32 / Acquisition matériel aratoirepour les sites de Matankari

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

33 / Acquisition matériel aratoirepour les sites de Dogon kiryaKieche

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,600.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

34 / Acquisition matériel aratoirepour les sites de Falmey-Boboy

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

35 / Acquisition matériel aratoirepour les sites de Diffa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,600.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

36 / Acquisition matériel aratoirepour les sites de Mainé

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

37 / Acquisition matériel aratoirepour les sites de Goudoumaria

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,400.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

38 / Achat semence espèce 1 et2 pour la région D'Agagez

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 35,275.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

39 / Achat semence espèce 1 et2 pour la région De Diffa

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,455.00 0.00 Pending

Implementation 2018-01-07 2018-03-04 2018-08-31

40 / Achat semence espèce 1 et2 pour la région De Dosso

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,185.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

41 / Achat semence espèce 1 et2 pour la région De Maradi

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 18,900.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

42 / Achat semence espèce 1 et2 pour la région De Tahoua

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

43 / Achat semence espèce 1 et2 pour la région De Tillaberi

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 38,000.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

44 / Achat semence espèce 1,2et 3 pour la région De Zinder

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 73,000.00 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

Page 9: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 7

46 / Acquisition et installation dusystème de securité ( alarmeincendie et vidéo surveillance)

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-10-04 2017-11-29 2018-05-28

47 / Achat matériel de collectepour la DGSV

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 56,000.00 0.00 Pending

Implementation 2017-10-25 2017-12-20 2018-06-18

48 / Acquisition materielsd'archivage electronique

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-10-27 2017-12-22 2018-06-20

49 / Acquisition de logiciel pour5 postes ( Arc Gis logicel R etSPSS)

IDA / 56510 Pastoral Crisis Management Post Request forQuotations Limited

Single Stage - OneEnvelope 18,000.00 0.00 Pending

Implementation 2017-10-27 2017-12-22 2018-06-20

50 / Acquisition matérielinformatique et mobilier debureau pour les 5 postes OSV

IDA / 56510 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-10-27 2017-12-22 2018-06-20

NE-PRAPS-NE-30649-GO-RFQ/ Acquisition des kits devaccination

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 27,000.00 0.00 Pending

Implementation 2017-10-22 2017-12-17 2018-06-15

NE-PRAPS-NE-30651-GO-RFQ/ Réalisation de film sur la placedes femmes et des jeune dans lepastoralisme

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-10-15 2017-12-10 2018-06-08

REF 20 / Un ordinateur, 1imprimante et photocopieur, 2bureaux, une armoire, fournituresde bureau

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 26,000.00 0.00 Pending

Implementation 2017-03-24 2017-03-24 2017-03-24

ML-PRAPS-ML-31420-GO-RFB/ Acquisition et Transportd'aliment bétail

IDA / 56500 Pastoral Crisis Management Post Request for Bids Open - National

Single Stage - OneEnvelope 600,000.00 0.00 Pending

Implementation 2017-10-10 2017-10-15 2017-11-26 2017-12-26 2018-01-30 2018-07-29

NE-PRAPS-NE-30638-GO-DIR /Acquisition de vaccins et diluantsPPR (15 000 000 doses)

IDA / 56510 Animal Health Improvement Prior Direct Selection Direct

852,000.00 0.00 PendingImplementation 2017-11-09 2017-11-14 2017-12-16 2018-06-14

NE-PRAPS-NE-34367-GO-RFQ/ Mise en place des incinérateurspour la gestion des déchets

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-12-05 2018-01-30 2018-07-29

NE-PRAPS-NE-34385-GO-RFQ/ Acquisition /construction desparcs mobiles pour bovins

IDA / 56510 Animal Health Improvement Post Request forQuotations Limited

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-11-11 2018-01-06 2018-07-05

NON CONSULTING SERVICESActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7661-NC-RFQ /Internet

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,200.00 0.00 Pending

Implementation 2017-02-24 2017-04-21 2018-04-16

NE-PRAPS-NE-7665-NC-RFQ /Assurance véhicule

IDA / 56510 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 150,000.00 0.00 Pending

Implementation 2017-02-25 2017-04-22 2018-04-17

PRAPS-SN-10-F / Acquisitiondu logiciel MS Project etformation des utilisateurs

IDA / 56520 Project Management andInstitutional Support Prior Direct Selection Direct

30,000.00 0.00 Pending

Implementation 2017-03-13 2017-03-18 2017-04-22 2017-05-22

PRAPS-SN-08-F / Servicesd'entretiens et de maintenancedu matériel informatique, du siteweb du PRAPS

IDA / 56520 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2016-12-30 2017-01-17 2018-01-17

REF 27 / Production dessupports de vulgarisation

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-05-15 2017-07-10 2018-01-06

REF 28 / Appui à la productiondes cartes des couloirs detranshumance

IDA / 56500 Natural Resource ManagementEnhancement Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-16 2017-06-11 2017-12-08

REF 29 / Développement d�unepage Facebook et d�une pageYouTube

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,000.00 0.00 Pending

Implementation 2017-06-17 2017-08-12 2018-02-08

REF 30 / Conception etréalisation d�un clip vidéo pour lePRAPS

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-04-15 2017-06-10 2017-12-07

NE-PRAPS-NE-7669-NC-DIR /Location Bureaux UCP/PRAPS

IDA / 56510 Project Management andInstitutional Support Post Direct Selection Direct

72,864.00 0.00 Pending

Implementation 2017-02-19 2017-02-24 2017-03-31 2018-03-26

NE-PRAPS-NE-7642-NC-DIR /Etablissement de 7 conventionsavec les média locaux pour lavulgarisation des textes

IDA / 56510 Project Management andInstitutional Support Post Direct Selection Direct

20,000.00 0.00 Pending

Implementation 2017-02-28 2017-03-05 2017-04-09 2017-10-06

ML-PRAPS-ML-34772-NC-RFQ /Diffusion de messages

IDA / 56500 Project Management andInstitutional Support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-11-05 2017-12-31 2018-06-29

CONSULTING FIRMSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference Expression of Interest

NoticeShort List and Draft

Request for ProposalsRequest for Proposals

as IssuedOpening of TechnicalProposals / Minutes

Evaluation of TechnicalProposal

Combined EvaluationReport and Draft

Negotiated ContractSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7700-CS-CQS /Multiples Conventions avec lesopérateurs privés pourl'organisation des usagers deparcours(ingénerie sociale,aménagements pastoraux ethydraulique pastorale ds les 7régions avec une vingtaine d'ONG au niveau de Vingt septzones

