Monitoring and Evaluation Module for the Government of India (RGNDWM) CRSP I Total Sanitaiton Campaign
MONITORING AND EVALUATION MODULE DESIGN
September 2004 New Delhi
Supported by
water§P sanitation program
Created by
Knowledge Links Private limited
+ ~oral svnergv Con~.~·~=te~
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
~ Knowledge Links
~ Private Limited + Total S1111erov Consulting -------------,--------------- f'rl!fflteUmlllHI
CONTENTS
C-ontents
List of Figures
List of Tables
Abbreviations
Executive Summary
Chapter 1 Introduction
Chapter 2 Quantitative Window
Chapter 3 Qualitative Window
Chapter 4 Integration Mechanism
Chapter 5 M&E Management Structure
Annexures
Annex I.A Log-frame for M&E Sanitation
Anne~x I.B Computer-based MIS Indicators
Annex I.C Input formats
Annex 1.0 Output formats
Annex II.A State Periodic Review
Annex II.B District Periodic Review
Annex III.A Inland Letters
Annex III.B Feedback Reports
Annex IV Management Structure
Annex V Cost Estimates
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign
ii
ii
iii-iv
v-xxiii
01-15
16-23
24-49
50-63
64-70
71-74
75-78
79-90
91-109
110-121
122-132
133-136
137-139
140-140
141-145
r.~ Knowledge Links
~* Total Syner!l;;;;::!l --------------------------- i'mraWWTilWEi
list of Figures
Figure 1.1
Figure 1.2
Figure 2.2
List of Tables
Table 1.1
Table 1.2
Table 3.1
Table 3.2.1
Table 3.2.2 Table 3.2.3
Table 3.3
Table 3.4
Table 3.5 Table 3.6
Table 3.7
Table 3.8
Table 3.9
Table 3.10
Table 4.1
Table 4.2
Table 4.3
Table 4.4
Table 4.5 Table 4. 6 Table 4.7
Table 4.8
Organizational Structure of TSC
Schematic presentation of proposed monitoring and evaluation system
Master T abies
Objectives of TSC and underlying assumptions
Logical framework for developing indicators
Periodic Review: Issues to be reviewed at State, District and Village levels
Review Activities and Methods for Periodic Review Teams at State Level
Review Activities and Methods for Periodic Review Teams at District Level
Review Activities and Methods for Periodic Review Teams at Village Level State indicators (related data to be cross-checked)
District indicators (related data to be cross-checked)
Scheme/ village indicators (related data to be cross-checked)
Internalization of community monitoring: Review activities and methods
Action taken based on periodic review: Review activities and methods
Break-up of Marks of Core Performance in the PIC:
Community Monitoring Issues and Indicators
Community Monitoring Indicators and Tools
PIC overview - dimensions (including both water supply and
other related dimensions)
PIC with Water Supply and Sanitation Dimensions included
PIC Overview (details of sanitation dimension across levels)
Marking pattern of the core performance at the village/scheme levei Categories of evaluation and scores Community M&E parameters and allotted marks Benchmark Matrix (from quantitative MIS indicators)
Benchmark categories and quality points
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign ii
AIR
APL
AWL
BPL
BWL
CAP
CBOs
COs
CM&E
CMG
CPs
CRSP
CSCs
DEOs
DPR
DWSC
DWSM
FP
GOI
GP
GPs
HHs
HRD
IHHLs
IEC
ISDN
IT
M&E
MIS
MMs
MORD
MTAs
NGOs
NGP
NIC
NSSC
O&M p
Abbreviations
All India Radio
Above Poverty Line
Anganwadi Latrine
Below Poverty Line
Balwadi Latrine
Community Action Plan
Community-based Organizations
Compact Disks
Community Monitoring &Evaluation
Community Monitoring Group
Compost Pits
Central Rural Sanitation Programme
Community Sanitary Complexes
Data Entry Operators
Detailed Project Report
District Water and Sanitation Committee
District Water and Sanitation Mission
Financial Progress
Government of India
Gram Panchayat
Garbage Pits
Households
Human Resource Development
Individual Household Latrines
Information education communication
International Straight Dialling Network
Information Technology
Monitoring and Evaluation
Management Information System
Mahila Mandals
Ministry of Rural Development
Mother Teacher Associations
Non Government Organisations
Nirmal Gram Puraskar
National Informatics Centre
National Scheme Sanctioning Committee
Operation and maintenance
Process/ Planning
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign
~~ Knowledge Links
Private Limited
Total Slllllliif!lllllliiiiSIIIting
lil
~ Knowledge Links ~ + Totaillllilllf!l;;;::g
--------------------------- i'r!WI:eUmllhl!:l
PCs
PIC
PIP pp
PR
Pre-P
PRis
PTAs
RDBMS
RGNDWM
RSMs
RWSS
SC/ST
SHGs so SPs
SQL
SSLs
SRP
SRS SRSP
SWSM
TOR
TSC VMW
vwsc WSP-SA
YMs
ZP
Personal Computers I Production centres
Performance Index Card
Project Implementation Plan
Physical Progress
Periodic Review
Pre-planning
Panchayati Raj Institutions
Parent Teacher Associations
Relational Database Management Systems
Rajiv Gandhi National Drinking Water Mission
Rural Sanitary Marts Rural water supply and sanitation
Scheduled Caste/ScheduledTribes
Self Help Groups
Support Organisation
Soak-pits
Sequential Language
School Sanitary Latrines
Sector Reform Program Systems Requirements and Specifications
State Rural Sanitation Programme
State Water and Sanitation Mission
Terms of reference Total Sanitation Campaign
Village Maintenance Worker
Village Water and Sanitation Committee
Water and Sanitation Program - South Asia
Yuvak Mandals
Zilla Parishad/Panchayat
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign iv
EXECUTIVE SUMMARY
Knowledge Links
Private Limited
Total Sllll6FIUI llii!!SIIIting !'rllflUf!:llmltell
1. Total Sanitation Campaign: Reform Initiative in Rural Sanitation
The Total Sanitation Campaign (TSC) marks a major policy shift from a subsidy based supply driven approach to an incentive based demand responsive approach to sanitation in the country. The focus now is on total sanitation at the community level as against some individual sanitary latrines at the household level. The idea is to have fully sanitised villages free from open defecation, dry latrines and manual scavenging, and safe disposal o1~ solid waste and waste water.
The strategy is to make the programme community led, people centered and demand re!sponsive with increased emphasis on awareness creation and demand generation for sanitary facilities at the household and community level. Another major area of thrust is clean village environment. The TSC is demand responsive and community-led in the s19nse that local communities have to be mobilised to undertake the responsibility for planning, implementation and operation and maintenance of assets. This people-centered approach of the TSC is aimed not only at creating community ownership of the assets created, but also at promoting behaviour change in people in order to ensure health and hygiene benefits on a sustainable basis.
TSC envisages closer inter-linkages with Panchayat Raj Institutions in consonance with the spirit of 73rd Amendment to the Constitution and, as far as possible, its implementation is to be integrated with that of the recently launched country-wide community-based rural water supply program known as Swajaldhara.
The Total Sanitation Campaign thus in brief embodies a shift from a high subsidy to a low subsidy regime, greater community involvement, choice of technology according to customer preferences, emphasis on software activities for capacity building, institutionalization of participative processes and development of back-up services.
1.1 Reform Agenda of TSC
The key elements of the reform agenda of TSC are :
~ community-based approaches and processes, ~ creation or an enabling environment, ~ promotion of usage of sanitary facilities ~ sustainability of assets created through ongoing operation and maintenance ~ change in persona~ domestic and environmental health and hygiene
behaviour/practices
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Executive Summary
v
Knowledge Links
Private Limited
Total Si!II®F!Ilf llllnsuitill!i
1.2 Campaign Objectives, Components and Structure
1.2. 1 Objectives
The main objectives of the TSC, as stated in the RGNDWM guidelines are to:
• Bring about an improvement in the general quality of life in the rural areas. • Accelerate sanitation coverage in rural areas. • Generate felt demand for sanitation facilities through awareness creation and
health education. • Cover schools/Anganwadis in rural areas with sanitation facilities and promote
hygiene education and sanitary habits among students. • Encourage cost effective and appropriate technologies in Sanitation. • Eliminate open defecation to minimize risk of contamination of drinking water
sources and food • Conved dry latrines to pour flush latrines, and eliminate manual scavenging
practice, wherever in existence in rural areas.
1.2.2 Campaign Components
a) Start-up Activities b) IEC Activities c) Rural Sanitation Marts and Production Centers d) Construction of Individual Household Latrines {IHHLs) e) Construction of Community Sanitary Complexes f) School Sanitation and Hygiene Education g) Administrative charges
1. 2. 3 Campaign Or..qanizational Structure
Planning and implementation of the Total Sanitation Campaign at the District level would be carried out by the Zilla Panchayat. In case where Zilla Panchayat is not in existence, a District Water and Sanitation Mission would be constituted to implement the project. However, both the TSC and Swajaldhara should be implemented by the same agency and the line departments have to play a catalytic role in the process.
The TSC would be implemented by the Panchayati Raj Institutions at all levels. They would facilitate social mobilization, help maintain the clean environment by way of safe disposal of wastes, act as the custodian of the assets such as the Community Sanitary Complexes (CSCs), environmental components, drainage etc. constructed under the TSC and can also open and operate the Production Centres/Rural Sanitary Marts. However, at the village level, representative Village Water and Sanitation Committees (VWSCs) would be formed, which would be responsible for day-to-day informed decisions regarding the planning and implementation of the project.
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
vi
~i Knowledge Links
Private Limited
'!'®till Slll!l!f~JIIJ®ilSIIItill!l
NGOs have to be actively involved in IEC (software) activities as well as in hardware activities. They can also open and operate Production Centres and Rural Sanitary Marts and may be engaged to conduct base line surveys and PRAs specifically to determine key behaviours and perceptions regarding sanitation, hygiene, water use, O&M, etc.
States would have more of an advisory role and ensure co-ordinating, monitoring and evaluation of progress and achievements of TSC. States can take up IEC and HRD activities for the whole state and engage required specialist consultants for which funds may be provided to the states by GOI on a 75:25 sharing pattern. These funds would be outside the TSC funds.
Proposals received from the districts, through the state channel, will be examined by the NSSC, which will be chaired by the Secretary, Drinking Water Supply Department. The Rajiv Gandhi National Drinking Water Mission will also have the mandate of arranging for periodic reviews of the states' performance with regard to TSC and evaluating and reviisiting TSC policies and guidelines accordingly.
1. 3 Current Reporting and Momloring Practices
Thn GOI has already put in place a reasonably supportive monitoring and evaluation system comprising the following:
);- Household Survey Questionnaire and Base-line Survey );- Project District Sanitation Data Base );- Monthly and cumulative annual progress reports - both physical and financial
to be submitted by each participating state to GOI. );- Regular field inspections by state and district officials );- Periodic Reviews by SWSM and RGNDWM );- Web-based online progress tracking system
Th1e existing M & E system being followed by GOI basically captures physical and financial progress of the project. In view of the process driven nature of the reform initiative of TSC, there is a felt need to develop an M & E design which could assess qualitative aspects such as generation of demand and creation of an enabling environment. These qualitative dimensions of the programme are expected to result in community's enhanced demand for household and community latrines, promotion of different types of technology for sanitation facilities suited to local needs and conditions, and their sustained maintenance and usage.
The TSC M&E module design, while building on the existing system already in use at RGNDWM, adds considerable value to the monitoring and evaluation exercise by making it an interactive exercise in continuous learning and action. The TSC module is to be plugged into the M&E system designed for the Swajaldhara program. The integrated delivery of these two programmes in some states will provide a suitable platform for the launching of this plug-in module.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
vii
r.~ Knowledge Links
~r: Total smerg::::ll!l ------------------------------ PriuataUmit!ill
1. 4 Conceptual Approach to Proposed TSC M&E system
Table 1.1 :Objectives of TSC and underlying assumptions
1' : ' .· ,·':' :: ': o.:f u· ., •• •
: .. ,.,'.:•'; , ... ., .. I' ',,•· ...... ·.·• u"dei'l~d~q~i~hjP;trc:l~,~,ofobjec~ivei.,.· ·. ·,.: r ••,·••.· .••• ,.,••'•.•·,. · .. <: .. ::·,· ~~~ •v.es :.,.·:. ;.':' ·' '···''•·
Bring about an improvement in the general quality of Improvement in the general quality of life in the rural life in the rural areas areas is critically dependent on sanitation facilities and
practices
Accelerate sanitation coverage in the rural areas Acceleration of sanitation coverage in the rural areas is the key to improved sanitation practices.
Generate felt demand for sanitation facilities through Awareness creation and health education lead to awareness creation and health education generation of felt demand for sanitation facilities.
Cover schools in rural areas with sanitation facilities Promotion of sanitary habits in school children has a and promote sanitary habits among students determining positive influence on sanitary habits of the
households and the wider community.
Encourage cost-effective and appropriate Cost -effective and appropriate technologies in technologies in sanitation sanitation offer incentives for adoption of sanitary
practices to a range of community segments having varied financial position and expenditure priorities.
Eliminate open defecation to ..
risk of Elimination of open defecation would eliminate the m1n1m1ze contamination of drinking water sources and food dispersal of faeces and thus result in minimising the
risk of contamination of drinking water sources and food.
Convert dry latrines to pour flush latrines, and Practice of dry latrines and manual scavenging is eliminate manual scavenging, wherever in existence unsanitary and carries a high risk of dispersal of in rural areas faeces, particularly during transit and at disposal
points. Besides, manual scavenging is not only degrading for people engaged in carrying it out but also highly risky for their health as well. Therefore, this practice leads to health hazards and needs to be stopped, wherever in existence. Converting dry latrines into pour flush latrines would automatically lead to elimination of manual scavenging.
Table1.2: Logical framework for developing indicators
Goal: Improvement in the general quality of life in the rural areas Purpose: Reduction in morbidity rate by reducing incidence of faecal-oral disease
transmission
s.:; No~
I. Generating demand & creating an enabling environment (GDEE)
Pre-planning & Planning
Start-up & IEC activities
• •
•
•
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
Conducting baseline survey
Preparation of a demandresponsive Project Implementation Plan (PIP)
Designing and carrying out IEC activities
Arranging for adequate and trained man-power and appropriate use of resources for facilitating/implementing project activities
viii
II. Promotion of Implementation Construction of • Helping users make an informed Appropriate and IHHLs, SSLs, choice by sharing all the Cost-effective CSCs, available technology options of Technology and AWLs/BWLs, IHHLs with them Alternative RSMs and PCs • Promotion of RSMs and PCs for Delivery alternate delivery Mechanisms (PACT) • Construction of IHHLs, CSCs
and SSLs, AWLs/BWLs in a consultative manner
• Expenditure and community contribution for sanitation assets
Ill. Functionality, Implementation Construction of • Ensuring availability of water for Access and SSLs, CSCs, use in sanitary latrines Privacy of AWLs/BWLs, • Ensuring access and privacy to Sanitation sanitation facilities for women Facilities {FAPS) and girls
• Ensuring equity and access to sanitation facilities for SC/ST
IV. Usage, O&M Training (included • Improving the cleanliness of the Maintenance and in administrative village environment by proper Sustainability of charges use and maintenance of Sanitary Assets component) environmental sanitation items created (UMS) • Ensuring availability of trained
technician
• Ensuring use of sanitary latrines on a sustained basis
1. 5 Overall Framework of Proposed M & E system of TSC
The TSC module takes into account both the quantitative and qualitative aspects of the programme. The quantitative window consists of a set of indicators which contains process-based indicators as well as the performance-based physical and financial progress indicators in the already existing M&E system being followed by the TSC.
The qualitative window consists of a system of periodic reviews (PR) and a community monitoring and evaluation (CM&E) system. The periodic reviews are proposed to be conducted by RGNDWM and SWSMs at the state and district levels respectively. These reviews are to be carried out by a team of multidisciplinary professionals. The CM&E is to be undertaken by the users themselves primarily for their own purposes at the community level, but it would also inform the project management through the mechanism of inland letters. The performance at various levels in these two sub-components would be given some numeric value, so as to be reflected in the PIC system.
The Performance Index Card (PIC), which will be generated by the computerized MIS system to be operationalized at all levels, is the integrating mechanism of the system. The PIC is designed to integrate and rate the quantitative and qualitative performance of all stakeholders and functionaries at various levels in a holistic and comprehensive manner. A set of benchmarks derived from both the quantitative and qualitative indicators, and the
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Executive Summary
ix
~i Knowledge Links
Private IJmited
Total Slllll!lf!lll !lonsultill!l PritmtoUmite!.l
procedure of analyzing project functioning against these, will also be utilized to measure performances and capture best practices in the sanitation sector for others to emulate.
Fig 1.2: The schematic presentation of proposed monitoring and evaluation system
I M&E SYSTEM - STRUCTURE I
RGNDWM
District State
so vwsc
Community '418
vwsc
District
State
RGNDWM
• PACT • FAPS
PIC • Scheme • District • State
1.6 Implications of a Plug-in Module with Swajaldhara
The integrated delivery of drinking water and sanitation services is fundamental to the functionality, usage and sustainability of assets created. Hence, it is important to have a single, integrated M&E system to be used by different implementing and facilitating agencies/bodies at the various project levels. It is in view of this that the TSC module is designed as a plug-in module to Swajaldhara M&E system.
Though to begin with, there would be states and districts where Swajaldhara and TSC would be implemented independently of each other. But at the same time, as per the current policy intent, both the programmes would have to be managed in an integrated manner over a period of time in all the states and districts. The TSC module is designed to cater to both these requirements. Moreover, the structure and management costs of administering this module would also be not much, as it is assumed that the infrastructure, hardware, personnel and other resources would be jointly shared by both Swajaldhara and TSC programmes.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
X
2. Quantitative Window
Knowledge Links
Private LUDited
'l'llt!lll SVIl!llf!lllllOIISIIItillll Pr!uaffiUmlltl!l
The quantitative aspects of the campaign i.e. physical and financial progress will be captured through a set of objectively verifiable indicators that include process (P), physical pro~Jress (PP) and financial progress (FP) indicators. The information to be fed into the computer based MIS, would be determined by these indicators only. This information would be obtained through progress formats, which would be filled up by facillitating/implementing agencies in the field. All data entry will be done at the district level and the district programme management team will be responsible for analysis and generation of reports.
2.1 Key Assumptions
• Swajaldhara was designed as a modular system to accommodate multiple thematic plug-ins which were envisaged as:
o Total Sanitation Campaign (TSC) o Hygiene and Health o Water Quality Monitoring o Water Conservation Measures
• TSC represents the first thematic module of the overall Swajaldhara M&E System and has to be similar in its structure and design to the main system.
2.2 Deviations from Swajaldhara M&E Design
Certain deviations have been necessitated due to inherent differences in the program structures of both TSC and Swajaldhara programs.
i. No baseline data is available either at village or at habitation level, for the country as a whole. However, provision would be made for entering the baseline data at the district level,' as and when available.
ii. In Swajaldhara the schemes are designed and formulated at the habitation /
level, whereas in TSC the entire village (covering all habitations of the village) is the unit for scheme formulation and design.
iii. There are two sources of funds at the district level - one from the State and the other directly from Gal.
iv. In Swajaldhara the expenses incurred during the month were being captured under the categories of hardware, software and administrative expenses, while in TSC, expenses against each of the items are being captured and subsequently reflected in various reports.
v. Suitable indicators at the village level have been devised so that the eligibility of an individual/village/scheme for Nirmal Gram Puraskar can be
determined.
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Executive Summary
xi
~i Knowledge Links
Private Limited
Total Sliii®W!Ili I::IIIISIIitill!l
vi. Data capture during the O&M phase has been limited to information on assets only and does not capture expenses.
2.3 Scoring Pattern
There are a total of 27 MIS indicators distributed over three levels of the project- village, district and state, on the basis of which· data would be collected. The maximum score of quantitative indicators at the village level is 500. At the district level, the maximum score against quantitative performance would be 500 out of which 50 marks would be based on district specific indicators, 50 marks as bonus for Nirmal Gram Puraskar and remaining 400 marks based on quantitative performance at the village level. At the state level, the maximum score against quantitative performance would be 500 out of which 100 marks would be based on state specific indicators and the remaining 400 marks would be based on quantitative performance at the village and district levels including bonus for Nirmal Gram Puraskar.
The quantitative scores obtained will then be combined with the qualitative scores which will be tabulated together to inform the Performance Index Card system by which each project village, district and state can be rated.
2.4 Supporting technology option
As the M & E system proposed for TSC is to be used in an integrated manner along with the Swajaldhara module, it would be utilizing the existing infrastructure. The computerised MIS of the system is web-based, in which both the application and the databases would be physically hosted on a server within RGNDWM. The entire data would be maintained within the centralized databases but the access to data by the respective states would be controlled.
2.5 Systems Requirements and Specifications (SRS)
Based on the ove~rall project design, a Systems Requirements and Specifications (SRS) document would be prepared. The core project database relates to other external datasets and users (through input and output formats). It would comprise of the following.
2 5 1 Database Structure
Data for the Computerized MIS can be classified as 'External Data' (available as Census and Habitation survey), 'Internal Data' (data related to system used, and support data for user lists), and 'Project Data' (data collected at Scheme, District, State and National levels). This data will then be processed to deliver the desired reports. The database design is characterized by two types of tables, namely (1) Master Table (one time entry) which would maintain the external and internal data, and (2) Transaction Table (providing for regular updates) to maintain all the project data set.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
xii
-
Administrative set
States
Districts
Blocks
Revenue ~
village
t External database Census 2001
2.5.2 Interfaces
Fig 2.1: Master and Transaction Tables
Master Tables -Project Set
(Database Operation)
User Data Data for user lists
Transaction tables
Project set (Sanitation module)
RGNDWM
SWSM
ZP/DWSC
Scheme
Process Financial Progress Physical Progress
t Input Formats -Onetime ·Monthly
Output Formats -Monthly progress - PIC & Benchmark details
- Feedback: reports
• Input formats- Data Entry Forms
Knowledge Links
Private Umited
Total Syn®f!lllll®llsl!ltin!l
Sector description
set
Habitation O&M Assets
t External database Habitation Survey
!'rl!latnllm!tell
-
Direct data entry in the computerized M & E System will be done through (1) Input forms for Internal Data to be manually entered through data entry screens and (2) Input forms
for Project Data set for data collected at Village/Scheme, Districts and State level is
through hard copy (paper) forms identified for each of these levels at defined frequencies (one-time or monthly), which will then be entered into the computerized MIS using data entry screens.
Design- M&E tillodule for Go! (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
X til
• Output formats - Report Forms
~i Knowledge Links
Private IJmited
Total Sllrlllr!Jll CllilSIIItill!l
It may be noted here that the computerised MIS will automatically generate the RGNDWM monthly progress report partly, Performance Index Cards, including Benchmark details, and community feedback reports. In addition, the user would also have the freedom to query the database directly for any specific information s/he may require during the course of project management.
3. Qualitative Window
The qualitative window has two components of state and district periodic review and the community monitoring system.
3.1 Periodic Review
Periodic reviews of the states and districts would be commissioned by RGNDWM and SWSM respectively, with the prime objective of assessing the quality of processes and outcomes. It is expected that a team of multidisciplinary professionals having a sound understanding of sanitation and hygiene issues would be fielded for undertaking these periodic reviews. In states and districts where the Swajaldhara and TSC projects are being managed jointly at state and district levels, the review teams would look at both programmes simultaneously. Therefore, the management structure and the costs involved for conducting the Periodic Reviews, will not be duplicated and the exercise would be cost effective. However, where the TSC is being managed independently of Swajaldhara, the costs will have to be booked under the administrative component of the project.
For review of districts within a state, it would be the responsibility of the concerned SWSM to form a multi-disciplinary team of professionals engaged in planning and management of Swajaldhara districts as members of the review team. The SWSM would ensure that all the project districts are reviewed at least once in a year. Similarly, review of participating states would be carried out by RGNDWM at least once in a year in every participating state. This again has to be carried out by a multi-disciplinary team of professionals, selected carefully for their outstanding experience and insight in the sector. The periodic review team will also suggest a set of actions, which require immediate attention at the project end. The scores achieved in the periodic review of districts by SWSM would be entered in the respective District PICs. Similarly, scores achieved in periodic reviews commissioned by RGNDWM for States would be entered in the respective State PICs.
3. 1. 1 Outcomes to be reviewed
Periodic review would be undertaken in the two broad categories, namely programme qualitative assessment and moving towards Nirmal Gram Puraskar. These would entail the following:
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
xiv
1. Programme qualitative assessment
• Knowledge Links
Private Limited
Total Slllll'lf!lll COI!SIIIliii!J
);;- Generating demand & Creation of an Enabling Environment; );;- Promotion of Appropriate and Cost-effective Technology and Alternative
Delivery Mechanisms; );;- Functionality, Access and Privacy of Sanitation Facilities; and );;- Usage, Maintenance and Sustainability of Sanitation Assets.
2. Moving towards Nirmal Gram Puraskar
);;- Coverage of sanitary latrines );;- Reduction in the practice of open defecation );;- Clean environment management
31.2 Review Activities and Methods for Periodic Review Teams at State, District and VIllage Levels
In order to determine the scores to be earned for each of the above contributing factors in each category, the Periodic Review teams conducting both the State and the District PRs will have to undertake various review activities like perusal of relevant documents, transect walks, observation, focused group discussions and individual interviews, community mapping exercises, visits to relevant institutions, checking data entries and so on.
3. 1. 3 Linkage with Performance Index Card and Benchmarks
The scores achieved in the state reviews organized by RGNDWM would be entered in the State PIC. Similarly, the scores achieved in the district reviews organized by SWSM would be entered in the district PIC.
As evident from the above description, the programme qualitative assessment is being carried out in the four benchmark categories. This is being done to capture the qualitative aspects of the related indicators, the quantitative information about which is already being obtained through the computerised MIS. The numerical value of each benchmark category would be worked out on the basis of actual percentage being achieved against ~~ach benchmark, as per the data available in the computerised MIS. The scores obtained loy states on the benchmark categories will be compared with the determined benchmark values. The final benchmark value will be ascertained by taking average percentage of values scored in respect of benchmark categories through computer based MIS and periodic review.
3.2 Community Monitoring & Evaluation (C-M&E) System
The purpose of C-M&E is to institutionalise the process of concurrent learning and action regarding TSC project planning and management at the community level. A participatory community monitoring system would empower the user communities by upgrading their organisational and management skills. This would also generate a wealth of data, which
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Samlation Campaign Executive Summary
XV
Knowledge Links
Private Limited
'l'otal SYiiiJW!!!II:liii!SIIitill!l
besides being used by the community for their own purposes, would also inform project management.
The C-M&E tools are essentially designed to promote interactive and experiential learning. They can also be used both by the literate and illiterate segments of the community equally effectively irrespective of their gender and class characteristics. However, the community capacity building and initial hand holding by the support agency and their community facilitators are of critical importance in this regard.
The community monitoring activities shall be undertaken during all the phases (planning, implementation, O&M) to ensure community control over all the key project processes and decisions. This would promote transparency in VWSC functioning and ensure greater user participation in scheme planning and management.
Community monitoring would involve collection of both qualitative and quantitative data and information. Special methods that stimulate group awareness, assessment and action would be utilized by communities for monitoring of activities and processes in the project.
The key steps that would be required for institutionalising community-monitoring system are:
1. Formation of a Community Monitoring Group and training them to undertake monitoring activities through use of tools for information collection.
2. Identification of key issues and concerns amongst communities through a process of consultation with VWSC and users.
3. Identification of indicators and dedication of the community monitoring group to a small set of monitoring activities.
A community monitoring group of 6-8 persons compnsmg representatives of VWSC, village maintenance worker (VMW), Anganwadi worker, an elderly lady, a school going girl child and representatives of disadvantaged sections etc. would be constituted for the purpose. This group would monitor issues of their concern and submit their assessment report to VWSC for action.
• Inland letters
Communities would be sending information to DWSC/ZP through printed inland letters on a bimonthly basis in planning and implementation phase and on a monthly basis in the
operation and maintenance phase. The inland letter would have mainly objective questions with yes/ no answers and would also have writing space for answers to few subjective questions. This would include information directly related to the issues of concern to the community and which DWSC/ZP would like to utilize for monitoring the performance in completed schemes.
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
xvi
~ Knowledge Links
Private Limited.
Total Sll!lllflllll:lO!lsultillll i>r!natallmltiltl
Th~e information coming on key issues would be assigned marks and would be fed into the computer for analysis and use .The information sent will be analyzed and directly used for pre~paring the PIC at the scheme level. DWSC/ZP would also analyze and send feedback/suggestions to communities based on the information received through inland letter system, in case there is a need for it.
• Feedback report
In order to foster transparency, and to provide the community with full access to the computerised MIS, some paper-based feedback reports in local language would be forwarded on a regular basis to the communities. They would thus exactly know what is recorded in the database about their scheme and may revert back to DWSC/ZP in case th1~y find any discrepancy.
4. Integration Mechanism
4.1 Performance Index Card (PIC)
The Performance Index Card (PIC) is the integrating mechanism of the system. The PIC would integrate the various components of the M&E system and act as the key mechanism for evaluating and comparing the performance across project schemes, across districts and across states.
Tine computerised MIS would generate three sets of PICs, one each for Village, District and State levels. Whereas the PICs would function as an instrument of self-assessment to b~~ used by the project village, districts and states for their own learning and improvement on a continuous basis, the use of state PIC by the GOI might include streamlining the release of funds to states by linking it to project performance.
The quantitative component of District PIC would have 80% village performance and 20% District performance. This latter 20% comprises of 10% marks based on the District MIS indicators and the remaining 10% in the form of a bonus for qualifying for the Nirmal Gram Puraskar. The qualitative component of the District PIC would comprise 20% of performance against C-M&E and 80% on performance against periodic review. The quantitative component of State PIC would comprise of 80% based on district and village performance and 20% on State performance. The qualitative aspect would comprise of 4% of performance against C-M&E and 16% against district periodic review and 80% of performance in the State periodic review.
• The structure of the PIC
The structure of the PIC would be identical for State and District and slightly adapted for schemes. The State and District PIC would have two components: MIS-based quantitative information and field-based qualitative information collected through periodic reviews. Qualitative information would basically be made available through periodic reviews commissioned by RGNDWM for State and by SWSM for Districts, and the corresponding score would be taken and entered in State and District PICs as appropriate. Scheme PIC
Design- M&E Module for Go! (RGNDWM} CRSP I Total Sanitation Campaign Executive Summary
xvii
Knowledge Links
Private Limited
l~»tal SltlillfW!l!l Clllllllllltlrl!l
would be based on quantitative information generated through computer based MIS and information received through community monitoring and evaluation in the form of inland letters.
The PIC would capture performance related to water supply, which is referred to as core performance and also potentially to other related dimensions such as sanitation, hygiene and health, water resources management and water quality monitoring.
PIC overview- dimensions (including both water supply and other related dimensions)
.. Component . . Core·Pei'forrrianC:e Extra initiatives . .. To.tar
.(Water sl.lpply · {Other related dimensions) .Marks .· .. dimef)Sion5 .· ... · · · .
Quantitative Indicators- Water Indicators- Thematic Modules Supply Sanitation Hygiene & Water Water
Computer- Health conservation quality based MIS measures monitoring
(Maximum Marks) (1000) _(500)
Sanitation Qualitative
Periodic (250) (250) (250) reviews and Community Monitoring System
(Maximum (500) (250) Marks)
Total Marks 1500 1500 3000
PIC with Water Supply and Sanitation Dimensions included
corn·ponellt ···•· ..••. ·. • ... . .. . ..... .. . .. .... .. . ··. . ... . tota.l
•• . . ...... . .. :· •·· Petformance Categol) · .... ·. ·.·· .. . .. ..
'0 ~ ' 0
Quantitative: Water Supply Sanitation Computer Based MIS Max Marks 1000 500 1500 Qualitative: Periodic Review Com M&E Max Marks 500 250 750
Total 1500 750 2250
Marking pattern of the sanitation performance at the village/scheme level
catet~qry .· .. ·•·. · ... · ..... · .. · ··•••··. ... •• ••• Marks .. fqr sar~itatiqn Perfqrinanee lndieatqrs . ... ·.·
Physical Progress 125 Financial Progress 125 Process 250 Total 500
Additionally, at the scheme level, the ratio of weightage for the process indicators related to O&M phase and those related to pre-planning - planning - implementation together has been taken as 40:60, in order to accord slightly higher weightage to community ownership and O&M of assets created.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
xviii
42 The periodic reviews
~ Knowledge Links
Private I.lmilod
Total S!lll!!V!Ill Cl!lllSilltiR!I
The score achieved in the reviews of districts by SWSM would be entered in the District
PIGs. Similarly, scores achieved in periodic reviews commissioned by RGNDWM for States would be entered in the respective State PICs. These scores would be entered in
respect of two broad categories of evaluation along with their sub-categories, which are as foil lows:
Categories of evaluation and scores
Category Sanitation Performance Field-based Periodic Review carried out by RGNDWM and SWSM as applicable in case of State and District respectively
1. ·· Programme gualitatiVe assessment • ••• ' : . ... · ':
.. · .· .. < .. ,. : · . 1.1 Generating demand & Creation of an enabling 25
environment (GDEE) 1..2 Promotion of Appropriate and Cost-effective Technology 25
and Alternative Delivery Mechanisms (PACTl 1.3 Functionality, Access and Privacy of Sanitation Facilities 25
(FAPS) 1.4 Usage, Maintenance and Sustainability of Sanitation 25
Assets (UMS) Sub Total 100 2:. Mc:Jvlng tc:Jwal"d$.Nirmal Gram Pur~~k•u :. .:· .. .. ·.: . .·
2.1 Coverage of sanitary latrines 30 2:.2 Reduction in the practice of open defecation 30 2.3 Clean environment management 40 Sub Total 100 Tot,alfor PE!rlodic ~eview . :
.. · .·· . ' ·.· · . . . '. 200
4.3 System of benchmarks
The system of benchmarking would also be used for making comparisons across states and districts as per a set of pre-defined benchmarks. Benchmarks basically comprise of a
set of indicators carrying numerical reference values against which the actual project measures would be compared to. System of benchmarks is being employed under the IM&E system as a tool in an overall strategy aimed at the effective implementation of best practice
Benchmarking is the process of identifying, sharing, and using best practices to improve processes .For simplicity benchmarking covers exercises comparing data (usually key performance indicators) or tracking performance over time. Whilst these provide
comparative measures, they do not in themselves result in the identification or exchange
of best practice. Benchmarking examines processes, compares the activities and seeks to
identify best practices that can be implemented, so effecting performance improvement.
