4 ~~~E895
VOL. 16
nvironmental Management Plan
EAST - WEST CORRIDOR
=E- - st0+nt ultancy Services for Independent Review andConsolidation of Environmental and
Social Assessment
- ~~~~~~~~~~~~~~~~-
49F10July 2004
Submitted byOperations Research Group
in association withSpatial Decisions
Submitted to
, ,,z, . 5, National Highway Authority of Indi mAl N
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
ii
I
I
i
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Specific Environmental Management PlanPackage Xl (Section C-Ill/I)
Table of Contents
1. Introduction1.1 Project Background .................... 1-1
1.2 Project Description .................... 1-2
1.3 Statutory Clearances Required .................... 1-5
2. Environmental setting2.1 Meteorology ....................... 2-1
2.2 Physical Environment ....................... 2-1
2.3 Biological Environment ....................... 2-3
2.4 Social Environment ....................... 2-4
3. Environmental Management Action Plan
4. Environmental Monitoring Plan
5. Environmental Management Budget
Annexures
Annexure 1: Proposed Alignment of Four Lane Carriageway along with Service
RoadAnnexure 11: Proposed Highway Junction Improvements
Annexure III: Details of Proposed UnderpassesAnnexure IV: Existing Major and Minor Bridges
Annexure V: Proposed Improvement/ Construction of Bridges and Culverts
Annexure VI: Proposed RCC Covered Drains in Built-Up Locations
Annexure VII: Proposed Borrow Areas
Annexure VIII: Ambient Air Quality Monitoring Results
Annexure IX: Details of Ponds within the Direct Impact Zone
Annexure X: Wells within the Direct Impact Zone
Annexure Xl: Hand-Pumps within the Direct Impact Zone
Annexure XII: Ground Water Quality Monitoring Results
Annexure XIII: Ambient Noise Level Monitoring Results
Annexure XIV: Number of Trees to be Cut and Saved due to Proposed Alignment
Annexure XV: Sensitive Receptors within the Direct Impact Zone
Annexure XVI: Existing Market Locations and Roadside Dhabas
Annexure XVII: Proposed Parking Areas, Bus-Stops, Lay Byes
Annexure XVIII: Noise BarriersAnnexure XIX: Proposed Environmental Monitoring Locations
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Schematics
Schematic 1: Location and Lead of Borrow Areas - Package XISchematic 2: Suggested Specific Noise Barriers - Package XlSchematic 3: Median Plantation - Package XI
Drawings
DRG NO. 1: STRIP DETAILS OF C-l1l/1 PACKAGE XIDRG NO. 2(a): ENHANCEMENT OF POND AT CH. 459.230DRG NO. 2(b): ENHANCEMENT OF POND AT CH. 462.850
Operations Research Group in association with Spatial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
1. INTRODUCTION
1.1 Project Background
The Lucknow Muzaffarpur National Highway Project (LMNHP) is along NH-28 on the East-Westcorridor of the National Highways Development Project (NHDP). It is a part of phase-lIl programme of
the East-West Corridor development that is about strengthening and widening of the existing two-laneNational Highway 28 to four-lane dual carriageway configuration.
LMNHP consists of five consultancy packages- C ll/1, C 111/2, CIII/3, C1II/5, Gorakhpur Bypass. Eachconsultancy package is further divided into multiple contract packages for the purpose of roadconstruction and implementation of environmental management action plan.
Consultancy Package C ll/1 runs from Gopalganj (Km 386.000) to Muzaffarpur (Km 520.000), a total of
134.000 Km, covering districts Gopalganj, East-Champaran and Muzaffarpur in North Bihar. It carries
on an average 21,000 to 24,000-passenger car units (PCU) daily, based on the traffic survey conductedin the year 2002, with goods traffic amounting to about 52 - 55% of the total traffic. The traffic volume
on most part of the section is expected to grow up to 150,000 to 159,000 PCUs at the end of designperiod of 30 years. The purpose of the proposed project is to cater to the increasing traffic volume,reduce travel time and transport costs besides improving socio-economic condition of the localpopulation.
Consultancy package C-l1l/1 has been divided into three full contract packages (Contract Package X,
Xl, XII) and a part of Contract Package IX. The project under consideration in this report is contractpackaqe Xl of C-l l/1. Chainage-wise description of the contract packages for the project road isprovided in Table 1.1.
TABLE-1*1: CONTRACT PACKAGES IN GOPALGANJ-MUZAFFARPUR SECTION (SECTION C-ll/1) OF LMNHP UNDER NHAI PHASE-
iII PROGRAM OF EAST - WEST CORRIDOR DEVELOPMENT
Packages Contract Chainage Total Length RemarksPackages (in Km)
(Consultancy) under LMNHP
C-1i111 Ix Part length: 16.00 Part length of Consultancy Package C-(Gopalganj - 386.000 to III/5 from Km 360.915 to Km 386.000Muzaffarpur 402.000 has been added to this ProjectSection)
x Km. 402.000 to 38.00Km. 386.000 to Km. 440.000Km. 520.000 ofNH-28. XI Km. 440.000 to 40.00
Km. 480.000
Xli Km. 480.000 to 40.00Km. 520.000
Operations Research Group in association with Spatial Decisions 1-1
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST COFRIDOR FINAL SPECIFIC EMP
1.2 Project Description
Contract Package Xl of Consultancy Package C-1ll/1 of the LMNHP covers a total length of 40 Km. Itstarts at Km 440.00 (Dumra: near Kotwa) and terminates at Km 480.00 (Mehsi) passing through districtEast Champaran.
The project stretch runs through flat terrain and falls under typical flood prone zone of North westernpart of Bihar. The average slope of the terrain is around 5 cm per Km. General nature of soil is mostlyclayey silt or silty clay with some percentage of sand. The land use is primarily agricultural. TwoNational Highways (NH- 28A & NH-104 at Km 453.600 & Km 470.390 respectively) and two StateHighways (at Km 443.875 & Km 473.200) as mentioned in Table-1.2 intersect the highway stretch atdifferent locations of the project stretch.
TABLE- 1.2: SALIENT FEATURES OF THE PROJECT STRETCH
Road stretch Package Xl of Gopalganj-Muzaffarpur stretch on NH-28
Road length 40 Km
Start point From Km 440.00 (Dumra: near Kotwa)
End point At Km 480.00 (Mehsi)
Existing 2-lane facility with the carriageway of 7.Om from Km 440 to 454 (Piprakothi Jn.) and forcarriageway remaining stretch (Piprakothi- Mehsi Section), the carriageway is average 6.60 m
without paved shoulder and 2 m average earthern shoulders on either side.
Available RoW 45 m for entire road length
Districts en-route East Champaran
Major Built-up Kotwa (Km 443-444), Piprakothi (Km 453-455), Pipra (Km 462), Barachakia (Km 470-locations 471) and Chakia (Km 473-476)
No. of villages Total 33 villages
Major/ Minor 2 major Jn.- Km 453.600 (Piprakothi-Raxaul), Km 470.390 (Chakia-Madhuban-Junctions Sheohar-Sitamarhi)
2 minor Jn.- Km 443.875 (Kotwa-Motihari S.H.), Km 473.200 (Chakia-Madhuban)
Major river No major river crossing exists in the stretch. Gandak canal at Km 443.crossing/ponds/streams/canals 9 ponds within direct impact zone.
Existing Cross 1 major bridge, 5 minor bridges, 46 culverts (H.P. & Slab type)drainagestructures
Drinking water Ground water sources: 15 wells, 190 hand pumpssources
Eco-sensitive None on the alignment or in close vicinity of the roadareas
The proposed alignment of the existing highway for the purpose of expansion and strengthening in theproject stretch is proposed to be eccentric to left or concentric or transitioning to rightleft/centre at a fewplaces. The same has been designed to minimise resettlement problems, tree felling etc. taking intoconsideration the engineering aspects of the design during design period. Annexure I gives details ofproposed alignment arrangement. Besides, several enhancement measures have been proposed toimprove the overall effectiveness of the proposed project.
Operations Research Group in association with Spatial Decisions 1-2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
1.2.1 Summary of Proposed Improvements inTechnical Design
Service roads: Service roads have been proposed at major built up locations to separate highwaytraffic from local traffic and provide access to commercial and residential premises, bus stops etc. Thetotal length of proposed service roads with 5.5 m wide carriageway including tapering length is 15.45Km. Proposed service roads with 7 m wide carriageway including tapering length will have a cumulativelength of 3.510 Km. Annexure I provides chainage wise description of proposed service roads.
Improvement of major/minor highway junctions: Two major and two minor highway junctionshave been proposed for improvement at grade level to ease traffic situation. Chainage wise details ofproposed highway junction improvements have been provided in Annexure II.
Underpasses: SMV (slow moving traffic) underpasses have been proposed for movement of localtraffic from one side of service lane to the to other side of service lane. This has been proposed in thebuilt up areas as provided in Annexure 1ll.
Raising of additional two lane carriageway: Between Km. 475.000 and Km 480.000 (Chakia toMehsi), the formation of the existing highway is only about 0.50 to 0.70m above than the existingground on both sides of the roadway. The Burhi Gandak river also runs parallel on eastern side (leftside) of existing Highway. During flood seasons the HFL appears to be above required free-board onleft side. As left side widening has been proposed in the project stretch throughout (except for built-upzone), it has been proposed to raise the additional two lane 0.5 m. avg. above the existing formationlevel of Highway between Km. Km. 475.000 and Km 480.000 (Chakia to Mehsi).
