7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
1/7
DATED MRR_NO SUPPLIER
2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 154 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 157 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT
2/10/2014 159 FIAT INDIA AUTOMOBILES LTD. (DR.)
2/10/2014 160 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.
2/10/2014 161 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.
2/10/2014 162 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.
2/10/2014 163 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.
2/10/2014 164 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.
2/12/2014 165 TATA MOTORS LTD-ERC
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
2/7
BILL_CHL CODE ITEM_NAME
5172 Dt.29/01/14 S122428 PIPE OUTLET
5172 Dt.29/01/14 201906710R DPF OUTLET TUBE 4X4 K9K STEP 4
5172 Dt.29/01/14 1150021252 H79 4X4 K9K PIPE V2-V3
5168 Dt.29/01/14 S126252 REAR EXHAUST SYSTEM ASM (BSIII)
5173 Dt.29/01/14 S140586 F24 MUFFLER ASSLY.
5173 Dt.29/01/14 S122436 BS IV INLET PIPE
5173 Dt.29/01/14 S134834 F-24 PIPE FOR TUBE EXHAUST ASSEMBLY
5171 Dt.29/01/14 201904822R TUBE SILENCER INLET K4M 4X2
5171 Dt.29/01/14 200911611R SILENCER OUTLET TUBE 4X4 K9K STEP 4
5171 Dt.29/01/14 200280189R H79 TUBE DECOUPLER OUTLET
5169 Dt.29/01/14 201003425R H79 REAR MUFFLER ASSY
5170 Dt.29/01/14 S125542 TAIL PIPE AL NISSAN
5170 Dt.29/01/14 201906387R H79 INLET PIPE TO REAR MUFFLER
5170 Dt.29/01/14 201902979R SILENCER INLET TUBE 4X2 K9K STEP4
7408825 Dt.17/12/13 A4000002 CONTROSTAFFA POST ( Linea Bracket )
6500018808 Dt.08/01/14 A4004900021 ZB EXAHUST GAS LINE ( 31 T Front Pipe )
6500018852 Dt.09/01/14 A4004900021 ZB EXAHUST GAS LINE ( 31 T Front Pipe )
6500018818 Dt.08/01/14 A4004900127 ASSLY FRONT PIPE 25 TON
6500018724 Dt.07/01/14 A4004900019 ZB EXAHUST GAS LINE FOR DAIMLER ( 31 T Flex Assy )
6500018710 Dt.07/01/14 A4004900019 ZB EXAHUST GAS LINE FOR DAIMLER ( 31 T Flex Assy )
7718341 Dt.04/02/14 5.51E+11 SUMO GOLD MUFFLER ASSLY.
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
3/7
UNIT RCVD DEFECT
NOS 643 SIZING PROBLEM & BENDING PROBLEM
NOS 0 SIZING PROBLEM
NOS 6 BENDING PROBLEM
NOS 183 BAFFLE INLET PIPE DAMAGE/ SCRATCH MARK
NOS 7 DENT & DAMAGE
NOS 349 SIZING NOT
NOS 168 SUPPLIER ISSUE(BENDING PROBLEM & CUTTING VARIATION)
NOS 3 SIZING PROBLEM
NOS 30 SHORT LENGTH & SIZING PROBLEM
NOS 48 DENT & DAMAGE
NOS 52 BAFFLE INLET PIPE DAMAGE/ SCRATCH MARK
NOS 14 SIZING PROBLEM
NOS 148 SHORT LENGTH
NOS 13 SHORT LENGTH
NOS 1 Over penetration ( 2012 Part )
NOS 14 Profile NG
NOS 6 Profile NG
NOS 6 Profile NG
NOS 2 Profile NG
NOS 1 Profile NG
NOS 4
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
4/7
CAUSE
PROPER BEND CHECKING GAUGE WAS NOT AVAILABLE>
VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>
MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY
1) BAFFLE INLET PIPE DAMAGE (FOULING OF PIPE WITH THE TOOL DURING END SPINNING).2) SCRATCH
MARK(DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD)DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD
SIZING NOT DONE AFTER SLOTTING OPERATION & IT WAS DISPATCHED WITHOUT CHECKING>OPERATOR NEGLIG
-
VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>
VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>
DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD
1) BAFFLE INLET PIPE DAMAGE (FOULING OF PIPE WITH THE TOOL DURING END SPINNING).2) SCRATCH
MARK(DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD)
OPERATION MISSING>OPERATOR NEGLIGENCE
MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY
MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY
-
Variation in welding fixture & checking gauge
Devp samples of May 13
Devp samples of May 13 , checking gauge , master sample was not avl
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
5/7
ACTION PLAN
NEW BEND & SIZING CHECKING GAUGE IS PROVIDED ON> REWORKED AND DISPATCHED
REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE>INDENT RAISED & APPROVAL IS PENDING
GAJANAN & SANTHOSH
CHANGE IN PACKING STD (BAFFLE ASSY CAN USE) SANTOSH SHINDE
100% INSPECTION TO BE DONE & AWARENESS PROGRAM TO OPERATORS TO BE GIVEN
GAJANAN & SANTHOSH
100% INSPECTION TO BE DONE & AWARENESS PROGRAM TO OPERATORS TO BE GIVEN
REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE> REWORK DONE FOR 3478 R PIPE
REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE>INDENT RAISED & APPROVAL IS PENDING
Part will be reworked and sent back
3 no. Samples each on welding fixture & checking gauge will be prepared and sent to Daimler & based on result ,
correction will be done in either fixture
Profile & gauge correction done at Ravian in Jan 14 ; samples submitted and approved by customer
Profile correction done at supplier end , checking gauge and drawing provided , not repeated from Jan 14
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
6/7
TARGET DATE.
REWORK PENDING REWORKED DISPATCHED
13.02.14 243 400 400
17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED) 0 61 59
28.02.2014
18.02.2014
17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED)
17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED)
28.02.2014
DISPOSAL
7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)
7/7
SCRAP REWORK COMPLETION REWORKED DISPATCHED SCRAP
19.02.2014 13.02.2014
2 17.02.2014 18.02.2014 19.02.2014
22 19.02.2014
TARGET DATE