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign EJrecutive Summary ·
xix
[II~ Knowledge Links
~ ~kllD~ + Total Slllli!lrgy!l®llltl!!tillg ------------------------- i'rilffltaumatmj
Benchmarks use ratios and percentages to give results -an overall picture that reflects attainment against the desired level/target. Benchmarks under .Swajaldhara will comprise mainly of numerical reference values so that it can be objectively measured.
Benchmarking will promote:
• The exchange of best practice in pursuit of general objectives. • Stakeholders to make informed decisions about initiating actions for
improvement. • Setting performance targets for ensuring sustainability of investments and
benefits. • Information to identify areas where there is an apparent performance gap.
Benchmark Categories:
• Generating demand & Creation of an Enabling Environment (GDEE); • Promotion of Appropriate and Cost-effective Technology and Alternative
Delivery Mechanisms (PACT); • Functionality, Access and Privacy of Sanitation Facilities (FAPS); and • Usage, Maintenance and Sustainability of Sanitation Assets (UMS).
Monitoring of benchmarks
Benchmarks would be monitored directly through the information flow against indicators being proposed for monitoring of activities. However the monitoring of benchmarks would also heavily thrive on the periodic review component and community monitoring system being proposed under the monitoring and evaluation system after exit from a village.
The information being fed in the computer, based on indicators, would generate status of attainment of benchmarks and a report for each state on actual attainment against desired level can be generated.
5. Management structure
5.1 Strategy for Management of Proposed M & E of Total Sanitation Campaign
Currently, in many states water supply and sanitation are being managed independently by separate organizations. However, it is envisaged that States would implement water supply and sanitation in an integrated manner and existing SWSM, DWSMs and VWSCs at the state, district and village levels would be responsible for both water supply and sanitation and all their various dimensions. The proposed M&E system of TSC would rely heavily on the proposed institutional arrangement i.e. DWSM and SWSM for managing the reform projects.
In line with the above scenario in which water supply and sanitation are being jointly managed by the same implementing/facilitating agencies/organizations at all levels, it is
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
XX
Knowledge Links
Private Limited
anticipated that there would be substantial savings in the management costs of the M&E system. The following costs should be common and shared by both projects:
~ Hardware and software costs at the state and districUsub-divisional levels ~ Costs of conducting the State and District Periodic Reviews as they can be
jointly conducted. Only if there are villages in which only TSC or only Swajaldhara are being implemented in isolation, costs would have to be booked separately under the respective programmes by concerned departmenUagency.
~ Training of trainers on MIS, periodic review and community monitoring can also be done jointly as the components and methods to be followed are very similar in nature.
~ The costs to be incurred on additional staff members also will be common as these staff members will be handling the M&E workload of both Swajaldhara and TSC.
5.2 Suggested Management Structure
The proposed M & E system comprises of three main components, namely a computerized MIS system which is quantitative in nature, a qualitative component which consists of a periodic review process and a community monitoring system. It is a bottomup system, which has specified formats, and reports in which data has to be either recorded manually or fed into a computerized system.
5.2.1 Village Level
At the village level, the VWSC itself will be trained and made responsible to fill the necessary data in the formats prescribed by the proposed M & E design during the !?Ianning and Implementation Phases. These formats will then be handed over to the concerned DWSC/ Core Group functionary at district level who is responsible for "facilitation and project management of that particular TSC village. During the O&M Phase, the VWSC will collect the relevant data using different methods and tools and fill it in the Inland Letter Format and send it by post bi-monthly to the DWSC. The training of VWSC and other responsible community members in M & E methods and procedures may be conducted by a suitable NGO or training institution appointed for the purpose. Initially, the trainers will also have to be trained in these methods by persons who are proficient in the administration of the proposed M&E module for TSC.
5.2.2 District level
According to the TSC guidelines the district is envisaged to be the focal point for the overall management of projects. Zilla Parishad/Panchayat (ZP) would be the agency responsible for overall project planning and management at the district level. In cases where there is no ZP, a DWSC will have to be specially constituted for the purpose.
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Executive Summary
xxi
Knowledge Links
Private IJmited
lota13lllllllr!l!l Coi!SIIItill!l
A core group of multi-disciplinary professionals would need to be set up at the district level. It is proposed that the members of this core group at the district level carry the required experience and skills in Communication, Human Resource Development, Monitoring and School Sanitation & Hygiene Education etc.
The management structure suggested presupposes the presence of a full-time project manager at the district level. Ideally it would be desirable to have a district project manager for the purpose. However, in case of member secretary, DWSC being the overall in-charge, which is generally an ex-officio position, it is recommended that suitable full time project management assistance is made available for day-to-day management of project activities. The same would be applicable where Zilla Parishad/Panchayat is managing the project at the district level.
The district project manager would need to be assisted by a core group of multidisciplinary professionals as indicated above. One of the team members must be a monitoring and evaluation specialist, who is designated as the M&E coordinator and is entrusted with the responsibility of day-to-day management of the designed M&E system. Other professionals in the core group should be given the responsibility of field coordinators. Each field coordinator would be allocated a number of villages/schemes and would be responsible for supervising the work being done on the ground in the project villages.
For the purposes of data entry, the M&E coordinator would be assisted by one or two data entry operators as per requirement. However, the actual number of data entry operators and field coordinators in the district team would vary as per the number of villages actually undertaken under TSC in a particular district.
The field coordinators (core group members) shall ensure timely collection of data from the VWSC as per the input formats designed and periodicity of collection agreed for the purpose and make it available to the M&E;: coordinator at the district level for its entry into the computerized system by data entry operators. It would be the responsibility of the M&E coordinator to make sure that all data entered in the system is cross-checked by at least one more person to avoid any errors of omission and commission.
5.23 State level
Within the TSC framework, the State Government should set up an appropriate institutional arrangement to monitor the projects and facilitate the districts in implementing TSC. However, in states where water supply & sanitation are handled by two different departments, separate institutional set up may also be made subject to the condition that officials handling water supply should be actively associated with this.
In view of the above, the states have been given a role in operationalising the designed M&E system both in terms of coordinating various functions related to the management of the computerised MIS at the state and district levels on the one hand and organising periodic review exercise in the TSC districts on a regular basis on the other.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Executive Summary
xxii
~.i Knowledge Links
Private Limited
Total Sl.II!OF!Illillli!S!.illiiil!
The purpose of the periodic review exercise would be to identify areas of weakness in implementation and suggest measures for mid-course corrections and desired improvements. A full time M&E coordinator would be required to carry out all the ne~cessary management functions in this regard at the state level. The M&E coordinator at th1:! state level would report to the member secretary SWSM.
5.2.4 National level
As per the proposed M&E system, RGNDWM at the Government of India level has the most crucial role in terms of an efficient and effective functioning of the system being de~signed. Some of the key functions of the system include web management related to IT -based MIS and parts of benchmarking, Performance Index Card (PIC) and the periodic review component of the system to be managed at the national level. Hence, a full time dedicated monitoring and evaluation coordinator has to be identified and placed at the RGNDWM level for managing the system.
The actual management of the web-based M&E MIS has to be done centrally at the RGNDWM level on a day-to-day basis. A panel of professionals would be prepared at the national level for the periodic review proposed to be carried out in each TSC state once in a year by RGNDWM. The professionals have to be selected on the basis of their experience and expertise in the sector. A list of professionals is reportedly already drawn at RGNDWM.
Operationalisation of this suggested management structure is dependent on appropriate and adequate capacity building, particularly training and technical assistance, to be carried out for desired skill up-gradation of the personnel involved at various levels.
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign £)(ecutive Summary
xxiii
1 Introduction
1.1 Context
Knowledge Links
Private Limited
'i'llllli IIJII!IIlW!lll Cllli!SIIItill!l
Sanitation is an essential precondition of improvement in the quality of life of people. Lack of awareness regarding critical linkages between sanitation, hygiene and health lie at the root of unsafe sanitary practices such as open defecation resulting in avoidable morbidity andl mortality, especially of children in India, on a large scale every year.
For many years, sanitation programmes have concentrated mainly on promoting the construction of sanitary latrines at the individual household level, but with very little impact on the quality of life of people. This is primarily because some sanitary latrines at the individual household level amidst the vast majority still defecating in the open brings no substantial difference in the prevailing state of affairs, as all the community members remain exposed to the killing fecal-oral route of disease transmission resulting in enormous amount of loss of human life and productivity. Hence, a community resolve to put an end to open defecation and create a fully sanitized village (no less than 100%) is of paramount importance.
The concept of sanitation is now not limited merely to the disposal of human excreta, but has widened to include fundamental changes in the hygiene and health seeking behaviour of people. This is about breaking the transmission route of fecal-oral transmission of diseases. In order to make this happen in an effective manner, one needs to have an approach of total sanitation that not only involves construction of individual and community sanitary latrines, but also the facilities for safe solid waste management and waste water disposal, drainage etc. But above all else, the most critical factor in sanitation is one of human behaviour, which is determined by a number of socio-economic and cultural factors that need to be effectively addressed in order to achieve the goal of total sanitation. A number of empirical studies have indicated that, the factors of self-respect, self-motivation, convenience and privacy have been of greater significance, as against the subsidy for household sanitary latrines.
In terms of strategy to address the issue of sanitation, the conventional one of providing subsidies to individual households for constructing sanitary latrines has not really worked in any significant sense. It is now being increasingly realized that sanitation is essentially a community issue and effective results can be achieved only with the help of active community involvement. There is also a need to send this message across to all the potential users of sanitation services, particularly the poor, that having sanitary latrines is easy and affordable. All one needs is to have the conviction and commitment to do so. This can be done by developing and presenting a range of region-specific technology options (from almost no-cost to low-cost to medium-cost to high-cost) to the people to
choose from and to innovate, if required.
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - Introduction
1
1.2 Total Sanitation Campaign • A Historical Perspective
The Goverment of India launched the Central Rural Sanitation Programme (CRSP) in 1986, to give an impetus to sanitation efforts of the State Rural Sanitation Programmes (SRSPs) being implemented by the State Governments. In order to enhance sanitation coverage even further, in 1993, the Government of India revised the guidelines of CRSP, providing higher budgetary allocations, thereby giving a boost to this sector. As a result of the heightened efforts taken during the 9th Plan Period, the coverage of total households amongst the States varied between 16-20%, which still left a lot of room for improvement (As per the Census 2001, rural sanitation coverage in india was 22%). In view of the widening connotation of sanitation, and in consonance with the spirit of the reform approach in the drinking water supply sector, based on the strategy outlined in Ninth Plan, the CRSP was restructured into a "demand-driven" and people-centered programme to be implemented in a campaign project mode and christened as the Total Sanitation Campaign (TSC).
This programme is being implemented in project mode in around 400 identified districts. The revised approach in the programme emphasizes more on Information, Education and Communication (IEC) activities to increase awareness with a focus on community-led and people-centred initiatives. It implies the institutionalization of a "community action planning" model in which the users actively assess, analyze and plan solutions to their own problems, leading to action and self-monitoring. It equally addresses the needs, preferences and behaviour of children, women and men and, while guarding against the danger of placing the burden of improved sanitation on women, it clearly fosters a gendersensitive approach. There is a special focus on school sanitation and a central theme is the continuous promotion of hygiene and sanitation. The people-centered approach of the TSC is aimed not only at promoting health and preventing disease, but intends to foster a sense of ownership of sanitation assets created within the community, which is paramount for sustainable development.
Reform Principles of the TSC
TSC makes major departures from the existing supply-driven approach through enabling the communities to demand sanitary facilities and make informed choices regarding formation of user committees, site selection, technology options, material procurement, construction supervision, sustained usage, operation and maintenance of the assets created. Some of the main reform principles made part of TSC are as below:
~ community-based approaches and processes, ~ creation of an enabling environment ~ promotion of usage of sanitary facilities ~ sustainability of assets created through ongoing operation and maintenance ~ change in personal, domestic and environmental health and hygiene
behaviour/practices
Design- M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
2
1.3 Campaign Objectives
The main thrust of the Total Sanitation campaign is shift from a high subsidy to a low subsidy regime, greater household involvement, choice of technology according to customer preferences, stress on software activities for capacity building, institutionalization of participative processes and development of back-up services. The main objectives of the TSC, as stated in the RGNDWM guidelines are to:
• Bring about an improvement in the general quality of life in the rural areas. • Accelerate sanitation coverage in rural areas. • Generate felt demand for samlation fact!ities through awareness creation and
health education. • Cover schools/Anganwadis in rural areas with samlation factltlies and promote
hygiene education and sanitary habits among students. • Encourage cost effective and appropriate technologies in Sanitation. • Eliminate open defecation to minimize risk of contamination of drinking water
sources and food • Convert dry latrines to pour flush latrines, and eliminate manual scavenging
practice, wherever in existence in rural areas.
1.4 Campaign Components
Towards achievement of the above-mentioned objectives, the various components and activities of TSC include the following:
a) Start-up Activities ( <5% of outlay subject to a ceiling of Rs. 20 lakh per district), which include conducting a baseline survey, preparation of project implementation plan, initial orientation and training of key project managers at the district level, publicity etc. It is expected that proposals will be developed based on the results of the survey. (100% Gol)
b) IEC Activities (>15% of outlay) for creating a demand for the toilets at the household, school, Anganwadi, Balwadi and community level. This will include wall paintings, hoardings, and audio-video clippings on Doordarshan, AIR etc. (80% Gol and 20% State)
c) Rural Sanitation Marts and Production Centers (>,5% of outlay subject to a maximum of Rs. 35 Lakh/district) to provide materials and guidance needed for constructing different kinds of latrines and other sanitary facilities, which are technologically and financially suitable to the rural areas. (80% Gol, 20% State)
I
d) Construction of Individual Household Latrines :(IHHLs) (<60% of outlay) which includes a basic low cost unit without the super structure. The subsidy is only for the BPL families. There is no provision of subsidy for APL families. The major portion of
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Samlation Campaign 3 Chapter 1 - Introduction · 1
'
TSC funds is earmarked for this component only. (60% Gol, 20% State, 20% Beneficiary)
e) Community Sanitary Complexes (included in <60% of outlay of IHHLs) which are to be constructed with adequate consultation of the community members and can be managed by the Panchayat and/or SHGs. (60% Gol, 20% State, 20% Beneficiary)
f) School Sanitation and Hygiene Education (>1 0% of outlay) Under TSC all levels of Government schools would be covered and special emphasis will be on toilets for girls in schools. Separate toilets will be constructed for girls. (60% Gol, 30% State, 10% Beneficiary)
g) Administrative charges(< 5% of outlay subject to a ceiling of Rs. 40 lakh per district) includes money spent on training, salary of temporary staff deployed during project peripd, support services, fuel charges, vehicle hire charges, stationery and M&E. (80% Go I and 20% state)
1.5 Campaign Organization Structure and Role of Different Organizations/ Institutions
The Zila Parishad (ZP) is the main implementing Agency at District level assisted by the District Water and Sanitation Committee (DWSC) and the District Water and Sanitation Mission (DWSM) which are multi-sectoral bodies composed of different officials/ individuals closely linked with the ongoing sanitation efforts. The district proposals are scrutinized by the State Government and sent to GOI for approval by the National Scheme Sanctioning Committee (NSSC). The role of different organizations and institutions - both governmental and non-governmental - at community, district, state and national levels is briefly outlined below:
1.5.1 Community-based Organizations and PRis: At the village level, representative user committees i.e. Village Water and Sanitation Committees (VWSCs) shall be formed, which would be responsible for day-to-day informed decisions regarding the planning and implementation of the project. The PRis have a mandated role in TSC, because, as per the 73rd Amendment Act, 1992, of the Constitution, sanitation is included in the 11th
Schedule. They have a clear role to play in the mobilization of the community in order that they are informed and aware enough to demand for sanitation facilities, whether they are individual or community items. Their other responsibilities include the proper and safe disposal of liquid and solid waste thereby maintaining a clean environment, which actually acts as a 'barrier to disease', custody and maintenance of community items like community sanitary complexes and drainage and augmentation of resources towards the construction of school sanitation facilities. If the community expresses the need for a Rural Sanitary Mart (RSM) or a Production Centre (PC), the Gram Panchayat can also construct, operate and maintain these assets.
Design- M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
4
Knowledge Links
Private J.Jmited
'!'®tal Sll!'lilr!Jll Consulting
1.5.2 CBOs: Community based organizations like self-help groups, Mahila Mandals, Yuvak Mandals, PTAs, MTAs etc., if so empowered and capable, may also take on some of these above responsibilities. These initiatives form an integral part of rendering this project into a community-led and people-centred one, leading to increased demand, change in behaviour and practices in the community, resulting in usage and sustainability of the assets created.
1.5.3 NGOs: The role of NGOs envisaged is mainly for creating change in the knowledge, attitude and practices of the community members. For this to happen, NGOs are supposed to undertake information sharing and awareness creation coupled with intense, preferably 'hands-on' capacity-building efforts. They may however, also participate in TSC activities by establishing RSMs and PCs, depending on the community's need and their capacity to take on such tasks.
1.5.4 Zila Panchayat, DWSC, DWSM: At the District level, the Zila Panchayat will have a cardinal role as the Implementing Agency. After it has managed the IEC campaign and facilitated the creation of an enabling environment at all levels, it will be responsible for scrutinizing village proposals and consolidating these into a comprehensive district proposal for submission to the central and State Governments. Subsequent to the sanction of proposals, it will facilitate the day-to-day implementation of the project, institutionalize and functionalize the monitoring and evaluation system and will also be the recruiting body for NGOs and any other consultants/organizations whenever required by the project. The District Water and Sanitation Mission and Committee will both be complementary arms of the ZP and they will ensure that there is co-ordination and synergy between all the concerned line departments towards the integrated delivery of water supply and sanitation in the district, resulting in reduction in water-borne diseases, thereby guaranteeing a better quality of life for the communities involved.
'1.5.5 State Water and Sanitation Mission (SWSM): The State will have more of an advisory role and ensure co-ordinating, monitoring and evaluation of progress and achievements of TSC. The SWSM will also scrutinize all district proposals submitted by the districts, make timely budgetary allocation to the districts subsequent to sanction, eonduct periodic reviews of district level personnel and achievements, evaluate the district's performance as a whole and be responsible for the state-wide performance under this project.
1.5.6 National Scheme Sanctioning Committee (NSSC), Dept. of Drinking Water Supply, Ministry of Rural Development, GOI: Proposals received from the districts, through the StaJe channel, will be examined by the NSSC, which will be chaired by the Secretary, Department of Drinking Water Supply, Ministry of Rural Development. The Rajiv Gandhi National Drinking Water Mission will also have the mandate of arranging for periodic reviews of the States' performance with regard to TSC and evaluating and revisiting TSC policies and guidelines accordingly.
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - Introduction
5
Fig. 1.1: Organizational Structure of TSC
National Scheme Sanctioning Committee (NSSC), GOI (Dept. of Drinking Water Supply, MORD)
1j I State Water and Sanitation Mission I
D I Zilla Panchayat I District Water and Sanitation Mission I
1t Village Water and Sanitation Committee/PRI j
1.6 Conceptual Approach to the M&E of Rural Sanitation
1.6.1 Current Reporting and Monitoring Practices
The GOI has already put in place a reasonably supportive progress monitoring system comprising the following:
~ Monthly and cumulative annual progress reports - both physical and financial (Annexure) to be submitted by each participating state to GOI.
~ Project Implementation Plan (PIP) to define the MIS process and type of indicators.
~ Template for Periodic review. ~ Household Survey Questionnaire. ~ Project District Sanitation Data Base.
A provision for regular field inspections by state and district officials has been made to supervise the following:
• Construction work has been done as per norms,
• Community involvement in the construction,
• Latrines are not polluting the water sources,
• Proper selection of beneficiaries,
• Proper use of the constructed facilities,
• Display of TSC information in the Gram Panchayat.
Another M&E tool of the existing system is the system of periodic evaluation studies to be conducted by the states/UTs. A list of categories have also been drawn up for reporting on TSC Projects under the four heads, namely, enabling environment, project implementation, use and impact of latrines and specific comments.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 ~Introduction
6
Knowledge Links
Private Limited
iotai Sliii®WIIll Cilll!iiiltillll
Besides this, GOI may organize implementation review (Periodic Review System) twice a year for a group of TSC projects in a state through a multi-agency team. In the districts and villages visited, these teams are tasked to assess the following aspects:
• Methodology of project implementation and implementation status and quality,
• Start-up Activities -the Baseline Survey and preparation of the PIP,
• Institutional Arrangements,
• Role of NGOs and PRis,
• IEC Plan, activities and impact in terms of awareness of the project and willingness to participate and share the cost,
• Capacity Building Plan, Activities and Implementation,
• Appropriateness, soundness and cost of technology options in Sanitation and community participation in its selection,
• Hygiene Education,
• Community Participation in Construction quality and 0 & M arrangements for both individual and community sanitary facilities,
• Financial Management,
• State Level Operations.
There is also a web-based online progress tracking system instituted by GOI. But it does not capture the qualitative and the process-based reform aspects of TSC.
The existing M & E system has been thoroughly reviewed and most of the elements have been incorporated into the proposed M & E module for TSC. It has been ensured that many of the existing tools would feed into the proposed M & E system with suitable amendments, so that there is a comprehensive coverage of all the components and processes involved. There will also be an integration of all M&E procedures in order to have a holistic evaluation of the entire project.
1.6.2 Log-frame of the proposed M&E Design of TSC
Though the existing M & E system being followed by GOI is fairly thorough in capturing physical and financial progress indicators of the project, it misses out on the qualitative dimensions of TSC programme planning and implementation on the ground. In view of the TSC being a process-based reform initiative, there is a felt need to develop an M & E design which incorporates qualitative aspects like generation of demand and creation of an enabling environment resulting in the community's enhanced demand for household and community latrines, promotion of different types of technology for sanitation facilities suited to local needs and conditions, and their sustained maintenance and usage. Moreover, the current M & E system does not take into account the views and perceptions of the community, nor the efficacy of the processes followed by them. Such an omission
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
1
(II~ Knowledge Links
~ Private Limited + illtlll Sll!l®f!llli:IJIISIIItil!!l l'r!WU:r:Uml!flll
can only prove detrimental to the spirit of the reform process inherent in this project. Therefore, the proposed M & E system, is only a reorganization of the elements of the existing TSC monitoring system, while incorporating certain aspects, which make this programme different from it's predecessors.
The M&E system designed for the Swajaldhara program has the provision of plugging in thematic modules into the system as per requirement. The sanitation module (Total Sanitation Campaign) is the first in the series, which is being developed currently and is proposed to be plugged in into the Swajaldhara M&E system already developed and commissioned in the RGNDWM and in two states of UP and TN. The integrated dellivery of these two programmes in some states will provide a suitable platform for the launching of this plug-in module.
Developing appropriate indicators is the key to effectiveness of an M&E system. The indicators have been developed on the basis of a logical framework, which is based on the overall reform goal of the TSC programme and its underlying assumptions, as articulated on the basis of main objectives of the TSC. The logical framework takes into account the objectives, strategy and various components of the program as spelt out in the TSC guidelines.
The strategy as spelt out in the TSC guidelines is to make the programme "community led" and "people centred" and the approach is "demand driven" with increased stress on awareness creation and demand generation from the people for sanitary facilities in houses, schools and for cleaner environment.
The underlying principles of TSC have been worked out on the basis of the objectives of the Total Sanitation Campaign (TSC). The critical functions flow from the reform principles inherent in the programme framework. These critical functions related to each of the principles form the basis of developing objectively verifiable indicators.
The predominant principle underlying the entire TSC program design is one of creation of sanitation facilities in response to the felt demand for the same. The chosen strategy to realize this principle into practice is to create awareness through appropriate IEC activities with a focus on hygiene and health education. In view of the above, the logical framework is presented in the following two tables. Table 1.1 presents the objectives of the program as contained in the TSC guidelines and the under~ying
assumptions of the objectives as worked out on that basis. Table 1.2 presents the goal and purpose of the TSC program, spells out the principles, critical functions in terms of various program components. However, a column titled "phase" has been included to articulate the principles and functions in terms of phase (though the program design is in terms of components and not in terms of phases) as well, so as to ensure its compatibility with the Swajaldhara M&E system design. On the basis of these principles, critical functions and the components involved, the indicators, their type i.e. measuring process, physical progress or financial progress, means of their verification in the proposed M & E
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 -Introduction
8
[II~ Knowledge Links
~ Private Limited + 'l'®l!!l IIJIII®WIIll COIISI.Iitillll PrruataUmltm~
system and periodicity of information collection, have been provided in the logical framework enclosed in Annexure I A.
Table 1.1: Objectives of TSC and underlying assumptions
. Obj~ctive$ Underlying Assumptions of objectives Bring about an improvement in the general Improvement in the general quality of life in quality of life in the rural areas the rural areas is critically dependent on
sanitation facilities and practices Accelerate sanitation coverage in the rural Acceleration of sanitation coverage in the areas rural areas is the key to improved sanitation
practices. GEmerate felt demand for sanitation Awareness creation and health education facilities through awareness creation and lead to generation of felt demand for he~alth education sanitation facilities. Cover schools in rural areas with sanitation Promotion of sanitary habits in school facilities and promote sanitary habits children has a determining positive influence among students on sanitary habits of the households and the
wider community. Encourage cost-effective and appropriate Cost-effective and appropriate technologies technologies in sanitation in sanitation offer incentives for adoption of
sanitary practices to a range of community segments having varied financial position and expenditure priorities.
Eliminate open defecation to minimize risk Elimination of open defecation would of contamination of drinking water sources eliminate the dispersal of fecal material and and food related micro-organisms and thus result in
minimising the risk of contamination of drinking water sources and food.
Convert dry latrines to pour flush latrines, Practice of dry latrines and manual and eliminate manual scavenging, scavenging is unsanitary and carries a high wherever in existence in rural areas risk of dispersal of faeces, particularly
during transit and at disposal points. Besides, manual scavenging is not only degrading for people engaged in carrying it out but also highly risky for their health as well. Therefore, this practice leads to health hazards and needs to be stopped, wherever in existence. Converting dry latrines into pour flush latrines would automatically lead to elimination of manual scavenging.
One of the major considerations in developing the indicators has been to ensure their compatibility with the Swajaldhara M&E system mainly in terms of the data base design, as the TSC module would have to be plugged in into the Swajaldhara M&E system already designed and commissioned in UP and Tamil Nadu to begin with.
The number of indicators have been deliberately kept limited to ensure collection of only
that information, which is easy to get and reliable and is more likely to be used by the intended users. The limited number of indicators would also help avoid unnecessary
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - Introduction
9
Knowledge Links
Private Limited
Total Swsrgy C!nmsultiwg Prl\ll!Wll!lllled
complexity in the design of computer based MIS: The indicators and their logical framework is as follows:
Table1.2: Logical framework for developing indicators
Goal: Improvement in the general quality of life in the rural areas
Purpose: Reduction in morbidity rate by reducing incidence of fecal-oral d~sease transmission
s. >>:
PrinQIJ)Ie$ >' >> > , c
C~mp~nent >Critical functi9ns >
Phase rNo. I >':> '>
I ' >>>>>> >>. : > >> >>:
>: :>>>> >>>>:'
I. Generating Pre-planning & Start-up & IEC • Conducting baseline surv,ey
demand & Planning activities • Preparation of a demand-creating an responsive Project enabli{'lg Implementation Plan (PIP) environment • Designing and carrying out IEC (GDEE) activities
• Arranging for adequate and trained man-power and appropriate use of resources for facilitating/implementing project activities
II. Promotion of Implementation Construction of • Helping users make an inlformed Appropriate and IHHLs, SSLs, choice by sharing all the Cost-effective CSCs, available technology options of Technology and AWLs/BWLs, IHHLs with them Alternative RSMs and PCs • Promotion of RSMs and PCs for Delivery alternate delivery Mechanisms (PACT) • Construction of IHHLs, CSCs
and SSLs, AWLs/BWLs in a consultative manner
• Expenditure and community contribution for sanitation assets
Ill. Functionality, Implementation Construction of • Ensuring availability of water for Access and SSLs, CSCs, use in sanitary latrines Privacy of AWLs/BWLs, • Ensuring access and privacy to Sanitation sanitation facilities for women Facilities (FAPS) and girls
• Ensuring equity and access to sanitation facilities for SC/ST
IV. Usage, O&M Training (included • Improving the cleanliness of the Maintenance and in administrative village environment by proper Sustainability of charges use and maintenance of Sanitary Assets component) environmental sanitation items created (UMS) • Ensuring availability of trained
technician
• Ensuring use of sanitary latrines on a sustained basis
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - Introduction
10
1.6.3 Key Elements and Assumptions of M&E Design
Knowledge Links
Priva .. m lOt!! I SJ1116W!I!I COi!Silitill!l
The proposed M & E design will be driven by and encompass the following elements and
assumptions:
• The states and districts implementing TSC would have the willingness to adopt the
system as an instrument of strategic learning and action especially to use it to make
mid-course corrections whenever necessary. The emergence of recorded benefits early on would also help reinforce ownership, and early warning of emerging
problems would allow for timely action to be taken before costs rise.
• The states and districts would have the technological and infrastructural capability to run a web-based M & E system. Initially, the module would be launched in states
and districts where the Swajaldhara M & E module is being used already, as they would be having the necessary hardware and software to run the module.
• The M&E system could also be effectively used to capture the best practices in the
sector in terms of the community based processes and their functioning in realizing
the goal of total sanitation at the village level.
• In line with the current policy intent of integrating the delivery of water and sanitation
services, the TSC M&E system has been conceived in the context of existing
Swajaldhara M&E system of which it would form an integral part as one of its plug-in
modules Hence, to avoid repetition and overlap, indicators related to the constitution and training of VWSC, integrated service delivery etc. have not been included in this
module, as they are already being covered by the Swajaldhara M & E system.
• "Nirmal Gram Puraskar" (NGP), announced by the Government of India under TSC, is basically an incentive scheme, aimed at promoting fully sanitized
GPs/Biocks/Districts. The four conditions to be met by GPs/Biocks/Districts in order to be eligible for NGP are (a) 100%sanitation coverage of individual households (b)
100% school sanitation coverage (c) free from open defecation, dry latrines and manual scavenging (d) clean environment maintenance. The proposed M&E design incorporates monitoring of this reward system in both the qualitative and quantitative
components of it's design.
• Stakeholder participation in the M&E process through community monitoring,
promotes their ownership of data which ensures that information generated from them will have relevance to the continued maintenance, usage and sustainability of
their sanitary assets - both individual and collective - and that their knowledge,
attitude and practices regarding personal, domestic and environmental hygiene also
change along with the installation of sanitary assets.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
11
1.6.4 Implications and Challenges
~i Knowledge Links
Private Limited
Totml S!mllf!Jll Cilil!!llitiii!J
The implications of the use of the TSC M&E module are envisaged to be far-reaching and wide. As a plug-in module of the Swajaldhara M&E system, it would inherently work towards integrated monitoring of reform oriented community based water and sanitation projects. This would help understand the processes involved in the integrated planning and management of water and sanitation services at the community level, which could in turn inform macro policy perspectives and micro operational strategies for sector wide reform initiatives in the sector.
Another practical implication of the system is in terms of cost effectiveness. The institutional arrangements for project planning and management of Swajaldhara and TSC could be kept the same to ensure a more integrated and effective delivery of services, which would also be cost effective. Moreover, the periodic review exercises could be undertaken simultaneously to optimize on learning, which would also automatically save costs.
The greatest challenge of the M&E system (both Swajaldhara and TSC) is to create an institutional culture and climate of adopting monitoring and evaluation as a critical programme activity in learning and action, aimed at realizing the reform goals both in water and sanitation. As a result, the system design is flexible and open and allows for a broad based two way communication between project managers and user communities, instead of having a closed, one way, linear communication channel.
Ownership of a system and the data it generates are major factors that affect the efficacy of an M&E system and in this aspect, all project partners and functionaries at community, district and state level need to feel that they have an essential role to play in the collection and analysis of information. There has to be an inbuilt incentive to do better. The proposed M&E design addresses this through the mechanism of Performance Index Card (PIC), which allots scores to different indicators and integrates the whole system in a manner that generates an overall rating for each village, district and state. This PIC score forms the basis on which they will be graded and even if they do not make it to the top of the heap, they will constantly try to improve their own score. This will give them the necessary stimulus to adhere to the M&E system and develop a sense of ownership of the same.