Cross Drainage Structure: There are 5 minor bridges and 1 major bridge in existence (AnnexureIV) under the project stretch. Total 46 Nos. of different types of culverts also falls in the project stretchof slab (16) and hume pipe (30) type. 28 nos. of existing culverts are being retained. The existing crossdrainage structures are found to be inadequate and extra cross drainage structures in terms of newbridges and culverts have been proposed in the project stretch as listed in Annexure V.
Construction of 4-lane ROB in replacement of Level Crossing: Motihari - Muzaffarpur B.G.Rly. Tracks (linking Narkatiganj - Raxaul - Motihari - Muzaffapur - Barauni Section) runs side by side
from Km. 454 to Km. 520. A Level Crossing No. 151 - SPL I 3 - E is situated in Km. 453 on Motihari -
Muzaffapur B.G. Rly. Section near Bangari halt station. The existing level crossing shall be replaced bya 4-lane R.O.B. for smooth flow of traffic on NH-28. It has been decided to go for earthen Embankmentwith provision for slope protection and extra Land acquisition. It has also been decided to keep the sideslope of embankment 1:1.5 with provision of retaining wall at Toe and slope protection. The diversionroad shall be provided adjacent to Retaining wall at Toe. The Proposed construction shall beconcentric to the centre line of existing Highway Alignment.
Construction of two-lane Fly-Over at Piprakothi Junction: Piprakothi is an important junctionwhere NH-28 intersects with NH-28A (Piprakothi-Raxaul section, moving towards left to Nepal). NH-28at this junction takes a right angle bend towards east side. Thus, heavy traffic-count on account oftraffic conflict of Muzaffarpur to Raxaul traffic and Gopalganj to Muzaffarpur traffic requires measure toease the same. It has been proposed to construct a two-lane fly over for unidirectional flow of trafficfrom Muzaffarpur side to Raxaul / Nepal side. This two lane fly over will consist of one span of 36malong with two adjacent spans of 24 m having vertical clearance of 5.50 m. Both side approach will
Operations Research Group in association with Spatial Decisions 1-3
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
consist of R.E wall and in 1:40 slope. The leg of NH - 28 A (to Nepal) and NH - 28 moving toMuzaffarpur shall be improved beyond 75 m length from the start of approaches to the proposed flyover. The remaining at grade improvement of this junction shall be carried out as per IRC standard.
Toll Plaza: It has been proposed to construct Toll Plaza at point of traffic interception of traffic fromboth NH-28 & NH-28A (Km 468, near Bara Chakia). Along the proposed section, a number of accessroads exist but there is no alternative connection to be used by local traffic to avoid the toll. The roadpasses through a lot of villages and settlements with their local traffic, animal driven carts, bicycles andpedestrian movements. So, an open system of tolled road is being proposed. Typical plans of (10 lane)Toll Plaza of 5 lanes on each side have been appended in Drawing Volume. It is proposed that initiallyit will be manually operated which may be improved to semi-automatic/automatic operating system asvolume of traffic grows.
Road Side Drain: Various drainage arrangements have been proposed for effective roadsidedrainage. The arrangements remain the same as mentioned in General EMP. RCC covered drains inbuilt-up locations for the project stretch have been proposed as mentioned in Annexure VI.
Operations Research Group in association with SpatHal Decisions 1-4
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
a
1.3 Statutory Clearances Required
The project would require various clearances to be obtained by the contractor prior to starting up theproject during mobilization period as well as during the course of construction. The various clearancesrequired by the contractor for the project stretch are described below:
TABLE-1.3: STATUTORY CLEARANCES TO BE OBTAINED BY THE CONTRACTOR FOR THE PROJECT STRETCH
S. Clearance Statute under which Clearance Statutory Authority
No. Required for is required
1. Permission for EP Act, 1986 Central Ground Water Board as perwithdrawal of MoEF notification dated 14th Januaryground Water for 1997construction
2. Hot mix plants, Air (Prevention and Control of Bihar Pollution Control BoardCrushers and Pollution) Act, 1981 and TheBatch plants Noise Pollution (Regulation and
Control) Rules, 2000.
3. Storage, handling Hazardous Wastes (Management Bihar Pollution Control Boardand transport of and Handling) Rules, 1989 andHazardous Manufacturing, Storage andmaterials Import of Hazardous Chemicals
Rules, 1989
4. Clearance for EP Act, 1986 Bihar Pollution Control Boardengineering forlocation and layout Manufacturing, Storage andof workers camp, Import of Hazardous Chemicalsequipment and Rules, 1989storage yards
5. Quarries (if new Environment (Protection) Act, Department of mining, Governmentquarries are 1986 of Biharopened) Bihar Pollution Control Board
6. Discharges from Water (Prevention and Control of Bihar Pollution Control Boardlabour camp Pollution) Act, 1974
7. Disposal of Hazardous Wastes (Management Intimate to local civic body to useBituminous and Handling) Rules, 1989 the local solid waste disposal siteWastes, if any
The contractor will procure sand only from agencies licensed for collection of sand from river. Wherethe contractor directly engages in sand collection from river, (called as surface mining), he will berequired to obtain necessary permission from the State Irrigation Department.
In addition, any other clearance which supervision consultant or PIU, NHAI feels required for thisproject will be procured by the Contractor.
The contractor will submit an undertaking to NHAI agreeing to ensure that no child labour shall be usedfor any construction and to comply with the EMP provision to the PIU, NHAI.
Operations Research Group in association with Spatial Decisions 1-5
I
i
iI
ii
iii
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
2. ENVIRONMENTAL SETTING
This chapter documents the major findings of the Environmental Impact Assessment process along with
the baseline conditions that have been used to formulate the Environmental Management Planincluding the mitigation and enhancement measures. The micro level data have been obtained from
within a width of 30m either side of the existing centre line and the macro level data, as per the MOEF
guidelines for conducting EIA, have been collected from within 7 km radius of the project corridor.
2.1 Meteorology
The project stretch is located in humid sub-tropical region. The climate is distinguished by three distinct
seasons- Hot summer (from April to June), Warm humid rainy season (from July to September) andCold winter (from November to February). Observed minimum and maximum temperature in districtEast Champaran is 3 degree Celsius and 43 degree Celsius respectively. Wind is predominantlyeasterly and westerly from October to June and shifts easterly or south-easterly from July toSeptember. The average wind velocity is 5 km/hr and ranges between 2 to 7.1 km/hr. Observedmaximum rainfall in district East Champaran is 490 mm in the month of August while June receivesminimum rainfall of 65 mm during rainy season. Average relative humidity in the region is 74%.Maximum relative humidity recorded in district East Champaran is 88% in the month of September.
The project is expected to bring a slight change in micrometeorology by raising daytime temperature on
the road surface and soils with felling of trees. The impact is categorized as low adverse.
2.2 Physical Environment
2.2.1 Land Environment
The project passes through mainly flat terrain and there are no substantial cut and fill operationsrequired by the project. The average slope of terrain is around less than 5 cm per km and the fall of the
slope is generally towards southeast direction. The project corridor falls within Type-IV seismic zone
with moderate to high seismic coefficient but the project is not expected to have any impact on theseismic stability of the area. Water logging is observed during rains (July/Aug to October) throughoutthe project stretch.
The soils in the region are mainly of the alluvial type and are very fertile lands. Land use is primarilyagriculture. However, a major part of the agricultural land falls under the unirrigated category. The total
agricultural area to be used for borrowing of earth within this contract package is 36.50 hectare. Borrow
Operations Research Group in association with Spatial Decisions 2-1
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
areas have been proposed at 16 locations (Annexure VII), mostly privately owned land. No new stoneand rock quarries have been proposed to be opened for the purpose of the project without priorclearances.
Environmental impacts on the soils include compaction of soils, contamination of soils and loss ofproductive soils because of borrowing of earth, setting up of construction camps and erosion atembankments and sides of borrow areas. Besides changes in land use pattern are also taken intoaccount, particularly during operation phase.
2.2.2 Ambient Air Quality
Existing ambient air quality monitored in the contract package stretch (Annexure VIII) at three majorbuilt up locations viz. Kotwa market (Ch. 444), Piprakothi Jn. (Ch. 454) and in front of Sufia NursingHome at Chakia (Ch. 474) reveals that the ambient air pollution level for criteria gaseous pollutants(CO, SO2, NOx) is below the prescribed National Ambient Air Quality Standards (NAAQS). However, forsuspended and respirable particulate matter, the levels exceed the NAAQS at all the monitoredlocations. Level of lead in ambient air is very low or below detection limit at these locations.
Project impacts on ambient air quality along the project stretch will include increase in suspendedparticulate matter due to dust generation and gaseous pollutants such as CO, N02 etc due to exhaustemissions. While increase in suspended particulate matter shall be predominantly during constructionphase, exhaust gas emissions will result both during construction and operation phases.
2.2.3 Water Resources
There is no major river in the project stretch. A few irrigation channels of river Gandak are there in theproject area, including Gandak canal (km 443). Most of the nallahs / streams / rivers are seasonal.