IDA / 56510 Project Management andInstitutional Support Prior

ConsultantQualificationSelection

Open - National

1,500,000.00 0.00 PendingImplementation 2017-02-20 2017-03-13 2017-04-26 2017-05-26 2017-06-30 2018-06-25

NE-PRAPS-NE-7766-CS-CQS /Appui à la mise en place d'undisposititif adaptéd'approvisionnement et dedistribution d'aliments bétail encas de crise pastorale

IDA / 56510 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

40,000.00 0.00 PendingImplementation 2017-03-13 2017-04-03 2017-05-17 2017-06-16 2017-07-21 2017-09-19

NE-PRAPS-NE-7769-CS-CQS /Elaboration d'un documentd'evaluation d'une activité ensituation de crises pastorales

IDA / 56510 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

20,000.00 0.00 PendingImplementation 2017-03-23 2017-04-13 2017-05-27 2017-06-26 2017-07-31 2017-08-30

Page 10: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 8

PRAPS-SN-12-PI / Sélectiond'un consultant individuel pourl'étude de capitalisation desactivités de la cellule de luttecontre le vol de bétail

IDA / 56520 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

40,000.00 0.00 PendingImplementation 2016-11-29 2017-02-09 2017-03-26 2017-04-25 2017-06-09 2017-10-07

PRAPS-SN-09-PI / Sélection deconsultant pour le développementde modules sur les crisespastorales (SIGEL) et formationdes utilisateurs

IDA / 56520 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2016-12-07 2017-02-04 2017-03-10 2017-04-10 2017-05-31 2017-08-29

PRAPS-SN-04-PI / Sélectiond'un cabinet pour l'étude sur lesinitiatives en cours pour la miseen place de pares feux dans lecadre de la lutte contre les feuxde brousses

IDA / 56520 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

60,000.00 0.00 PendingImplementation 2017-03-27 2017-04-17 2017-05-31 2017-06-30 2017-08-04 2018-01-01

PRAPS-SN-06-PI / Sélectiond'un cabinet pour les étudestechniques en vue de laréhabilitation de 50 km de pistesrurales

IDA / 56520 Market Access Facilitation PostConsultantQualificationSelection

Open - National

30,000.00 0.00 PendingImplementation 2017-05-02 2017-05-23 2017-07-06 2017-08-05 2017-09-09 2017-12-08

PRAPS-SN-10-PI / Sélectiond'un cabinet pour les servicesd'évaluation d'impact OSB

IDA / 56520 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-08-28 2017-09-18 2017-11-01 2017-12-01 2018-01-05 2018-05-05

TD-PRAPS-TD-9404-CS-QBS /Recrutement d'un consultantpour les travaux de réhabilitationdes locaux de l'UCP

IDA / D0650 Project Management andInstitutional Support Post Quality Based

Selection Open - National

28,000.00 0.00 PendingImplementation 2017-03-23 2017-04-13 2017-05-27 2017-06-24 2017-07-24 2017-08-23 2017-09-27 2018-09-27

REF 38 / Etudes pour 15schémas d'aménagement deterroirs

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-04-18 2017-05-09 2017-06-22 2017-07-22 2017-08-26 2018-02-22

REF 39 / Contrôle -surveillancedes travaux d�aménagement

IDA / 56500 Market Access Facilitation PostConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-03-14 2017-04-04 2017-05-18 2017-06-17 2017-07-22 2018-01-18

REF 40 / Evaluation dessuperficies de pâturages

IDA / 56500 Natural Resource ManagementEnhancement Post Quality And Cost-

Based Selection Open - National

100,000.00 0.00 PendingImplementation 2017-05-03 2017-05-24 2017-07-07 2017-08-04 2017-09-03 2017-10-08 2017-11-12 2018-11-12

REF 41 / Contrôle -surveillancedes travaux

IDA / 56500 Market Access Facilitation PostConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-03-16 2017-04-06 2017-05-20 2017-06-19 2017-07-24 2018-01-20

REF 42 / Réalisation des étudesgéophysiques

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

110,000.00 0.00 PendingImplementation 2017-05-10 2017-05-31 2017-07-14 2017-08-13 2017-09-17 2018-03-16

REF 44 / Réalisation des étudestechniques

IDA / 56500 Natural Resource ManagementEnhancement Post Quality And Cost-

Based Selection Open - National

100,000.00 0.00 PendingImplementation 2017-05-04 2017-05-25 2017-07-08 2017-08-05 2017-09-04 2017-10-09 2017-11-13 2018-11-13

REF 45 / Contrôle -surveillancedes travaux et équipementsd'abreuvement

IDA / 56500 Market Access Facilitation PostConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-04-25 2017-05-16 2017-06-29 2017-07-29 2017-09-02 2018-03-01

REF 46 / Contrôle des travauxdans la zone mali NORD- EST

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-05-18 2017-06-08 2017-07-22 2017-08-21 2017-09-25 2018-03-24

REF 63 / Mise en place d�unfonds de roulement vaccins

IDA / 56500 Animal Health Improvement PostConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-02 2017-05-23 2017-07-06 2017-08-05 2017-09-09 2018-03-08

REF 73 / Etudes d'identificationdes travaux d�aménagement

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

90,000.00 0.00 PendingImplementation 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03

REF 74 / Aménagement dansla zone Centre du Mali

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

90,000.00 0.00 PendingImplementation 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03

REF 75 / Aménagement etgestion durable desbourgoutières

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03

REF 76 / Aménagement etgestion durable desbourgoutières dans les régionsde Tombouctou et de Gao(régions du Nord-Mali)

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03

REF 78 / Réalisation des pare-feu de sécurisation

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

60,000.00 0.00 PendingImplementation 2017-06-22 2017-07-13 2017-08-26 2017-09-25 2017-10-30 2018-04-28

REF 80 / Mise en place d�unfonds de roulement vaccins

IDA / 56500 Animal Health Improvement PostConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-04-17 2017-05-08 2017-06-21 2017-07-21 2017-08-25 2018-02-21

NE-PRAPS-NE-7774-CS-CQS /Recrutement d'un bureau d'étudepour étude, conception et suivide travaux de construction de laDGSV et Réhabilitation bureauUCP

IDA / 56510 Animal Health Improvement PostConsultantQualificationSelection

Open - National

40,000.00 0.00 PendingImplementation 2017-03-22 2017-04-12 2017-05-26 2017-06-25 2017-07-30 2019-01-21