1.6.5 Overall frame'f"!ork of Proposed M&E system of TSC
In view of the above considerations, the proposed M & E system for TSC takes into account both the quantitative and the qualitative aspects of the programme with the help of two windows of the same name. The quantitative window is based on objectively verifiable indicators, which relate to process and physical and financial progress. These indicators also take into account the current information requirements of the programme managers at the national, state and district levels in the form of Monthly Progress Reports, which would be generated by the related web-based computerized MIS system.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
12
Knowledge Links
Private Limited
Tlltl!l Sllilllr!lll l::ll!1SIIItiil!l
The qualitative window has two systems of periodic review and community monitoring. A system of periodic reviews (PR) proposed at the state, district and comml,lnity levels by a team composed of multidisciplinary professionals, officers and experts in the field will be an essential part of the qualitative component of the proposed M&E system. The concurrent M&E system of the TSC already follows a periodic review system and the proposed system has taken into account the indicators developed for the same. The indicators developed under the periodic review have been derived from the guiding priinciples and objectives of the programme and have been assigned scores so that they ane quantified, in order to be reflected in the PIC system.
Another distinct component in the form of Community Monitoring & Evaluation (C-M&E) system has been proposed to capture the qualitative aspects. The community will be providedwith tools and techniques and trained in their use so that they can monitor critical issues of importance on their own even after the project implementation is over. The CIVI&E will also inform the project management through a system of inland letters on critical issues. A mechanism of providing regular feedback to the community is there in the system in the form of sending feedback letters to the community.
The two features of the system namely performance index card (PIC) and benchmarking feed on both the quantitative and qualitative windows of the system. The computerized MIS would also generate Performance Index Cards at village, district and state levels, which would help compare performance across all these levels. This would also work as a mechanism for self-assessment by project villages, districts and states. The system of benchmarking, which is a feature both of the quantitative and qualitative windows, would help compare performance across project states on the basis of some benchmarks.
The details of the PIC system and benchmarks are available in the chapter on "Integration Mechanism".
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - Introduction
13
Knowledge Lonks
Private Limited
Total S!mllllr!Jlli:IIIISillting
Fig 1.2: The schematic presentation of proposed monitoring and evaluation system
•PACT • FAPS
~
M&E SYSTEM - STRUCTURE
District State
so
vwsc
District
State
RGNDWM
PIC • Scheme • District • State
1. 7 Issues related to plugging in (TSC module in Swajaldhara M&E)
There are states/ districts where TSC is being implemented independent of Swajaldhara and is being facilitated by a different line department from the one looking after drinking water supply. In these locations, this module will have to be administered in an independent manner and the PIC also will reflect only the performance of the Sanitation component.
The integrated delivery of drinking water and sanitation is fundamental to the functionality, usage and sustainability of assets created and the concomitant change in health and hygiene behaviour and practices of the people using them. As such, it will not be prudent to have separate delivery of both, by different implementing and facili~ating
agencies/bodies at the various project levels. In the Swajaldhara M & E module, there are certain indicators, especially in the qualitative part, which pertain to the vibrancy and efficacy of these agencies/bodies in the implementation and facilitation of TSC activities and integrated delivery, to which there are scores assigned and these scores are inpluded in the overall PIC score. Since the score obtained in the sanitation module is ultimately
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 1 - Introduction
14
• Knowledge Links
Private Limited
'l'lltlli SllllllWI!II l::iilil&llltill!l
being plugged into the overall score-card for water and sanitation, it was felt that there was no point in duplicating their measurement in this system also. However, this will mean that if there is no integrated delivery, then these factors will not be evaluated at all. This
will not be totally reflective of the project's performance. Nevertheless, at present, there is no move to include these indicators for the areas where there is no integrated delivery,
simply because the best scenario is integrated delivery and a PIC which does not
measure these integrated service delivery indicators will show a poorer overall score. This
will impress upon the concerned authorities the urgency of integrating the delivery of
services if they are really serious about the sustainability of the project.
Secondly, the structure and management costs of administering this module are also not separately catered for, as it is assumed that the infrastructure, hardware, personnel and
other resources used for/by it, will be the same as those being employed for the administration of the Swajaldhara M & E system. Therefore, while the indicators of this
Sanitation module are different, in keeping with it's principles, objectives, guidelines and
components, it will be to a very large extent, based on the Swajaldhara pattern of M & E,
because both the projects have the underlying fundamental principles of being reform initiatives which are 'people-centered' and 'community-led'.
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 1 - lntra,duction
15
r.~ Knowledge Links
JE'rivate Limited
Total S!lnllflllllilllllitililtinlll
of cost-effective and appropriate technological options to the community and demonstrating their affordability to them, will be crucial to their wholehearted adoption of this programme.
• Establishment of RSMs/PCs is expected to increase availability of material, services and guidance needed for construction of sanitary assets. This would result in increasing sanitation coverage.
• The success of a programme is measured by it's ability to cover all sections of society, especially the disadvantaged groups like women, children, SC/ST, BPL,
disabled, senior citizens etc. Privacy and accessibility for certain groups like the girls, women and the old are necessary if usage is to be promoted and the facilities are to be rendered sustainable. The project guidelines clearly state that separate sanitation facilities should be provided for boys and girls in schools. There have to be well coordinated and planned efforts at all levels in order to make the use of sanitation facilities in schools a universal and regular practice.
• In order to ensure sustainable health and hygiene benefits, it is essential that the targeted sanitary latrines (both individual and community) are not only completed but are also used on a daily basis.
• In a project in which further installments are to be released only when a certain amount of the previous installment has been expended, the percentage of expenditure has to be monitored regularly, in order to know when the project qualifies for the next installment. Appropriate and planned expenditure of funds received will be reflected in the timely achievement of project objectives.
• Integration of water and sanitation is essential to the sustainability of the project and for the impact of health and hygiene to be really felt. Sanitary facilities which do not have water easily available will not be used regularly.
• Regular repair and maintenance of both individual and community sanitation facilities is necessary for their continued usage and sustainability. Local technicians would be preferred for this as they would be easily accessible.
• Coverage of the target households and population as planned is crucial for the enhancement of sanitation coverage as stated in the project objectives.
• Selection of capable and suitable Government and non-government bodies for carrying selected project tasks will ensure the stakeholders are mobilized and informed in a manner that will equip them to plan, implement and operate their project in a collective manner.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 2- Quantitative Window
18
[.I~ Knowledge Links -.... ________________________ ,·;*~ lotaiSmcr!i;;;;:!i
PrlmlteUI'!lU!lti
• One of the major incentives at all levels in the TSC project is the Nirmal Gram Puraskar (NGP) which is awarded on the fulfillment of certain rather stringent conditions one of which is the declaration of the project area 'open defecation free'. Keeping the village environment clean is one of the eligibility conditions of the NGP. The only way to achieve this is to see that the village drains and lanes are clean, there is no stagnant pool of water around water points and proper disposal of garbage and cow-dung is done.
2.3 Key assumptions
• Swajaldhara was designed as a modular system so that it can accommodate multiple thematic plug-ins subsequently. It is understood that these plug-ins would be based on the same overall structure proposed for Swajaldhara but would vary in terms of indicators and related basic data. Based upon the core Swajaldhara module, the other thematic modules envisaged are:
o Total Sanitation Campaign (TSC)
o Hygiene and Health
o Water Quality Monitoring
o Water Conservation Measures
• TSC represents the first thematic module of the overall M&E system and builds upon the foundation provided by the Swajaldhara M&E system design. In view of this approach, the overall structure of TSC is the same as Swajaldhara. This means that not only are the components of TSC the same as Swajaldhara, but that the flow of data and organization of information in the computer based MIS also follows a similar pattern as the Swajaldhara core module.
2.4 Deviations from Swajaldhara MIS
Although the basic design remains the same as Swajaldhara, certain deviations have been necessitated due to inherent differences in the program structures of both the programs.
i. No baseline data is available either at village or at habitation level, for the country as a whole. However, since the TSC M&E module design is based upon the Swajaldhara M&E design, provision would be made for entering the baseline data at the district level, as and when available. This would be done based upon the format given in Format HAB-16 of Annex 1-C.
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 2- Quantitative Window
19
Knowledge Links
Private Limited
Totllll Sll!l®f!.IY Commltil'l!.l l'rnmta!Jmlte!l
ii. In Swajaldhara the schemes are generally designed and formulated at the habitation level, whereas in TSC the entire villa~e (covering all habitations of the village) is the unit for scheme formulation and design.
iii. There are two sources of funds at the district level - one from the State and the other directly from Go I.
iv. In Swajaldhara the expenses incurred during the month were being captured under the categories of hardware, software and administrative expenses, while in TSC, expenses against each of the items i.e. IHHLs, CSCs, SSLs/ AWLs - BWLs, Start-up, IEC and Administration, are being captured and subsequently reflected in various reports. This is as per the requirements reflected in the guidelines.
v. One of the key components of TSC is its emphasis towards 'Nirmal Gram Puraskar' as a motivator for better implementation. Keeping this in view suitable indicators at the village level have been devised so that the eligibility of an individual village/scheme for Nirmal Gram Puraskar can be determined. At the district level, information is captured through input formats regarding qualification of villages (GPs), blocks, individuals, and NGOs as well as qualification of the entire district for Nirmal Gram Puraskar.
vi. Since there is no formal mechanism for collection of community funds during the O&M phase, data capture during this phase has been limited to information on assets only.
2.5 Scoring Pattern
There are a total of 27 MIS indicators distributed over three levels of the project - Village, District and State (See Annexure 1.8), on the basis of which data will be collected. In the MIS indicator tables it has been indicated as to how the data would be represented i.e. Yes (Y)/ No (N), date or percentage(%). The type of indicator is mentioned i.e. process (Pr), physical progress (PP) and financial progress (FP). The means of verification is reflected in the type of input format given against each indicator in the table and the periodicity of collection can be inferred from the type of Input Form to be used to record the information. The phase during which the information should be gathered i.e. Pre-planning (PP), Planning (P), Implementation (I) or Operation & Maintenance (O&M) is referred to. In the last column the maximum marks that may be scored with regard to each field /indicator is shown.
The maximum score of the village level indicators is 250 for process (Pr) indicators, 125 for financial progress (FP) indicators and 125 for physical progress (PP) indicators, making it a total of 500 for quantitative indicators at this level. The phase-wise break-up of marks is such that the scores for all the process indicators pertaining to the Pre-Planning, Planning and Implementation Phases total up to 150 and the scores for the O&M Phase indicators total up
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 2- Quantitative Window
20
~ Knowledge Links
Private Limited
iota! Sl!iMJ:F!Ill Cllll!!llltirl!l
to 100. At the district and state levels, the maximum quantitative score is 500 each. The quantitative scores obtained will then be combined with the qualitative scores which will then be tabulated together to inform the Performance Index Card system by which each project village, district and state can be rated. The combined score-sheet can be viewed in table in the Chapter 4- "Integration Mechanism".
2.6 Supporting technology option
The~ M & E system proposed for TSC is to be used in an integrated manner along with the Swajaldhara module as a plugged-in component of the same. Hence, it will be utilizing the existing infrastructure for which the supporting technology is web-based. This makes information accessible anywhere at anytime by every body, but this mode of M & E is heavily dependent on the communication infrastructure status, which may have to be upgraded for the purpose in some cases. The web based system would ensure that information is captured in nearly real-time and is made available to users I stakeholders (depending on their user access rights) at all levels. Such a system would also allow RGNDWM to instantly access and analyze up-to-date information from all the states.
In this web-based approach both the application and the databases will be physically hosted on a server within RGNDWM. The entire data will be maintained within the centralized databases, but the access to data will be controlled using a filling mechanism, which will ensure that individual states will not only have complete control over the data but will also be protected from possible misuse or inadvertent disruption due to problems caused by other states. Thus states will retain ownership and full control over their data segment.
I
2.Ei.1 Systems Requirem~hts and Specifications (SRS)
Based on the overall project design, a revised Systems Requirements and Specifications (SIRS) document was prepared. The SRS document was prepared keeping in view the computerised-MIS definition and expectations. It clearly defines each essential component required for design and development of the computerised-MIS. The SRS is like a blue print of the software solution being developed and gives the future managers the possibility to understand how the computerised MIS is conceived and developed. The SRS is being made available as a separate document, complementary to this one, and forms an integral part of the M&E system design documentation package.
The core project database relates to other external datasets and users {through input and output formats). It would comprise of the following:
• Database Structure
Data for the Computerized MIS can be classified as 'External Data' (available as Census and Habitation survey), 'Internal Data' (data related to system used, and support data for user
Design - M&EModule for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 2- Quantitative Window
21
~i Knowledge Links
Private Limited
Total Sll!llllr!J!IIlonsultillll
lists), and 'Project Data' (data collected at Scheme, District, State and National levels). This data will then be processed to deliver the desired reports. The database design is characterized by two types of tables, namely:
1. Master Table (one time entry), and
2. Transaction Table (providing for regular updates) to capture and maintain all the data.
Further, both External and internal data would be maintained by tables classified as 'Master', while most of project data set falls under the category of 'Transaction' tables, diagrammatically represented below:
.....
Administrative set
States
Districts
Blocks
Revenue village
t External database Census 2001
Fig 2.1: Master Tables
Master Tables
Project Set (Database Operation)
User Data Data for user lists
Transaction tables
Project set (Sanitation module)
RGNDWM
SWSM
ZP/DWSC
Scheme ... ....
Process Financial Progress Physical Progress
t Input Formats -Onetime ·Monthly
Output Formats - Monthly progress - PIC & Benchmark details
• Feedback reports
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 2- Quantitative Window
Sector description
set
Habitation O&M Assets
t External database Habitation Survey
22
• Interfaces
Input formats - Data Entry Forms
Knowledge Links
Private Limited
Total !:'lllllllr!lll ClliiSIIItill!l
Direct data entry in the computerized M & E System will be done through data entry forms provided by the system. These can broadly be classified as:
1. Input forms for Internal Data, and
2. Input forms for Project Data set.
(Note: External data as collected through Census and Habitation Survey datasets can be uploaded directly into master table, if available, without any manual data entry)
Data classified, as Internal data will be manually entered through data entry screens. This consists of data related to system users (like user details, passwords etc.) and support data for user lists (e.g. Levels, Phases, Groups, Themes, Indicators) that facilitate data entry for the Project Data Set. Data collected at Scheme, Districts, State and National level is through hard copy (paper) forms identified for each of these levels at defined frequencies (one-time or monthly). This can be entered into the computerized MIS using data entry screens that will be provided by the MIS.
Output formats - Report Forms
It may be noted here that the computerised MIS will automatically generate the RGNDWM monthly progress report partly, Performance Index Cards, including Benchmark details, and
community feedback reports.
In addition to using the above-standardised formats, the user would also have the freedom to query the database directly for any specific information s/he may require during the course of
project management.
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 2- Quantitative /At'lndow
23
3 Qualitative Window
Knowledge Links
Private Limited
Total Sll!lllf!llll CllllSIIIiil'l!ll Prlltatelimlted
The qualitative aspects of TSC will be monitored and evaluated mainly through the periodic reviews to be commissioned by SWSM and DWSMs and Community Monitoring & Evaluation (CM&E) system.
Qualitative aspects would have 250 quality points, which will be based on the periodic review and community monitoring systems. However, the Village PIC will be based on 500 marks from quantitative window and 250 marks from community monitoring. The marks obtained both on periodic review and community monitoring would be instrumental in determining the PIC of the District and the State, along with the quantitative score.
3.1 Periodic Review
Periodic reviews will be commissioned with the prime objective of assessing the quality of processes and outcomes. It is expected that a team of multidisciplinary professionals having a sound understanding of sanitation and hygiene behaviour would be fielded for undertaking these periodic reviews. The RGNDWM would commission the state reviews of TSC and the SWSM would carry out the review of TSC Districts.
In States and Districts where Swajaldhara and TSC projects are being managed jointly at State and District levels by the SWSMs and DWSMs respectively. Ideally the same team should be carrying out both kinds of reviews simultaneously. It is envisaged that there will be integrated delivery of water and sanitation by the SWSM and the overall supervision of the project will have to be conducted at the state level along with the SWSM. Hence, the M&E module has catered to this and built in a Periodic Review of State functions also into the design. Therefore, the management structure and the costs involved for conducting the Periodic Reviews, will not be duplicated and the exercise will prove economical.
However, where the TSC is being managed independently of Swajaldhara, the costs will have to be booked under the Administrative component of the project, which amounts to below 5% of the total outlay, out of which 80% will be borne by the Gol and 20% by the concerned State Govt. The amount available in each district will be different depending on the total amount sanctioned for the d.istrict. Other guidelines, procedures and conditions for the reviews will remain the same as\ those followed by the Swajaldhara M&E design as outlined below.
Periodic reviews will be undertaken on an annual basis based on an agreed set of issues and indicators and would feed their findings to Districts and State, as the case may be. The
Design- M&E Module for Go/ (RGNDWM) CIJSP /Total Sanitation Campaign Chapter 3- Qualitative I!Wndow
24
Knowledge Links
Private Limited
Total S!.!lliilf!ilii:IIIISI.IIiing
periodic review team will also suggest a set of actions, which require immediate attention at the project end.
The Review commissioned by SWSM will be undertaken in three to five select villages of the district on an agreed set of issues and forn)ats. However, the review team will have the liberty to expand the scope depending on the local situation and in consultation with the VWSCs. The review team will share the findings and submit action report for action in the village and at the DWSM level.
The Periodic Review commissioned by RGNDWM will be undertaken in 3 sample villages of two sample districts, along with review of district functions and plan. The review report will be shared with the Chairman SWSM and actions agreed will be indicated in the review report. Follow up action on the agreed actions would also qualify for marks in the subsequent reviews.
Qualitative aspect would have 250 quality points, which will be based on the periodic review and community monitoring system. The marks obtained in the Periodic Review commissioned by RGNDWM will be utilized for determining the PIC of the State and the marks obtained in the Periodic Review commissioned by SWSM will be utilized for determining the PIC of the District.
3.1.1 !Periodic Review Procedure
Steps•
Before undertaking any review mission, the review teams, both at RGNDWM and State levels, would be provided with the latest set of available documentation concerning the state, district and schemes to be visited, i.e.:
the last Periodic Review reports of the state/district(s),
the latest Monthly Progress report of the district(s),
the latest Scheme profiles and Inland Letters of the scheme(s).
The periodic review of project districts would be carried out by multi-disciplinary teams formE!d by SWSM and would have the following steps:
• Interaction with key project managers and functionaries at the district level,
• Selection of villages to be visited through a purposive random sampling method,
• Field assessment in sample villages including intensive interaction with members of VWSC and user communities, particularly women,
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualtlative IMndow
25
Knowledge Links
Private Limited
Total Slllillr!lllllonsultili!l
• Wrap-up discussion at the district level,
• Preparation of a review report and its submission to SWSM with copy to ZP/DWSC.
The interaction with key project managers and functionaries at the district level would begin with setting the agenda for the proposed field investigations at the village level including the selection of villages to be visited. However, the main focus of the interactions has to be on getting to know the qualitative dimensions of the programme implementation, particularly the aspects of efforts at generating demand and creating an enabling environment, promotion of appropriate and cost-effective technology and an alternative delivery mechanism, functionality, access and privacy of sanitation facilities and the usage, maintenance and sustainability of sanitation assets created.
The field assessment at the village level would aim at mapping out the quality of progress made in achieving the realization of project objectives both in terms of the processes involved and outcomes achieved. The focus would be on assessing the effectiveness of the efforts made to generate demand in terms of the community's response to the IEC and motivational activities conducted, facilitating the informed community choice of technological options and the functionality and usage patterns of both individual and community sanitation facilities and the 0 & M arrangements made for them.
The review team shall visit at least one village in each of the three phases, i.e. planning, implementation and O&M. In case of new TSC Project districts, where project villages have yet to be undertaken, the review exercise would be limited to the district review only. In case of districts, where the villages are in the planning or implementation phases only, all the villages to be selected for the field-based review would obviously be taken from these phases only.
The field assessments would be followed up by a wrap-up discussion at the district level, leading to the preparation of an action plan agreed to be put into action before the next review. In case of a felt need, an interaction with stakeholders at the state level would also be held to discuss and sort out required policy and other issues.
Similarly, the periodic review of states would be carried out by multi-disciplinary teams formed by RGNDWM and would have the following steps:
• Interaction with key functionaries at the SWSM,
• Selection of districts to be reviewed through a purposive random sampling method,
• Interaction with key project managers and functionaries at the district level,
• Selection of villages to be visited through a purposive random sampling method,
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
26
~ Knowledge Links
Private Limited
• Field assessment in sample villages including intensive interaction with members of VWSC and user communities, particularly women,
• Wrap-up discussion at the district and state levels,
• Preparation of a review report and its submission to RGNDWM with copy to the SWSM.
Revi1ew type and Periodicity
The periodic reviews shall be of two types, review of project districts by SWSM and project states by RGNDWM. Both the reviews would be carried out by multi-disciplinary teams formed at respective levels for the purpose.
For review of districts within a state, it would be the responsibility of the concerned SWSM to form a multi-disciplinary team of experts from within the resources available in the state. One way of doing this could be to have selected members of a core group, i.e. a multi-disciplinary team of professionals engaged in planning and management of TSC Project in a district, as members of the review team in districts other than their own. This would indeed indirectly promote cross-learning between districts and foster a spirit of competition. The SWSM would ensure that all the project districts are reviewed at least once in a year.
Similarly, review of participating states would be carried out by RGNDWM at least once in a year in every participating state. The purpose of this review would be to assess the overall reform orientation of the state as per the reform principles inherent in TSC Project Guidelines. This again has to be carried out by a multi-disciplinary team of professionals, selected care!fully for their outstanding experience and insight in the sector.
The aggregated scores achieved in the periodic review of districts by SWSM would be entered in the District PIC. Similarly, scores achieved in periodic reviews commissioned by RGNDWM for States would be entered in the respective State PIC.
Duration
The review exercise in case of state reviews would be of 8 days duration including 1 day at the state level, 1 day each at two districts (one old TSC district and one new TSC district), 2 days each at the village level in both the districts and 1 day for wrap-up discussion at the district/state levels as per requirement. The district level review is proposed to be of duration of 5 days excluding the travel time. The first day would be for interaction with project functionaries and stakeholders at the district level. The following three days would be declicated to field assessments and related debriefing. The fifth day would be spent in interactions at the district and state levels as per the review requirements.
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative Window
27
Composition of Review Team
~i Knowledge Links
Private Limited
Total Sllllllf!llll Consultill!ll
The periodic review team formed for reviewing states' performance would comprise of a minimum of 3 and maximum of 5 members chosen by RGNDWM from among the panel of professionals prepared for the purpose. However, the team members to be inducted in the team locally would be besides the team constituted for the purpose by RGNDWM. It would be desirable that the local review teams for different project districts are decided well in advance and confirmation of the concerned team members are also obtained. The specialists in the review team shall include:
• Social scientist with experience in community driven rural water and sanitation management,
• Sanitation engineer with experience in community driven rural water and sanitation management,
(One of the above two professionals, could also act as Team Leader)
• Environmental sanitation specialist also well versed with solid waste management issues.
Besides, following three members from the district to be evaluated would also be included in the review team:
• One social scientist from core group,
• One sanitation engineer from core group,
• One environmental sanitation specialist from core group.
The basic intent of including them in the review team is to ensure transparency in the review process and promote involvement and ownership of the stakeholders in the review exercise at the local level. However, these members would not have the right of assigning scores on review so as to keep the review process free from biases.
Similarly, two or three VWSC/community members should also be chosen on the spot in consultation with the community at the time of conducting a review at the village level.
The periodic review team formed by SWSM would comprise primarily of the members of the core group, i.e. a multi-disciplinary team of professionals engaged in planning and management of TSC Project at the district level. However, the team could also have members drawn from other agencies such as support organizations engaged in TSC Project implementation. Two or three VWSC/community members should also be chosen and inducted in the team on the spot in consultation with the community at the time of conducting a review at the village level.
Design - M&E Module tor Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
28
~~ Knowledge Links
Priva .. Limited
lotalliiwer!lll Collsllltill!l
Estimated Cost
The unit costs of district and state periodic reviews have been worked out and are presented in Annexure V. However, it is assumed that the RGNDWM, SWSMs and DWSMs will send Periodic Review Missions for the Swajaldhara and TSC Projects jointly, so these costs are only attached for reference.
3.1.:! Outcomes to be reviewed: Programme qualitative assessment
Periodic review of a state by RGNDWM would involve review at state level, at district level in randomly selected TSC (old) and TSC (new) districts (at least one each) and village levels (at least one each in planning, implementation and O&M phases). Similarly, periodic review of a district by SWSM would involve review at district level and village levels (at least one each in planning, implementation and O&M phases).
The outcomes to be reviewed at various levels and related contributing factors have been listed in the table below. The multi-disciplinary teams constituted by RGNDWM and SWSM for the purpose of periodic review exercise would keep these in view during the course of reviE~W as per the requirements of the level of review.
The issues to be reviewed at different levels and their contributing factors are given below:
Table 3.1: Programme Qualitative Assessment: Periodic Review Categories and their Contributing Factors
J-e"el , , Review.
;,, ,', ,, , ',
contributing Factor , ',;, ,; ,
04tc<Jrne < . . ·.· Category
.. ·.· ,-·· .. :- . •:::.,: ,,., •'•' ,' 1•'',',, ,,, .,.' .',,' .. ,'•'' ,,, •:: ', ... ,
State Generating Generating i. A sound Vision/strategy on sanitation at the demand & Creation demand & Creation state level in the form of a document, of an enabling of an enabling accompanied with a plan of action environment environment for (GDEE): TSC at the State ii. Setting up of an appropriate institutional
Level arrangement (carrying well-defined project rules, systems and operational procedures) to monitor TSC projects and facilitate their implementation at the district level
iii. Appropriate and adequate HRD/IEC initiatives undertaken by the state government providing capacity building support to TSC including hiring specialist consultants in the field of communication, HRD, monitoring, school sanitation and hygiene education
iv. Timely release of state share
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
29
District
State
District
Village
Generating demand & Creation of an enabling environment (GDEE):
Promotion of Appropriate and Cost-effective technology and Alternative Delivery Mechanisms (PACT)
Promotion of Appropriate and Cost -effectiVE! technology and Alternative Delivery Mechanisms (PACT)
Functionality, Access and Privacy of S:=mitation
Generating demand & Creation of an enabling environment for TSC at the District Level
Enhancing demand for and construction of
i.
ii.
~~ Knowledge Links
Private Limited
Tlltlil S!lllllfU!II:IlllllllltiliU Pmrntf!Umllet!
Steps taken to ensure the central role of Gram Panchayats (GP) in TSC planning and implementation
Comprehensive and well-designed IEC strategy and Plan at district Level worked out in a consultative manner and the quality of its implementation
iii. Quality and adequacy of District Level Project Implementation Plan (PIP) based on findings of baseline survey
iv. Well-defined project rules, systems and operational procedures in place and transparency in their application
v. Capacity development plan and activities for ZP, DWSMs and NGOs to achieve intended objectives and it's effective and timely implementation
i. Preparation of a menu of area-specific lowcost/appropriate technological options for sanitation
individual/communit 1-----------------------1 y sanitation facilities at village level
ii. Formulation of construction specifications, norms, unit costs etc. in consultation with districts and their timely dissemination to project districts to ensure good quality construction.
iii. Efforts made by the State to learn from best practices in this sector (state-wide, nationally and internationally)
Enhancing demand i. Availability of a menu of area-specific low-for and construction cost/appropriate technological options for of sanitation and demonstration of the same individual/communit 1-----------------------1 y sanitation ii. Close supervision of village proposals by facilities at village district functionaries to ensure adherence to level construction specifications, norms, unit costs
etc. and construction supervision by district to ensure good quality construction.
Encouraging socially vulnerable arouns to usA
iii. Establishment of and close supervision of functioning of RSMs and PCs to ensure their success as alternative delivery mechanisms
iv. Adequacy of trained manpower district-wide, to promote the different technological options proposed
v. Efforts made by the districts to learn from best practices within the country
i. Availability of water for use in sanitary latrines either inside or outside
Design- M&E Module for Go/ (RGNDWM) CRSPI1otal Sanitation Campaign Chapter 3- Qualitative I!Wndow
30
~~ Knowledge Links
----------------------------+ lotalllllililr!l;;;;:;::il!'l l'nvaieW1tltm.!
of Sanitation groups to use ii. Easy access to sanitation facilities without Facilities (FAPS) sanitation facilities any stagnant pool of water on the way
iii. Suitability of the design in terms of providing privacy to people, particularly women
iv. Community's adoption of sanitation designs, which are old/disabled /women/ child friendly
v. Availability of an institutional mechanism (informal/formal) for ensuring functionality, access and privacy on a regular basis
Usage, Promoting the i. Quality of maintenance and use of the Maintenance and usage, community- sanitation facilities created Sustainability of based operation Sanitation Assets and maintenance of ii. Vibrancy, effectiveness and transparency in (UMS) sanitation assets functioning of implementing agencies at
created and community-level, so that sustainability is ensuring their ensured sustainability
iii. Community Monitoring System in place, active and quality/ effectiveness of their activities
3.1.3 Programme qualitative assessment: Review activity and methods
In order to determine the scores to be earned for each of the above contributing factors in each category, the Periodic Review teams conducting both the State and the DistrictNillage PRs will have to undertake various review activities. The lists of these review activities and the methods to be used to conduct them are mentioned below.
Table 3.2.1: Review Activities and Methods for Periodic Review Teams at State Level
I. Generating Demand & creation of an Enabling Environment (GDEE) at State level
s. Contributing·Factor .. Review Activities .Methods. No. . ..
i. A sound Vision/strategy on Review the following: . Review of relevant sanitation at the state level documents in the form of a document, . Process of working out the vision and . Interaction with accompanied with a plan of strategy members of SWSM action . Quality of state's action plan, and State level training
particularly training and capacity institutions engaged for building component the purpose (if any) . SMARTness of the action plan
ii. Setting up of an appropriate Review the following: • Review of relevant institutional arrangement documents (carrying well-defined 1. Is there a clearly defined institutional • Interviews and project rules, systems and mechanism for monitoring TSC activities? discussions operational procedures) to monitor TSC projects and 2. Find out whether appropriate guidelines facilitate their have been issued by the state government implementation at the district on the followirtg:
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign 31 Chapter 3- Qualitative Window ·
~ Knowledge Links
_______________________________ cf) rotalswer~~::::::~~ f'ri~n~ttUm!U:tl
level ~ Village selection process ~ NGO selection process ~ Cost -sharing formula ~ IEC ~ HRD ~ M&E System ~ Manual of Technology options
iii. Appropriate and adequate Review the following: . Review of relevant HRD/IEC initiatives documents undertaken by the state a. Whether there is a multi-disciplinary . Interviews and government providing team in place having specialist discussions capacity building support to consultants TSC including hiring b. Whether an IEC strategy and plan is in specialist consultantrs in the place and operational field of communication, c. Whether there is a training and capacity HRD, monitoring, school development plan in place and sanitation and hygiene operational education d. Find out the quality and adequacy of
HRD/IEC strategy and plan being implemented
iv. Timely release of state Are funds being disbursed on time to the • Review of relevant share districts? documents and reports
II. Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT) at State Level
··.s .. NC.~h
i. Preparation of a menu of 1. Find out whether there is a manual of area-specific low- area-specific, low-cost and appropriate cosUappropriate technology options available in the state technological options for 2. If yes, was it created by the SWSM in-sanitation house or through any service
agency/institution hired for the purpose?
3. Find out whether the manual is user friendly and is being actually used.
ii. Form~lation of construction 1. Check whether the SWSM has specifications, norms, unit developed any construction costs etc. in consultation specifications, norms, unit costs of with districts and their timely various technological options of dissemination to project community/ individual sanitation items, districts to ensure good in consultation with technical staff from quality construction. districts and other sanitation technical
experts?
2. If so, have they been prepared with local regional conditions and availability of material, supply chain etc. in mind?
3. Have the norms been disseminated to the field?
iii. Efforts made by the State to Review the following: learn form best practices in 1. State initiative for drawing lessons
Design- M&E Module for Go/ (RGNDWM)'CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
Review of relevant documents
Interview /Group Interaction with SWSM members
• Interaction with the concerned Line Departments and any technical staff appointed at State Level for this purpose (if any)
• Review of relevant documents
• Interviews with concerned persons
32
this sector (state-wide, learnt from the field such as research nationally and activities for the purpose internationally} 2. exposure visits organized for State and
District personnel to other States to learn from their experiences in sanitation?
3. Review of technical training modules undertaken to see whether they provide for learning from best practices
4. State contribution to making any technological innovations based on field experience and local conditions
[li~ Knowledge Links !!,:t!!E
.
Private Limited
Totailllliillit!llll:illiSilltin!l
Review of relevant documents
TabiB 3.2.2: Review Activities and Methods for Periodic Review Teams at District Level
I. Generating Demand & Creation of an enabling environment (GDEE) at District Level
s. ·. ·. Contribpting Factor ·•·· No.
i.
ii.
iii.