The contract package has direct impact on 9 ponds (Annexure IX), 15 wells (Annexure X) and 190hand-pumps (Annexure Xl). The quality of both surface and groundwater is fair as per the visualexamination and monitoring results (Annexure XII) being carried out for the purpose of theEnvironmental Assessment. However, ground water being high in Total Coliform count as compared toIS 10500 drinking water quality standards can not be used directly for drinking purpose. Conventionaltreatment and disinfection measures need to be provided for the purpose of using ground water aspotable water.
Water logging has been observed throughout the entire project stretch during rains. The existing crossdrainage structures are inadequate that will deteriorate drainage condition in the vicinity of the road. Butdesign stage has taken care of the drainage across the project stretch proposing rehabilitation /construction of new cross drainage structures (Annexure V). The provision will improve the drainagecondition in the vicinity of the road. It would be further required to provide appropriate outfall of drain forcomplete runoff management. No flood-overtopping situation in the stretch has been reported.
Other impacts on water quality will largely be contamination of surface and ground water fromconstruction activities and from wastewater discharge of construction camps, siltation problems insurface water, and stress on available water resources, mainly drinking water for domestic purpose.
Operations Research Group in association with Spatial Decisions 2-2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
2.2.4 Noise Environment
Ambient noise monitoring results at busy and sensitive locations (Annexure XIII) indicate that day timesound pressure levels exceed the permissible noise levels for specific land use categories at most of
the areas in the project stretch. This is of special interest for commercial and residential areas withpermissible noise levels of the order of 65 dBA and 55 dBA respectively during day-time. However,night-time sound level at these locations are well below the permissible levels.
It is assessed that noise levels shall be increased both during construction and operation phases of theproject.
Noise modelling was conducted to assess impact of highway operation phase on sensitive receptorlocations using FHWA (Federal Highway Administration, US Department of Transportation) developednoise model. Conservative estimates have been computed through the model for three different yearsof operation- 2005, 2020, 2030 with adjusted operative speeds and increased traffic volume. Theresults (listed in EIA document-chapter on Assessment of Impacts) indicate that both daytime and nighttime noise levels shall exceed the permissible limits at all locations. Noise levels will be higher in lateryears owing to increased traffic. In effect specific noise barriers shall be required to be provided at thesensitive locations falling within the right of way to mitigate adverse impacts of noise during highwayoperations. Specific locations and choice of barrier types need to be decided based on degree ofimpact that will in turn depend on distance of the existing sensitive receptor falling within the right ofway from the proposed road.
2.3 Biological Environment
The project corridor does not pass through any reserved or protected forests between its entire length
and no endangered flora species have been reported along the highway. The impact of removal oftrees however should be a concern as a total of 3987 nos. of trees within the ROW have been found onthe left side (north side) whereas 3768 trees found on the right side of the project stretch. Around 4700trees within the ROW are likely to be affected due to the project. Existing trees identified during detailstudy likely to be impacted include Eucalyptus, Neem, Pipal, Mango, Mahua, Babool, Jamun, Haldu
and Sheesham. The list of trees to be felled in the project stretch due to the proposed alignment isbeing provided in Annexure XIV. The assessed environmental impacts include upsetting ofmicroclimate with increase in ambient temperature as well as soil erosion problems and increase insuspended particulate matter in ambient air.
As regards the fauna of the region, the historical human influence and the continuous human habitationalong the NH-28 has meant that there is very little faunal presence except for domestic animals alongthe highway and there are no reports of any endangered species present or identified in the project-affected area. However, if any rarelendangered species is found during course of construction,construction may then cause impact on the same.
Operations Research Group in association with Spatial Decisions 2-3
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
2.4 Social Environment
2.4.1 Human Use Value
A total of 33 villages fall under the project stretch passing through district East Champaran. The numberof wells and hand pumps that fall within the direct impact zone of the project stretch is 15 and 190respectively and is listed chainage wise in Annexure X & Xl respectively. Though the design stage hastaken care of various utilities while choosing widening options, proper relocation plans shall be requiredfor the wells and hand-pumps likely to get impacted during construction.
Similarly, the proposed project shall have an environmental and social impact on a few sensitivereceptors (Annexure XV) falling within the direct impact zone.
Market locations have been identified at three places in the project stretch in built-up areas (AnnexureXVI). These are put up on daily basis at the identified locations. So, project will have impact on the dailymarkets, affecting community for purchase of daily necessities and others. Likewise, existing roadsidedhabas within the direct impact zone (Annexure XVI) will get impacted during construction operations.These cater primarily to highway traffic, stopping for rest.
It is envisaged that the agricultural land along the highway will get converted to industrial/commercialuse to realise the value of the improved connectivity of the area. Such an induced development willrequire a check to ensure success of the proposed 4-lane road. Further increased vehicular speedmeans that the fringe areas along the road are at increased risk from speeding vehicles.
2.4.2 Cultural properties
As per the United Nations definition, "cultural property" includes sites having archaeological(prehistoric), paleontological, historical, religious and unique natural values such as waterfalls, canyonsetc. Structures of cultural value have been identified within the direct impact zone and are listed in RAPDocument. All the structures shall get impacted during construction in various degrees and the impactsand treatment have widely been dealt with under SIA document. There is no identified structure in theproject stretch falling under the purview of the Archaeological Survey of India or State ArchaeologicalDepartment.
2.4.3 Quality Of Life Values
The project is expected to bring in substantial improvement in connectivity along the corridor. Presently,the traffic conditions are characterised by mixed traffic with bullock carts and high-speed trucks jostlingfor space on the highway. These combinations create hazardous conditions for all the road users. Withsegregation of local and through traffic, by the provision of service lanes, flyovers, etc. the project willhave a beneficial effect on road safety. However, real safety concerns have been raised with referenceto the children using the highway to get to the numerous schools and other educational institutions thathave direct access opening on to the NH-28.
Operations Research Group in association with Spatial Decisions 24
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
FINAL SPECIFIC EMP
3. ENVIRONMENTALMANAGEMENT ACTIONPLAN
This chapter documents the description of various environmental management measures for avoidance
and / or mitigation of the impacts assessed during baseline study. The proposed measures have been
suggested for three stages: pre-construction stage, construction stage and post-construction stage. The
responsibilities for implementation of the EMP measures shall remain the same as described in general
EMP.
Many of the environmental measures remain the same as suggested in General EMP. Monitoring
schedule as specified in Monitoring Plan at the locations specified shall be followed alongwith
suggested avoidance / mitigation / enhancement measures.
All the suggested environmental management measures (Table 3.1) need to be followed by the
responsible parties during pre-construction, construction and operation stages of the project.
Operations Research Group in association with Spatial Decisions3-1
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
TABLE-3.1: ENVIRONMENT MANAGEMENT ACTION PLAN
Chainage ResponsibilityEnvironmen for Implementatital Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati SupervisionS. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
Pre-construction (PC) Stage
Physical Environment
PC 1. Land PC 1.1 Loss Borrow Pits, Annexure Borrow areas suggested MoRTH: 305.2 Pre- Contractor/ PIUResources of productive Construction VII (Specific are given in Annexure VII. and MoRTH: construction Environmentasoil camps, EMP) 305.2.2.2 Stage I Expert of SC
storage To ensure minimal loss ofgodowns, fertile and productive PC 1.1 of theHot mix agrcultural soil as well as General EMPplants and loss of vegetation, borrowbatching areas are to be selected asplants per specifications of
general EMP.
Refer PC 1.1 of the General Contractor EnvironmentaEMP for measures to I Expert of SCprevent loss of productive and PIUsoil.
PC 1.2 Land Refer PC 1.2 of the General Contractor EnvironmentaUse Change EMP I Expert of SC
and PIUPC 2. Ambient Air PC 2.1 Dust Entire stretch Refer PC 2.1 of the General During Contractor, EnvironmentaQuality and odour EMP Construction Environmenta I Expert of SCgeneration Mobilisation I Expert of SC and PIU
Period (contractorand SCtogetherresponsiblefor flyashhandling)
Operations Research Group in association with Spatial Decisions 3-2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage Responsibility
Environmen for Implementatital Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati Supervision
S. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
PC 3. Water PC 3.1 Entire stretch Refer PC 3.1 of the General During Contractor Supervision
Resources Contaminati EMP Construction Consultant,
on of water Mobilisation PIU
resources Period
PC 3.2 Loss Entire stretch Refer PC 3.2 of the General During Contractor, Environmenta
of EMP Construction PIU I Expert of SC
community Mobilisation and PIU
and prvate Stagewaterresources
Biological Environment
PC 4. Flora Loss of trees Entire stretch Annexure Total of 4693 trees are to PC 4. of the Before Contractor SC and PIU,
XIV be cut within the right of General EMP Construction NHAI
(Specific way. Trees will be removed StartsEMP) with prior approval from
State Forest Department asmentioned in PC 4. of theGeneral EMP.
Social Environment
PC 5. Land PC 5.1 Corridor of Refer PC 5.1 of the General RAP Document Before NGOs, PIU, NHAI
Resources Acquisition impact EMP Construction Collaborating
of Land Starts Agencies,PIU
PC 5.2 Corridor of Refer PC 5.2 of the General MoRTH: 110.3 Prior to start Contractor, PIU
Relocation impact EMP of PIU
of construction
Community workProperty
Operations Research Group in association with SpaRial Decisions 3-3
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage ResponsibilityEnvironmen for Implementati
tal Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati SupervisionS. No. Parameter Impact Location Measure Enhancemnent Measures Document Frame on
PC 5.3 Corridor of Refer PC 5.3 of the General Pror to start Contractor, PIU, NHAIRelocation impact EMP of PIU, NHAIof Cultural constructionProperty workResources
Construction (C) Stage
Physical Environment
C 1. Land C 1.1 Loss Borrow Pits, Refer C 1.1 of the General Annexure VI During Contractor EnvironmentaResources of Topsoil Construction EMP (General EMP) Construction I Expert of
sites, Quarry SC, PIUSites etc.
