Working Internationally Across the

Nuclear LifecycleUK Support to International Fusion

Ian Grayson

Amec Foster Wheeler Fusion Account Director

Page 2: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Fusion

Amec Foster Wheeler is a major

international engineering company

operating globally in more than 55

countries, and has been supporting Civil

Nuclear for more than 60 years.

We have participated in contracts

associated with ITER since 1994, and

were a founder member of European

Fusion Engineering and Technology

Group (EFET)

Page 3: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Fusion

• Fusion and ITER relies on

worldwide collaboration

• This mirrors how we like to

work

• We integrate projects and

teams to deliver the best

value for our clients

• Partnership is key

• This a UK strength

Page 4: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Fusion

• We work right across the lifecycle of design, build, operate

maintain and decommission

• Design

• Specialist Technology

• Remote Handling

• Construction Management

• Operations

• Decommissioning

Page 5: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Example Contracts

2011 – 2012

Radiation

Mapping

1994 -2004

Framework contract

contributing to

overall design of ITER

Engineering Design

1998

Development of

Plasma Facing

Components

2002

Developed a

low temperature

HIP cycle

2002- 2006

Supported

DEMO and Power

Plant Conceptual

Design studies

2004 - 2006

Site selection

studies

for ITER

2009-2013

Tokamak

Framework

Contract

VV analysis

2015- to date

Neutral Beam Remote

Handling System

Design, Manufacture, Install,

Commission

2016 – to date

Construction

Management

of ITER plant

2014 – to date

Test Blanket Module

Maintenance

Studies

2013-2015

Remote Environmental

Monitoring Framework

2013-2015

Engineering Support

In Radwaste Handling

& Storage

2014 - to date

Neutronics

Design

Support

Framework

2014 – to date

Test Blanket

Module Accident

Analyses

2013 – to date

First Wall Panels

Design & production

of prototypes

2015 – to date

Maintenance &

Remote Handling

Framework

2016 – to date

E C & I Design

Support Framework

2016 – to date

Deactivation

Analysis

2016 – to date

Contamination

Control &

Decontamination

Procedures

2016 – to date

ITER Simulator

Specification

Page 6: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

International Partnering

2011 – 2012

Radiation

Mapping

1994 -2004

Framework contract

contributing to

overall design of ITER

Engineering Design

1998

Development of

Plasma Facing

Components

2002

Developed a

low temperature

HIP cycle

2002- 2006

Supported

DEMO and Power

Plant Conceptual

Design studies

2004 - 2006

Site selection

studies

for ITER

2009-2013

Tokamak

Framework

Contract

VV analysis

2015- to date

Neutral Beam Remote

Handling System

Design, Manufacture, Install,

Commission

2016 – to date

Construction

Management

of ITER plant

2014 – to date

Test Blanket Module

Maintenance

Studies

2013-2015

Remote Environmental

Monitoring Framework

2013-2015

Engineering Support

In Radwaste Handling

& Storage

2014 - to date

Neutronics

Design

Support

Framework

2014 – to date

Test Blanket

Module Accident

Analyses

2013 – to date

First Wall Panels

Design & production

of prototypes

2015 – to date

Maintenance &

Remote Handling

Framework

2016 – to date

E C & I Design

Support Framework

2016 – to date

Optimisation of

ITER Deactivation

Scenario

2016 – to date

Contamination

Control &

Decontamination

Procedures

2016 – to date

ITER Simulator

Specification

Page 7: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Specialist Technology

First Wall Panels – development of prototypes

and specialist bonding technologies

• Spanish partners Iberdrola and Leading

Enterprises

Test Blanket Modules – Safety Analyses of

unique experimental plasma facing assemblies

• USA partner Idaho National Labs

Plant Simulation

• Finnish partners Fortum & VTT and CCFE

Page 8: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Remote Handling

UK leading 50% of major Remote

Handling packages for ITER

• Neutral Beam Remote Handling

System: Amec Foster Wheeler with 2

Finnish, 1 French, 1 German, 1

Belgian, and 2 UK partners

• Diverter Remote Handling System:

Assystem UK with 2 Finnish and 2 UK

partners

Page 9: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Remote Handling

• European Domestic Agency

Intelligent Client support

framework UK led: Oxford

Technologies Ltd

• 50% of ITER Organisation

Maintenance & Remote

Handling framework held by

UK Companies (Amec Foster

Wheeler/OTL and Assystem

UK)

Page 10: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Remote Handling

Why Partner?

• Best Value to client

• Reduce Risk

• Increase Capability across niche areas

Page 11: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Construction

Construction Management as Agent

• Amec Foster Wheeler led

Consortium

• Assystem (France)

• KEPCO (South Korea)

Page 12: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Construction

Partner with client and 2 international partners to bring expertise and

experience

Page 13: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Operations

• UK has the largest operational Fusion

facility with JET

• Facilities for proving operation prior

to shipping to site

• New Investment in High Temperature

Facility (Private, Academia, and UK

Government Facility)

• Specialist materials analysis

• R&D

• RACE

Page 14: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Decommissioning

Analysis of plant for waste

and decommissioning

• Partnership with Nukem

from Germany and

EAI France

Page 15: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Summary

• Amec Foster Wheeler and the UK in general are highly

committed and well placed for the Fusion market

• We are doing much more than is always immediately apparent

• UK Government is encouraging UK innovation through support

of new facilities

• We welcome working with international partners, and have a

track record of delivering win-win-wins through such

arrangements

Page 16: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification

Any Questions?

Page 17: Working Internationally Across the Nuclear Lifecycle · Working Internationally Across the Nuclear Lifecycle ... DEMO and Power Plant Conceptual ... ITER Simulator Specification