Steps taken to ensure the central role of Gram Panchayats (GP) in TSC planning and implementation
Comprehensive and well-designed IEC strategy and plan at district level worked out in a consultative manner and the quality of its implementation
Quality and adequacy of District Level Project
Review Adi~iti~: · ·
... .. Find out the specific steps taken at the district level to work out a mechanism for involving Gram Panchayat and its members in planning and implementation of TSC activities at the village level and ensuring its operationalisation
1. Review IEC strategy and action plan and find-out whether it was prepared:
• On the basis of IEC plan developed and disseminated by the State
• In view of the local culture, language and art-forms
• In consultation with stakeholders at community level, NGO and line department personnel
• In view of the amount of funds available
2. Review whether IEC activities are being undertaken as a planned intervention or as ad-hoc activities?
3. Interact with core group, NGOs and community members to find out:
• Whether people are aware of project objectives, benefits and activities
• Whether there is a marked increase in the people's demand for sanitation services, as indicated by their willingness to pay for these facilities
1. Review the PIP in terms of defining project milestones, strategies for communication,
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative /Mndow
Interviews and discussions with the core group members
Review of relevant documents, if any
. Review of relevant documents . Interviews and discussions
• Focus group discussion
. Review of relevant documents
33
Implementation Plan capacity development and monitoring and (PIP) based on findings of evaluation baseline survey
iv. Well-defined project rules, 1. Review following guidelines/documents issued systems and operational by the districUstate for day-to-day project procedures in place and functioning: transparency in their
~ Village selection process application ~ NGO selection process
~ Cost -sharing procedure
~ IEC activities
~ HRD activities
~ M&E System
2. Meeting and discussion with NGO, community members and DWSC group to assess their level of awareness about the various guidelines and their use
3. Formal interaction with NGO, community members to assess their general feeling about transparency in DWSC functioning. For example, Find out:
a. Does the NGO I village get their payment on time (without delay)?
b. Does NGO/ village get answers to their queries?
v. Capacity development 1. Review the quality of training strategy and plan and activities for ZP, action plan DWSMs and NGOs to
2. Review the quality of training modules achieve intended objectives and it's prepared
effective and timely 3. Review the training materials to be used implementation
4. Review of timeliness and effectiveness of training interventions
5. Interaction with the core group, line departments, selected NGOs to assess their understanding and competence in facilitating I implementing (at the village level):
~ Demand generation and community mobilization activities
~ Choice of technological options
~ Community action planning (CAP)
~ Institutional strengthening
~ Financial management
~ Construction Supervision
~ O&M
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative !Mildow
~.~ Knowledge Links
Private Limited
Tlltlll Slll!llf!lllil®llllllltin!l
documents . Interviews and discussions
. Review of relevant documents . Interviews and discussions
. Review of relevant documents
• Interviews and discussions
34
~~ Knowledge Links
Private Limited
Total Sl.lll!llF!Ill I:Or!Silitil'i!l rrruateUmltml
II. Promotion of Appropriate and Cost-effective technology and Alternative Delivery Mechanisms (PACT) at District Level
··.· s. No.
i.
ii.
iii.
iv.
· contnbutin9 Factor ..
Availability of a menu of area-specific lowcosUappropriate technological options for sanitation and demonstration of the same
Close supervision of village proposals by district functionaries to ensure adherence to construction specifications, norms, unit costs etc. and construction supervision by district to ensure good quality construction.
Establishment of and close supervision of functioning of RSMs and PCs to ensure their success as alternative delivery mechanisms
Adequacy of trained manpower district-wide, to promote the different technological options proposed
Review Activitie$ :. . . ; ;··
Review the following:
• Whether there is a menu/manual of technology options available at the district level
• Is there a mechanism to explain these options to the potential user so as to facilitate informed choice at their level?
• Is the menu/manual being actually used by TSC project facilitators and community members?
Review the following:
• What is the mechanism/procedure by which village proposals are scrutinized by technical personnel at districUZP level to ensure adherence to construction specifications, norms, unit costs etc.?
• Has the core group appointed any construction supervision agency to ensure good quality construction?
• Is there a system of supervision by the community members in place?
Review the following:
• Are the RSMs/PCs in the district functional?
• Are they fulfilling the role envisaged for them as alternative delivery mechanisms?
• Are the RSMs storing spare parts for sanitation facilities?
• Have the personnel managing the RSMs/PCs been trained?
• Are they being rendered sustainable, and if so, have any of the RSMs/PCs returned the revolving fund to the District Implementing Agency (DIA)?
Review whether the capacity-building efforts made at district level have been adequate for developing a cadre of technical personnel at the district level and GP levels, who can promote the different technological options proposed
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative Window
. ..
•
•
· Methods
Review of relevant documents
Interviews and discussions with the stakeholders, particularly the DWSM/DWSC members and available NGO functionaries
Review of relevant documents
Interview /group interaction with concerned core group members
Visit to RSMs/PCs
Interview of community and staff of RSMs/PCs
Review of RSMs/PCs and district records
Interview and group interaction with district core groups and line departments
35
v. Efforts made by the Find out districts to learn from best 1. Has there been any exposure visits practices within the organized for district personnel to other country districts/states to learn from their
experiences in sanitation?
2. Review technical training modules to see whether they are based on learning from best practices
3. Has the district contributed to making any technological innovations based on field experience and local conditions?
•
.
Knowledge Links
Private Limited
'!'lltal Sllllar!lllllllmmltill!l
Interviews with concerned persons
Review of relevant documents
Table 3.2.3: Review Activities and Methods for Periodic Review Teams at Village Level
Ill. Functionality, Access and Privacy of Sanitation Facilities (FAPS) at Village Level
s. Contributing Factor I Review Activities No.
i. Availability of water for use . Sample physical verification of sanitary in sanitary latrines either latrines in the village visited inside or outside . Interaction with some women in the
village visited
ii. Easy access to sanitation . Sample physical verification of sanitary facilities without any facilities in the village visited stagnant pool of water on • Interaction with some women in the the way village visited
iii. Suitability of the design in . Sample physical verification of sanitary terms of providing privacy to facilities in the village visited people, particularly women . Interaction with some women in the
village visited
iv. Community's adoption of Review sanitation designs which are . Whether the community members are old/disabled/women/child aware of sanitation designs/options that friendly by the community are old/disabled/women/child friendly? . Have they generally adopted these
kinds of designs in constructing individual/ community sanitation items?
v. Availability of an institutional Review mechanism (informal/formal) . Whether there is a group or agency at for ensuring functionality, the community level to ensure that the access and privacy on a sanitary facilities being created are regular basis taking care of functionality, access and
privacy for vulnerable groups like the old/disabled/women/children on a regular basis?
• Is there a known way to identify and address the problems regarding functionality, access and privacy of sanitation assets?
Design- M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
Methods .
. Participant observation . Random interview
. Participant observation . Random interview
. Participant observation . Random interview
. Group Interaction . Interviews . Transect Walks for observation
. Community Mapping of Sanitation Facilities (proposed or constructed)
• Group Interaction . Transect Walks for observation . Interviews and discussions
36
Knowledge Links
Private Limited
Total ilhll'll~r!DllllilllSilltim!J
IV. Usage, Maintenance and Sustainability of Sanitation Assets (UMS) at Village Level
$. No.
·. . ··.. · ..... . Contributing Factor RevieW: Acti>Aties · •
.· .. · .... ·
i.
ii.
iii.
. .... . · .. :c :_e.:··. _o:_.. • .•
Quality of maintenance and use of the sanitation facilities created
Vibrancy, effectiveness and transparency in functioning of implementing agencies at community-level, so that sustainability is ensured
Community Monitoring System in place, active and quality/ effectiveness of their activities
Review whether the IHHLs, SSLs and CSCs and other environmental sanitation facilities such as soak pits, garbage pits, compost pits and drains are being used and maintained properly.
• Sample physical verification of these facilities to assess the quality of maintenance and use
Find out whether VWSC, Gram Panchayat, self-help groups and other village based organizations take active interest and part in TSC activities at the village level.
Find out
• Whether there is a mechanism of community monitoring in place
• If yes, what are the specific activities being carried out by the community members or by their group created for the purpose, if any?
• Are decisions regarding the proper maintenance and use of the facilities created taken as an outcome of the monitoring activities undertaken by the community or their group?
• Whether the inland letter and feedback system is functional
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative mndow
1·.
• •
Methods
Transect walk
Participant observation
Focus group discussion
Interviews and discussion
Group Interaction
Interviews and discussions
37
~"i Knowledge Links Private Limited
ll'lti'II!!Pilf®ll' !ll'l!iSIIItin!l
3.1.4 Outcomes to be reviewed: Moving towards Nirmal Gram Puraskar
Table 3.3: Moving towards Nirmal Gram Puraskar: Periodic Review Categories and their Contributing Factors
Level Review Category Outcome Contributing Factor
Village/District Coverage of Availability of and i. Community awareness regarding the
sanitary latrines access to hazards of open defecation and
household, benefits of use of sanitary latrines
community and leading to an increasing coverage of
school sanitation IHHLs, CSCs and SSLs including
facilities latrines for Anganwadis and Balwadis ii. Efforts made by the VWSC I SO to
demonstrate a range of technology options from no-cost to low-cost to medium-cost to high-cost so as to help people chose options best suited to them as per their affordability and requirements
iii. Local availability of technical know-how in the form of masons trained in all the technology options presented to the potential users
Village Reduction in the Reduction in the i. Level of community consensus on
practice of open practice of open eradicating the practice of open
defecation defecation, dry defecation/dry-latrines/manual
latrines and manual scavenging
scavenging ii. A plan prepared by the community!VWSC to phase out open defecation/dry latrines/ manual scavenging
iii. A penalty imposed by the community!VWSC on people/households defecating in the open
Clean environment Clean village i. Village level institutions such as GP,
. management environment schools, self help groups, mahila mandals, youth clubs etc are sensitised and aware of the critical interconnections between sanitation, hygiene and health
ii. Formation of a Community Monitoring Group (CMG) to periodically monitor the environmental sanitation situation at the villaqe level
iii. Village clean up campaigns are being organized frequently
iv. Healthy home surveys are being undertaken periodically
v. Villaqe paths are clean vi. Drains, soak pits are built and are
functional to ensure no stagnant pool of water around water sources
vii. Safe disposal of non bio-degradable solid waste is ensured through qarbage pits etc.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
38
viii.
i!.~ Knowledge Links
Private Umlted
Totallhlnllr!Jll Consulting
Safe disposal of bio-degradable solid waste is ensured through composting methods
3.1.5 Review activity and methods: Moving towards Nirmal Gram Puraskar
As is e!vident from the above table, the efforts made for moving towards Nirmal Gram Puraskar are to be assessed in the three broad categories of coverage of sanitary latrines, reduction in the practice of open defecation, and Clean environment management. The review activities and methods in respect of these categories are listed below:
Table 3.4: Coverage of sanitary latrines: Review Activities and Methods
S.No. Contributiog Factor Review Activities.··
i. Community awareness • Review the available project data at regarding the hazards of the district level open defecation and benefits of use of sanitary • Random interview with at least 5
latrines leading to an women to assess their level of
increasing coverage of awareness regarding the hazards of
IHHLs, CSCs and SSLs open defecation and benefits of
including latrines for sanitary latrines in each village visited
Anganwadis and Balwadis • Sample physical verification in the villages visited
ii. Efforts made by the VWSC • Review the technology manual, if any I so to demonstrate a range of technology options • Interview the VWSC members and SO
from no-cost to low-cost to functionaries working at the village
medium-cost to high-cost level regarding choice of technology
so as to help people chose and manner of their use and
options best suited to them application
as per their affordability and • Focus group discussion on technology requirements options in the villages visited
iii. Local availability of • Interview the local masons and any technical know-how in the other community member having form of masons trained in working knowledge and experience of all the technology options related technology issues presented to the potential users
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative Window
Methods
Review of relevant documents/progress report
Informal interviews
Participant observation
Review of relevant documents/progress report
Semi-structured interview
Focus group discussion
Semi-structured interview
39
~ Knowledge Links
-------------------------------'~;~"} illtlliSlll!llf!.!::;::;ll Pr(Vll1:!llUTllllltl
Table 3.5: Reduction in the practice of open defecation: Review Activities and Methods
s. I<·. contnbutilig Fac,or ··· Review Activities . .. Methods
N.o~ , .... ·.. . ... ·< .. .I: __::_ . . _::c
i. Level of community • Spot verification of defecation areas • Transect walk consensus on eradicating and sites of dry latrines • Participant observation the practice of open defecation/dry • Discussions with groups of people, • Focus group discussion latrines/manual scavenging particularly women
ii. A plan prepared by the • Discussions with VWSC and • Focus group discussion communityNWSC to phase community members, particularly out open defecation/dry women latrines/ manual scaven_gir:!_g_
-"'-
iii. A penalty imposed by the • Discussions with VWSC and • Focus group discussion communityNWSC on community members, particularly people/households women defecating in the open
Table 3.6: Clean environment management: Review Activities and Methods
.s. .. . Cc.ntributing FaCtor Review Activities Methods
No. .. :··· ' . . .• .
i. Village level institutions such • Interview and discussion with members • Interview and discussion as GP, schools, self help of different groups regarding sanitation, groups, mahila mandals, hygiene and health issues youth clubs etc are sensitized and aware of the critical interconnections between sanitation, hygiene and health
ii. Formation of a Community • Discussion with VWSC and CMG • Focus group discussion Monitoring Group (CMG) to members periodically monitor the environmental sanitation situation at the village level
iii. Village clean up campaigns • Interview and discussion with •Interview and discussion are being organized community members particularly frequently women and children on village clean up
campaigns
iv. Healthy home surveys are .. Interview and discussion with •Interview and discussion being undertaken community members particularly periodically women and children on village clean up
campaigns
v. Village paths are clean • Traversing all the village paths with a • Transect walk group of community members, • Participant observation including men, women and children
vi. Drains, soak pits are built • Visiting all the water points with a group • Transect walk and are functional to ensure of community members, including men, • Participant observation no stagnant pool of water women and children around water sources
vii. Safe disposal of non bio- • Visiting some of the garbage collection • Transect walk degradable solid waste is and disposal points with a group of • Participant observation ensured through garbage community members, including men,
• Focus group discussion pits etc. women and children
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
40
(II~ Knowledge Links
------------------------------~* TotaiSJ11111F!I::::=I!i l'r!lmtelimltml
• Interaction with community members, particularly women
viii. Safe disposal of bio- • Visiting some of the com posting sites • Transect walk degradable solid waste is with a group of community members, • Participant observation ensured through composting including men, women and children methods Interaction with community members,
• Focus group discussion •
particularly women
3.1.6 :scoring System and Review Report
The maximum score in both types of reviews would be the same with 200 marks for sanitation performance of the agencies/stakeholders at the concerned level and 50 marks based on the qualitative performance at the other levels of the project, both totalling to 250. The break-up of marks of sanitation performance is given in the table below:
Table 3.7: Break-up of Marks of Sanitation Performance in the PIC
S. Nt). Contributing Factor Max. Marks
Pn>grcamme qualitative assessment. .. ·: 1!)0 .. ·. . . .. . ·.· ... . ...... ·• :• .. . · .. ... • .
I. Generating demand & Creation of an enabling environment (GDEE) 25
II. Promotion of Appropriate and Cost-effective Technology & Alternative Delivery 25 Mechanisms (PACT)
Ill. Functionality, Access and Privacy of Sanitation Facilities (FAPS) 25
IV . Usage, Maintenance and Sustainability of Sanitation Assets (UMS) 25
• Movlns.towards Nirmat Gram.P~rasl<ar . ·· .. .··· ..
100 . . V. Coverage of sanitary latrines 30
VI. Reduction in the practice of open defecation 30
VII. Clean environment management 40
Total ~score of Periodic Review 200
However, the detailed break-ups of each of the above would be different in case of the two types of review as their scopes would be different. These details are given in respective State and District Periodic Review Report formats (Annexures II-A & B).
• linkage with Performance Index Card
The scores achieved in the state reviews organized by RGNDWM would be entered in the State PIC. Similarly, the scores achieved in the district reviews organized by SWSM would be entered in the district PIC. Besides, the system would also provide for a box facilitating inclusion of a brief descriptive text highlighting the key findings of the overall assessment of the quality of implementation in respect of each of the four categories mentioned above. The system would also provide for 2 forms for entering the list of issues and problems and agreed
plan of action.
Design - M&E Module for Go! (RGNDWM) CRSP I Total Samlation Campaign Chapter 3- Qualitative Window
41
~~ Knowledge Links
---------------------------~r; "i'lltaiS!IIillf!l:::~::!l Pnuatellm!te!l
• Linkage with Benchmarks
As evident from the above description, the programme qualitative assessment is being carried out in the four benchmark categories. This is being done to capture the qualitative aspects of the related indicators, the quantitative information about which is already being obtained through the computerised MIS.
The numerical value of each benchmark category would be worked out on the basis of actual percentage being achieved against each benchmark, as per the data available in the computerised MIS.
The qualitative aspects of benchmarks would be assessed through state periodic review commissioned by RGNDWM. Benchmarks have been determined under four major categories. Each benchmark category would be assigned an actual value to assess the performance of state against benchmarks. The benchmark categories comprise of issues, which are directly related to the qualitative aspects of benchmarks.
The scores obtained by states on the benchmark categories will be compared with the determined benchmark values. The final benchmark value will be ascertained by taking average percentage of values scored in respect of benchmark categories through computer based MIS and periodic review. The section relating to benchmarks can be viewed in Chapter 4.
3.2 Community Monitoring & Evaluation (C-M&E) System
3.2.1 Purpose
The purpose of C-M&E is to institutionalise the process of concurrent learning and action regarding TSC project planning and management at the community level. A participatory community monitoring system would empower the user communities by upgrading their organisational and management skills. This would also generate a wealth of data, which besides being used by the community for their own purposes would also inform project management.
The C-M&E tools are essentially designed to promote interactive and experiential learning. They can also be used both by the literate and illiterate segments of the community equally effectively irrespective of their gender and class characteristics. However, the community capacity building and initial hand holding by the support agency and their community facilitators are of critical importance in this regard.
By employing these tools as a plan drawn by the community, they can see where they have succeeded and where they have fallen short and then take appropriate measures to remedy the situation. It is also the best way for communities to gauge their status vis-a-vis their
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
42
~~ Knowledge Links
---------------------------"1:) TotaiSJml.lf!l;;;::':ll Prliistellmltm:l
project objectives and the targets, which they themselves have set in the Community Action Plan. Through this process communities themselves generate and use knowledge to solve their own problems, which is fundamental to the sustainability of the sanitation facilities installed and the resulting changes in health and hygiene behaviours and practices. It adds owne!rship to findings and commitment to action.
3.2.2 Establishing the C-M&E System
i) Community Monitoring Issues and Methodology: The process of identification of key issues and indicators amongst communities, which they will then monitor on their own, would be a crucial one. This will have to be done through a process of consultation with VWSC and users. However, for the purposes of this M&E design, a set of key issues have already been arrived at and may be viewed in table 3.8. These may be subsequently modified by each concerned community to suit their particular conditions, as long as the main elements of the benefits/ sustainability of a sanitation project are retained.
For the purposes of convenience, regarding the time-line dimension of the project, the issues and indicators to be monitored by the community, are being categorized according to the Planning, Implementation and O&M phases. In the planning phase, they will focus on whether the community members are motivated enough to construct sanitary facilities, their informed choice of sanitation technology and sites for the facilities and the quality of the capacity-building and other facilitative activities of the selected NGO. The issues that require monitoring in the Implementation Phase mainly center around construction activities, their proper supervision by the community and the resulting quality. In the O&M Phase, the community will be concerned about the functionality and maintenance of both the individual and community sanitation assets created in their village, as these would be the factors behind the sustainability of the assets created.
Community Monitoring Group: In order to make the C-M&E work as intended, it would be imperative to have a representative and dedicated group to undertake all the related activities on a regular basis. Hence, it is proposed to have a Community Monitoring Group (CMG) constituted of the selected members of the community, who would be working on behalf of the community members in a participatory and transparent manner. The CMG would be required to function under the overall guidance and supervision of the VWSC. However, the members of the CMG would have to be representative of the users and would not consist only of VWSC members.
The main role of the CMG in the TSC framework would be one of bringing community cohesiveness on issues related to sanitation in the village. This would be done by bringing different groups and actors on a common platform, whl_yh could include Gram
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
43
(II~ Knowledge Links -.....
---------------------------c;j 'l'otiiiiSwerg~:=~~ l'rM'i!lllUiilltfl~
Panchayat (GP), Parent Teacher Association (PTA), households etc. It would also be useful to involve community based organisations such as Mahila Mandals, Yuvak Mandals, Self-Help Groups or any other local bodies in community monitoring activities.
The CMG would endeavour to bring individual I institutional initiatives under an overall decision-making process of a collective nature, and thereby individual I institutional actions into a consistent community action plan including environmental sanitation, community sanitary complexes, school sanitary latrines, Anganwadi latrines, Balwadi latrines and individual household latrines.
The CMG, which should not comprise of more than 6 members, must also necessarily have members from the socially vulnerable groups like senior citizens, women, children and from the BPL and the SCIST households, so that there is an equitable representation of these segments in the group and their concerns are also voiced by their own representatives. This group would undertake community-monitoring exercises through use of tools and aids being developed for the purpose and they will be trained on conducting monitoring activities and use of tools for gathering information. After conducting each exercise, they would submit their assessment report to the VWSC for action and follow up.
ii) Community Monitoring Indicators: Here again, the exercise of identifying the CM&E indicators will be the task of the VWSC and the community members, as they are the best judge of what they would like to measure for the sustainability of their own sanitation project. These indicators are to be arrived at, keeping in view the issues which need monitoring at the community level. They will have to be simple, easy to measure and should not involve too much paper work and time, or the system will not be adhered to. A suggestive list of indicators is given in the table below:
Table 3.8: Community Monitoring Issues and Indicators
Phase Community monitoring Indicators issues
Planning i) Community consensus on • Expressed willingness by (Start- Up & IEC eradication of open defecation community members to stop Activities) open defecation in a community
wide meeting • Community penalty on open
defecation
ii) Selection of sites for • 100% site selection for Sanitation assets by community sanitation assets done by members, particularly women community members, and other marginalised groups particularly women and other
marginalised groups
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
44
iii) Availability of and people's access to information about all the possible and feasible technology options for IHHLs
iv) Activities undertaken by the SO/Consulting Agency in the village
v) Community participation in preparation of community action plan (CAP)
Implementation i) Community members' access to Rural Sanitary Marts (RSMs)/Production Centres (PCs)
ii.a) Community initiative to construct individual household latrines (IHHLs)
ii.b) Construction of school sanitary latrines
ii.c) Construction of environmental sanitation facilities such as soak pits, garbage pits, compost pits, and drains and their quality
iii) Location of sanitation assets actually constructed
iv) Availability of technical know-how to construct individual and community latrines and other environmental sanitation facilities such as soak pits, garbage pits, compost pits and drains
v) Activities undertaken by the SO/Consulting Agency in the village
•
•
•
~i Knowledge Links
Private Limited
Tiltlll Sllllflf!lll Consl.lltinll
Informed choice of technology options for sanitation by people
All activities listed in the TOR of SO/Consulting Agency for community mobilisation and capacity building undertaken on time Community members aware of community action plan {CAP)
Community members can get sanitation related material without any apparent difficulty
Number of IHHLs constructed
Separate latrines constructed for girls and boys in schools
Number of soak pits, garbage pits, compost pits and the length of drains constructed and their quality as per the norms specified in the CAP and PIP
Location of community sanitary facilities created are as agreed in the CAP
Locally available trained masons to construct latrines and other environmental sanitation facilities such as soak pits, garbage pits, compost pits and drains
All activities listed in the TOR of SO/Consulting Agency for community mobilisation and capacity building undertaken on time
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualtlative 141ndow
45
O&M i.a) Reduction in the practice of • open defecation
•
i.b) Reduction in the practice of • dry latrines and manual scavenging
•
ii) Use and maintenance of • latrines
•
•
iii) Hand washing practices •
•
iv) O&M of CSCs •
v) O&M of SSLs/AWLs/BWLs •
vi.a) Safe disposal of solid • waste and waste water •
•
•
• vi.b) Safe disposal of Infant • excreta
~~ Knowledge Links
Private Limited
TOtlll llllllllf!lllillOII!!IIItill!l
More and more people have access to and use sanitary latrines for defecation Community penalty imposed on open defecation More and more people have access to and use sanitary latrines for defecation Community penalty imposed on the practice of dry latrines and manual scavenging 100% of the individual and community sanitary facilities constructed are functional and are being used All individual and community sanitary facilities are being maintained and cleaned regularly Repairs are being done in a timely manner, mostly by a trained technician available locally All the community members are washing their hands with soap/ash after defecation There is a practice of hand washing with soap/ash after anal cleaning of infants O&M requirements of CSCs are being met by the GP O&M requirements of SSLs/AWLs/BWLs are being met by the PTA/School Authorities Village paths are clean Garbage is being disposed in garbage pits Cow dung is disposed in compost pits No stagnant pools of water around water sources Clean and functional drains Infant excreta disposed in sanitary latrines
Design - M&E Module for Go! (RGNDWM} CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
46
(II~ Knowledge Links ,_....,
--------------------------;*'' !otaiSllllllf!l;;;:=~~~ Pr!iiSWL!mltml
iii) Capacity Building for community monitoring: The CMG members will be new to the task of Community Monitoring and they would need to be trained in the use of various tools and methods developed for the purpose. Corrective actions will have to be taken
in a timely fashion in order for them to continue to realize the benefits of the project. As
the members would vary in terms of their respective backgrounds including age, educational level and capacity, the training will have to be designed and conducted keeping these differences in mind. The facilitating agencies and NGOs at the district
and community level will also have to be trained to undertake this task of building the
capacities of the CMGs.
iv) Information Flow and Feedback to the Community: The information flow between
the community and the project management is designed to be two-way. The mechanism to activate this arrangement is there in the form of pre-printed inland letters
to be sent by the community to the project management in each phase and feedback reports to be sent to the community by the project management. The details are
outlined below in point no. 3.2.4.
v) Follow up and action: Operationalization of a system of follow up and action on the
basis of assessment reports of the CMG.
3.2.3 Community Monitoring Issues and Tools
The Community Monitoring issues to be reviewed during each phase and the tools to be used to do the same can be seen in the table below:
Table 3.9: Community Monitoring Issues and Tools
Phase Issues
Planning i) Community consensus on (Start- Up & IEC Activities) eradication of open
defecation
ii) Selection of sites for Sanitation assets by community members, particularly women and other marginalised groups
iii) Availability of and people's access to information about all the possible and feasible technology options for IHHLs
Design - M&E Module for Go! (RGNDWM) CRSP /Total Samfation Campaign Chapter 3- Qualitative W7ndow
Tools
• Hand raising/voice vote to express willingness in community wide meeting
• Focus group discussion
• Defecation map
• Resource mapping
• Menu card of technology options
47
~ Knowledge Links
---------------------------~~) TotaiS!Illllro::::o
iv) Activities undertaken by the SO/Consulting Agency in the village
v) Community participation in preparation of community action plan (CAP)
Implementation i) Community members' access to Rural Sanitary Marts (RSMs )/Production Centres (PCs) \\
ii.a) Community initiative to construct individual household latrines (IHHLs)
ii.b) Construction of school sanitary latrines
ii.c) Construction of environmental sanitation facilities such as soak pits, garbage pits, compost pits, and drains and their quality
iii) Location of sanitation assets actually constructed
iv) Availability of technical know-how to construct individual and community latrines and other environmental sanitation facilities such as soak pits, garbage pits, compost pits and drains
v) Activities undertaken by the SO/Consulting Agency in the village
O&M i.a) Reduction in the practice of open defecation
i.b) Reduction in the practice of dry latrines and manual scavenging
ii) Use and maintenance of latrines
Design- M&E Module for Go/ jRGNDWM) CRSP /Total Sanitation Campaign Chapter 3- Qualitative Window
Pr!vate!.!mltflil
• Checklist based on the TOR of SO/Consulting Agency
• Community mapping
• Focus group discussion
• Latrine coverage bars followed by pasting of logos of local deities on houses practicing no open defecation
• Visit to school with checklist on construction norms
• Environmental sanitation mapping followed by site visits with checklist on construction norms
• Resource mapping
• Community interaction with local masons in a community wide meeting
• Checklist based on the TOR of SO/ Consulting Agency
• Defecation map followed by transect walk
• Focus group discussion
• Transect walk followed by focus group discussion
48
iii) Hand washing practices •
lv) O&M of CSCs •
v) O&M of SSLs/AWLs/BWLs • \
vi.a) Safe disposal of solid • waste and waste water
vi.b) Safe disposal of Infant • excreta
3.2.4 linkage with project Management
Knowledge Links
Private Limited
Ylltllililllllllr!lll Coll!lllltill!l
Pocket chart - hand washing
Transect walk followed by focus group discussion
Transect walk followed by focus group discussion
Transect walk
Secret Ballot- infant excreta disposal
Communities would send their findings /response on these issues through a pre-printed inland letter. These inland letters will have mainly YES/NO type objective questions. HoWiever, some space would also be provided in the inland letter to write in brief on any issue of concern regarding sanitation. It will be the onus of the DWSM-Core Group to scrutinize and analyse the responses and provide feedback. A standard feedback form is also suggested which may be employed by the Core Group for sending their feedback to the community concerned. The Inland letter Formats and the Feedback Report Formats can be viewed in Annexures Ill A & B.
3.2.!i linkage with Computerised MIS
The linkages of the community monitoring system with the computerised MIS are as follows:
• In planning, implementation and O&M phases, marks against some information received through inland letters, particularly related to user satisfaction, would be entered into the computerized system and shall form a part of the scheme level PIC. During the O&M phase, the information on the indicators would be available through inland letter system only.
• A part of the information (received through inland letters from community) would not be entered in computerized MIS so as to avoid unnecessary data overload on the system. The information, not to be entered in the computerized MIS, is meant for use directly by field coordinators and other district level programme managers for identifying gaps and taking suitable timely action for improvement.
• Feedback reports - to increase transparency and provide the community with some access to the computerized MIS
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 3- Qualitative !#ndow
49
I 4 I Integration Mechanism
4.1 Performance Index Card
4.1.1 Purpose
~ Knowledge Links
Private limited
T®tlli llll!lllf!lll @®I!Si!IUiil!ll
The Performance Index Card (PIC) mechanism has been built in into the system with the purpose of assessing performance of villages, districts and states, as also to make a comparative evaluation of their performance across all these levels. It is expected that it would result in healthy competition and exchange of best practices and knowledge on key performance issues.
The PIC would take into account both the quantitative and qualitative aspects of performance. While the quantitative performance would be assessed on the basis of marks obtained against fulfillment of each indicator, qualitative performance would be considered based on periodic review scores and performance against community monitoring system. The computerised MIS would generate three sets of PIC for village/scheme, district and state respectively. The State PIC and District PIC would be based on performance against key process and progress indicators and marks obtained in periodic review and community monitoring and evaluation. Village/ Scheme level PIC would be based on scores obtained against key indicators and community monitoring and evaluation.
4.1.2 Key features
The quantitative component of District PIC would have 80% village performance and 20% district performance. This latter 20% comprises of 10% marks based on the District MIS indicators and the remaining 10% in the form of a bonus for qualifying for the Nirmal Gram Puraskar. The qualitative component of the District PIC would comprise 20% of performance against C-M&E and 80% on performance against periodic review. The quantitative component of State PIC would comprise of 80% based on district and village performance and 20% on state performance. The qualitative aspect would comprise of 4% of performance against C-M&E and 16% against district periodic review and 80% of performance in the state periodic review.
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
50
I
~~ Knowledge Links
!!'!'+.~i!!!E? Private Llmllad
--------------------------- .. Totail!illllllf!lliCII!l!ll!ltill!l
Table 4.1 :PIC overview- dimensions (including both water supply and other related dimensions)
Coo'lp,on.,nt .. ·.· .. Cor' PelfQ!lti~nce Extra initiative$ • . •. ... · ·•· · · .·· ..... ·• ·•· .• (Other rei':teq ditf!ens.ion$0) .. .... .. · . (Waier supply
... · tlim,nsionf .. ... . ,·. .. .. '·· · ... ·.:• .. ;: ·.·: Quantitative Indicators- Water Indicators- Thematic Modules
Supply Sanitation Hygiene & Water Water quality
Computer-based Health conservation monitoring
MIS measures
(250) (250) (250)
(Maximum (1 000) (500) Bifurcation Bifurcation of Bifurcation of Marks)
Sanitation of marks marks marks
Qualitative between between between quantitative quantitative quantitative
Periodic reviews and and and qualitative qualitative qualitative
and Community components components components Monitoring to be to be to be decided System decided decided once the
(Maximum once the once the components
Marks) (500) (250) components components are are are developed developed developed
Total Marks 1500 1500
The PIC inclusive of water and sanitation would look as below:
Table 4.2: PIC with Water Supply and Sanitation Dimensions included
Quantitative:
Com1puter Based MIS Max !Marks
Qualitative: Periodic Review
ComM&E Max Marks
Total!
Sanitation
1000 500
500 250
1500 750
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
1500
750
2250
....
rt!UateUmltll!l
Total .... MarkS ..
3000
51
..• Leve.l i • '
-"-
State
District
Village
Table 4.3 : PIC overview- levels (details of sanitation across levels)
Quantitative window· .. Qualitative window
<·· 1 00 marks on state quantitative performance
400 marks based on quantitative 50 marks based on performance of districts qualitative performance of
districts - 40 marks based on district - 1 0 marks based on
...
indicators qualitative performance - 40 marks based on Bonus at the village level
marks for Nirmal Gram (Community Puraskar monitoring)
- 320 marks based on - 40 marks based on quantitative performance at district periodic review the village level commissioned by
SWSM) 200 marks based on periodic review to be commissioned by RGNDWM
Sub total 500 Sub total 250
50 marks on district performance
50 marks bonus for Nirmal Gram Puraskar 400 marks from quantitative 50 marks based on performance at village level qualitative performance at
the village level (Community monitoring) 200 marks from district periodic review to be commissioned by SWSM
Sub total 500 Sub total 250
Quantitative performance from Qualitative performance -computer-based MIS indicators- 250 marks (based on 500 marks Community Monitoring
System) Sub total 500 Sub total250
• Quantitative component: Computer-based Monitoring System
Knowledge Links
Private Llmlt8d
Tl1tlll llWIIf!llliliJil!UII~ill!l
··rotal .. ...