C 1.2 Soil Entire stretch Refer C 1.2 of the General MoRTH: 306.2, During Contractor EnvironmentaErosion EMP MoRTH: Construction I Expert of
305.2.2.2 SC, PIUSoil erosion will beAnnexure monitored as per the Table 4.2 SC P I U, NHAIXiX monitoring plan. (General EMP)(SpecificEMP)
C 1.3 Entire stretch Refer C 1.3 of the General MoRTH: 112.6, During Contractor EnvironmentaCompaction EMP MoRTH: Construction I Expert of SCof Soil 305.2.2.2 and PIU,
NHAI
Operations Research Group in association with Spatial Decisions 3-4
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
FINAL SPECIFIC EMP
Chainage ResponsibilityEnvironmen for Inmplementati
tal Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati Supervision
S. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
C 1.4 Near Refer C 1.4 of the General MoRTH: 201 .2A, During Contractor Environmenta
Contaminati construction EMP MoRTH: 112.2, Construction and SC I Expert of SC
on of Soil site, asphalt MoRTH: 112.6, and PIU,plants etc. MoRTH: 201.2 NHAI
and MoRTH:301.3.11
Soil contamination will be Table 4.2 Contractor P I U, NHAImonitored as per the (General EMP) throughmonitorng plan at locations approvedto be identified by the monitoringEngineer. agency
C 2. Ambient Air C Entire Refer C 2.1 of the General MoRTH: 111.5, Contractor Environmenta
Quality 2.1Generatio Project EMP MoRTH: 111.9, I Expert of SC
n of Dust Stretch MoRTH: 118.1, and PIU,MoRTH: 112.2 NHAI
C 2.2 Entire Refer C 2.2 of the GeneralGeneration Project EMP Contractorof Exhaust Stretch throughGases Air pollution monitoring will approved P I U, NHAI
be carried out as per the Table 4.2 monitoringmonitoring plan of General (General EMP) agencyEMP
Operations Research Group in association with Spatial Decisions 3-5
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage ResponsibilityEnvironmen for Implementati
tal Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati SupervisionS. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
C 3. Water C 3.1 Ponds Ponds to be a) Silt fencing to be MoRTH: 306 During Contractor EnvironmentaResources Contaminati provided silt provided along ponds within Construction I Expert of
on of Water fence at Ch. the direct impact zone SC, PIU,Resources 459.230, intercepting highway to NHAI
462.850, prevent siltation in water476.500 body. Such ponds will not
be impacted duringconstruction.
Rivers, b) Refer C 3.1 of thecanals, General EMP for additionalponds etc. measures to be taken.
Ground and surface water Table 4.2 ContractorAnnexure quality will be monitored as (General EMP) through P I U, NHAIXIX per the monitoring plan of approved(Specific General EMP monitoringEMP) agency
C 3.2 Loss Community Enhanceme a) Pond enhancement MoRTH: 301.5 During Contractor Environmentaof Ponds, Hand nt to be measures are to be Construction I Expert ofCommunity Pumps, provided for provided as described in Drawing nos. 2 SC, PIU,Water Wells ponds at general EMP. (a), 2 (b) NHAIResources Ch. (Specific EMP)
459.230,462.850 b) Roadside wells shall be
enhanced as per general Drawing no. 7EMP. (General EMP)
Operations Research Group in associotion with Spatial Decisions 3-6
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
FINAL SPECIFIC EMP
Chainage Responsibility
Environmen for Implementatital Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati Supervision
S. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
C 3.3 Water Proposed a) Urban storm water runoff MoRTH: 305.3.2 During Contractor Environmenta
logging drains to be shall be managed by Construction I Expert of
connected connecting RCC covered SC, PIU,with drains in these locations to NHAI
proximal proximal culverts.culverts:Annexure However, proximal culvertsVI (Specific at Ch. 474 & 475 are beingEMP) proposed for removal
during design stage. So,drains at Ch. 473.900-475.300 could be emptiedin nearby ponds or culvertsa km away.
C 3.4 Refer C 3.4 of the General During Contractor Environmenta
Disruption to EMP construction I Expert of
other users SC, PIU,NHAI
C 4. Noise Increase in Entire stretch Annexure Noise barriers will be Contractor Environmenta
Environment Sound XVIII provided at sensitive I Expert of
Levels (Specific receptor locations. SC, PIU,EMP) NHAI
Noise levels will be Table 4.2 ContractorAnnexure monitored at equipment (General EMP) through P I U, NHAI
XIX yards and other locations approved(Specific as per the monitoring plan monitoringEMP) of General EMP. MoRTH: 111.13, agency Environmenta
Refer C 4. of the General MoRTH: 1 11. 1, Contractor I Expert ofEMP for other measures to MoRTH: 11 1.6, SC, PIU,mitigate noise levels. MoRTH: 302.4, NHAI
MoRTH: 112.1,MoRTH: 112.5,MoRTH: 111.5
Operations Research Group in association with Spcifial Decisions 3-7
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage ResponsibilityEnvironmen for Implementati -
tal Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati SupervisionS. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
Biological Environment
C 5. Flora Loss of Entire project Entire a) Compensatory Forest During State Forest PIU, NHAIRoadside stretch project afforestation shall be done Conservation Construction DepartmentPlantation stretch @ 1:2 (for every tree cut, Act, 1980
two trees to be planted). Atotal of 9386 trees are to be Annexure IVplanted. Planting shall be (General EMP)done as per plantingstrategy described ingeneral EMP.
b) Avenue plantation shall C 5. of the During NHAIbe done as per guidelines General EMP Construction PIU, NHAIof general EMP. A total of30,000 trees are to beplanted as part of avenueplantation .
Schematic c) Shrubs will be planted in C 5. of the During Environmenta3 (Specific the median along the General EMP Construction Contractor I Expert of SCEMP) project stretch. Total of and PIU,
26,640 shrubs are to be NHAIplanted.
C 6. Fauna Poaching of Entire project Refer C 6. of the General During Contractor Environmentaanimals, stretch EMP Construction I Expert of SCfishes, and PIU,accidents NHAIinvolvingdomesticated animalsetc.
Social Environment
Operations Research Group in association with Spatial Decisions 3-8
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage Responsibility
Environmen for Implementatital Assessed Proposed Avoidance, Mitigation and Reference on Tlme Implementati Supervision
S. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
C 7. Human C 7.1 Entire Refer C 7.1 of the General MoRTH: 112.4, During Contractor Environmenta
Health & Increased Project EMP MoRTH: 112.1, Construction I Expert of SC
Safety Accident Stretch MoRTH: 112.5 and PIU
Risks due toHighSpeeds,Increase inVehicularPollution andother workrelated rsks.
C 7.2 Labour camp Refer C 7.2 of the General During Contractor Environmenta
Deterioration and entire EMP Construction I Expert of SC
of indoor air project and PIU
quality and stretchrisk of waterbornediseases
C 7.3 Loss Refer C 7.3 of the General MoRTH: 112.7 During Contractor Environmenta
of Access EMP Construction I Expert of SCand PIU,N HAI
C 7.4 Health Refer C 7.4 of the General Annexure II During Contractor Environmenta
and Hygiene EMP (General EMP) Construction I Expert of SC
Impacts on and PIU,
Construction NHAI
Camps
C 7.5 Risk Refer C 7.5 of the General MoRTH: 106 During Contractor Environmenta
from EMP Construction I Expert of SC
Electrical and PIU
Equipment(s)
Operations Research Group in association with Spatial Decisions 3-9
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Chainage ResponsibilityEnvironmen for Implementaff
tal Assessed Proposed Avoidance, Mitigation and Reference on Time Implementati SupervisionS. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
C 7.6 Refer C 7.7 of the General MoRTH: 301.5 During Contractor EnvironmentaImpacts on EMP Construction I Expert of SCCultural and PIUProperty
Other Activities
C 8. Orientation The PIU shall organize Annexure V During Pre PIU, NHAI ESDA, NHAIneed of orientation sessions during (General EMP) ConstructionImplementin all stages of the project for andg Agency staff of Environmental Cell, Constructionand field level implementationContractor staff of PIU, Environmental
Expert of SC andContractor.
Operation (0) Stage
Physical Environment
0 1. Ambient Air Increase in Project Annexure Monitoring will be done as Table 4.2: Dunng NHAI NHAIQuality Concentratio stretch XIX per the monitoring plan of (General EMP) Operation
n of (Specific General EMP at selectPollutants in EMP) locations.Ambient Air
02. Water Contaminati Project Monitoring will be done as Table 4.2: During NHAI NHAIResources on of Water stretch per the monitorng plan of (General EMP) Operation
Resources General EMP at rivers andculverts.
