15
Working Group Meeting #10 UMASS Springfield – Tower Square Springfield, Massachusetts June 28, 2017

Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Working Group Meeting #10

UMASS Springfield – Tower SquareSpringfield, Massachusetts

June 28, 2017

Page 2: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

2

Welcome & Introductions

June 28, 2017

Ethan Britland – Project Manager (MassDOT)

Michael Clark – Transportation Planner (MassDOT)

Mark Arigoni, L.A. – Principal-in-Charge (MMI)

Van Kacoyannakis, P.E. – Traffic (MMI)

Tim Baird, AICP – Planner (MMI)

John Hoey - QA/QC (MMI)

Sarah Paritsky – Public Involvement (Regina Villa)

Page 3: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

3

Agenda

Welcome and Introductions

Three Alternatives

Evaluation Criteria (Presentation & Workbook Walk Through)

Evolution of Evaluation Criteria

Evaluation of No-Build & the (3) Alternatives

Discussion of Ratings

Discussion of Recommendations

Next Steps/Process

June 28, 2017

Page 4: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Current Redevelopment

Blocks

Alternative #1

Conceptual Planning Study: This graphic represents a hypothetical development scenario that could be representative of potential future development along the I-91 Viaduct Corridor and is shown for general informational purposes. Any actual future development that occurs along this corridor may vary from this conceptual representation.

Sunken I-91 Following Same AlignmentElevated Park over

Existing Railroad

Parking Garage & Redevelopment

Realigned East-West Columbus Boulevard

Page 5: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Current Redevelopment

Blocks

Alternative #2

Conceptual Planning Study: This graphic represents a hypothetical development scenario that could be representative of potential future development along the I-91 Viaduct Corridor and is shown for general informational purposes. Any actual future development that occurs along this corridor may vary from this conceptual representation.

Elevated Park over Existing Railroad

Sunken I-91 shifted Alignment Adjacent to Railroad Alignment

Realigned East-West Columbus Boulevard

Columbus/Boland/Memorial Round-about

Page 6: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Current Redevelopment

Blocks

Alternative #3

Conceptual Planning Study: This graphic represents a hypothetical development scenario that could be representative of potential future development along the I-91 Viaduct Corridor and is shown for general informational purposes. Any actual future development that occurs along this corridor may vary from this conceptual representation.

Rebuilt/Elevated Viaduct Same Alignment

Removal of I-91 South Parking Garage

Page 7: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

7

Evolution of Evaluation Criteria

Completion of Comprehensive Evaluation Criteria & Ratings

Mobility & Accessibility, Safety, Environmental Effects

Additional Air & Noise Analysis Completed

Land Use & Economic Development

Community Effects, and Cost

MASSDOT & MASSDPH Coordination Continues

o

o

o

o

June 28, 2017

Page 8: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

8

Refinement of Evaluation Criteria

o Mobility & Accessibility

o Safety

o Environmental Effects

o Land Use & Economic

Development

o Community Effects

o Cost

A lot of Detail – too much to present on a screen

June 28, 2017

Page 9: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

9

Evaluation Criteria Work Book

A workbook was developed to function as a stand alone document that provides support information along with the actual Evaluation Criteria. The support information is intended to assist in the understanding of the Detailed Evaluation Criteria and includes the Criteria, Descriptions, Ratings, and Mapping.

June 28, 2017

Page 10: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

10

Evaluation Criteria Work Book

The Evaluation consists of a rating system that provides a value to each criteria. The alternatives have been assessed based upon the criteria and a value/rating has been given for each alternative and the no-build. These ratings are based upon the information provided and can be either qualitative, quantitative, or both.

June 28, 2017

Harvey Ball System

Page 11: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

11

Evaluation Criteria Work Book

June 28, 2017

Page 12: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Project Schedule

12 June 28, 2017

Project Extension to October 2017

Page 13: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Next Steps

13

Recommend Preferred Alternative

Additional Working Group Meeting

Final Public Informational Meeting

Final Report & Public Comment Period

June 28, 2017

Page 14: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

Contacts:

Ethan Britland, Project Manager

Phone: 857-368-8840

Email: [email protected]

Questions & Comments

14 June 28, 2017

Michael Clark, Transportation Planner

Phone: 857-368-9800

Email: [email protected]

Study Website Link:www.massdot.state.ma.us/i91viaductstudy

Page 15: Working Group Presentation - Mass.Gov · (Presentation & Workbook Walk Through) Evolution of Evaluation Criteria Evaluation of No-Build & the (3) Alternatives. Discussion of Ratings

THANK YOU FOR

YOUR PARTICIPATION

March 23, 201715