100
450
200
750
50
50
450
200
750
750
750
The computerized system shall monitor the performance of TSC across all the project states,
districts and villages. The system will generate scores obtained by the concerned TSC states, districts and villages that will be reflected in their respective PICs.
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
52
Knowledge Links
Private Lim
Total l>JmllFII!Ii:Ollllll!ltillll
TSC is based on some fundamental principles, which in the course of their operationalization invariably involve certain critical functions. These critical functions are to be followed across all the project districts. A set of indicators has been evolved to monitor the process and progress of these functions. These are proposed to be termed as 'sanitation performance indicators'.
The scores obtained in the PIGs by the TSC project states, districts and villages will in turn be plugned into the Swajaldhara M & E module PIC, which is designed to reflect the performance of other initiatives like sanitation, hygiene and health, water resources management and water quality monitoring, once all these concomitant M & E modules are developed.
• Qualitative component: Evaluation system
Field-based Periodic Review
Periodic review would essentially be an exercise in evaluation, learning and action. The primary purpose of periodic review is to make a qualitative assessment of the process and outcomes of TSC projects.
The detailed methodology of carrying out periodic review exercise including steps involved, duration, periodicity, outcomes to be reviewed and associated contributing factors, methods and tools, review and reporting formats etc., has been developed by the consultants.
The periodic review of states and districts would be carried out by RGNDWM and SWSM respectively by forming multi-disciplinary teams drawn from a panel of experts drawn at their level. These would be carried out once a year. The basic purpose of this exercise would be to identify areas of weaknesses and plan and undertake required corrective measures, as also to work out areas of required policy and capacity building support to project districts as per their specific requirements.
Community M&E
In case of village/scheme PIC, the qualitative component would comprise of information received through community monitoring and evaluation in the form of inland letters, in place of periodic reviews.
• Scoring mechanism
As mentioned in the tables above, in the TSC module, the PIC of each state, district and village would have a maximum total of 750 marks, out of which 500 will be based on the quantitative computerized MIS indicators and 250 marks are allocated to the qualitative aspects of periodic review (at the state and district levels) and the community monitoring
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
53
Knowledge Links
Privat& Limited
Tlltlll Sll!l®f!Jll lliJ!!SII!tiii!ID
system (at the village level). The summaries of the village, district and state PICs are available in Annexure 1-D.
4.1.3 Scores of computerized MIS
Village/Scheme level
The quantitative MIS indicators at the village level have been distributed in the following manner:
Table 4.4: Marking pattern of sanitation indicators at the village/scheme level
Total 500
As is evident from the above marking pattern, the combined total of the physical and financial progress indicators together carry equal weightage as compared to the total of process indicators. The underlying reason of proposing this pattern is to avoid bias and distortion in fair and objective evaluation by way of striking a balance between quantum and quality of effort made.
catego,Y ~'" " ' ~ ' ~ ' '~' ''!: ~'" ~ :> / ~ ~ : ~ : ' Mark$ tor Sanitation ProcessJndicators' ~ '~·~ '' ...
Pre-Planning Phase 25 Planning Phase 50 Implementation Phase 75 0 & M Phase 100 Total 250
The phase-wise break-up of marks is such that the scores for all the process indicators pertaining to the Pre-Planning, Planning and Implementation Phases total up to 150 and the scores for the O&M Phase indicators total up to 100. The ratio of weightage for the process indicators related to O&M phase and those related to pre-planning, planning and implementation phases together have been taken as 40:60, in order to accord slightly higher weightage to community ownership and O&M of assets created, which is the very basis of the reform agenda.
The sanitation indicators as developed broadly relate to three levels, namely village/scheme, district and state. Whereas the state level process indicators shall directly get aggregated into the computerized MIS, the system would have an in-built mechanism for calculating average of each district and village level indicators as against the total number of districts and villages applicable for the same respectively. The financial progress indicators shall be aggregated
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
54
(II~ Knowledge Links ~
+ Privata Llmltsd
------------------------- llltlllil!llllliF!"IliiJIIII!IIIItlii!D l"rlllatct!ffijttl!l
against village budget and physical progress indicators against the number of households in the village and it's total population. Please refer to Annexure 1-B for the detailed list of indicators and thE! score assigned to each of them.
Distl·ict level
The total district level quantitative score of 500 would comprise of 100 marks on district performance, out of which 50 marks will be based on the district MIS indicators and 50 marks will be based on the bonus received with regard to their performance vis-a-vis the Nirmal Gram Puraskar. The other 400 marks will be derived from the performance of villages in the quantitative indicators. Thus, 80 % of the total quantitative score at the district level is based on village performance.
The 250 marks which have been allocated to the district qualitative window will be distributed in the following manner: 200 marks will be allotted for the district's performance in the Periodic Review commissioned by the SWSM and 50 marks will be based on the marks obtained by the village in the C-M&E System.
The total state level quantitative score of 500 would comprise of 100 marks of state performance and 400 marks of district performance. The break-up of 400 would include 40 marks on the basis of district indicators, 40 marks on the basis of bonus marks obtained by villa!~es for Nirmal Gram Puraskar and 320 marks from the village level performance in the quantitative MIS indicators. Here again 80 % of the total quantitative score at the state level is basE~d on district and village level performance.
The state level qualitative score of 250 would comprise of 200 marks based on the State Periodic Review commissioned by the RGNDWM and 50 marks based on the District Periodic Review (40 marks) and the village-based C-M&E System (10 marks).
4.1.•4 Scoring of field-based periodic review system
The aggregated scores achieved in the periodic review of districts by SWSM would be entE!red in the District PIC along with some score on the basis of C-M&E. Similarly, scores achiieved in periodic reviews commissioned by RGNDWM for States would be entered in the respective State PIC along with some score based on district periodic reviews and C-M&E. These scores would be entered in respect of all the categories of evaluation, the maximum marks for which are as follows:
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitab'on Campaign Chapter 4- Integration Mechanism
55
Table 4.5: Categories of evaluation and scores
Knowledge Links
Private Limited
Total Sll!lllf!JlllliliOSIIitiiiiU
Category Sanitation Performance Field-based Periodic Review carried out by RGNDWM and SWSM as applicable in case of State and District respectively
:1.···· .. Programme qUalltatl9'e ass.essment .· .. .. i
1.1 Generating Demand & Creation of an Enabling Environment (GDEE)
1.2 Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT)
1.3 Functionality, Access and Privacy of Sanitation Facilities (FAPS)
1.4 Usage, Maintenance and Sustainability of Sanitation Assets (UMS)
Sub Total 2. Moving towards Nir.mai.Gram Puraskar . .. .. ..
2.1 Coverage of sanitary latrines 2.2 Reduction in the practice of open defecation 2.3 Clean environment management Sub Total .Total for Periodic Review· .
Besides, the system would also provide for a box facilitating inclusion of a brief descriptive
text highlighting the key findings of the overall assessment of the quality of implementation in
respect of each of the categories/sub categories mentioned above. The system would also
provide for 2 forms for entering the list of issues and problems and agreed plan of action.
4.1.5 Scoring of village level community based monitoring and evaluation system
As mentioned above, the qualitative component of village/scheme PIC would comprise of
information received through community monitoring and evaluation in the form of inland
letters. The evaluation parameters as spelt out in the inland letters and the maximum marks
proposed are as follows:
Table 4.6: Community Monitoring & Evaluation System Parameters and allotted marks
.
25
25
25
25
100
30 30 40
100 200
Parameter Maximum Marks
Plcmriing Phas.e ·.··
··. -
Has there been a decision/resolution by the community to take action to stop open defecation?
Whether community members, particularly women and other marginalized groups, are satisfied with the sites planned/selected for most of the sanitation assets?
Are people aware of the possible technology options that could be chosen for IHHLs?
Is the community satisfied with the assistance/facilitation being provided by the SO/ Consulting Agency?
Has the community prepared a Community Action Plan (CAP) for sanitation in the village?
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
15
15
15
15
15
56
Knowledge Links
Sub-Total
Private Llmltad
Total Sl.lliilf!lll illliil!llltin!l
75
.. l.,:tPl~men~•iltion Pha~e. .·· ....... ··.·............. • L . · • • · ·· · ... ...... .( · •• .. ... . ...... ·.·· ~· > -: ·•······ -,< Whether community members have easy access to Rural Sanitary Marts/Production 15 Centres? •
Whether community members are actively involved in construction of sanitation assets as per CAP?
Whether community members, particularly women and other marginalized groups, are satisfied wilth the actual location of most of the sanitation assets constructed?
Is the community satisfied with the general quality of sanitation assets constructed in the village?
Is the community satisfied with the assistance/facilitation being provided by the SO/ Consulting Agency
Sub Total
O&M Phas' . · < . > • • < < ···. > . ·.. .. ·.·· •. _:.. • ·.·•·· ..•..•••. ·•. •·
Has the practice of open defecation substantially reduced/decreased in the village?
15
15
15
15
75
. > •
10
Are most of the individual and community sanitary latrines being used and cleaned 10 regularly?
Are most of the community members usually washing their hands after defecation? 10
Are the O~(M requirements of CSCs being met by the GP? 10
Are the 08..M requirements of SSLs/AWLs/BWLs being met by the PTA/School Authorities 10
Has the GP been awarded the Nirmal Gram Puraskar? 25
If the GP was awarded Nirmal Gram Puraskar, are the 4 eligibility conditions still enforced? 25
Sub Total 100
~:r:iind 1'o·~··· ·••· ·. . .. ··• .· .· ·· · .• ••···· .· .. : ..... •· .· ·· · ·· .. < {··~ ·.... j ~. ·~· .__ ·• ..•. ·.· ............ ·.•· •··• .•. •••···· ..• ; 2~~
The marks indicated in the above table would be accounted for on the basis of maximum scorable marks, similar to scoring mechanism of quantitative indicators, as discussed earlier.
4.1.6 Final Score
With regard to the TSC project, the comparison of the performance of villages/schemes, districts and states would be made on the basis of scores achieved by the districts and states, against the total marks of 750 distributed between the quantitative and qualitative windows of the respective village/scheme, district and state PICs. However, the overall score across all the dimensions to be covered under the Swajaldhara module (see table 4.1) will not be obtained till the M & E modules for all the other initiatives are also developed. A joint PIC for water and sanitation can be obtained (see table 4.2) for the states, districts and villages where the Swajaldhara and TSC projects are being implemented either jointly by the same implementing agencies/local bodies or separately by different agencies/line departments. In the latter case the total score of the PIC will be out of a maximum of 2250 (Water Supply-1500 and Sanitation-750).
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4 -Integration Mechanism
57
Knowledge Links
PrlvatBLimlted
'i"lltllll SJmlllf!!!ilf llllllSIIitillll
4.2 Benchmarking
A system of benchmarking offers standardized measures of performance, which all the TSC states could work to achieve. This would also help assess and compare the performance of states in terms of internalization of the reform principles and the initiative to undertake corrective measures, as required. This would basically offer a way to admit that another village, district or state is better at something and provide an opportunity to learn as to how to match or surpass it.
It would help facilitate the process of identifying, sharing, and using best practices to improve processes. The process could entail exercises comparing data (usually key performance indicators) either between villages, districts and States or tracking performance over time. Whereas these provide comparative measures, they do not in themselves result in the identification or exchange of best practice. It would help examine processes, compare activities and identify best practices that can be implemented for effecting performance improvement.
It could be ideally used to achieve the following:
• Encourage the exchange of best practice in pursuit of general objectives.
• Enable stakeholders to make informed decisions about initiating actions for improvement.
• Set performance targets for ensuring sustainability of investments and benefits.
• Share information to identify areas where there is an apparent performance gap.
There have been some obvious constraints in developing benchmarks, particularly for assessing the progress of the reform initiative itself. There has been hardly any precedence in terms of available reference values for some of the components of the reform program. As an initiative to introduce far-reaching changes in sector functioning on demand responsive lines on a major scale, the TSC program has to have some well-defined benchmarks for making a comparative assessment across states.
4.2.1 Benchmark categories
In view of the reform objectives and principles as enshrined in the new TSC guidelines, four sets of benchmarks have been identified in order to have a comparative assessment of the progress being made in various TSC states. These are:
• Generating demand & Creation of an Enabling Environment (GDEE);
• Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT);
• Functionality, Access and Privacy of Sanitation Facilities (FAPS); and
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
58
• Usage, Maintenance and Sustainability of Sanitation Assets (UMS).
Knowledge Links
Private Limited
Total Symerwl:onsultln!l
It is foreseen that quality performance in all these categories would be necessary for States to realize the benefits of the program and ensure sustainability of investments and benefits. While certain benchmarks could be attainable over a shorter duration of time, attainment of others would be ensured only over a longer period of time through concerted efforts.
4.2.2 !Benchmark monitoring
The monitoring and evaluation system would propose numeric references for benchmarks, which all states must aspire to attain over the life of the program. However, since there are different levels of preparedness based on prior experience of managing demand responsive programs, states would be free to assign time limits over which they would like to monitor attainment of benchmarks.
Benchmarks would be monitored directly through the information flow against indicators being proposed for monitoring of activities. However the monitoring of benchmarks would also heavily thrive on the periodic review component and community monitoring system being proposed under the monitoring and evaluation system after exit from a village.
The information being fed in the computer, based on indicators, would generate status of attainment of benchmarks and a report for each state on actual attainment against desired level can be generated.
4.2.3 Benchmarks: Desirables vs. actuals
The benchmarking exercise would be carried out at the state level and the related reports would be generated by the computerised MIS on the basis of data already entered therein. The following table on benchmarks matrix contains the desired benchmark categories, the indicators to be employed for measuring the performance against it and the desired level to be attained under each benchmark category. The information regarding actual attainment against desired level would be generated through computer on the basis of information already recorded therein against various indicators.
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
59
sf .!>.It
.····
1.
2.
3.
Knowledge Links
Private Limited
Total Slllli!IF!Jll i:onsllltiii!J
Table 4.7: Benchmark Matrix (from quantitative MIS indicators)
. Benchmark '
Indicator Benchmark (Desired level) . Practice/Positioil against .··· category ·•·.· .• Benchmark (actual} •• ..
.. .. ·.. . .•
Generating Is there a detailed IEC 90% of the TSC districts % of the TSC districts have a demand & plan prepared for the have a detailed IEC plan detailed IEC plan prepared creating an district? prepared enabling
Community-wide 100% of the TSC villages % of the TSC villages have environment meetings held for have had Community-wide had Community-wide
(GDEE) formulation and meetings held for meetings held for formulation acceptance of formulation and acceptance and acceptance of Community Action Plan of Community Action Plan Community Action Plan (CAP) (CAP) (CAP)
Sub-total (GDEE)
Promotion of Community-wide 1 00% of the TSC villages % of the TSC villages have Appropriate meetings held for have had Community-wide had Community-wide and Cost- selection of technical meetings held for selection of meetings held for selection of effective options technical options technical options Technology &
% hhs. which have 50% hhs. have constructed % hhs. which have Alternative Delivery constructed IHHLs as IHHLs as against total no. of constructed IHHLs as against
Mechanisms against total no. of households in the village total no. of households in the
(PACT) households in the village village
% Household I 40% Household I Community % Household I Community Community contribution contribution towards contribution towards towards environmental environmental sanitation environmental sanitation sanitation assets assets (garbage pits, assets (garbage pits, (garbage pits, compost compost pits, soak pits and compost pits, soak pits and pits, soak pits and drainage) as against drainage) as against drainage) as against Household I Community Household I Community Household I Community contribution towards all contribution towards all contribution towards all sanitation assets (individual sanitation assets (individual sanitation assets and community) and community) (individual and community)
Development and 1 00% districts have % districts have developed demonstration of various developed and demonstrated and demonstrated various appropriate and cost- various appropriate and cost- appropriate and cost-effective technological effective technological effective technological options for sanitation options for sanitation facilities options for sanitation facilities in the district facilities
Sub-Total (PACT)
Functionality, Do at least 80% of 90% of villages have at least % of villages have at least Access and IHHLs ICSCs 80% of IHHLs ICSCs 80% of IHHLs ICSCs Privacy of constructed have a constructed with a proper constructed with a proper Sanitation proper superstructure in superstructure in order to superstructure in order to Facilities order to ensure privacy ensure privacy for women ensure privacy for women (FAPS) for women?
Design - M&E Module tor Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
· Benchrl1art ·.numerical vaiiJe {in o/o)
90
100
95
100
50
40
100
72.5
(Say 73)
90
60
4.
r.~ Knowledge Links + Tiltlll ~llllilr!lll ;::~:;: -------------------------- rrruat!!Um!ltcd
Do all schools in the 1 00% of villages have % of villages which have village have SSLs with ensured that all schools have ensured that all schools separate sanitation separate sanitation facilities have separate sanitation facilities for girls and for girls and boys facilities for girls and boys boys?
Sub-total (FAPS)
Usage, Whether all sanitation 80% of villages have all % of villages which have all Maintenance facilities (individual and sanitary latrines (individual sanitary latrines (individual and community) are being and community) being used and community) being used Sustainalbility used on a daily basis? on a daily basis on a daily basis of Sanitation
Is there a trained 90% of the TSC villages have % of the TSC villages which Assets (UMS) technician available trained technicians available have trained technicians locally for maintenance locally for maintenance and available locally for and repair activities? repairs maintenance and repairs
Sub-total (UMS)
Qualitative: The qualitative performance of state would be ascertained through periodic review scores attained by states on four major benchmark categories. The major categories and maximum marks for each of the benchmark category are:
Generating Demand & Creation of an Enabling Environment 25
Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms 25
Functionality, Access and Privacy of Sanitation Facilities 25
Usage, Maintenance and Sustainability of Sanitation Assets 25
Each benchmark category has a set of contributing factors and the reviewer would assign marks based on the status of attainment of these benchmark categories. While some of the conltributing factors have a direct bearing on the benchmarks, others though important have subsidiary bearings. Quality points have been assigned to the directly affecting contributing factors. The total values of these directly affecting contributing factors have been made the target benchmark value for that category. The major contributing factors for each of the benchmark category and their quality point are indicated below:
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 4- Integration Mechanism
61
100
95
80
90
85
~~ Knowledge Links ~
+ Private limltad
------------------------------- TlltlliSYIUlf!l:llllllllSIIItill!l f'f(lffitet!mlteil
Table: 4.8: Benchmark Matrix (from Qualitative Window i.e. Periodic Review)
>:>>>: >:: >> F > >C > :: > > >
s1~. Benchmark C~tegory> > Major contributing factor
N() >>: >> >
I>::;»>> :
!>: >:> <> >> > >> >>>>>.> >> >>
1. Generating Demand & Setting up of an appropriate institutional creating an Enabling arrangement (carrying well-defined project rules, Environment (GDEE) systems and operational procedures) to monitor
TSC projects and facilitate their implementation at the district level
Comprehensive and well-designed IEC Plan prepared at district Level worked out in a consultative manner and the quality of its implementation
Capacity development plan and activities for ZP, DWSMs and NGOs to achieve intended objectives and it's effective and timely implementation
Sub total (GDEE)
2. Promotion of Efforts made by the State to learn from best Appropriate and Cost- practices in this sector (state-wide, nationally and effective Technology internationally) and Alternative
Availability of a menu of area-specific low-Delivery Mechanisms (PACT) cost/appropriate technological options for
sanitation and demonstration of the same
Close supervision of village proposals by district functionaries to ensure adherence to construction specifications, norms, unit costs etc. and construction supervision by district to ensure good quality construction.
Establishment of and close supervision of functioning of RSMs and PCs to ensure their success as alternative delivery mechanisms
Sub total (PACT)
3. Functionality, Access Availability of water for use in sanitary latrines and Privacy of either inside or outside Sanitation Facilities
Easy access to sanitation facilities without any (FAPS) stagnant pool of water on the way
Suitability of the design in terms of providing privacy to people, particularly women
Sub total (FAPS)
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
>>
Clu~tlity point Maximum
(benc;hmarl( marks
target):> >>
4
5
4
13 (52%) 25
3
4
3
3
13 (52%) 25
5
5
5
15 (60%) 25
62
4. Usage, Maintenance and Sustainability of l)anitation Assets {UMS)
Sub total (UMS)
4.2.4 Benchmark Reports
Quality of maintenance and use of the sanitation facilities created
Community Monitoring System in place, active and quality/ effectiveness of their activities
10
8
Knowledge Links
Prlva1B Llmlt8d
Total Sl.lll®f!illl:llillillitill!l
18 (72%) 25
Computer would generate reports depicting actual performance of states vis-a-vis desired levels through information generated through indicators, periodic reviews and community monitoring systems. These reports would be generated on an annual basis. These reports would be used for analyzing trends and identifying practices that enable and hinder better performance. The stakeholders would discuss the key findings and have an opportunity to interact with each other and with the best-practice villages, districts or states. These would help stakeholders to create action plans tailored to their needs based on the benchmark reports.
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 4- Integration Mechanism
63
II 5 II M&E Management Structure
5.1 Background
51~ Knowledge Links
Private Umlled Total SW®f!ll!l Commltil'l!l
Since the launch of the Total Sanitation Campaign (TSC) in April 1999, around 400 projects have been sanctioned in different districts across the country. These projects are at various stages of implementation.
Till recently, the progress of implementation in the various districts, was monitored manually by the Rajiv Gandhi National Drinking Water Mission (RGNDWM). Data in the prescribed formats was sent by post to the Mission and, thereafter, necessary information processing was done manually in order to produce required outputs. This method was time consuming and heavily reliant on the person dealing with this data. These bottlenecks were subsequently ironed out by the introduction and use of a computer based information system, using WEB based technology, which enables easy data access and retrieval from any location on the globe, over the Internet.
The present software being used by RGNDWM takes care of the various TSC project issues listed below:
1. Project Sanctioned details for Districts Projects.
2. Funds released by Mission to Districts under TSC.
3. Monthly Financial statements (Funds released by the States I Beneficiaries & Utilized by districts) received from Districts.
4. Monthly Physical Achievement (Households Latrines, School Toilets, Balwadi Toilets, Community Sanitary Complexes, RSM, PC etc.) received from districts.
5. TSC Action Plan for 2003-2004.
6. List of Contact Persons.
The total volume and diversified nature of the data that gets generated out of the system, calls for a proper information system planning. This is expected to streamline monitoring and reconciliation activity of funds and resources.
The present software has been developed in ASP 3.0 using VBScript & JavaScript on client
side with MS-SQL Server 7.0 as Backend database, on a 2-tier architecture (Client-Server Web technology). The data inputs I updates made through this software gets automatically
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 5- Management Structure
64
['.i~ Knowledge Links
~* "iiltllll>l!IIOF!I;~;;~~~:!I ----------------------------- '"""""""'
reflected in the reports generated by the system, which can be easily retrieved by anyone, havin~~ access to the Net.
Objectives and Benefits of the online monitoring system being used by RGNDWM presently:
~ Centralized database for monitoring all the projects.
~ Speeds up information flow from the Districts.
~ Improved efficiency, performance and speed in decision-making process.
~ Enhanced security of the system with password protection.
~ Ease in historical Data Maintenance.
~ Elimination of human error in processes.
Besides the online monitoring MIS-based computerized system being followed by the TSC, there are other M & E methods being used like the conventional report system, field visits, review meetings, course corrections, community based monitoring, independent agency monitoring mid line and end line surveys.
5.2 Limitations of present M & E System
While the present system being followed by the Mission is quite comprehensive and well thought out, there are some inherent limitations, which are as follows:
~ There is no proper system formulated for information flow from the TSC villages to the blocks and then on to the districts. Therefore, there is the danger that the information fed online at the district level, may not be based on hard facts coming up from the grass-root level and thus, it may not be totally reliable. There is no check and balance mechanism in-built for cross-verification of data being fed into the system.
~ The physical and financial progress of the project are not the only factors to be monitored. The present system does not cater to the monitoring and evaluation of qualitative, process-based aspects of the project, which are so essential to the reform initiatives in this sector.
~ There are no systems developed for giving feed-back to the community and for the follow-up of any remedial actions and mid-course corrections recommended
as a result of M & E activities.
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 5- Management Structure
65
Knowledge Links
PrlvateUmltsd
Total Slll!llf!lllilllllSI.!itill!l Pr!lmh'llimlieil.
> A scoring mechanism or benchmarks have not been developed, by which one can tell where a particular TSC village, district or state stands in comparison to others and in which particular aspect they need to improve their functioning and implementation, in order to be successful.
> Community-based monitoring which is essential for a 'community-led', 'people-centred' project, is as yet not a part and parcel of the existing M & E system. Unless this is made an integral part of the M & E system, the sense of ownership of the project and their effective participation in all it's processes will not be fostered.
> The existing system is almost entirely quantitative in nature and there is an inherent danger that there may be misrepresentation of facts and figures in the enthusiasm of functionaries to show timely and speedy project progress.
> Result-oriented and thorough monitoring and evaluation needs trained and earmarked personnel, who work through proper channels in a systematized manner so that flow of information to and from the field is not, blocked anywhere. There is not much clarity regarding these flow channels and systems in the existing M & E system. Hence, there is lack of accountability.
5.3 Strategy for Management of Proposed M & E of Total Sanitation Campaign
Currently, in many states water supply and sanitation are being managed independently by separate organizations. However it is envisaged that States would implement water supply and sanitation in an integrated manner and existing SWSM, DWSMs and VWSCs at the state, district and village levels would be responsible for both Water Supply and Sanitation and all their various dimensions. The proposed M&E system of TSC would rely heavily on the proposed institutional arrangement i.e. DWSM and SWSM for managing the reform projects.
In line with the above scenario in which water supply and sanitation are being jointly managed by the same implementing/facilitating agencies/organizations at all levels, it is anticipated that there would be substantial savings in the management costs of the M&E system. The following costs should be common and shared by both projects:
> Hardware and software costs at the state and district/sub-divisional levels.
> Costs of conducting the State and District Periodic Reviews as they can be jointly conducted. Only if there are villages in which only TSC or only Swajaldhara are being implemented in isolation, costs would have to be booked separately under the respective programmes by concerned department/agency.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 5- Management Structure
66
Knowledge Links
Private LlmltBd
lotallhiiUifgy COIIS!lltillg
~ Training of trainers on MIS, periodic review and community monitoring can also be done jointly as the components and methods to be followed are very similar in nature.
~ The costs to be incurred on additional staff members also will be common as these staff members will be handling the M&E workload of both Swajaldhara and TSC.
It is foreseen that State's would put in place a Core Group compnsmg multidisciplinary professionals for managing water supply and sanitation projects based on reform principles. At the village level, the VWSC members will be responsible for filling up the necessary information on the designed issues, fields and indicators in the prescribed formats and submitting them in a timely manner to the DWSC. All data entry would be done at the level of district through a team of Data Entry Operators (DEOs) supervised by an M&E coordinator positioned in the Core Group exclusively for Swajaldhara and TSC. The District M&E coordinator would be able to generate reports based on information provided by NGOs and fed into the computerized system by the DEOs.
It is proposed that professionals deployed in the Core Group be made responsible for a particular set of villages and all data/information generated from those set of villages would be analyzed by the responsible professional and necessary action initiated.
The information flow at different levels and agencies responsible for M&E can be found in Annexure IV.
5.4 Suggested Management Structure
The proposed M & E system comprises of three main components, namely a computerized MIS system which is quantitative in nature, a qualitative component which consists of a periodic review process and a community monitoring system. It is a bottom-up system, which has specified formats, and reports in which data has to be either recorded manually or fed into a computerized system.
5.4.1 Village Level
For the purposes of the proposed M & E design of the TSC project, the first level of management would be at the village level. Since the unit for evaluation of various parameters at the community level is the village, which will be made of several habitations and at which the VWSC will be community-based organization responsible for day-to-day management of projE!Ct functions, it will be the VWSC itself who will be trained and made responsible to fill the necessary data in the Village Level One-Time (V0-10) and Monthly Information (VM-9) formats prescribed by the proposed M & E design during the Planning and Implementation
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Chapter 5- Management Structure
67
Phases. These formats will then be handed over to the concerned DWSC/ Core Group functionary at district level who is responsible for facilitation and project management of that particular TSC village. During the O&M Phase, the VWSC will collect the relevant data using
different methods and tools and fill it in the Inland Letter Format (VQ-11) and send it by post
on a monthly basis to the DWSC. The training of VWSC and other responsible community members in M & E methods and procedures may be conducted by a suitable NGO or training
institution appointed for the purpose. Initially, the trainers will also have to be trained in these
methods by persons who are proficient in the administration of the proposed M&E module for TSC.
5.4.2 District level
According to the TSC guidelines the district is envisaged to be the focal point for the overall
management of projects. Zilla Parishad/Panchayat (ZP) would be the agency responsible for overall project planning and management at the district level. In cases where there is no ZP,
a DWSC will have to be specially constituted for the purpose.
A core group of multi-disciplinary professionals would need to be set up at the district level. It
is proposed that the members of this core group at the district level carry the required experience and skills in Communication, Human Resource Development, Monitoring and
School Sanitation & Hygiene Education etc.
The district would be the nerve centre of the designed M&E system, as most of the related
critical functions such as data collection, entry, analysis and use would converge at that level.
The management structure suggested presupposes the presence of a full-time project manager at the district level. Ideally it would be desirable to have a district project manager for the purpose. However, in case of member secretary, DWSC being the overall in-charge,
which is generally an ex-officio position, it is recommended that suitable full time project management assistance is made available for day-to-day management of project activities.
The same would be applicable where Zilla Parishad/Panchayat is managing the project at the district level.
The district project manager would need to be assisted by a core group of multi-disciplinary professionals as indicated above. One of the team members must be a monitoring and evaluation specialist, who is designated as the M&E coordinator and is entrusted with the responsibility of day-to-day management of the designed M&E system. Other professionals in the core group should be given the responsibility of field coordinators. Each field coordinator
would be allocated a number of villages/schemes and would be responsible for supervising
the work being done on the ground in the project villages.
The field coordinators would be broadly of two types based on their specialization in
engineering and community development aspects. In the planning phase, the field
coordinator specializing in community development should be the lead coordinator with the
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Chapter 5- Management Structure
68
Knowledge Links
Private Limhad
Total Sl91illt!lli illll'l!!l!ltlll!l
one specializing in engineering aspects providing the required assistance. In implementation these roles would be reversed and the engineering specialist would be the lead coordinator with the community development specialist providing the necessary assistance. However, this must be decided at the local level as per specific needs, demands and constraints in view of the ground realities.
For the purposes of data entry, the M&E coordinator would be assisted by one or two data entry operators as per requirement. However, the actual number of data ·entry operators and field coordinators in the district team would vary as per the number of villages actually undertaken under TSC in a particular district.
The field coordinators (core group members) shall ensure timely collection of data from the VWSC as per the input formats designed and periodicity of collection agreed for the purpose and make it available to the M&E coordinator at the district level for its entry into the computerized system by data entry operators. it would be the responsibility of the M&E coordinator to make sure that all data entered in the system is cross-checked by at least one more person to avoid any errors of omission and commission.
5.4.~1 State level
Within the TSC framework, the State Government should set up an appropriate institutional arrangement to monitor the projects and facilitate the districts in implementing TSC. However, in states where Water supply & sanitation are handled by two different departments, separate institutional set up may also be made subject to the condition that officials handling water supply should be actively associated with this.
In view of the above, the states have been given a role in operationalising the designed M&E system both in terms of coordinating various functions related to the management of the computerised MIS at the state and district levels on the one hand and organising periodic review exercise in the TSC districts on a regular basis on the other.
The purpose of the periodic review exercise would be to identify areas of weakness in imp!lementation and suggest measures for mid-course corrections and desired improvements. A full time M&E coordinator would be required to carry out all the necessary management functions in this regard at the state level. The M&E coordinator at the state level would report to the member secretary SWSM. The specific responsibilities would include forming a review team in each project district, drawing up a roaster for annual reviews to be carried out in each TSC district in the state and making sure that the periodic reviews take place as scheduled and the review scores and the related descriptive text are entered in the computer-based MIS at the district level in time.
Other important functions at the state level include integrating and operating communication and capacity development programmes for both water supply and sanitation. This potentially
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Chapter 5- Management Structure
69
Knowledge Links
PIIY£umiCJ Total S~memll Commlting
includes an initiative to build the capacities of the concerned project functionaries at the state and district levels for an efficient and effective use of the M&E MIS and also integrate the monitoring and evaluation functions related to water supply and sanitation.
5.4.4 National level
As per the proposed M&E system, RGNDWM at the Government of India level has the most crucial role in terms of an efficient and effective functioning of the system being designed. Some of the key functions of the system include web management related to IT-based MIS and parts of benchmarking, Performance Index Card (PIC) and the periodic review component of the system to be managed at the national level. Hence, a full time dedicated monitoring and evaluation coordinator is proposed to be put in place at the RGNDWM level for managing the system, as already suggested in Swajaldhara M&E system design document. It is proposed to have one M&E coordinator at the national level looking after both Swajaldhara and TSC.
The actual management of the web-based M&E MIS has to be done centrally at the RGNDWM level on a day-to-day basis. This would require a full time IT specialist trained for the purpose. IT specialists from NIC currently placed with RGNDWM could be trained to manage the MIS, who could function as per the overall supervision and guidance provided by the M&E coordinator at that level. The IT specialist would be assisted by the required number of data entry operators.
A panel of professionals would be prepared at the national level for the periodic review proposed to be carried out in each TSC state once in a year by RGNDWM. The professionals have to be selected on the basis of their experience and expertise in the sector. A list of professionals is reportedly already drawn at RGNDWM.
Operationalisation of this suggested management structure is dependent on appropriate and adequate capacity building, particularly training and technical assistance, to be carried out for desired skill up-gradation of the personnel involved at various levels.