0 3. Noise Increased Sensitive Annexure Noise monitoring will be Table 4.2: During NHAI NHAIEnvironment Noise due to Receptor XIX done at select locations to (General EMP) Operation
High Locations (Specific check efficacy of the noiseSpeeding EMP) barners.Vehicles
Operations Research Group in association with Spaffal Decisions 3-10
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
FINAL SPECIFIC EMP
Chainage Responsibility
Environmen for Implementati
tal Assessed Proposed Avoidance, Mitigaton and Reference on Time Implementati Supervision
S. No. Parameter Impact Location Measure Enhancement Measures Document Frame on
0 4. Soil 0 4.1 Soil Entire project Annexure Monitoring will be done as Table 4.2: During NHAI NHAI
erosion stretch XIX per the monitonng plan of (General EMP) Operation(Specific General EMP at selectEMP) locations.
O 4.2 Soil Entire project Soil contamination shall be Table 4.2: During NHAI NHAI
contaminatio stretch monitored at accident or (General EMP) Operation
n spill locations as per themonitoring plan of theGeneral EMP.
Biological Environment
O 5. Flora Loss of Flora Entire project NHAI shall be responsible Table 4.2: During NHAI NHAI
stretch for monitoring survival rate (General EMP) Operationof all plantations as part ofcompensatory afforestation,avenue plantation andalong median for a periodof five years.
Operations Research Group in association with Spatial Decisions 3-11
i
I
ii
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
4. ENVIRONMENTALMONITORING PLAN
The environmental monitoring programme is devised to ensure effective implementation of the EMP.
The following table provides locations to be monitored at different stages of the project. The frequency,
duration, parameters to be monitored, institutional responsibility, reporting system etc. need to be
referred from the general EMP.
TABLE 4.1: LocATIONS FOR ENVIRONMENTAL MONITORING
S.No. Environmental Component Project Stage Location
1 Ambient Air Quality Construction Hot mix plant / batching plant (max. of 48 samples)
Construction sites in tandem with construction(max. of 48 samples)
Operation Ch. 444.000 (Kotwa market), 453.600 (PiprakothiJn.), 470.390 (Chakia Jn.), 475.398 (Sufia NursingHome)
2 Ground Water Quality Construction Ch. 444.000 (Kotwa market), 462.000 (Pipra),475.398 (Sufia Nursing Home)
Surface Water Quality Ponds at Ch. 459.230, 462.850, 476.522
Surface Water Quality Operation Rivers and Culverts (max. of 12 samples)
3 Ambient Noise Levels Construction Equipment Yards (max. of 20 samples)
Ch 444.000 (Kotwa market), 453.600 (PiprakothiJn.), 475.398 (Sufia Nursing Home)
Operation Ch. 443.550 (Nursing Home), 475.398 (NursingHome)
4 Soil Contamination Construction Productive agricultural lands abutting traffic detoursand traffic diversions (max. of 9 samples)
Operation Accident / spill locations involving bulk transportcarrying hazardous materials (max. of 3 samples)
5 Soil Erosion Construction Ponds at Ch.: 459.230, 462.850, 476.522
Operation Ponds at Ch.: 459.230, 462.850, 476.522
Operations Research Group in association with Spatial Decisions 4-1
i
II11
i
Ii
ii
ii
I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
5. ENVIRONMENTALMANAGEMENTBUDGET
The environmental budget for various environmental management measures proposed in the EMP is
detailed in Table 5.1. There are several other environmental issues that have been addressed as part
of good engineering practices, the costs for which have been accounted for in the Engineering Costs.
Environmental management budget is split into four categories- Mitigation Measures, Enhancement
Measures, Environmental Monitoring and Institutional Capacity Strengthening. The estimated cost
under each category for the project stretch is as follows:
1. Mitigation cost = Rs 2,81,57,500
2. Enhancement cost= Rs 10,50,000
3. Environmental Monitoring cost = Rs 7,98,500
4. Institutional Capacity Strengthening Cost = Rs 4,94,750 (Cost of independent compliancemonitoring and cost of equipments and facilities at PIU is shared with other packages, and is
not included in this package)
The total Environmental Mitigation, Enhancement, Monitoring and Institutional Capacity Strengthening
costs are estimated to be around Rs. 30.50 million (Rs 3.19 crores).
Operations Research Group in association with Spatial Decisions 5-1
i
IIiI
ii
i
INDEPENDENT REVIEW OF ENVIRONMENTAL SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF FINAL SPECIFIC EMP
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
Table 5.1: Environmental Budget for Package Xi (Km 440.000 - Km 480.000)
Component T Stage Item Reference Document Unit Unit Cost Quantity Total CostI__I_ _I__I (INR) (INR)
MITIGATION MEASURES
construction Relocation of hand pumps and provision of taps Covered in RAP/Engg cost
Water Silt Fencing running meters 400 140 56,000
Construction Urban Storm Water Runoff Management:
Connection of RCC covered urban drains to No. 10,000 16 160,000
proximal culverts/water bodies
Type B Noise Barriers at sensitive locations- running meters 2,860 40 114,400
Construction of 3.0 m high brck wallNoise Operation Annexure XVIIINoise Operation (Specific EMP)
Type B Noise Bamers at sensitive locations- No. 5,000 2 10,000
Construction of sideways gate
Providing Oil Interceptors (at proposed vehicle Drawing no. 5 No. S0000 3 150,00
parking areas and one at construction yard) (General EMP) . ,Soil Construction
Erosion control along high embankments Covered in Engineenng Cost
Cultural Pre- Relocation of Shnnes, Temples and other Covered in Social Impact Assessment Budget
Properties Construction properties
Tree cutting and haulage upto depot (To be done by the contractor):
120 cm girth size and upto 50 km lead till No. 300 704 211,200
depot point
Flora > 120 cm girth size and upto 100 km lead till No. 400 704 281,600depot point
Compensatory Afforestation (To be executed by N. 50 98 ,9,0the State Forest Department) No 500 9386 4,693,00
Avenue plantation (To be executed by the No. 500 30,000 15,000,000
Construction NHAI)
Median plantation (To be executed by the Schematic 3 (Specific
Contractor, ensurng 90% survival and em P) No 250 26,640 6,660,000
maintenance upto defect liability perod)
Culverts Construction Cleaning of Culverts Covered in Engineenng Cost
Post Restoration of construction sites at diversions,Site restoration Construction workers camps and construction yard and Covered in Engineerng Cost
Construction ~~disposal of spoil
Safety Construction Crash barriers, fencing of service roads, Covered in Engineerng Costretaining walls and other road safety measures
TOTAL MITIGATION I ENHANCEMENT COST 28,157,500
ENHANCEMENT MEASURES
Enhancement / Rehabilitation of ponds Drawing no. 2(a), 2(b) No. 350,000 2 700,000
Water Construction (Specific EMP)
Enhancement of road side wells Drawing no. 7 Lumpsum 350,000TOTAL___ (General EMP) COST_1,050,00_l
Operations /esearch Group in association with Spatial Decisions TOTAL ENHANCEMENT COST 1,050,000
INDEPENDENT REVIEW OF ENVIRONMENTAL SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF FINAL SPECIFIC EMPEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
Component Stage Item Reference Document Unit UnitCR)ot Quantity T(lCNR)ost
ENVIRONMENTAL MONITORING
Monitorng near all hot mix plant locations Air Sample 6000 48 288,000Monitorng of Air approved by the Engineer
Quality ConstructionParameters e.g. Monitoing at construction sites in tandem with Air Sample 2,000 48 96000SPM, RSPM, constructionSO2, NOx etc. Anxr I
S02, NOx etc, Operation At sensitive receptor locations . Annexuci XIX Air Sample 6,000 12 72,000
Ground water at specific locations Annexuc e XIX Water Sample 5,000 9 45,000Water Quality Construction (pcfcEP
Parameters e.g. Surface water at specific locations Annexure XIX Water Sample 5,000 9 45,000P', B00, D0 (Specitic EMP)
etc.Operation At Rivers and culverts for one year Water Sample 5,000 12 60,000
At equipment yards as directed by the Engineer Noise Sample 1,000 20 20,000Construction
Noise At sensitive receptor locations Annexure XIX Noise Sample 1,000 27 27,000Noise At sensitive receptor locations ~(Specific EMP)
Operation At sensitive receptor locations Annexure XIX Noise Sample 1,000 6 6,000
So Construction At productive agrcultural lands abutting traffic To be identied Soil Sampe 6,000 9 54,000Soil detours and traffic diversions EngineerContamination Operation At accident / spill locations involving bulk As per the occurrence Soil Sample 6,000 3 18,000
transport carring hazardous materals of such incidents
Construction Silt load in ponds, water courses Annexuci XIX Water Course 2,500 18 45,000
Soil ErosionOperation Silt load in ponds, water courses Annexuci XIX Water Course 2,500 9 22,500
TOTAL ENVIRONMENTAL MONITORING COST 798,500
INSTITUTIONAL CAPACITY STRENGTHENING
Training and Durng Training programmes as well as administrativeMobilisation Construction charges including logistics as defined in General EMP Lumpsum 494,750and Operation General EMP
imuepenueniMonitorng for Durng Common for all packages and provision has Will be shared with Construction packages of
EMP been kept under Construction packages of General EMP Gorakhpur BypassCompliance CosrcinGorakhpar Bypass
Equipments a nd strucon Common for all packages and provision has Will be shared with Contract Package XII Xaqimns CndsOpraction been kept under Contract Package XII
TOTAL INSTITUTIONAL CAPACITY STRENGTHENING COST 494,750
SUB TOTAL (Mitigation + Enhancement + Monitoring + Institutional Capacity Strengthening Costs) 30,500,750
TOTAL EMP COST FOR PACKAGE Xi J 30,500.750
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR
FINAL SPECIFIC EMP
Annexure IProposed Alignment of Four Lane Carriageway along with Service Road (Package Xi, Km. 440.000 to Km. 480.000)
Proposed Alignment Arrangement Service Road Details Remarks / Other
S. Design Chainage Alignment Locations Chainage Width Location Length of Total DevelopmentNo. Arrangement One Side Length
From To From To (in Km) (in Km)
1 2 3 4 5 6 7 8 9 10(7-6) 11 12
1. 440.000 442.500 Eccentric to Left
2. 442.500 442.700 Transition to Centre
3. 442.700 443.170 Concentric Kotwa BU-Zone 442.700 444.350 5.50 Both 1.650 3.300 Kotwa Built-Up Zonesides SMV Under-Pass at
Ch. 443.750
4. 443.170 443.300 Transition to Right
5. 443.300 443.920 Eccentric to Right
6. 443.920 444.070 Transition to Centre
7. 444.070 444.200 Concentric
8. 444.200 444.460 Transition to Left
9. 444.460 451.000 Eccentric to Left
10. 451.000 451.225 Transition to Centre
11. 451.225 454.540 Concentric R.O.B at level crossing 451.225 452.750 5.50 Both 1.525 3.050 4-Lane R.O.B. at Rly.