NE-PRAPS-NE-7779-CS-CQS /Recrutement d'un bureaud'études pour etude,conceptionet contrôle des 15 postesdépartementaux et des 10postes communauxfrontaliers*

IDA / 56510 Animal Health Improvement PostConsultantQualificationSelection

Open - National

80,000.00 0.00 PendingImplementation 2017-02-21 2017-03-14 2017-04-27 2017-05-27 2017-07-01 2018-12-23

NE-PRAPS-NE-7702-CS-CQS /Convention de prestation avec unBureau pour organisation desusagers de parcours

IDA / 56510 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-04-02 2017-04-23 2017-06-06 2017-07-06 2017-08-10 2018-08-05

53 / Recrutemnt d'un bureaud'étude pour Appui aux initiativescommunautaires à travers lesCEP

IDA / 56510 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

35,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

58 / Identification, accordssociaux, géo référence etpréparation des DAO pour lestravaux de balisage en 2018 descouloirs de passage

IDA / 56510 Project Management andInstitutional Support Post

ConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

65 / Convention de prestationavec un bureau pour organisationdes usagers de parcours

IDA / 56510 Project Management andInstitutional Support Post

ConsultantQualificationSelection

Open - National

50,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

Page 11: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 9

66 / Multiples Conventions avecles opérateurs privés pourl'organisation des usagers deparcours(ingénerie sociale,aménagements pastoraux ethydraulique pastorale ds les 7régions avec une vingtaine d'ONG au niveau de Vingt septzones

IDA / 56510 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

1,500,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

68 / Recrutement d'unconsultant firme pourl'Elaboration d'un documentd'evaluation d'une activité ensituation de crises pastorales

IDA / 56510 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

40,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

80 / Recrutement d'un bureaud'étude pour étude, conception etsuivi et contôle de batiment duProjet

IDA / 56510 Project Management andInstitutional Support Post

ConsultantQualificationSelection

Open - National

40,000.00 0.00 UnderImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

84 / Recrutement desONG/OPEL pour le démarragedu processus des accords partispour la construction/réhabilitationdes marchés

IDA / 56510 Market Access Facilitation PostConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

85 / Recrutement d'un bureaud'études pour etude,conceptionet contrôle des 15 postesdépartementaux et des 10postes communauxfrontaliers*

IDA / 56510 Animal Health Improvement PostConsultantQualificationSelection

Open - National

80,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

86 / Etude sur l'institution deSVPP

IDA / 56510 Pastoral Crisis Management PostConsultantQualificationSelection

Open - National

40,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

91 / Recrutement dun bureaudetude pour Etudes defaisabilité, préparation DAO, suiviet contrôle des quatorze centresde collecte de lait

IDA / 56520 Market Access Facilitation PostConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-08-05

97 / recrutement dun bureaud'études pour la réalisation desetudes techniques et elaborationdes DAO relatifs a laconstruction/rehabilitation des 29marchés à bétail

IDA / 56510 Market Access Facilitation Post Quality And Cost-Based Selection Open - National

100,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-20 2017-12-03 2017-12-31 2018-01-30 2018-03-06 2018-04-10 2019-04-10

NE-PRAPS-NE-30657-CS-LCS /Recrutement d'un bureau d'étudepour etudes,suivi et contrôle destravaux de Réhabilitation dubatiment de la DGPIA et leslocaux devant abriter lesantennes régionales du PRAPS

IDA / 56510 Project Management andInstitutional Support Post Least Cost Selection Open - National

70,000.00 0.00 Pending

Implementation 2017-09-30 2017-10-21 2017-12-04 2018-01-01 2018-01-31 2018-03-07 2018-04-11 2018-10-08

REF 47 / Recrutement deconsultant chargé des étudestechniques pour la réalisationdes Travaux dans la zone DELTACENTRAL

IDA / 56500 Market Access Facilitation PostConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-05-19 2017-06-09 2017-07-23 2017-08-22 2017-09-26 2018-03-25

ML-PRAPS-ML-31460-CS-CQS/ RECRUTEMENT D'UNE ONGPOUR LA CONDUITE DESACTIVITÉS DE SAUVEGARDESSOCIALES AUTOUR DESINFRASTRUCTURES DUPRAPS

IDA / 56500 Project Management andInstitutional Support Post

ConsultantQualificationSelection

Open - National

200,000.00 0.00 PendingImplementation 2017-10-25 2017-11-15 2017-12-29 2018-01-28 2018-03-04 2018-08-31

ML-PRAPS-ML-33294-CS-CQS/ Recrutement de consultant pourla réalisation des Travaux desécurisation

IDA / 56500 Natural Resource ManagementEnhancement Post

ConsultantQualificationSelection

Open - National

120,000.00 0.00 PendingImplementation 2017-05-28 2017-06-18 2017-08-01 2017-08-31 2017-10-05 2018-04-03

INDIVIDUAL CONSULTANTSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference

Invitation toIdentified/Selected

ConsultantDraft Negotiated

Contract Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NE-PRAPS-NE-7677-CS-INDV /Recrutement des 7 Assistantsadministratifs et financier, et 7Assistants en suivi évaluationpour les antennes Régionales duPRAPS

IDA / 56510 Project Management andInstitutional Support Prior Individual Consultant

Selection Open

235,200.00 0.00 PendingImplementation 2017-02-19 2017-04-09 2017-04-30 2017-06-04 2018-05-30

NE-PRAPS-NE-7680-CS-INDV /Création d'une base de données

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-02-28 2017-03-05 2017-03-26 2017-04-30 2017-07-29

NE-PRAPS-NE-7681-CS-INDV /Renforcement des capacités engestion et management

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-06-19 2017-06-24 2017-07-15 2017-08-19 2017-09-18

NE-PRAPS-NE-7686-CS-INDV /Conception et Réalisation du SiteWeb PRAPS

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

19,000.00 0.00 PendingImplementation 2017-02-19 2017-02-24 2017-03-17 2017-04-21 2017-05-12

NE-PRAPS-NE-7688-CS-INDV /Mise en place d'un reseauintranet et internet du MAG/EL (contribution)

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

27,000.00 0.00 PendingImplementation 2017-02-19 2017-02-24 2017-03-17 2017-04-21 2017-06-20

NE-PRAPS-NE-7695-CS-INDV /Elaboration d'une strategie etd'un plan de communication

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

24,000.00 0.00 PendingImplementation 2017-04-25 2017-04-30 2017-05-21 2017-06-25 2017-08-24