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Chapter 5- Management Structure
70
~~ Knowledge Links
Private Limited
Total Sli!IIIF!Jllllollsllltiii!J
ANNEXES
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign
Kn
ow
led
ge
Lin
ks
.--...
......
Lim
ited
'l"llt
lll S
l!MIII
fllll
Clll
lSill
tillll
, .
,,. ..
. ~ U
111!1
1Jt1
Tab
le 1
: L
og
ical
Fra
mew
ork
of T
ota
l S
anit
atio
n C
amp
aig
n
Go
al:
Imp
rove
men
t in
th
e g
ener
al q
ual
ity
of
life
in t
he
rura
l ar
eas
Pu
rpo
se:
Red
uct
ion
in
mo
rbid
ity
rate
by
red
uci
ng
in
cid
ence
of f
ecal
-ora
l d
isea
se t
ran
smis
sio
n
s.
Cri
tica
l fu
nct
ion
s P
roje
ct
Ind
icat
or
No
. C
om
po
nen
t/s
Invo
lved
' J.
,, P
rin
cip
le:
Gen
erat
ing
Dem
and
an
d c
reat
ing
an
En
abli
ng
En
viro
nm
ent (
GD
EE
),
1 C
ondu
ctin
g ba
selin
e su
rvey
S
tart
-up
Act
iviti
es
1.
Bas
elin
e S
urve
y co
mpl
eted
in t
he
villa
ge
2 P
repa
ratio
n o
f a d
eman
d-S
tart
-up
Act
iviti
es
2.
For
mul
atio
n o
f com
preh
ensi
ve a
nd
resp
onsi
ve P
roje
ct
wel
l-des
igne
d D
istr
ict
Leve
l P
roje
ct
Impl
emen
tatio
n P
lan
(PIP
) Im
plem
enta
tion
Pla
n (P
IP)
in k
eepi
ng
with
TS
C g
uide
lines
and
ref
orm
in
itiat
ives
3 D
esig
ning
and
car
ryin
g ou
t A
dmin
istr
ativ
e 3.
. C
omm
unity
-wid
e m
eetin
g he
ld f
or
IEC
act
iviti
es
and
IEC
· f
orm
ulat
ion
and
acce
ptan
ce o
f C
omm
unity
Act
ion
Pla
n (C
AP
)
4.
Is t
here
a d
etai
led
IEC
pla
n pr
epar
ed
for
the
dist
rict?
5.
Com
preh
ensi
ve S
choo
l S
anita
tion
and
Hyg
iene
Edu
catio
n P
lan
prep
ared
at
Sta
te L
evel
in c
lose
co-
ordi
natio
n w
ith S
tate
Edu
catio
n D
epar
tmen
t
4 A
rran
ging
for
ade
quat
e an
d A
dmin
istr
ativ
e 6.
N
GO
s se
lect
ed a
nd i
n pl
ace
for
trai
ned
man
-pow
er a
nd
and
IEC
pr
ojec
t ac
tiviti
es
appr
opri
ate
use
of r
esou
rces
fn
r f
"'ll
"ili
t-:l
fin
n/i
n"t
on
l.a
.rn
on
+in
rt
De
sig
n-
M&
E M
odul
e fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x !.A
-L
og
ica
l Fra
mew
ork
Typ
e M
ean
s o
f o
fln
d.
veri
fica
tio
n i
n p
rop
ose
d M
&E
sy
stem
;
' c
Pr
. One
tim
e V
illag
e In
form
atio
n S
heet
: F
orm
V0
-10
Pr
. One
-tim
e D
istr
ict
Info
rmat
ion
She
et:
D0
-13
Pr
• O
ne-t
ime
Vill
age
Info
rmat
ion
She
et:
For
m V
0-1
0
Pr
. One
-tim
e D
istr
ict
Info
rmat
ion
She
et:
For
m D
0-1
3
Pr
• O
ne-t
ime
Sta
te
Info
rmat
ion
She
et:
S0
-15
Pr
. One
-tim
e D
istr
ict
I In
form
atio
n S
heet
: F
orm
D0
-13
Per
iod
icit
y o
f d
ata
colle
ctio
n
,c i
c,
Onc
e
I
Onc
e I
Onc
e
Onc
e
Onc
e
Onc
e
71
S4 K
no
wle
dg
e L
ink
s
•..
....
111
Lim
ited
Tot
al S
llil
lilr
!l!l
CII
IISI
!Itil
l!l
• n~u•~ U
m!tf
il:l
s.
Cri
tica
l fu
nct
ion
s P
roje
ct
Ind
icat
or
Typ
e M
ean
s o
f P
erio
dic
ity
No
. C
om
po
nen
t/s
ofl
nd
. ve
rifi
cati
on
in
of d
ata
Invo
lved
p
rop
ose
d M
&E
co
llect
ion
sy
stem
fo
r fa
cilit
atin
g/im
plem
entin
g 7.
C
ompr
ehen
sive
Cap
acity
Bui
ldin
g P
r . O
ne-t
ime
Sta
te
Onc
e pr
ojec
t ac
tiviti
es
Str
ateg
y an
d P
lan
prep
ared
at
Sta
te
Info
rmat
ion
She
et:
Leve
l F
orm
S0
-15
Sta
rt-u
p, I
EC
, 8.
%
of s
oftw
are
expe
nditu
re (
star
t-up
, FP
. M
onth
ly D
istr
ict
Mon
thly
ad
min
istr
ativ
e IE
C,
adm
in.)
as
agai
nst
elig
ible
In
form
atio
n S
heet
: ex
pend
iture
s fo
r th
e sa
me
For
m D
M-1
4
II.
Pri
nci
ple
: P
rom
oti
on
of C
ost
-eff
ecti
ve t~chnologyand Alternativ~ D
eliv
eJ'Y
Mec
han
i$m
{P
AC
T}
· .•·.
·•· .
.. .
.· .
.... , ....
· .
5 H
elpi
ng u
sers
mak
e an
IH
HLs
9.
C
omm
unity
-wid
e m
eetin
g he
ld f
or
info
rmed
cho
ice
by
shar
ing
all
sele
ctio
n o
f Tec
hnol
ogic
al O
ptio
ns f
or
the
avai
labl
e te
chn
olo
gy
San
itatio
n op
tions
of
IHH
Ls w
ith t
hem
IH
HLs
10
. D
evel
opm
ent
and
dem
onst
ratio
n o
f va
rious
app
ropr
iate
and
cos
t-ef
fect
ive
tech
nolo
gica
l op
tions
for
san
itatio
n fa
cilit
ies
in t
he d
istr
ict
6 P
rom
otio
n o
f R
SM
s an
d P
Cs
RS
Ms,
PC
s 11
. %
of
RS
Ms/
PC
s co
nstr
ucte
d as
fo
r al
tern
ate
deliv
ery
agai
nst t
he t
arge
t in
the
PIP
7 C
onst
ruct
ion
of I
HH
Ls,
CS
Cs
IHH
Ls
12.
% H
ouse
hold
s w
hich
hav
e an
d S
SLs
, A
WL
s/B
WL
s in
a
cons
truc
ted
IHH
Ls a
s ag
ains
t to
tal
cons
ulta
tive
ma
nn
er
no.
of h
ouse
hold
s in
the
vill
age
IHH
Ls
13.
% I
HH
Ls c
ompl
eted
aga
inst
thos
e ap
prov
ed in
CA
P/P
IP
CS
Cs,
SS
Ls,
14.
%o
f CS
Cs,
SS
Ls,
AW
Ls &
BW
Ls
AW
Ls/B
WLs
co
mpl
eted
as
agai
nst t
hose
app
rove
d in
CA
P/P
IP
I_
_L
_
--·
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x /.A
-L
og
ica
l Fra
me
wo
rk
Pr
• O
ne-t
ime
Vill
age
Onc
e In
form
atio
n S
heet
: F
orm
V0
-10
Pr
• O
ne-t
ime
Dis
tric
t O
nce
Info
rmat
ion
She
et:
For
m D
0-1
3
pp
•
Dis
tric
t In
form
atio
n M
onth
ly
She
ets:
DM
-12
&
D0
-13
p
p
. Vill
age
Info
rmat
ion
Mon
thly
S
heet
s: V
M-9
pp
. M
onth
ly V
illag
e M
onth
ly
Info
rmat
ion
She
et:
For
m V
M-9
pp
. V
illag
e In
form
atio
n M
onth
ly
She
ets:
VM
-9 &
V
0-1
0
·----
--·---
72
s.
Cri
tica
l fu
nct
ion
s P
roje
ct
Ind
ica
tor
No.
C
om
po
ne
ntls
In
volv
ed
15.
% p
opul
atio
n o
f the
dis
tric
t cov
ered
by
TS
C a
s ag
ains
t tar
gete
d po
pula
tion
to b
e co
vere
d
8 E
xpe
nd
iture
and
com
mun
ity
All
16.
%o
f ha
rdw
are
expe
nditu
re (
IHH
L,
cont
ribu
tion
for
sani
tatio
n C
SC
, S
SL,
RS
M/P
C)
as a
gain
st
ass
ets
el
igib
le e
xpen
ditu
res
for
the
sam
e
IHH
Ls
17.
%C
om
mu
nit
y C
ontr
ibut
ion
tow
ards
IH
HLs
as
agai
nst t
he t
arge
t fix
ed f
or
the
sam
e in
CA
P/P
IP
CS
Cs,
SS
Ls,
18.
% C
omm
unity
Con
trib
utio
n to
war
ds
AW
Ls,
BW
Ls
CS
Cs,
SS
Ls,
AW
Ls,
BW
Ls a
s ag
ains
t the
tar
get f
ixed
for
the
sam
e in
CA
P/P
IP
No
com
pone
nt
19.
% H
ouse
hold
/Com
mun
ity
prov
ided
in T
SC
co
ntrib
utio
n to
war
ds e
nviro
nmen
tal
guid
elin
es -
only
sa
nita
tion
asse
ts (
garb
age
pits
, in
prin
cipl
e co
mpo
st p
its,
soak
pits
and
dra
inag
e)
as a
gain
st h
ouse
hold
/com
mun
ity
cont
ribut
ion
tow
ards
all
sani
tatio
n as
sets
(in
d~vi
dual
and
com
mun
ity}
•. lit
.·.
Pnn~
lpl$
: F~ri(::tionalify,
Acc
e.s
an
d P
riva
cy o
f San
itati(
)n fa
Cili
ties.
(FA
PS
) 9
Ens
urin
g av
aila
bilit
y o
f wat
er
IHH
Ls,
CS
Cs,
20
. D
o at
leas
t 80
% o
f san
itary
latr
ines
fo
r us
e in
san
itary
latr
ines
S
SLs
, A
WLs
and
(in
divi
dual
and
com
mun
ity)
have
B
WLs
ru
nnin
g/ s
tore
d w
ater
ava
ilabl
e in
side
/out
side
?
10
Ens
urin
g ac
cess
and
priv
acy
IHH
Ls /
CS
Cs
21.
Do
at le
ast 8
0%
of I
HH
Ls /
CS
Cs
to s
anita
tion
faci
litie
s fo
r co
nstr
ucte
d ha
ve a
pro
per
wo
me
n a
nd g
irls
supe
rstr
uctu
re in
ord
er to
ens
ure
priv
acy
for
wom
en?
SS
Ls
22.
Do
all
scho
ols
in t
he v
illag
e ha
ve
SS
Ls w
ith s
epar
ate
sani
tatio
n fa
cilit
ies
for
girls
and
boy
s?
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
!.A -
Lo
gic
al F
ram
ew
ork
~ K
no
wle
dg
e L
inks
n..a
.._ .
....
'""G
-Um
lbld
lllt
lil S
!mllf
!ill
CII
IISI
!Itll
l!i
, .,~.,..,. lll
l~UI
II
Typ
e M
eans
of
Pe
rio
dic
ity
of!
nd
. ve
rific
atio
n in
o
f dat
a p
rop
ose
d M
&E
co
llect
ion
s)
'ste
m
pp
•
Dis
tric
t In
form
atio
n M
onth
ly
She
ets:
DM
-12
FP
. M
onth
ly D
istr
ict
Mon
thly
In
form
atio
n S
heet
: F
orm
DM
-12
FP
• V
illag
e In
form
atio
n M
onth
ly
She
ets:
VM
-9 &
V
0-1
0
FP
. V
illag
e In
form
atio
n M
onth
ly
She
ets:
VM
-9 &
V
0-1
0
FP
. Vill
age
Info
rmat
ion
Mon
thly
S
heet
: V
M-9
I I I
' . '.
··I
. . ..
Pr
• O
ne-t
ime
Vill
age
Onc
e In
form
atio
n S
heet
: V
0-1
0
Pr
• O
ne ti
me
Vill
age
On
eT
ime
In
form
atio
n S
heet
: F
orm
V0
-10
Pr
• O
ne ti
me
Vill
age
On
eT
ime
In
form
atio
n S
heet
: F
orm
V0
-10
73
s.
Cri
tica
l fu
nct
ion
s P
roje
ct
Ind
icat
or
No
. C
om
po
nen
t/s
Invo
lved
11
Ens
urin
g e
qu
ity a
nd a
cces
s to
IH
HLs
23
. W
heth
er a
t le
ast
25%
sub
sidy
is
sani
tatio
n fa
cilit
ies
for
SC
/ST
sp
ent
for
SC
/ST
IH
HLs
as
agai
nst
tota
l su
bsid
y sp
ent o
n IH
HL
s?
IV.
Pri
nci
plf
!: U
sagE
!, M
ain
ten
ance
an
d S
ust
ain
abil
ity
of S
anit
atio
n A
sset
S (
OM
S)
12
Impr
ovin
g th
e cl
eanl
ines
s o
f N
o co
mpo
nent
24
. Is
cle
anlin
ess
bein
g m
aint
aine
d in
the
th
e vi
llage
en
viro
nm
en
t by
pr
ovid
ed in
TS
C
villa
ge?
(Vill
age
drai
ns a
nd l
anes
are
p
rop
er
use
and
mai
nten
ance
·
guid
elin
es -
on
ly
clea
n, a
bsen
ce o
f pon
ding
aro
und
of e
nvir
onm
enta
l san
itatio
n in
prin
cipl
e w
ater
poi
nts
and
prop
er d
ispo
sal o
f ite
ms
garb
age
and
cow
-dun
g)
HH
Ls,
CS
Cs,
25
. Is
the
vill
age
elig
ible
for
Nirm
al G
ram
S
SLs
, A
WLs
and
P
uras
kar?
B
WLs
13
E
nsur
ing
avai
labi
lity
of t
rain
ed
Adm
inis
trat
ive
26.
Is t
here
a t
rain
ed t
echn
icia
n av
aila
ble
tech
nici
an
and
IEC
lo
cally
for
mai
nten
ance
and
rep
air
activ
ities
? 14
E
nsur
ing
use
of s
anita
ry
IHH
Ls,
CS
Cs,
27
. W
he
the
r al
l th
e sa
nita
ry la
trin
es
latr
ines
on
a su
stai
ned
basi
s S
SLs
, A
WLs
and
(in
divi
dual
and
com
mun
ity)
are
bein
g B
WLs
us
ed o
n a
daily
bas
is
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x /.A
-L
og
ica
l Fra
me
wo
rk
• Kn
ow
led
ge
Lin
ks
Do
oh
·-"
' ..
....
.. L
imite
d
Tot
al S
lll'!
ilr!
ll!l
llll
llll
llti
llll
..
....
.. ~U
m!tall
Typ
e M
ean
s o
f P
erio
dic
ity
ofl
nd
. ve
rifi
cati
on
in
of d
ata
pro
po
sed
M&
E
colle
ctio
n
syst
em
Pr
• D
istr
ict
Info
rmat
ion
One
Tim
e S
heet
DO
-1
3
·. .. ·
. .
" "·
Pr
. Inl
and
Lette
r: V
Q-
Mon
thly
11
Pr
. Inl
and
Lette
r:
Mon
thly
V
Q-1
1
Pr
• In
land
Let
ter:
VQ
-M
onth
ly
11
Pr
• In
land
Let
ter:
M
onth
ly
VQ
-11
74
AN
NEX
UR
EI.B
Q
uan
tita
tive
Win
do
w:
Co
mp
ute
r-b
ased
MIS
Ind
icat
ors
T
able
I.B
(i)
: V
illa
ge
Lev
el
S.N
o.
Ind
icat
or
,'
Pro
ces5
!nd
icat
ors
1.
B
ase
line
Sur
vey
com
plet
ed in
the
vill
age
2.
Com
mun
ity-w
ide
mee
ting
held
for
Sel
ectio
n o
f Tec
hnic
al O
ptio
ns f
or S
anita
tion
3.
Com
mun
ity-w
ide
mee
ting
held
for
For
mul
atio
n an
d ac
cept
ance
of
Co
mm
un
ity
Act
ion
Pla
n (C
AP
)
4.
Do
at
lea
st 8
0% o
f IH
HLs
/C
SC
s co
nstr
ucte
d ha
ve a
pro
pe
r su
pers
truc
ture
in~
o
rde
r to
ens
ure
priv
acy
for
wom
en?
5.
Do
all
scho
ols
in t
he v
illag
e ha
ve S
SL
s w
ith s
epar
ate
sani
tatio
n fa
cilit
ies
for
girls
an
d bo
ys?
6.
Is t
he
re a
trai
ned
tech
nici
an a
vaila
ble
loca
lly fo
r m
aint
enan
ce a
nd r
ep
air
ac
tiviti
es?
7.
Do
at
lea
st 8
0% o
f san
itary
latr
ines
(in
divi
dual
and
com
mun
ity)
have
run
ning
/ st
ored
wa
ter
avai
labl
e in
side
/out
side
? '
8.
Is c
lean
lines
s be
ing
mai
ntai
ned
in t
he v
illag
e? (
villa
ge d
rain
s an
d la
nes
are
clea
n, a
bsen
ce o
f pen
ding
aro
und
wa
ter
poin
ts a
nd p
rope
r di
spos
al o
f gar
bage
an
d co
w-d
ung)
?
9.
Wh
eth
er
all t
he s
anita
ry la
trin
es (
indi
vidu
al a
nd c
omm
unity
) ar
e be
ing
used
on
a d
aily
bas
is?
10.
Is t
he v
illag
e el
igib
le f
or
Nir
mal
Gra
m P
uras
kar
bonu
s? *
Sub
-tot
al o
f P
roce
ss I
ndic
ator
s L
---------
---
--
----
--
-
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
1.8
-C
om
pu
teri
zed
MIS
indi
cato
rs
Yes
/No
or
MO
V
%,
Dat
e ,', ''
<
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
V
Q-1
1
Y/N
-(I
f V
0-1
0
Y:
Dat
e)
Y/N
V
Q-1
1
Y/N
V
Q-1
1
Y/N
V
Q-1
1
~ K
no
wle
dg
e L
ink
s
rnva
w L
imite
d
Tot
al S
llllO
fl&ll
CO
IIS
IIIt
ill!
l <a
•N"<
<>llf
filtB
tl
Ph
ase:
M
ax.
Co
mm
ents
P
P,
P,l
, M
arks
O
&M
',
',,:',
'
,'\i
'
',,,
>
,' p
p
25
p 25
p 25
I 25
I 25
O&
M
10
I 25
IH
HLs
, C
SC
s,
SS
Ls/A
WLs
/BW
Ls
O&
M
35
All
thre
e fa
ctor
s m
entio
ned
in
brac
kets
sho
uld
be
obse
rved
to a
sses
s th
is in
dica
tor
O&
M
35
IHH
Ls,
CS
Cs,
S
SLs
/AW
Ls/B
WLs
O&
M
20
Ple
ase
refe
r to
*
250
15
~ K
no
wle
dg
e L
ink
s
~
Pri
vate
Llm
iC
Tot
al S
lll'l
llf!
llll
.llln
suit
lll!
l ,-
. .. , .
....
Um
llll
d
- S.
No
. In
dic
ato
r Y
es/N
o,
Mea
ns
of
Ph
ase:
M
ax.
Co
mm
ents
%
, V
erif
icat
i P
P,
P,l
, M
arks
D
ate
on
O&
M
"'
.>,,
'' '
· Phy
SiC
JI P
rog
ress
Ind
icat
ors
. ··
. " :.,
.,>
• ·•
·• ''
",',
'
. .·•
,<
• ':.
· ..
:• •. ·
',
··,;·:
• ~
: :;
• :
~ ~
S'_ •
.•.... ···~.
: .:·
····
• •
11.
%o
f IH
HL
s co
mp
lete
d a
gain
st th
ose
app
rove
d in
CA
P/P
IP
%
VM
-9
I 4
0
12
% o
f CS
Cs,
SS
Ls/
AW
Ls/
BW
Ls
com
plet
ed a
s a
ga
inst
tho
se a
pp
rove
d in
%
V
M-9
I
25
CA
P/P
IP
13.
% H
ou
seh
old
s. w
hich
hav
e co
nstr
ucte
d IH
HLs
as
ag
ain
st t
he t
otal
no.
of
%
VM
-9
I 60
A
dd
IH
HL
s h
ou
seh
old
s in
th
e v
illag
e co
nstr
ucte
d d
uri
ng
the
pro
ject
(A
PL
+ B
PL
) w
ith e
xist
ing
IHH
Ls
(AP
L +
B
PL
) as
sho
wn
in
the
base
line
data
fr
om h
ab
su
rve
y an
d d
ivid
e b
y to
tal
nu
mb
er
of
ho
use
ho
lds
in
the
villa
ge a
s av
aila
ble
in
Sw
aja
ldh
ara
ha
bita
tion
surv
ey
data
. S
ub
-to
tal
of
Ph
ysic
al P
rog
ress
In
dic
ato
rs
125
,·, ... ,
',
F~nancial ProgressJndlca~ors
.: .. ·••
·· •·····
•
• ··
.. ·
. · ... ··· .
..•. ·
·· ..
/ ''
' .•
' •.
·."
·• .•.
' '<
'·
·, ::··
·: :
• .
> .
.... 'F
. 14
. %
Co
mm
un
ity
con
trib
utio
n t
owar
ds I
HH
Ls a
s a
ga
inst
the
ta
rge
t fix
ed f
or
the
%
VM
9 I
40
sam
e in
CA
P/P
IP
15.
% C
om
mu
nit
y co
ntr
ibu
tion
tow
ards
CS
Cs,
SS
Ls/
AW
Ls/
BW
Ls
as a
ga
inst
the
%
V
M-9
I
25
targ
et
fixed
fo
r th
e s
am
e in
CA
P/P
IP
16.
% H
ou
seh
old
I C
om
mu
nity
con
trib
utio
n to
war
ds e
nvi
ron
me
nta
l san
itatio
n a
sse
ts
%
VM
-9
I 60
(g
arb
ag
e p
its,
com
po
st p
its,
soa
k pi
ts a
nd d
rain
ag
e)
as a
ga
inst
Ho
use
ho
ld I
Co
mm
un
ity
con
trib
uti
on
tow
ards
all
sani
tatio
n a
sse
ts (
indi
vidu
al a
nd
com
mun
i!y)_
S
ub
-to
tal
of
Fin
anci
al P
rog
ress
Ind
icat
ors
12
5 G
ran
d T
ota
l o
f Vill
age
lev
el
Co
mp
ute
r-b
ased
MIS
In
dic
ato
rs
500
--
-·
--·
--
--
--------~
* In
dic
ato
r# 1
0 w
ill b
e ca
lcu
late
d b
y th
e sy
stem
bas
ed o
n 1
00
% a
chie
vem
en
t o
f ind
icat
ors
liste
d at
S.
Nos
. 5,
8,
9 &
13.
De
sig
n-
M&
E M
od
ule
for
Go
! (R
GN
DW
M)
CR
SP
/To
tal S
anita
tion
Cam
paig
n A
nn
ex
I.B
-C
om
pu
teri
zed
MIS
indi
cato
rs
76
AN
NEX
URE
I.B
Qua
ntita
tive
Win
do
w:
Com
pute
r-ba
sed
MIS
in
dic
ato
rs
Tab
le I
.B (
ii):
Dis
tric
t le
ve
l
S.
No.
In
dic
ato
r
17.
For
mul
atio
n o
f com
preh
ensi
ve a
nd w
ell-d
esig
ned
Dis
tric
t Le
vel
Pro
ject
Im
plem
enta
tion
Pla
n (P
IP)
in k
eepi
ng w
ith T
SC
gui
delin
es a
nd r
efor
m
initi
ativ
es
18.
Dev
elop
men
t an
d de
mon
stra
tion
of v
ario
us a
ppro
pria
te a
nd c
ost-
effe
ctiv
e te
chno
loqi
cal
optio
ns f
or s
anita
tion
faci
litie
s in
the
dis
tric
t 19
. Is
the
re a
det
aile
d IE
C p
lan
prep
ared
for
the
dist
rict?
20
. N
GO
s se
lect
ed a
nd i
n pl
ace
for
proj
ect
activ
ities
21
. W
he
the
r at
leas
t 25%
sub
sidy
is s
pent
for
SC
IST
IH
HLs
as
agai
nst t
otal
su
bsi
dy
spen
t on
IH
HLs
? 22
. %
pop
ulat
ion
of t
he d
istr
ict c
over
ed b
y T
SC
as
agai
nst t
arge
ted
popu
latio
n to
be
cove
red
23.
% R
SM
s I
PC
s co
nstr
ucte
d as
aga
inst
targ
et in
the
PIP
24
. %
of
hard
war
e ex
pend
iture
as
agai
nst
elig
ible
exp
endi
ture
s fo
r th
e sa
me
**
A.
Su
b-t
ota
l fo
r D
istr
ict M
IS I
nd
ica
tors
H
as t
he
dis
tric
t qua
lifie
d fo
r N
irmal
Gra
m P
uras
kar?
If
no
t:
% o
f Blo
cks
qual
ified
for
Nirm
al G
ram
Pur
aska
r?
% o
f Gra
m P
anha
yats
qua
lifie
d fo
r N
irm
al G
ram
Pur
aska
r th
at a
re n
ot
alre
ady
unde
r a
qual
ifyin
g B
lock
B.
Sub
-Tot
al f
or
Bo
nu
s M
arks
for
Nir
ma
l Gra
m P
ura
ska
r C
. M
ark
s ba
sed
on
au
an
tita
tive
pe
rfo
rma
nce
at t
he
vill
ag
e le
vel
Tot
al M
arks
fo
r D
istr
ict {
A+
B+
Cl
** E
xpen
ditu
re in
clud
es
a)
expe
nditu
re (
Sta
te
and
Gol
sha
re)
on R
SM
siP
Cs
b)
expe
nditu
re (
sub
sid
y+ c
ontr
ibut
ion)
on
IHH
Ls,
CS
Cs,
SS
Ls I
AW
Ls I
BW
Ls
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
1.8
-C
om
pu
teri
zed
MIS
indi
cato
rs
Yes
/No
or%
, M
eans
D
ate
of
Ve
rific
a
tion
YIN
(If
Y-
date
) D
0-1
3
YIN
D
0-1
3
YIN
(lf
Y-
date
) D
0-1
3
YIN
D
0-1
3
YIN
(If
Y-
date
) D
0-1
3
%
DM
-12
%
DM
12
%
DM
-12
YIN
(If
Y-
date
) D
0-1
3
YIN
(If
Y-
date
) D
0-1
3
YIN
(lf
Y-
date
) D
0-1
3
Kn
ow
led
ge
Lin
ks
~nvatv L
imite
d
Tot
al S
ll!lil
li'l#l
f Con
slllt
iii!J
'i"
r!lll:
IU>U
IT!IU
UI
Typ
e M
ax.
Co
mm
en
ts
of
Mar
k ln
dic
at
s or
: P
r/
PP
/FP
P
r 5
Pr
5
Pr
5 P
r 5
Pr
5
pp
10
pp
2
FP
13
50
50
Thi
s is
re
leva
nt
25
only
in
25
case
th
e
dist
rict
do
es n
ot
qual
ify
50
400
500
17
S.N
o.
25.
26.
27.
AN
NEX
UR
EI.B
Q
uan
tita
tive
Win
do
w:
Co
mp
ute
r-b
ased
MIS
In
dic
ato
rs
Tab
le I.
B (
iii)
: S
tate
Lev
el
Ind
icat
or
Yes
/No
or
Mea
ns
%,
of
Dat
e V
erif
ica
tio
n
Com
preh
ensi
ve C
apac
ity B
uild
ing
Str
ateg
y an
d P
lan
prep
ared
at
Y/N
(lf
Y-
S0
-15
S
tate
Lev
el
give
dat
e)
Com
preh
ensi
ve S
choo
l San
itatio
n an
d H
ygie
ne P
lan
prep
ared
at
Y/N
(IfY
-S
0-1
5
Sta
te L
evel
in c
lose
co-
ordi
natio
n w
ith S
tate
Edu
calio
n D~partment
give
dat
e}_
% o
f sof
twar
e ex
pend
iture
(st
art-
up,
IEC
, ad
min
.) a
s ag
ains
t el
igib
le
%
DM
-12
expe
nditu
res
for
the
sam
e A
. S
ub
-To
tal
of S
tate
Ind
icat
ors
Typ
e o
f ln
dic
ato
r:
Pr/
P
P/F
P
Pr
Pr
FP
B.
Ma
rks
bas
ed o
n Q
uan
tita
tive
Per
form
ance
at
Dis
tric
t an
d V
illa
ge
Lev
els
and
Nir
mal
Gra
m P
ura
skar
B
on
us
To
tal
Mar
ks f
or
Sta
te (
A+B
)
De
sig
n-
M&
E M
od
ule
for
Go
! (R
GN
DW
M)
CR
SP
/To
tal S
anita
tion
Cam
paig
n A
nn
ex
I.B
-C
om
pu
teri
zed
MIS
indi
cato
rs
~
Kn
ow
led
ge
Lin
ks
"*k Tot
al Sliiii
iF!I;~::
~~~!:~~
I'I!
\!!U
6Uln
!t6d
Max
. M
arks
25
25
50
100
400
500
78
~ ~
~
Imp
lem
en
tatio
n
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on IR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
For
m N
o. V
M-9
M
on
thly
Vill
age
leve
l In
form
atio
n S
heet
A c E
G
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
I. C
-In
pu
t For
mat
s
-~
B
D
F
79
~
l!t
--=
-......
Pre
-Pla
nn
ing
Pla
nn
ing
12.
Was
P
lan
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on [R
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
For
m N
o. V
O 1
0 O
ne T
ime
Vill
age
Info
rma
tion
She
et
A c E
G
Yes
com
mun
ity-w
ide
mee
ting
held
for
form
ulat
ion
and
acce
ptan
ce o
f the
Com
mun
ity A
ctio
n I Y
es
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
Ann
ex I.
C-
Inpu
t For
mat
s
B
D
F
No
Use
r D
ate
No
Use
r D
ate
80
~
==:;-
-:;=:
..,..
.. R
aiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Mis
sion
lRGN
DWM
J M
&E
Mo
du
le fo
r C
RS
P/T
SC
Vill
ag
e T
SC
Pro
ject
Te
chn
ica
l In
form
ati
on
(A
pp
rove
d T
arg
et a
s p
er
CA
P/P
IP b
efo
re c
on
stru
ctio
n c
om
me
nce
s)
Key
: S
F-
With
se
pa
rate
faci
litie
s fo
r bo
ys a
nd g
irls,
WS
F-
with
out
sepa
rate
fac
ilitie
s fo
r bo
ys a
nd g
irls
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex/
. C-
Inpu
t For
mat
s
.. ~;~~r;
~~;} '·
81
~
~~
-::
-..
_-
-~
15.
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on IR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
For
m N
o. V
O 1
0 O
ne T
ime
Vill
ag
e I
nfo
rma
tion
Sh
ee
t
Vill
ag
e T
SC
Pro
ject
Te
chn
ica
l Inf
orm
atio
n (A
ctu
ally
co
nst
ruct
ed
at t
he e
nd o
f Im
plem
enta
tion
Pha
se)
SA
NIT
AR
Y L
A TR
INE
S
EN
VIR
ON
ME
NT
AL
SA
NIT
AT
ION
-~
Nam
e o
f H
ab
itatio
n
Do
me
stic
Item
s S
cho
ol I
tem
s S
olid
wa
ste
Item
s I
Liq
uid
wa
ste
Item
s
IHH
Ls
l CS
Cs
AP
L
Key
: S
F-
With
sep
arat
e fa
cilit
ies
for
boys
and
girl
s, W
SF
-w
ithou
t se
para
te f
acili
ties
for
boys
and
girl
s
De
sig
n-
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P /T
ota
l Sam
tatio
n C
ampa
ign
An
ne
x I C
-In
pu
t Fo
rma
ts
82
~ ~
~
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on lR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
A c E
G
Fo
rm N
o.
VQ
-11
Inla
nd
Le
tte
r O
&M
Ph
ase
'$
~:
B
D
F
1. I
s th
ere
a tr
aine
d te
chni
cian
ava
ilabl
e lo
cally
for
mai
nten
ance
and
rep
air
activ
ities
? Y
es_
_
No _
_ _
2. I
s cl
eanl
ines
s be
ing
mai
ntai
ned
in t
he v
illag
e? (
villa
ge d
rain
s an
d la
nes
are
clea
n, a
bsen
ce
of p
endi
ng a
roun
d w
ater
poi
nts
and
prop
er d
ispo
sal o
f gar
bage
and
cow
-dun
g)?
Ye
s_
_
No _
_ _
3. W
heth
er a
ll th
e sa
nita
ry la
trin
es (
indi
vidu
al/c
omm
unity
) ar
e be
ing
used
on
a da
ily b
asis
? Y
es_
_
No _
_ _
Det
ails
on
fu
nct
ion
alit
y an
d us
age
Nam
e o
f H
ab
itatio
n
Dom
estic
Item
s S
AN
ITA
RY
lATR
INE
S
I · .~N
\liR
OJ{M
ENlA
I...