sides Crossing Ch.
452.108
Piprakothi Jn. & Built- 452.750 454.540 7.00 Both 1.790 3.580 Two Lane Fly over at
up Zone sides Piprakothi Jn. Ch.453.726
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Proposed Alignment Arrangement Service Road Details Remarks I OtherDevelopmentS. Design Chainage Alignment Locations Chainage Width Location Length of Total
No. Arrangement One Side LengthFrom To From To (in Km) (in Km)
1 2 3 4 5 6 7 8 9 10 (7- 6) 11 1212. 454.540 454.700 Transition to Left
13. 454.700 460.800 Eccentric to Left
14. 460.800 461.050 Transition to Centre
15. 461.050 462.000 Concentric Pipra Village 461.050 462.100 5.50 Both 1.050 2.100 SMV Under-Pass atsides Jn. Ch. 461.838
16. 462.000 462.250 Transition to Left
17. 460.250 469.750 Eccentric to Left
18. 469.750 469.900 Transition to Centre
19. 469.900 470.500 Concentric Barachakia Village 469.900 470.500 5.50 Both 0.600 1.200 Y Jn. with N.H.-1 04.Sides At grade
Improvement
20. 470.500 470.700 Transition to Left
21. 470.700 472.250 Eccentric to Left
22. 472.250 472.400 Transition to Centre
23. 472.400 475.300 Concentric Chakia Village 472.400 473.450 5.50 Both 1.050 2.100 SMV Under-pass atSides Junction Ch. 473.201
Chakia Village 473.900 475.300 5.50 Both 1.400 2.800Sides
24. 475.300 475.450 Transition to Left
25. 475.450 480.000 Eccentric to Left End of Package Xi
Operations Research Group in association with Spatial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC
EMP
Proposed Alignment Arrangement Service Road Details Remarks / OtherDevelopment
S. Design Chainage Alignment Locations Chainage Width Location Length of Total
No. Arrangement One Side LengthFrom To From To (in Km) (in Km)
1 2 3 4 5 6 7 8 9 10 (7- 6) 1 1 1 2
26. 0.000 0.700 Concentric NH-28A at T Jn. 0.000 0.700 7.00 Both Side 0.700 1.400 NH-28 A PortionPiprakothi
Operations Research Group in association with Spatial Decisions 3
i
i
iI
qi
i
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure 11Proposed Highway Junction Improvements
S. Km Name of Road Classification Place Type of ProposedNo. of Road junction Improvement
1. 443.875 Kotwa - State Highway Kotwa 3-legged 'Y' At grade to beMotihari S.H. merged in service
lane with Via-ductopening.
2. 453.600 Piprakothi- NH-28A Piprakhoti Three legged At grade with two
Raxaul 'T" type lane Fly over
3. 470.390 Chakia- NH-104 Barachakia Three legged At grade with serviceMadhuban- "Y" type laneSheohar-Sitamarhi
4. 473.200 Chakia- State Highway Chakia Four legged At grade to beMadhuban cross Jn. merged in service
lane with Via-ductopening.
Operations Research Group in association with Spatial Decisions
-- - -- -- - ------ ----
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure IIIDetails of Proposed Underpasses
S. Chainage Place Type of Proposed Proposed Vertical Total LengthNo. Underpass Span Clearance including
Arrangement (in m) Approachof Under-pass (in m)
1. 443.692 Kotwa Built-up 4-Lane SMV 1 x10.56 3.50 650Zone Underpass
2. 461.692 Pipra Village 4-Lane SMV 1 x 10.56 3.50 650Underpass
3. 472.990 Chakia Village 4-Lane SMV 1 x 10.56 3.50 650Underpass
OetnRsr GrpnsoaowtStleio
Operations Research Group in association with Spatial Decisions I
I - ... ---
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure IVExisting Major and Minor bridges
S. Bridge No. Chainage Chainage Major / MinorNo. at Start at End
1. 443/1 442.564 442.636 Major
2. 444/1 443.704 443729 Minor
3. 452/2 452.093 452.100 Minor
4. 453/2 452.675 452.682 Minor
5. 454/2 453.8130 453.8199 Minor
6. 458/2 457.755 457.762 Minor
Operations Research Group in association with Spatial Decisions
-- ------ --
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure VProposed Improvement I Construction of Bridges and Culverts
Bridges
Construction of New two lane Bridges on Additional Lane = 3 Nos.
* Construction of New 4-Lane Bridges in replacement of Existing Bridges of inadequate
waterway Bridge = Nil.
* Construction of New 4-Lane Bridges in replacement of Existing Culverts = 2.
* Construction of New Service Lane Minor Bridge in Built-up Zone = 2
* Replacement of Existing Minor Bridge (6.7 m span} by New 4-lane H.P. Culvert falling under
approaches to ROB & underpass / Fly-over = 3 Nos.
Culverts
52 nos. of H.P. culverts are proposed for the major/minor connecting roads on the side of widening.
j Widening of Existing HP & Slab Culverts = 28 Nos.
Replacement of Existing Damage Culvert by 4-lane Box, RCC/HP Culvert = 17 Nos.
Replacement of Existing Culvert by New Bridge = 2 Nos.
Construction of New 4 - Lane Box, RCC / HP Culverts = 32 Nos.
Removal of unserviceable Culverts = 2 Nos.
Construction of New H.P. (two Row) Culvert for minor road meeting NH-28 at different
locations = 52 Nos.