NE-PRAPS-NE-7767-CS-INDV /Elaboration d'un document decadrage pour le financement desAGR

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

15,000.00 0.00 Pending

Implementation 2017-02-20 2017-02-25 2017-03-18 2017-04-22 2017-05-22

NE-PRAPS-NE-7772-CS-INDV /Mise en place d'un système dedocumentation et d'archivageElectronique

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

40,000.00 0.00 PendingImplementation 2017-02-26 2017-03-03 2017-03-24 2017-04-28 2017-05-28

NE-PRAPS-NE-7776-CS-INDV /Recrutement d'un consultantpour l'analyse genre dans leszones d'intervention du PRAPS

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-02-20 2017-02-25 2017-03-18 2017-04-22 2017-05-22

NE-PRAPS-NE-7778-CS-INDV /Recrutement d'un consultantpour l'elaboration de la strategiegenre

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

24,000.00 0.00 PendingImplementation 2017-02-20 2017-02-25 2017-03-18 2017-04-22 2017-05-22

Page 12: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 10

NE-PRAPS-NE-7782-CS-INDV /Conception de model de marchéà betail

IDA / 56510 Market Access Facilitation Post Individual ConsultantSelection Limited

15,000.00 0.00 Pending

Implementation 2017-05-22 2017-05-27 2017-06-17 2017-07-22 2017-08-21

PRAPS-SN-11-PI / Sélectiond'un consultant pour l'étude sur lacapitalisation des modèles degestion de magasins etboutiques pastorales

IDA / 56520 Pastoral Crisis Management Post Individual ConsultantSelection Limited

10,000.00 0.00 Pending

Implementation 2016-11-22 2017-01-17 2017-03-20 2017-04-24 2017-06-23

BF-CILSS-9095-CS-CDS / Étudecomparative exportation deviande versus exportation dubétail sur pieds

IDA / D0640 Market Access Facilitation Post Individual ConsultantSelection Open

60,000.00 0.00 Pending

Implementation 2018-01-28 2018-03-02 2018-03-09 2018-03-23 2018-06-21

PRAPS-SN-02-PI / Sélectiond'un consultant facilitateur dansle cadre de l'élaboration du plande lutte contre la circulation desmédicaments frauduleux

IDA / 56520 Animal Health Improvement Post Individual ConsultantSelection Limited

16,000.00 0.00 Pending

Implementation 2017-03-20 2017-03-25 2017-04-15 2017-05-20 2017-08-18

PRAPS-SN-05-PI / Sélectiond'un consultant individuel pour lesservices de formation des relaisaux techniques de constitution etd'utilisation rationnelle(valorisation) des ressources(réserves) fourragères dans 8départements

IDA / 56520 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

14,000.00 0.00 PendingImplementation 2017-07-10 2017-07-15 2017-08-05 2017-09-09 2017-11-08

PRAPS-SN-08-PI / Formation deformateurs sur les modulescommercialisation

IDA / 56520 Market Access Facilitation Prior Direct Selection Direct

20,000.00 0.00 PendingImplementation 2017-04-10 2017-04-20 2017-06-24 2017-07-24

PRAPS-SN-13-PI / Sélectiond'un consultant individuel pour lafacilitation de la mise en place decadres de concertation etélaboration de leur plan d'action

IDA / 56520 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-27 2017-04-01 2017-04-22 2017-05-27 2017-07-26

PRAPS-SN-14-PI / Sélectiond'un consultant individuel pour laformation des animateurs enanimation pastorale

IDA / 56520 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-06-05 2017-06-10 2017-07-01 2017-08-05 2017-09-04

TD-PRAPS-TD-9184-CS-INDV /Etude technique et état des lieuxsur les infrastructures àréhabiliter à la DGSV

IDA / D0650 Animal Health Improvement Post Individual ConsultantSelection Limited

32,400.00 0.00 Pending

Implementation 2017-03-15 2017-03-20 2017-04-10 2017-05-15 2017-11-11

TD-PRAPS-TD-9187-CS-INDV /Etude relative à la création d'unfonds de roulement vaccinal

IDA / D0650 Animal Health Improvement Post Individual ConsultantSelection Limited

1,200.00 0.00 Pending

Implementation 2017-03-10 2017-03-15 2017-04-05 2017-05-10 2017-11-06

TD-PRAPS-TD-9188-CS-INDV /formulation pour une bonnegestion de chaine de froid auniveau des délégationsrégionales

IDA / D0650 Animal Health Improvement Post Individual ConsultantSelection Limited

36,000.00 0.00 Pending

Implementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-11-02

TD-PRAPS-TD-9196-CS-INDV /Réalisation du diagnostic SIM B

IDA / D0650 Market Access Facilitation Post Individual ConsultantSelection Limited

18,181.00 0.00 Pending

Implementation 2017-03-07 2017-03-12 2017-04-02 2017-05-07 2017-11-03

TD-PRAPS-TD-9243-CS-INDV /Recrutement d'un consultantpour l'actualisation desaménagements d'hydrauliquepastorale

IDA / D0650 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

54,550.00 0.00 PendingImplementation 2017-04-30 2017-05-05 2017-05-26 2017-06-30 2017-12-27

TD-PRAPS-TD-9247-CS-INDV /Recrutement d'un consultantpour l'étude sur l'inventaire

IDA / D0650 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

43,636.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-12-17

TD-PRAPS-TD-9253-CS-INDV /Etude de faisabilité économiqueet environnemental sur lesstations pastorales

IDA / D0650 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

21,818.00 0.00 PendingImplementation 2017-04-30 2017-05-05 2017-05-26 2017-06-30 2017-12-27

BF-CILSS-9303-CS-INDV /Assistance technique du CIRADà la coordination régionale duPRAPS

IDA / D0640 Project Management andInstitutional Support Post Direct Selection Direct

28,000.00 0.00 Pending

Implementation 2017-11-26 2017-12-06 2017-12-21 2018-12-16

BF-CILSS-9306-CS-CDS / Étudesur l'utilisation de l'approcheproxy calorique avec les produitsde l'élevage

IDA / D0640 Pastoral Crisis Management Post Individual ConsultantSelection Open

60,000.00 0.00 Pending

Implementation 2018-01-25 2018-02-27 2018-03-06 2018-04-03 2018-09-30

BF-CILSS-9314-CS-CDS / Suivides flux et tracasseries,enquêtes de satisfaction

IDA / D0640 Market Access Facilitation Post Direct Selection Direct

56,000.00 0.00 PendingImplementation 2018-01-07 2018-01-17 2018-02-07 2018-07-17

BF-CILSS-9322-CS-INDV /Appui aux pays pour la mise enSuvre des mesures desauvegarde sociale