SANI
'rAT
ION·
S
choo
t·lte
ms
-·s
oiid
-wa
ste
.lte
ms .
•. T.i
pqui
~~'N
a~te
-lt~
fl-l
s .
Prim
arY
/Sec
onda
ry ~m
rAWC
st8W
l:.s
i•·.
:-&a
·r·?
~g.·
.. ·.··a:··.·.
···T···· C~
p.qs
t J.•
Soak.P
it~>··
· .. rQ.r·a
· i~ag·
·.e .. ~•.(
.IIi.
SF
I W
SF
. ··
··. ·
P1ts
l
P1ts
·l
<
.
· m
etre
s)
IHH
Ls
CSC
s A
PL
.·1 BP
L T
otal
I
NU
T
otal
I
NU
T
otal
NU
To
tal I
NU
I T
otal
I. Nu·
l·rot
a:C
1-N
U ~
1 ·ataT_[~1.J_TJq1at_Li\4\J_]~fOJaC[N'i·lJ'qtat~J·NF:
Key
: N
U -
Not
use
d, N
F-
Not
Fun
ctio
nal,
SF
-w
ith s
epar
ate
faci
litie
s fo
r gi
rls a
nd b
oys,
WS
F -
wit
ho
ut
sepa
rate
faci
litie
s fo
r gi
rls a
nd b
oys
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex/
. C-
Inp
ut F
orm
ats
83
~
l!t
---=
---
Raiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Mis
sion
IRGN
DWMJ
M
&E
Mo
du
le f
or
CR
SP
/TS
C
-~
Has
the
pra
ctic
e o
f ope
n de
feca
tion
subs
tant
ially
red
uced
/dec
reas
ed in
the
vill
age?
Y
es --
Are
mos
t of t
he in
divi
dual
and
com
mun
ity s
anita
ry la
trin
es b
eing
use
d an
d cl
eane
d re
gula
rly?
Yes
--
Are
mo
st o
f the
co
mm
un
ity m
embe
rs u
sual
ly w
ashi
ng t
heir
han
ds a
fter
def
ecat
ion?
Y
es --
Are
the
O&
M r
equi
rem
ents
of C
SC
s be
ing
met
by
the
GP
? Y
es --
Are
the
O&
M r
equi
rem
ents
of S
SLs
I A
WLs
I B
WLs
bei
ng m
et b
y th
e P
TA
/Sch
ool A
utho
ritie
s?
Yes
--
Has
the
GP
bee
n aw
arde
d th
e N
irmal
Gra
m P
uras
kar?
Y
es --
Yes
No -
-N
o --
No -
-N
o --
No _
_
No -
-N
o If
the
GP
wa
s aw
arde
d N
irmal
Gra
m P
uras
kar,
are
the
4 e
ligib
ility
con
ditio
ns s
till e
nfor
ced?
--
--
-
Sig
natu
re C
hair
pers
on V
WS
C
Sig
natu
re o
f rep
rese
ntat
ive
of C
MG
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x/. C
-In
pu
t Fo
rma
ts
84
~ ~
~
~
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on IR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
For
m N
o. D
M-1
2 M
on
thly
Dis
tric
t In
form
atio
n S
heet
A c E
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex/
. C-
Inp
ut F
orm
ats
...w
t...r.
t
B
D
Use
r D
ate
85
~ ~
--~
~
Raiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Mis
sion
lRGN
DWMJ
M
&E
Mo
du
le f
or
CR
SP
/TS
C
Fo
rm N
o. D
0-1
3
On
e T
ime
Dis
tric
t In
form
atio
n S
hee
t
A c E
10.
Wh
eth
er
at
lea
st 2
5% s
ub
sid
y is
spe
nt fo
r S
C/S
T I
HH
Ls a
s ag
ains
t to
tal
subs
idy
spen
t on
IH
HLs
?
De
sig
n -
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x I. C
-In
pu
t Fo
rma
ts
-.,
;r
B
D
86
~ ~ ~ ~
De
tails
of
Nir
ma
l Gra
m P
ura
ska
r
s ..
. Pa
rtic
ula
rs
No
; .
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on lR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
Nu
mb
er q
ua
lifie
d fo
r N
irm
al.
Gra
m Pur~skar
(NG
J=l)
afte
r ve
rifi
cati
on
·
.·. '
Gra
m P
an
cha
yat
Blo
ck
Dis
tric
t ..
· . ..
·. 1.
P
op
ula
tio
n C
rite
ria
U
pto
500
0 50
01 a
nd
U
pto
500
00
5000
1 a
nd
U
pto
10
lakh
A
bo
ve 1
0 la
kh
cbo
ve
ab
ove
N
um
be
rs q
ua
lifie
d fo
r N
GP
No
te: 1.
If th
e d
istr
ict q
ua
lifie
s fo
r N
irm
al G
ram
Pu
rusk
ar e
nte
r '1
' un
de
r th
e a
pp
lica
ble
po
pu
lati
on
co
lum
n f
or
the
dis
tric
t.
2.
If th
e d
istr
ict q
ua
lifie
s fo
r N
GP
, th
e G
P a
nd
Blo
ck d
eta
ils m
ust
no
t be
en
tere
d
3.
If th
e d
istr
ict d
oe
s n
ot q
ua
lify
for
Nir
ma
l Gra
m P
uru
ska
r T
hen,
a)
E
nte
r th
e n
um
be
r of b
lock
s w
hic
h h
ave
qu
alif
ied
fo
r N
GP
in
the
ap
plic
ab
le p
op
ula
tio
n c
olu
mn
fo
r th
e B
lock
b
) E
nte
r th
e n
um
be
r of G
Ps
wh
ich
ha
ve q
ua
lifie
d fo
r N
GP
bu
t are
no
t alr
ea
dy
un
de
r a q
ua
lifyi
ng
blo
ck.
Th
ese
mu
st a
lso
be
en
tere
d
in th
e a
pp
lica
ble
po
pu
lati
on
co
lum
n f
or
the
GP
.
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
I. C
-In
pu
t For
mat
s 8
7
~
-........
,.... ......
Raiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Mis
sion
IRGN
DWMJ
M
&E
Mo
du
le f
or
CR
SP
/TS
C
A
Fo
rm N
o.
SM
-14
Mo
nth
lv S
tate
Info
rmat
ion
Sh
eet
, . .,.
~ ... ~~
··,_,.
..,..,
.. .
. H.
1 a
!.$~;Name:.'
s re
ceiv
ed f
rom
the
Gol
dur
ing
the
repo
rtin
g m
onth
(E
nter
Dat
e O
f Rel
ease
in t
he D
ate
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x/. C
-In
pu
t Fo
rma
ts
--c
88
~
=
--.......
..
Rai
iv G
andh
i Nat
iona
l Drin
king
Wat
er M
issi
on lR
GNDW
MJ
M&
E M
od
ule
fo
r C
RS
P/T
SC
For
m N
o. S
0-1
5
One
Tim
e S
tate
In
form
atio
n S
heet
A
B
,',s~~"t•e-;;f;' ~'"
'· :. ):
. ,:
De
sig
n -
M&
E M
od
ule
for
Go
/ (R
GN
DW
M)
CR
SP
I T
otal
San
itatio
n C
ampa
ign
An
ne
x/. C
-In
pu
t For
mat
s
--c
89
~
=
-:;.__~
~
,~tc
i~~>
7 Slci~lc''
' ,,,
Hab
ltatlc
ri,'r
iaro
e,,''
'
Raiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Miss
ion
lRGN
DWM
J M
&E
Mo
du
le f
or
CR
SP
/TS
C
A c E
Fo
rm N
o. H
AB
-16
Ha
bita
tion
In
form
atio
n S
heet
Sa
nit
ary
ass
ets
: d
eta
ils o
n f
un
ctio
na
lity
an
d u
sag
e
-"~'
!it
B
D
Na
me
o,f
'
',
',
SA
NIT
AR
Y L
AT
RIN
ES
,,
',,,
'>
',
' ,,
',,,,
',
' ,,
,,,,
' ',
EN
VJR
ON
ME
SN
TA
L,S
AN
ITA
TIO
N
.,, ,',,'
,',,•','
, ',
Ha
bit
ati
on
D
om
est
ic It
em
s
IHH
Ls
AP
L I
BP
L
'-----
·· -··
---· -·· -··
-,T
()ta
l _I ~u _
1 To
t~
I_N
u_
Ke
y:
IHH
L-
Indi
vidu
al H
ouse
hold
Lat
rine
AP
L -A
bo
ve
Pov
erty
Lin
e B
PL
-B
elow
Pov
erty
Lin
e C
SC
-C
omm
unity
San
itary
Com
plex
S
SL
-S
choo
l S
anita
ry L
atrin
e
CS
Cs
Iot§
l lN
!J .
SF
-W
ith
sep
arat
e fa
cilit
ies
for
boys
and
girl
s W
SF
-w
ithou
t se
para
te f
acili
ties
for
boys
and
girl
s B
WL
-B
alw
adi
Latr
ine
AW
L-
Ang
anw
adi L
atrin
e N
U-
Not
use
d
Sch
oo
l Ite
ms '
SS
Ls
(Prim
ary/
Sec
onda
ry)
SF
I
WS
F
T()ta
l_ I
_Nl.J
_ I_
To_
!alj
f\.JU
_
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x I C
-In
pu
t Fo
rma
ts
•' S
olid
wa
ste
lte
ms'
Uq
uid
wa
ste
Ite
ms
BW
Ls
Gar
bage
C
ompo
st
Soa
k P
its
Dra
inag
e (in
/A
WLs
P
its
Pits
',
,
rnet
res)
Tot~
l l N
l)
To
tal
INU
T
ota
l I N
U
Tot
al
j N
U
Tot
al I ,N
U
90
1!t ~
-~
Raiiv
Gan
dhi N
atio
nal D
rinki
ng W
ater
Mis
sion
(RGN
DWMJ
M
&E
Mo
du
le f
or
CR
SP
/TS
C
To
tal
San
itat
ion
Cam
pai
gn
M
on
thly
Pro
gre
ss R
epo
rt F
or
the
Mo
nth
of _
__
_ _
Dis
tric
t S
tate
__
_ _
Aso
n r
!····. r
c I
c c'
:,',, o,~
',~
' '
'','
;';~'
~ ,','\
;:,
,~,' ,;
r;
(DO
I M
M I
Y
YY
Y )
A.
PH
YS
ICA
L P
RO
GR
ES
S O
F S
AN
ITA
RY
FA
CIL
ITIE
S
Indi
vidu
al H
ouse
hold
La
trin
es
(IH
HLs
) C
omm
unity
San
itary
S
choo
l S
anita
ry L
atri
nes
Rur
al S
anita
ry M
arts
/ C
ompl
ex (
CS
C)
Pro
duct
ion
Cen
tres
(R
SM
s/P
Cs)
T
otal
B
PL
SS
Ls
AW
Ls/
BW
Ls
App
rove
d I A
chie
ved
A
pp
rove
d
I Ach
ieve
d A
ppro
ved
I Ach
ieve
d A
ppro
ved
1 A
chie
ved
App
rove
d I
Ach
ieve
d A
ppro
ved
I A
chie
ved
I ·-L
__
._L
I
I I
I
C.
FIN
AN
CIA
l P
RO
GR
ES
S R
EP
OR
T
TS
C p
roje
ct e
xpen
ditu
re (
Gol
sh
are
+ s
tate
sha
re
+co
ntr
ibu
tion
) In
curr
ed (
Rs.
in
Lakh
s)
IHH
Ls
esc
S
SLs
/AW
Ls-B
WLs
R
SM
s/ P
Cs
Tot
al
I S
C/S
T
I
D.
RE
CE
IPT
OF
FU
ND
S
Up
to P
revi
ous
Mon
th
Dur
ing
the
Rep
ortin
g M
onth
C
entr
e
Sta
te
Ho
use
ho
lds/
Co
mm
un
ity
(GP
/PT
A)
Des
ign
-M
&E
Mo
du
le f
or
Go
/ (R
GN
DW
M)
CR
SP
I T
otal
San
itatio
n C
ampa
ign
An
ne
x I.
D-
Ou
tpu
t Fo
rma
ts
Sta
rt-u
p A
ctiv
ities
A
dmin
. C
harg
es
IEC
Tot
al T
ill D
ate
I
B.P
HY
SIC
AL
PR
OG
RE
SS
OF
EN
VIR
ON
ME
NT
AL
S
AN
ITA
TIO
N
Sol
id w
aste
item
s Li
quid
was
te it
ems
Gar
bage
I C
ompo
st
Pits
P
its
Soa
k P
its
1_ D
rain
age
(in m
) A
chie
ved
_l_A
chie
vecl
_ A
chie
vEl(j
I 6
chie
yed
_
Tot
al E
xpen
ditu
re
91
1. 2. 3. 4. 5.
P . tPh rojec ase D t "I e a1s Pbas~ . ~;; ···•• ...•. ·.···· ~ .... -=> !: • :· .. Planning (Start up & IEC Activities) Implementation _{Construction) O&M
Village Profile
AettJJI$tart bat~ ·•·· • \ .. ·· ii
Funds Received Details fas reed. From DWSMJ
E d"t D t "I xpen 1 ure e a1s .••. . .•...•. ·.•· •· Phase < > ... : ;; ..... ... .. ···;.. .·;·. Item. ····. ·:. ·· ... ··· ..• ii:> Implementation IHHLs
CSCs, SSLs, AWLs I BWLs Environmental assets (garbage pits, compost pits, soak pits and drainage) Total
Community Contribution Details ;··• · :: Phase .... ·· 3 . .. . . ... ·· .. ···· Item .•.. ;·· .. ·•.·· ·i·.••·c·· ... ... ... . ..
Implementation IHHLs CSCs, SSLs, AWLs I BWLs Environmental assets (garbage pits, compost pits, soak pits and drainage) Total
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex~D-Ou~utForma~
:Aetual J:tld D~te • •.•.. :iT
<Date • ...... ·•·· ... •···.· ....... · ..• · >
...• ..i·•.· · •. Arriqunt (in .Rs.) ··•·i .. •··
< .. Amou.nt (in Rs.)t .····.
92
Vill
ag
e T
SC
Pro
iect
Te
chn
ica
l In
form
atio
n {
Ap
pro
ved
Ta
rge
t as
pe
r CA
P/P
IP b
efo
re c
on
stru
ctio
n c
om
me
nce
s)
.Nam
e o
f S
AN
ITA
RY
LA
TR
INE
S
EN
VIR
ON
ME
NT
AL
SA
NIT
AT
ION
Ha
bita
tion
D
om
est
ic It
ems
Sch
oo
l Ite
ms
. So
lid w
a$
te lt
f;lm
s L
iqu
id w
ast
e I
tem
s ·
. . .
.
. '
~ .
.
lHH
Ls
CS
Cs
Pri
mar
y/S
econ
da
AW
Ls/
A
Pt.
B
PL
S
F
WS
F
BW
Ls
Key
: S
F-
With
sep
arat
e fa
cilit
ies
for
boys
and
girl
s, W
SF
-w
ithou
t se
para
te f
acili
ties
for
boys
and
girl
s
Vill
ag
e T
SC
Pro
ject
Te
chn
ica
l In
form
atio
n {
Act
ua
lly c
on
stru
cte
d a
t th
e e
nd
of I
mp
lem
en
tatio
n P
hase
)
Nam
e o
f S
AN
ITA
RY
LA
TR
INE
S
EN
VIR
ON
ME
NT
AL
SA
NIT
AT
ION
Ha
bita
tion
D
om
est
ic .J
tem
s S
cho
ol I
tem
s S
olid
wa
ste
Ite
ms
Liq
uid
wa
ste
Item
s. ·
IHH
Ls
·· C
SC
s P
rim
ary/
Sec
onda
ry
AW
Ls{
Gar
bage
C
ompo
st··
So
ak
Drs
Jhag
e A
PL
B
PL
SF
WS
F
BW
Ls
·· P
its
Pits
P
its
(in m
etre
s)
•.
Key
: S
F-
With
sep
arat
e fa
cilit
ies
for
boys
and
girl
s, W
SF
-w
ithou
t se
para
te f
acili
ties
for
boys
and
girl
s
De
sig
n-
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex-
I.D
-O
utp
ut F
orm
ats
.,. ~ ~ 93
Village Performance Index Card (Summary)
•se:fie:rueNan!ie ....•..• ; •. ·•·· ... ·•:··•·•·
•··• M.lirksScoreCI··
Note: The Following will be hyper/inks that can be expanded to show the PIC Phase details: Pre Planning , Planning, Implementation, O&M
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-/.D- Output Formats
94
Village Performance Index Card (Detailed)
Community-wide meeting held for Selection of Process Technical Options for Sanitation
3. Community-wide meeting held for Formulation Process an~ acc~ptance of Communit Action. Plan
Im lementation 4. Do at least 80% of IHHLs /CSCs constructed Process
have a proper superstructure in order to ensure rivacy for women?
5. Do all schools in the village have SSLs with Process se arate sanitation facilities for irls and bo s?
6. Do at least 80% of sanitary latrines (individual Process and community) have running/ stored water available inside/outside?
7. % Community contribution towards IHHLs as Financial against the target fixed for the same in Progress CAP/PIP
8. % Community contribution towards CSCs, Financial SSLs, AWLs, BWLs as against the target fixed Progress
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex-1.0- Output Formats
Yes/No
Yes /No
Yes/No
Yes/No
Yes /No
%
%
25
25
25
25
25
40
25
95
for the same in CAP /PIP 9. % Household I Community contribution Financial
towards environmental sanitation assets Progress (garbage pits, compost pits, soak pits and drainage) as against Household I Community contribution towards all sanitation assets (individual and community)
10. % of IHHLs completed against those approved Physical in CAP/PIP Progress
11. % of CSCs, SSLs, AWLs & BWLs completed Physical as against those ap roved in CAP/PIP Progress
12.% Households. which have constructed IHHLs Physical as against the total no. of households in the Progress village
13. Is there a trained technician available locally Process for maintenance and repair activities?
14. Is cleanliness being maintained in the village? Process (village drains and lanes, absence ofponding around water points and proper disposal of garbage and cow-dung)
15. Whether all the sanitary latrines (individual and Process community) are being used on a daily basis?
16. Is the village eligible for Nirmal Gram Puraskar Process bonus?
... ..
'C~iii!U~tiv~ TC'Itall . ·
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex~D-Ou~utFormam
% 60
% 40
% 25
% 60
Yes /No 10
Yes /No 35
Yes/No 35
Yes/No 20
96
District Performance Index Card (Summary)
·As Otl bate·· .• · .. · ··· · !State •.· .• · ••··· ..... ··. ···• ·.. I
G~lShare .• • ···.·••·•·• ..• ··.•··.····••·. ·.····· ... · .. ·
';[' dta) J!.rojeet QuJlay .•• •....• ••··
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex-/.D- Output Formats
·Marks s~itrea.
97
District Performance Index Card (Detailed)
1. Formulation of comprehensive and well-designed District Level Project Implementation Plan (PIP) in keeping with TSC uidelines and reform initiatives
2. Development and demonstration of various appropriate and cost-effective technological options for sanitation facilities in the district
5. Whether at least 25% subsidy is spent for SC/ST IHHLs as a ainst total subsid s ent on IHHLs?
6. % ofhardware expenditure (IHHL, CSC, SSL, RSM/PC) as a ainst eli ible ex enditures for the same
7. % population of the district covered by TSC as against tar eted po ulation to be covered
8. % of RSMs and PCs constructed as against target in the PIP
Process
Process
Process Process Process
Financial Pro ress Physical Progress Physical Progress
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-1.0- Output Formats
Yes/No
Yes/No
Yes/No Yes/No Yes/No
%
%
%
5
5
5 5 5
13
10
2
98
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Annex-/.D- Output Formats
99
Annexure 1: Scheme Data Analysis Sheet
Number of Schemes in Pre Planning Phase (A) Number of Schemes in Planning Phase (B) Number of Schemes in Im_plementation Phase (C) Number of Schemes in O&M Phase ill) Total Number of Schemes (A+B+C +D)
.·illldieator ... ~ .· ... . ·.::c ::.· ... ·:. .. .: .. .. . ··.· :::· .. .•.. ..
Pre- Planning 1. Baseline Survey completed in the village
Planning 2. Community-wide meeting held for Selection of Technical Options
for Sanitation 3. Community-wide meeting held for Formulation and acceptance of
Community Action Plan (CAP) Implementation 4. Do at least 80% of IHHLs /CSCs constructed have a proper
superstructure in order to ensure privacy for women? 5. Do all schools in the village have SSLs with separate sanitation
facilities for girls and boys? 6. Do at least 80% of sanitary latrines (individual and community)
have running/ stored water available inside/outside? 7. % Community contribution towards IHHLs as against the target
fixed for the same in CAP/PIP
8. % Community contribution towards CSCs, SSLs, AWLs, BWLs as against the target fixed for the same in CAP /PIP
9. % Household I Community contribution towards environmental sanitation assets (garbage pits, compost pits, soak pits and drainage) as against Household I Community contribution towards all sanitation assets (individual and community)
10.% ofiHHLs completed against those approved in CAP/PIP
11. % of CSCs, SSLs, AWLs & BWLs completed as against those approved in CAP /PIP
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex~D-Ou~utForma~
As. 4lnllat~ 1. CqruuJative ....
/
··estton~e·· ···· ·.··Nos. J %
YES NO
YES NO YES NO
YES NO YES NO YES NO 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51 -75% 76-100% 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51-75% 76-100%
100
12.% Households. which have constructed IHHLs as against the total no. of households in the village
O&M 13. Is there a trained technician available locally for maintenance and
repair activities? 14. Is cleanliness being maintained in the village? (village drains and
lanes are clean, absence of ponding around water points and proper disposal of garbage and cow-dung)
15. Whether all the sanitary latrines (individual and community) are being used on a daily basis?
16. Is the village eligible for Nirmal Gram Puraskar bonus?
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-I.D- Output Formats
0-25% 26-50% 51 -75% 76-100%
YES NO YES NO
YES NO YES NO
101
State Performance Index Card (Summary)
"~~~~~;~~;;···i.•;·;· .. · .. ::•!ii;i;.• ....... i);, •• ; •• ;Ji .• ;:· .. ···••; •• ·.;;•i•:l
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-I.D- Output Formats
102
State Performance Index Card (Detailed)
I State N at1re ·· .... ·····I
. 1\tiiount.Relefl.sed by State ........ ··.·.·. ··
1. Comprehensive Capacity Building Strategy and Plan Process Yes/No prepared at State Level
2. Comprehensive School Sanitation and Hygiene Plan Process Yes/No 25 prepared at State Level in close co-ordination with State Education Department
3. %of software expenditure (start-up, IEC, admin.) as Financial % 50 against eli ible expenditures for the same Pro ress Total 100
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Annex-I.D- Output Formats
.. . Marks . .scored
103
· ··I::~·.·Gs~~e,·M~{~t~!l.anc~ .. an~•Sust~i~.abili~··of:·~~~it~tiQn ~sser;s , . .: ·: (UM,S).
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex-/.D- Output Formats
::.M:atks · ·s(oted ·
104
Annexure 1: District Data Analysis Sheet
1. Formulation of comprehensive and well-designed District Level Pr~ject Implementation Plan (PIP) in keeping with TSC guidelines and reform initiatives
2. Development and demonstration of various appropriate and cost-effective technological options for sanitation facilities in the district
3. Is there a detailed IEC plan prepared for the district?
4. NGOs selected and in place for project activities
5. Whether at least 25% subsidy is spent for SC/ST IHHLs as against total subsidy spent on IHHLs?
6. % ofhardware expenditure (IHHL, CSC, SSL, RSM/PC) as against eligible expenditures for the same
7. % population of the district covered by TSC as against targeted population to be covered
8. % ofRSMs and PCs constructed as against target in the PIP
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-I.D- Output Formats
YES NO
YES NO
YES NO YES NO YES NO 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51-75% 76-100%
105
Annexure 2: Scheme Data Analysis Sheet
Number of Schemes in Pre Plannin2 Phase (A) Number of Schemes in Planning Phase (B) Number of Schemes in Implementation Phase (C) Number of Schemes in O&M Phase (D) Total Number of Schemes (A+B+C+D)
Indicator •:
Pre- Planning 1. Baseline Survey completed in the village
Planning 2. Community-wide meeting held for Selection of Technical Options
for Sanitation 3. Community-wide meeting held for Formulation and acceptance of
Community Action Plan (CAP) Implementation 4. Do at least 80% of IHHLs /CSCs constructed have a proper
superstructure in order to ensure privacy for women? 5. Do all schools in the village have SSLs with separate sanitation
facilities for girls and boys? 6. Do at least 80% of sanitary latrines (individual and community)
have running/ stored water available inside/outside? 7. % Community contribution towards IHHLs as against the target
fixed for the same in CAP/PIP
8. % Community contribution towards CSCs, SSLs, AWLs, BWLs as against the target fixed for the same in CAP /PIP
9. % Household I Community contribution towards environmental sanitation assets (garbage pits, compost pits, soak pits and drainage) as against Household I Community contribution towards all sanitation assets (individual and community)
10.% ofiHHLs completed against those approved in CAP/PIP
11. % of CSCs, SSLs, AWLs & BWLs completed as against those approved in CAP /PIP
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex~D-Ou~utFormats
As onDal.te ... • ··
Respons~
YES NO
YES NO YES NO
YES NO YES NO YES NO 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51 -75% 76-100% 0-25% 26-50% 51-75% 76-100% 0-25% 26-50% 51 -75% 76-100% 0-25% 26-50% 51 -75% 76-100%
Cumulative·····
Nos. %
106
12.% Households. which have constructed IHHLs as against the total no. of households in the village
O&M 13. Is there a trained technician available locally for maintenance and
repair activities? 14. Is cleanliness being maintained in the village? (village drains and
lanes are clean, absence of ponding around water points and proper disposal of garbage and cow-dung)
15. Whether all the sanitary latrines (individual and community) are being used on a daily basis?
16. Is the village eligible for Nirmal Gram Puraskar bonus?
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex~D-Ou~utForma~
0-25% 26-50% 51 -75% 76-100%
YES NO
YES NO
YES NO YES NO
107
Analysis Against Benchmarks (Summary)
Generating demand & creating an enabling environment (GDEE)
(A) Quantitative (Indicators sub total) (B) Qualitative (State Periodic Review) (C) Benchmark Total (A+B)
Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT)
(A) Quantitative (Indicators sub total) (B) Qualitative (State Periodic Review) (C) Benchmark Total (A+B)
Functionality, Access and Privacy of Sanitation Facilities (FAPS) (A) Quantitative (Indicators sub total) (B) Qualitative (State Periodic Review) (C) Benchmark Total (A+B)
Usage, Maintenance and Sustainability of Sanitary Assets created (UMS)
(A) Quantitative (Indicators sub total) (B) Qualitative (State Periodic Review) (C) Benchmark Total (A+B)
Total
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex-I.D- Output Formats
95 52 74
73 52 63
95 60 78
85 72 79
74
108
Analysis Against Benchmarks (Detailed)
/cc Categ«iry cc c<cc B~nchJJI:ark c .. ccc cc
cc c c cc ccCCCC ; cjC c .. c cc ecce Cc jjccjcC ecCe cc\cc c>C cc c
Generating 90% of the TSC districts have a detailed IEC plan prepared
Demand~md 100% of the TSC villages have had Community-wide
Creating :m meetings held for formulation and acceptance of Community Action Plan (CAP)
Enabling Sub total quantitative Environment State Periodic Review {GDEE) Sub total qualitative
Benchmark Total
Promotimt of 100% of the TSC villages have had Community-wide
Appropriate meetings held for selection of technical options
and Cost- 50% hhs. have constructed IHHLs as against total no. of
effective households in the village 40% Household I Community contribution towards
Technolojzy environmental sanitation assets (garbage pits, compost pits, & Alternative soak pits and drainage) as against Household I Community
Delivery contribution towards all sanitation assets (individual and
Mechanisms community)
{PACT) 100% districts have developed and demonstrated various appropriate and cost-effective technological options for sanitation facilities Sub total quantitative State Periodic Review Sub total qualitative
Benchmark Total Functionality, 90% of villages have at least 80% of IHHLs ICSCs
Access and constructed with a proper superstructure in order to ensure
Privacy of privacy for women 100% of villages have ensured that all schools have separate
Sanitation sanitation facilities for girls and boys Facilities Sub total quantitative (FAPS) State Periodic Review
Sub total qualitative Benchmark Total
Usage, 80% of villages have all sanitary latrines (individual and
Maintenance community) being used on a dai!Y basis
and 90% of the TSC villages have trained technicians available locally for maintenance and repairs
Sustainability Sub total quantitative of Sanitation State Periodic Review Assets {UMS) Sub total qualitative
Benchmark Total
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex-/.0- Output Formats
Benchmarkc ccccc Desih.tble,
{l}lo) 90 100
95 52 52 74 100 \
50
40
100
73 52 52 63 90
100
95 60 60 78 80
90
85 72 72 79
1 CCC Benchmark cc
Actual{o/o} cc
109
~ ~ ---------------------------------------------------------------~
STATE PERIODIC REVIEW {Review commissioned by RGNDWM)
STATE PERIODIC REVIEW REPORT
Name of the State Dates of review
Score
Category Maximum Marks
"'1 •.. Programme qualitative assessment. ·"· i• .. 1QO. ....
1.1 Generating demand & Creation of an Enabling 25 Environment (GDEE)
1.2 Promotion of Appropriate and Cost-effective Technology 25 and Alternative Delivery Mechanisms (PACT)
1.3 Functionality, Access and Privacy of Sanitation Facilities 25 (FAPS)
1.4 Usage, Maintenance and Sustainability of Sanitation 25 Assets (UMS)
.2~ .. Moving towards Nirfnal Gram Puraskar ' ·.' ,· 100 .· 2.1 Coverage of sanitary latrines 30 2.2 Reduction in the practice of open defecation 30 2.3 Clean environment management 40 Total 200
1. Programme qualitative assessment
. .
Generating Demand & Creation of an Enabling Environment (GDEE)
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
Marks Obtained
; ..
110
Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT)
Functionality, Access and Privacy of Sanitation Facilities (FAPS)
Usage, Maintenance and Sustainability of Sanitation Assets (UMS)
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
111
~ ~ --------------------------------------------------------------------~~
2. Moving towards Nirmal Gram Puraskar
Coverage of sanitary latrines
Reduction in the practice of open defecation
Clean environment management
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.A - State Periodic Review
112
~ ~ ------------------------------------------------------------------,~
Review Team
S.N .. Name····.·· .··
Anne:xes
Score sheet Agreed action plan
~ .. Designatiofl. . ·.· · · .. Specialization· .. ·. ·.
2. 4.
List of issues and problems List of persons met
1. 3. 5. List of districts and villages visited
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
Signature
113
Score Sheet
1. Programme qualitative assessment
1.1 Generating demand & Creation of an enabling environment (GDEE) (To be assessed at state and district levels)
(a) GDEE at State level
Contributing Factors ·····
i. A sound Vision/strategy on sanitation at the state level in the form of a document, accompanied with a plan of action
ii. Setting up of an appropriate institutional arrangement (carrying-well-defined project rules, systems and operational procedures) to monitor TSC projects and facilitate their implementation at the district level
iii. Appropriate and adequate HRD/IEC initiatives undertaken by the state government providing capacity building support to TSC including hiring specialist consultants in the field of communication, HRD, monitoring, school sanitation and hygiene education
iv. Timely release of state share Sub-total
(b) GDEE at District level
Contributing Factors .
i. Steps taken to ensure the central role of Gram Panchayats (GP) in TSC planning and implementation
ii. Comprehensive and well-designed IEC strategy and Plan at district Level worked out in a consultative manner and the qualityof its implementation
iii. Quality and adequacy of District Level Project Implementation Plan (PIP) based on findings of baseline survey
iv. Well-defined project rules, systems and operational procedures in place and transparency in their application
v. Capacity development plan and activities for ZP, DWSMs and NGOs to achieve intended objectives and it's effective and timely implementation
Sub-total
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.A - State Pedodic Review
Maximum Marks
10
Maximum Marks ..