Operations Research Group in association with Spatial Decisions
ii
I
I
I
ii
i
I
IiII
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure VIProposed RCC Covered Drains in Built-Up Locations
S. Place Chainage Location Length of One Total Length Type of
Side (in Km) (in Km) DrainNo. From To
1. Kotwa BU-Zone 442.700 444.350 Both sides 1.100 2.200 D2
2. Piprakothi Jn. & 452.750 454.540 Both sides 1.600 3.200 D2
Built-up Zone
3. Pipra Village 461.050 462.100 Both sides 0.900 1.800 D2
4. Barachakia 469.900 470.500 Both Sides 0.500 1.000 D2
Village
5. Chakia Village 472.400 473.450 Both Sides 0.800 1.600 D2
6. Chakia Village 473.900 475.300 Both Sides 1.000 2.000 D2
7. NH-28A at T Jn. 0.000 0.700 Both Side 0.700 1.400 D2
Piprakothi
8. Toll Plaza 467.773 468.445 Both Side 0.650 1.300 D3
Operations Research Group in association with Spatial Decisions I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure VIIProposed Borrow Areas
S. No. Location Distance Name of Private / Land Use Quantity Type of Soil on
from NH (in Village Govt. Land Available (in Visual
Km.) cum.) Observation
1. 441.500 (L) 0.300 Rajapur Private Agricultural 50,000 Light grey
Mathia land clayey silt
2. 442.640 (L) 3.500 Kotwa Private Govt. Barren land 50,000 10,000 Yellowish grey
Chowk clayey silt
3. 444.580 (L + 0.100 Kotwa Bazar Private Agricultural 50,000 Light grey
R) tola land clayey silt with
I _ sand
4. 446.575 to 0.150 Kotwa Private Barren land 30,000 Greyish clayey
447.000 (L + Bathna silt with sand
R) (Mauza tola)
5. 449.050 to 0.150 Math Private Barren land 50,000 Light grey
449.250 (L + Banwari clayey silt
R) Chowk
6. 450.625 (R) 0.200 Ratanpur Private Agricultural 50,000 Light grey
land clayey silt
7. 452.410 (L) 1.000 Veer Private Agricultural 80,000 Light grey
Chhapra land clayey silt
8. 454.050 to 0.200 Piprakothi Govt. Barren land 2,80,000 Light grey
455.100 (L) more to Nav clayey silt
Vidyalay
9. 457.125 (R) 0.500 Kuarpur Private Agricultural 50,000 Light grey
(Near Hot land clayey silt
Mix PlantSite)
10. 458.400 to 0.200 Private Agricultural 50,000 Light grey
459.800 (R) land clayey silt
11. 461.900 to 0.600 Naya Chowk Govt. Barren land 15,000 Light grey
465.800 (L) Pipra (From clayey silt
Canaldeposit)
12. 464.600 to 0.300 Mahuawa Private Agricultural 1,00,000 Light grey
465.800 (L) Chakia land clayey silt
Sugar CaneFactory Land
13. 466.950 to 0.200 Pakhri Private Barren land 1,20,000 Light grey
468.000 (L) (Chakia clayey silt
Sugar Mill)
14. 471.500 (R) 0.500 Bara Chakia Private Barren land 80,000 Light grey
(Chakia clayey silt
SugarFactoryLand)
15. 474.525 (L) 1.000 Ojha Tola Private Barren land 15,000 Light grey
(Near Burhi clayey silt
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
S. No. Location Distance Name of Private / Land Use Quantity Type of Soil onfrom NH (in Village Govt. Land Available (in Visual
Km.) cum.) Observation
GandakRiver)
16. 477.925 (L) 0.200 Harpur - Private Agrcultural 20,000 Light greyNagar land clayey silt
Operations Research Group in association with Spafial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure VIIIAmbient Air Quality Monitoring Results
S. No. Location Chainage Suspended Sulphur Nitrogen Carbon Respirable LeadParticulate Dioxide Dioxide Monoxide Suspended (Pb)
Matter (SO 2 ), (NOx), (CO), Particulate micro(SPM), micro micro micro gm Matter gm per
micro gm gm per gm per per cum (RSPM) cumper cum cum cum micro gm
per cum
(Particlesize < 10)
1. Kotwa Market Km. 444 312.6 28.64 30.18 530.6 116.3 BDL
2. Piprakothi Jn. KM. 454 516.83 54.3 32.66 828.7 140.62 0.14
3. In front of Sufia Km. 474 316.87 24.83 22.74 288.4 102.6 BDL
Nursing Home
Operations Research Group in association with Spatial Decisions
Iii
I
iii
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure IXDetails of Ponds within the Direct Impact Zone
S. No. Chainage Location Distance from Enhancement
Existing Pavement being ProposedEdge (m)
1. 440.700 LHS 6.75 No
2. 446.100 LHS 7.80 No
3. 453.223 RHS 4.90 No
4. 459.230 LHS 20.00 Yes
5. 461.800 LHS 8.00 No
6. 462.850 LHS 22.00 Yes
7. 463.500 LHS 18.00 No
8. 472.625 RHS 18.00 No
9. 476.522 RHS 18.00 No
Operations Research Group in association with Spafial Decisions
- ----------- --- - -- -- = =
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XWells within the Direct Impact Zone
S. No. Chainage / Km Location
Left Right
1. 451.980 R
2. 453.720 R
3. 454.540 R
4. 457.490 R
5. 458.430 R
6. 458.820 R
7. 461.755 L
8. 463.170 R
9. 463.175 R
10. 466.595 R
11. 469.005 R
12. 469.970 L
13. 476.440 L
14. 477.750 R
15. 479.340 L
Total No. of Wells on Left Side 4
Total No. of Wells on Right Side = I4
Total No. of Wells in the Project Stretch within ROW = 15
Operations Research Group in association with Spatial Decisions
0~~ ~ ~~~~~ l l l
IIi
iI
i
ii
iiiIIi
I
I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XIHand-Pumps within the Direct Impact Zone
S. No. Location / Km Numbers in Left Hand Numbers in Right HandSide Side
1. 441-442 -
2. 442-443 12 7
3. 443-444 6 7
4. 444-445 4 9
5. 445-446 1 5
6. 446-447 1
7. 447-448 1 3
8. 448-449 1 1
9. 449-450 1 3
10. 450-451 - 2
11. 451-452 - 2
12. 452-453 3 3
13. 453-454 9 7
14. 454-455 1 15
15. 455-456 3 4
16. 456-457 2 2
17. 457-458 5 4
18. 458-459 2 1
19. 459-460 2 1
20. 460-461 - 1
21. 461-462 - 2
22. 462-463 1 1
23. 463-464 2 2
24. 464-465 - 1
25. 465-466 1 1
26. 466-467 -
27. 467-468 3 1
28. 468-469 - 2
29. 469-470 14
30. 470-471 9 2
31. 471-472 -=
32. 472-473
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
S. No. Location / Km Numbers in Left Hand Numbers in Right HandSide Side
33. 473-474 4 1
34. 474-475 -
35. 475-476 1 4
36. 476-477 3
37. 477-478 1
38. 478-479 4 4
39. 479-480 2 2
Total No. of Hand-Pumps on Left Side = 86
Total No. of Hand-Pumps on Right Side = 104
Total No. of Hand-Pumps in the Project Stretch within ROW = 190
Operations Research Group in association with Spatial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XIIGround Water Quality Monitoring Results
Sampling Station Nursing Chakia near Pipra-kothi Kotwa MarketHome Hand- P.S. Open Hand-Pump Hand-Pump
Pump DugwellKm. 462 Km. 444
Parameters Km. 474 Km. 474
1. Colour, Hazen Unit Colourless Colourless Colourless Colourless
2. Odour Odourless Odourless Odouriess Odourless
3. Taste Agreeable Agreeable Agreeable Agreeable
4. Turbidity, NTU 2.0 15.00 5.0 8.0
5. Total Dissolved Solids, mg/l 655.40 488.60 728.60 806.42
6. pH 7.40 7.14 7.26 7.40
7. Total Hardness as CaCO3, mg/l 298.40 216.83 312.40 322.60
8. Iron as 'Fe', mg/I 1.02 0.89 1.14 1.20
9. Chloride as 'Cl', mg/I 24.36 64.83 18.60 20.46
10. Residual Free Chlorine, mg/l Nil Nil Nil Nil
11. Calcium as 'Ca', mg/l 80.26 64.86 86.42 92.34
12. Magnesium as 'Mg', mg/l 23.80 13.33 23.47 22.36
13. Copperas'Cu', mg/l 0.14 BDL 0.06 0.12
14. Manganese as 'Mn', mg/I 0.12 0.18 0.16 0.18
15. Sulphate as S04, mg/l 32.42 82.88 28.60 32.82
16. Nitrate as N03, mg/l 5.44 18.64 10.40 12.00
17. Fluoride as 'F', mg/l 0.72 0.84 0.88 1.16
18. Phenolic Compounds, mg/l Nil Nil Nil Nil
19. Mercury as 'Hg', mg/l Nil Nil Nil Nil
20. Cadmium as 'Cd', mg/I BDL BDL BDL BDL
21. Selenium as 'Se', mg/l 0.08 0.04 BDL BDL
22. Arsenic as 'As', mg/l Nil Nil Nil Nil
23. Cyanide as 'CN', mg/I Nil Nil Nil Nil
24. Lead as 'Pb', mg/l BDL BDL 0.06 Nil
25. Zinc as 'Zn', mg/l 0.18 0.28 0.22 0.36
26. Total Chromium as 'Cr', mg/I Nil Nil Nil Nil
27. Mineral Oil, mg/I Nil Nil Nil Nil
28. Alkalinity as CaCO3, mg/l 308.44 324.82 308.62 244.84
29. Aluminium as 'Al', mg/l BDL Nil Nil 0.16
Operations Research Group in associotion with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
30. Boron as 'B', mg/l BDL BDL BDL 0.08
31. Total Phosphate as 'P', mg/l 0.08 0.16 Nil 0.25
32. Coliform per 100 ml, MPN 580 600 480 144
33. E. coli per 100 ml Absent Absent Absent Absent
Operations Research Group in association with Spatial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XillAmbient Noise Level Monitoring Results
Noise Level Noise LevelS. No. Location Chainage Day Time Night Time
dB(A) dB(A)
1. Kotwa Market Km 444 75 40
2. Piprakothi Jn. Km 454 78 45
3. In front of Sufia Nursing Home Km 474 68 40
Operations Research Group in association with Spatial Decisions
I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XIVNumber of Trees to be Cut and Saved due to Proposed Alignment
S. No. Alignment Finalised Finalised 4-Lane Alignment Number Number of Number of Number ofof Existing Trees to Trees to be
Chainage Existing Trees be Cut CutTrees
From To (Left) (Right) (Left) (Right)
1. 440.000 442.480 Eccentric to Left (Including 88 121 88 0Transition)
2. 442.480 444.250 Concentric (Including 79 70 79 70Transition)
3. 444.250 451.175 Eccentric to Left (Including 503 370 503 0Transition)
4. 451.175 454.700 Concentric (Including 292 301 292 301Transition)
5. 454.700 461.100 Eccentric to Left (Including 441 650 441 0Transition)
6. 461.100 462.250 Concentric (Including 177 123 177 123Transition)
7. 462.250 469.875 Eccentric to Left (Including 997 1205 997 0Transition)
8. 469.875 470.750 Concentric 21 55 21 55
9. 470.750 472.450 Eccentric to Left (Including 172 117 172 0Transition)
10. 472.450 475.500 Concentric (Including 115 157 115 157Transition)
11. 475.500 480.000 Eccentric to Left (Including 1102 599 1102 0Transition)
Total 3987 3768 3987 706
Grand Total of Existing Trees within the RoW 7755
Grand Total of Proposed Trees to be Cut within the RoW 4693
Operations Research Group in association with Spatiol Decisions
i
i
i
I
i
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XVSensitive Receptors within the Direct Impact Zone
S. No. Chainage Name of Structure Location Distance ofBoundary Wallfrom Existing
PavementEdge (m)
1. 443.550 Rajendra Phuleshwari Nursing Home, Kotwa RHS 19.65
2. 453.479 Prathamic Vidayalaya, Urdu LHS 20.40
3. 454.509 Navodaya Vidayalaya (Under Construction) LHS 23.50
4. 470.873 Shivedeni Ram Ayodhaya Prasad Maha RHS 16.00
Vidayalaya
5. 475.398 Sufia Nursing Home RHS 3.50
Operations Research Group in association with Spatial Decisions 1
-- ----- --
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XVI
Existing Market Locations and Roadside Dhabas
List of Market Locations
S. No. Location (Km) Market
1. 443-444 Kotwa
2. 453-454 Piprakothi
3. 473-474 Chakia
List of Roadside Dhabas within the Direct Impact Zone
S. No. Chainage I Km Numbers on Left Hand Numbers on Right HandSide Side
1. 443.160 1.....
