    DATED MRR_NO SUPPLIER

    2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 153 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 154 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 155 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 156 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 157 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/3/2014 158 MAGNETI MARELLI SKH EXHAUST SYSTEM PVT.LTD-CHENNAI PLANT

    2/10/2014 159 FIAT INDIA AUTOMOBILES LTD. (DR.)

    2/10/2014 160 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.

    2/10/2014 161 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.

    2/10/2014 162 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.

    2/10/2014 163 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.

    2/10/2014 164 DAIMLER INDIA COMMERCIAL VEHICLES PVT. LTD.

    2/12/2014 165 TATA MOTORS LTD-ERC

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    2/7

    BILL_CHL CODE ITEM_NAME

    5172 Dt.29/01/14 S122428 PIPE OUTLET

    5172 Dt.29/01/14 201906710R DPF OUTLET TUBE 4X4 K9K STEP 4

    5172 Dt.29/01/14 1150021252 H79 4X4 K9K PIPE V2-V3

    5168 Dt.29/01/14 S126252 REAR EXHAUST SYSTEM ASM (BSIII)

    5173 Dt.29/01/14 S140586 F24 MUFFLER ASSLY.

    5173 Dt.29/01/14 S122436 BS IV INLET PIPE

    5173 Dt.29/01/14 S134834 F-24 PIPE FOR TUBE EXHAUST ASSEMBLY

    5171 Dt.29/01/14 201904822R TUBE SILENCER INLET K4M 4X2

    5171 Dt.29/01/14 200911611R SILENCER OUTLET TUBE 4X4 K9K STEP 4

    5171 Dt.29/01/14 200280189R H79 TUBE DECOUPLER OUTLET

    5169 Dt.29/01/14 201003425R H79 REAR MUFFLER ASSY

    5170 Dt.29/01/14 S125542 TAIL PIPE AL NISSAN

    5170 Dt.29/01/14 201906387R H79 INLET PIPE TO REAR MUFFLER

    5170 Dt.29/01/14 201902979R SILENCER INLET TUBE 4X2 K9K STEP4

    7408825 Dt.17/12/13 A4000002 CONTROSTAFFA POST ( Linea Bracket )

    6500018808 Dt.08/01/14 A4004900021 ZB EXAHUST GAS LINE ( 31 T Front Pipe )

    6500018852 Dt.09/01/14 A4004900021 ZB EXAHUST GAS LINE ( 31 T Front Pipe )

    6500018818 Dt.08/01/14 A4004900127 ASSLY FRONT PIPE 25 TON

    6500018724 Dt.07/01/14 A4004900019 ZB EXAHUST GAS LINE FOR DAIMLER ( 31 T Flex Assy )

    6500018710 Dt.07/01/14 A4004900019 ZB EXAHUST GAS LINE FOR DAIMLER ( 31 T Flex Assy )

    7718341 Dt.04/02/14 5.51E+11 SUMO GOLD MUFFLER ASSLY.

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    3/7

    UNIT RCVD DEFECT

    NOS 643 SIZING PROBLEM & BENDING PROBLEM

    NOS 0 SIZING PROBLEM

    NOS 6 BENDING PROBLEM

    NOS 183 BAFFLE INLET PIPE DAMAGE/ SCRATCH MARK

    NOS 7 DENT & DAMAGE

    NOS 349 SIZING NOT

    NOS 168 SUPPLIER ISSUE(BENDING PROBLEM & CUTTING VARIATION)

    NOS 3 SIZING PROBLEM

    NOS 30 SHORT LENGTH & SIZING PROBLEM

    NOS 48 DENT & DAMAGE

    NOS 52 BAFFLE INLET PIPE DAMAGE/ SCRATCH MARK

    NOS 14 SIZING PROBLEM

    NOS 148 SHORT LENGTH

    NOS 13 SHORT LENGTH

    NOS 1 Over penetration ( 2012 Part )

    NOS 14 Profile NG

    NOS 6 Profile NG

    NOS 6 Profile NG

    NOS 2 Profile NG

    NOS 1 Profile NG

    NOS 4

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    4/7

    CAUSE

    PROPER BEND CHECKING GAUGE WAS NOT AVAILABLE>

    VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>

    MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY

    1) BAFFLE INLET PIPE DAMAGE (FOULING OF PIPE WITH THE TOOL DURING END SPINNING).2) SCRATCH

    MARK(DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD)DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD

    SIZING NOT DONE AFTER SLOTTING OPERATION & IT WAS DISPATCHED WITHOUT CHECKING>OPERATOR NEGLIG

    -

    VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>

    VERNIER WAS USED INSTEAD OF RING GAUGE >RING GAUGE WAS NOT AVAILABLE>

    DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD

    1) BAFFLE INLET PIPE DAMAGE (FOULING OF PIPE WITH THE TOOL DURING END SPINNING).2) SCRATCH

    MARK(DAMAGE DURING TRANSPORT>PACKING STD NOT GOOD)

    OPERATION MISSING>OPERATOR NEGLIGENCE

    MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY

    MACHINE VARIATION DURING BENDING>PLY IN CLAMP & PRESSURE DIE ASY

    -

    Variation in welding fixture & checking gauge

    Devp samples of May 13

    Devp samples of May 13 , checking gauge , master sample was not avl

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    5/7

    ACTION PLAN

    NEW BEND & SIZING CHECKING GAUGE IS PROVIDED ON> REWORKED AND DISPATCHED

    REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE>INDENT RAISED & APPROVAL IS PENDING

    GAJANAN & SANTHOSH

    CHANGE IN PACKING STD (BAFFLE ASSY CAN USE) SANTOSH SHINDE

    100% INSPECTION TO BE DONE & AWARENESS PROGRAM TO OPERATORS TO BE GIVEN

    GAJANAN & SANTHOSH

    100% INSPECTION TO BE DONE & AWARENESS PROGRAM TO OPERATORS TO BE GIVEN

    REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE> REWORK DONE FOR 3478 R PIPE

    REPLACE THE PRESSURE DIE ASSY & CLAMP ASSY BY NEW ONE>INDENT RAISED & APPROVAL IS PENDING

    Part will be reworked and sent back

    3 no. Samples each on welding fixture & checking gauge will be prepared and sent to Daimler & based on result ,

    correction will be done in either fixture

    Profile & gauge correction done at Ravian in Jan 14 ; samples submitted and approved by customer

    Profile correction done at supplier end , checking gauge and drawing provided , not repeated from Jan 14

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    6/7

    TARGET DATE.

    REWORK PENDING REWORKED DISPATCHED

    13.02.14 243 400 400

    17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED) 0 61 59

    28.02.2014

    18.02.2014

    17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED)

    17.02.2014 (IMPLEMENTED AND WILL BE FOLLOWED)

    28.02.2014

    DISPOSAL

  • 7/22/2019 Worksheet in Internal Rejection_Week II (Compatibility Mode)

    7/7

    SCRAP REWORK COMPLETION REWORKED DISPATCHED SCRAP

    19.02.2014 13.02.2014

    2 17.02.2014 18.02.2014 19.02.2014

    22 19.02.2014

    TARGET DATE