15
Marks Obtained
Marks Obtained
114
~ ~ --------------------------------------------------------------~
~
1.2 Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT) (To be assessed at State and district levels)
a) PACTatStatelevel
ConttibutiOg Factors
i. Preparation of a menu of area-specific low-cosUappropriate technological o_ptions for sanitation
ii. Formulation of construction specifications, norms, unit costs etc. in consultation with districts and their timely dissemination to project districts to ensure good quality construction.
iii. Efforts made by the State to learn from best practices in this sector (state-wide, nationally and internationally)
Sub··total
(b) PACT at District level
Contributing Factors ·.·
•• .·• i. Availability of a menu of area-specific low-cosUappropriate
technological options for sanitation and demonstration of the same
ii. Close supervision of village proposals by district functionaries to ensure adherence to construction specifications, norms, unit costs etc. and construction supervision by district to ensure good quality construction.
iii. Establishment of and close supervision of functioning of RSMs and PCs to ensure their success as alternative delivery mechanisms
iv. Adequacy of trained manpower district-wide, to promote the different technological options proposed
v. Efforts made by the districts to learn from best practices within the country
Sub-total
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
Maximum Marks Marks .Obtained
10
Maximum Marks ·•Niarks Obtained
15
115
1-' ~ --------------------------------------------------------------~~
1.3 Functionality, Access and Privacy of Sanitation Facilities (FAPS) (To be assessed at village level)
.··· ·, .· C~ntributing factors
·: . .Maximum
.'· .'., ... ; . : : '· Nlarks. i. Availability of water for use in sanitary latrines either inside
or outside ii. Easy access to sanitation facilities without any stagnant pool
of water on the way iii. Suitability of the design in terms of providing privacy to
people, particularly women iv. Community's adoption of sanitation designs, which are old
/disabled /women/ child friendl1'_ v. Availability of an institutional mechanism (informal/formal) for
ensuring functionality, access and privacy on a regular basis Sub-total
1.4 Usage, Maintenance and Sustainability of Sanitation Assets {UMS) (To be assessed at village level)
25
Marks ·· .. /" '' ',, ',"
Obtained
Maximum Marks
i. Quality of maintenance and use of the sanitation facilities created
ii. Vibrancy, effectiveness and transparency in functioning of implementing agencies at community-level, so that sustainability is ensured
iii. Community Monitoring System in place, active and quality/ effectiveness of their activities
Sub-total
2. Moving towards Nirmal Gram Puraskar
2.1 Coverage of sanitary latrines (To be assessed at village/ district levels)
i. Community awareness regarding the hazards of open defecation and benefits of use of sanitary latrines leading to an increasing coverage of IHHLs, CSCs and SSLs includin latrines for Anganwadis and Balwadis
ii. Efforts made by the VWSC I SO to demonstrate a range of technology options from no-cost to low-cost to mediumcost to high-cost so as to help people chose options best suited to them as per their affordabilit and requirements
iii. Local availability of technical know-how in the form of masons trained in all the technology options presented to the potential users
Total
Design- M&E Module for Go/ (RGNDWM) CRSP/ Total Sanitation Campaign Annex 1/.A - State Periodic Review
'. ,. Mark~ ···.·. ·.·Qbt~i.ned
25
30
116
1" ~ ------------------------------------------------~------------<~
2.2 Reduction in the practice of open defecation (To be assessed at village level)
Contributing Factors ,, ,,,
,,, '
,,, ,'' ,,, ,', ', ,,
i. Level of community consensus on eradicating the practice of open defecation/dry-latrines/manual scavenging
ii. A plan prepared by the community/VWSC to phase out open defecation/dry latrines/ manual scavenging
iii. A penalty imposed by the community/VWSC on people/households defecating in the open \
Tot:tl
2.3 Clean environment management (To be assessed at village level)
Contributing factors
i. Village level institutions such as GP, schools, self help groups, mahila mandals, youth clubs etc are sensitised and aware of the critical interconnections between sanitation, hygiene and health
ii. Formation of a Community Monitoring Group (CMG) to periodically monitor the environmental sanitation situation at the village level
iii. Village clean up q:1mpaigns are being organized frequently
iv. Healthy home surveys are being undertaken periodicaly v. Village paths are clean. vi. Drains, soak pits are built and are functional to ensure no
stagnant pool of water around water sources vii. Safe disposal of non bio-degradable solid waste is
ensured through garbage pits etc. viii.. Safe disposal of bio-degradable solid waste is ensured
through composting methods Total
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
Maximum , ''Marks Marks Obt,ained
30
Maximum Marks Marks Obtained
40
117
~ }!& -------------------------------------------------------------~
LIST OF ISSUES AND PROBLEMS
S.No. Review category and list of issues and problems 1. Program qualitative assessment 1.1. Generating demand & Creation of an enabling environment (GDEE)
1 ;2 .Prom.otiorf of Appropriate and Cost~effective Technology and Alternative Delive.rv Mechanisms {PACT)
1.3 • Functionality, Access and Privacy of Sanitation Facilities {FAPSJ
1.4 Usage. Maintenance and Sustainability of Sanitation Assets {UMS).. .· · ..
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.A - State Periodic Review
118
S.No. Review category and list of issues and problems 2. Moving towards Nirmal Gram Puraskar
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
119
1" )!& -----------------------------------------------------------------------.....
AGREED PLAN OF ACTION
(Based on the outcomes of the visit, the periodic review team would discuss with the district/state project officials and prepare an agreed plan of action to be undertaken and completed before the next review)
S.N. Action to be. taken Responsibility .· ..
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.A - State Periodic Review
Date of Completion
120
., ~
------------------------------------------------------------~~
list of villages visited
S.N. ONam.'* (If 00 yillage • 0 Napu~ C)fSiocl(. Oo. 00
•000000 00 ••
00000 ~(arne of~the dit;triet .0
00 Vi$ited . 0 I· o00 0 • ..
000 0 0 : 00 °. 0.0 °
00 •. 0 •• Oo 00oo .00
List c)f persons met
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.A - State Periodic Review
121
~ -------------------------------------------------------------~~
DISTRICT PERIODIC REVIEW (Review commissioned by SWSM)
DISTRICT PERIODIC REVIEW REPORT
Name of the District State Dates of review
Score
Category Maximum Marks
.. 1 . Programmf}·quaUtativE! assessment 1QO 1.1 Generating demand & Creation of an Enabling 25
Environment (GDEE) 1.2 Promotion of Appropriate and Cost-effective Technology 25
and Alternative Delivery Mechanisms (PACT) 1.3 Functionality, Access and Privacy of Sanitation 25
Facilities (FAPS) 1.4 Usage, Maintenance and Sustainability of Sanitation 25
Assets (UMS) 2 .. ·•.·. Moving towards N.irmal Gram Puraskar 100 2.1 Coverage of sanitary latrines 30 2.2 Reduction in the practice of open defecation 30 2.3 Clean environment management 40 Total 200
1. Programme qualitative assessment
~
Marks Obtained
·.
Generating Demand & Creation of an Enabling Environment (GDEE)
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.B - District Periodic Review
122
~ ~ -------------------------------------------------------------~
Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT)
Functionality, Access and Privacy of Sanitation Facilities (FAPS)
Usage, Maintenance and Sustainability of Sanitation Assets (UMS)
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 11.8- District Periodic Review
123
~ ~ -----------------------------------------------------------------~
2. Moving towards Nirmal Gram Puraskar
Coverage of sanitary latrines
Reduction in the practice of open defecation
Clean environment management
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.B - District Periodic Review
124
Review Team
S.N. · Designati()n :<. ·:·.··· ·· Specialization · .Signature ·
Annexes
1. 3 .. 5.
Score sheet Agreed action plan List of districts and villages visited
2. 4.
List of issues and problems List of persons met
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/.B- District Periodic Review
125
~ ~ --------~---------------------------------------------------~
Score Sheet
1. Programme qualitative assessment
1.1 Generating demand & Creation of an enabling environment (GDEE) (To be assessed at district level)
i. Steps taken to ensure the central role of Gram Panchayats (GP) in TSC planning and implementation
ii. Comprehensive and well-designed IEC strategy and Plan at district Level worked out in a consultative manner and the quality of its implementation
iii. Quality and adequacy of District Level Project Implementation Plan (PIP) based on findings of baseline survey
iv. Well-defined project rules, systems and operational procedures in place and transparency in their application
v. Capacity development plan and activities for ZP, DWSMs and NGOs to achieve intended objectives and it's effective and time! implementation
Sub-total 25
M.al-ks .. · . ob.tained
1. 2 Promotion of Appropriate and Cost-effective Technology and Alternative Delivery Mechanisms (PACT) (To be assessed at district level)
i. Availability of a menu of area-specific lowcost/appropriate technological options for sanitation and demonstration of the same
ii. Close supervision of village proposals by district functionaries to ensure adherence to construction specifications, norms,. unit costs etc. and construction supervision by district to ensure good quality construction.
iii. Establishment of and close supervision of functioning of RSMs and PCs to ensure their success as alternative delivery mechanisms
iv. Adequacy of trained manpower district-wide, to promote the different technological options proposed
v. Efforts made by the districts to learn from best practices within the country
Sub-total 25
Design - M&E Module for Go/ (RGNDWM) ClJ$P /Total Sanitation Campaign Annex 1/.B - District Periodic Review
126
1.a Functionality, Access and Privacy of-Sanitation Facilities (FAPS) (To be assessed at village level)
<!Marks .. . bb,tabte~
r--~~~~~~~--~~~~~~~~~~~~~~~~~~~r
i. Availability of water for use in sanitary latrines either inside or outside
ii. Easy access to sanitation facilities without any stagnant pool of water on the wa
iii. Suitability of the design in terms of providing privacy to peo le, particularly women
iv. Community's adoption of sanitation designs, which are old /disabled /women/ child friendl
v. Availability of an institutional mechanism (informal/formal) for ensuring functionality, access and privac on a regular basis
Sub-total 25
1 .. 4 Usage, Maintenance and Sustainability of Sanitation Assets (UMS) (To be assessed at village level)
Mara ·· · bhtaaned Quality of maintenance and use of the sanitation facilities created
ii. Vibrancy, effectiveness and transparency in functioning of implementing agencies at communitylevel, so that sustainabilit is ensured
iii. Community Monitoring System in place, active and qualit I effectiveness of their activities
Sub-total
2. Moving towards Nirmal Gram Puraskar
2.1 Coverage of sanitary latrines (To be assessed at village/ district levels)
i. Community awareness regarding the hazards of open defecation and benefits of use of sanitary latrines leading to an increasing coverage of IHHLs, CSCs and SSLs including latrines for Anganwadis and Balwadis
ii. Efforts made by the VWSC I SO to demonstrate a range of technology options from no-cost to low-cost to medium-cost to high-cost so as to help people chose options best suited to them as per their affordability and requirements
Design- M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 11.8 - District Periodic Review
25
127
~ ~ ---------------------------------------------------------------~
iii. Local availability of technical know-how in the form of masons trained in all the technology options presented to the potential users
Total
2.2 Reduction in the practice of open defecation {To be assessed at village level)
i > ' Contributing. Factors ·.
i. Level of community consensus on eradicating the practice of open defecation/dry-latrines/manual scavenging
ii. A plan prepared by the communityNWSC to phase out open defecation/dry latrines/ manual scavenging
iii. A penalty imposed by the communityNWSC on people/households defecating in the open
Total
2.3 Clean environment management (To be assessed at village level)
Contributing Factors
i. Village level institutions such as GP, schools, self help groups, mahila mandals, youth clubs etc are sensitised and aware of the critical interconnections between sanitation, hygiene and health
ii. Formation of a Community Monitoring Group (CMG) to periodically monitor the environmental sanitation situation at the village level
iii. Village clean up campaigns are being organized frequently
iv. Healthy home surveys are being undertaken periodicaly
v. Village paths are clean vi. Drains, soak pits are built and are functional to ensure
no stagnant pool of water around water sources vii. Safe disposal of non bio-degradable solid waste is
ensured through garbage pits etc. viii. Safe disposal of bio-degradable solid waste is
ensured through composting methods Total
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.B- District Periodic Review
30
Maximum .Marks Marks Obtained
30
Maximum Marks Mar~s Obtained
40
128
LIST OF ISSUES AND PROBLEMS
S .. No. Review category and list of issues and J!roblems 1., Program _gualitative assessment
1.2 .. ·.·· ... Promqtion .. of Appropriateand Co~t-effectiye. rechnology·• iUld ..•• · •.···· }~lt~rn~thle .Delivery~Mechanisms {PACT)_· · . ·.···. · · ..•
·1·3· .. . · ... · .... .
· 11.4 ··••·· ··.. Osage, Malnt~nanc~ arid sustainabilltY ofSanitation Assets (UMS) ·
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 11.8 -District Periodic Review
129
I
~ ~ ---------------------------------------------------------------~
S.No. Review category and list of issues and problems 2. Moving towards Nirmal Gram Puraskar 2 .. t••··. Cowrage of $aril~ry latrines
..· ...
2.2·.······· .. · R~t.lttion in.the practice ofopen~efecaticm . :· .. :.
2~~·.········ .. ··. Clean environment management.·. .. . : . .
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.B- District Periodic Review
. ·.·. ·.··· ..
. .. ..
. ·.: • •• ...
..... · ~ .·
..
130
~ ~ ------------------------------------------------------------~ AGREED PLAN OF ACTION
(Based on the outcomes of the visit, the periodic review team would discuss with the district/state project officials and prepare an agreed plan of action to be undertaken and completed before the next review)
s~.,L~ ·· ... ·. Acttontobetakeri · .... ···· ·· · .. . .· .. ,·.·· .•.... ·.· .. ·. · ........ . .·.•.. • •·•··. ..••• • .• > .
·· .•... ···· .. · ·•·. Respoo$ibility . · Da~ .: · L •. of ....... . r ··... .··. : •· ..• · .. ·.. cornpleti.Qi. . ··
Design- M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Annex 11.8- District Periodic Review
131
~ ---------------------------------------------------------------~ list of villages visited
'S.~N.. Name<. Of.. village tNafJ1e>of Block 1 .. : visited .. :· · c · > · ·=
· .. Name of the district ··· • · .. . . . . . .. . .............. : ........ .
list of persons met
. S;N;.·· Narne6f'J)er~6n.met .•. ·•·•···· .... ·······•~·• ·._ ·· Oesig_nation __;_._ ___;;, • :Address.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex 1/.B- District Periodic Review
• .... · .. ··· .......... .
132
Inland letter (Planning Phase)
Gram Panchayat ---------------------- VWSC of Project ----------------------------------
Months for which report is prepared ----------------------------------------------------------------
How many times did the following activities take place during the last 2 months
S,.N~ . Activity ··. . . ... Number · of times · · ·. .. ·····. . .. ··. . .....
• •• .... ~~~tiv~ toc)k_l,tac• < .•
1. Focus group discussion 2. Video show 3 .. Street play 4 .. Cultural programme 5 .. Competitions 6 .. VWSC meeting 7.. Community-wide meeting 8. Cross-visit of VWSC/community members to other
successful villages/projects 9. Training
Has there been a decision/resolution by the community to take action to Yes __
stop open defecation? No
Whether community members, particularly women and other Yes --marginalized groups, are satisfied with the sites planned/selected for No most of the sanitation assets*?
Are people aware of the possible technology options that could be Yes __
chosen for IHHLs? No
Is the community satisfied with the assistance/facilitation being provided Yes --by the SO/ Consulting Agency? No
Has the community prepared a Community Action Plan (CAP) for Yes --sanitation in the village? No
the · ....
Note: *-Sanitation assets include sanitary latrines (indivtdual and community) and environmental sanitation assets (soak pitS; garbage pits, compost pits, drains, etc).
Any major problem that you may like to highlight
Siignature of Chairperson VWSC Signature of representative of CMG
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex 1/!A -Inland Letters
133
Inland letter (Implementation Phase)
Gram Panchayat ---------------------- VWSC of Project----------------------------------
Months for which report is prepared ----------------------------------------------------------------
How many times did the following activities take place during the last 2 months
Community-wide meeting Cross-visit of VWSC/community members to other successful villages/projects
4. Training
Whether community members have easy access to Rural Sanitary Marts/Production Centres?
Whether community members are actively involved in construction of sanitation assets as per CAP?
Whether community members, particularly women and other marginalized groups, are satisfied with the actual locations of most of the sanitation assets* constructed?
Is the community satisfied with the general quality of sanitation assets constructed in the village?
Is the community satisfied with the assistance/facilitation being provided by the SO/ Consulting Agency
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
--
--
Note: *-Sanitation assets mc/ude sanitary latnnes (Individual and community) and environmental sanitation assets (soak pits, garbage pits, compost pits, drains, etc).
Any major problem that you may like to highlight
Signature of Chairperson VWSC Signature of representative of CMG
Design - M&E Module for Go! (RGNDWM) CRSP /Total Sanitation Campaign Annex 11/.A - Inland Letters
134
~ ~
~
Inla
nd
Le
tte
r O
&M
Pha
se
A
B
c D
E
F
G
1. I
s th
ere
a tr
aine
d te
chni
cian
ava
ilabl
e lo
cally
for
mai
nten
ance
and
rep
air
activ
ities
? Y
es
No _
_ _
2. I
s cl
eanl
ines
s be
ing
mai
ntai
ned
in t
he v
illag
e? (
villa
ge d
rain
s an
d la
nes
are
clea
n, a
bsen
ce
of p
endi
ng a
roun
d w
ater
poi
nts
and
pro
pe
r dis
posa
l of g
arba
ge a
nd c
ow-d
ung)
? Y
es
No _
_ _
3. W
he
the
r al
l th
e sa
nita
ry la
trin
es (
indi
vidu
al/c
omm
unity
) ar
e be
ing
used
on
a da
ily b
asis
? Y
es
No _
_ _
De
tails
on
fu
nct
ion
alit
y an
d u
sag
e
Na.
m.e
of
EN
VIR
ON
ME
NT
AL
SA
NIT
AT
ION
H
ab
itatio
n
Do
me
stic
Ite
ms
Sp
lid w
ast
e It
em
s L
iqu
id w
ast
e It
ems
NU
Key
: N
U -
No
t use
d, N
F -
Not
Fun
ctio
nal,
SF
-w
ith
sep
arat
e fa
cilit
ies
for
girls
and
boy
s, W
SF
-w
ith
ou
t se
para
te f
acili
ties
for
girls
and
boy
s
De
sig
n-
M&
E M
od
ule
fo
r G
o/ (
RG
ND
WM
) C
RS
P I
Tot
al S
anita
tion
Cam
paig
n A
nn
ex
11/.A
-In
lan
d L
ett
ers
13
5
Has
the
prac
tice
of o
pen
defe
catio
n su
bsta
ntia
lly r
educ
ed/d
ecre
ased
in
the
villa
ge?
Yes
--
No -
-A
re m
ost
of t
he in
divi
dual
and
com
mun
ity s
anita
ry la
trin
es b
eing
use
d an
d cl
eane
d re
gula
rly?
Yes
--
No
Are
mos
t o
f the
com
mun
ity m
embe
rs u
sual
ly w
ashi
ng t
heir
han
ds a
fter
defe
catio
n?
Yes
__
No
Are
the
O&
M r
equi
rem
ents
of C
SC
s be
ing
met
by
the
GP
? Y
es --
No -
-A
re t
he O
&M
req
uire
men
ts o
f SS
Ls/A
WLs
/BW
Ls b
eing
met
by
the
PT
A/S
choo
l Aut
hori
ties
Yes
N
o
Has
the
GP
bee
n aw
arde
d th
e N
irmal
Gra
m P
uras
kar?
Y
es --
No
If th
e G
P w
as a
war
ded
Nirm
al G
ram
Pur
aska
r, a
re t
he 4
elig
ibili
ty c
ondi
tions
stil
l enf
orce
d?
Yes
N
o
Sig
nat
ure
Ch
air
pe
rso
n V
WS
C
Sig
nat
ure
of
rep
rese
nta
tive
of C
MG
De
sig
n -
M&
E M
od
ule
fo
r G
o! (
RG
ND
WM
) C
RS
P /T
ota
l San
itatio
n C
ampa
ign
An
ne
x 11
/.A -
Inla
nd
Le
tte
rs
~ ~
~
13
6
Dear Chairperson VWSC,
Community Feedback Report (Planning Phase)
We are in receipt of your letter and thank you for letting us know the situation of planning procE3ss in your village. We acknowledge your responses and are happy to note that you are keenly involved in the planning process. Our feedback on the situation of your village is as follows:
1. Number of habitations you have planned to cover through the project is: 2. Time taken since the work started is: 3. Community wide meeting held/not held for selecting technology options 4. Community action plan has been finalized/not finalized 5. Number of Households that are willing to construct lHHLs are:
6. You benefited from the following activities that took place in your village in last two months:
De$crlption of ActivitY . ' ',. 1]1~tbC:tl>l>enettiriJ•st.t\NQ.montbs: _. ,~ .' Focus group discussion Video show Street play Cultural program Competitions VW:SC meeting Community wide meeting Cross visit of VWSC Training
7. Must ensure that: );;>The approach focuses on motivating people to change existing behaviours and
practices and to get on to the sanitation ladder, 'Y The community members, particularly women and other marginalized groups, are
involved in site selection process, 'Y The communities are informed and involved in technology options selection process, 'Y The community action plan is discussed in community wide meetings and focuses on
eradicating open defecation practice; and management of clean village environment through solid waste and waste water disposal,
'Y All schools in the village plan to have separate toilets for girls and boys, 'Y You reach all households to motivate them to construct IHHLs and other village
improvement environmental items.
8. Our suggestions/ comments on issues raised by you in your letter: --------------------------------
Don't forget to post your next inland letter. Regards.
Signature of DWSC/ZP/Core Group Representative
Design - M&E Module for Go! (RGNDWM) CRSP I Total Sanitation Campaign Annex 11/.B- Feedback Reports
137
~ ----------------------------------------;~ ......
Dear Chairperson VWSC,
Community Feedback Report (Implementation Phase)
We are in receipt of your letter and thank you for letting us know the situation of implementation process in your village. We acknowledge your responses and are happy to note that you are keenly involved in the construction process. Our feedback on the situation of your village is as follows:
1. Amount received for construction under TSC project from DWSC/ZP is: 2. Total cost of project is: 3. Amount contributed by the community (PTA/GP) towards CSCs,SSLs, AWLs, BWLs
as against targeted contribution for the same is: % 4. Amount contributed by the households towards IHHLs as against targeted
contribution for the same is: % 5. Amount contributed by the households/community towards environmental sanitation
assets (garbage pits, compost pits, soak pits and drainage) as against households/community contribution towards all sanitation assets (individual and community) is: %
6. You benefited from the following activities that took place in your village in last two months:
·· Description of Activity That happened in last two months Focus group discussion VWSC meeting Community wide meeting Cross visit of VWSC Training
7. Must ensure that: . ~ The community members, particularly women arid other marginalized groups, are
involved in construction supervision · >- Community is aware of the quality, specifications and cost of material procured >- The sanitation assets created are at the sites and of quality mentioned in DPR >- The receipts and expenditures are updated, recorded and publicly displayed >- You reach all households who have opted for constructing IHHLs according to the
CAP but have still not done so
8. Our suggestions/ comments on issues raised by you in your letter: -------------------------
Don't forget to post your next inland letter. Regards.
Signature of DWSC/ZP/Core GroUJp Representative
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex /1/.B -Feedback Reports
138
~ ~ ------------------------------------------------------------~~
Dear Chairperson VWSC,
Community Feedback Report (O&M Phase)
We are in receipt of your letter and thank you for letting us know the situation regarding the usage and maintenance of the individual and community sanitation facilities and the status of the village environment improvement items in your village. We acknowledge your responses and our feedback on the situation of your village is as follows:
1. All the sanitary latrines (individual/community) are being used/ need to be used on a daily basis.
2. Cleanliness being maintained/needs to be maintained in the village.
3. A trained technician is available/ needs to be available locally for maintenance and repair activities.
4. Must ensure that:
~ The water points are clean ~ Village paths are clean ~ Village drains are regularly cleaned ~ Solid waste is being disposed of safely and regularly ~ SSLs/AWLs/BWLs/CSCs are being kept clean and used
5. Our suggestions/ comments on issues raised by you in your letter: ---------------------------
Don't forget to post your next inland letter. Regards
Signature of DWSC/ZP/Core Group Representative
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex /11.8- Feedback Reports
139
• Knowledge Links
National Level
State Level
District Level
Village Level
Proposed Management Structure: An Organogram (shaded boxes indicate additional staff positions)
-----·---~
Mission Director
I
IT Specialist I (Web Server J Manager)
Member Secretary SWSM
+ Member Secretary DWSM
Area Officers (Periodic Review Managers)
Panel of Professionals for Periodic Review
Panel of Professionals for District Periodic Review
I
Core Group Members (CD)
. '----------
. I
I .
I I I I
~ l l vws:J
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex IV- Management Structure
l 1 Core Group Members (Finance) _j
·-·-··-···-·
j
140
~~ Knowledge Links
Private Limited
'1"01!'11 SWIIf!ilii:II!UIIlltiii!D
Estimated Costs of Management of Proposed M & E System
Table 1. Estimated Unit Cost of State Periodic Review (Review commissioned by RGNDWM)
s. Item Unit Average Quantity Estimated Cost {Rs.) N. Rate Minimum Maximum Minimum Maximum
(Rs.) (3 member {5 member team) team)
A. ProfessioniJtCost. .. .. . · . · . ·,. ':· ', ····· ·' •· ' ..
1 External Person 3,000 30 50 90,000 1,50,000 Resource days (3 persons (5 persons Persons x 10 days) x 10 days)
2 Professionals Person 900 22 28 19,800 25,200 from project to days {1 person x {1 person x be reviewed 8 days+ (2 8 days+ (3
persons x 3 persons x 3 days + 1 days+ 1 person X person x 1day ) x 2 1day) x 2 districts} districts}
Sub-total 1,09,800 1,75,200 B. Trave.l cost ··· . .,. :·.,, ·' .. .
c . :: : . ' ' ··,,' ,. ' ',, .·· ..
1 For External 25,000 3 5 75,000 1,25,000 Resource Trip Persons
2 For Project Travel 500 18 22 9,000 11,000 Professionals {1 person x {1 person x
8 days+ (2 8 days+ (3 persons x 2 persons x 2 days+ 1 days+ 1 person x person x 1day) x2 1day)x2 districts} districts}
Sub-total 84,000 1,36,000 C. Boarding & Lod' ing :·: . . . ..
1 For External Person 1,500 30 50 45,000 75,000 Resource days Persons
,~ ,_ For Project Person 1,000 18 22 18,000 22,000 Professionals days Sub-total 63,000 97,000 Total 2,56,800 4,08,200 Average cost per state periodic review (assuming a 3 2,94,650 member team in 75% cases & a 5 member team in the Say Rs. 2.95 lakh remaining 25% cases)
•'
[Note: Costs are based on review scope covering review at state level, review at district level in 2 districts in the respective state and review of 6 project villages (3 villages in each of the 2 districts).}
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex V- Cost Estimates
141
Knowledge Links
Private Limited
T!ltiil Sl!llllF!IllilllllSI.iltill!l
Table 2. Estimated Unit Cost of District Periodic Review (Review commissioned by SWSM)
s. Item Unit Average Quantity Estimated Cost (Rs.) N. Rate Minimum Maximum Minimum Maximum
(Rs.) A. Professional Cost ·.·
.. '' 1 Resource Person 900 21 35 18,900 31,500
Persons from days (3 persons (5 persons a x 7 days) x 7 days) neighbouring project district
2 Professionals Person 900 13 13 11,700 11 ,700 . from project to days (2 persons (2 persons be reviewed x 5 days+ x 5 days+
1 person x 1 person x 3 days) 3 days)
Sub-total 30,600 43,200 B .. Travel Cost 1 Resource Person 5,000 3 5 15,000 25,000
Persons from Trips a neighbouring project district
2 For Project Travel 500 7 7 3,500 3,500 Professionals (2 persons (2 persons
x 3 days+ x 3 days+ 1 person x 1 person x 1 days) 1 daysj_
Sub-total 18,500 28,500 C. Boarding & lo<Js ing
'~
1 For Resource Person 1,000 21 35 21,000 35,000 Persons from days a neighbouring project district
2 For Project Person· 1,000 7 7 3,500 3,500 Professionals days Sub-total 24,500 38,500 Total 73,600 1,10,200 Average cost per district periodic review (assuming a 3 82,750 member team in 75% cases & a 5 member team in the Say Rs. 0.83 Lakh remaining 25% cases)
[Note: Costs are based on review scope covering review at district level and review of 3 project villages in the respective district.]
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex V- Cost Estimates
142
Table 3. Estimated Unit Cost of Additional Staff Positions (Proposed M&E Management Structure)
S.N. Staff Position No. of staff Rate per Annual Expenditure month {Rs.) (Rs.}
'"atit;Jn~t R'GNDWJ,il)Lttvel ... ,, '· ·,•• .. ·.,,. :' > . . ) · .. ·· ..•. ,·.· •.. · ' :;>.': ' < . >< ·.•."·•.··.'.,·:'···· .. ·· ...
1 M&E Coordinator 1 45,000 5,40,000 (RGNDWM)
2 Data Entry Operator 2 10,000 2,40,000
Sub-total 7,80,000 ~-t~JSWs.'l>L.•-v.!l.· :, ... ~ ... · .. · , .. ·· .·., ... ··•· ··· .. , ... • :'
.. . • :. '.• . ,·• •. > ,''.· · .. ·.··.··.{ ... / ... 1 M&E Coordinator 1 45,000 5,40,000
(State) 2 Data Entry Operator 1 10,000 1,20,000
Sub-total 780000 bi$tdc;f(ZPIQW$C) l.,;evEil•·:•··· •. .··• .. ·.····•·,·' . ·•.·· ·. ·····' ...... , ...... · .. ,.·· .... ·. : •<·
. ' ,·•"• \<···· ...... •• >
1 M&E Coordinator 1 35,000 4,20,000 (District)
2 Data Entry Operator 2 10,000 2,40,000 Sub-total 6,60,000
:·
'
Based on the above unit costs, annual estimated expenditure on having these additional staff positions at the national level and in all the states and districts of the country is calculated as follows:
(1) Expenditure at national (RGNDWM) level
(2) Expenditure at state (SWSM) level (35 states/UTs x Rs. 7.80 Lakh)
(3) Expenditure at district (ZP/DWSM) level (600 districts x Rs. 6.60 Lakh)
= Rs. 7.80 lakh
= Rs. 273.00 lakh
= Rs. 3960.00 lakh
Design - M&E Module for Go/ (RGNDWM) CRSP I Total Sanitation Campaign Annex V- Cost Estimates
143
S.N.
1. 1.1
1.2 1.21
1.2.2
2.· .. 2.1
2.2
KIHilwledge Links
Private Limited
'l'ilti!il Sllll«~r!IY COIISI!!tlll!l
Table 4. Estimated upfront costs (Operationa/isation of M&E system across the entire country)
Item Total Remarks Estimated Expenditure (Rs. Lakh)
Commis$iol'ling · • .. ·· ·.· •·. ... ·.:. . :· . ·.•• ··k .· .. ·.· .·······: ······ .·.· ..
:· .. · · ... ··•.···· •· AtRGNDWM 30.00 For 15 TOTs @ Rs. 2 lakh per TOT; A 5-day 3 TOTs to be organised at TOT on M&E MIS RGNDWM every year for 5 years
At state/district Commissioning of 70.00 For 140 DTPs (4 each in 35 computerised MIS through states/UTs) @ Rs. 0.50 lakh per a 5-day direct training DTP programme (DTP)
Commissioning of periodic review and community 175.00 For 35 TOTs (1 each in 35 monitoring through a 8- states/UTs) @ Rs. 5.00 lakh per day TOT TOT
· tr tacllities .• ·.· ;
·.··•
... · .··· .. '· .. .. ; . .: ..
.···. .. . : ~ .:: At RGNDWM level- 52.00 Rs. 10 lakh for hardware and 42 lakh (upgradation of Web for software to be invested by WSP-server for meeting the SA and RGNDWM respectively as initial requirement of 2/3 per the co-financing arrangement years - 10 states full between them. capacity or 15 states partial capacity) At state/district level No additional The required hardware and software is (purchase of computer costs generally available in all the states and hardware and software most of the districts. In few cases,
etc.) wherever it is not there, it could be purchased with existing provision with reference to the communication from JS, DDWS, MoRD, Gol to all Secretaries in-charge dated February 11, 2003. which states that RGNDWM would continue to support state governments for taking up computerization/MIS projects under ARWSP during the 10th Five Year Plan (2002-07).
Total 327.00
Note: If a five-year scenario is assumed (covering 7 states/UTs per year and thus covering all the 35 states/UTs in a span of five years), the upfront cost per year would be Rs. 65.40 lakhs.
Design - M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex V- Cost Estimates
144
s. Item N.
Knowledge Links
Private LDnited
Total SJ81111f!UiilDmll!ltill!ll
Table 5. Estimated recurrent costs (Operationalisation of M&E system across the entire country)
Annual Annual Recurring Annual Recurring Recurring Estimated Estimated Expenditure Estimated Expenditure as a as a % of funds Expenditure % of annual earmarked for software (Rs. Lakh) Swajaldhara & and administrative
CRSPJTSC expenses allocations
1. ·Maintenance ofrt.faciJities<· . . . . .. . ~ :-:::- .. ~~, .. " .. ~ --;; . ~..... ··. . . . . .
1.1 Web- server at No additional RGNDWM costs
1.2 Recurring expenditure 402.00 0.35 1.52 on maintenance of IT facilities in states/UTs and districts
2. Pc:Jriqdic .f:tevlew~ ... .. · ....... •. ...•. . . .• ; > •··~ .··•· ..• ~ .~. ·. ·. . ..••.•... ···~ ··.· > .. . ~. . ... .·
2.1 State Periodic 103.25 Reviews (not included in Should be funded the total) separately from project allocation with a M&E budget line at DDWSievel
2.2 District Periodic 498.00 0.44 1.89 Reviews Should fit into allocations for software activities .
3. M&E .n\al1agernent structure··· -:-'· . --:· ..
. ~ . .. . . .. .. . •· . . ... .· .
3.1 Expenditure at 7.80 national level (not included in Should be funded total) separately from project allocation with a M&E budget line at DDWSievel
3.2 Expenditure at state 4233.00 3.73 16.03 (SWSM) and district (ZP/DWSM) level Should fit into the allocations for administrative expenses Total 5133.00 4.52 19.44
Notes:
i) Swajaldhara allocations for 2003-04 is Rs.200 Crores and CRSP/TSC allocation for 4 years is Rs. 37 44 Crores. Thus, current annual Swajaldhara + CRSP/TSC allocation is taken as Rs. 1136 Crores,
ii) Funds earmarked for software and administrative expenses are: 15% of Swajaldhara allocations i.e. Rs. 30 crores, and 25% of CRSP/TSC allocations, i. e. Rs.234 crores.
Design- M&E Module for Go/ (RGNDWM) CRSP /Total Sanitation Campaign Annex V- Cost Estimates
145