2. 444.413 ...... 1
3. 454.750 1
4. 456.700 1
5. 456.988 ...... 1
6. 457.100 ...... 1
7. 457.203 1 ......
8. 457.389 1......
9. 457.843 1......
10. 463.450 1......
11. 463.555 ...... 1
12. 468.600 ...... 1
13. 470.750 1......
14. 470.150 ...... 1
15. 470.220 ...... 1
16. 470.642 1 ......
17. 470.673 1......
18. 475.832 1......
19. 475.955 ...... 1
20. 477.553 1 ......
Total 9 11
Operations Research Group in association with Spatial Decisions
I
i
I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XVIIProposed Parking Areas, Bus-Stops, Lay Byes
Proposed Parking Areas
S. No. Km I Place Location Size of Parking Total Area of LandChainage Area (in m) Required (in sqm)
1 456.300 Piprakothi Left side 200 x 150 30000
2. 468.300 In continuation of Right side 320 X45.50 14530Toll Plaza
Proposed Bus-Stops
S. No. Place Km No. of Bus Stopsbeing Proposed
1 Kotwa 443-444 2
2. Piprakothi 454 3
3. Pipra 462 2
4. Barachakia 470 2
5. Chakia 473 2
6. Chakia 474 2
Proposed Lay Byes
S. No. Location / Km No. of Lay Byes beingProposed
1 446 2
2. 451 2
3. 457 2
4. 463 2
5. 476 2
Operations Research Group in association with Spatial Decisions
I
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OF
EIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XVIIINoise Barriers
Specific noise barriers are being proposed for sensitive receptor locations.
PROPOSED NOISE BARRIERS FOR DIFFERENT LOCATION TYPES
Noise Barrier Type Criteria of Selection Proposed Action Suggested Location
Type A No space availability within Double-glazing of window Sensitive receptor
the RoW but boundary wall panes.
does not get impacted.
Type B Boundary wall gets impacted Noise barrier as 3.0 m Sensitive receptor
within the RoW. high and 0.23 m thick
plastered brick wall. Gate
entry, if facing highway, to
be shifted sideways.
Type C Space availability within the Noise barrier as 3.0 m Sensitive receptor
RoW but boundary wall does high and 0.23 m thick
not get impacted. plastered brick wall. This
would also serve as
boundary wall. Gate
entry, if facing highway, to
be shifted sideways.
SPECIFIC NOISE MITIGATION MEASURES AT SPECIFIC LOCATIONS
S. Chainage Name of the Feature Available Space within Location for Proposed Noise
No. RoW Proposed Barrier Type
Measure
1. 443.550 Rajendra Phuleshwari Nursing Nil, boundary wall to get RHS Type B, gate entry
Home, Kotwa impacted. to be shiftedsideways.
2. 475.398 Sufia Nursing Home Nil, boundary wall to get RHS Type B, gate entry
impacted. to be shiftedsideways.
Operations Research Group in association with Spafial Decisions 1
II
f
iI
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Annexure XIXProposed Environmental Monitoring Locations
PROPOSED ENVIRONMENTAL MONITORING LOCATIONS
Environmental Project Stage Parameters Location (Chainage)Component
Ambient Air During Operation SPM, RSPM, S02, NOx, 444.000 (Kotwa market),CO, HC 453.600 (Piprakothi Jn.),
470.390 (Chakia Jn.),475.398 (Sufia NursingHome)
Ground Water Quality During Construction pH, BOD, COD, TDS, 444.000 (Kotwa market),TSS, DO, Oil & Grease, 462.000 (Pipra), 475.398Pb (Sufia Nursing Home)
Surface Water Quality During Construction pH, BOD, COD, TDS, Ponds at: 459.230,TSS, DO, Oil & Grease, 462.850, 476.522Pb
Noise Level During Construction Noise Levels on dB(A) 444.000 (Kotwa market),scale 453.600 (Piprakothi Jn.),
475.398 (Sufia NursingHome)
During Operation Noise Levels on dB(A) 443.550 (Nursing Home),scale 475.398 (Nursing Home)
Soil Erosion During Construction Silt load in ponds, water Ponds: 459.230, 462.850,courses 476.522
During Operation Silt load in ponds, water Ponds: 459.230, 462.850,courses 476.522
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Schematic 1: Location and Lead of Borrow areas - Package XI
RHS Stretch Starts at 440.000 LHS
0.3 km offRajapur Mathia50,000 cu. m
Km. 441.5----*
j3.5 km offKm 44 64 --- * ~ ~~Kotwa ChowkKm 442.64 50,000/10,000 cu.m
0.1 km off (L+R)Kotwa BazarTola
Km 444.58 - - -- 50,000 cu. m
0.15 km off (L+R)Kotwa Bathna30,000 cu. m
Km 446.575 -447
0.15 km offMath Banwar Chowk50,000 cu. m
Km 449.05 - 449.25
0.2 km offRatanpur50,000 cu --m Km 450.625
1.0 km offVeer Chhapra80,000 cu. m
Km 452.41
0.2 km offPiprakothi more to NavVidyalaya
* < 2,80,000 cu. mKm 454.05 - 455.1
.
0.5 km offKuarpur50,000 cu. m -- * . - Km 457.125
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
0.2 km off Km 458.4 - 459.8
50,000 cu. m
.
Km 461.9 - 465.8 G 0.6 km off- -, Naya Chowk Pipra
15,000 cu. m
0.3 km off- - Mahuawa Chakia Sugarcane
Km 464.6 - 465.8 -- Factory land* j i 1,00,000 cu. m
- e 0.2kmoff- Pakhri
Km 466.95 - 468 -- 1,20,000 cu. m
.
0.5kmoff CBara Chakia80,000 cu. m Km 471.5
1 km offOjha Tola15,000 cu. m
Km 474.525
0.2 km offHarpur Nagar20,000 cu. m
Km 477.925
Stretch Ends at Km. 480.000
Operations Research Group in association with Spatial Decisions 2
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Schematic 2: Suggested Specific Noise Barriers - Package XI
RHS Stretch Starts at Km. 440.0 LHS
Type BNursing HomeKm.443.500
Km. 448.500
Km. 456.350
Km. 468.500
Type B
Sufia Nursing Home
Km. 475.398,
Stretch ends at Km. 480.0
Operations Research Group in association with Spatial Decisions
INDEPENDENT REVIEW OF ENVIRONMENTAL & SOCIAL ASSESSMENT PROCESS AND CONSOLIDATION OFEIA, EMP AND RAP REPORTS FOR AYODHYA TO MUZAFFARPUR SECTION OF EAST WEST CORRIDOR FINAL SPECIFIC EMP
Schematic 3: Median Plantation - Package Xl
Stretch Starts at Km. 440.000RHS LHS
Km 440.00
Km 442.50
Km 443.30
Km 443.92
Km 444.46
Km 451.00
Km 454.70
Km 460.80
Km. 460.25
Km. 469.75
Km. 470.70
Km. 472.25
Km. 475.45
Km. 480.00
Legend: Stretch ends at Km. 480.000Double Row of Shrubs Single Row of Shrubs
Operations Research Group in association with Spatial Decisions
Ii
I
iI
iI
LEGEND
*MAJOR BUILT-UP LOCATION
PROJECT STRETCH (NH 28)
OTH ER NATIONAL HIGHWAYT _ / ~~~~~~~~~~~~~~~~~~~~iPprakothi 3 N|rakothi ~ ~ ~ ~ ~ ~~~~~ -MAJOR METALLED ROAD
UNMETALLED ROAD
iI DISTRICT BOUNDARY
04 \- ~~~~~~~~~~~~~~~~~~~~~~~~~~DRAINAGESWATERBODIES
NH 104
1fl1E~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~S MARH /
%'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~S
40 K0l sX tiEmad~~~~~~~~~~~~~~~~~~~~~~~~PlrnL/
ackage -xio l GOPALGi%s / _ < - > \
l 0 - |Nt SCALE 1 200,000 2 4
National Highways 0 2 4 Kilometers
l L L = § ~~~~~~~~~~~~~~~~Authority of Indiall l|