IDA / D0640 Project Management andInstitutional Support Post Individual Consultant

Selection Open

80,000.00 0.00 PendingImplementation 2017-11-16 2017-12-14 2017-12-19 2017-12-29 2018-04-28

TD-PRAPS-TD-9374-CS-INDV /Audit des capacités desopérateurs pastoraux nationaux

IDA / D0650 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

21,818.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-12-17

TD-PRAPS-TD-9379-CS-INDV /Etude d'impact de la sécuritédans le corridor de la zonepastorale

IDA / D0650 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

36,363.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-12-17

TD-PRAPS-TD-9398-CS-INDV /Etude de faisabilité technique deconstruction de 12 marchés àbétail et de 5 portes de sortiesfrontaliers

IDA / D0650 Market Access Facilitation Post Individual ConsultantSelection Limited

43,636.00 0.00 Pending

Implementation 2017-04-25 2017-04-30 2017-05-21 2017-06-25 2017-12-22

TD-PRAPS-TD-9402-CS-INDV /Recrutement d'un consultantpour l'encadrement harmoniosé

IDA / D0650 Pastoral Crisis Management Post Individual ConsultantSelection Limited

21,812.00 0.00 Pending

Implementation 2017-06-30 2017-07-05 2017-07-26 2017-08-30 2018-02-26

TD-PRAPS-TD-9452-CS-INDV /Audit des comptes du PRAPS2015 2016 ET 2017

IDA / D0650 Project Management andInstitutional Support Prior Individual Consultant

Selection Open

46,000.00 0.00 PendingImplementation 2017-03-08 2017-04-26 2017-05-17 2017-06-21 2017-12-18

TD-PRAPS-TD-9456-CS-INDV /Etude d'impact environnemental

IDA / D0650 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

36,363.00 0.00 PendingImplementation 2017-04-17 2017-04-22 2017-05-13 2017-06-17 2017-12-14

TD-PRAPS-TD-9458-CS-INDV /Etude de la gouvernance desorganisations pastorales

IDA / D0650 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

29,090.00 0.00 PendingImplementation 2017-05-10 2017-05-15 2017-06-05 2017-07-10 2018-01-06

Page 13: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 11

TD-PRAPS-TD-9987-CS-INDV /Formulation et recommandationpour une bonne gestion dechaine de froid au niveau desdélégations régionales

IDA / D0650 Animal Health Improvement Post Individual ConsultantSelection Limited

3,600.00 0.00 Pending

Implementation 2016-12-15 2016-12-15 2016-12-15 2017-01-05 2017-07-04

TD-PRAPS-TD-9992-CS-INDV /Etude pour la mise en place d'unfonds de roulement pour vaccins

IDA / D0650 Animal Health Improvement Post Individual ConsultantSelection Limited

12,000.00 0.00 Pending

Implementation 2016-12-23 2016-12-28 2017-01-18 2017-02-22 2017-08-21

TD-PRAPS-TD-9996-CS-INDV /Etude de stratégie genre

IDA / D0650 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

36,363.00 0.00 PendingImplementation 2016-12-19 2016-12-24 2017-01-14 2017-02-18 2017-08-17

TD-PRAPS-TD-10000-CS-INDV /Audit des comptes du PRAPS2015 2016 et 2017

IDA / D0650 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

46,000.00 0.00 PendingImplementation 2016-09-26 2016-10-01 2016-10-22 2016-11-26 2017-05-25

REF 37 / Appui à la directionnationale de l�hydraulique

IDA / 56500 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-03-19 2017-03-24 2017-04-14 2017-05-19 2017-11-15

REF 43 / Formation desmembres des comités de gestiondes infrastructures marchandes

IDA / 56500 Market Access Facilitation Post Individual ConsultantSelection Limited

70,000.00 0.00 Pending

Implementation 2017-05-04 2017-05-09 2017-05-30 2017-07-04 2017-12-31

REF 48 / Mise en place de laplateforme pastorale

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-04-02 2017-04-07 2017-04-28 2017-06-02 2017-11-29

REF 49 / Elaboration del�exercice simulation du plan decontingence

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-04-02 2017-05-21 2017-06-11 2017-07-16 2018-01-12

REF 50 / Rédaction du manuelde procédures des AGR

IDA / 56500 Pastoral Crisis Management Prior Individual ConsultantSelection Open

60,000.00 0.00 Pending

Implementation 2017-07-06 2017-08-24 2017-09-14 2017-10-19 2018-04-17

REF 51 / Assistance techniqueà la mise en Suvre des AGR

IDA / 56500 Pastoral Crisis Management Prior Individual ConsultantSelection Open

60,000.00 0.00 Pending

Implementation 2017-07-06 2017-08-24 2017-09-14 2017-10-19 2018-04-17

REF 52 / Elaboration/adaptationde cadres de gestionenvironnementale et sociale pourles différents types d�AGR

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-07-17 2017-07-22 2017-08-12 2017-09-16 2018-03-15

REF 57 / Appui de l�UCP à laplanification pour les activités degestion de la plateformeWepmaping

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2017-02-14 2017-04-04 2017-04-25 2017-05-30 2017-11-26

REF 58 / Etude diagnostiquedes OP des femmes pasteurs etagropasteurs

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

REF 60 / Etudes d'identificationdes travaux d�aménagement despistes de transhumance et desgîtes d'étapes

IDA / 56500 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-05-28 2017-07-16 2017-08-06 2017-09-10 2018-03-09

REF 61 / Appui auxnégociations/validation desaccords sociaux desaménagements et infrastructurespour 1 mois

IDA / 56500 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-06-19 2017-06-24 2017-07-15 2017-08-19 2018-02-15

REF 62 / Elaboration desmodules de formation desvétérinaires titulaires de mandatsanitaires et des chefs de postevétérinaires

IDA / 56500 Animal Health Improvement Post Individual ConsultantSelection Limited

50,000.00 0.00 Pending

Implementation 2017-08-04 2017-08-09 2017-08-30 2017-10-04 2018-04-02

REF 64 / Elaboration d�unmanuel de procédures,financières

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2018-02-17

REF 65 / Consultant individuelNational du Projet d�Appui auDéveloppement de l�Elevageintensif au Mali

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

26,400.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 66 / Etude de la rentabilitédes modèles d�élevagemodernes(PADEL-M)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 67 / Etude de ladisponibilité des fonds definancement (PADEL-M)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 68 / Etude sur le répertoiredes grands acheteurs PADEL-M

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 69 / Etude sur le répertoireet la cartographie desinfrastructures économiques(PADEL-M)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 70 / Etude sur le répertoireet la cartographie synthétiquedes interventions du Ministère del�Elevage et de la Pêche

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

10,000.00 0.00 PendingImplementation 2017-03-29 2017-04-03 2017-04-24 2017-05-29 2017-11-25

REF 71 / Etudes CEGS (PADEL-M)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-08-06 2017-08-11 2017-09-01 2017-10-06 2018-04-04

REF 72 / Etudes CPRP(PADELM)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

25,000.00 0.00 PendingImplementation 2017-08-06 2017-08-11 2017-09-01 2017-10-06 2018-04-04

REF 79 / Elaboration desmodules de formation desvétérinaires

IDA / 56500 Animal Health Improvement Post Individual ConsultantSelection Open

50,000.00 0.00 Pending

Implementation 2017-08-04 2017-09-22 2017-10-13 2017-11-17 2018-05-16

REF 81 / Manuel de procéduresfinancières

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-05-17 2017-05-22 2017-06-12 2017-07-17 2018-01-13

REF 82 / Plan d�interventiond�urgence

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-07-17 2017-07-22 2017-08-12 2017-09-16 2018-03-15

NE-PRAPS-NE-7682-CS-INDV /Renforcement des Capacités enpassation des marchés

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Direct

10,000.00 0.00 PendingImplementation 2017-03-21 2017-03-31 2017-04-21 2017-05-26 2017-06-23

NE-PRAPS-NE-7690-CS-INDV /Recrutement d'un consultantpour appui en sauvegarde sociale

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

40,000.00 0.00 PendingImplementation 2017-02-20 2017-04-10 2017-05-01 2017-06-05 2018-05-31

NE-PRAPS-NE-30293-CS-INDV/ Analyse du fonctionnement dessystèmes des centres pastoraux

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

14,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

Page 14: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 12

51 / Réalisation des étudesenvironnementales et socialespour les projets programmés duPRAPS

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

6,000.00 0.00 PendingImplementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

52 / Recrutement des ONGs etAssociations pour les Travaux deCES/DRS et ensemencementpar des espèces appétées

IDA / 56510 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Open

6,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

54 / Etude pour une propositiond'harmonisation des texteslégislatifs et réglementaires surle pastoralisme

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

14,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

56 / Création d'une base dedonnées

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

57 / Réalisation des étudesenvironnementales et socialespour les projets programmés duPRAPS

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

6,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

59 / Analyse du fonctionnementdes systèmes des centrespastoraux

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

14,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

60 / Recrutement d'unconsultant pour appui ensauvegarde sociale

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

40,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

61 / Elaboration d'un documentde Planification operationnelle

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

62 / Assistant tehniqueinternationnale

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

63 / Conception descommunication en santé animale

IDA / 56510 Animal Health Improvement Post Individual ConsultantSelection Limited

10,300.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

64 / Harmonisation des textesréglementaires et législatifs

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

30,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

67 / Evaluation et améliorationdu FOSEL (cabinetinternationnal)

IDA / 56510 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

69 / Etude pour l'élaboration duplan de passation de marchés enpériode de crises pastorales ensituation d'urgence ( contrôle,qualité, délai, réputation&) etune première sélectiond'opérateur

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

6,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

70 / Recrutement d'un Bureaud'Etudes pour la réalisation decollecte des données sur lesinfrastructures/Équipements etles ressources pastorales.

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

60,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

82 / Recrutement d unconsultant Etude diagnostiquesur le système de gestiondéléguée des marchés bétail

IDA / 56510 Market Access Facilitation Post Individual ConsultantSelection Limited

14,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

83 / Recrutement d'unconsultant pour l'elaboration de lastrategie genre

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

87 / Recrutement d'unconsultant individuel pour laconception des solutions NTICpour la transmission desdonnées au suivi des marchés àBétail

IDA / 56510 Market Access Facilitation Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

88 / Elaboration du pland'urgence PPCB/PPR

IDA / 56510 Animal Health Improvement Post Individual ConsultantSelection Open

30,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

89 / Révision du plan decontingence

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

6,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

92 / Etat de lieu des sites decollecte des données sur labiomasse au Niger

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

30,000.00 0.00 Under

Implementation 2017-09-29 2017-10-26 2017-11-17 2017-12-08 2018-01-12 2018-07-11

93 / Recrutemnt d'un consultantpour l'Etude Diagnosque desobservatoires de suivi de lavulnérabilité (OSV) et dessystèmes communautairesd'alerte précoces et desreponses (SCAP/RU) dans lesZones pastorales etagropastorales du Niger

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

14,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

95 / Appui internationale eningenierie sociale

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

40,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

96 / Realisation des etudes surles filieres d'elevage en vue lapreparation du terrain pour lefutur projet de developpement del'elevage au Niger

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

40,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

98 / Etat de lieu etgeoreferencement desrealisations du PRAPS

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

100,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

101 / Recrutement dunconsultant pour etat de lieux (Evaluation du fonctionnementdes centres pastoraux)

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-09-29 2017-10-04 2017-10-25 2017-11-29 2018-05-28

102 / Etude de préparation de lanote conceptuelle par unConsultant International,Spécialiste en Développement deProjet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

103 / Contribution à l�Etude depréparation de la noteconceptuelle par un ConsultantNational, Agro-Eco/Eco

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

Page 15: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 13

104 / Etude AnalyseEconomique du projet par UnConsultant International Agro-Economiste

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

105 / Un Consultant nationalSpécialiste en GRN,Récupération des Terres et RNA

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

106 / Un ConsultantInternational, Spécialiste desFilières Cuir, Viande et Peau

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

100,000.00 0.00 Pending

Implementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

107 / Un consultant National,Spécialiste des Filières Cuir,Viande et Peau

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

108 / Un ConsultantInternational, Analyse de laFilière Lait

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

109 / Un consultant National,Spécialiste de la Filière Lait

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

110 / Consultant InternationalEtude Analyse de la FilièreVolaille (poulet de chair, pouletbicyclette, pintade et Ruf)

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

111 / Consultant national EtudeAnalyse de la Filière Volaille(poulet de chair, pouletbicyclette, pintade et Ruf)

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

112 / Un Consultant Internationalpour la Mécanisation Agricole

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

113 / Un consultant National,Spécialiste des Filières

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

114 / Un consultant National,Spécialiste des Filières Agricole

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

115 / Un Consultant InternationalSpécialiste en Irrigation

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

116 / Un consultant nationalspécialiste en Irrigation

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

117 / Un consultant Internationalpour la péparation du documentdu projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

100,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

118 / Un consultant nationaljuriste

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-09-29 2017-11-17 2017-12-08 2018-01-12 2018-07-11

NE-PRAPS-NE-30653-CS-INDV/ Elaboration d'un plan decontengence pastoral

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Limited

10,000.00 0.00 Pending

Implementation 2017-10-17 2017-10-22 2017-11-12 2017-12-17 2018-06-15

NE-PRAPS-NE-30655-CS-INDV/ Elaboration des outils desensiblisation sur les maladiesprioritaires du betail et lesmaladies emergentes

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

30,000.00 0.00 PendingImplementation 2017-10-19 2017-10-24 2017-11-14 2017-12-19 2018-06-17

NE-PRAPS-NE-30656-CS-INDV/ Manuel sur les maladiesprioritaires du betail à l'intentiondes agents des servicesveterinaires

IDA / 56510 Animal Health Improvement Post Individual ConsultantSelection Limited

30,000.00 0.00 Under

Implementation 2017-10-02 2017-10-07 2017-10-28 2017-12-02 2018-05-31

NE-PRAPS-NE-30658-CS-INDV/ PRISE EN COMPTE MSESPOUR 8 STATIONS DEPOMPAGES

IDA / 56510 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

7,500.00 0.00 PendingImplementation 2017-10-11 2017-10-16 2017-11-06 2017-12-11 2018-06-09

NE-PRAPS-NE-30660-CS-INDV/ Assistance TechniqueInternationale ( COSTAB) pour lenouveau projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2018-06-13 2018-06-18 2018-07-09 2018-08-13 2019-02-09

NE-PRAPS-NE-30661-CS-INDV/ Recrutement d'un consultantNational en CGES pour lenouveau projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

20,000.00 0.00 UnderImplementation 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02

NE-PRAPS-NE-30662-CS-INDV/ Recrutement d'un consultantNational en CPRP pour lenouveau projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2018-03-13 2018-03-18 2018-04-08 2018-05-13 2018-11-09

NE-PRAPS-NE-30663-CS-INDV/ Recrutement d'un consultantEnvironnementaliste et socialpour le nouveau projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2018-01-09 2018-02-27 2018-03-20 2018-04-24 2018-10-21

NE-PRAPS-NE-30664-CS-INDV/ Recrutement d'un consultantpour appui en formation

IDA / 56510 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

10,500.00 0.00 PendingImplementation 2017-11-21 2017-11-26 2017-12-17 2018-01-21 2018-07-20

REF 35 / Formation de 42VTMS et 200 chefs postesvétérinaires

IDA / 56500 Animal Health Improvement Post Direct Selection Direct

50,000.00 0.00 PendingImplementation 2017-04-05 2017-04-15 2017-06-19 2017-12-16

REF 31 / RéalisationEIES/NIES pour lesinfrastructures de la composante1

IDA / 56500 Animal Health Improvement Post Individual ConsultantSelection Open

100,000.00 0.00 Pending

Implementation 2017-02-26 2017-04-16 2017-05-07 2017-06-11 2017-12-08

REF 32 / Réalisation desEIES/NIES pour lesinfrastructures de la composante2

IDA / 56500 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Limited

100,000.00 0.00 PendingImplementation 2017-02-28 2017-03-05 2017-03-26 2017-04-30 2017-10-27

REF 33 / RéalisationEIES/NIES pour lesinfrastructures de la composante3 et 4

IDA / 56500 Market Access FacilitationPastoral Crisis Management Post Individual Consultant

Selection Limited

100,000.00 0.00 PendingImplementation 2017-03-04 2017-03-09 2017-03-30 2017-05-04 2017-10-31

REF 36 / Formation 300auxiliaires de santé animale

IDA / 56500 Animal Health Improvement Post Direct Selection Direct

50,000.00 0.00 PendingImplementation 2017-04-20 2017-04-30 2017-07-04 2017-12-31

REF 53 / Elaboration d�un cadrejuridique et institutionnel du SIM-B

IDA / 56500 Market Access Facilitation Post Individual ConsultantSelection Open

10,000.00 0.00 Pending

Implementation 2017-07-19 2017-07-19 2017-07-19 2017-07-19 2017-07-19

Page 16: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 14

REF 59 / Formation de 30agents et 50 marchands de bétail

IDA / 56500 Market Access Facilitation Post Direct Selection Direct

50,000.00 0.00 PendingImplementation 2017-06-04 2017-06-14 2017-08-18 2018-02-14

ML-PRAPS-ML-31402-CS-INDV/ manuel de procédures,financières pour le paiement dela prime à la vaccination

IDA / 56500 Animal Health Improvement Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-10-10 2017-10-15 2017-11-05 2017-12-10 2018-06-08

ML-PRAPS-ML-31407-CS-INDV/ Recrutement d'un consultantpour l'élaboration d'un pland'intervention d'urgence

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Limited

20,000.00 0.00 Pending

Implementation 2017-10-09 2017-10-14 2017-11-04 2017-12-09 2018-06-07

ML-PRAPS-ML-31408-CS-INDV/ Recrutement d'un consultantchargé de l'audit institutionnel etorganisationnel desOrganisations de Producteurs(OP) du PADEL-M

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

12,000.00 0.00 PendingImplementation 2017-10-09 2017-10-14 2017-11-04 2017-12-09 2018-06-07

ML-PRAPS-ML-31409-CS-INDV/ Recrutement d'un Consultantchargé de la préparation d'unprojet d'accord-cadre entre lePADEL -M et les institutionsfinancières partenaires (IFP)

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

25,000.00 0.00 PendingImplementation 2017-11-07 2017-11-12 2017-12-03 2018-01-07 2018-07-06

ML-PRAPS-ML-31410-CS-INDV/ Recrutement d'un consultantchargé de l'étude pour la créationde l'unité de prévention et degestion des crises au Ministèrede l'Elevage et de la Pèche pourle PADEL-M

IDA / 56500 Pastoral Crisis Management Post Individual ConsultantSelection Limited

15,000.00 0.00 Pending

Implementation 2017-10-09 2017-10-14 2017-11-04 2017-12-09 2018-06-07

ML-PRAPS-ML-31411-CS-INDV/ Recrutement d'un consultantchargé de l'Etude d'analyse de laplace actuelle des femmes etdes jeunes (15-40 ans) dans lesfilières d'élevage, y comprisl'aquaculture et proposition deleur meilleure implication pour lePADEL-M

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

25,000.00 0.00 PendingImplementation 2017-10-09 2017-10-14 2017-11-04 2017-12-09 2018-06-07

ML-PRAPS-ML-31412-CS-INDV/ Recrutement d'un Consultantchargé de L'Etude de référencedu Cadre de résultats du Projetau Développement de l'Elevageau Mali

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

15,000.00 0.00 PendingImplementation 2017-10-10 2017-10-15 2017-11-05 2017-12-10 2018-06-08

ML-PRAPS-ML-31413-CS-CDS /Recrutement d'un consultantSPECIALISTE AGRICOLEchargé d'appuyer l'équipemalienne de préparation du projetlors de la phase d'évaluation duPADEL-M

IDA / 56500 Project Management andInstitutional Support Post Direct Selection Direct

20,000.00 0.00 Pending

Implementation 2017-10-11 2017-10-21 2017-12-25 2018-06-23

ML-PRAPS-ML-31415-CS-CDS /Recrutement d'un consultantpour l'Evaluation du personnel duPRAPS-ML

IDA / 56500 Project Management andInstitutional Support Post Direct Selection Direct

65,000.00 0.00 Pending

Implementation 2017-10-11 2017-10-21 2017-12-25 2018-06-23

ML-PRAPS-ML-31417-CS-INDV/ Recrutement d'un Consultantpour la mise en place duSystème de documentation etd'archivage électronique duPRAPS MALI

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-10-17 2017-10-22 2017-11-12 2017-12-17 2018-06-15

ML-PRAPS-ML-33295-CS-INDV/ Recrutement d'un consultantchargé d'Appui à l'UCP pour laplanification des activités ensauvegardes environnementale etsociale

IDA / 56500 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

100,000.00 0.00 PendingImplementation 2017-04-10 2017-04-15 2017-05-06 2017-06-10 2017-12-07

ML-PRAPS-ML-33816-CS-INDV/ Recrutement d'un consultantinternational pour appuyer lacomposante 2 du PRAPS MALI

IDA / 56500 Natural Resource ManagementEnhancement Post Individual Consultant

Selection Direct

20,000.00 0.00 PendingImplementation 2017-10-31 2017-11-10 2017-12-01 2018-01-05 2018-07-04

NE-PRAPS-NE-30659-CS-INDV/ Recrutement d'un consultant ensauvegarde environnementale etsociale dans la région deTillabery

IDA / 56510 Pastoral Crisis Management Post Individual ConsultantSelection Open

50,000.00 0.00 Pending

Implementation 2017-10-17 2017-12-05 2017-12-26 2018-01-30 2018-07-29

NE-PRAPS-NE-34421-CS-INDV/ Recrutement d'un consultant ensauvegarde environnementale etsociale dans la région de Dosso

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2018-10-01

NE-PRAPS-NE-34422-CS-INDV/ Recrutement d'un pour appui enconsultant en sauvegardeenvironnementale et sociale dansla région de Tahoua

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-11-22 2018-01-10 2018-01-31 2018-03-07 2018-09-03

NE-PRAPS-NE-34467-CS-INDV/ Recrutement d'un consultantpour appui en sauvegardeenvironnementale et sociale dansla region de Maradi

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-11-29 2018-01-17 2018-02-07 2018-03-14 2018-09-10

NE-PRAPS-NE-34470-CS-INDV/ Recrutement d'un consultantpour appui en sauvegardeenvironnementale et sociale dansla région d'Agadez

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-12-12 2018-01-30 2018-02-20 2018-03-27 2018-09-23

NE-PRAPS-NE-34474-CS-INDV/ Recrutement d'un consultantpour appui en sauvegardeenvironnementale et sociale dansla région de Zinder

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Open

50,000.00 0.00 PendingImplementation 2017-11-23 2018-01-11 2018-02-01 2018-03-08 2018-09-04

NE-PRAPS-NE-34488-CS-INDV/ Recrutement d'un Consultantpour la mise à jourCOSTAB/PTBA2018

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-06 2017-11-11 2017-12-02 2018-01-06 2018-07-05

NE-PRAPS-NE-34489-CS-INDV/ Recrutement d'un ConsultantPIMELAN, Appui à l'identificationdu Projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-06 2017-11-11 2017-12-02 2018-01-06 2018-07-05

NE-PRAPS-NE-34490-CS-INDV/ Recrutement d'un consultantpour la préparation évaluation dunouveau Projet

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-07 2017-11-12 2017-12-03 2018-01-07 2018-07-06

Page 17: World Bank Document · 2020. 8. 24. · 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 119 / Construction de 15 postes départementaux vétérinaires IDA / 56510

Page 15

NE-PRAPS-NE-34491-CS-INDV/ recrutement d'un consultantpour Appui Spécialisation engestion des ressources enAfrique de l'Ouest au Sahel

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-10 2017-11-15 2017-12-06 2018-01-10 2018-07-09

NE-PRAPS-NE-34492-CS-INDV/ Recrutement d'un consultantpour appui Spécialisation,Facilitation Accé au marché enAfrique de l'Ouest au Sahel

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-03 2017-11-08 2017-11-29 2018-01-03 2018-07-02

NE-PRAPS-NE-34493-CS-INDV/ Recrutement d'un consultantSpécialiste de la gestion de crisepastorale en Afrique de l'Ouestau Sahel

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-11-14 2017-11-19 2017-12-10 2018-01-14 2018-07-13

NE-PRAPS-NE-34494-CS-INDV/ Recrutement d'un consultantpour appui en sauvegardeenvironnementale et sociale dansla région de Diffa

IDA / 56510 Project Management andInstitutional Support Post Individual Consultant

Selection Limited

50,000.00 0.00 PendingImplementation 2017-12-19 2017-12-24 2018-01-14 2018-02-18 2018-08-17

BF-CILSS-36687-CS-INDV /Recrutement d'un consultantpour la formation sur le suiviévaluation en zone de conflits

IDA / D0640 Project Management andInstitutional Support Post Individual Consultant

Selection Open

5,000.00 0.00 PendingImplementation 2017-11-17 2017-12-09 2017-12-14 2017-12-24 2017-12-31